Quinn London Ltd 2012 Brochure

Transcript of Quinn London Ltd

  • 01 EDUCATIONp09 Surrey Square p11 Sacred Heartp12 Queensbridgep13 Henry Cavendish

    02 HIGHER EDUCATIONp17 Franklin Wilkinsp19 University of London p21 CATS Collegep23 Kings College IOP

    03 SOCIAL HOUSING p27 Notting Hillp29 Pound Lanep31 Holloway Roadp32 Villiers Road

    04 HERITAGEp35 Endell Street p37 Connaught Hallp38 Lauderdale Housep39 St Marys Rectory

    00 OVERVIEWp03 About Us p05 Key Faces

    CONTENTS

  • 05 COMMERCIALp43 Telephone and Minervap45 Fitzroy Housep46 Dennis Handfieldp47 Universal Music Publishing

    06 LEISURE & RETAILp51 Golden Lanep53 Hertford House Hotelp55 The Shire Londonp57 Shanghai Blues

    08 PUBLIC BUILDINGSp69 Highbury Magistrates Courtp71 Woodford Fire Stationp72 Stratford Library

    09 HEALTHCAREp75 Simmons House p77 Earls Court Health Centrep78 Archway Health Centre

    07 HIGH-END RESIDENTIALp61 Porchester Terracep63 Spring Gardensp65 Station Road

    02

  • Quinn London Ltd was founded at the turn of the millennium by our Managing Director, Seamus Quinn, with the aim to deliver Quality Construction Solutions across London and the south of England.

    Built upon this ethos and led by Seamus, Quinn London has excelled through the years and today is a leading main contractor within the social housing, education, public buildings and healthcare sectors.

    Our continued performance has seen us naturally evolve into servicing commercial, leisure, retail, heritage and high-end residential projects and we continue to identify and diversify our activities to align with emerging markets.

    SELF BUILTHEAD OFFICE

    ABOUT US

  • We have carefully expanded our operations, ensuring that we have not over-leveraged our resources therefore allowing us to organically build up skill and equity in our business and be more competitive in the current market conditions. As a result, we offer our clients certainty and reliability when dealing with us - a reputation which is invaluable.

    Today, we deliver a workload exceeding 36m per annum and passionately believe that Quinn London is a success story founded on the principals of a quality, customer first construction service.OVER 80% OF OUR

    BUSINESS IS DERIVED FROM REPEAT CUSTOM - A DIRECT RESULT OF CLIENTS EXPERIENCING HIGH QUALITY OF SERVICE WITH US.

    We look forward to being of service to you in the

    future and demonstrate first hand, what makes Quinn London the ideal contractor partner for

    your projects.

    04

  • KEY FACES

    SEAMUS QUINN

    PATMCGRATH

    DEREKMURPHY

    MANAGINGDIRECTOR

    CONSTRUCTIONDIRECTOR

    FINANCEDIRECTOR

    05

  • MARKDEVON

    PAULCLEMENT

    ROBERTBROADFIELD

    BUSINESSDEVELOPMENT

    DIRECTOR

    ESTIMATINGDIRECTOR

    CHIEFSURVEYOR

    06

  • EDUCATION

  • COMMENDATION AT THE 2011 CIVIC TRUST AWARDSWINNER OF A GREEN APPLE AWARD FOR THE 2011 BUILT ENVIRONMENT

    COMMUNITY BENEFIT RUNNER-UP IN THE 2011 RICS LONDON AWARDS

    SURREYSQUARE

    09

  • Client: London Borough of Southwark Value: 1m Completion: June 2010

    The contract involved the construction of a new build subterranean dining hall with a domed green roof. The purpose built outdoor pavilion was developed to house a state of the art kitchen and dining space and was designed to enable pupils to utilise the turfed roof with decking as an additional space for play. The doors to the pavilion are concertinaed to allow for tables and chairs to be brought outside in the summer months. The compound was constructed using solid acoustic hoarding around the perimeter. It had cut outs incorporated into it to allow viewing from outside.

    The works were completed during term time therefore strict H&S precautions had to be put in place.

    10

  • SACREDHEART

    Client: London Borough of WandsworthValue: 500k

    Completion: June 2012

    This new build contract included the design of classrooms, disabled toilets as well as a sensory room. The construction was masonry with a steel and timber mono pitched roof covered with a Kalzip standing seam roof. PV panels were incorporated into the roof as well as large roof lights to bring in as much natural daylight as possible.

    The external finish was a mixture of self coloured render and cedar cladding. The timber theme was continued through to the windows with the use of Velfac windows of different shapes to create additional interest.

  • Refurbishment of a Grade II listed Victorian school together with a new build Professional Development Centre extension. The build consisted of a reinforced concrete structure situated on a tight corner site.

    The scheme incorporated innovative sustainability functions such as Passivent Ventilation and high thermal resistance. The school was in continuous occupation throughout the works so secure solid screens were put in place to

    Client: The Learning Trust Value: 4.25m Completion: April 2009 QUEENSBRIDGE SCHOOL

    separate the areas of our compound and working areas with those of the occupied school.

    The project was completed to an extremely high standard to the satisfaction of all those involved.

    12

  • Construction of new classrooms, infilling of old courtyard areas as well as the refurbishment of existing areas. The works entailed the fitting out of a new kitchen, dining hall as well as the formation of new front entrance reception area and school office. It also involved extensive soft and hard landscaping areas including a soft play area located on the roof of the new single storey front extension.

    HENRYCAVENDISHSCHOOL

    Client: London Borough of Lambeth Value: 2.8mCompletion: September 2012

    14

  • HIGHEREDUCATION

  • Client: Kings College London Value: 2.2m

    Completion: September 2011

    The complete refurbishment of the existing Library space on levels 1 and 2 making it fit for purpose and flexible to suit both the needs of the Library Services and the KCL students.

    The goal was to create a contemporary environment incorporating the latest technology including DDA requirements and enhanced acoustic levels within the open study areas. The creation of modern social spaces and colourful accent walls throughout assisted with achieving the relaxed atmosphere required in todays study space.

    The works were fast tracked, being completed over nine weeks.

    FRANKLINWILKINS

  • 18

  • Client: University of London Value: 1m per annum Dates: 2000 Present

    Quinn London has been a preferred contractor of the University of London since 2000 whereby we are usually working on a minimum of four projects with them at any one time.

    The works are on an adhoc basis to a value of, on average, 1m per annum. We have been with the University for 12 years and have had the same team working there throughout; this has given the University confidence as the relationships are well established.

    We have completed many contracts for UOL, including a refurbishment of their library, reception renewal, many internal and external repairs and decoration projects, mechanical and electrical installations as well as a swimming pool refurbishment.

  • UNIVERSITY OFLONDON

    20

  • Client: Cambridge Education Group Value: 1.8m Completion: July 2011

    The alterations and fitting out of 4No inter joined Grade 2 listed properties over 5 floors including a basement. New facilities included science laboratories, classrooms with interactive teaching walls, art rooms, a photographic darkroom and associated staff areas and offices. Due to the listing of the building careful consideration was given to all elements of the works but particularly to the M&E services to maintaining the existing features of the building. The tight programme was achieved with very close working relationships with all members of the design team and the client.

    CATS COLLEGE

    21

  • 22

  • KINGS COLLEGEIOP

    The creation of a new education hub for the Institute of Psychiatry located on their Denmark Hill campus.

    The scheme required a mixture of works including a new build lecture theatre and refurbishment of the Wolfson lecture theatre and also the creation of high quality circulation areas and social spaces.

    The works comprised of a 250 seat lecture theatre sited within the existing quadrangle courtyard, a student hub link, three seminar spaces, new WC provision and an enhanced landscaped courtyard with access to new balconies adjoining a second floor cafeteria.

    Client: Kings College LondonValue: 2.5mCompletion: August 2012

    23

  • 24

  • SOCIALHOUSING

  • Client: Notting Hill Housing TrustValue: 6m per annum

    associated works along with internal works to communal areas including floor coverings, fire risk remedial works and new low energy lighting,

    We have worked with NHHT for a number of years and we are currently employed within a Framework Agreement to the above value. We utilise a large number of our own direct labour as well as employing various long term unemployed and other candidates as proposed by Notting Hill Housing Trust, as part of our commitment to them.

    NOTTING HILL

    Quinn London carry out a variety of separate contracts for Notting Hill Housing Trust including works such as, kitchen and bathroom renewals and cyclical repair.

    Redecorations include external redecorations and internal redecorations to communal hallways, roof repairs and re-roofing, roof and cavity insulation, window repairs and replacement, door repairs and replacement, repairs to steps, balconies & fencing, environmental works to front gardens and HHSRS

  • 28

  • Client: St Mungos Community Housing Association

    Value: 8m Completion: May 2010

    This project was delivered for St Mungos Housing Association, a specialist social landlord that works with homeless people. Quinn London has a long term relationship with this partner and we were commissioned to deliver a New Design and Build project, carried out over 80 weeks to become an 85 bed hostel for the homeless.

    Works included a commercial kitchen, associated offices, training and activity areas and off-road parking. Green roofs, green living walls, solar panels, bio-mass boilers, wind turbines and permanent recycling facilities that were incorporated into the design of the building.

    POUNDLANE

    Achi

    eved

    a B

    REEA

    M ra

    ting

    of V

    ery

    Goo

    d

    29

  • 30

  • HOLLOWAYROAD

    Client: Family Mosaic Value: 2.2m Completion: August 2010

    A Design & Build Contract for the Refurbishment of a locally Grade 11 listed building in a conservation area. From what was formally a hostel owned by the London Borough of Islington, Quinn London built a total of 14 high quality family units to help meet the acute housing need in Islington.

    This refurbishment project achieved an Ecohomes Excellent rating.

  • The Design & Build of three, three storey houses, built on a brown field site. This development provides supported living accommodation for St Mungos clients. The buildings provide three detached one bedroomed units, each with a courtyard, open plan living

    area and a first floor bedroom under a spectacular vaulted roof.

    To reduce the environmental impact of the development, the scheme was constructed to Code Level 3 of the Code for Sustainable Homes.

    VILLIERS ROADClient: St Mungos Community Housing Association Value: 400k Completion: September 2009

    32

  • HERITAGE

  • HERITAGE

  • ENDELLSTREET

    35

  • Client: St Mungos Community Housing Association Value: 3m Completion: April 2008

    Refurbishment of Victorian Grade 2 listed building to create a 53 bedroom hostel for the homeless.

    Works included: the strip out of existing building, complete refurbishment of internal rooms to form new en suite bedrooms, complete rewiring and heating, overhaul of existing lift, new entrance area and a new build rear extension.

    The new entrance area and new build rear extension was constructed to match as closely as possible to the existing original brick and stonework and internally the above features including timber windows and oak flooring were incorporated into the design materials and approved by the local authority.

    36

  • Client: University of LondonValue 750k

    Completion: September 2011

    CONNAUGHTHALL

    The refurbishment of a Grade II listed building in Bloomsbury, to provide student accommodation with en-site bathrooms to 65 newly formed rooms and communal areas. Works included the stripping off of the existing asphalt roof and formation of a new sustainable green roof to the full extent of the building in Connaught Square.

  • LAUDERDALEHOUSE

    Refurbishment of five listed buildings throughout the London Borough of Camden including the renovation of Grade II listed building; Lauderdale House.

    Built in 1582 and set in the beautiful Waterlow Park, Lauderdale House now runs primarily as an arts and education centre welcoming over 65,000 visitors each year.

    This Heritage Lottery funded project included external repairs to the house including the repair and renewal of the natural slate coverings, lead gutters and overhanging timber cornices. Works also included drainage repairs, brickwork, window overhaul, repairs to columns and complete external redecorations.

    Client: London Borough of Camden Value: 400k Completion: July 2011

    38

  • The renovation of a Grade II listed Rectory. The works were to create a living accommodation on the upper floors for the priests, a new kitchen on the ground floor and in the basement, as well as offices and meeting rooms.

    The external Portland stone arches and windowsills were repaired and new stone work was required for the large new opening within the new kitchen giving excellent views over the new courtyard garden. The internal fit out was to a high specification and an excellent quality was achieved throughout. This included careful restoration of an oak panelled room as well as the restoration of the existing stone fire places.

    Client: The Diocese of Westminster Value: 900k Completion: April 2009

    ST MARYS RECTORY

    40

  • COMM ERCIAL

  • COMM ERCIAL

  • TELEPHONE & MINERVA

  • Two negotiated contracts on office blocks. The projects comprised of external envelope works including new roof finishes, external window replacements and faade repairs and redecorations. The front faade to Minerva House was listed so the works to the ornate stonework had to be agreed with the Conservation Officer.

    Internal fit-out included new toilet facilities as well as the installation of new fire alarms, air conditioning and other services upgrade works.

    The decanting of occupants was unnecessary as a lot of works were carried outside of normal working hours or with the use of temporary partitions and screens.

    Client: Wainbridge Global OpportunitiesValue 2.8mCompletion: July 2012

    44

  • FITZROY HOUSE

    This project was successfully delivered for Wainbridge Global Opportunities for the refurbishment of an existing five storey office block in Chenies Street, just off Tottenham Court Road

    Floors were completed on a phased manner with the Client being decanted to allow the works to be undertaken. The works were carried out in a live office. Quinn Londons contract included managing the office moves to free up work areas.

    Client: Wainbridge Global Opportunities

    Value: 1mCompletion: October 2011

    45

  • DENNIS HANDFIELD

    This project was for Circle Anglia who in turn leased this building to SHP, a charity for vulnerable and homeless people.

    The works comprised of the refurbishment of an existing hostel contained within two separate buildings. Quinn London refurbished these buildings over five floors into thirty nine bedrooms for Single Homeless people of the London Borough of Camden.

    The works were carried out to the upper floors with offices and recreational areas to the lower areas, providing a high level of support to the Hostels residents.

    Client: Circle Anglia GroupValue 700kCompletion: June 2011

    46

  • The project entailed the refurbishment of five storeys of the BMG Office Block, with the employees in occupation. Works consisting of internal repairs and decorations, installation of new partitions and ceilings, new raised flooring and mechanical and electrical works .

    Each floor was worked on over a two to three week period and all of the refurbishment works on one floor were completed before we started on the next in order to minimise disruption to the occupants, this was assisted by our phased handover sequence.

    UNIVERSALMUSIC

    PUBLISHINGClient: Universal Music Publishing Value: 900k Completion: March 2009

  • 48

  • LEISURE &RETAIL

  • GOLDEN LANE

    51

  • The complete refurbishment of an existing Grade II listed Leisure Centre. A contemporary fitness and health club facility, together with a social space for the residents of Golden Lane Estate and those working within the Barbican area.

    The works were particularly challenging given the listing of the building, which created an interesting concept in contemporary styling requirements, incorporating glass structures, stainless steel and solar heating.

    This project won the title of Best Public Building in the 2012 Architects Journal Retrofit Awards.

    Client: Corporation of London Value: 2.3m Completion: January 2012

    Winner of the BEST PUBLIC

    BUILDING 2012 ARCHITECTS JOURNAL

    RETROFIT AWARDS

    52

  • The project comprised of the extension and conversion of a Grade II listed building, formally the Mercury Print Business, in the centre of Hertford Town.

    The project was carried out in close consultation with the Conservation Officer at Hertfordshire County Council. The works involved the re-fitting and refurbishment of 22 bedrooms, all with en-suite facilities, together with conference rooms and the bar and restaurant facilities.

    Client: Hertford House Hotel Value: 2.2mCompletion: November 2008

  • HERTFORDHOUSE HOTEL

    WINNER OF A CIVIC AWARD

    54

  • 55

  • Quinn London carried out the extension and refurbishment of Bridgetown Golf Club in 2007 to form what is now the Shire London Golf Club.

    The works included an extension and refurbishment to the existing club house which comprised of a new restaurant, two new bars, changing rooms leisure facilities, a gym and a swimming pool.

    External work included a new car parking area and the construction of a driving range. The works were carried out over three phases with the club remaining in use throughout the 32 week contract period.

    Client: Tony Menai DavisValue: 1.2mCompletition: September 2007

    THE SHIRELONDON

    56

  • SHANGHAIBLUES

    Refurbishment of the former Holborn Library, to form a new restaurant finished to an extremely high standard.

    Natural materials such as oak, marble and slate were used and carefully procured and machined to the clients exacting standards. The restaurant featured two main dining

    Client: Shanghai BluesValue: 1.1mCompletion: October 2008

    areas, bars and a mezzanine level for corporate events.

    Careful co-ordination had to be made for the Grade II listed building, situated on a red route in one of the busiest parts of London, as not to disrupt traffic and adjoining owners and business during the course of the works.

    58

  • HIGH-ENDRESIDENTIAL

  • This project involved the complete strip out and both internal and external comprehensive refurbishment of a Grade II Listed residential property.

    Works included overhauling and reinstatement of period features including original ceilings and cornice to satisfy conservation planners, bespoke walk in wardrobes, completely new plumbing, heating and ventilation systems as well as new lighting, power, security and audio visual systems throughout the property.

    The refurbishment works created a refined residence comprising of 5 bedrooms, 5 bathrooms and 3 receptions which have exceeded the clients expectations for market rental value.

    PORCHESTER TERRACE

    Client: Egyptian Building Fund Value 1.3mCompletion: June 2012

    61

  • 62

  • This project was successfully delivered for St Mungos Housing Association, a specialist social landlord that works with homeless people. Quinn London has a long term relationship with this partner and was commissioned to deliver a new Design & Build project to construct 24 self-contained units.

    From the early meetings the agreed solution was to proceed based on a timber frame. This would allow a fast on site construction programme as well as achieving high code points both in terms of the sustainable sourcing of the timber but also through achieving excellent U values.

    The external works scheme was very extensive both in terms of hard and soft landscaping.

    SPRING GARDENS

    Client: St Mungos Housing AssociationValue: 2.5m Completion: November 2011

    64

  • STATION ROADClient: Hampton Wick Developments Value: 1.7m Completion: September 2009

    Station Road in Twickenham was a joint venture on a design and build scheme of 9 flats, the construction of an RC frame and curtain walling with 2 commercial units on the ground floor.

    Achieved a BREEAM rating of Excellent 65

  • 66

  • PUBLICBUILDINGS

  • April 2011 saw the completion of the asbestos remediation and building reinstatement works at Highbury Magistrates Court for HMCS.

    The works were split into 10 zones which were carried out in a phased manner, leaving remaining courts in use. The zones comprised of courts, custody areas, offices and service risers. The works entailed the removal of existing ceilings under controlled conditions, removal of all existing or encapsulation of the asbestos, plus the reinstatement of existing suspended ceilings along with laminate timber panels. Through careful programming and close liaison with the client the works were re-sequenced and completed two weeks ahead of schedule.

    HIGHBURYMAGISTRATES

    COURT

    Client: Her Majestys Court Services Value: 880k Completion: March 2011

  • 70

  • Client: London Fire & Emergency Planning Authority Value: 440kCompletion: 2009

    In 2009 we undertook the refurbishment and extension of Woodford Fire Station for the London Fire & Emergency Planning Authority. The works included a New Incident Response unit. The existing building was in occupation throughout the duration of the 16 week programme.

    WOODFORDFIRE STATION

  • Part of a programme of regeneration and refurbishment works being carried out to libraries within London Borough of Newham with the focus on delivering a library service based on local community needs, and one which is up to date with the IT advancements of recent times.

    STRATFORDLIBRARY

    Client: London Borough of NewhamValue: 1m Completion: February 2012

    The works involved the complete strip out and refurbishment to provide: fixtures and finishes, a completely new electrical installation and the replacement of HVAC Air Conditioning and Ventilation. The refurbishment works created a spacious airy environment which is easily identifiable with the boroughs branding and effortlessly useable to the public at large.

    72

  • HEALTHCARE

  • SIMMONSHOUSE

  • This contract comprised the refurbishment of a Grade II listed Victorian building including the construction of a new basement, replacement of the existing floors and a new roof with solar panels.

    The existing building became accommodation for vulnerable adolescents, the upper floor comprising of 10 en-suite bedrooms, whilst the ground floor incorporated a lounge, library, kitchen and staff offices.

    The new two story building that wrapped around the existing became an educational facility, with classrooms, group and therapy rooms as well as offices for the staff and teachers looking after the students.

    Client: Camden & Islington PCT Value: 1.8m Completion: April 2009

    76

  • EARLS COURTHEALTH CENTRE

    This project was the first of this kind for the Kensington and Chelsea Primary Care Trust with the focus on delivering a Health and Wellbeing Centre based on local community needs.

    It involved the complete demolition and reconstruction except external faade to provide: 6 GP Surgeries, 2 Dental Surgeries, Lab, Utilities and X-rays, Associated Offices, Meeting Rooms and a Community Resource area.

    Client: Kensington & Chelsea PCT Value: 1.8m Completion: October 2011

  • The refurbishment and fit out of two floors of office space to form a new Health Centre. The scheme involved major structural and M&E works together with the provision of new office space, treatment rooms and welfare facilities. The works were carried out while the building was in occupation on a busy red route along Holloway Road.

    ARCHWAY HEALTH CENTREClient: Camden & Islington PCTValue: 2.3mCompletion: June 2010

    78

  • Dome House, 8 Hartley AvenueMill Hill, London, NW7 2HX

    t: 020 8238 1950 e: [email protected] f: 020 8238 1951 w: www.quinnlondon.co.uk