SUMMARY STATEMENT
No. ITEMS AMOUNT FINAL AMOUNT
1 CIVIL WORK 316715.00 0.00
2 INTERNAL PLUMBING WORK 341000.00 0.00
3 FALSE CEILING / POP WORK 592500.00 0.00
4 PARTITION / PANELLING WORK 1807700.00 0.00
5 STORAGE & FIX FURNITURE WORK 0.00 0.00
6 DOOR & WINDOW 355200.00 0.00
7 LOOSE FURNITURE WORK 0.00 0.00
8 PAINTING WORK 275000.00 0.00
9 MISCELLANEOUS #VALUE! 0.00
TOTAL #VALUE! 0.00
Note:
1 Items which are not included in this specification shall be used by contractor
only after approval
2 Ceramic tiles ,marble & Granite for flooring will be approved coloured & make.
3 If any Difference will found in any item prices will be given extra by client
4 Sales Tax, Vat & any Government levies will be extra
5 Advance 25% along with work order as per discussion
Specifications
1 Cement to be used for all interior propose will be pf A.C.C. make Portland
grade & equivalent.
2 Ceramic tiles ,marble & Granite for flooring will be approved coloured & make.
3 Plywood for all furniture will be of 303 grade I.S.I. mark powder proof)
(commercial grade A ply only like century commerical or equailent.
4 Wood to be used for partition frame work will be of Sal Wood
5 Edge Binding of Tables, Flush door sense will be use of 1 Grade B. T. C.
6 Laminate will be used as per approval(1.00 mm thick)
7 Paint will be used Asian Paint / ICI Dulux / Nerolac Emalstion.
E. & O. E.
-
8/22/2019 Quotation for Referencem
2/12
Sub : QUATATION FOR INTERIOR JOB WORK AT GROUND FLOOR AREA
Dear Sir,
This is regarding the above statted matter. We are quoating our comparative prices
for your kind consideration & perusal.
No. Description Qty. Unit Rate Amount
A CIVIL WORK
1a Providing & Making of the 150mm thk. Brick Sq.ft 0.00
wall with cement morter 1:4 (1 cement : 4
coarse sand), including lintels for doors
1b Providing & Making of the 9" thk. Brick Sq.ft 0.00
wall with cement morter 1:4 (1 cement : 4
coarse sand), including lintels for doors
2 Providing & Applying 1/2" thk smooth plaster Sq.ft 0.00
on brick / concreat wall
3 BRICKBAT COBA filling of average thickness Sq.ft 0.00150mm after laying of soil pipes, with 1:4
cement sand morter at toilet & pantry area
4 Providing & Laying cement based water Sq.ft 0.00
proofing treament up to 4' - 0" height of toilet
& floor area & pantry aera wall by surface
method in 12mm thk. Cement morter with
ten years guarantee
5 Providing & erecting 600mm deep pantry Rft 0.00
counter in shape & design with approved
18mm thk. Granite top with 1 1/2" thk.
Double round moulding of approved shake,
making cut - out for sink, plumbing fixture ,&
with granite vertical & marble self with edge
polishing
(Basic cost granite 145/- per Sq.ft)
6 Providing & erecting 600mm deep wash basin 36.00 Rft 0.00
counter to shape & desigen with18mm thk.
granite top with 3/4" cement morter bedding &
cuddappa base , granite / marine ply fasia
making cut-out for sink
(Basic cost granite 145/- per Sq.ft)
-
8/22/2019 Quotation for Referencem
3/12
No. Description Qty. Unit Rate Amount
7 Providing & Laying of the ceramic tile flooring 786.00 Sq.ft 110.00 86460.00
at pantry/cafetaria area
(Basic rate of tile 50/- per sq.ft)
8 Providing, Laying & Fixing of the toilet area 414.00 Sq.ft 110.00 45540.00
ceramic tile flooring
(Basic cost of tile 50/- per Sq.ft)
9 Providing, Laying & Fixing of the store area 110.00 Sq.ft 110.00 12100.00
ceramic tile flooring
(Basic cost of tile 50/- per Sq.ft)
10 Providing & Fixing of the ceramic tile dado 1501.00 Sq.ft 115.00 172615.00
at toilet area
(Basic cost of tile 55/- per Sq.ft)
11 Providing & Fixing of the 6mm thk Vitrified Tile 3561.00 Sq.ft 135.00 480735.00
flooring avg 40mm thk bed of 1:4 cement float,
filling joints clearing complete.
24" x 24" ( Basic Rate :- 80/-)
12 Providing & Fixing of the vitrified Skirting 100mm 821.00 Rft 110.00 90310.00
high.
13 Laying & fixing of the window ledge with edge 225.00 Rft 55.00 12375.00
moulding & polish finish in Indian Marble( Marble supply by Client )
14 Providing & fixing 18mm thk. Granite devider 3.00 Nos 2000.00 6000.00
at urinal area ( Both side polish )
( 4'- 0" x 2'- 0" )
15 Providing & Fixing of the italian marble 716.00 Sq.ft 310.00 221960.00
flooring avg 40mm thk bed of 1:4 cement float,
filling joints clearing complete.
( Basic Rate :- 250/-)
TOTAL CIVIL WORK 316715.00
-
8/22/2019 Quotation for Referencem
4/12
No. Description Qty. Unit Rate Amount
B INTERNAL PLUMBING
1 Providing & Fixing plumbing inlet & outlet
concealed plumbing line for ladies & gents
toilet pantry
a Pantry plumbing Nos On Selection 30000.00
2 Providing & Fixing Toilet area plumbing
2a 1 WC, 1 Wash basin Nos On Selection 12000.00
2b 2 WC, 2 Wash basin Nos On Selection 24000.00
2c 1 WC , 3 Urinal , 3 Wash basin Nos On Selection 31000.00
3 Providing & Fixing wall mount E.W.C. with all 6.00 Nos On selection 50000.00
fitting like concealed fluse walve,health faucet,
seat cover, braket etc.
model no. 20047 white (hindware make)
4 Providing & fixing under counter wash basin 8.00 Nos On selection 110000.00
including jaqure make bottle trap,pillar cock,
angle cock etc.
5 Providing & fixing of the Hindware make 3.00 Nos On selection 20000.00back large urinal with Auto flush system
6 C.P. finish toilet paper holder Jaquar 6.00 Nos On selection 20000.00
make
7 Toilet paper dispenser 6.00 Nos On selection 12000.00
8 Bip tap of Jaquar make 6.00 Nos On selection 15000.00
9 Robe hook 6.00 Nos On selection 7000.00
10 S.S.sink, nirali make with single drian board 1.00 Nos On selection 10000.00
& with Jaquar make sink mixture
TOTALOF PLUMBING WORK 341000.00
-
8/22/2019 Quotation for Referencem
5/12
No. Description Qty. Unit Rate Amount
C FALSE CEILING/ P.O.P. WORK
1 Providing & making of the metal frame false 7000.00 Sq.ft 60.00 420000.00
ceiling of 12.5mm thick gypsum board
including vertical drop pannels
2 Providing & fixing of the openable trap door 150.00 Sq.ft 350.00 52500.00
shutter in 19mm thick ply in paint finish with
requried salwood vertical frame section &
with L end key system
3 Providing & Levelling of the Plaster of paris 8000.00 Sq.ft 15.00 120000.00
punning upto 12mm thick on existing walls
& columns
FALSE CEILING/ P.O.P. WORK 592500.00
-
8/22/2019 Quotation for Referencem
6/12
No. Description Qty. Unit Rate Amount
D PARTITIONS/ PANNELLING WORK
1 Providing & Fixing of the full height double 2400.00 Sq.ft 350.00 840000.00
skin gypsum board partition(GI framing & both
side 12mm thick gypsum board)
2 Providing & Fixing of the full height partly glaze 700.00 Sq.ft 350.00 245000.00
double skin gypsum board partition(GI framing
& both side 12mm thick gypsum board)
3 Providing & Fixing of the full height double 144.00 Sq.ft 400.00 57600.00
skin partition(2''x2''salwood frame & both
side 12mm thick commercial ply) in with
laminate finish &100mm heigh laminite
skirting
4 Providing & Fixing of the full height single 1338.00 Sq.ft 450.00 602100.00
skin partition(2''x2''salwood frame & both
side 12mm thick commercial ply) in with
veneer finish
4 Providing & Fixing of the full height double 140.00 Sq.ft 450.00 63000.00
skin sliding folding partition in with veneer finish
4 Providing & Fixing of the 12mm thick soft Sq.ft 400.00 0.00
board pannelling work with fabric finish &
25mmx12mm t.w. moulding on edge with
white zinc polish finish.
5 Providing & Fixing of the Pelment for window Rft 350.00 0.00
area made out of 19mm thick plywood &
laminate finish.
6 Providing & fixing of Venner pannellling Sq.ft 450.00 0.00
with Melamine Polish at Discussion Wall
area
7 Providing & Fixing of the Glass Wool in side Sq.ft 50.00 0.00
partition area for sound proofing
TOTAL OF PARTITION/PANNELLING WORK 1807700.00
-
8/22/2019 Quotation for Referencem
7/12
No. Description Qty. Unit Rate Amount
E STORAGE & FIX FURNITURE WORK
1 Providing & Fixing of the full height storage
made in 19mm thick comm.ply in laminate
finish from outside & french polish from inside
& with handle,lock,injesh & megnate boll
catch fixing etc.
A. 18'' deep Sqft 480.00 0.00
B. 24'' deep Sqft 480.00 0.00
2 Providing & Fixing of the low height storage Sqft 480.00 0.00made in 19mm thick comm.ply in laminate
finish from outside & french polish from inside
& with handle,lock,hinges & megnate boll
catch fixing etc.
3 Providing & Fixing of the rear credenza in Sqft 480.00 0.00
laminate finish from outside & french polish from
& with handle,lock,hinjesh & megnate boll
catch fixing etc.
4 Providing & Fixing of the Overhead storage in Sqft 480.00 0.00
in 19mm thick comm. ply & in laminate
finish from outside & french polish from inside& with handle,lock,hinjesh & megnate boll
catch fixing etc.
5 Providing & Fixing of the pantry granite Sqft 500.00 0.00
counter's below area storage shutters made
in marine ply & in laminate finish from outside
& with french polish from inside & with handle
lock,injesh etc.
6 Providing & Fixing of the electrical pannel Sqft 450.00 0.00
shutter in laminate finish.
7 Providing & Fixing of the Discussion Room area Sqft 495.00 0.00
side board in 19mm thick comm. ply & in Venner
finish from outside & french polish from inside
& with handle,lock,injesh & megnate boll
catch fixing etc.
8 Providing & making of the Side board in Sq.ft 495.00 0.00
Venner finish from outside & with french polish
from inside & with handle lock,injesh etc.at
conference room area.
TOTAL OF STORAGE & FIX FURNITURE 0.00
-
8/22/2019 Quotation for Referencem
8/12
No. Description Qty. Unit Rate Amount
F DOOR & WINDOW
1 Providing & Fixing of the first grade teak wood 120.00 Rft 360.00 43200.00
door frame made out of 125mmx50mm thick
& with melamine polish finish .
2 Providing & Fixing of the 38mm thick solid 230.00 Sqft 250.00 57500.00
flush door in laminate finish from both side,
white zinc polish on t.w. side edge,cylender
lock, handle,ss injesh at office area
(excluding floor spring /door closer)
3 Providing & Fixing of the Glass door with 231.00 Sqft 400.00 92400.00
Top bottom wooden laminate finish frame
white zinc polish on t.w. side edge,cylender
lock, handle,ss injesh at office area
(excluding floor spring /door closer)
4 Providing & Fixing of the Flush door in venner 28.00 Sqft 250.00 7000.00
finish with melamine polish ,cylender lock,
handle,ss injesh at conference hall area.
(excluding floor spring /door closer)
5 Providing & Fixing of the Aluminium Sliding 330.00 Sqft 470.00 155100.00
Windows in G5 series, with Auto Consealedlock, Heavy duty ball bearing, 6mm thick clear
glass, 25 Micron wether stripe.
TOTAL OF DOOR & WINDOW 355200.00
-
8/22/2019 Quotation for Referencem
9/12
No. Description Qty. Unit Rate Amount
G LOOSE FURNITURE WORK
1 Making & Supplying of the Chairman Cabin's Nos 18000.00 0.00
table in laminate finish & with pedestal unit
( Table size-8'-0''x3'0'' )
(Side Credenza :4'-3" x 1'-3")
ht- 2' 6''
2 Providing & fixing of the Cabin Area Table No 17500.00 0.00
table in laminate finish & with pedestal unit
Table size-6'-0''x3'0''Side Credenza 4'-6" x 1'-6"
Ht 2' - 6"
3 Providing & fixing of the Cabin Area Table
table in laminate finish & with pedestal unit
a. 6'-0" x 2'-6" No 17500.00 0.00
Side Credenza 4'-6" x 1'-6"
Ht 2' - 6"
b. 4'-0" x 2'- 0" No 12000.00 0.00
Side Credenza 4'- 0" x 1'-6"
Ht 2' - 6"
4 Making & Supplying Discussion area Round Nos 9000.00 0.00
Table in Laminate finish3'-0" Dia & 2'-6" ht.
5 Making & Supplying of the Confrence Table Nos 18000.00 0.00
side borad finish in venner from outside &
inside french polish finish.
6 Supplying of the sofa
a Two seater Nos 14000.00 0.00
b Three seater Nos 21000.00 0.00
7 Supplying of the Corner table Nos 3200.00 0.00
Size Top 2'- 0" x 2'- 0"
8 Supplying of the Chairs
a Confrence hall Chair Nos 3500.00 0.00
b Cabin Head chair Nos 8000.00 0.00
c Cabin / Discussion Chair No 3800.00 0.00
9 Making & Supplying of the Center Table Nos 5000.00 0.00
TOTAL OF LOOSE FURNITURE 0.00
-
8/22/2019 Quotation for Referencem
10/12
No. Description Qty. Unit Rate Amount
H PAINTING WORK
1 Applying of the plastic emulsion paint at ceiling 7000.00 Sq.ft 15.00 105000.00
area
2 Applying of the luster paint on wall area 10000.00 Sq.ft 17.00 170000.00
TOTAL OF PAINTING WORK 275000.00
-
8/22/2019 Quotation for Referencem
11/12
No. Description Qty. Unit Rate Amount
I STAIRCASE WORK
1 Providing & fixing of the Indian Marble Sq.ft 55.00 0.00
with cement mortar with edge moulding
& polishing for steps Top & risers
( Marble supply by client )
2 Providing & fixing of the MS powder Rft 42.00 0.00
coated railling at staircase area
made out of MS hollow pipe & MS
supporting bars
TOTAL OF STAIRCASE WORK 0.00
-
8/22/2019 Quotation for Referencem
12/12
No. Description Qty. Unit Rate Amount
J MISCELLANEOUS WORK
1 Supplying & Fixing in position heavy duty floor 11.00 Nos Price awaited #VALUE!
springs of hamco make
2 Supplying & Fixing of the door colsers of 7.00 Nos Price awaited #VALUE!
"Evenite"
3 Providing & Fixing of the 6mm thk. Mirror in 150.00 Sq.ft 160.00 24000.00
toilet over 6mm ply with SS stud
4 Providing & Fixing of the vertical blinds Sq.ft 180.00 0.00
5 Providing & Fixing of the Writing borad at Sq.ft 130.00 0.00
Discussion Room area.
TOTAL OF MISCELLANEOUS WORK #VALUE!