PRIME MINISTER -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom – Happiness --------------- No. 428/QĐ-TTg Hanoi, 18 March 2016 DECISION THE APPROVAL OF REVISIONS TO THE NATIONAL POWER DEVELOPMENT PLAN FROM 2011 TO 2020 WITH VISIONS EXTENDED TO 2030 PRIME MINISTER Pursuant to the Law on Government Organization dated 19 June 2015; Pursuant to the Law on Electricity dated 03 December 2004 and Law on amendments and supplements to the Electricity Law dated 20 November 2012; Pursuant to the Government’s Decree No. 137/2013/ND-CP dated 21 October 2013 on the enforcement of certain articles of the Electricity Law and the Law on amendments and supplements to the Electricity Law; In consideration of the Letter No. 13649/TTr-BCT dated 31 December 2015 and the Official dispatch n o 1703/BCT-TCNL dated 29 February 2016 by the Ministry of Industry and Trade, and standpoints from Ministries and sectors on the Scheme for revisions to the National power development plan from 2011 to 2020 with visions extended to 2030, DECIDES: Article 1. The scheme for revisions to the National power development plan from 2011 to 2020 with visions extended to 2030 (referred to as the revised Power Plan VII) on the following terms is approbated. 1. Outlook on development: a) Develop the power sector in front to dispense adequate electricity and satiate clamors for economic - social development and citizens’ daily electrical consumption.

Transcript of Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No....

Page 1: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

PRIME MINISTER--------

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom – Happiness

---------------

No. 428/QĐ-TTg Hanoi, 18 March 2016

 

DECISION

THE APPROVAL OF REVISIONS TO THE NATIONAL POWER DEVELOPMENT PLAN FROM 2011 TO 2020 WITH VISIONS EXTENDED TO 2030

PRIME MINISTER

Pursuant to the Law on Government Organization dated 19 June 2015;

Pursuant to the Law on Electricity dated 03 December 2004 and Law on amendments and supplements to the Electricity Law dated 20 November 2012;

Pursuant to the Government’s Decree No. 137/2013/ND-CP dated 21 October 2013 on the enforcement of certain articles of the Electricity Law and the Law on amendments and supplements to the Electricity Law;

In consideration of the Letter No. 13649/TTr-BCT dated 31 December 2015 and the Official dispatch no 1703/BCT-TCNL dated 29 February 2016 by the Ministry of Industry and Trade, and standpoints from Ministries and sectors on the Scheme for revisions to the National power development plan from 2011 to 2020 with visions extended to 2030,

DECIDES:

Article 1. The scheme for revisions to the National power development plan from 2011 to 2020 with visions extended to 2030 (referred to as the revised Power Plan VII) on the following terms is approbated.

1. Outlook on development:

a) Develop the power sector in front to dispense adequate electricity and satiate clamors for economic - social development and citizens’ daily electrical consumption.

b) Utilize domestic primary energy supplies effectively while importing electricity and fuels proportionately to diversify primary energy sources for electricity generation. Prioritize the development of electric power from renewable energy, achieve breakthrough in national energy assurance, contribute to the conservation of energy resources and curtail adverse impacts on the environment from electricity production. c) Develop electrical sources and grids synchronously from the basis of resources and clamors for economic and social growth; make investments in

Page 2: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

balance between electrical source growth and electricity demand by area for rational and efficient exploitation of each area’s primary energy resources.

d) Develop 220kv and 550kv transmission lines of the national power system to maintain the transmission of electric power from power centers to load centers in safe, reliable and economical manners; hone in small-scale sources of renewable-energy based power connected to transmission lines to redound to the reduction of power loss.

dd) Augment the quality of electricity gradually to achieve higher excellence in provision of electrical services.0} Implement market-based pricing policy to attract investments into the power sector; encourage the economical and efficient consumption of electricity.

e) Develop the competitive electricity market according to plan in order to diversify approaches for business and investment in electricity.   The government shall solely retain its monopoly in transmission lines to secure the national power system.

2. Objectives

a) General objectives:

Mobilize all domestic and global resources for electricity development to maintain the supply of ample electric power of higher quality at reasonable price for the nation's growth in economy and society; utilize varied resources of primary energy for effective production of electricity; fortify the development and use of renewable energies for electricity generation to gradually enhance the volume of electricity generated by renewable energies to alleviate dependence on coal imports for electricity production, contribute to power security, mitigate climate changes, protect the environment and develop economic and society in sustainable manners; establish and develop smart electrical systems compatible with high-proportion resources of renewable energy.

b) Specific objectives:

- Supply adequate electricity on nation-wide scale for the national goals of economic - social development, which aim at an average GDP growth rate of 7.0% per year from 2016 to 2030:

+ Commercial electricity: about 235 - 245 billion kWh by 2020; about 352 - 379 billion kWh by 2025; about 506 - 559 billion kWh by 2030.

+ Electricity generated and imported: about 265 - 278 billion kWh by 2020; about 400 - 431 billion kWh by 2025 and 572 - 632 billion kWh by 2030.

- Prioritize the development of renewable energy resources for electricity production; increase the proportion of electric power generated by renewable energies (excluding large-scale, medium-scale and pumped-storage hydropower) at about 7% by 2020 and over 10% by 2030.

Page 3: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- Construct flexible electrical grids highly automated from transmission to distribution; develop electrical substations unmanned or minimally manned to improve the labor productivity of the power sector.

- Accelerate electrification programs for rural and mountainous areas to assure the supply of electricity to the majority of rural households by 2020.

3. National power development plan:

a) Power source development plan:

- Course of growth:

+ Balance the growth of source output in northern, central and southern regions, maintain reliability of power supply of each region’s power system to lessen transmission loss, share reserve source output and exploit hydropower plants effectively in wet and dry seasons.

+ Develop power centers rationally in combination with the growth of small-scale and medium-scale power sources on nation-wide scale to maintain reliability of local power supply, reduce loss in the national power system, assure projects' economical quality, and contribute to the economic - social growth of each area and the nation.

+ Develop new power sources on par with in-depth investment and technology innovation in power plants in operation; fulfill environmental standards; utilize modern technology in new power plants.

+ Diversify forms of investment into power sources to augment competitiveness and economic effects.

- Power source development plan:

+ Expedite the growth of renewable energy based power sources (hydropower, wind power, solar power, biomass, etc.) to escalate gradually the proportion of electric power generated by renewable energies in the structure of power sources:  

. Prioritize the development of hydropower sources, particularly projects for combined benefits (flood prevention, water supply, electricity production); conduct studies to operate pumped-storage hydropower plants commensurate with the growth of the national power system in order to advance the performance of power systems. Total capacity of hydropower sources (including small-scale, medium-scale and pumped-storage hydropower) shall be raised from nearly 17,000 MW at present to about 21,600 MW by 2020, to about 24,600 MW by 2025 (1,200 MW for pumped-storage hydropower) and about 27,800 MW by 2030 (2,400 MW for pumped-storage hydropower). The ratio of hydropower shall be about 29.5% by 2020, about 20.5% by 2025 and about 15.5% by 2030.

Page 4: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

. Total capacity of wind power shall soar from 140 MW at present to about 800 MW by 2020, about 2,000 MW by 2025 and about 6,000 MW by 2030. The ratio of wind-based electricity shall be about 0.8% by 2020, about 1% by 2025 and about 2.1% by 2030.

. Develop biomass-based power sources through cogeneration at sugar mills and food processing factories; use biomass and coal simultaneously in coal-fired power plants; produce electricity with solid waste, etc. The ratio of biomass-based power shall reach about 1% by 2020, about 1.2% by 2025 and about 2.1% by 2030.

. Spur the development of solar power sources, including ground-mounted and rooftop solar power sources, for total output of solar power to surge from inconsiderable amount at present to about 850 MW by 2020, about 4,000 MW by 2025 and about 12,000 MW by 2030. The ratio of solar power shall be about 0.5% by 2020, about 1.6% by 2025 and about 3.3% by 2030.

+ Develop thermal power stations proportionately in accordance with the availability and allocation of fuels:

. Thermal power based on natural gas and liquefied natural gas (LNG): total capacity by 2020 shall reach 9,000 MW for generation of about 44 billion kWH of electricity that makes up 16.6% of the power produced; total capacity by 2025 shall reach 15,000 MW for generation of about 76 billion kWh of electricity that makes up 19% of the power produced; total capacity by 2030 shall reach 19,000 MW for generation of 96 billion kWh of electricity that makes up 16.8% of the power produced.

Southeastern region: stabilize the supply of gas to power plants in Phu My, Ba Ria and Nhon Trach.

Southwestern region: convey gas from Lot B ashore by 2020 to power plants in power centers in Kien Giang and O Mon, with total capacity of about 4,500 MW.

Central region: power plants with total capacity of about 3,000 - 4,000 MW shall be developed according to plan by 2020, which consume 3.0 to 4.0 billion m3 of gas per year.

Develop warehouses and ports for LNG imports in Son My (Binh Thuan) to supply gas to power centers in Phu My and Nhon Trach upon the decline in natural gas in eastern areas; conduct research on additional supply of gas to power centers in Ca Mau and O Mon through pipelines linked with gas systems in eastern areas and southwestern region.

. Coal-based thermal power: maximize the consumption of domestic coal for development of thermal power stations, prioritize the use of domestic coal for thermal power stations in northern region. Total capacity by 2020 shall be 26,000 MW for generation of about 131 billion kWh of electricity that makes up about 49.3% of the power produced and consumes about 63 million tons of coal. Total capacity by 2025 shall be about 47,600 MW for generation of about 220 billion kWh of electricity that makes up about 55% of the power produced and consumes about 95 million tons of coal. Total capacity by 2030 shall be about 55,300 MW for generation of 304 billion kWh of electricity that makes up 53.2% of the power produced and consumes about 129

Page 5: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

million tons of coal. Due to limitations in domestic coal production, some thermal power stations in power centers in Duyen Hai, Long Phu, Song Hau, Long An … shall be developed to consume coal imports.

+ Develop nuclear power plants to stabilize the supply of electricity in the future when domestic primary energies are exhausted: the first nuclear power generator set to be operated in 2028, the output of nuclear-based electric power to reach 4,600 MW by 2030 to produce about 32.5 billion kWh of electricity, making up 5.7% of the power produced.

+ Import and export of electricity: conduct effective electricity exchange among regional countries, maintain reciprocal interests, intensify exchange for electrical system security, boost imports in areas with hydropower potential, firstly in South East Asian nations (ASEAN) and Greater Mekong Subregion (GMS)

- Electricity source structure:

+ By 2020:

. Total capacity of power plants shall reach about 60,000 MW: large-scale, medium-scale and pumped-storage hydropower makes up about 30.1%, coal-based thermal power makes up 42.7%, gas-based thermal power (including LNG) makes up 14.9%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 9.9%, and 2.4% is imported.

. Total product of electricity generated and imported is 265 billion kWh: large-scale, medium-scale and pumped-storage hydropower makes up about 25.2%, coal-based power makes up 49.3%, gas-based thermal power (including LNG) makes up 16.6%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 6.5%, and 2.4% is imported.

+ By 2025:

. Total capacity of power plants shall reach about 96,500 MW: large-scale, medium-scale and pumped-storage hydropower makes up about 21.1%, coal-based thermal power makes up 49.3%, gas-based thermal power (including LNG) makes up 15.6%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 12.5%, and 1.5% is imported.

. Total product of electricity generated and imported is 400 billion kWh: large-scale, medium-scale and pumped-storage hydropower makes up about 17.4%, coal-based power makes up 55%, gas-based thermal power (including LNG) makes up 19.1%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 6.9%, and 1.6% of electricity is imported.

+ By 2030:

Page 6: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

. Total capacity of power plants shall reach about 129,500 MW: large-scale, medium-scale and pumped-storage hydropower makes up about 16.9%, coal-based thermal power makes up 42.6%, gas-based thermal power (including LNG) makes up 14.7%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 21%, nuclear power makes up 3.6% and 1.2% of electricity is imported.

. Total product of electricity generated and imported is 572 billion kWh: large-scale, medium-scale and pumped-storage hydropower makes up about 12.4%, coal-based power makes up 53.2%, gas-based thermal power (including LNG) makes up 16.8%, renewable energy based power (including small-scale hydropower, wind power, solar power, biomass-based power) makes up 10.7%, nuclear power makes up 5.7% and 1.2% is imported.

The list and operational schedule of power source projects are available in Appendix I of this Decision.

b) Electrical grid development plan:

- Course of growth:

+ Construct and upgrade electrical grids to apply gradually technical criteria of transmission lines to achieve N-1 reliability criterion for main equipment by 2020 and maintain compliance with regulated standards of quality.

+ Settle issues of overload, network congestion and poor voltage quality on transmission lines; and maintain supply of power with elevated reliability to load centers.

+ 500kV transmission lines shall be constructed to transmit electricity from major power centers to load centers, connect regional power systems and exchange electricity with regional countries.

+ 220kV transmission lines shall be constructed in double loop circuit structure, and electric substations with high load density must be logically designed and planned for flexible operations. Conduct research on the construction of GIS substations, 220/22kV substations, underground substations, unmanned substations in load centers. Implement smart grid technology in power transmission.

- Table 1 demonstrates the capacity of transmission lines by construction phase:

Table 1. The capacity of transmission lines to be constructed by 2030

Item Unit 2016 - 2020 2021 - 2025 2026 - 2030

500kV station MVA 26,700 26,400 23,550

220kV station MVA 34,966 33,888 32,750

500kV lines km 2,746 3,592 3,714

220kV lines km 7,488 4,076 3,435

Page 7: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- The following essential power grid projects must be on schedule from 2016 to 2020 to supply power in need in southern provinces:

+ 500kV works: Upgrade of 500kV capacitor banks on all 500kV lines throughout the country; construction of 500kV lines in Vinh Tan - Re Song May - Tan Uyen, Duyen Hai - My Tho - Duc Hoa, Long Phu - O Mon, Song Hau - Duc Hoa; construction of 500kV substation named Pleiku 2 (operated in 2016).

+ 220kV lines in Ha Tinh - Da Nang (operated in 2017), Binh Long - Tay Ninh (2016 - 2017), Vinh Tan - Thap Cham - Nha Trang and Vinh Tan - Phan Thiet - Ham Tan - Tan Thanh.

The list and progress of transmission line renovation and investment projects are available in Appendix II of this Decision.

c) Connection of power grids to regional countries:

- Continue research on collaboration and connection power grids among nations in ASEAN and GMS.

- Connect power grids with Laos via 220kV lines to import hydroelectricity from southern and central Laos.

- Maintain connection with Cambodian power grids via existing 220kV lines; conduct research on the viability of enhanced power grid connection between Vietnam and Cambodia through mutual and multilateral cooperation programs.

- Maintain connection and trade of electricity between Vietnam and China via existing 220kV and 110kV infrastructure; conduct research on solutions for asynchronous connection of power systems through direct - alternating current conversion stations. Continue studies on the viability of electricity exchange with China through connected 500kV power grids.

d) Supply of electricity to rural and mountainous areas and islands:

Carry on power supply programs for rural and mountainous areas and islands according to Prime Minister's decisions; provide electric power from national power grids and new energy resources to rural and mountainous areas and islands; accomplish the objective of supplying power to most rural households by 2020.

dd) Total investment demand:

Total investment in the development of power sources and grids (excluding BOT investments) from 2016 to 2030 is about 3,206,652 billion dongs (equivalent to 148 billion US dollars), in the following phases:

Page 8: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- From 2016 to 2020: about 856,660 billion dongs (equivalent to nearly 40 billion US dollars, averagely 7.9 billion US dollars per year) 75% of investments are poured into power sources and 25% into power grids.

- From 2021 to 2030: about 2,347,989 billion dongs (equivalent to nearly 108 billion US dollars, averagely over 10.8 billion US dollars per year) 74% of investments are poured into power sources and 26% into power grids.

4. Solutions for execution of plans

a) Solutions for national power assurance:

- Vietnam Electricity Corporation (EVN), Vietnam National Oil and Group (PVN) and Vietnam National Coal - Mineral Industries Holding Corporation Limited (Vinacomin) are held mainly responsible for developing power sources. National Power Transmission Corporation is held responsible for developing transmission lines.

- Diversify fuels and primary energies for electricity production.

- Adopt solutions to increase the ratio of power sources exploiting renewable energies by establishing policies and legislative documents with suitable encouragement policies to spur the growth of power sources based on renewable energies, including supportive pricing policies for projects exploiting wind power, solar power, biomass, geothermal energy, etc.

- Implement plans for solid development of nuclear power in conformity to the laws and maintain safety and efficiency of top objectives. Cooperate with other nations and international organizations to urge the use of nuclear energy; gradually master technology and develop nuclear power for peaceful purpose.

- Implement preferential finance policies and expand international cooperation to intensify the search, survey and increase of reserves and competency for exploitation of coal, gas and renewable energies, maintain and secure the supply of fuels and energy for electricity production.

- Seek additional resources of gases that will decrease and become exhausted. Speed up negotiations with other countries to enter contracts for stable and long-term import of coal for thermal power stations.

- Focus on the construction of coal entrepots in each region to optimize coal import expenses; quicken the search and negotiation for stable and long-term import of coal and LNG for power stations.

b) Solutions for financing power development:

- Expedite the equitization of corporations and power generation companies under EVN, PVN and Vinacomin.

Page 9: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- Gradually augment power companies’ ability to mobilize internal finances by enhancing their efficiency and performance and maintaining accumulations and self-financed capital for development investment as per requests by local and international financial organizations to make their self-financed capital as the main source of finances for power-related facilities.

- Develop power groups and corporations with high financial credibility to lower costs of capital mobilization and self-finance power projects without the Government's guarantee.

- Mobilize more capital by issuing bonds domestically and abroad to gain investments in power works and adopt methods to convert domestic savings to investments in infrastructure. The government, at the initial stage, shall underwrite bond issues for major and urgent power projects.

- Establish local and overseas joint ventures to attract foreign investors and other nations to engage in power projects, development of coal entrepots and infrastructure for LNG projects.

- Equitize power companies, in which the government's full holding is not essential.

- Intrigue foreign direct investment (FDI) into power projects. Prioritize FDI projects that use local currency or barter and do not request the government’s guarantee.

- Appeal to foreign investments in power-related facilities from preferential and non-preferential official development assistance, foreign commercial loans, etc.

c) Electricity pricing solutions:

- Implement market-based pricing policy under the government's regulation, harmonize the government's political - economic - social goals with power companies' aims in business and financial autonomy. Electricity pricing must energize electricity development, create an investment magnet and encourage competition in production, transmission, distribution, retail and consumption of electric power.

- Electricity pricing must recover expenses and generate reasonable profit (for investments in reproduction and expansion) to assure power companies’ financial autonomy.

- Continue renovating and completing current electricity tariff towards:

+ Adjustment of electricity price commensurate with the fluctuation of fuel price, exchange rate, electricity production and market prices.

+ Gradual cutback of cross subsidy in customer groups, regions; conduct studies on seasonal and area-based pricing.

+ Division of electricity price in two components: output price and electrical energy price, which shall first apply to major customers.

Page 10: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- Electricity pricing must consider traits of regions and residents at borders, islands, rural and mountainous areas ... and regulated subsidy and tax preference necessary for shrinkage of power consumption gaps, promotion of economic - social growth and urbanization among areas and resident groups, between highland and lowland, between rural and urban areas.  

- Electricity price is gradually revised to establish the long run marginal cost of power systems, in order to assure the sustainable growth of the power sector and meet demands for investments in power systems.

- Electricity pricing must aim at conserving energy, avoiding the dilapidation of non-renewable energy, encourage the rational consumption of energies and use of domestic energy resources, and lessen reliance on energy import.

d) Solutions for management innovation and electricity-related performance improvement:

- Conduct research and implement management models commensurate with the power sector to elevate labor productivity, quicken investments in power projects and enhance reliability in power system operation.

- Restructure the power sector to gradually develop a sound competitive electricity market from the basis of maintaining and securing power supply, lessening costs, improving effectiveness in power production and trade; give out price signals in explicit and transparent manners to attract investments and sustainably develop the power sector.

dd) Environmental protection solutions:

- Abide by legal regulations on projects' environmental impact assessment and appraise strategic ambiance as defined in plans.

- Strengthen governmental authorities’ management of environmental affairs and electricity-related companies.

- Use ash and cinders from coal-based thermal power stations for production of building materials and other industries to shrink refuse grounds in thermal power projects according to regulations.

- Monitor, observe, measure and manage environmental criteria in thorough manner; inspect power companies' compliance with environmental protection regulations.

- Implement power saving programs effectively, augment performance in production, transmission, distribution and consumption of electricity.

- Associate the development of the power sector with the protection of the environment:

+ The government adopts supportive policies regarding investment and taxation for the development of low-impact energies and environmental improvement through new and

Page 11: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

renewable energies; for use of refuse from agriculture, forestry and urban areas to produce electricity, etc.

+ Manage the environmental aspect of the electricity generation technology in strict manner. Technologies selected must be advanced, highly productive and least influential in the environment.

- Establish financial regulations on the power sector for accurate and full inclusion of environmental expenses in investments and cost price.

- Encourage companies producing and consuming various forms of energy to enhance their cooperation with nations for clean development mechanism (CDM) by development of new and renewable energies; elevate efficiency in energy consumption and development of energy conservation projects.

e) Solutions and policies for science - technology development:

- Consummate, modernize and innovate electrical technologies and equipment to develop the power sector in the near and far future.

- Define the felicitous model and course of technology in power source and power grid, maintain stable growth apposite to investment capacity and Vietnam’s potential in natural resources at reasonable cost price and for the environment.

- Newly constructed electricity facilities must possess modern technology pertinent to Vietnam's economic conditions; upgrade and renovate existing facilities gradually to adhere to technical, economic and environmental standards.

- Combine new advanced technologies with existing ones, which have been consummated and improved, to augment productivity and save energy.

- Encourage the application of new technologies in thermal power stations: injection combustion chamber, fluidized bed, supercritical and ultra-supercritical steam conditions, combined cycle gas turbine, advanced waste treatment technology ... to heighten productivity, protect the environment and shrink landfills for ash and cinders.

- Renovate, upgrade and modernize transmission and distribution lines to reduce loss and maintain safety and reliability.

- Modernize systems for dispatch, operation, communications, control and automation to dispatch domestic power grids and make regional connections.

- Implement methods of encouragement and compel the innovation of technologies and equipment in industries (steel, cement, chemicals) with intensive consumption of electric power in gradual manner; limit then ban import of old and poorly-functional apparatus for production and consumption of electricity.  

Page 12: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

g) Human resource development solutions:

- For personnel training, educational institutions specialized in electricity shall be developed towards international accreditation and universal standard programs for in-depth industrial training shall be established.

- Focus on training personnel for major industries in production, transmission and distribution of electricity. Attach great importance to vocational training for skilled technicians and workers capable of comprehending and utilizing technical instruments and modern technologies in proficient manner. Organize training and retraining of technicians and managerial officials, and gradually enhance training quality on par with other nations in the region and across the world.

- Innovate educational programs for human resources in the power sector, diversify training modes and connect training with actual business activities; pay attention to the selection and assignment of scientific and managerial officials on overseas training in pivotal areas. Provide additional and advance training in understaffed industries, particularly for nuclear power and new energies. Establish suitable treatment policies to attract personnel of great caliber.

- Arrange and reorganize the business model in scientific and logical manners to maintain efficiency in labor performance and ameliorate workforce productivity.

h) Establishment and development of electromechanics and localization:

- Intensify investments and diversify capital sources, attract foreign contributors in research, design and manufacturing of equipment and parts for the power sector. Producers of electrical equipment and parts strive for international certification of their products.

- Establish complexes, whose core members are mechanical engineering factories, for research, design and creation of electrical equipment.

- Establish centers for repair and maintenance of modern equipment to self-repair and self-assess electrical instruments.

- Innovate existing mechanical engineering factories, expand joint ventures, construct new factories, and establish electrical engineering zones.

i) Solutions for economical and efficient consumption of electricity:

- Strengthen propaganda, dispersion and enforcement of the Law on economical and efficient consumption of energy to elevate the efficiency in the use of energies and electricity for production, trade and family households' daily activities.

- Execute the National program for economical and efficient use of electricity on wide scale and augment its effectiveness for the objective of saving over 10% in commercial electricity to total electric power consumed from 2016 to 2020.

Page 13: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Article 2. Duties of ministries, sectors, local authorities and entities concerned:

1. Ministry of Industry and Trade:

a) Direct, inspect and expedite activities by main investors, contractors and relevant entities for projects ratified as per this Decision on periodic basis and in effective manner; report to the Prime Minister for treatments against delayed projects that impact the supply of electric power in large magnitude.

b) Supervise tightly the power supply and demand, the progress of projects for power source and power grid to make decisions on rescheduling projects in ratified plans or report to the Prime Minister for approval of the addition or removal of projects from the plans in accordance with actual needs in economic - social growth from time to time.

c) Direct, inspect and ratify the establishment of site plans and detailed schemes for coal-based and gas-based thermal power centers, hydroelectric plants, run-of-the-river cascade hydropower plans to attract local and foreign investors. Direct the development and import of natural gas, LNG and coal for electricity product, industrial works and other essential needs.

d) Direct the development of coal entrepots and LNG infrastructure, consider and propose solutions for attraction of investments from private sectors and overseas into such buildings.

dd) Lead and collaborate with other ministries, sectors and local authorities concerned to construct and consummate policies that encourage investments into renewable energy projects.

e) Lead and collaborate with other ministries and sectors to negotiate and conclude agreements for cooperation and electricity exchange with neighbor countries and Vietnam’s engagement in the power system connecting nations in the GMS.

g) Direct and expedite local authorities and main investors to accomplish projects for development of power source and power grid (including rural power grids) according to plan and schedule approved.

h) Further the construction and completion of vital conditions (legislation, technical infrastructure, etc.) for the development of electricity wholesale and retail markets according to the course of action approved.

i) Direct research and domestic production of equipment for coal-based thermal power stations, nuclear power plants and hydropower plants.

k) Study and issue regulations on coal import types and technologies in coal-based thermal power stations to adhere to environmental standards and decrease the emission of CO2.

l) Lead and collaborate with other ministries and sectors to execute the economical electricity use program from 2016 to 2020.

Page 14: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

m) Work with people’s committees in provinces and centrally affiliated cities to come to terms on land areas for power projects and keep projects on schedule according to plans approved.

n) Continue studies on solutions for short-circuit current; fortify connections in transmission lines with transmission methods by alternating current or direct current; uphold N-1 criterion for transmission lines and propose requirements for N-2 criterion; elevate the stability of angles, frequency and voltage of the national power system,

o) Issue regulations on treatments against delayed projects.

p) Preside studies and propose amendments to legislative documents, regulations on delegation and echelon arrangement to the Prime Minister to facilitate the assurance of project schedule.

g) Study trends for power grid connection with regional nations from the basis of elevated reliability of the power system.

r) Study and establish plans for power centers in Long An, Tan Phuoc, Bac Lieu, clarify the feasibility and necessity of power plants in such power centers.

2. Ministry of Planning and Investment establishes regulations and policies to attract investments and use ODA funds properly to facilitate the synchronous, balanced, logical and sustainable growth of the power sector.

3. Ministry of Finance leads and collaborates with other ministers and relevant sectors to establish regulations on mobilization of investments for power sector development to satiate society's demands for electricity in timely and adequate manners according to the ratified revised Power Plan VII.

4. Vietnam State Bank directs domestic commercial banks to balance funds and consider loans for main investors of power projects according to actual needs of each project for sustainable growth of the power sector.

5. Vietnam Electricity Corporation:

a) Hold the leading role in maintaining stable and secure supply of power for economic - social development. Make investments in power source projects as per assignments and in power grid projects to augment the efficiency of investment.

b) Implement solutions to continue reducing power loss and saving electricity in production and daily consumption.

c) Continue enhancing labor productivity to optimize expenditure in generation, transmission, distribution and sale of electricity.

d) Direct main investors’ marking of boundaries of major power grid projects after the approval of feasibility reports.

Page 15: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

6. Vietnam National Oil and Group:

a) Preside studies on solutions for exploitation of gas from Ca Voi Xanh and Lot B fields, rational and effective approaches for LNG import in need; and provide the Ministry of Industry and Trade with reports to be delivered to the Prime Minister. Invest in power source projects as per assignments.

b) Cooperate with local and foreign private investors to make investments in infrastructure for LNG import.

7. Vietnam National Coal - Mineral Industries Holding Corporation Limited:

a) Play the leading role in assuring the supply of coal from domestic sources and import for electricity production and other demands of the national economy. Make investments in power source projects as per assignments.

b) Cooperate with foreign and local private investors to make investments in coal entrepots.

8. People’s Committees in provinces and centrally affiliated cities:

a) Lead and collaborate tightly with main investors in ground clearance, compensation, relocation and resettlement for projects in power source and power grid as per regulations.

b) Update and arrange land areas for power-related facilities ratified in land use plans and publicize information.

c) Strengthen land management to preclude disputes and lawsuits that prolong the clarification of land origin, examination, establishment and ratification of plans for compensation and assignment of land for main investors' project execution; expedite surveys, determination and ratification of unit price for compensation to avoid delays of the ratification of compensation plans and disbursement of money to affected households.

d) Issue regulations and guidelines in timely manner for concerned entities to execute according to project schedule; implement strict treatments against intentional expansion of premises and placement of architectural items and plants in project boundaries for higher claims or against refusal of compensation according to plans approved.

Article 3. This Decision takes effect from the date of signing and replaces the Prime Minister's Decision No. 1208/QĐ-TTg dated 21 July 2011 on the approval of the National power development plan from 2011 to 2020 with visions extended to 2030.

Article 4. Ministers, heads of ministerial-level authorities, heads of governmental authorities, chairpeople of people's committees in provinces and centrally affiliated cities, chairpeople of members' councils, general directors of Vietnam Electricity Corporation, Vietnam National Oil and Gas Group and Vietnam National Coal - Mineral Industries Holding Corporation Limited shall be held responsible for enforcing this Decision./.

Page 16: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

  

 

PRIME MINISTER 

Nguyen Tan Dung

 

APPENDIX I

THE LIST OF POWER SOURCE PROJECTS BROUGHT INTO OPERATION FROM 2016 TO 2030

(Enclosed to the Prime Minister’s Decision No. 428/QĐ-TTg dated 18 May 2016)

Table 1. List of power source projects coming into operation from 2016 to 2020

No. Name of power plantInstalled capacity (MW)

Main investor

  Projects in operation from 2016    

1 Nho Que 2 hydropower plant 48 IPP

2 Nho Que 1 hydropower plant 32 IPP

3 Nam Na 3 hydropower plant 84 IPP

4 Nam Toong hydropower plant 34 IPP

5 Bac Me hydropower plant 45 IPP

6 Ba Thuoc 1 hydropower plant 60 IPP

7 Song Tranh 3 hydropower plant 62 IPP

8 Huoi Quang hydropower plant (2nd phase) 260 EVN

9 Lai Chau hydropower plant (2nd and 3rd phases) 2x400 EVN

10 Trung Son hydropower plant (1st and 2nd phases) 2x65 EVN

11 Nhan Hac hydropower plant 59 IPP

12 Song Bung 2 hydropower plant 100 EVN

13 Xekaman 1 hydropower plant (Laos) 290 Viet Lao Power Joint-stock Company

Page 17: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

14 Song Tranh 4 hydropower plant 48 IPP

15 Dak Mi 2 hydropower plant 98 IPP

16 Formosa Ha Tinh thermal power station (2nd phase) 150 IPP - coal based power

17 Formosa Ha Tinh thermal power station (3rd and 4th phases) 2x100 IPP - blast furnace gas

18 Formosa Ha Tinh thermal power station (5th phase) 150 IPP - coal based power

19 Dak Mi 3 hydropower plant 45 IPP

20 Formosa Dong Nai thermal power station (3rd phase) 150 IPP

21 Ve Dan coal-based thermal power station 60 IPP (cogeneration)

22 Duyen Hai III thermal power station (1st station) 600 EVN

23 KCP biomass power station (1st phase) 30 IPP (Phu Yen)

24Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

260  

  Projects in operation from 2017    

1 Chi Khe hydropower plant 41 IPP

2 Long Tao hydropower plant 42 IPP

3 Trung Son hydropower plant (3rd and 4th phases) 2x65 EVN

4 Yen Son hydropower plant 70Binh Minh Construction & Travel Group Joint-stock

Company

5 Tra Khuc 1 hydropower plant 36 IPP

6 Xekaman Xanxay 1 hydropower plant (Laos) 32 Viet Lao Power Joint-stock

Company

7 Thac Mo hydropower plant expanded 75 EVN

8 Thai Binh I thermal power station (1st

and 2nd phases) 2x300 EVN

9 Thai Binh II thermal power station (1st phase) 600 PVN

Page 18: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

10 Duyen Hai III thermal power station (2nd phase) 600 EVN

11 Long Son petrochemical thermal power station (1st phase) 75 IPP (cogeneration)

12 An Khe biomass power station (1st phase) 55 Quang Ngai Sugar Joint-stock

Company

13Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

360  

  Projects in operation from 2018    

1 Song Lo 6 hydropower plant 44 Xuan Thien Ha Giang Co., Ltd

2 Hoi Xuan hydropower plant 102 IPP

3 Song Mien 4 hydropower plant 38 IPP

4 La Ngau hydropower plant 36 La Ngau Hydropower Joint-stock Company

5 Dak Mi 1 hydropower plant 54 IPP

6 Da Nhim hydropower plant expanded 100 EVN

7 Xekaman 4 hydropower plant (Laos) 80 Viet Lao Power Joint-stock Company

8 A Lin hydropower plant 62 IPP

9 Thang Long thermal power station (1st phase) 300 Thang Long Thermal Power

Joint-stock Company

10 Thai Binh II thermal power station (2nd phase) 600 PVN

11 Vinh Tan IV thermal power station (1st and 2nd phases) 2x600 EVN

12 Long Phu I thermal power station (1st

phase) 600 PVN

13 Long Son petrochemical thermal power station (2nd and 3rd phases) 2x75 IPP (cogeneration)

14 KCP biomass power station (2nd phase) 30 IPP (Phu Yen)

15 An Khe biomass power station (2nd phase) 55 Quang Ngai Sugar Joint-stock

Company

16 Lee&Man biomass power station 125 Lee & Man Paper Vietnam Co., Ltd (cogeneration)

Page 19: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

17 Khai Long (Ca Mau) wind power plant 100 Cong Ly Construction - Trading

- Tourism Co., Ltd

18 Bac Lieu wind power plant, 3rd phase 142 Cong Ly Construction - Trading - Tourism Co., Ltd

19Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

520  

  Projects in operation from 2019    

1 Bao Lam 3 hydropower plant 46 IPP

2 Pac Ma hydropower plant 140 Pac Ma Hydropower Joint-stock Company

3 Thuong Kon Tum hydropower plant (1st and 2nd phases) 2x110 EVN

4 Thang Long thermal power station (2nd phase) 300 Thang Long Thermal Power

Joint-stock Company

5 Hai Ha 1 cogeneration plant 3x50 IPP (inside the industrial zone)

6 Na Duong II thermal power station 110 Vinacomin

7 Long Phu I thermal power station (2nd phase) 600 PVN

8 Song Hau I thermal power station (1st

and 2nd phases) 2x600 PVN

9 Duyen Hai III thermal power station expanded 660 EVN

10 Vinh Tan I thermal power station (1st and 2nd phases) 2x600 CSG - CPIH - Vinacomin

(BOT)

11 Vinh Tan IV thermal power station expanded 600 EVN

12 Small-scaled hydropower cluster named Nam Cum 1, 4, 5 65 IPP

13 Trung - Nam wind power plant 90 IPP (Ninh Thuan)

14 Soc Trang wind power plant 99 Cong Ly Construction - Trading - Tourism Co., Ltd

15 Thien Tan 1 solar power plant 300 IPP (Ninh Thuan)

16Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

450  

Page 20: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

  Projects in operation from 2020    

1 Nam Pan 5 hydropower plant 35 IPP

2 Nam Mo hydropower plant (Vietnam) 95 IPP

3 Ialy hydropower plant expanded 360 EVN

4 Formosa Ha Tinh, 6th and 7th phases 2x150 IPP - coal based power

5 Formosa Ha Tinh, 8th and 9th phases 2x100 IPP - blast furnace gas

6 Formosa Ha Tinh, 10th phase 150 IPP - coal based power

7 Hai Duong thermal power station (1st phase) 600 Jaks Resources Berhad (BOT)

8 Cam Pha III thermal power station (1st and 2nd phases) 2x220 Vinacomin

9 Cong Thanh thermal power station 600 Cong Thanh Thermal Power Joint-stock Company

10 O Mon III combined cycle power plant 750 EVN

11 Small-scaled hydropower cluster named Nam Cum 2, 3, 6 54 IPP

12 Hanbaram wind power plant 117 IPP

13 Thien Tan 2 solar power plant 400 IPP (Ninh Thuan)

14Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

470  

 

Table 2. List of power source projects coming into operation from 2021 to 2025

No. Name of power plantInstalled capacity (MW)

Main investor

  Projects in operation from 2021    

1 My Ly hydropower plant 250 IPP

2 Hoa Binh hydropower plant expanded (1st phase) 240 EVN

3 Nghi Son II thermal power station (1st phase) 600 Marubeni - Kepco (BOT)

Page 21: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

4 Vung Ang II thermal power station (1st phase) 600 VAPCO (BOT)

5 Hai Duong thermal power station (2nd

phase) 600 Jaks Resources Berhad (BOT)

6 Nam Dinh I thermal power station (1st phase) 600 Taekwang Power Holdings -

ACWA Power (BOT)

7 Quang Trach I thermal power station (1st phase) 600 PVN

8 Kien Giang 1 combined cycle power plant 750 PVN

9 O Mon IV combined cycle power plant 750 EVN

10 Duyen Hai II thermal power station (1st and 2nd phases) 2x600 Janakuasa Sdn. Bhd (BOT)

11 Song Hau II thermal power station (1st phase) 1000 Toyo Ink (BOT)

12 Long Phu II thermal power station (1st phase) 660 TATA Power (BOT)

13 Long Phu III thermal power station (1st phase) 600 PVN

14 Uong Bi thermal power station ceasing power generation 105 EVN

15 Thien Tan 3 solar power plant 300 IPP (Ninh Thuan)

16Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

790  

  Projects in operation from 2022    

1 Ban Mong (Song Hieu) hydropower plant 60 IPP

2 Hoa Binh hydropower plant expanded (2nd phase) 240 EVN

3 Dak Re hydropower plant 60 IPP

4 Hai Ha 2 cogeneration plant 5x150 IPP

5 Luc Nam thermal power station (1st phase) 50 IPP

6 Quynh Lap I thermal power station 600 Vinacomin

Page 22: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

(1st phase)

7 Vung Ang II thermal power station (2nd phase) 600 VAPCO (BOT)

8 Nghi Son II thermal power station (2nd phase) 600 Marubeni - Kepco (BOT)

9 Nam Dinh I thermal power station (2nd phase) 600 Taekwang Power Holdings -

ACWA Power (BOT)

10 Quang Trach I thermal power station (2nd phase) 600 PVN

11 Vinh Tan III thermal power station (1st phase) 660 VTEC (BOT)

12 Song Hau II thermal power station (2nd phase) 1000 Toyo Ink (BOT)

13 Long Phu II thermal power station (2nd phase) 660 TATA Power (BOT)

14 Long Phu III thermal power station (2nd and 3rd phases) 2x600 PVN

15 Van Phong I thermal power station (1st station) 660 Sumitomo (BOT)

16 Kien Giang II combined cycle power plant 750 PVN

17Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

1200  

  Projects in operation from 2023    

1 Phu Tho low head hydro power plant 105Binh Minh Construction & Travel Group Joint-stock

Company

2 Quynh Lap I thermal power station (2nd phase) 600 Vinacomin

3 Luc Nam thermal power station (2nd phase) 50 IPP

4 Quang Tri thermal power station (1st phase) 600 EGATi (BOT)

5 Mien Trung I combined cycle power plant 750 PVN

6 Dung Quat I combined cycle power 750 Sembcorp (BOT)

Page 23: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

plant

7 Vinh Tan III thermal power station (2nd and 3rd phases) 2x660 VTEC (BOT)

8 Van Phong I thermal power station (2nd phase) 660 Sumitomo (BOT)

9 Son My II combined cycle power plant (1st phase) 750 PVN

10 Bac Ai pumped-storage hydroelectric power station (1st and 2nd phases) 2x300 EVN

11Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

1000  

  Projects in operation from 2024    

1 Vung Ang III thermal power station (1st phase) 600 Samsung C&T (BOT)

2 Quang Tri thermal power station (2nd phase) 600 EGATi (BOT)

3 Mien Trung II combined cycle power plant 750 PVN

4 Dung Quat II combined cycle power plant 750 Sembcorp (BOT)

5 Long An I thermal power station (1st phase) 600  

6 Son My II combined cycle power plant (2nd phase) 750 PVN

7Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

1200  

  Projects in operation from 2025    

1 Tri An hydropower plant expanded 200 EVN

2 Hai Phong III thermal power station (1st phase) 600 Vinacomin

3 Hai Ha 3 cogeneration plant 2x300 IPP

4 Rang Dong cogeneration plant 100 IPP

5 Vung Ang III thermal power station (2nd phase) 600 Samsung C&T (BOT)

Page 24: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

6 Long An I thermal power station (2nd phase) 600  

7 Son My II combined cycle power plant (3rd phase) 750 PVN

8 Bac Ai pumped-storage hydroelectric power station (3rd and 4th phases) 2x300 EVN

9Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

1800  

 

Table 3. List of power source projects coming into operation from 2026 to 2030

No. Name of power plantInstalled capacity (MW)

Main investor

  Projects in operation from 2026    

1 Nam Mo 1 hydropower plant (Laos) 72 IPP

2 Hai Phong III thermal power station (2nd phase) 600 Vinacomin

3 Quynh Lap II thermal power station (1st phase) 600 BOT

4Mien Trung III combined cycle power plant (if petrochemical gases are not viable)

750 PVN

5 Long An II thermal power station (1st phase) 800  

6 O Mon II combined cycle power plant 750  

7 Son My I combined cycle power plant (1st phase) 750 GDF SUEZ/Sojitz-Pacific

(BOT)

8Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

2160  

  Projects in operation from 2027    

1 Quynh Lap II thermal power station (2nd phase) 600 BOT

Page 25: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2 Son My I combined cycle power plant (2nd phase) 750 GDF SUEZ/Sojitz-Pacific

(BOT)

3 Long An II thermal power station (2nd phase) 800  

4 Tan Phuoc I thermal power station (1st phase) 600  

5Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

2910  

  Projects in operation from 2028    

1 Dong Phu Yen pumped-storage hydroelectric power plant (1st phase) 300 Xuan Thien Company

2 Hai Ha 4 cogeneration plant 2x300 IPP

3 Quang Trach II thermal power station (1st phase) 600  

4 Ninh Thuan I nuclear power plant (1st phase) 1200 EVN

5 Tan Phuoc I thermal power station (2nd phase) 600  

6 Tan Phuoc II thermal power station, 1st phase (*) 600  

7 Son My I combined cycle power plant (3rd phase) 750 GDF SUEZ/Sojitz-Pacific

(BOT)

8Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

3240  

  Projects in operation from 2029    

1 Dong Phu Yen pumped-storage hydroelectric power plant (2nd phase) 300 Xuan Thien Company

2 Quang Ninh III thermal power station (1st phase) 600  

3 Vung Ang III thermal power station, 3rd phase (*) 600  

4 Quang Trach II thermal power station, 2nd phase 600  

5 Tan Phuoc II thermal power station, 2nd phase (*) 600  

Page 26: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

6 Bac Lieu I thermal power station, 1st phase (*) 600  

7 Ninh Thuan I nuclear power plant (2nd phase) 1200 EVN

8 Ninh Thuan II nuclear power plant (1st phase) 1100 EVN

9Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

3350  

  Projects in operation from 2030    

1 Huoi Tao hydropower plant 180  

2 Dong Phu Yen pumped-storage hydroelectric power plant (3rd phase) 300 Xuan Thien Company

3 Don Duong pumped-storage hydroelectric power plant (1st phase) 300 EVN

4 Quang Ninh III thermal power station (2nd phase) 600  

5 Vung Ang III thermal power station, 4th phase (*) 600  

6 Bac Lieu I thermal power station, 2nd

phase (*) 600  

7 Ninh Thuan II nuclear power plant (2nd phase) 1100 EVN

8Renewable energy (small-scale hydroelectric power, wind power, solar power, biomass, etc.)

3530  

Note: (*) Reserve power plants for renewable energy power stations’ failure of schedule and output expected (27,000 MW by 2030)

 

APPENDIX II

THE LIST OF POWER GRID PROJECTS BROUGHT INTO OPERATION FROM 2016 TO 2030

(Enclosed to the Prime Minister’s Decision No. 428/QĐ-TTg dated 18 March 2016)

Table 1. List of 500kV electrical substations coming into operation from 2016 to 2030

Page 27: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

No. Project name Capacity (MVA) Note

  Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

  North 12150  

1 West of Hanoi 900 New construction, installation of the transformer set 1

2 Dong Anh 1800 New construction

3 Pho Noi 1500New construction, installation of the transformer set 1 (600 MVA) and the 2nd transformer set (900 MVA)

4 Viet Tri 450 New construction

5 Son La 1800 Replacement of 2 transformer sets, hydropower transmission equipment

6 Lai Chau 900 New construction outside the hydropower plant

7 Nghi Son 900 New construction synchronized with Nghi son 2 thermal power station

8 Vung Ang 1800 Renovation of the transformer sets 1 and 2 for increase of capacity

9 Quang Ninh 1200 Renovation of 2 transformer sets for increase of capacity and conformity to N-1 criterion

10 Thuong Tin 900Renovation of the 2nd transformer set for increase of capacity and assurance of power supply for Hanoi

  Central 900  

1 Pleiku 2 900 New construction, import of hydroelectricity from South Laos

  South 13650  

1 Cau Bong 900 Renovation, installation of the 2nd transformer set

2 Nha Be 1800 Renovation, replacement with two 600MVA transformer sets

3 Cu Chi 900 New construction, design of flexible busway with land area reserved for the recloser.

4 Tan Uyen 1800 New construction

5 Tan Dinh 1800 Renovation of 2 transformer sets for increase

Page 28: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

of capacity

6 Chon Thanh 900 New construction, design of flexible busway with land area reserved for recloser.

7 Long Thanh 900 New construction

8 Duc Hoa 900 New construction

9 My Tho 1800 New construction

10 O Mon 900 Renovation of 2 transformer sets for increase of capacity

11 Duyen Hai 450 New construction

12 Long Phu 600 New construction

  Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

  North 10350  

1 West of Hanoi 900 Renovation, installation of the 2nd transformer set

2 Bac Ninh 1800 New construction, design of flexible busway with land area reserved for the recloser.

3 Vinh Yen 1800 New construction, design of flexible busway with land area reserved for the recloser.

4 Viet Tri 450 Renovation, installation of the 2nd transformer set

5 Hai Phong 3 thermal power station 900 New construction of the communicative

transformer set in the power station

6 Thai Binh 600 New construction, design of flexible busway with land area reserved for the recloser.

7 Nho Quan 1800 Renovation of 2 transformer sets for increase of capacity

8 Hai Phong 900 New construction

9 Thanh Hoa 1200 New construction, further research on the location of the substation

  Central 4500  

1 Quang Tri 600 New construction

2 Doc Soi 1200 Renovation for increase of capacity

3 Van Phong 1800 New construction

Page 29: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

4 Krong Buk 900New construction synchronized with the Central gas-based thermal power station when total capacity surpasses 2500 MW

  South 10350  

1 Cu Chi 900 Renovation, installation of the 2nd transformer set

2 Binh Duong 1 900 New construction, prevention of overload in Tan Dinh, Song May

3 Dong Nai 2 900 New construction

4 Bac Chau Duc 900 New construction

5 Son My thermal power station 450 New construction of the communicative

transformer set in the power station

6 Chon Thanh 900 Renovation, installation of the 2nd transformer set

7 Tay Ninh 1 1800 New construction, design of flexible busway with land area reserved for the recloser.

8 Duc Hoa 900 Renovation, installation of the 2nd transformer set

9 Long An 900 New construction

10 Thot Not 1800 New construction, design of flexible busway with land area reserved for the recloser.

  Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

  North 10200  

1 Long Bien 1800 New construction, increase of power supply for Hanoi

2 Son Tay 900 New construction, increase of power supply for Hanoi

3 South of Hanoi 900 New construction, increase of power supply for Hanoi

4 Viet Tri 1800 Renovation of 2 transformer sets for increase of capacity

5 Thai Nguyen 1800 New construction, increase of power source for Thai Nguyen and adjacent areas

6 Bac Giang 900 New construction in Luc Nam district, with flexible busway design

Page 30: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

7 Thai Binh 600 Renovation, installation of the 2nd transformer set

8  Hai Phong 900 Renovation, installation of the 2nd transformer set

9 Nam Dinh thermal power station 600 Renovation of the communicative transformer

set in the power station

  Central 3000  

1 Da Nang 1800 Renovation of 2 transformer sets for increase of capacity

2 Binh Dinh 1200 New construction

  South 10950  

1 Song May 1800 Renovation of 2 transformer sets for increase of capacity

2 Cau Bong 900 Renovation, installation of the 3th transformer set

3 Cu Chi 900 Renovation, installation of the 3th transformer set

4 Binh Duong 1 900 Renovation, installation of the 2nd transformer set

5 Dong Nai 2 900 Renovation, installation of the 2nd transformer set

6 Long Thanh 900 Renovation, installation of the 2nd transformer set

7 Bac Chau Duc 900 Renovation, installation of the 2nd transformer set

8 Di Linh 450 Renovation, installation of the 2nd transformer set

9 Tay Ninh 2 900 New construction

10 Tan Phuoc 600 New construction

11 Tien Giang 900 New construction

12 Dong Thap 900 New construction

 

Table 2. List of 500kV power lines coming into operation from 2016 to 2030

No. Project name Circuit(s) x km Circuit(s) x kmCircuit(s) x N

Page 31: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

kmCircuit(s) x kmCircuit(s) x kmCircuit(s) x kmNote

ote 

  Facilities built from 2016 to 2020 Facilities built from 2016 to 2020Facilit

Page 32: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ies built from 2016 to 2020Facilities built fr

Page 33: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

om 2016 to 2020Facilities built from 2016 to 2

Page 34: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

020Facilities built from 2016 to 2020Facilitie

Page 35: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

s built from 2016 to 2020Facilities built from

Page 36: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2016 to 2020Facilities built from 2016 to 202

Page 37: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

  North            

1 Pho Noi - branch to Quang Ninh - Thuong Tin

2x0.66+2x0.57 2x0.66+2x0.572x0.66+2x0.572x0.66+2x0.572x0.66+2x0.572x0.66+2x0.57New construction, power line from Pho

Noi switched to 2-circuit line in Quang Ninh - Thuong Tin

New construction, power line from Pho Noi

Page 38: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

switched to 2-circuit line in Quang Ninh - Th

Page 39: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

uong Tin 

2 Hiep Hoa - Pho Noi 1 x xx71 71New construction, sharing the pylon with two 220kV circuits

New construction, sharing the pylon

Page 40: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

with two 220kV circuits 

3 Dong Anh - branch to Hiep Hoa - Pho Noi

2 x xx2 2New construction, 1-circuirt switchingNew construction, 1-c

Page 41: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ircuirt switching 

4 Vung Ang - branch to Ha Tinh - Da Nang

2 x xx17 17New construction, switching on 500kV power line in Ha Tinh - Da

Nang

New construction, switching

Page 42: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

on 500kV power line in Ha Tinh - Da Nang 

5 Lai Chau - branch to Son La hydropower plant - Lai Chau

2 x xx2 2New construction, 1-circuit switching on the power line in Son La - La Chau

New

Page 43: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

construction, 1-circuit switching on the powe

Page 44: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

r line in Son La - La Chau 

6 West of Hanoi - Thuong Tin

2 x xx40 40New construction, increase of reliability in power supply for Hanoi

New construction,

Page 45: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

increase of reliability in power supply for Ha

Page 46: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

noi 

7 Nho Quan - Thuong Tin 1 x xx75 75New construction of the 2nd circuit, 500kV single-circuit power line, in

combination with 220kV power line in Nho Quan - Phu Ly

New construction of the 2n

d

circuit, 500k

Page 47: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

V single-circuit power line, in combination wi

Page 48: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

th 220kV power line in Nho Quan - Phu Ly 

8 Thang Long thermal power station - branch to Quang Ninh - Pho Noi

2 x xx5 5New construction synchronized with Thang Long thermal power station

New

Page 49: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

construction synchronized with Thang Long ther

Page 50: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

mal power station 

9 Nghi Son - branch to Nho Quan - Ha Tinh

4 x xx30 30New construction, 2-circuit switching on the power line in Nho

Quan - Ha Tinh

New construction, 2-circuit

Page 51: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

switching on the power line in Nho Quan - Ha

Page 52: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Tinh 

10 Viet Tri - branch to Son La - Hiep Hoa

2 x xx5 5New construction, 1-circuit switching on the power line in Son La - Hiep Hoa

New construction, 1-circuit switching on

Page 53: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

the power line in Son La - Hiep Hoa 

11 Cong Thanh thermal power station - Nghi Son

2 x xx10 10New construction synchronized with Cong Thanh thermal power station

New cons

Page 54: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

truction synchronized with Cong Thanh thermal

Page 55: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

power station 

12 Nam Dinh I thermal power station - Pho Noi

2 x xx133 133New construction synchronized with Nam Dinh I thermal power station

New construction synchronized w

Page 56: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ith Nam Dinh I thermal power station 

  Central            

1 Pleiku 2 - branch to Pleiku - Cau Bong

4 x xx2 2New construction, 2-circuit switching on the power line in Pleiku - Cau Bong

New co

Page 57: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

nstruction, 2-circuit switching on the power l

Page 58: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ine in Pleiku - Cau Bong 

2 Van Phong thermal power station - Vinh Tan

2 x xx195 195New construction synchronized with Van Phong 1 thermal power

station

New construction syn

Page 59: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

chronized with Van Phong 1 thermal power stati

Page 60: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

on 

  South            

1 Duc Hoa - branch to Phu Lam - Cau Bong

4 x xx8 8New construction, 2-circuit switching on the existing 500kV power line

New construction, 2-circuit switching on

Page 61: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

the existing 500kV power line 

2 Song May - Tan Uyen 2 x xx22 22New construction New constructi

Page 62: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

on 

3 My Tho - Duc Hoa 2 x xx60 60New construction, switching to Chon Thanh, decrease of short-circuit current

New construction, switching to Chon Thanh,

Page 63: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

decrease of short-circuit current 

4 Duyen Hai thermal power station - My Tho

2 x xx113 113New construction New constr

Page 64: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

uction 

5 Long Phu thermal power station - O Mon 2 x xx84 84New construction

New construction 

6 My Tho - branch to Phu Lam - O Mon and Nha Be - O Mon

4 x xx1 1New construction, 2-circuit switching on the existing power line

New construction, 2-c

Page 65: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ircuit switching on the existing power line 

7 Vinh Tan - branch to 2 x xx235 235New construction of the 3rd and 4th N

Page 66: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Song May - Tan Uyen circuits, exploitation of power sources in Vinh Tan thermal power station and

Van Phong thermal power station

ew construction of the 3r

d

and 4t

h

circuits, e

Page 67: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

xploitation of power sources in Vinh Tan therm

Page 68: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

al power station and Van Phong thermal power s

Page 69: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

tation  

8 Song Hau thermal power station - Duc Hoa

2 x xx120 120New construction synchronized with Song Hau I thermal power station

New construction synchronized with Son

Page 70: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

g Hau I thermal power station 

9 Long Thanh - branch to Phu My - Song May

2 x xx16 16New construction, 1-circuit switching on the 500kV power line in

Phu My - Song May

New constructio

Page 71: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

n, 1-circuit switching on the 500kV power line

Page 72: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

in Phu My - Song May 

10 Chon Thanh - Duc Hoa 2 x xx127 127New construction, circuits passing Tay Ninh, increase of reliability in

power supply for southeastern region

New construction, circu

Page 73: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

its passing Tay Ninh, increase of reliability

Page 74: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

in power supply for southeastern region  

11 Cu Chi - branch to Chon Thanh - Duc Hoa

2 x x x 30 30New construction, 1-circuirt switching

New c

Page 75: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

onstruction, 1-circuirt switching 

12 Vinh Tan 4 - Vinh Tan 2 x xx2 2New construction, Vinh Tan 4 power plant connected to the distribution field

in Vinh Tan

New constru

Page 76: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction, Vinh Tan 4 power plant connected to the

Page 77: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

distribution field in Vinh Tan 

13 Chon Thanh - branch to Pleiku 2 - Cau Bong

4 x xx2 2New construction, 2-circuit switching on 500kV power line

New construct

Page 78: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ion, 2-circuit switching on 500kV power line 

Page 79: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

  Facilities built from 2021 to 2025 Facilities built from 2021 to 2025Facilities b

Page 80: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

uilt from 2021 to 2025Facilities built from 20

Page 81: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

21 to 2025Facilities built from 2021 to 2025Fa

Page 82: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

cilities built from 2021 to 2025Facilities bui

Page 83: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

lt from 2021 to 2025Facilities built from 2021

Page 84: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

to 2025Facilities built from 2021 to 2025 

  North            

Page 85: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

1 Thai Binh - branch to Nam Dinh I thermal power station - Pho Noi

4 4x xx1 New construction, 2-circuit switching on the power line in Nam Dinh I thermal power station - Pho Noi

New construction, 2-circuit switching on the p

Page 86: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ower line in Nam Dinh I thermal power station

Page 87: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- Pho Noi 

2 Nam Dinh 1 - Thanh Hoa 2 2x xx72 New construction, exploitation of thermal power source in the North Central region

New construction, exploitation of t

Page 88: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

hermal power source in the North Central regio

Page 89: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

3 Hai Phong - Thai Binh 2 2x xx50 New construction, increase of power supply for Hai Phong

New construction, increase of power supply

Page 90: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

for Hai Phong 

4 Hai Phong - Hai Phong 3 thermal power station

2 2x xx42 New construction, exploitation of the output of Hai Phong 3 thermal power station

New construction, exploitation

Page 91: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

of the output of Hai Phong 3 thermal power sta

Page 92: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

tion 

5 Bac Ninh - branch to Dong Anh - Pho Noi 2 2x xx3 New construction, 1-circuirt switching

New construction, 1-circuirt switching 

6 Vinh Yen - branch to Son 4 4x xx50 New construction, 2-circuit switching N

Page 93: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

La - Hiep Hoa and Viet Tri - Hiep Hoa

on the existing 500kV power line ew construction, 2-circuit switching on the ex

Page 94: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

isting 500kV power line 

7 Vung Ang 3 thermal power station - Quynh Lap thermal power station

2 2x xx220New construction synchronized with Vung Ang 3 thermal power station

New construction sync

Page 95: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

hronized with Vung Ang 3 thermal power station

Page 96: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

 

8Quynh Lap thermal power station - Thanh Hoa

2 2x xx80 New construction

New construction 

9 Quang Trach thermal power station - Vung Ang

2 2x xx18 New construction synchronized with Quang Trach 1 thermal power station

New construction synchroniz

Page 97: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ed with Quang Trach 1 thermal power station 

10 Vung Ang 3 thermal 4 4x xx2 New construction, 2-circuit switching, N

Page 98: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

power station - branch to Quang Trach 1 - Vung Ang

synchronized with Vung Ang 3 thermal power station

ew construction, 2-circuit switching, synchron

Page 99: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ized with Vung Ang 3 thermal power station 

  Central              

Page 100: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

1 Quang Tri - branch to Vung Ang - Da Nang

4 4x xx5 New construction, 2-circuit switching on the existing power line

New construction, 2-circuit switching on the e

Page 101: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

xisting power line 

2 Quang Tri thermal power station - Quang Tri

2 2x xx25 New construction connected with busway in Quang Tri 500kV electrical substation

New construction connected

Page 102: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

with busway in Quang Tri 500kV electrical sub

Page 103: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

station 

3 Gas turbines in the Central thermal power station - Krong Buk

2 2x xx330New construction synchronized with the Central gas-based thermal power station when total capacity surpasses 2500 MW

New construction synchronized with th

Page 104: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

e Central gas-based thermal power station when

Page 105: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

total capacity surpasses 2500 MW 

4 Krong Buk - Tay Ninh 1 2 2x xx300New construction synchronized with the Central gas-based thermal power station

New constru

Page 106: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction synchronized with the Central gas-based

Page 107: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

thermal power station 

5 Krong Buk - branch to Pleiku 2 - Chon Thanh

4 4x xx20 New construction, 2-circuit switching on the existing 500kV power line

New construction, 2-cir

Page 108: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

cuit switching on the existing 500kV power lin

Page 109: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

6 Gas turbines in the Central thermal power station - Doc Soi

2 2x xx20 New construction synchronized with the Central gas-based thermal power station

New construction synchronized with the Cent

Page 110: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ral gas-based thermal power station 

7 Bac Ai pumped storage hydropower plant - branch to Van Phong - Vinh Tan

4 4x xx35 New construction, 2-circuit switching on the power line in Van Phong - Vinh Tan

New const

Page 111: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ruction, 2-circuit switching on the power line

Page 112: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

in Van Phong - Vinh Tan 

  South              

1 Binh Duong 1 - branch to Song May - Tan Dinh

2 2x xx30 New construction, 1-circuit switching on the existing power line

New construction,

Page 113: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

1-circuit switching on the existing power line

Page 114: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

 

2 Binh Duong 1 - Chon Thanh

2 2x xx45 New construction, loop circuit, increase of reliability in power supply for southeastern region

New construction, loop circuit, increase of

Page 115: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

reliability in power supply for southeastern r

Page 116: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

egion 

3 Dong Nai 2 - branch to Vinh Tan -  Song May

4 4x xx5 New construction, switching via the 3rd or 4th circuit on the power line from Vinh Tan to Song May - Tan Uyen

New construction, switching via the 3r

d

Page 117: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

or 4t

h

circuit on the power line from Vinh Ta

Page 118: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

n to Song May - Tan Uyen  

4 Bac Chau Duc - branch to Phu My - Song May and Phu My - Long Thanh

4 4x xx10 New construction, 2-circuit switching on the existing 500kV power line

New construction, 2-

Page 119: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

circuit switching on the existing 500kV power

Page 120: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

line 

5 Son My thermal power station - Bac Chau Duc

2 2x xx80 New construction synchronized with Son My thermal power station

New construction synchronized with Son M

Page 121: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

y thermal power station 

6 Tay Ninh 1 - branch to Chon Thanh - Duc Hoa

4 4x xx2 New construction, 2-circuit switching New construction, 2-c

Page 122: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ircuit switching 

7 Long An - branch to Nha Be - My Tho 2 2x xx15 New construction

New construction 

8 O Mon - Thot Not 2 2x xx16 New construction, increase of reliability in power supply for the western areas of the South

New constru

Page 123: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction, increase of reliability in power supply

Page 124: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

for the western areas of the South 

  Facilities built from 2026 to 2030 Facilitie

Page 125: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

s built from 2026 to 2030Facilities built from

Page 126: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2026 to 2030Facilities built from 2026 to 203

Page 127: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

0Facilities built from 2026 to 2030Facilities

Page 128: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

built from 2026 to 2030Facilities built from 2

Page 129: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

026 to 2030Facilities built from 2026 to 2030F

Page 130: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

acilities built from 2026 to 2030 

  North              

1 West of Hanoi - Vinh Yen

2 2x 40 4040New construction, increase of reliability in power supply for Hanoi

New const

Page 131: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ruction, increase of reliability in power supp

Page 132: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ly for Hanoi 

2 South of Hanoi - branch to Nho Quan - Thuong Tin

2 2x 5 55New construction, increase of power supply for southern areas of Hanoi

New construction, increase of po

Page 133: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

wer supply for southern areas of Hanoi 

3 Son Tay - branch to Dong Phu Yen pumped-storage hydropower plant - West of Hanoi

4 4x 1 11New construction, increase of reliability in power supply for western

areas of Hanoi

New co

Page 134: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

nstruction, increase of reliability in power s

Page 135: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

upply for western areas of Hanoi 

4 Long Bien - branch to Pho Noi - Thuong Tin

2 2x 10 1010New construction, 1-circuit switching on the existing 500kV power

line

New construc

Page 136: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

tion, 1-circuit switching on the existing 500k

Page 137: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

V power line 

5 Hiep Hoa - Thai Nguyen 2 2x 35 3535New construction, increase of power supply for Thai Nguyen

New construction, increase of po

Page 138: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

wer supply for Thai Nguyen 

6 Bac Giang - branch to Quang Ninh - Hiep Hoa

4 4x 5 55New construction, increase of power supply for Dong Bac

New construction,

Page 139: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

increase of power supply for Dong Bac 

7 Bac Giang - Bac Ninh 2 2x 30 3030New construction, increase of load source for Bac Ninh

New con

Page 140: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

struction, increase of load source for Bac Nin

Page 141: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

8 Connection to new Quang Ninh thermal power station

     340 340340New construction, further research required

New construction, further research required

Page 142: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

 

9 Vung Ang - Nho Quan 2 2x 378 378378Renovation of 500kV single-circuit power line to 2-circuit power

line

Renovation of 500kV single-circuit power lin

Page 143: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

e to 2-circuit power line 

10 Quynh Lap - branch to Vung Ang - Nho Quan

2 2x 30 3030New construction connected to Quynh Lap thermal power station

New construction co

Page 144: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

nnected to Quynh Lap thermal power station 

11 Dong Phu Yen pumped-storage hydropower plant

2 2x 10 1010New construction connected to Dong Phu Yen pumped-storage

Ne

Page 145: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

- branch to Son La - Viet Tri

hydropower plant w construction connected to Dong Phu Yen pumpe

Page 146: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

d-storage hydropower plant 

12 Dong Phu Yen pumped-storage hydropower plant - branch to Son La - Vinh Yen

2 2x 10 1010New construction connected to Dong Phu Yen pumped-storage

hydropower plant

New construction c

Page 147: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

onnected to Dong Phu Yen pumped-storage hydrop

Page 148: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ower plant 

13 Dong Phu Yen pumped-storage hydropower plant - West of Hanoi

2 2x 105 105105New construction connected to Dong Phu Yen pumped-storage

hydropower plant

New construction connected to Dong

Page 149: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Phu Yen pumped-storage hydropower plant 

  Central              

1 Van Phong thermal power station - Binh

1 1x 220 220220New construction of 2-circuit power line suspended in front of the

Ne

Page 150: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Dinh single-circuit power line w construction of 2-circuit power line suspend

Page 151: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ed in front of the single-circuit power line  

Page 152: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2 Binh Dinh - branch to Gas turbines in the Central thermal power station - Krong Buk

2 2x 30 3030New construction synchronized with Binh Dinh electrical substation

New construction synchronized with Binh Dinh e

Page 153: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

lectrical substation 

3 Doc Soi - Pleiku 1 1x 190 190190New construction, increase of reliability in power grid

New construction, increa

Page 154: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

se of reliability in power grid 

  South              

1 Nuclear power plant 1 - Binh Duong 1

2 2x 250 250250New construction synchronized with the 1st and 2nd generator sets of Ninh Thuan 1 nuclear power plant

New constru

Page 155: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction synchronized with the 1s

t

and 2n

d

genera

Page 156: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

tor sets of Ninh Thuan 1 nuclear power plant 

Page 157: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2 Nuclear power plant 1 - branch to Van Phong - Vinh Tan

4 4x 15 1515New construction, 2-circuit switching on the power line in Van

Phong - Vinh Tan

New construction, 2-circuit switching on the p

Page 158: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ower line in Van Phong - Vinh Tan 

3 Nuclear power plant 2 - branch to Van Phong - Nuclear power plant 1

2 2x 15 1515New construction synchronized with Ninh Thuan 2 nuclear power plant

New constru

Page 159: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction synchronized with Ninh Thuan 2 nuclear p

Page 160: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ower plant 

4 Nuclear power plant 2 - Chon Thanh

2 2x 292 292292New construction synchronized with Ninh Thuan 2 nuclear power plant

New construction synchronized with

Page 161: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Ninh Thuan 2 nuclear power plant 

5 Don Duong pumped-storage hydropower plant - branch to Nuclear power plant 2 - Chon Thanh

4 4x 10 1010New construction synchronized with Don Duong pumped-storage

hydropower plant

New constru

Page 162: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ction synchronized with Don Duong pumped-stora

Page 163: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ge hydropower plant 

6 Tay Ninh 2 - branch to Tay Ninh 1 - Duc Hoa

4 4x 10 1010New construction, 2-circuit switching

New construction, 2-circu

Page 164: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

it switching 

7 Thot Not - Tay Ninh 2 2 2x 140 140140New construction, exploitation of thermal power sources in Bac Lieu

and Kien Giang

New construction, exploitation o

Page 165: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

f thermal power sources in Bac Lieu and Kien G

Page 166: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

iang 

8 Power line connected to Tan Phuoc power center

     80 8080New construction, further research required

New construction, further research requi

Page 167: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

red 

9 Tien Giang - branch to O Mon - My Tho

4 4x 5 55New construction, increase of power source for western areas of the South

New construction, increase of power sourc

Page 168: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

e for western areas of the South 

10 Connection to Bac Lieu 1 thermal power station

     260 260260New construction, further research required

New construc

Page 169: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

tion, further research required 

11 Dong Thap - branch to Thot Not - Tay Ninh 2

4 4x 5 55New construction, 2-circuit switching

New construct

Page 170: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

ion, 2-circuit switching 

                                        

Table 3. List of 220kV electrical substations in the North by 2030

No. Project name Transformer set(s) x MVA Note

  Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Quang Ninh 1 x 125 Renovation, installation of the 2nd transformer set

2 Trang Bach 1 x 250 Renovation, replacement of the 1st transformer set

3 Vat Cach 1 x 250 Renovation, replacement of the 125MVA transformer set

4 Hiep Hoa 1 x 250 Renovation, installation of the 2nd transformer set

5 Uong Bi 1 x 125 Renovation, installation of the 2nd

Page 171: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

transformer set under the power plant's management

6 Quang Chau 1 x 250 New construction

7 Hai Duong 2 1 x 250 Renovation, installation of the 2nd transformer set

8 Dong Hoa 1 x 250 Renovation for increase of capacity

9 Thuy Nguyen 1 x 250 New construction

10 Lang Son 1 x 125 New construction

11 Dinh Vu 1 x 250 Renovation, installation of the 2nd transformer set

12 Hoanh Bo 1 x 250 Renovation for increase of capacity

13 Hai Duong 1 1 x 250 Renovation for increase of capacity

14 Son Tay 1 x 250 New construction

15 Tay Ho 1 x 250 Renovation, installation of the 2nd transformer set

16 Long Bien 2 x 250 New construction, prevention of overload in 110kV grid

17 West of Hanoi 2 x 250 New construction, installation of the 1st transformer set

18 Bac Ninh 2 2 x 250 New construction

19 Vinh Yen 1 x 250 Renovation, installation of the 2nd transformer set

20 Dong Anh 2 x 250New construction synchronized with the 500kV and 220kV power lines in Hiep Hoa - Bac Ninh 2

21 Thuong Tin 1 x 250 Renovation, installation of the 2nd transformer set

22 Van Tri 1 x 250Renovation, installation of the 3rd transformer set, for conformity to N-1 criterion

23 Bac Ninh 3 (Yen Phong) 2 x 250 New construction

24 Kim Dong 1 x 250 Renovation, installation of the 2nd transformer set

25 Vinh Tuong 2 x 250 New construction

26 Son Tay 1 x 250 Renovation, installation of the 2nd

Page 172: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

transformer set

27 Yen My 1 x 250 New construction

28 Bac Ninh 4 1 x 250 New construction

29 Nho Quan 2 x 125 Renovation of Nho Quan 500kV electrical substation

30 Truc Ninh 2 x 250 New construction

31 Thai Thuy 1 x 250 New construction, exploitation of thermal power source in Thai Binh

32 Thanh Nghi 1 x 250 New construction

33 Ninh Binh 2 1 x 250 New construction, supply of power to VINAKYOEI steel company

34 Cao Bang 1 x 125 Renovation, installation of the 2nd transformer set

35 Yen Bai 1 x 125

Renovation, installation of the 2nd transformer set, establishment of connection to Yen Bai small-scale hydropower plant, prevention of overload in dry season

36 Bao Lam 2 x 125 New construction, power transmission for hydropower cluster in Bao Lam

37 Ha Giang 1 x 125Renovation, installation of the 2nd transformer set, small-scale hydropower transmission

38 Phu Binh 1 x 250 Renovation, installation of the 2nd transformer set

39 Hoa Binh 2 x 125Renovation, replacement of 2 transformer sets under the power plant’s management

40 Than Uyen 1 x 250 New construction, exploitation of small-scale hydropower in Lao Cai, Yen Bai

41 Lao Cai 1 x 250 Renovation, installation of the 2nd transformer set

42 Nghia Lo 1 x 250 New construction, exploitation of hydropower in Tay Bac

43 Lai Chau 2 x 250 New construction, power transmission of small-scale hydropower in Lai Chau

44 Phu Tho 2 x 250 New construction

Page 173: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

45 Bao Thang 1 x 250New construction, installation of the 2nd transformer set, exploitation of small-scale hydropower in Lao Cai

46 Bac Kan 1 x 125 New construction, supply of power in dry season

47 Tuyen Quang 1 x 125 Renovation, installation of the 2nd transformer set

48 Muong Te 1 x 250 New construction, power transmission for hydropower cluster in Pac Ma

49 Luu Xa 1 x 250 New construction

50 Nghi Son 1 x 250 Replacement of machines

51 Ha Tinh 1 x 125 Renovation, installation of the 2nd transformer set

52 Thanh Hoa 1 x 250 Renovation of the 2nd transformer set for increase of capacity

53 Bim Son 1 x 125 Renovation, installation of the 2nd transformer set

54 Do Luong 1 x 125 Renovation, installation of the 2nd

transformer set

55 Quynh Luu 1 x 250 New construction

56 Ha Tinh 1 x 250 Renovation of the 1st transformer set for increase of capacity

57 Vung Ang 1 x 125 New construction

58 Nong Cong 1 x 250 New construction

59 Bac Me 1 x 63 New construction

60 Khe Than 1 x 63 New construction, supply of power for pits' load

61 Van Dien 2 x 100 New construction, installation of two 220/22kV transformer sets in advance

62 Muong La 2 x 125 New construction, transmission of small-scale hydropower in Son La

  Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

1 Lang Son 1 x 250 Renovation, installation of the 2nd transformer set

2 Duong Kinh 1 x 250 New construction

Page 174: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

3 Yen My 1 x 250 Renovation, installation of the 2nd transformer set

4 Thanh Nghi 1 x 250 Renovation, installation of the 2nd transformer set

5 Bac Ninh 5 (Dong Ky) 1 x 250 New construction

6 Ba Thien 1 x 250 New construction

7 Muong Te 1 x 250 Renovation, installation of the 2nd transformer set

8 Than Uyen 1 x 250 Renovation, installation of the 2nd transformer set

9 Thai Thuy 1 x 250 Renovation, installation of the 2nd transformer set

10 Van Dien 1 x 250 Renovation, installation of the 3rd transformer set

11 Me Linh 1 x 250 New construction

12 Ung Hoa 1 x 250 New construction

13 My Dinh 2 x 100 New construction of the 220/22kV transformer set

14 My Dinh 1 x 250 Renovation, installation of the 3rd transformer set

15 Hai Phong thermal power station 2 x 250 Renovation, replacement of two

125MVA transformer sets

16 An Lao 2 x 250 New construction in the 500kV electrical substation in Hai Phong

17 Thuy Nguyen 1 x 250 Renovation, installation of the 2nd transformer set

18 Hai Duong 1 1 x 250 Renovation, replacement of the 125MVA transformer set

19 Gia Loc 2 x 250 New construction

20 Pho Cao 2 x 250 New construction

21 Hai Hau 2 x 250 New construction

22 Vu Thu 1 x 250 New construction

23 Ninh Binh 2 1 x 250 Renovation, installation of the 2nd transformer set

24 Cao Bang 1 x 250 Renovation, replacement of the

Page 175: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

125MVA transformer set

25 Bac Kan 1 x 250 Renovation, installation of the 2nd transformer set

26 Dong Mo 1 x 250 New construction

27 Tuyen Quang 1 x 250 Renovation, replacement of the 125MVA transformer set

28 Dai Tu 1 x 250 New construction

29 Luu Xa 1 x 250 Renovation, installation of the 2nd transformer set

30 Phu Tho 2 1 x 250 New construction

31 Quang Chau 1 x 250 Renovation, installation of the 2nd transformer set

32 Lang Giang 1 x 250 New construction

33 Bac Ninh 4 2 x 250 New construction

34 Gia Luong (Bac Ninh 6) 1 x 250 New construction

35 Trang Bach 1 x 250 Renovation, replacement of the 2nd transformer set at 125 MVA

36 Uong Bi 1 x 250 Renovation, replacement of the 125MVA transformer set

37 Quang Ninh 1 x 250 Renovation, replacement of the 125MVA transformer set

38 Khe Than 1 x 63Renovation, installation of the 2nd transformer set, supply of power for pits’ load

39 Dien Bien 2 x 125 New construction

40 Muong Te 1 x 250

Renovation, installation of the 2nd transformer set, power transmission for small-scale hydropower cluster in Lai Chau

41 Yen Thuy 1 x 125 New construction

42 Yen Hung 1 x 250 New construction

43 Bim Son 1 x 250 Renovation, replacement of the 125MVA transformer set

44 Sam Son 2 x 250 New construction

45 Nong Cong 1 x 250 Renovation, installation of the 2nd

Page 176: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

transformer set

46 Quynh Luu 1 x 250 Renovation, installation of the 2nd transformer set

47 Nam Cam 1 x 250 New construction

48 Ha Tinh 1 x 250 Renovation, replacement of the 125MVA transformer set

49 Thach Khe 1 x 250 New construction

50 Vung Ang 1 x 250 Renovation, installation of the 2nd transformer set

  Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1 Dong Anh 2 2 x 250 New construction

2 Soc Son 2 2 x 250 New construction

3 Long Bien 2 2 x 250 New construction

4 Me Linh 1 x 250 Renovation, installation of the 2nd transformer set

5 Xuan Mai 1 x 250 Renovation, replacement of the 125MVA transformer set

6 Chuong My 2 x 250 New construction

7 Ung Hoa 1 x 250 Renovation, installation of the 2nd transformer set

8 Hai Ha 1 x 250 Renovation, installation of the 2nd transformer set

9 Do Son 1 x 250 New construction

10 Dai Ban 1 x 250 New construction

11 Tu Ky 2 x 250 New construction

12 Phuc Dien 2 x 250 New construction

13 Hung Yen City 1 x 250 New construction

14 Ly Nhan 2 x 250 New construction

15 Nam Dinh 2 1 x 250 New construction, with flexible busway design

16 Quynh Phu 2 x 250 New construction

17 Vu Thu 1 x 250 Renovation, installation of the 2nd transformer set

Page 177: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

18 Tam Diep 2 x 125 New construction

19 Cao Bang 1 x 250 Renovation, replacement of the 125MVA transformer set

20 Tuyen Quang 1 x 250 Renovation, replacement of the 125MVA transformer set

21 Tuyen Quang hydropower plant 1 x 125 Renovation, replacement of the 63MVA

transformer set

22 Luc Yen 2 x 125 New construction

23 Dai Tu 1 x 250 Renovation, installation of the 2nd

transformer set

24 Song Cong 1 x 250 New construction

25 Phu Tho 2 1 x 250 Renovation, installation of the 2nd transformer set

26 Tam Duong 1 x 250 New construction

27 Ba Thien 1 x 250 Renovation, installation of the 2nd

transformer set

28 Chu 2 x 125 New construction

29 Gia Luong (Bac Ninh 6) 1 x 250 Renovation, installation of the 2nd transformer set

30 Thuan Thanh 2 x 250 New construction

31 Dong Ky (Bac Ninh 7) 2 x 125 New construction

32 Hoanh Bo 1 x 250 Renovation, replacement of the 125MVA transformer set

33 Uong Bi 1 x 250 Renovation, replacement of the 125MVA transformer set

34 Mong Cai 2 x 125 New construction

35 Ha Long 1 x 250 New construction

36 Tan Lac 1 x 125 New construction

37 Yen Thuy 1 x 125 Renovation, installation of the 2nd transformer set

38 Yen Hung 1 x 250 Renovation, installation of the 2nd transformer set

39 Bim Son 1 x 250 Renovation, replacement of the 125MVA transformer set

40 Hau Loc 2 x 250 New construction

Page 178: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

41 Ngoc Lac 2 x 125 New construction

42 Do Luong 2 x 250 Renovation, replacement of two 125MVA transformer sets

43 Tuong Duong 1 x 125 New construction

44 Thach Khe 1 x 250 Renovation, installation of the 2nd transformer set

45 Can Loc 1 x 125 New construction

 

Table 4. List of 220kV power lines in the North by 2030

No. Project name Circuit(s) x km Circuit(s) x kmCircuit(s) x kmCircuit(s) x km Note Note

 Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities

built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Bao Thang - Yen Bai 2 x 117 New constructionNew constructionNew construction

2 Than Uyen - Ban Chat 2 x 26

New construction, exploitation of small-scale hydropower in Lao Cai, Yen BaiNew construction, exploitation of small-scale hydropower in Lao Cai, Yen BaiNew construction, exploitation of small-scale hydropower in Lao Cai, Yen Bai

3 Bao Lam - branch to Nho Que - Cao Bang 2 x 5

New construction, power transmission for hydropower cluster in Bao LamNew construction, power transmission for hydropower cluster in Bao LamNew construction, power transmission for hydropower cluster in Bao Lam

4 Phu Tho - branch to Viet Tri - Yen Bai 2 x 7 New constructionNew constructionNew

construction

5 Viet Tri 500kV - branch to Viet Tri 4 x 10

New construction connected to the 500kV electrical substation in Viet TriNew construction connected to the 500kV electrical substation in Viet TriNew construction connected to the 500kV electrical substation in Viet Tri

Page 179: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

6 Nghia Lo - Viet Tri 500kV 2 x 85

New construction, exploitation of hydropower in Tay BacNew construction, exploitation of hydropower in Tay BacNew construction, exploitation of hydropower in Tay Bac

7 Increase of load capacity in Yen Bai - Viet Tri 1 x 67

Renovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay Bac

8 Muong Te - Lai Chau 2 x 80

New construction, power transmission for hydropower cluster in Pac MaNew construction, power transmission for hydropower cluster in Pac MaNew construction, power transmission for hydropower cluster in Pac Ma

9 Branch to Luu Xa 2 x 5 New constructionNew constructionNew construction

10 Huoi Quang - Nghia Lo 2 x 65

New construction, exploitation of hydropower in Tay BacNew construction, exploitation of hydropower in Tay BacNew construction, exploitation of hydropower in Tay Bac

11Increase of load capacity to 500kV in Viet Tri - Vinh Tuong

1 x 27

Renovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay Bac

12Increase of load capacity to 500kV in Viet Tri - Vinh Yen

1 x 36

Renovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay BacRenovation, exploitation of hydropower in Tay Bac

13 Son Tay - branch to Hoa Binh - Viet Tri 2 x 1 New constructionNew constructionNew

construction

14 Dong Anh - Hiep Hoa 2 x 24

New construction of 3-circuit power line at 500kV and 220kVNew construction of 3-circuit power line at 500kV and 220kVNew construction of 3-circuit power line at 500kV and 220kV

15 Long Bien - branch to Dong Anh - Bac Ninh 2

4 x 4,5 New construction synchronized with the 220kV electrical substation in Long BienNew construction synchronized with the 220kV electrical substation in Long

Page 180: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

BienNew construction synchronized with the 220kV electrical substation in Long Bien

16 Dong Anh - Bac Ninh 2 2 x 20

New construction of 3-circuit power line at 500kV and 220kVNew construction of 3-circuit power line at 500kV and 220kVNew construction of 3-circuit power line at 500kV and 220kV

17 Increase of load capacity in Hoa Binh - Ha Dong 2 x 65

Renovation, assurance of power supply for HanoiRenovation, assurance of power supply for HanoiRenovation, assurance of power supply for Hanoi

18 Increase of load capacity in Hoa Binh - Chem 1 x 70

Renovation, assurance of power supply for HanoiRenovation, assurance of power supply for HanoiRenovation, assurance of power supply for Hanoi

19 Increase of load capacity in Ha Dong - Chem 1 x 17

Renovation, assurance of power supply for HanoiRenovation, assurance of power supply for HanoiRenovation, assurance of power supply for Hanoi

20Pho Noi 500kV substation - Pho Noi - Pha Lai

4 x 5

New construction in the project of Pho Noi 500kV electrical substation and connection linesNew construction in the project of Pho Noi 500kV electrical substation and connection linesNew construction in the project of Pho Noi 500kV electrical substation and connection lines

21 Pho Noi 500kV - Bac Ninh 2 2 x 30

New construction of 3-circuit power lineNew construction of 3-circuit power lineNew construction of 3-circuit power line

22 Vinh Tuong - branch to Son Tay - Viet Tri 4 x 2 New constructionNew constructionNew

construction

23 Bac Ninh 3 - branch to Dong Anh - Hiep Hoa 2 x 5 New constructionNew constructionNew

construction

24 West of Hanoi - branch to Ha Dong - Chem 4 x 12

New construction, assurance of power supply for HanoiNew construction, assurance of power supply for HanoiNew construction, assurance of power supply for Hanoi

Page 181: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

25 Hoa Binh - West of Hanoi 2 x 50 New constructionNew constructionNew

construction

26 Yen My - branch to Pho Noi - Thuong tin 2 x 2 New constructionNew constructionNew

construction

27 Connection to Bac Ninh 4 2 x 11 New constructionNew constructionNew

construction

28 Increase of load capacity in Pha Lai - Bac Ninh 2 x 24

Renovation, transmission for power source in Dong Bac, prevention of overloadRenovation, transmission for power source in Dong Bac, prevention of overloadRenovation, transmission for power source in Dong Bac, prevention of overload

29 Increase of load capacity in Pha Lai – Hiep Hoa 1 x 58

Renovation, transmission for power source in Dong Bac, prevention of overloadRenovation, transmission for power source in Dong Bac, prevention of overloadRenovation, transmission for power source in Dong Bac, prevention of overload

30 Increase of load capacity in Dong Hoa - Thai Binh 2 x 53

Renovation, conformity to N-1 criterionRenovation, conformity to N-1 criterionRenovation, conformity to N-1 criterion

31 Branch to Quang Chau 4 x 6 New constructionNew constructionNew construction

32Thuy Nguyen - branch to Hai Phong thermal power station - Vat Cach

4 x 2 New constructionNew constructionNew construction

33 Lang Son - Bac Giang 2 x 95 New constructionNew constructionNew construction

34Hai Duong thermal power station - branch to Pha Lai – Hai Duong 2

4 x 2

New construction synchronized with the generator set 1 in Hai Duong thermal power stationNew construction synchronized with the generator set 1 in Hai Duong thermal power stationNew construction synchronized with the generator set 1 in Hai Duong thermal power station

35 Hai Duong thermal power station – Pho Noi

2 x 60 New construction synchronized with the generator set 2 in Hai Duong thermal

Page 182: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

500kV

power stationNew construction synchronized with the generator set 2 in Hai Duong thermal power stationNew construction synchronized with the generator set 2 in Hai Duong thermal power station

36 Thai Binh - Kim Dong 2 x 46

New construction, increase of power transmission capacityNew construction, increase of power transmission capacityNew construction, increase of power transmission capacity

37 Truc Ninh - branch to Nam Dinh - Ninh Binh 2 x 29

New construction connected the electrical substation in Truc NinhNew construction connected the electrical substation in Truc NinhNew construction connected the electrical substation in Truc Ninh

38 Nam Dinh – Ninh Binh, 2nd circuit 2 x 31

Renovation, exploitation of the output of Thai Binh thermal power stationRenovation, exploitation of the output of Thai Binh thermal power stationRenovation, exploitation of the output of Thai Binh thermal power station

39 Thai Binh - Thai Binh thermal power station 2 x 30

New construction, exploitation of the output of Thai Binh thermal power stationNew construction, exploitation of the output of Thai Binh thermal power stationNew construction, exploitation of the output of Thai Binh thermal power station

40 Thai Thuy - Thai Binh thermal power station 2 x 0,5

New construction, exploitation of the output of Thai Binh thermal power stationNew construction, exploitation of the output of Thai Binh thermal power stationNew construction, exploitation of the output of Thai Binh thermal power station

41 Truc Ninh - Thai Binh thermal power station 2 x 45

New construction, power transmission for Thai Binh thermal power stationNew construction, power transmission for Thai Binh thermal power stationNew construction, power transmission for Thai Binh thermal power station

Page 183: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

42 Nho Quan - Thanh Nghi 2 x 25 New constructionNew constructionNew construction

43 Nho Quan - Phu Ly 1 x 40

Renovation, 2nd circuit, sharing the pylon with the 500kV power line in Nho Quan – Thuong Tin (2nd circuit), 200kV power line in Nho Quan - Thanh Nghi Renovation, 2nd circuit, sharing the pylon with the 500kV power line in Nho Quan – Thuong Tin (2nd circuit), 200kV power line in Nho Quan - Thanh Nghi Renovation, 2nd circuit, sharing the pylon with the 500kV power line in Nho Quan – Thuong Tin (2nd circuit), 200kV power line in Nho Quan - Thanh Nghi

44 Ninh Binh 2 - branch to Ninh Binh - Thai Binh 2 x 19 New constructionNew constructionNew

construction

45 Vung Ang - Ba Don - Dong Hoi 2 x 85

New construction, increase of power transmission between the North and the CentralNew construction, increase of power transmission between the North and the CentralNew construction, increase of power transmission between the North and the Central

46Trung Son hydropower plant - branch to Hoa Binh - Nho Quan

2 x 57

New construction synchronized with Trung Son hydropower plantNew construction synchronized with Trung Son hydropower plantNew construction synchronized with Trung Son hydropower plant

47 Thanh Son - branch to Trung Son - Nho Quan 2 x 0,5

New construction synchronized with Trung Son hydropower plantNew construction synchronized with Trung Son hydropower plantNew construction synchronized with Trung Son hydropower plant

48 Dong Van - branch to Hua Na - Thanh Hoa 2 x 0,5

New construction synchronized with Dong Van hydropower plantNew construction synchronized with Dong Van hydropower plantNew construction synchronized with Dong Van hydropower plant

49 Increase of load capacity 1 x 62 Renovation, transmission for power

Page 184: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

in Nho Quan - Thanh Hoa

sources in North Central region Renovation, transmission for power sources in North Central region Renovation, transmission for power sources in North Central region

50 Hoi Xuan - branch to Trung Son - Nho Quan 2 x 16

New construction synchronized with Hoi Xuan hydropower plantNew construction synchronized with Hoi Xuan hydropower plantNew construction synchronized with Hoi Xuan hydropower plant

51 Branch to Quynh Luu 4 x 5 New constructionNew constructionNew construction

52 Vung Ang - Vung Ang thermal power station 2 x 3 New constructionNew constructionNew

construction

53 Branch to Nong Cong 4 x 5 New constructionNew constructionNew construction

54 Viet Tri 500kV - branch to Phu Tho - Viet Tri 2 x 10 New constructionNew constructionNew

construction

55Khe Than - branch to Son Dong thermal power station - Trach Bach

2 x 3

New construction, specialized power supplyNew construction, specialized power supplyNew construction, specialized power supply

56 Van Dien - branch to Ha Dong - Thuong Tin 4 x 7

New construction, switching in Van Dien for receipt of power from 2 circuits of Hoa Binh hydropower plantNew construction, switching in Van Dien for receipt of power from 2 circuits of Hoa Binh hydropower plantNew construction, switching in Van Dien for receipt of power from 2 circuits of Hoa Binh hydropower plant

57 Branch to Bac Me 2 x 1 New constructionNew constructionNew construction

58 Muong La - branch to Son La 500kV - Son La 2 x 1,5 New constructionNew constructionNew

construction

59 Viet Tri - Vinh Yen - Soc Son 2 x 74

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

Page 185: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

60 Son Tay - Hoa Binh 1 x 49

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

61 Thai Nguyen - Bac Giang1 x 68

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

62Pha Lai - branch to Hai Duong thermal power station

2 x 17

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

63 Phu Ly - Nho Quan 2 x 37

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

64 Ha Dong - Phu Ly 1 x 43

Renovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterionRenovation, increase of load capacity, conformity to N-1 criterion

 Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities

built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

1 Connection to Bac Ninh 5 2 x 7 77New construction

2 Viet Tri 500kV - Tam Duong 2 x 20 2020New construction

3 Tam Duong - Ba Thien 2 x 18 1818New construction

4 Ba Thien - Me Linh 2 x 20 2020New construction

5 Me Linh - branch to Soc Son - Van Tri 2 x 3 33New construction

6Gia Loc - branch to Hai Duong thermal power station - Pho Noi

4 x 2 22New construction

7 Duong Kinh - branch t o 4 x 3 33New construction

Page 186: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Dong Hoa - Dinh Vuconnected to the

electrical substation in Duong Kinh

8 My Ly - Ban Ve 2 x 72

7272New construction synchronized with My

Ly hydropower plan, and suspended before the 1-

circuit line

9 Nam Mo 1 - branch to My Ly - Ban Ve 2 x 18

1818New construction synchronized with Nam

Mo (Vietnam) hydropower plant

10 Phu Tho 2 - branch to Son La - Viet Tri 2 x 5 55New construction, 1-

circuirt switching

11 Son La - Dien Bien 2 x 126 126126New construction

12 Vinh Tuong - Vinh Yen 2 x 8

88New construction and renovation, switching to 2-circuit power line in

Vinh Tuong - Vinh Yen

13 Yen Thuy - branch to Hoa Binh - Nho Quan 4 x 3 33New construction, 2-

circuirt switching

14 Dong Mo - branch to Bac Giang – Lang Son 4 x 3 33New construction, 2-

circuirt switching

15

Dai Tu - branch to Tuyen Quang - Luu Xa and Tuyen Quang hydropower plant - Thai Nguyen

4 x 3 33New construction, 2-circuirt switching

16Hai Phong 500kV - branch to Dong Hoa - Thai Binh

4 x 5 55New construction, 2-circuirt switching

17 Hai Phong 500kV - Gia Loc 2 x 35 3535New construction,

4-wire phase

18 Lang Giang - branch to Bac Giang - Thai Nguyen2 x 2 22New construction, 1-

circuirt switching

19Bac Ninh 500kV - branch to Bac Ninh 2 - Pho Noi 500kV

4 x 3 33New construction, 2-circuirt switching

20 Bac Ninh 500kV - Bac 2 x 15 1515New construction,

Page 187: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Ninh 4 4-wire  phasing

21Gia Luong (Bac Ninh 6) - branch to Bac Ninh 2 - Pho Noi 500kV

4 x 2 22New construction, 2-circuirt switching

22 Long Bien - Mai Dong 2 x 20 2020New construction, line phasing

23 Dong Anh 500kV - Van Tri 2 2 x 16 1616New construction,

line phasing

24 Vinh Yen 500kV - Ba Thien 2 x 10 1010New construction,

2-wire or 4-wire phasing

25 Vinh Yen 500kV - Vinh Yen 2 x 16

1616New construction, 4-wire phasing, partial

renovation of the existing power line in Vinh Yen -

Soc Son

26Vinh Yen 500kV - branch to Ba Thien - Me Linh

4 x 3 33New construction, 4-wire phasing

27 West of Hanoi - branch to Chem - Tay Ho 2 x 25

2525New construction, switching to the power

line in Hoa Binh – West of Hanoi for direct power

supply from Hoa Binh hydropower plant to Chem and Tay Ho

28 Ung Hoa - branch to Ha Dong - Phu Ly 2 x 4 44New construction, 1-

circuirt switching

29 My Dinh - branch to West of Hanoi - Chem 4 x 1 11New construction, 2-

circuirt switching

30 Connection to Hai Phong 3 thermal power station     92 9292New construction,

further research required

31Thai Binh 500kV - branch to Thai Binh - Kim Dong

4 x 5 55New construction, 2-circuirt switching

32 Thai Binh 500kV - Thanh Nghi 2 x 34 3434New construction,

2-wire or 4-wire phasing

33 Pho Cao - branch to Thai Binh - Kim Dong 4 x 2 22New construction, 2-

circuirt switching

34 Vu Thu - branch to Thai 4 x 5 55New construction, 2-

Page 188: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Binh – Nam Dinh and Thai Binh - Ninh Binh 2 circuirt switching

35 Hai Hau - Truc Ninh 2 x 16 1616New construction

36Thanh Hoa 500kV - branch to Nghi Son - Ba Che

4 x 5 55New construction, 2-circuirt switching

37 Nong Cong - branch to Nghi Son - Ba Che 4 x 2 22New construction, 2-

circuirt switching

38 Thanh Hoa 500kV -  Sam Son 2 x 25 2525New construction

39

Nam Cam - branch to Nghi Son thermal power station - Vinh and Quynh Luu - Vinh

4 x 3 33New construction, 2-circuirt switching

40Nghi Son thermal power station - branch to Nghi Son - Vinh

2 x 10

1010New construction, switching from the

electrical substation in Vinh to the 500kV

electrical substation in Nghi Son

41Suspension of 2nd circuit in Thanh Hoa - Nghi Son - Quynh Luu

1 x 707070Suspension of the 2nd circuit of the new

power line

42 Thach Khe - Ha Tinh 500kV 2 x 15 1515New construction

43 Ninh Binh - Tam Diep - Bim Son 2 x 27

2727Renovation, increase of load capacity,

conformity to N-1 criterion

44 Son La - Phu Tho - Viet Tri 1 x 192

192192Renovation, increase of load capacity,

conformity to N-1 criterion

45 Connection to Yen Hung 2 x 12 1212New construction

46 Van Tri - Tay Ho 1 x 7

77Renovation, increase of load capacity,

conformity to N-1 criterion

  Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities

Page 189: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1 Luc Yen - branch to Bao Thang - Yen Bai 4 x 2 22New construction, 2-

circuirt switching

2 Son Tay 500kV - Vinh Yen 2 x 30 3030New construction

and renovation

3 Son Tay 500kV - Son Tay 2 x 8 88New construction

4 Tan Lac - branch to Hoa Binh - Yen Thuy 4 x 1 11New construction, 2-

circuirt switching

5Tan Lac - branch to Trung Son hydropower plant

2 x 1

11New construction, switching from Trung

Son hydropower plant in Ban Uon to Tan Lac

6

Thai Nguyen 500kV - branch to Bac Kan - Thai Nguyen and Tuyen Quang - Thai Nguyen

4 x 3 33New construction, 2-circuirt switching

7 Branch to Luu Xa 2 x 333New construction, line

switching from Tuyen Quang - Phu Binh

8 Thai Nguyen 500kV - Thai Nguyen 2 x 5

55New construction, line switching, direct

connection from the 500kV electrical

substation in Thai Nguyen to Luu Xa, Phu

Binh

9 Son My thermal power station - Chu 2 x 30

3030New construction, increase of reliability in

power supply

10 Dong Mo - Chu 2 x 303030New construction, increase of reliability in

power supply

11Bac Giang 500kV - branch to Bac Giang - Thai Nguyen

2 x 10 1010New construction

12 Bac Giang 500kV - branch to Bac Giang - Dong Mo

2 x 10 1010New construction, line switching, direct connection from the

Page 190: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

500kV electrical substation in Bac Giang

to Dong Mo

13 Song Cong - branch to Phu Binh - Hiep Hoa 4 x 5 55New construction, 2-

circuirt switching

14

New Dong Bac coal-based thermal power station (Hai Ha 500kV) - Mong Cai

2 x 38 3838New construction

15

New Dong Bac coal-based thermal power station (Hai Ha 500kV) - Hai Ha

2 x 3 33New construction

16 Ha Long - Quang Ninh 2 x 10 1010New construction, 2-wire or 4-wire phasing

17 Hai Phong 500kV - Do Son 2 x 25 2525New construction,

2-wire or 4-wire phasing

18 Hai Phong 500kV - Duong Kinh 2 x 15 1515New construction,

4-wire phasing

19 Tu Ky - branch to Gia Loc - Hai Phong 500kV 4 x 2 22New construction

20Phuc Dien - branch to Gia Loc - Pho Noi 500kV

4 x 2 22New construction

21 Dong Anh 500kV - Dong Ky 2 x 8 88New construction, 4-

wire phasing

22 Dong Anh 2 - branch to Dong Anh - Van Tri 4 x 2 22New construction, 2-

circuirt switching

23 Soc Son 2 - branch to Dong Anh - Hiep Hoa 2 x 10 1010New construction,

1-circuirt switching

24West of Hanoi - branch to Ha Dong - Thanh Cong

2 x 12

1212New construction, line switching, direct

power supply from the West of Hanoi to Thanh

Cong

25 Ha Dong - Phu Ly 2 x 50 5050Upgrade to double circuit

26 Chuong My - branch to Ha Dong - Ung Hoa 4 x 10 1010New construction,

2-circuirt switching

Page 191: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

27 Ung Hoa - branch to Ha Dong - Phu Ly 2 x 4

44New construction, switching on the remaining circuit

28South of Hanoi 500kV - branch to Ha Dong - Phu Ly

4 x 2 22New construction, 2-circuirt switching

29 Thuan Thanh - branch to Bac Ninh - Pho Noi 2 x 6 66New construction, 1-

circuirt switching

30Long Bien 500kV - branch to Long Bien - Mai Dong

4 x 2 22New construction, 4-wire phasing

31Long Bien 500kV - branch to Long Bien - Bac Ninh 2

2 x 5

55New construction, line switching, direct

connection from Long Bien 500kV to Bac Ninh

2

32 Thai Binh 500kV - Hung Yen City 2 x 15 1515New construction

33Ly Nhan - branch to Thai Binh 500kV - Thanh Nghi

4 x 2 22New construction, 2-circuirt switching

34Nam Dinh 2 - branch to Nam Dinh -Ninh Binh & Vu Thu - Ninh Binh 2

4 x 3 33New construction, 2-circuirt switching

35 Nam Dinh 2 – branch to Truc Ninh 2 x 2

22New construction, line switching, direct

connection from Nam Dinh 2 to Truc Ninh

36Quynh Phu - branch to Hai Phong 500kV - Thai Binh I

4 x 2 22New construction, 2-circuirt switching

37 Thanh Hoa 500kV - Hau Loc 2 x 27 2727New construction,

4-wire phasing

38 Nam Dinh I thermal power station - Hau Loc 2 x 40 4040New construction

39Nam Dinh I thermal power station - Ninh Binh 2

2 x 25 2525New construction

40 Nam Dinh I thermal 2 x 10 1010New construction

Page 192: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

power station - Hai Hau

41 Tam Diep - branch to Bim Son - Ninh Binh 2 x 5 55New construction, 1-

circuirt switching

42 Can Loc - branch to Vinh - Ha Tinh 4 x 2 22New construction, 2-

circuirt switching

43Tuong Duong - branch to Ban Ve hydropower plant - Do Luong

2 x 3 33New construction, 1-circuirt switching

44 Tuong Duong - branch to Nam Mo - Ban Ve 1 x 6

66New construction, line switching in Nam Mo -

Tuong Duong

45 Tuong Duong - Do Luong 1 x 118

118118New construction, conformity

to N-1 criterion

46 Do Luong - Nam Cam 2 x 454545New construction,

conformity to N-1 criterion

47 Ha Tinh 500kV - Hung Dong 2 x 63

6363Renovation, increase of load capacity,

conformity to N-1 criterion

48 Phu Tho - Viet Tri 2 x 34

3434Renovation, increase of load capacity,

conformity to N-1 criterion

               

Table 5. List of 220kV electrical substations in the Central by 2030

No. Project name

Project nameProject

nameTransformer set(s) x

MVA

 Note

 Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities

built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Doc SoiDoc Soi1

x 125 Renovation, replacement of the

63MVA transformer set

Page 193: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2 Ngu Hanh Son

Ngu Hanh Son1

x

 250 New construction (former name: District 3 substation)

3 Hoa KhanhHoa

Khanh1 x

 250Renovation, replacement of the 125MVA transformer set for prevention of overload

4 Son HaSon Ha2

x 125

New construction subject to the progress of the hydropower project

5 Thanh My

Thanh

My1 x

 125

Renovation, installation of the 2nd transformer set, small-scale hydropower transmission, prevention of overload for the 1st

transformer set

6 Hai ChauHai

Chau1 x

 250 New construction, prevention of overload

7 Phong Dien

Phong

Dien1 x

 125 New construction, increase of reliability

8 Quang Ngai

Quang

Ngai1 x

 125Renovation, installation of the 2nd transformer set, prevention of overload

9 Dong HaDong

Ha1 x 125

Renovation, installation of the 2nd transformer set, power supply in dry season

10 Duy XuyenDuy

Xuyen1 x

 125 New construction

11 Kon TumKon Tum

1 x 125 New construction, transmission

of hydroelectricity in Kon Tum

12 Buon KuopBuon Kuop

1 x 125

Renovation, installation of the 2nd transformer set, overload prevention, under the power plant's management

13 Krong Buk Kron 250 Renovation, replacement of the

Page 194: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

g Buk1

x

1st transformer set, prevention of overload

14 Dak NongDak

Nong2 x

 125 New construction

15 Chu Se Chu Se1 x 125 New construction

16 Tuy HoaTuy

Hoa1 x 125

Renovation, installation of the 2nd transformer set, prevention of overload

17 Quy NhonQuy

Nhon1 x

 250Renovation of the 2nd transformer set for increase of capacity

18 Phu MyPhu

My1 x 125 New construction, assurance of

reliability

19 Nha TrangNha Trang1 x

 250 Renovation, replacement of the 125MVA transformer set

20 Thap ChamThap Cha

m1 x 125

Renovation, installation of the 2nd transformer set

21 Van PhongVan

Phong1 x

 250 New construction

22 Phuoc An

Phuoc

An1 x

 125New construction, installation of the transformer set in the circuit breaker station

23 Pleiku Pleiku1 x 250 Renovation, replacement of the

1st transformer set

24 Aluminum smelting

Aluminum smelting6

x

 174

New construction of 6 transformer sets at 220/99/22 kV - 174/174/65 MVA and 2 transformer sets at 220/22/10 kV - 70 MVA

 Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities

built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

Page 195: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

1 Ba Don 1 x 1 x 125Renovation, installation of the 2nd transformer set

2 Hue 1 x 1 x 250Renovation, replacement of the 1st transformer set

3 Tam Ky 1 x 1 x 125Renovation, installation of the 2nd transformer set

4 Dong Ha 1 x 1 x 250Renovation, replacement of the 1st transformer set

5 Krong Ana 2 x 2 x 125New construction

6 Chu Se 1 x 1 x 125Renovation, installation of the 2nd transformer set

7 Tuy Hoa 1 x 1 x 250Renovation of the 2nd transformer set for increase of capacity

8 Cam Ranh 1 x 1 x 250New construction

9 Lao Bao 1 x 1 x 125New construction connected to wind-based power plants

10 Kon Tum 1 x 1 x 125Renovation, installation of the 2nd transformer set

11 Dong Hoi 1 x 1 x 250Renovation, replacement of the 1st transformer set

12 Hoa Khanh 1 x 1 x 250Renovation, replacement of the 2nd transformer set

13 Tam Hiep 2 x 2 x 125New construction

14 Dung Quat 1 x 1 x 125Renovation, installation of the 2nd transformer set

15 Dung Quat 2 1 x 1 x 250New construction

16 Phuoc An 1 x 1 x 250Renovation, installation of the 2nd transformer set

17 Phu My 1 x 1 x 125Renovation, installation of the 2nd transformer set

18 Cam Ranh 1 x 1 x 250Renovation, installation of the 2nd transformer set

19 Ninh Hoa 2 x 2 x 250New construction

20 Krong Buk 1 x 1 x 250Renovation, replacement of the 2nd transformer set

Page 196: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

21 Buon Kuop 1 x 1 x 250Renovation, replacement of the 1st transformer set

22 Chan May 1 x 1 x 125New construction

 Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities

built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1 Dong Hoi 1 x 1 x 250Renovation, replacement of the 2nd transformer set

2 Lao Bao 1 x 1 x 125Renovation, installation of the 2nd transformer set

3 Dong Ha 1 x 1 x 250Renovation, replacement of the 2nd transformer set

4 Ngu Hanh Son 1 x 1 x 250Renovation, installation of the 2nd transformer set (former name: District 3 substation)

5 An Don 1 x 1 x 250New construction

6 Thanh My 1 x 1 x 250Renovation, replacement of the 1st transformer set

7 Tam Ky 1 x 1 x 250Renovation, replacement of the 1st transformer set

8 Tam Hiep 1 x 1 x 250Renovation, replacement of the 2nd transformer set

9 Bac Chu Lai 1 x 1 x 125New construction

10 Hue 1 x 1 x 250Renovation, replacement of the 2nd transformer set

11 Chan May 1 x 1 x 125Renovation, installation of the 2nd transformer set

12 Lien Chieu 2 x 2 x 250New construction

13 Doc Soi 1 x 1 x 250Renovation, replacement of the 2nd transformer set

14 Dung Quat 2 1 x 1 x 250Renovation

15 Dung Quat 1 x 1 x 250Renovation, replacement of 2 transformer sets

16 Quang Ngai 1 x 1 x 250Renovation, replacement of the 2nd transformer set

17 Quang Ngai 2 1 x 1 x 250New construction

Page 197: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

18 Phuoc An 1 x 1 x 250Renovation, replacement of the 1st transformer set

19 Phu My 1 x 1 x 250Renovation, replacement of the 1st transformer set

20 Song Cau 2 x 2 x 125New construction

21 Nhon Hoi 1 x 1 x 250New construction

22 Van Phong 1 x 1 x 250Renovation, installation of the 2nd transformer set

23 Bo Y 1 x 1 x 125New construction

24 Pleiku 1 x 1 x 250Renovation, replacement of the 2nd transformer set

25 Buon Kuop 1 x 1 x 250Renovation, replacement of the 2nd transformer set

           

Table 6. List of 220kV power lines in the Central by 2030

No. Project name Circuit(s) x kmCircuit(s) x kmCircuit(s) x km Note

 Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities

built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Ngu Hanh Son - branch to Da Nang - Tam Ky 2 x 12 New construction

2 Dong Hoi - Dong Ha 2 x 108New construction of the 2nd circuit, increase of power transmission between the North and the Central

3 Dong Ha - Hue 2 x 68New construction of the 2nd circuit, increase of power transmission between the North and the Central

4 Phong Dien - branch to Dong Hoi - Hue 4 x 5 New construction

5 Hoa Khanh - Hai Chau 2 x 10 New construction

6 Duy Xuyen - branch to Da Nang - Tam Ky 4 x 2 New construction

7 Xekaman 1 - Pleiku 2 x 133 New construction, use of the surveyed 500kV line (in Vietnam's territory)

8 Pleiku 2 - branch to Pleiku - Se San 4 4 x 16 New construction connected to Pleiku

2 500kV electrical substation

Page 198: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

9 Connection to the aluminum smelting factory 6 x 10 New construction

10An Khe biomass power plant - branch to Pleiku - An Khe hydropower plant

2 x 1New construction, exploitation of the output of An Khe biomass power plant

11 Pleiku 2 - branch to Pleiku - Krong Buk 2 x 13 New construction connected to Pleiku

2 500kV electrical substation

12 Pleiku 2 - Krong Buk 1 x 141 New construction of 2nd circuit, increase of reliability

13 An Khe - Pleiku 2 1 x 120 New construction of 2nd circuit, increase of reliability

14 An Khe - Quy Nhon 1 x 46 New construction of 2nd circuit, conformity to N-1 criterion

15 Quang Ngai - Phuoc An 2 x 135 New construction

16 Phu My - branch to Phuoc An - Quang Ngai 2 x 2 New construction

17 Thuong Kon Tum - Quang Ngai 2 x 76 New construction synchronized with

Thuong Kon Tum hydropower plant

18 Chu Se - branch to Pleiku - Krong Buk 2 x 2 New construction

19 Duc Trong - branch to Da Nhim - Di Linh 2 x 7 New construction

20 Tuy Hoa - Nha Trang 1 x 129 Renovation, suspension of the 2nd circuit

21 Nha Trang - Thap Cham 2 x 105 New construction, exploitation of electric output from Vinh Tan

22 Van Phong - branch to Nha Trang - Tuy Hoa 4 x 3 New construction

 Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities

built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

1 Thanh My 500kV - Duy Xuyen 2 x 57

New construction, increase of reliability in power supply for Da Nang City

2 Krong Ana - branch to Krong Buk - Buon Kuop 2 x 12 New construction

3 Cam Ranh - branch to Thap 4 x 2 New construction

Page 199: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Cham - Nha Trang

4 Lao Bao - Dong Ha 2 x 52 New construction, transmission of wind-based electricity

5 Hai Chau - Ngu Hanh Son 2 x 15New construction, increase of reliability in power supply for Da Nang City

6 Tam Hiep - Doc Soi 2 x 14New construction synchronized with the 220kV electrical substation in Tam Hiep

7 Doc Soi - Quang Ngai 1 x 60 Renovation of the 2nd circuit

8 Dung Quat 2 - Dung Quat thermal power station 2 x 15

New construction synchronized with the 220kV electrical substation in Dung Quat 2

9Dung Quat thermal power station - branch to Dung Quat - Doc Soi

4 x 1New construction, exploitation of the output of Dung Quat thermal power station

10 Dung Quat thermal power station - Doc Soi 2 x 5

New construction, exploitation of the output of Dung Quat thermal power station

11 Nha Trang - Krong Buk 1 x 147 New construction of the 2nd circuit

12 Ninh Hoa - branch to Tuy Hoa - Nha Trang 4 x 5 New construction

13220kV circuit breaker station - 500kV electrical substation in Krong Buk - Krong Buk

4 x 30New construction connected to 220kV breaker station and 500kV substation in Krong Buk

14220kv circuit breaker station - 500kV electrical substation in Van Phon - Ninh Hoa

2 x 25New construction, exploitation of the output of Van Phong 1 thermal power station

15

220kv circuit breaker station - 500kV electrical substation in Van Phong - branch to Ninh Hoa - Tuy Hoa 1

2 x 25New construction, exploitation of the output of Van Phong 1 thermal power station

 Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities

built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1An Don - branch to Hai Chau - Ngu Hanh Son (District 3)

2 x 1New construction synchronized with the 220kV electrical substation in An Don

Page 200: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

2 Bac Chu Lai - branch to Tam Ky - Doc Soi 4 x 3

New construction synchronized with the 220kV electrical substation in Bac Chu Lai

3 Quang Ngai 2 - branch to Doc Soi - Quang Ngai 4 x 3

New construction synchronized with the 220kV electrical substation in Quang Ngai 2

4 Bo Y - Kon Tum 2 x 60New construction synchronized with the 220kV electrical substation in Bo Y

5

220kV circuit breaker station - 500kV electrical substation in Binh Dinh - branch to Phuoc An - Phu My

4 x 20New construction connected to 220kV breaker station and 500kV substation in Binh Dinh

6220kV circuit breaker station - 500kV electrical substation in Binh Dinh - Nhon Hoi

2 x 22New construction synchronized with the 220kV electrical substation in Nhon Hoi

7 Song Cau - branch to Quy Nhon - Tuy Hoa 2 x 3

New construction synchronized with the 220kV electrical substation in Song Cau

8 Nhon Hoi - Song Cau 2 x 75 New construction

9 Song Cau - Tuy Hoa 2 x 40 New construction

10Van Phong thermal power station - branch to Ninh Hoa - Van Phong

2 x 25New construction synchronized with the 220kV electrical substation in Van Phong

11 Nha Trang - Ninh Hoa 2 x 129 Renovation, increase of load capacity, conformity to N-1 criterion

 

Table 7. List of 220kV electrical substations in the South by 2030

No. Project name Transformer set(s) x MVA  Note

  Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Duc Trong 2 x 125 New construction, increase of reliability in power supply

2 Thap Cham 1 x 125 Renovation, installation of the 2nd

transformer set

Page 201: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

3 Ham Tan 1 x 250 New construction, increase of reliability in power supply

4 Ham Tan 1 x 125 Renovation, installation of the 2nd transformer set

5 Bao Loc 1 x 125 Renovation, replacement of the 63MVA transformer set

6 Da Nhim 2 x 125 Renovation, transformer set replacement

7 Vung Tau 2 x 250New construction, increase of reliability in power supply for Vung Tau City

8 My Xuan 2 x 250 New construction, prevention of overload in Phu My

9 Tan Thanh 1 x 250

Renovation, installation of the 3rd transformer set, prevention of overload, supply of power to the Southern petrochemical complex

10 Chau Duc 1 x 250 New construction, supply of power to Chau Duc industrial zone

11 Tri An 1 x 250 Renovation, replacement of the 125MVA transformer set

12 Thuan An 1 x 250 Renovation, installation of the 2nd transformer set

13 Binh Long 1 x 250 Renovation

14 Tan Uyen 2 x 250 New construction synchronized with the 500kV substation in Tan Uyen

15 Duc Hoa 1 1 x 250 Renovation, installation of the 2nd transformer set

16 Tay Ninh 2 1 x 250 New construction, supply of power to Phuoc Dong Boi Loi industrial zone

17 Nhon Trach City 1 x 250Renovation, installation of the 2nd transformer set, reduction of electrical load in Long Thanh

18 Tam Phuoc 1 x 250 New construction

19 Uyen Hung 1 x 250 Renovation, installation of the 2nd transformer set

20 Chon Thanh (Binh Long 2) 1 x 250 New construction in the 500kV

Page 202: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

electrical substation in Chon Thanh

21 Ben Cat 2 x 250 New construction

22 Ben Cat 2 2 x 250 New construction

23 Binh Long 1 x 250 Renovation of the 1st transformer set for increase of capacity

24 District 8 2 x 250 New construction

25 High tech zone0} 2 x 250 New construction

26 Vinh Loc 1 x 250Renovation, replacement of the temporary substation with the official one

27 Tan Cang 2 x 250 New construction

28 Dam Sen 2 x 250 New construction

29 Thu Thiem 1 x 250 New construction

30 Tan Son Nhat 2 x 250 New construction

31 Mo Cay 1 x 125 New construction

32 Tra Vinh 1 x 125 Renovation, installation of the 2nd transformer set

33 Cao Lanh 2 x 250 Renovation, replacement of two 125MVA transformer sets

34 Can Duoc 1 x 250 New construction

35 Ben Luc 1 x 250 New construction, reduction of electrical load in Long An

36 Tra Noc 1 x 250 Renovation, replacement of the 100MVA transformer set

37 Sa Dec 2 x 250 New construction

38 Long Xuyen 2 1 x 250 New construction

39 Kien Binh 2 x 250 Renovation, increase of power supply in Phu Quoc

40 Soc Trang 1 x 250 Renovation of the 1st transformer set at full load

41 Rach Gia 1 x 250 Renovation for increase of capacity

42 Chau Thanh (Hau Giang) 1 x 250 New construction

43 Can Tho 1 x 250 New construction

44 Vinh Long 2 1 x 250 Renovation of the 2nd transformer set

Page 203: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

for increase of capacity

45 Tra Vinh 1 x 250 Renovation of the 1st transformer set for increase of capacity

46 Gia Rai 1 x 125 New construction, prevention of overload in 110kV grid

47 Ca Mau 1 x 250 Renovation of the 1st transformer set for increase of capacity

48 An Phuoc 2 x 250 New construction

  Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

1 Tay Ninh 1 x 250 Renovation, installation of the 2nd transformer set

2 Xuan Loc 1 x 250 Renovation, installation of the 2nd transformer set

3 VSIP 2 x 250 New construction

4 Binh Long 2 1 x 250 Renovation, installation of the 2nd

transformer set

5 Can Duoc 1 x 250 Renovation, installation of the 2nd transformer set

6 Ben Luc 1 x 250 Renovation, installation of the 2nd transformer set

7 Long Xuyen 2 1 x 250 Renovation, installation of the 2nd transformer set

8 Gia Rai 1 x 125 Renovation, installation of the 2nd transformer set

9 Thot Not 1 x 250 Renovation, transformer set replacement

10 Phan Ri 1 x 250 New construction

11 Chau Duc 1 x 250 Renovation, installation of the 2nd transformer set

12 Dat Do 2 x 250 New construction

13 Bac Chau Duc 2 x 250 New construction in the 500kV electrical substation

14 Phu My 3 industrial zone 2 x 250 New construction

15 Thu Thiem 1 x 250 Renovation, installation of the 2nd

transformer set

Page 204: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

16 District 7 2 x 250 New construction

17 Cu Chi 2 2 x 250 New construction

18 Binh Chanh 1 2 x 250 New construction

19 Binh Long 1 x 250 Renovation, replacement of the 2nd transformer set

20 Phuoc Long 1 x 250 New construction of the 1st transformer set

21 Tay Ninh 2 1 x 250 Renovation, installation of the 2nd transformer set

22 Tan Bien 2 x 250 New construction

23 Phuoc Dong 1 x 250 New construction

24 Chon Thanh 1 x 250Renovation, installation of the 2nd cascade transformer set in the 500kV substation

25 Lai Uyen 2 x 250 New construction

26 Tan Dinh 2 2 x 250 New construction

27 Binh My 1 x 250 New construction

28 Tri An 1 x 250 Renovation, replacement of the 2nd transformer set

29 Long Khanh 2 x 250 New construction

30 Dinh Quan 2 x 250 New construction

31 Nhon Trach industrial zone 2 x 250 New construction

32 Duc Hoa 1 x 250Renovation, installation of the 1st cascade transformer set in the 500kV electrical substation in Duc Hoa

33 Duc Hoa 2 2 x 250 New construction

34 Duc Hoa 3 2 x 250 New construction

35 Lap Vo 1 x 250 New construction

36 Chau Thanh 1 x 250 New construction

37 Go Cong 1 x 250 New construction

38 Ben Tre 1 x 250 Renovation, replacement of the 2nd transformer set

39 Mo Cay 1 x 250 Renovation, installation of the 2nd

Page 205: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

transformer set

40 Tra Noc 1 x 250 Renovation, replacement of two 125MVA transformer sets

41 O Mon 2 x 250 Renovation, replacement of 2 transformer sets

42 Can Tho 1 x 250 Renovation, installation of the 2nd transformer set

43 Duyen Hai 1 x 250 New construction

44 My Tu 1 x 125 New construction

45 Cai Be 1 x 250 New construction

46 Chau Thanh 1 x 125 New construction

47 Hon Dat circuit breaker station   New construction connected to Kien

Giang thermal power station

48 Nam Can 1 x 250 New construction (former name: Cai Nuoc)

49 Long Son 1 x 250 New construction, supply of power on Long Son island

  Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1 Bao Loc 1 x 250 Renovation, replacement of the 1st transformer set

2 Duc Trong 1 x 250 Renovation, replacement of the 1st transformer set

3 Ninh Phuoc 1 x 250 New construction

4 Ham Thuan 1 x 125 Renovation, installation of the 2nd transformer set

5 Phan Thiet 1 x 250 Renovation, replacement of the 1st transformer set

6 Phan Ri 1 x 250 Renovation, installation of the 2nd transformer set

7 Ba Ria 1 x 250 Renovation, installation of the 2nd

transformer set

8 Phu My City 2 x 250 New construction

9 Nam Hiep Phuoc 2 x 250 New construction

10 Binh Chanh 2 2 x 250 New construction

Page 206: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

11 Phu Hoa Dong 1 x 250 New construction

12 Northwest of Cu Chi 1 x 250 New construction

13 Dong Xoai 1 x 250 New construction

14 Phuoc Dong 1 x 250 Renovation, installation of the 2nd transformer set

15 Ben Cau 2 x 250 New construction

16 Tay Ninh 2 x 250New construction cascaded in the 500kV electrical substation in Tay Ninh

17 Tay Ninh 3 2 x 250 New construction

18 Binh My 1 x 250 Renovation, installation of the 2nd transformer set

19 Phu Giao 1 x 250 New construction

20 Ho Nai 2 x 250 New construction

21 Bien Hoa 2 x 250 New construction, reduction of electrical load in Long Binh

22 Dau Giay 2 x 250 New construction

23 Tam Phuoc 1 x 250 Renovation, installation of the 2nd transformer set

24 Duc Hoa 1 x 250Renovation, installation of the 2nd cascade transformer set in the 500kV electrical substation in Duc Hoa

25 Tan An 2 x 250 New construction

26 Duc Hoa 4 2 x 250 New construction

27 Thanh Binh 2 x 250 New construction

28 Hong Ngu 1 x 250 New construction

29 Chau Thanh (Hau Giang) 1 x 250 Renovation, installation of the 2nd

transformer set

30 Cho Moi 1 x 250 New construction

31 Go Cong 1 x 250 Renovation, installation of the 2nd

transformer set

32 Vinh Long 3 2 x 250 New construction

33 Ba Tri 1 x 250 New construction

34 Vinh Thuan 1 x 250 New construction

Page 207: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

35 Thot Not 1 x 250 Renovation, replacement of the 2nd transformer set

36 Tra Vinh 1 x 250 Renovation, replacement of the 2nd transformer set

37 Soc Trang 1 x 250 Renovation, replacement of the 2nd transformer set

38 My Tu 1 x 125 Renovation, installation of the 2nd transformer set

39 Chau Thanh 1 x 125 Renovation, installation of the 2nd transformer set

40 Hon Dat 1 x 250 New construction, installation of the 1st

transformer set

41 Bac Lieu 2 1 x 250 Renovation, replacement of the 2nd transformer set

42 Nam Can 1 x 250 Renovation, installation of the 2nd transformer set

 

Table 8. List of 220kV power lines in the South by 2030

No. Project name Circuit(s) x km Circuit(s) x kmCircuit(s) x km Note

 Facilities built from 2016 to 2020Facilities built from 2016 to 2020Facilities

built from 2016 to 2020Facilities built from 2016 to 2020Facilities built from 2016 to 2020

1 Phan Thiet - Tan Thanh (Phu My 2 industrial zone) 2 x 144 New construction, exploitation of

electric output from Vinh Tan

2 Increase of load capacity in Phu My - My Xuan 2 x 5 Renovation, prevention of overload

3 My Xuan - branch to Phu My - Cat Lai 4 x 0,5 New construction synchronized with

the electrical substation in My Xuan

4 Ham Tan - branch to Phan Thiet - Tan Thanh 4 x 1 New construction synchronized with

the electrical substation in Ham Tan

5 Di Linh - Bao Loc 1 x 34New construction, suspension of 2-circuit line before 1-circuit line in consideration

6 Chau Duc - branch to Ham Tan - Tan Thanh 4 x 2 New construction

Page 208: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

7 Phu My thermal power station - Tan Thanh 2 x 11

Renovation of the 110kV power line between Phu My thermal power station and Tan Thanh to 4-circuit power line

8 Cau Bong - Hoc Mon - branch to Binh Tan 4 x 7 New construction, 6-circuit

arrangement in consideration

9 Cau Bong - Duc Hoa 4 x 12 New construction

10 High tech zone - Cat Lai 2 x 6,5 New construction, temporary use of 110kV line

11 Phu Lam - Hoc Mon 2 x 19 Renovation of 1-circuit line to 2-circuit line

12 Binh Chanh - District 8 2 x 6,5 New construction, underground line

13 My Tho 500 - branch to Long An - Cai Lay 4 x 3 New construction

14 Connection to Ben Luc 2 x 10 New construction

15 Tay Ninh - Binh Long 2 x 64 New construction, increase of reliability in power supply

16 Tan Uyen - Thuan An 2 x 8New construction and renovation,  exploitation of the 500kV substation in Tan Uyen

17 Tan Uyen - branch to Thu Duc - Long Binh 4 x 8 New construction synchronized with

the 500kV substation in Tan Uyen

18 Tay Ninh 2 - branch to Trang Bang - Tay Ninh 2 x 5 New construction

19 Tan Cang - Cat Lai 2 x 14 New construction, underground line

20 Junction from Vinh Loc to Hoc Mon - Binh Tan 2 x 5 New construction, 2-circuirt switching

21 Tam Phuoc - branch to Long Thanh - Long Binh 2 x 2 New construction

22 Phu Lam - Dam Sen 2 x 8 New construction

23 Connection to Thu Thiem 4 x 0,5 New construction

24 Ben Cat - branch to Binh Long - My Phuoc 4 x 2 New construction

25 Chon Thanh - branch to Binh Long - My Phuoc 4 x 10 New construction

26 Chon Thanh - Ben Cat 2 x 50 New construction

Page 209: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

27 Hiep Binh Phuoc - Tan Son Nhat 2 x 7 New construction

28 Bien Hoa - branch to Tan Uyen - Long Binh 4 x 1 New construction

29 Song May - Tam Phuoc 2 x 20New construction, reduction of electrical load in Song May - Long Binh

30 An Phuoc - branch to Long Binh - Long Thanh 4 x 5 New construction

31 Cat Lai - Thu Duc 2 x 9 Renovation, increase of load capacity

32 Can Duoc - branch to Phu My - My Tho 4 x 5 New construction

33 Sa Dec - branch to Vinh Long 2 - O Mon 2 x 5 New construction

34 Long Xuyen 2 - branch to Thot Not - Chau Doc 4 x 6 New construction

35 Cai Lay - Cao Lanh (2nd generator set) 1 x 54 New construction

36 Cao Lanh - Thot Not (2nd generator set) 1 x 27 New construction

37 Long Phu thermal power station - Can Tho - Tra Noc 2 x 95

New construction, exploitation of the output of Long Phu 1 thermal power station

38Suspension of 2nd circuit of the power line from Soc Trang to O Mon

1 x 80 Renovation, exploitation of the output of Long Phu 1 thermal power station

39 Duc Hoa 500kV - Duc Hoa 1 4 x 22 New construction, 4-circuit line,

suspension of 2 circuits in advance

40 Increase of load capacity in Ben Tre - My Tho 2 x 16

Renovation, exploitation of the output of Duyen Hai 1 and Duyen Hai 3 thermal power stations

41 Long Phu thermal power station - Soc Trang 2 x 25 New construction synchronized with

Long Phu 1 thermal power station

42Chau Thanh (Hau Giang) - branch to O Mon - Soc Trang

4 x 5 New construction

43 Duc Hoa 500kV - branch to Phu Lam - Long An 2 x 20 New construction

Page 210: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

44 Dam Sen - Tan Son Nhat 2 x 6 New construction

45 Tan Son Nhat - Thuan An 2 x 15 New construction

46 Long Thanh 500kV - High tech zone 2 x 25 New construction, increase of power

supply for Ho Chi Minh City

47Long Thanh 500kV - branch to Long Thanh - Long Binh

4 x 12 New construction, 2-circuit switching on the existing power line

48 Ben Cat 2 - branch to Tan Dinh - Cu Chi 4 x 2 New construction

49 Ben Cat - Ben Cat 2 2 x 20 New construction, switching to Chon Thanh - Ben Cat 2

50 Thot Not - Long Xuyen - Chau Doc 2  x 69 Renovation, increase of load capacity,

conformity to N-1 criterion

51 Cu Chi - Trang Bang 2  x 15 Renovation, increase of load capacity, conformity to N-1 criterion

52Gia Rai - branch to Ca Mau thermal power station - Bac Lieu 2

4 x 2New construction synchronized with the 220kV electrical substation in Gia Rai

 Facilities built from 2021 to 2025Facilities built from 2021 to 2025Facilities

built from 2021 to 2025Facilities built from 2021 to 2025Facilities built from 2021 to 2025

1 Bao Loc - Song May 1 x 127 Renovation, 2nd circuit, increase of reliability

2 Dinh Quan - branch to Bao Loc - Song May 4 x 1

New construction synchronized with the 220kV electrical substation in Dinh Quan

3 Phan Ri - branch to Phan Thiet - Vinh Tan 4 x 2

New construction synchronized with the 220kV electrical substation in Phan Ri

4 Bac Chau Duc - branch to Tan Thanh - Chau Duc 4 x 10 New construction

5 Son My - branch to Ham Tan - Chau Duc 4 x 4 New construction

6 Dat Do - branch to Son My - Chau Duc 4 x 2

New construction synchronized with the 220kV electrical substation in Dat Do

7 Phu My 3 industrial zone - branch to Tan Thanh - Bac

4 x 6 New construction synchronized with the 220kV electrical substation in Phu

Page 211: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Chau Duc My 3 industrial zone

8 Tao Dan - Tan Cang 2 x 7 New construction, underground line

9 Binh Chanh 1 - Cau Bong 2 x 13New construction synchronized with the 220kV electrical substation in Binh Chanh 1

10 Cu Chi 2 - branch to Cu Chi - Cau Bong 4 x 1 New construction

11 Thu Thiem - branch to Cat Lai - Tan Cang 2 x 2 New construction, underground line

12 District 7 - Nha Be 2 x 6New construction synchronized with the 220kV electrical substation in District 7

13 Binh Duong - branch to Uyen Hung - Song May 4 x 2 New construction

14 Binh My - branch to Song May - Binh Duong 4 x 2

New construction synchronized with the 220kV electrical substation in Binh My

15 VSIP - branch to Binh Hoa - Thuan An 4 x 2

New construction synchronized with the 220kV electrical substation in VSIP

16 Tan Dinh 2 - branch to Tan Dinh - Ben Cat 4 x 2

New construction synchronized with the 220kV electrical substation in Tan Dinh 2

17 Lai Uyen - branch to Chon Thanh - My Phuoc 4 x 2

New construction synchronized with the 220kV electrical substation in Lai Uyen

18 Tan Bien - Tay Ninh 2 x 30New construction synchronized with the 220kV electrical substation in Tan Bien

19

220kV busway - 500kV electrical substation in Tay Ninh - branch to Tay Ninh - Trang Bang

4 x 1New construction connected to 220kV busway and 500kV substation in Tay Ninh

20220kV busway - 500kV electrical substation in Tay Ninh - Phuoc Dong

2 x 36New construction synchronized with the 220kV electrical substation in Phuoc Dong

21 Long Khanh - branch to Long Thanh - Xuan Loc 4 x 2

New construction synchronized with the 220kV electrical substation in Long Khanh

Page 212: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

22 Nhon Trach City - Nhon Trach industrial zone 2 x 3 New construction

23 Nhon Trach industrial zone - Long Thanh 500kV 2 x 30 New construction

24Duc Hoa 3 - 220kV busway and 500kV electrical substation in Duc Hoa

2 x 6 New construction synchronized with Duc Hoa 3 220kV electrical substation

25 Chau Thanh - branch to Chau Doc - Thot Not 4 x 2

New construction synchronized with the 220kV electrical substation in Chau Thanh (An Giang)

26

Lap Vo - 220kV circuit breaker station and 500kV electrical substation in Thot Not

2 x 22New construction synchronized with the 220kV electrical substation in Lap Vo

27 Connection to Kien Giang thermal power station     20 New construction, further research

required

28 Hon Dat busway - branch to Kien Binh - Rach Gia 2 x 2 New construction

29 Cai Be - branch to Cao Lanh - Cai Lay 4 x 3

New construction synchronized with the 220kV electrical substation in Cai Be

30 Chau Thanh - branch to O Mon - Long Phu 4 x 2

New construction synchronized with the 220kV electrical substation in Chau Thanh (Soc Trang)

31 My Tu - branch to Chau Thanh - Long Phu 2 x 2

New construction synchronized with the 220kV electrical substation in My Tu

32 Ninh Kieu - branch to Tra Noc - Long Phu 4 x 4

New construction synchronized with the 220kV electrical substation in Ninh Kieu

33 Nam Can - Ca Mau 2 2 x 55New construction synchronized with the 220kV electrical substation in Nam Can

34Duyen Hai 2 - branch to Duyen Hai thermal power station - Mo Cay

4   x 2New construction synchronized with the 220kV electrical substation in Duyen Hai 2

35 Go Cong - Can Duoc 2 x 20New construction synchronized with the 220kV electrical substation in Go Cong

Page 213: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

36 O Mon - Sa Dec - Vinh Long - Cai Lay 2 x 75 Renovation, increase of load capacity,

conformity to N-1 criterion

37 Xuan Loc - Long Khanh - Long Thanh 2 x 58 Renovation, increase of load capacity,

conformity to N-1 criterion

38 My Tho - Long An 2 x 27 Renovation, increase of load capacity, conformity to N-1 criterion

39 Connection to Long An 1 thermal power station     60 New construction, further research

required

40 Rach Gia - Hon Dat 2 x 40 Renovation, increase of load capacity, conformity to N-1 criterion

41 Phu Lam - Vinh Loc - Hoc Mon 2 x 36 Renovation, increase of load capacity,

conformity to N-1 criterion

42Long Son - branch to Chau Duc - Phu My 3 industrial zone

2 x 8 New construction

43 Phuoc Long - branch to Binh Long - Dak Nong 2 x 5 New construction

 Facilities built from 2026 to 2030Facilities built from 2026 to 2030Facilities

built from 2026 to 2030Facilities built from 2026 to 2030Facilities built from 2026 to 2030

1 Ninh Phuoc - branch to Thap Cham - Vinh Tan 4 x 2 New construction

2 Song May - Long Binh 1 x 17 Renovation, 2nd circuit, increase of reliability

3 Ho Nai - branch to Song May - Tam Phuoc 4 x 2 New construction

4Phu My City - branch to Bac Chau Duc - Phu My 3 industrial zone

4 x 8 New construction

5 Phu Giao - branch to Uyen Hung - Binh Duong 1 4 x 4 New construction

6 Phu Hoa Dong - branch to Cu Chi 2 - Cu Chi 4 x 2 New construction

7Cu Chi 3 - 220kV busway and 500kV electrical substation in Cu Chi

2 x 5 New construction

8 Tay Ninh 3 - branch to Tay Ninh 2 - Tay Ninh 1

4 x 3 New construction

Page 214: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

busway

9

220kV circuit breaker and 500kV electrical substation in Tay Ninh - branch to Tay Ninh 2 - Trang Bang

4 x 2 New construction

10 Binh Long 2 - branch to Binh Long - Chon Thanh 4 x 4

New construction synchronized with the 220kV electrical substation in Binh Long 2

11Ben Cau - branch to Tay Ninh 2 busway - Trang Bang

4 x 4 New construction

12Duc Hoa 4 - 220kV busway and 500kV substation in Duc Hoa

2 x 7 New construction

13

220kV busway and 500kV electrical substation in Duc Hoa - branch to Phu Lam - Ben Luc

2 x 20 New construction

14Binh Chanh 2 - branch to Phu Lam - Duc Hoa busway

4 x 2 New construction

15Dau Giay - 220kV busway and 500kV electrical substation in Dong Nai 2

2 x 20 New construction

16 Bien Hoa - branch to Long Binh - Tan Uyen busway 4 x 2 New construction

17 Hong Ngu - Chau Doc 2 x 34 New construction

18Hong Ngu - 220kV busway and 500kV electrical substation in Dong Thap

2 x 24 New construction

19

Thanh Binh - 220kV circuit breaker station and 500kV electrical substation in Dong Thap

2 x 7 New construction

20Cho Moi - 220kV busway and 500kV electrical substation in Dong Thap

2 x 12 New construction

21 Cho Moi - Chau Thanh 2 x 15 New construction

22 Vinh Thuan - branch to 2 x 2 New construction

Page 215: Quyết định 428/QD-TTg · Web viewTitle Quyết định 428/QD-TTg Subject Decision No. 428/QĐ-TTg revisions national power development plan 2011 2020 2030 2016 Author Thủ

Rach Gia - Ca Mau thermal power station

23

220kV busway and 500kV electrical substation in Tien Giang - branch to Vinh Long 2 - Sa Dec

4 x 15 New construction

24

220kV busway and 500kV electrical substation in Tien Giang - branch to Cao Lanh - Cai Be

4 x 4 New construction

25 Vinh Long 3 - branch to Vinh Long 2 - Tra Vinh 4 x 2 New construction

26 Ba Tri - Ben Tre 2 x 18 New construction

27 Tan An - branch to My Tho - Can Duoc 4 x 5 New construction

28 Connection to Long An 2 thermal power station     62 New construction, further research

required

29 Dong Xoai - Chon Thanh 2 x 39 New construction

30 Nam Hiep Phuoc - branch to Phu My - Can Duoc 4 x 2 New construction

31 Connection to Tan Phuoc power center     120 New construction, further research

required

32 Ca Mau 2 - Ca Mau thermal power station 2 x 6 Renovation, increase of load capacity,

conformity to N-1 criterion

33 Chon Thanh - Binh Long 2 x 30 Renovation, increase of load capacity, conformity to N-1 criterion

34 Tan Dinh - Binh Hoa - VSIP - Hoc Mon 2 x 22 Renovation, increase of load capacity,