QUEZON CITY DISASTER PREPAREDNESS PROGRAM

download QUEZON CITY  DISASTER PREPAREDNESS  PROGRAM

If you can't read please download the document

description

QUEZON CITY DISASTER PREPAREDNESS PROGRAM. The Metropolitan Manila Earthquake Impact Reduction Study (MMEIRS) JICA,PHIVOLCS,MMDA (2002-2004}. Subic. West Valley Fault. Manila Bay. West Valley Fault. Source: HIGP, Univ. Hawaii. Angat Dam. La MesaDam. Tagaytay Ridge. - PowerPoint PPT Presentation

Transcript of QUEZON CITY DISASTER PREPAREDNESS PROGRAM

  • QUEZON CITY DISASTER PREPAREDNESS PROGRAM

  • The Metropolitan Manila Earthquake Impact Reduction Study (MMEIRS)JICA,PHIVOLCS,MMDA (2002-2004}

  • West Valley FaultAngat DamLa MesaDamTagaytay Ridge

  • Surface Geology of Metro Manila

    Quezon CityMarikinaPasigMakatiPaterosTaguigMuntinlupa

    Fault Mapping by PHIVOLCS

    MetroManila cities transected by the West Valley Fault

  • Marikina Quadrangle,VFS

  • ESTIMATES OF MAXIMUM INTENSITY OF GROUNDSHAKINGScenario 08: M=7.2 PEIS HIGH VIII (brown) for most of MetroManila

    PEIS IX (red) for areas near the fault or underlain by soft sediments

  • Number of Deaths Analysis (Scenario 08)

  • Magnitude 7.0 2010 Jan. 12 Port-au-Prince, Haiti Dead: 200,000 +Mass Casualty Management2009 April 6 Aquila, Italy Magnitude 6.3 dead: 260+

  • RESIDENTIAL DAMAGES168, 000 heavily damaged or collapsed( 13% of total buildings )340,000 moderately damaged( 26% of total buildings)10,000 affected building alongsideManila Bay, riversides and Laguna lakeshore are prone to liquefaction

  • 2010 January 12 Port-au-Prince, Haiti Magnitude 7.0Photo from The Big Picture Boston.com

  • LIFELINE DAMAGE

    Water pipeline 4,600 kmBreak at 954 points Electricity cable Length of 4,900 kmCut of 31 km PLDT Telephone cable 13,300 km longCut of 97 km Of the 213 Bridges & 80 flyovers7 have high possibility of collapse

  • Picture taken on March 1, 2010 of telephone and power lines brought down in Concepcion, Chile, by the 8.8-magnitude earthquake three days earlier. (EVARISTO SA/AFP/Getty Images)# 2010 Feb 27 Chile Magnitude 8.8

  • CHRISTCHURCH,NEW ZEALAND MAGNITUDE 6.2 ,175 DEAD, 200 + MISSING,FEB.22,2011

  • SENDAI,JAPAN ,MAGNITUDE 8.9MARCH 11,2011,2:37 PM(8000 +DEAD)

    BEFOREAFTER

  • 1995 Kobe Earthquake Magnitude 7.2 ,5:47 am

  • When you feel an earthquake, DUCK,COVER AND HOLD under a desk or sturdy table.

    Stay undercover until the shaking stops or weakens. Hold onto your cover. If it moves, move with it. DURING AN EARTHQUAKEDUCKCOVERHOLDUmiwas sa mga malalaglag: upo, tago at hawakDROP, COVER, HOLD ON!

  • What you can do BEFORE an earthquake

  • Organizational ChartBEEP COMOver-all CoordinatorEvacuation TeamSite SecurityTeamCommunicationTeamFire-SafetyTeamFirst Aid TeamSearch & RescueTeamTeams must be integrated or in place per floor. Think of a contingency plan. Building Emergency and Evacuation Plan

  • QCDRRMC convened and conducted several coordinating conferences as mandated

  • ENHANCEMENT TRAININGS THAT ARE PRESENTLY UNDERTAKEN IN THE COMMUNITY LEVEL

    based on : Executive Order No. 23, series of 2010 E.O. No. 23 Implementation Plan that set forth the operational guidelines

  • EARTHQUAKE &LANDSLIDE SEARCH & RESCUE ORIENTATION COURSE (ELSAROC) Sto. CristoLaging HandaKamuningSouth TriangleSacred HeartPaligsahanRoxasMasambongSta, MonicaPayatas

    BARANGAYAUG,20-21SEPT.3-4SEPT.10-11SEPT.17-18SEPT.20-21

  • The Earthquake Landslide Search and Rescue Orientation Course (ELSAROC) Program is now being implemented in the barangay level to empower the barangay and their residents as the First-Responder.

  • Survival Kit Should Include:First Aid KitFlashlight with spare batteriesPortable radioBottled waterNon- Perishable FoodClothesZip lock bagsRopeSmall tool kitCoins for the telephoneFully charge cell phoneCandles and matchesShoes- flat, preferably hard soledPants- study materialLaminated emergency directoryHead cover hard hats, hoods on jacket, hatsGloves sturdy, preferably leatherJacket should provide protection from wind and weatherTactical light stickEmergency blanket size 210cmx130cmwhistle

  • HOME AND OFFICE FIRST AID KITS First aid kits are vital following any emergency. To be useful, a first aid kit must be accessible and ready. Store the kit in a location that will be accessible following the turmoil of an earthquake.MEDICATIONSAntibiotic Ointment Medications For All Family Members Aspirin and/or Pain Relief Medication Diarrhea Medication Eye Drops Cold/Cough Medicine Benadryl Insect Spray Ear and Nose Drops Hydrogen Peroxide Skin Disinfectant Spray Extra Prescription Medication Old Pair Of Prescription Eyeglasses For Spare

    MEDICAL MATERIALSBand-aids Medical Latex Gloves Surgical Mask Instant Cold Packs Instant Hot Packs Ace Bandages Butterfly Bandages Gauze Pads Cotton Swabs Adhesive Tape 2" & 4" Wide Sterile Bandage Rolls Triangular Bandage For Sling, Etc. (37" x 37" x 52") Tongue Depressors (Pop-sickle Sticks) Splint Material Spray Bottle With 10% Bleach Solution For Disinfecting Objects.

  • HYDRAULIC AND BAG LIFTER FOR COLLAPSED BUILDING AND EXTRICATION OF VICTIMS OF EARTHQUAKES

  • HYDRAULIC SHORING, LIFTING EQUIPMENT AND BREATHING APPARATUS

  • VIBRASCOPE FOR SURVEILANCE OF TRAPPED VICTIM ON COLLAPSED STRUCTURE

  • BARANGAY ORIENTATION ON WATER RESCUE ,FEB.28,2011SAN VICENTESACRED HEARTGULODBAGONG SILANGANDEL MONTEROXASTATALONDOA IMELDADAMAYANG LAGI

  • SCHOOL DISASTER PREPAREDNESS & RESCUE ORIENTATION COURSE MULTI-PURPOSE HALL, AMORANTO SPORTS COMPLEXSEPT.29 - OCT.1, 4, 5, 6, 2010

    District No. of School Attended No. of ParticipantsI32149II-A1990II-B30106III1560IV20124TOTAL116 out of 134 529

  • BARANGAY DISASTER PREPAREDNESS & RESCUE ORIENTATION COURSE MULTI-PURPOSE HALL, AMORANTO SPORTS COMPLEXSEPTEMBER 6,7,9 & 13, 2010

    District No. of Bgy. Attended No. of ParticipantsI32174II25250III29152IV33177TOTAL119753

  • DISTRICT I-4 ,50 NEWLY ELECTED BGY.CHAIRMAN & COUNCIL MEMBERS (FIRSTIMER),EMIRAMONA GARDEN HOTEL, TAGAYTAY CITY, DEC,9,2010DISTRICT 1 ,NEWLY ELECTED BGY.CHAIRMAN & COUNCIL MEMBERS ,EMIRAMONA GARDEN HOTEL, TAGAYTAY CITYDEC. 13, 2010DISTRICT 2 ,NEWLY ELECTED BGY.CHAIRMAN & COUNCIL MEMBERS ,EMIRAMONA GARDEN HOTEL, TAGAYTAY CITYDEC. 16,2010

    Disaster Risk Reduction and Management

  • BARANGAY DISASTER PREPAREDNESS & RESCUE ORIENTATION COURSEFOR 50 NEWLY ELECTED MULTI-PURPOSE HALL, AMORANTO SPORTS COMPLEXJANUARY 19 & 21,2011

    District No. of Bgy. Attended No. of ParticipantsI1363II1480III1254IV939TOTAL48236

  • QC MALL & SHOPPING CENTERS MANAGERS MEETING ON RISK REDUCTION MANAGEMENT NOV.26,2010SM NovalichesSM City North EdsaSM FairviewSM CenterpointSM CubaoAlimallEastwood MallBerkeley SquareFarmers PlazaCity WalkGateway MallRobinsons GalleriaTrinomaLandmarkWaltermart (Edsa) Circle CPuregold CommonwealthPuregold Araneta CenterShopwiseEvergotesco Commonwealth

  • CHURCHES/CHAPELS IN DISTRICT II THAT WERE COORDINATED FOR RISK REDUCTION AND DISASTER MITIGATION ACTIVITIESST. PETER CHURCHCHRIST THE KINGSAN ISIDRO LABRADORSAGRADA FAMILIAACTIVITIES:

    Organization of Disaster Action Group Orientation on Water Rescue & Earthquake Preparedness Information Dissemination on Disaster Preparedness &Prevention (flyers, basic orientation & hazard mapping)

  • 142 Barangays20 QCFD Sub-Stns.

  • END