BID #19‐2017 Custodial Cleaning Services
Addendum #2: Clarification, Questions and Answers
January 30, 2020
NOTE:
Appendix III‐ Cost Forms Revised which includes Cost Summarizations Part 1 and Part 2
are attached.
Cost Summarization Part 3 is no longer needed and has been deleted.
Appendix IV‐ Non‐Collusion Affidavit was inadvertently omitted is attached and must be
submitted back with your response.
The Pre‐Proposal Sign‐In Sheet is attached.
Please note the following (NEW) Exhibits:
Exhibit C‐ Students and Teachers per Location
Exhibit D‐ Number of Events Per Location
Exhibit E‐ 2020‐2021 School Calendar
Exhibit F‐ Floor plans
CLARIFICATION
Remove warehouse space from page 24. Contractor is only required to have office space.
The crew leader in the elementary and middle schools will be a working crew leader, i.e.
Crew Leader/Floor Technician, Crew Leader/Restroom Technician or Crew
Leader/General Cleaner.
The Crew Leader, Day Porter, General Cleaner, Floor Technician, and Restroom Technician
shall include the duties listed on pages 30‐32 of the RFP and the duties listed in the
Custodial Manual (Exhibit B).
2
There are 69 individuals that are employed by the District. The elementary schools have
one crew leader and one day porter, middle schools have one crew leader and 2 day
porters, high schools have one crew leader and 3 day porters.
The Contract and Zone managers will be required to have a pickup truck (full size and a
2017 model or newer with no physical damage) and a trailer (power deck style with a
capacity of at least 8,000 pounds) for a total of four (4) trucks and four (4) trailers.
QUESTIONS AND ANSWERS
1. What is the current software being utilized?
School‐Dude and Hillyard softwares.
2. Does the cleaning software have to integrate with the District’s?
No
3. Will the chemical supplier deliver to the Contractor?
The chemical supplier will deliver the chemicals directly to the locations.
4. Will the supplies and equipment be provided by the District?
Yes
5. Will the kitchen be cleaned twice even though the summer and winter cleaning hours?
Yes
6. In the current contract, are the kitchen areas being cleaned as described?
Yes
7. When you state 69 employees are they only district employees? Yes. Does that include
the night staff personnel? These individuals only work first shift (6:30 AM to 3:00 PM).
8. How long has the contract manager been in place with the under current contract?
The duties of this position has been in place since 2014.
9. What year is the current contract under?
This is the 6th year of the contract. It was approved by the Superintendent to extend for
an additional year.
10. Are the proposed rates/wages in the current contract? No
3
11. Are the performance deductions in the current contract? How long has that been in
place?
Yes, it has been in place since 2014.
12. How many total fines were assessed in 2019?
There were two (2) fines assessed.
13. Will a vendor will be deemed non‐responsive if they have not performed work on at least
three (3) million square feet in one location or campus?
Yes
14. Can the date be extended for the submittal due date?
Yes. The proposal due date has been extended to Tuesday, February 4, 2020 at 3:00PM.
15. Are you stating in the proposed wages a different wage that was is stated on the hourly rate?
The proposed hourly wages must be at least the amount stated under the “Minimum
Hourly Rate”.
16. All vendor overhead and profit should be loaded in the fringe/benefits column, correct? Overhead and profit can be rolled up in the either the proposed hourly wages or fringe/benefits per hour.
17. On the cost form, is the intention to roll up the overhead and profit in the labor rates?
Overhead and profit can be rolled up in the either the proposed hourly wages or
fringe/benefits per hour.
18. Since this a 260 day contract, does the contractor have to pay holiday pay to coincide with the District?
Yes.
19. Does the District use re‐conditioned equipment?
No
20. Are the employees required to have cell phones? Does the contractor provide these?
The hourly employees are not required to have cell phones. The Contract and Zone
Managers must have a phone that will be provided by the Contractor. The District will
provide 2‐way radios to the Contract and Zone Managers.
21. What is the value of the current contract?
The contract value is approximately $1,900,000.00.
4
22. Please clarify exactly how many trucks and trailers you want priced into the contract.
There shall be four pickup trucks and four trailers provided under this contract. Trucks
shall be full size and a 2017 model or newer with the company logo with no major physical
damage. The trailers must a power deck style trailer that has the capacity to carry a
minimum of 8,000 pounds.
23. What is the average pay rate for the current District Day Porters and District Day Crew
Leads?
Day Porter is $13.77 per hour (average). Lead Site Custodian (Crew Leads) is $17.28 per
hour (average).
24. What floor finish is currently used in the District?
Hillyard 25% solids.
25. What is the approximate % of floor surface type present in the district (i.e. VCT, Carpet,
LVT, Terrazzo)?
See table below for carpet square footages. The remaining flooring the school is either
VCT, LVT, or Terrazzo.
LOCATION TYPE TOTAL SQUARE FEET
Applied Technology Carpet 740
Bellview Elementary Carpet 4205
Castle Heights Middle Carpet 7231
Cherry Park Elementary Carpet 15000
District Office Carpet 25190
Dutchman Creek Middle Carpet 7231
Ebenezer Elementary Carpet 1215
Ebenezer Montessori Carpet 7000
Ebinport Elementary Carpet 3717
Finley Road Elementary Carpet 3235
Flexable Learning Center Carpet 5855
Independence Elementary Carpet 7612
India Hook Elementary Carpet 6616
Leslie Elementary Carpet 3835
Mount Gallant Elementary Carpet 7612
Mount Holly Elementary Carpet 6616
Northside Elementary Carpet 1080
Northwestern High Carpet 20031
Oakdale Elementary Carpet 3284
Old Pointe Elementary Carpet 6915
5
Parent Smart Carpet 4658
Rawlinson Road Middle Carpet 9505
Richmond Drive Elementary
Carpet 4587
Rock Hill High Carpet 17824
Saluda Trail Middle Carpet 14219
South Pointe High Carpet 32626
Sullivan Middle Carpet 16322
Sunset Park Elementary Carpet 3802
Sylvia Circle Elementary Carpet 1055
York Road Elementary Carpet 4933
26. What is the square footage for elementary wood stages and Cafeteria Kitchen Preparation
areas?
Please review the floor plans.
27. Will the custodial equipment, cleaning supplies and consumables (toilet paper, hand towels, trash can liners, and hand soaps) be provided by the District? Yes.
28. What is the enrollment per school and number district employees/teachers?
See Exhibit C.
29. Which schools have hand dryers? All schools have hand dryers.
30. Will you send floor plans to vendors?
See Exhibit F.
31. Will you forward an excel spreadsheet with the preferred pricing format to each of the
vendors?
Yes. The excel document will be a separate attachment. The Contractor will only be
allowed to place information in the Proposed Hourly Wages, Fringe/ Benefits per Hour,
and Cost Summarization Part 1 columns. All other areas are protected.
32. Where should the pricing for vehicles and trailers for the Zone Managers and Contract
manager be loaded on the pricing sheet?
Please see the Revised Cost Summarization Part 1.
33. Where should the pricing for crew leads and office assistants be on the pricing sheet?
Please see the Revised Cost Summarization Part 1 for the Office Assistant. The Crew
Leader cost is to be placed on the Revised Cost Form.
6
34. Will the district accept a provision which allows for increases by price by the Contractor
for other factors beyond the Contractor’s reasonable control, including but not limited to,
government increases to minimum, prevailing or living wages, benefits, or healthcare?
The pricing will remain firm the first two years of the contract. Increases will be in
accordance to the CPI. The District reserves the right to accept and negotiate any
increases.
35. Will the District accept a provision allowing a mutual termination for convenience upon
30 day written notice?
Yes, there is a termination for convenience clause on pages 4 and 5 of the RFP.
36. Will the District allow a change in indemnification obligations to only claims caused by the
negligence, misconduct, or other fault of the Contractor, its agents and employees, and
which arise out of work performed under this contract?
No
37. Will the District permit adjustments to the insurance requirements, which do not reduce
the amount of coverage but rather restructure the language to comply with Contractor's
insurance policies?
The District will expect the Contractor to have the following minimum requirements:
WORKERS’ COMPENSATION Statutory limits covering all employees, including Employer’s Liability with limits of: $500,000 Each Accident $500,000 Disease ‐ Each Employee $500,000 Disease ‐ Policy Limit B. COMMERCIAL GENERAL LIABILITY Covering all operations involved in this Agreement. $1,000,000 General Aggregate $1,000,000 Products/Completed Operations Aggregate $1,000,000 Each Occurrence $ 5,000 Medical Payments C. COMMERCIAL AUTOMOBILE LIABILITY $1,000,000 Combined Single Limit ‐ Any Auto
7
38. Will the District provide a list of vendors who were present at the pre bid meeting?
The pre‐proposal sign in sheet is attached.
39. Appendix IV. Cost Form. The formula calls for total Cost (F+G)*D. There is no D column. Also where do we put our overhead and profit? The Cost Form has been revised and is attached.
40. Appendix IV Cost Form is missing square footage for 3 facilities. It is also only 31 facilities and the Appendix I list 34 locations so you may want to ask about that. The Cost Form has been revised and is attached. All square footages are on the Revised
Cost Summarization Part 2‐Optional which is attached.
41. Appendix IV. Cost Form. Can you please provide a key for the different positions? For
example. What is a SUP/FT (N)? What is BIC? Please see the revised cost sheet which is attached. BIC stands for breakfast in the
classroom.
42. Should a Crew Leader be added to each schools staffing or should one of the positions list be considered a Crew Leader? A crew leader will be assigned to each school. The crew leader at the elementary and middle schools shall be combination of a crew leader and floor technician, crew leader and restroom technician, or crew leader and general cleaner.
43. Does the Rock Hill School District provide Day Porters for each school and if so is the contractor expected to manage these Rock Hill School District employees? Day porters are at each school. The Contractor will be required to provide a day porter at Central Child Development Center, District Office, and Sylvia Circle. The Contractor will be required to oversee the District’s day porter’s duties. The Contractor will not be required to manage personnel issues.
44. District Responsibility: Rock Hill School District is responsible for providing all equipment and supplies. Is the contractor responsible for the repair and maintenance cost of the equipment? The District will supply all equipment and supplies. The District will be responsible for the repair and maintenance of the equipment unless misuse, negligence, or abuse is found.
45. Appendix IV. Cost Summarization Part 3. Are you looking for an hourly rate as the Unit Cost? The Cost Summarization Part 3 has been deleted. Additional labor hours to include but not limited to, rental events and work orders that exceed the contract scope of work, will be in accordance the proposed hourly wages. If the hours exceed 40 hours, then the proposed hourly wages times 1.5 will be applied.
8
46. Are there any plans for adding new schools in the next five years? Yes. The additional schools will be added as an amendment to the contract. Pricing shall be in accordance to the current proposed wages.
47. Contractor Responsibility X. Experience: Please clarify this requirement. Would the School District consider a Contractor’s bid submittal if they have more than seven years of experience cleaning over 4.5 million square feet at multiple schools and locations just like Rock Hill Schools? The Contractor must have provided custodial cleaning at a campus or location that is three million square feet or greater. The following are the mandatory requirements, at a minimum, that the Contractor must
possess. Failure to have this qualification shall deem your proposal as non‐responsive.
The Contractor must:
Have a minimum of five (5) years’ experience in commercial custodial cleaning on a campus/location that is over three (3) million square feet.
Have a satisfactory record of performance from at least five (5) public K‐12 school districts or institutes of higher education in the past five (5) years. Contracts must be similar in size and scope.
48. According to the RFP, Rock Hill Schools would like the Pricing to be labeled as Appendix
III. Their Cost Forms are listed as Appendix IV, which is also what their Non‐Collusion Affidavit is listed as. For clarification will you update the labeling of your cost form? Appendix III is the Cost Proposal Appendix IV is the Non‐Collusion Affidavit which is attached.
49. Grand total winter clean up and summer clean up should be considered stand‐alone
pricing based on the mandated hours for each posted in the RFP, correct? Yes, Cost Summarization Part 2 has been revised as an optional pricing. This pricing will
only be used if the District decides not to utilize the 260 day employee model.
END OF QUESTIONS AND ANSWERS
Location Position
Mininum Hourly
Rate (per
specifications)
Annual
Contracted
Hours
Proposed Hourly
Wages
Fringe/Benefits per
Hour
Total Cost (Proposed Hourly Wages +
Fringe/Benefits)
GC 12.00$ 2080
FT/RT 15.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
Carroll School GC 12.00$ 520
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 14.00$ 2080
FT/RT 14.00$ 2080
GC 12.00$ 2080
GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
District Office (27,908 sq. ft.) FT/RT 14.00$ 2080
District Three Stadium‐ (hours may vary
dependent upon school functions) GC/FT/RT 14.00$ 520
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 14.00$ 2080
FT/RT 14.00$ 2080
GC 12.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
Castle Heights Middle (176,678 sq ft.)
Belleview Elementary (74,311 sq ft.)
Applied Technology Center (111,915 sq ft.)
Ebinport Elementray (65,175 sq. ft.)
Ebenezer Elementary (Sq. 73,083)
Dutchman Creek Middle ( 171,544 sq. ft.)
Cherry Park Elementary (97,493 sq. ft.)
Central Child Development / Parent Smart
(24,032 sq. ft.)
Finley Road Elementary (64,140 sq. ft.)
Appendix III‐ COST FORM (REVISED)
Location Position
Mininum Hourly
Rate (per
specifications)
Annual
Contracted
Hours
Proposed Hourly
Wages
Fringe/Benefits per
Hour
Total Cost (Proposed Hourly Wages +
Fringe/Benefits)
Appendix III‐ COST FORM (REVISED)
GC 12.00$ 2080
FT/RT 15.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 15.00$ 2080
FT/RT 15.00$ 2080
FT/RT 15.00$ 2080
CL 16.00$ 2080
GC 12.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
Operations (55,380 sq. ft.)GC 12.00$ 1040
Lesslie Elementary (55,812 sq. ft.)
India Hook Elementary (75,979 sq. ft. )
Independence Elementary (61,690 sq. ft.)
Flexible Learning Center (134,224 sq. ft.)
Oakdale Elementary (71,422 sq. ft.)
Northwestern High (319,573 sq. ft.)
Northside Elementary (71,657 sq. ft.)
Mt. Holly Elementary (75,979 sq. ft.)
Mt. Gallant Elementary (67,057 sq. ft.)
Old Pointe Elementary (86,284 sq. ft. )
Location Position
Mininum Hourly
Rate (per
specifications)
Annual
Contracted
Hours
Proposed Hourly
Wages
Fringe/Benefits per
Hour
Total Cost (Proposed Hourly Wages +
Fringe/Benefits)
Appendix III‐ COST FORM (REVISED)
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 14.00$ 2080
GC 12.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
CL 16.00$ 2080
FT/RT 13.00$ 2080
FT/RT 13.00$ 2080
FT/RT 13.00$ 2080
GC 13.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 14.00$ 2080
FT/RT 14.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 15.00$ 2080
FT/RT 15.00$ 2080
FT/RT 15.00$ 2080
CL 16.00$ 2080
GC 12.00$ 2080
South Pointe Stadium‐ (hours may vary
dependent upon school functions) GC/FT/RT 14.00$ 520
Saluda Trail Middle (162,919 sq. ft.)
Rosewood Elementary (67,389 sq. ft.)
Rock Hill High School (318,512 sq. ft.)
Richmond Drive Elementary (69,577 sq. ft.)
Rawlinson Road Middle (151,033 sq. ft.)
South Pointe High (364,382 sq. ft.)
Location Position
Mininum Hourly
Rate (per
specifications)
Annual
Contracted
Hours
Proposed Hourly
Wages
Fringe/Benefits per
Hour
Total Cost (Proposed Hourly Wages +
Fringe/Benefits)
Appendix III‐ COST FORM (REVISED)
GC 12.00$ 2080
GC 12.00$ 2080
GC 12.00$ 2080
FT/RT 14.00$ 2080
FT/RT 14.00$ 2080
GC 12.00$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
ELEM GC 12.30$ 2080
FT/RT 13.00$ 2080
FT/RT 13.00$ 2080
Transportation (4,750 sq. ft.) GC 12.00$ 1040
GC 12.30$ 2080
FT/RT 13.00$ 2080
ELEM GC 12.30$ 2080
FT‐ Floor Technician
GC‐General Cleaner
RT‐ Restroom Technician
CL‐Crew Leader
ELEM GC‐ Elementary General Cleaner
*The District reserves the right to negotiate these hours and costs.
Total for Labor
Total for Contract Management, Supervision, and Office Assistant (Cost Summarization Part 1)
Total Contract Price (*This amount will be evaluated.)
York Road Elementary (57,790 sq. ft.)
Sylvia Circle
Sunset Park Elementary (77,952 sq. ft.)
Sullivan Middle School (155,788 sq. ft.)
COST SUMMARIZATION PART 1 (REVISED)
Contract Management Annual Cost
Contract Manager*
$ _____________________
Zone Manager 1*
$ _____________________
Zone Manager 2*
$ _____________________
Zone Manager 3*
$ _____________________
Office Assistant**
$ _____________________
Total Cost Summarization Part 1
(This amount must be placed on the cost form.)
$ _____________________
*The annual cost for Contract and Zone Managers shall include the vehicles,
equipment, wages and fringe benefits.
** The annual cost for Office Assistant shall include all wages and fringe benefits.
OPTIONAL COST:
Annual Employee Training: $_____________________ (This shall include all associated costs.)
The District reserves the right to negotiate these costs.
School/ Location/
Square Footage
Total Winter
Clean Up
Hours per
Location
Total Winter
Clean Up Price
per Square
Foot
Total
Summer
Clean Up
Hours per
Location
Total Summer
Clean Up Price
per Square
Foot
Elem. Wood
Stage Floors
Top sand &
recoated with
minimum 1
coat
Elem. Wood
Stage Floors
Sand
completely
down & coated
with a
minimum 3
coats
Cleaning &
Restoration on
Carpet Areas
Per location for
twice per year
in each
location
Cafeteria
Kitchen
Preparation
Area Total Cost
for Cleaning
Elementary
Belleview /
74,311
CCDC / 24,030
Ebenezer /
44,439
Ebenezer
Montessori /
28,644
Ebinport /
65,175
Finley Rd /
64,140
Independence /
61,690
India Hook /
75,979
Lesslie / 55,812
Mt. Gallant /
67,057
(REVISED) COST SUMMARIZATION PART 2‐OPTIONAL
School/ Location/
Square Footage
Total
Christmas
Clean Up
Hours per
Location
Total
Christmas
Clean Up Price
per Square
Foot
Total
Summer
Clean Up
Hours per
Location
Total Summer
Clean Up Price
per Square
Foot
Elem. Wood
Stage Floors
Top sand &
recoated with
minimum 1
coat
Elem. Wood
Stage Floors
Sand
completely
down & coated
with a
minimum 3
coats
Cleaning &
Restoration on
Carpet Areas
Per location for
twice per year
in each
location
Cafeteria
Kitchen
Preparation
Area Total Cost
for Cleaning
Mt. Holly /
75,979
Northside /
71,657
Oakdale /
71,422
Old Pointe /
86,284
Richmond Dr /
69,577
Rosewood /
67,389
Sunset Pk /
77,952
CS at Sylvia Cr /
54,442
York Rd / 57,790
(REVISED) COST SUMMARIZATION PART 2‐OPTIONAL
School/ Location/
Square Footage
Total
Christmas
Clean Up
Hours per
Location
Total
Christmas
Clean Up Price
per Square
Foot
Total
Summer
Clean Up
Hours per
Location
Total Summer
Clean Up Price
per Square
Foot
Elem. Wood
Stage Floors
Top sand &
recoated with
minimum 1
coat
Elem. Wood
Stage Floors
Sand
completely
down & coated
with a
minimum 3
coats
Cleaning &
Restoration on
Carpet Areas
Per location for
twice per year
in each
location
Cafeteria
Kitchen
Preparation
Area Total Cost
for Cleaning
Middle Schools
Not
Applicable
Not
Applicable
Castle Heights /
176,678
Dutchman Cr /
171,544
Rawlinson Rd /
151,033
Saluda Tr /
162,919
Sullivan /
155,788
High Schools
Northwestern /
319,573
Rock Hill High /
318,512
South Pointe /
351,934
(REVISED) COST SUMMARIZATION PART 2‐OPTIONAL
School/ Location/
Square Footage
Total
Christmas
Clean Up
Hours per
Location
Total
Christmas
Clean Up Price
per Square
Foot
Total
Summer
Clean Up
Hours per
Location
Total Summer
Clean Up Price
per Square
Foot
Elem. Wood
Stage Floors
Top sand &
recoated with
minimum 1
coat
Elem. Wood
Stage Floors
Sand
completely
down & coated
with a
minimum 3
coats
Cleaning &
Restoration on
Carpet Areas
Per location for
twice per year
in each
location
Cafeteria
Kitchen
Preparation
Area Total Cost
for Cleaning
Auxiliary
Locations
Not
Applicable
Not
Applicable
ATC / 111,915
total sq ft,
Cleanable per
contract 80,000
Carroll School /
3,072
Cherry Rd
Stadium /
11,754
District Office /
Central Office /
28,959
Facilities
Services /
55,380
(REVISED) COST SUMMARIZATION PART 2‐OPTIONAL
School/ Location/
Square Footage
Total
Christmas
Clean Up
Hours per
Location
Total
Christmas
Clean Up Price
per Square
Foot
Total
Summer
Clean Up
Hours per
Location
Total Summer
Clean Up Price
per Square
Foot
Elem. Wood
Stage Floors
Top sand &
recoated with
minimum 1
coat
Elem. Wood
Stage Floors
Sand
completely
down & coated
with a
minimum 3
coats
Cleaning &
Restoration on
Carpet Areas
Per location for
twice per year
in each
location
Cafeteria
Kitchen
Preparation
Area Total Cost
for Cleaning
Flexible
Learning /
134,224
ITV / 1,216
South Stadium /
12,448
Transportation /
4,750
Grand Total Cost
(REVISED) COST SUMMARIZATION PART 2‐OPTIONAL
This cleaning shall be in accordance to the District's Custodial Manual.
APPENDIX IV‐ NON‐COLLUSION AFFIDAVIT State of __________________________________ County of _________________________________ ________________________________ being first duly sworn, deposes and says that:
(1) He is __________________________ of __________________________, the Bidder that has submitted the attached RFP:
(2) He is fully informed respecting the preparation and contents of the attached RFP and of all pertinent circumstances respecting such RFP: (3) Such RFP is genuine and is not a collusive or sham RFP: (4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham in connection with the Contract for which the attached RFP has been submitted or to retain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the District or any person interested in the proposed Contract; and (5) The price or prices quoted in the attached RFP are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit. (Signed)___________________________________
___________________________________ (Title)
Subscribed and sworn to before me this __________day of ________,20_____ ________________________________________________________ (Notary Public)
My commission expires _________________
Rock Hill Schools
School NameGrade
K3Grade
PKGrade
00Grade
01Grade
02Grade
03Grade
04Grade
05Grade
06Grade
07Grade
08Grade
09Grade
10Grade
11Grade
12Totals
Belleview 18 75 76 70 57 75 83 454Cherry Park 145 133 121 125 103 115 742Ebenezer Ave. 14 51 75 76 64 77 79 74 510Ebinport 36 63 56 49 69 50 60 383Finley Road 18 58 51 60 52 48 59 346Independence 84 73 78 87 93 108 523India Hook 83 97 94 109 91 114 588Lesslie 71 69 62 60 62 50 374Mt. Gallant 83 88 91 69 88 88 507Mt. Holly 90 70 76 71 80 79 466Northside 18 79 74 82 79 81 83 496Oakdale 18 75 68 90 88 79 92 510Old Pointe 20 61 70 80 78 89 95 493Richmond Drive 18 59 68 78 70 56 71 420Rosewood 17 79 78 70 73 74 78 469Sunset Park 57 69 70 74 84 77 431York Road 18 60 55 50 62 65 59 369Early Childhood 39 270 309Castle Heights 259 262 266 787Dutchman Creek 306 295 320 921Rawlinson Road 191 193 190 574Saluda Trail 310 309 274 893Sullivan 334 316 290 940Northwestern 505 458 409 426 1798Rock Hill 503 541 435 400 1879South Pointe 387 421 326 275 1409Children's Attention Home 4 4 4 1 3 4 3 3 26
53 502 1301 1275 1289 1301 1297 1388 1404 1378 1343 1395 1420 1170 1101 17617
45th day Student Distribution
As of 10/23/2019 @ 2:40 pmSchool Year - 2019-2020
Elementary BES CCDC CPES EAES EBES FRES55 29 60 61 49 51
IES IHES LES MGES MHES NES52 56 38 45 51 54
ODES OPES RDES RWES SPES SCES51 50 43 53 45 9
YRES Totals49 901
Middle 6-8 CHMS DCMS RRMS STMS SMS Totals76 78 64 84 85 387
High 9-12 Northwestern
Rock Hill High
South Pointe Totals
150 162 139 451
Applied Technology 33
Flex Building 77
Parent Smart 12
Number of Teachers
Exhibit D‐ Events # of Events by Location
Jan 2019 ‐ Dec 2019
Location # of Facility Rentals # of School Events
Applied Technology 2 16
Belleview 1 44
Carroll School 2 0
Castle Heights 44 100
Central Office 9 20
Central Child Development 0 8
Cherry Park 11 28
Dutchman Creek 53 105
Ebenezer Ave 0 136
Ebinport 2 212
Edgewood 15 0
Finley Road 4 41
Flexible Learning 315 67
Independence 0 64
India Hook 4 19
Lesslie 0 173
Mt Gallant 1 41
Mt Holly 0 129
Northside 1 99
Northwestern 24 1333
Oakdale 0 308
Old Pointe 52 65
Rawlinson Road 66 326
Richmond Drive 1 26
Rock Hill High 36 944
Rosewood 0 73
Saluda Trail 3 85
South Pointe 49 570
D3 Stadium 8 128
South Stadium 8 9
Sullivan 5 222
Sunset Park 2 240
Sylvia Circle 16 42
York Road 0 12
Total 734 5685
July 2020S M T W T F S 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
August 2020S M T W T F S 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
September 2020S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
October 2020S M T W T F S 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
November 2020S M T W T F S 1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
December 2020S M T W T F S 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
2020-2021 School Calendar
July 3 -Independence Day-
(Observed)District Closed
August 4 - 7New Teacher Orientation
August 10-11Teacher PD Day
August 12-14Teacher Work Day
August 17First Day for Students
September 7-Labor Day-
District Closed
October 15End of 1st 9 Weeks
October 16Possible Make-Up Day*District will be closed if day is not needed*
October 19Teacher PD Day
November 3-Election Day-District Closed
November 25 - 27-Thanksgiving Break-
District Closed
December 22Half Day for Students
Last Day of First Semester
December 23 - 31-Winter Holidays-
District Closed
HALF DAY DISMISSAL TIMES
Elementary - 11 a.m.Middle - 11:30 a.m.High - 11:45 a.m.
January 1-Winter Holidays-
District Closed
January 4Teacher PD Day
January 5Teacher Work Day
January 6Students Return
January 18-MLK Jr. Day-
District Closed
February 15-President’s Day-
Possible Make-Up Day*District will be closed if day is not needed*
March 11End of 3rd 9 Weeks
March 12Teacher PD Day
April 5 - 9-Spring Break- District Closed
May 21Possible Make-Up Day*District will be closed if day is not needed*
May 31-Memorial Day- District Closed
June 2Half Day for Students
June 3Half Day for StudentsLast Day of Second
Semester
June 4Teacher Work Day
June 5Graduation Day
Northwestern - 10 am South Pointe - 2 pm
Rock Hill - 6 pm
January 2021S M T W T F S 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
February 2021S M T W T F S 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28
March 2021S M T W T F S 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
April 2021S M T W T F S 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
May 2021S M T W T F S
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
June 2021S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Purple = New Teachers Only Green = Teacher PD Day Blue = Teacher Work DayRed = First/Last Day of Semester Orange = School Closed
= Possible Make-Up Day = End of Grading Periods
Approved December 17, 2018. In the event SC State Law is changed to allow an adjustment to the school start date, district administration may request a change to this calendar.
One Team. One Mission. One Rock Hill.
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/A
N/A
LABCOMPUTER
LABCHILDHOODEARLY
ROOMMIXPIANT
BOOTHPAINT
OFF
STOR
STOR
B201A
STOR
STORTOOL
R/R
STOR
TOOL
STOR SUPPLY
BOOK
STORR/R OFF
BOOK
STOR
OFF
STOR
R/RHEALTH RM
OFFSTORCHASE
STOR
BOOKWORK
STOR
A102
STOR
OFF.
STOR
OFF
TOOL
STOR
OFF
STOR
B-HALL
STOROFFMECH OFF
WORK
OBSERV.
STOR
C405
STOR
C-HALL
R/R
TOOLCORR
STOR
TOOLROOMBOILER
OFF
OFF
C412CLASS
CULINARY
STOR
LAUND.
STOR
COOLER
OFF
LOCKERBOYS
STOR
SUPPLY
OFF
STORDARK
COUNC.
WAITING
TOOL
STORSTOR
SECPRINASSIST.
B-HALL
ELEC
ELEC.
STOR
ELEC
HOLDING
DISPLAY
CHASE
OFFLAUND.
R/R
OFF
OFF
LOCKER
PRINCIPAL
A-HALL
R/RR/R
OFF
CLASSROOM
WELDINGB201B
CONF
LOUNGE
ATTEND
LOBBY
RECEPTION
A107
MEDICAL
A103DRAFTING
A104
FITMESS
B309VENDING
CLASSROOMB308
B305BANKING/FINAN
TRAVEL/TOURISMMARKETING
FASHION
B306TECHNOLOGYINDUSTRIAL
B205ELECTRICITY
MEDIA CENTERB207
DIGITAL ARTAND DESIGN
A108
GRAPHICDESIGN LAB
A113A111AND PRINTING LAB
GRAPHICS
A110COSMETOLOGY
A109CLASSROOM
BOILER
B211
EDITINGCOMMVISUAL
K-4 EARLYCHILDHOODEDUCATION
C401
C404
C408
C406
C415
C411LAB
DISTRI.WAREHOUSE
C410
ROBOTICSLAB
C409MASONRY
VISUALCOMMUNICATIONS
STUDIOB210
B208CONSTRUCTION
BUILDING
SMALLENGINES
B206
HORTICULTUREB202B203
AUTO BODY
B204REPAIR
AUTO BODY
CAR WASH BAY
ROOFED SERVICE YARDB209
AUTO TECHNOLOGYW
F.
WF.
WF.
ELEC
OFFOFF
B213
C402
MEDICAL SCIENCE
GUIDERECEP
GUIDEANCEGUIDEANCE
CULINARY PREP. LAB
PROF. DEV.STOR
COPY/PRINT
GUID.
GUID.CONF.
SCIENCE
AUTOBODY
LAB
A103A
A104A
A121
MEDICALSCIENCELAB
MEDICAL
A101SCIENCE
MEDICAL
A105SCIENCE
A105BA105C
CUSTODIALCLOSET
A120
A106A
A106B
A106
A107ACUSTODIALCLOSET
A119
R/RA118
R/RA117
118
R/R117
KEEPER116
115
113
114
101
110A
STOR112110107106
105
104 108
104
111
100
100B
100A
A105A
A113A
A111B
A111A
A110A A110B
A110C A110D
A108A
CUSTODIALCLOSET
A114R/RA115
R/RA116
105
102
B201E
B201DB201C
B218
B219CUSTODIALCLOSET
B220
B205CB308AB306C B309AB306B
B310
B310A
B306A
B305A
B205A
B205BB207B
SUPPLY B207C
B207D
R/RB217
R/RB216
B215 CUSTODIALCLOSET
B214
B307A B207A B304A B305C
B304CLASSROOM
B301CLASSROOM
B223A
B223
B224B204D
B202A
B204EB204F
B204AB204C
B204B
B208B
B208A
B206B
B206A
B209AB210AB209BB222
C421C410A
C410B
C411AC411BSTORC411C
R/RC417
R/RC416
C415B
C415A
C413 OFFC415C R/R
C417
C409C
R/RC420R/RC419
C409BC409A
C408CCUSTODIALCLOSET
C418
C408A
C406B
C406A C406C
C408B
STORC408D
C405A
C404B
C404CR/R
C405B
C407
OFFC404A
C401BC401C
C401B
R/RC401A
R/RC402A
CHILDHOODEARLY
C403 C403B
OFFIC403A
MECHC403D
ELECC403C
R/RB306C
STORB306D
R/RB306B
R/RB306D
STORB306E
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSApplied Technology Center2399 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
APPLIED TECHNOLOGYCENTER
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
R/R
ELEC
CUSTODIAL
HEALTH
FOYER
R/R BOYS
ELEC.
R/R GIRLS
WORKROOM
R/R
STORB114
CLASSROOM
B113CLASSROOM
B112CLASSROOM
B111CLASSROOM
B110CLASSROOM
B109CLASSROOM
B108CLASSROOM
B107CLASSROOM
B106CLASSROOM
D131RESOURCE
D129CLASSROOM
D127CLASSROOM
D125CLASSROOM
D130CLASSROOM
D128CLASSROOM
D126CLASSROOM
D124CLASSROOM
D133MULTI PURPOSE
STOR
STOR
A105CLASSROOM
A104CLASSROOM
A103CLASSROOM
A102CLASSROOM
A101CLASSROOM
A100CLASSROOM
STOROFF ELEC
B103RECOVERY
B105SPEECH
B104RECOV.
B122STOR
BOYSR/R
R/R
ELEC STOR
LOUNGE
R/R
VAULT
OFFICE
PROGRAMTEACHER
R/RR/RGUID
PRINCIPAL
R/R
MED
GIRLSR/R
BOYSR/R ELEC
CLOSET
D121ART
D119MUSIC
STORKILN
OFF
STORSTOR
D118DANCE
OFF R/R STOR
D110READING
D110LOUNGE
BOOKROOM
C116CLASSROOM
C117CLASSROOM
C115CLASSROOM
C114CLASSROOM C113
CLASSROOMC112
CLASSROOM
OFF
STOR
C118LIBRARY
CONF
RESO
SERVE
ELECRECV
RECOV RECOV
C111KINDERGARDEN
R/R
STOR
STOR
C110CLASSROOM
C109CLASSROOM
STOROFF
OFF
OFF
B102CLASSROOM
B101CLASSROOM
B100CLASSROOM
LOBBY
R/R
STORAGE
DININGSERVING
DISHWASHING
OFFICE
STORAGE
KITCHEN
ELEC MECH
CUSTODIAL
TLT LKRS
CAN WASH
BOYSR/RGIRLS
STORAGE
CLOSET
STAGE
RAMP
CUSTODIAL CLOSET R/R
R/R R/R
R/R
GIRLS
R/R
R/R
R/R
R/R
STOR
STOR
R/R
R/R
STOR
STOROFFICE
R/R
R/R
STOR
STOR
R/R
R/R
R/R
R/R
R/R
CUSTODIAL CLOSET
B115
B115B
B115A
B116
B117
B119
B118 B111A
B111B B110B
B110A
B125
B103EB103D B103C B124
B103B
B103A
B121
B123 B120
B108 107
107A100
101
101A102C
102B
105103
108105A 106A
106
C109A
C110A
C118C
C118D
C118E
C118B
C118A
C116D
C116C
C116B
C116A
C124
C114A
C114B
C114C
C114D
C114E
C123
C122C121
C120C119
C111A
C111C
C111BD118DD118C
D118B
D118A
D139
D138
D119A
D119B
D121B D121A
D124AD125A
D127A D126A
D136D134
D135
D137
D133A
D133B
E103A
E100
E102E101
E103B
E103
E103C
E104
E105A
E105B
E107
E105
E108E108A
E110 E111
E109
D000
R/R
R/R R/R
R/RB109A
B109B B108B
B108AR/R
R/R R/R
R/RB107A
B107B B106B
B106A
C112A
C112B
C112C
C112D
102
102A
104
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSBelleview Elementary School501 Belleview RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
BELLEVIEWELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
CLASSROOMBOY'SR/R
GIRLSR/R
CLASSROOMCLASSROOM
CUSTODIAL
CLASSROOM
SCIENCE CLASSROOMCHASE
ELEC
CLASSROOM
SCIENCECLASSROOM
B04
B22AB02B B02A
B06B08
B10B12B18
B14B16
B20
B22B24
CLOSET
D-HA
LLD-
HALL
D-HALL CORRIDOR
CAFETERIA
CORR
IDOR
JAN.
R/RDRYSTORAGE
OFFICE
DISHWASH
F103C
F103D
F103E
F103F
F103A F103B LAUNDRY
CUSTODIALCLOSET
MECH.HEATER
BOILER
FREEZER
COOLER
ELECTRICAL
KITCHENSERVING
F104
F105
F106
F107
F101 F103WATER
F100
STORAGE
CORRIDOR
STORAGE
MULTI-PURPOSEE120
E121BE121A
CHASE
F102
MULTI-PURPOSEE121
CONCESSIONSGIRLS
VENDING
MECH./ ELECT.
F-150
128
F125
F126R/R
BOYS127
R/R
STORAGESTORAGE WATERHEATERS
CHASE
BOYS ATHLETICLOCKER
DRYERS
CORRIDOR
LAUNDRY
STORAGEE115
E117 E118
E114
E119E116
VESTIBULESHOWER/ R/RR/R
OFFICEE110
E113E112
E110A E111
GIRLS P.E.LOCKER
BOYS P.E.LOCKER
STOR
STOR
E108
E109
E100A
E100B
GYMNASIUME100
100B
COMPUTERSD09
COMPUTERSD08DATA
ELEC.
DRAMATEACHER
WORK
R/R R/R
VESTIBULE
CHASE
SHOWER/ R/R
GIRLS ATHLETICLOCKER
OFFICE R/R
STORAGESTORAGE
D01
E105E107
E103
D10D11A
D11E101
E107A
E102
E104
F-109
D10B D10A
ROOM
E106
DATA CLOSET
HOMEARTS
KILNSTORSTOR
VISUALARTS
INDUSTRIALARTSD07
D05
D03
D03B D05CD05A
E-115
STORD03A
CHORUS
STAGESTORAGE
ORCHESTRA
STORAGE
MECHANICAL
PRACTICE
OFFICE/LIBRARY
BAND
PRACTICE
D04
D06
D02
D06B
E-103
E-114
E-118
D04A
R/RDRESSINGDRESSING
STAGE
MECH.
D19
D19A D19C
D13
D19B
R/RD19D
AUDITORIUM
CHASE
MECH. / ELECT.
GIRLS
STORAGE
CHASE
BOYS
VESTIBULE
STORAGE
PROJECTION
VESTIBULE
D18E
D18A
D18B
D18C
D18D
D15
D16
D17
D14
D18
CUSTODIALCLOSET
100A
LOUNGE
CLASSROOM
CLASSROOM
CLASSROOM
COMPUTER
LAB.
CLASSROOMPREP.
ROOM
SCIENCE
R/R
CLASSROOM
DATA
R/R
ELEC
BOYSR/R
CUSTODIALGIRLS
R/R
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
C01
C02C04
C05
C03
C06
C08
C17C07
C23C09
C10
C11
C12
C14C16
C13C15
C20
C22
C20A
C21
C08A
C18
C07B
C19
MECHANICAL
STORAGE
C HALL
CLOSET
R/RC07A
CHASE
TUTOR
AUDIO/VIDEO
BOOKSTORAGE
STORAGEROOM
OFFICEWORKROOM
TECHNICALOFFICE
NETWORKING
CLASSROOM
CLASSROOM
STOR
STOR
R/RSPECIAL
EDUCATION
COMPUTERLAB.
TEAMPREP.
LOUNGE
R/RDATA
CLASSROOM
SCIENCECLASSROOM
CLASSROOM
MC5
MC6
MC8
MC7
MC9 MC4
MC3
B01B B01AB03
B05B07
B09
B29
B11
B13B15
B17B03A
B19B21
B09BB23
B25
MECHANICAL
STORAGE
R/RB09A
MEDIACENTER
MC1
TUTORMC2
ASSTPRIN
I.S.S.
RESOURCEOFFICE
GUID
ANCE
RECORDS
ITIN
120
118
116115
117
119
A-115
123
121
122
110R/R
ASSTPRIN
ASSTPRIN
CONF.124
GUIDANCERECEP
ITIN.
ITIN.
ITIN.
ITIN.
R/R
PRINCIPALOFFICECORRIDOR
WORKROOM102
103
114
107
111
104 104A
103A
105
105A104B 108
106
113
STORAGE
R/R
HEALTHCTR
R/R
CONF.109
SCIENCE
CLASSROOM
CLASSROOM
R/R
R/R
R/R
LOUNGE
DATA
CORRIDOR
SCIENCE
TEAMPREP.
COMPUTERLA
B.
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
GIRLSR/R
BOY'SR/R ELEC
STORAGEMECHANICAL
A02
A01A03
A04
A06
A05
A08
A17
A07
A23
A10
A09
A11
A12
A14A16
A15A13
A21
A20
A22
A07A
A07B
D-114
A08AA20A
A19
D-118CHASE
CLOSET
CUSTODIAL
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSCastle Heights Middle School2382 Fire Tower RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
CASTLE HEIGHTSMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
OBSERVATIONGIRLS
CORR.
OBSERVATION
STORSTOR
CORRIDOR
R/R
LOUNGER/R
R/R
R/R
HEALTH
COORD
UTILITY ELEC.
DATA
RECORD
CORRIDOR
WORK
CONF. STAFF COORD
SUPPLYRECEPTION LOBBY
R/R R/R
OFFICE RESOURCE CENTER
UTILITY R/R
ELEC.
TOWER
CLASSROOMA101
CLASSROOMA100
CLASSROOMB100
CLASSROOMB101
CLASSROOMC100
CLASSROOMC101
CLASSROOMC102
CLASSROOMC103
CLASSROOMB103
CLASSROOMB102
R/R BOYSR/R
ROOM
OBSERVATION
R/R
R/R
STORSTOR
LOBBY
OBSERVATION
R/R
R/RSTORSTOR
OBSERVATION
R/R
R/R
STORSTOR
A100A
A100B
A100CA101C
A99
310
311
305A
306A
309
305
306 304
303 307
303301
300302
300A
99
201
202
202A200 100
400
401 402
500
403500A
501
C100A
C100C
C101C C100
B C100D
C101D
C102A
C102C
C103C C102
B C102D
C103D
C99
600
B101A
B101C
B103C
B101
B B101D
B103D
B99
B104
B100A
B100D
B102D
B100
B R/R
R/RB100C
B102C
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSCentral Child Development Center414 East Black StreetRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
CENTRAL CHILDDEVELOPMENT CENTER
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
EWH
EWH
F.E.
F.E.
EWH
F.E.
VISITOR SEATING 3,500 SEATS
EWH
F.E.
HOME SEATING 3,500 SEATS
TB1
TB2
TB3
CH102 CH101
CH100
CH112 CH111
CH110
CV112 CV111
CV110
CV102 CV101
CV100
FH101
FH101A
FH100
FH107
FH106
FH100AFH102
FH104A FH103
FH104
FH105A
FH105
TB4
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSDistrict 3 Stadium South211 South Cherry RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
DISTRICT 3STADIUM SOUTH
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
SIDE LINES
SIDE LINES
PRESS BOX
NORTH
MEETINGROOM
121
STOR122
MECH123
MEETINGROOM
130
KITCHEN129
R/R128
R/R125
STOR127
STOR124
126
R/RCV102
MENR/RCV101WOMEN
CONCESSIONCV100
STORCV100B
STORCV100A
R/RCH102MEN
R/RCH101WOMEN
CONCESSION
CH100
STORCH100A
STORCH100B
TICKET BOOTHTB100
R/RFH100A
ELECTFH105
MECH105A
SHOWERFH104
STORFH103
R/RFH102A
TAPING
FH100A
DRESSINGFH102
VISITOR
DRESSINGFH101
OFFICIALFH100B
DRESSINGFH100
HOME
R/R
R/RPB200A
PB200
131132
TAPINGFH102B
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSDistrict 3 Stadium211 South Cherry RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
DISTRICT 3STADIUM
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
AUDITORIUM
MECH.HEATER
BOILER
R/RDRY
STORAGE
OFFICE
FREEZER
DISHWASH
STORAGE
COOLER
ELECTRICAL
KITCHEN
CORRIDOR
STORAGE
SERVING
COMPUTERS
DATA CLOSET
GIRLS P.E.LOCKER
BOYS P.E.LOCKER
STORAGESTORAGEWATERHEATERS
VESTIBULE
CHASE
SHOWER/R/R
BOYS ATHLETICLOCKER
WRESTLING
MULTI-PURPOSE
DRYERS
CORRIDOR
LAUNDRY
R/R OFFICE
STORAGE
STOR
STOR
GYMNASIUM
DATA
ELEC.
DRAMA TEACHERWORK
R/R R/R
VESTIBULE
CHASESHOWER/R/R
GIRLS ATHLETICLOCKER
CORRIDOR
HOMEARTS
KILN STORSTOR
STORAGE
OFFICE
CHORUS
STAGESTORAGE
ORCHESTRA
R/R
OFFICER/R
STORAGE
STORAGESTORAGE
CHASE
DRESSING
MECHANICAL
DRESSING
STAGE
MECH. / ELECT.
R/R
GIRLS
PRACTICE
VISUALARTS
INDUSTRIALARTS
OFFICE/LIBRARY
BAND
PRACTICE
MECH. STORAGE
SCIENCE
CLASSROOM
CLASSROOM
R/R
R/R
R/R
LOUNGE
DATA
CORRIDOR
CHASECAFETERIA
CONCESSIONSGIRLS
SCIENCE
TEAMPREP.COMPUTER
LAB.
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
GIRLSR/R
BOY'SR/R
ELEC
CLASSROOM
TUTOR
AUDIO/VIDEO
VENDING
MECH./ ELECT.
TUTOR
BOOKSTORAGE
ASSTPRIN
MEDIACENTER
STORAGEROOM
VIDEOPRODUCTIONOFFICE
WORKROOM
TECHNICALOFFICE
NETWORKING
I.S.S.
CLASSROOM
RESOURCEOFFICE
GUIDANCERECEP
CHASE
BOYS
VESTIBULE
STORAGE
PROJECTION
GUID
ANCE
RECORDS
ITIN.
ITIN.
ITIN.HEALTH ITIN.
ITIN.
ITIN
R/R
PRINCIPALOFFICE
RECEPTION
CORRIDOR
WORKROOM
BOY'SR/R
GIRLSR/R
CLASSROOM
STOR
STOR
R/RSPECIAL
EDUCATION
CLASSROOM
COMPUTERLAB.
TEAMPREP.
CORRIDOR
LOUNGE
R/R
CLASSROOM
R/R DATACUSTODIAL
CLASSROOM
CLASSROOM
SCIENCECLASSROOM CHASE
ELEC
SCIENCE CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE CLASSROOM
VESTIBULE STORAGE
LOUNGE
CLASSROOM
CLASSROOM
CLASSROOM
COMPUTERLA
B.
CLASSROOM
PREP.ROOM
SCIENCE
R/R
CLASSROOM
DATA
R/R
ELEC BOYSR/R
CUSTODIAL
GIRLSR/R
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE
CLASSROOM
STORAGEMECHANICAL
B-102
B-101
B-103
B-105
B-104
B-106
B-108
B-107 B-10
9
B-119
B-122
B-121
B-124
B-123
B-125
B-127
B-126
B-128
B-116
B-120
B-110
B-117
B-112
B-114
B-118
B-111
B-115
B-100
D-101
D-102
D-104
D-103
D-105
D-106
D-108
D-107
D-109
D-119
D-121
D-122
D-124
D-123
D-125
D-127
D-128D-126
D-117
D-116
D-120
D-111
D-113
D-114
D-112
D-110
D-115
D-100
D-118
A-100
A-101
A-102
A-119A-117
A-109
A-121
A-123
A-125A-124
A-122
A-120
A-115
A-128
A-126
A-127
A-129
A-132A-137
A-130
A-133
A-138
A-105
A-134
A-104
A-103
A-108
A-107
A-118
A-111 A-106
A-114
A-131
A-135
A-136
A-116
A-110
C-108
C-116
C-117
C-100 C-102
C-101 C-103C-107
C-109 C-111
C-110 C-112
C-114
C-115 C-125
C-126
C-127
C-129 C-131
C-133
C-132
C-128 C-130
C-105
C-106
C-104C-113
C-118
C-120 C-124
C-119 C-121
C-122
C-123
E-100
E-106E-105
E-101
E-120
E-113E-110
E-117
E-108E-111E-107E-109
E-112 E-119
E-122 E-124
E-121 E-127
E-128
E-129
E-130
E-131
E-102
E-103
E-114
E-123E-134
E-135
E-136
E-137E-133
E-132
E-125
E-118
E-104
E-115
E-126
F-100
F-131
F-134
F-150
F-135F-144
F-145
F-125
F-129 F-128
F-124
F-130 F-126F-127
F-121F-119
F-118
F-120
F-110
F-114
F-112
F-108
F-101
F-105
F-104
F-106
F-113
F-122
F-147
F-146
F-140F-141
F-142F-143
F-133F-132
F-152
F-149
F-107
F-111
F-117
F-116
F-148
F-138F-139
F-136F-137
F-151
F-115
F-109
F-123
F-102F-103
CHASEF-154
MAINTANENCESHOP
MECHANICAL
STORAGE
MECHANICALSTORAGE
F-155
F-156
FIELD HOUSE
CORRIDOR
STORAGE
R/R
R/R
F-135A
LAUNDRY
HEALTHCTR
R/R
CLOSET
R/RB-11
3
CLOSET
ASSTPRIN
ASSTPRIN
CHASE
CHASE
CLOSETCUSTODIAL
CUSTODIALCLOSET
WATER
R/R
BOYSF-153
R/R
ROOM
COMPUTERSE-116
CUSTODIALCLOSET
CONF.
CONF.A-113
A-112
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSDutchman Creek Middle School4757 Mt Gallant RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
DUTCHMAN CREEKMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
N/A
B104BSTOR FREEZER
COOLER
B104KITCHEN
B104CLOCKERS
B104E
CUSTODIALCLOSET
B105BKILN
B105ASTOR
B105ART
B99GIRLS
B98R/R
B96BOYSB97
R/R
B104AOFF
B108ELEC
B102COFF
B102BSTOR
B102ASTOR
B102MUSIC
B103CAFETERIA
B101MEDIA CENTER
B106LOUNGE
B101CSPEECH
B101ASTORAGE
B101BOFFICE
603ELEC
A115ASTORAGE
A115BSTORAGE
A115MULTI-PURPOSE
A109CLASSROOM
A107CLASSROOM
A105CLASSROOM
A103CLASSROOM
A112CLASSROOM
A110CLASSROOM
A108CLASSROOM
A106CLASSROOM
A104CLASSROOM
A102CLASSROOM
A112AR/R
A108AR/R
A110AR/R
A104AR/R
A106AR/R
A102AR/R
A103AR/R
A105AR/R A125
BOYSA128
GIRLSA124
ESOL
A122QUIET ROOM
A121
CUSTODIALCLOSET
ELEV
A119ELEV EQ
A117ELECA130
MECH
A100CLASSROOM
A101CLASSROOM
A101DSTOR A101C
STOR
A101BR/R
A100DSTOR
A100ASTOR
A100BR/R A100C
WORKRM
96CLASSROOM
A98DSTOR
A99DSTOR
A98CSTOR
A99ASTOR
A99CLASSROOM
A98CLASSROOM
A98BR/R
A99BR/R
A99CWORKRM
A132ASTOR
A132STAIR
A113BSTOR
A113STAIR
A109AR/R
B95CHASE
B103ASTAGE
B104FDISHWASH
B104DR/R
94CLASSROOM
97GIFTED
100VEST
92VEST
93RECOVERY
READING
95RESOURCE
98CORRIDOR
99
A127A126
A111A97
A129
B100
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSEbenezer Avenue Elementary School242 Ebenezer AvenueRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
EBENEZER AVENUEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
A202CLASSROOM
A204CLASSROOM
A208CLASSROOM
A210CLASSROOM
A212CLASSROOM
A207CLASSROOM
A209CLASSROOM
A203CLASSROOM
A205CLASSROOM
701STAIR
A219WORKRM
A223BOYS
A229GIRLS
A221ROOF
ELEV
A215ELEC
A213
CUSTODIALCLOSET
A225 A227
A200
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSEbenezer Avenue Elementary School242 Ebenezer AvenueRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
EBENEZER AVENUEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
130ABREAK
112
133
MAINTENANCE SHOP113
110STAGING AREA
STOR109OFFICE
106CONF
103
KEYS104
105 126R/R
CLEANING119
R/R130
LOCKER118
WAREHOUSE131
COLD STORAGE136
134FREEZER FREEZER
135
OFFICE133
STORAGE132
206MAINTENANCS& GROUNDSLAWN MOWER
205
204
202STOR
203
201STORAGEEQUIPMENTTRACTOR &
PLANS ROOM
WORK CONTROL
FILE ROOM
VEHICLEMAINTENANCE
WASH BAY
STOR
PLUMBLINGWORKROOM
ELETRICALWORKROOM
HVACWORKROOM
OFF
OFF
GROUNDSWORKROOM
STOR
124B
OFF124A 124
121121A
123
OFF123A
OFF122A
OFF122B
122
125 129
128
113A
101OFFICE
102
102A
108OFFICE 107 111
STOR201A
OFF125A
OFF125B
115R/R
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSFacilities Services2171 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
FACILITIES SERVICES
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
OFFICE
RAM
P U
P
RAMP UP
STOR
R/R
ELECTRICAL
PANTRY
CAN WASH
STOR
FREEZERFOODPREP
COOLER
CAFETERIA
STOR
KILN
A106MUSIC
OFF
STORA105ART
R/RR/R
READINGRECOVERY
B-HALL
STORAGESTORAGE
KINDERGARTEN PLAYGROUND
C-HALL
R/R
OBSERV
STOR
TRYGG PLAYGROUND AREA
DHALL
STOR
R/R
VAULT
STAGE
ASST.
HEALTH
R/R
WRK.RM.STOR
PRIN.R/R
RECOVERY
CONF
A104
BOYS
A-HALL
GUID.
BOYS GIRLS
ELECTRIC
BOOK ROOM
LIBRARY
LOUNGE
B-HALL
RESOURCE
R/R
B109COMPUTER LAB
B107
ELECT
OFF
OFFICEETV
E-HALL
R/R
STOR. R/R
MULTI - PURPOSE
D130STOR
D132
STOR
ELECTDEVELOPMENTPROFESSIONAL
SPEACH
A118A114
A112R/R A110
A109
A108
A117
A111A107 A107A
A100
A100A
A106A
A106BA105B
A105A
A116
A115A104A
R/RA104B
A120
A119
A101
102
A103
A103A
A105
102A108
106
104
A96A94
R/RA95107
MECH110 R/R
A94A
A103CLASSROOM
A102CLASSROOM
A101CLASSROOM
A100CLASSROOM R/R R/R
A99 A98
CUSTODIALCLOSETA97
A97A
D119
D121CLASSROOM
D123CLASSROOM
D125CLASSROOM
D127CLASSROOM
D129RESOURCE
D131CLASSROOM
D120CLASSROOM
D122CLASSROOM
D124CLASSROOM
D126CLASSROOM
D128CLASSROOM
R/RD127A
R/RD126A
R/RD128A
D130A
D132A
STORD132B
CUSTODIALCLOSETE147
BOYSR/RE146
GIRLSR/RE144
E142
MECHE140C
E140E140A
E140B
E138
E135CLASSROOM
E134CLASSROOM
E133CCC LAB
E135A
R/RE134A
STORE134B
B114
B113CLASSROOM
B112CLASSROOM
B111CLASSROOM
B110CLASSROOM
R/RB112A
R/RB112B
R/RB113A
R/RB113B
R/RB110A
R/RB110B
R/RB111A
R/RB111B
B116
GIRLSR/RB115
READING RECOVERYB108
B106
C116CLASSROOM
C115CLASSROOM
C114CLASSROOM
C116B C115C
C116AR/R
C115B
C115A
R/R
STOR
C114C
C114A
C114B
C122
R/RC122A
C113
C119KINDERGRTEN
C118KINDERGRTEN
C117CLASSROOM
C118A
C120 R/RC118C
R/RC119A
C118BR/R
R/R
STOR
C117C
C117A
C117B
C113KINDERGRTEN
R/RC113B
STORC113A
STORC110
C113CSTORC136A
E137CLASSROOM
R/RE137A
E136CLASSROOM
R/RC136B
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSFinley Road Elementary School1089 Finley RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
FINLEY ROADELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
E106
D114STORAGE
STOR.BOILER RM.
ADMIN. HALL
CONF.A106
ELEC
STOR.
STORR/R
ELECT.
WRK
STOR
STOR
GUIDANCE HALL
R/R
R/R R/R STOR
ELEC
A125STOR
R/R
A100
WOMEN
LOUNGE B101
MEN
STOR
KITCHEN
D-HALLSTOR
STORAGE
FITTING
GIRLS
BOYS
ELEC.
BOILER
KITCHEN
ELEFREEZER
COOLER
PANTRY
LOCKER
OFFR/R
STAIR
C01 C02
STAIR
ELECT
EQUIP
ELEV
INDUSTRIALARTS
STORAGE
DARK RM
INDUSTRIAL ARTS
GYM
STAGE
LAUNDRY E108STOR. TEAM RM
INSTRUMENT
LOCKER RME120
SHOWER SHOWER
GIRLS BOYS
E-HALLWAY
OFF
R/RR/R
BOYS
EMMITT SCOTT
STORAGE
BANDREPAIR
MUSICLIBRARY
STOR
BOYS
CONFERENCE
STOR.
D116
D116A
D115VESTIBULED119
D118
VESTIBULED117
D104
CLASSROOMD100
CLASSROOMD102
CLASSROOMD103
CLASSROOMD105
D105B
D105A
A97
CLASSROOMA98
CLASSROOMA99
D104A
D104CD104BD107
D108CUSTODIALD106
CLOSET
E105
E107 E109
E110E120AE111A
E128E120B
E120C
E111BLOCKER RME111
GIRLS
OFFE111C
CLASSROOME127
CLASSROOME123
E127A
E127C
E127B
E127D
E120DE111DC17CLASSROOM
C07CLASSROOM
C06CLASSROOM
C05CLASSROOM
C04CLASSROOM
C03
CLASSROOMC15
CLASSROOMC14
CLASSROOMC12
CLASSROOMC11
CLASSROOMC10
CLASSROOMC09
CLASSROOMC08
C20
C16
CLASSROOMB96
CLASSROOMB97
CLASSROOMB98
CLASSROOMB99CLASSROOM
B100R/R
B102A
B102R/R
B102B
CUSTODIALA94
CLOSET
GIRLSR/R
B103
CLASSROOMB110
CLASSROOMB111
CLASSROOMB112
CLASSROOMB113
B110ASTORB111A
STORB112A
B113ASTORB113B
BOYSR/R
C19
C02C
C02BC02A
C01AC01B
C01C
C18C21
C25
C22
C23
C22A
C22C
C22D
C22E
C24
CUSTODIALC22B
CLOSET
CLASSROOMA101
CLASSROOMA102
CLASSROOMA103
CLASSROOM
A125A
R/R
A86
A96A95A93A92A91
R/RA93A
A95A
A89A89A
100
102
108
102A 108A103
107
106
105
104
101
109
109A109B109C109D
109EA110
111
109F
108
STORCLASSROOMCLASSROOM
A107
A106ASTORA107A
A104
STOR
CLASSROOMCLASSROOM
A105
A104AR/RA105A
A126
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSFlexible Learning Center1234 Flint Street ExtensionRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
FLEXIBLE LEARNINGCENTER
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
SECOND FLOOR C - BLD.
C231B
C231A C252
C250
C248C247C246C245C244C243242C241
C240
C239C238C237C236C235
C234C233C232
C228
C226
C225C224C223C222C221
C220
C219C218C217C216C215C214
C212
C211C214C209
C208C207C206C205
C204
C203
C202C201
C200
ELEV
C-HALL UP
GIRLSC229 BOYS
C251
CLASSROOMCLASSROOMC249
CLASSROOMC231
CLASSROOMC228
C227CLASSROOMCLASSROOM
C213
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSFlexible Learning Center1238 Flint Street ExtensionRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
FLEXIBLE LEARNINGCENTER
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
CLASSROOM
STOR
STOR
ELECCLASSROOM
G136
CORRIDOR
STOROFF
G138
STOR
KILN
B-HA
LL
A-HALL
D-HALL
G-HALL
COURTYARD
G134
COURTYARD
CAFETERIA
GUIDANCE
STAGE
PRIN
SEC.
D-HALL
MEDIA CENTER
D-HA
LL
E127
G117
G116
G118
G111G112
G110
G114
G113
BOYS
B113 B114
A110
E131
AUDIO VISUAL
113
BOOKROOM 114
107
109
118
119
101 104105
101LOBBY100
121
OFFICEA132
STOR.A133
A130
A129
A112STORAGE
A125MECH
A124ELEC A126
ELEC
LOCKERR/RA127
ROOMA128
CUSTODIALCLOSETA117
R/RA118
CAN WASHA116
A114STOR
CUSTODIALCLOSETA113
ELEC
STORAGEA111
R/RB106
B107CLASSROOM
B109CLASSROOM
B111CLASSROOM
B109A
B112
D112CLASSROOM
D113CLASSROOM
D115CLASSROOM
D116CLASSROOM
D119CLASSROOM
D100
GIRLSD101
R/R
R/R
ELECD98
CUSTODIALD99
D110CLASSROOM
D114CLASSROOM
D117CLASSROOM
D118CLASSROOM
B108CLASSROOM
A106CLASSROOM
A105CLASSROOM
A103CLASSROOM
A104
R/R116
LEARNINGROOM117
R/R102
STORAGE103
R/R106
ADMIN
108
110CONF.111
OFFICE
115
STORAGE112
ELECE132
SPEECHE130
R/RE128
CUSTODIAL
D121COMP. LAB.
D123CLASSROOM
D125CLASSROOM
D120CLASSROOM
D122CLASSROOM
D124CLASSROOM
D126CLASSROOM
D125OFFICE R/R
124E123
G130CLASSROOM
G132CLASSROOM
G128CLASSROOM
G133CLASSROOM
G135CLASSROOM
G124G126
G122
CLOSETG115
G137ART ROOM KINDERGARDEN
MUSICA102
A119
A115
DISH
A123STORAGE
R/RA109R/R
G131
G120GIRLS
ROOM
120
R/R
ROOM
G125
G123
D109D112A
D108 D105D115A
D104
D102D117A
D103D106D110A
D107
CLOSETE129
A108A105A
A107
R/R
A122
A121
A120
STORAGEA131
CLASSROOM
G109STOR
CUSTODIAL
R/R
G121BOYS
R/R
MECHG119
G129CLASSROOM
G127
RESOURCE
WORK RM.
LOUNGE
FREEZER
COOLER
FOODPREP
OFFICE
R/RR/R
R/R
R/RR/RR/R
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSIndependence Elementary School132 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
INDEPENDENCEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
RR
OFFICE
COMPUTER LAB
ART ROOMMUSIC ROOM
MEDIACENTER
MULTI-PURPOSE
CAFETERIA
BOYS RR
GIRLS RR
BOYS RR
GIRLS RR
STAGE
BOYSRR
GIRLSRR
HALL
RRRR
LADDER
RRRR
RESOURCE
MAINT
TEACHER'SCENTER
SELFCONTAINED
MAINT
TEACHER'SCENTER
STORAGE
STOR.
OFFICE
RRSTOR
RR
LOBBY
STOR.
RR
LADDER
STOR
TEACHER'SCENTER
RR
MAINT
READINGRECOVERY
SPEECH
C HALL
LADDER
C HALL
B HA
LLB
HALL
STOR.
RECEPTION
SECRETARYGUINDANCE
CONFERENCE
GUINDANCEWAITING OFFICE
ITINERANTOFFICE
TESTING
SASI/BOOK
KEEPERREMOTEOBSERVATION
PROGRAMTEACHER
OFFICE
PRINCIPALCONFE
CHALLENGER
RECORDS
RECOVERY WORKROOM
LADDER
RR RR HEALTH
P.E.STOR.
STORAGE KILN
ARTSTORAGE
MUSICSTORAGE
MAINT
CONF.
WORKROOM
RRHEAD-IN
T.V.STUDIO
A.V.STOR.
ELECT MECHANICALOUTDOORSTORAGE
P.E.OFFICE
RR
MAINTENANCE
LOCKERS
RR
SERVING
KITCHEN
OFFICE
DRYSTORAGE DISHWASH
STORAGE/DRESSING
STUDENTDINING
STORAGE
DISPLAY
D HA
LL
A HALLA HALL
C103
C107C101
B114
B124
D121
B105
B100
B108
A115
A113A112
A119
A120
A108
A103
A104A105
A140
A126
A139
A130
A128
D100
D106
D102
D109
D110
A116
A117
A118A121
A107
A106A102
A100
A109
A138A135A134
A129A127
A137
A131
A132
A124
A125
A122
A123
A110A111
A101
A114
B107
B109
B110
B112
B113B132
B101
B102
B103
B104B106
D105
C100
C102
C106
C103A
C103B
C109
D107D101
D103 D104D108
D112
D113D114
C124 C127
BOYSC125
GIRLSC126 C128
C118AC116A
C114AC112A
C132
B131
B117ARRB119ARR
B118ARR
B116ARR
D123
A114
A141
CLASSROOMB125
CLASSROOM
B122CLASSROOM
B123CLASSROOM
B120CLASSROOM
B121CLASSROOM
B118CLASSROOM
B119CLASSROOM
B116CLASSROOM
B117CLASSROOM
B115CLASSROOM
B115ARR
CUSTODIALCLOSETB111
C119CLASSROOM
C117CLASSROOM
C115CLASSROOM
C113CLASSROOM
C111CLASSROOM
C120CLASSROOM
C118CLASSROOM
C116CLASSROOM
C114CLASSROOM
C112CLASSROOM
C110CLASSROOM
RRC120A
HALLC121
BOYSC122
GIRLSC123
CUSTODIALCLOSETC108
CLASSROOMD122
CLASSROOM
D119CLASSROOM
D120CLASSROOM
D117CLASSROOM
D118CLASSROOM
D115CLASSROOM
D116CLASSROOM
CUSTODIALCLOSETD111
CUSTODIALCLOSETA133
A136
A100A
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSIndia Hook Elementary School2068 Yukon DriveRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
INDIA HOOKELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
OFF
STOR
WAITING AREA CONF.AV OFF
D-HALL
C-HALL
B-HALL
MULTI-PURPOSE ROOM
CONNECTOR HALLWAY
E111
E-HALL
CLASSROOM
LIBRARY
CAFETERIA STAGE
FOOD PREP
MAIN HALL
A117MUSIC
A-HALL
A-HA
LL
ELEC
ELEC
STOR
STORSTORJAN
HEALTH ASS.PRIN PRIN
VAULT CONF.
RECEPT.STOR
A100CLASSROOM
A102CLASSROOM
A104CLASSROOM
A106CLASSROOM
A108CLASSROOM
A110CLASSROOM
A112CLASSROOM
A113CLASSROOM
A111CLASSROOM
A109CLASSROOM
A107CLASSROOM
A105CLASSROOM
A103CLASSROOM
A101CLASSROOM
A114CLASSROOM
A115CLASSROOM
A116CLASSROOM
A100AR/R
A102AR/R
A104AR/R
A106AR/R
A108AR/R
A110AR/R
A112AR/R
A113AR/R
A103AR/RA101AR/R
A107AR/RA105AR/R
A111AR/RA109AR/R
A140R/R
A139R/R
A143ELEC
A144
BOYS
GIRLS
CLOS
ETCU
STOD
IAL
A145R/R
A141R/R
A114B
A114R/R
A114DSTOR
A114AOFFICE
A115B
R/RA115C
A116BSTOR
A115DSTOR
A117CA117BA117AA121
101102 105 MEN
106
R/RWOMEN
108
R/R107
109104
110
111
PANTRY112
OFFICE118
114 115116 117
119
120
122
126 125 110
123
127
129
130
128KILN
CLASSROOME110
CLASSROOME109
CLASSROOM
E108GIRLS
D101ELEC
D102BOYS
D103LOUNGE
D108CLASSROOM
D107CLASSROOM
D106CLASSROOM
D104
B102CLASSROOM
B101CLASSROOM
B100CLASSROOM
C105CLASSROOM
C104CLASSROOM
C103CLASSROOM
COUN.R/R
A116A
101A110A
R/RB102B
R/RB102A
R/RB101B
R/RB101A
R/RB100B
R/RB100AB109
R/RB110
R/RB111
RESORCEB112
R/RC105B
R/RC105A
R/RC104B
R/RC104A
R/RC103B
R/RC103AC102
SPEECH
C101SPEECH
C100RECOVERY
D112STOR
D111STOR
D110OFF
D109R/R
D105
CLOSETCUSTODIAL
D100CLOSETCUSTODIAL
VESTIBULE101
LOBBY100
SCHOOL DISPLAY111
HEALTH110 110A
R/R
VAULT108
CONF107PRINCIPAL
106
OFFICE105
OFFICE104
RECEP102
R/R109
CORRIDOR 103
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSLesslie Elementary School250 Neely Store RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
LESSLIEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
MULTI-PURPOSE ROOM
STOR
STOR
ELEC
CLASSROOMF129
CORRIDOR
STORSTOROFFICE
F128
STOR.
KILN
B-HA
LL
A-HALL
D-HALL
F-HALL
COURTYARD
F131
COURTYARD
CAFETERIA
GUIDANCE
STAGE
PRIN
SEC.
D-HALL
MEDIA CENTER
D-HA
LL
E127
7103
7101LOUNGE
WORK RM.
LOUNGE
F140
F131A
F131B
F145
F146F128AF128B
F128C
F130A
F130B
BOYS
B109B B110
B105
D100
STORAGE
C130
BOOKROOM D100A
104
108
111
110
109 101103
102LOBBY100
100B
OFFICEA102A
STOR.A102B
A101B
A101A
A101
A96STORAGE
A99MECH
A98ELEC A101C
ELEC
LOCKERR/RA100B
ROOMA100A
FREEZER
COOLER
CUSTODIALCLOSETA100D
R/RA100F
STORAGEA97
A101DSTOR
CUSTODIALCLOSETA95
ELEC
STORAGEB106
R/RB107A
B107CLASSROOM
B109CLASSROOM
B111CLASSROOM
B109A
B111B
D112CLASSROOM
D113CLASSROOM
D115CLASSROOM
D116CLASSROOM
D119CLASSROOM
D129
GIRLSD130
R/R
R/R
ELECD133
CUSTODIALD131
D110CLASSROOM
D114CLASSROOM
D117CLASSROOM
D118CLASSROOM
B108CLASSROOM
A106CLASSROOM
A105CLASSROOM
A103A104
R/R114
NURSE'SOFFICEC129
R/R102B
STORAGE102A
R/R103A
ADMIN
105
106CONF.107
OFFICE
C128
STORAGEA107A
ELECE130
CONF.E129
R/RE127A
CUSTODIAL
D121COMP. LAB.
D123CLASSROOM
D125CLASSROOM
D120CLASSROOM
D122CLASSROOM
D124CLASSROOM
D126CLASSROOM
D126AOFFICE R/R
126BE131
F137CLASSROOM
F135CLASSROOM
F133CLASSROOM
F136CLASSROOM
F134CLASSROOM
F132CLASSROOM
F135BF133A
F132BF132A
ELECF141
R/RF139R/RF138
R/RF129A
F130ART ROOM
KINDERGARDEN
CUSTODIALF142
MUSICA102
FOODPREPA100
A100E
DISH
A100CSTORAGE
R/RB104R/R
F143
F144R/R
R/R
100A
R/R
STORAGEF137A
STORAGEF136A
ROOM
F133B
F134B
D112BD112A
D113B D115BD115A
D116B
D118AD117A
D117BD114BD110A
D110B
CLOSETE128
A106BA105A
A105B
R/R
CLASSROOM
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSMount Gallant Elementary School4664 Mt Gallant RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
MOUNT GALLANTELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
RR
OFFICE
COMPUTER LAB
ART ROOMMUSIC ROOM
MEDIACENTER
MULTI-PURPOSE
CAFETERIA
BOYS RR
GIRLS RR
BOYS RR
GIRLS RR
STAGE
BOYSRR
GIRLSRR
HALL
RRRR
LADDER
RRRR
RESOURCE
MAINT
TEACHER'SCENTER
SELFCONTAINED
MAINT
TEACHER'SCENTER
STORAGE
STOR.
OFFICE
RRSTOR
RR
LOBBY
STOR.
RR
LADDER
STOR
TEACHER'SCENTER
RR
MAINT
READINGRECOVERY
SPEECH
C HALL
LADDER
C HALL
B HA
LLB
HALL
STOR.
RECEPTION
SECRETARYGUINDANCE
CONFERENCE
GUINDANCEWAITING OFFICE
ITINERANTOFFICE
TESTING
SASI/BOOK
KEEPERREMOTEOBSERVATION
PROGRAMTEACHER
OFFICE
PRINCIPALCONFE
CHALLENGER
RECORDS
RECOVERY WORKROOM
LADDER
RR RR HEALTH
P.E.STOR.
STORAGE KILN
ARTSTORAGE
MUSICSTORAGE
MAINT
CONF.
WORKROOM
RRHEAD-IN
T.V.STUDIO
A.V.STOR.
ELECT MECHANICALOUTDOORSTORAGE
P.E.OFFICE
RR
MAINTENANCE
LOCKERS
RR
SERVING
KITCHEN
OFFICE
DRYSTORAGE DISHWASH
STORAGE/DRESSING
STUDENTDINING
STORAGE
DISPLAY
D HA
LL
A HALLA HALL
C103
C107C101
B114
B124
D121
B105
B100
B108
A115
A113A112
A119
A120
A108
A103
A104A105
A140
A126
A139
A130
A128
D100
D106
D102
D109
D110
A116
A117
A118A121
A107
A106A102
A100
A109
A138A135A134
A129A127
A137
A131
A132
A124
A125
A122
A123
A110A111
A101
A114
B107
B109
B110
B112
B113B132
B101
B102
B103
B104B106
D105
C100
C102
C106
C103A
C103B
C109
D107D101
D103 D104D108
D112
D113D114
C124 C127
BOYSC125
GIRLSC126 C128
C118AC116A
C114AC112A
C132
B131
B117ARRB119ARR
B118ARR
B116ARR
D123
A114
A141
CLASSROOMB125
CLASSROOM
B122CLASSROOM
B123CLASSROOM
B120CLASSROOM
B121CLASSROOM
B118CLASSROOM
B119CLASSROOM
B116CLASSROOM
B117CLASSROOM
B115CLASSROOM
B115ARR
CUSTODIALCLOSETB111
C119CLASSROOM
C117CLASSROOM
C115CLASSROOM
C113CLASSROOM
C111CLASSROOM
C120CLASSROOM
C118CLASSROOM
C116CLASSROOM
C114CLASSROOM
C112CLASSROOM
C110CLASSROOM
RRC120A
HALLC121
BOYSC122
GIRLSC123
CUSTODIALCLOSETC108
CLASSROOMD122
CLASSROOM
D119CLASSROOM
D120CLASSROOM
D117CLASSROOM
D118CLASSROOM
D115CLASSROOM
D116CLASSROOM
CUSTODIALCLOSETD111
CUSTODIALCLOSETA133
A136
A100A
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSMt. Holly Elementary School1800 Porter RoadRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
MT HOLLYELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
GUIDANCE
SPEACH
E123
CENTER
BOYS GIRLS
MEDIA
C118
CURRIC.COORD.HEALTH
C116
MEN
C-HALL
C117 C115
E-HA
LL
E124
E125
E126
E127
E128
HALL
WORK
MUSICELEC
A-HALL
B-HALL
B108
COURTYARD
BOYS
GIRLS
TEACHERSLOUNGE
CAFETERIA
STAGE
HALL
BOYSMECHA
ELEC
M-1
M-2TOWER
I.T.V
ROOM
M-3 M-4
M-5
RECORDSVAULT
CLASSROOM
CLASSROOM
A104CLASSROOM
CLASSROOMA105
READINGRECOVERY
D122
MULTI-PURPOSE
B109
CLASSROOM
CLASSROOM
CLASSROOM
B110
B111
CLASSROOM
CLASSROOM
B112
CLASSROOM
B107
CLASSROOM CLASSROOMB114
A106CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM
CLASSROOM
D119
A103
D121
D120
CLASSROOM
A101CLASSROOM
A102
HALLART
BOYSE128A
GIRLSE128B
BOYSE127BGIRLS
E127A
BOYSE126A
GIRLSE126B
BOYSE124A
GIRLSE124B
BOYSE123BGIRLS
E123A
D107
ELECD108
WORKROOMD106
R/RD106A
STUDIOD105A
TV
OFFICED105B
STORAGED105C
A/V
D105
D104
STORAGED104B
R/RD104A
STORAGE 2D104C
KILND104D
STORAGED122A
R/RC122B
C121A
BOYSD120A
GIRLSC120B
BOYSD119A
GIRLSC119B
D103 D100
STORAGED102
CUSTODIALCLOSETD101
STORAGEC102A
STORAGEC102A
C102
C101
STORAGE2
C101BOFFICE
C101C
C101ASTORAGE
R/RB108A
R/RB110A
R/RB109A
B113 B117
B115
B119
B118
B101A
B101
OFFICEB102A
COOLER
FREEZER
R/RB102C
CUSTODIALB102D
DISHWASH
A108
GIRLSA107
CUSTODIALCLOSETA109
A98
ROOMA100A
RECOVERY
RESOURCEA100
STORAGEA101D
STORAGEA103D
STORAGEA105D
STORAGEA105D
R/R
WOMAN
OFFICE
105A
E100
D-HA
LL
A105A
D100
B100
R/RA105B
STORAGEA105C
115111
103
104
105
109
101
PRINCIPAL 113
100KITCHEN
PANTRYB102B
B102
GIRLSE125B
BOYSE125A
R/RC121B
R/RB112A
R/RB114A
R/RB111A
R/RB107A
B102E
R/RA104A
R/RA106A
R/RA102A
OFFICEA103A
R/RA103B
STORAGEA103C
OFFICEA101A
R/RA101B
STORAGEA101C
107
STORAGE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODTERRANOVASPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNORTHSIDE ELEMENTARY SCHOOL840 North Annafrel StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHSIDE ELEMENTARYSCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
STOR.
R/RDRY
STORAGE
COOL
FREE
OFF.
LOADING DOCK
STOR.
CAN WASH
SEWINGROOM
C114
R/RSHOWER
CHEM.STOR.
STORAGE
C110BSTOR
C109BSTOR.
WRK.RM.
GIRLS
BOYS
STOR
BOILERROOM
STORAGE
FOODCAFETERIA
STOR.ISS
BOOK
C HALL
C HALL
LOBBY
PLUMBER'S CHASE
DISHMACHINE
PREP
CAN WASH
STOR STOR
R/R
R/R
LINEN
R/R
CLASSROOMC103
CLASSROOMC104
CLASSROOMC102
CANTEENC101
CLASSROOMC107
CLASSROOMC108
CLASSROOMC109
CLASSROOMC110
CLASSROOMC111
CLASSROOMC112
CLASSROOMC113
CLASSROOMA105
CLASSROOMA104
CHILLIERROOM
BOILER
CLASSROOMA115CLASSROOM
A114CLASSROOM
A113
PRINCIPAL
SECFOYER
PRINTMAILSTOR
GUIDE
GUIDE
GUIDE
GUIDE
SEC
VAULT
BOOKKEEPER
PEERMED
ASSTPRINASST
ASSTPRIN
R/R
R/R
HEALTH
CLASSROOMA112
CLASSROOMA111
CLASSROOMA110
CLASSROOMA109
R/R
R/R R/R
STOR
CONF CONF
CONF CONF
LIBRARY
CLASSROOMA101
CLASSROOMA102
STOR WRKRM
R/RR/R
STORPROFLIB
LIBRARYOFF
MAIN LOBBY
ELEV
ELEVEQUIP
R/R
A100
A100A
A100B
A100C
A100D
A100E
A100F
A100G
A100H
A100IA100J
STORA118
141
140
140A100
ATTEND
LOUNGE102 105
104
103
101
103A
106
110
109108
A117
A116122
120
118
116
115114113112111
STOR123
124R/R125
C. CLOSET126
117133
119131
121129
121ASTOR121BR/R
129A
135A
135
GUIDE134
GUIDE132
GUIDE130
GUIDE128136
136A 127
107
107A
107C
STORA115A
OFFA115B
R/RA115C
A STAIR 2A STAIR 3
A STAIR 1A STAIR 4
C100
C119
C121
C103A
C103B
C104AC136
C105
C106
C123C122
C123A
C123B
C123C
C123D
C123EC134
C123H
C111A
C112A
STOR.C113AC115
C118
C116
C117
C107A C108A
C109A
C135
NWHSC-BUILDINGFIRST FLOOR
NWHSA-BUILDINGFIRST FLOOR
CUSTODIALC123F
CLOSET
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNorthwestern High School2503 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHWESTERNHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
R/R
CONCESSION
R/R
STOR
SHOWER
OFF
STORAGE
STORAGE
STOR.
OFF
R/R
STOR
STOR
STOR
R/RR/R
LAUNDRY
R/RCOACH
B105
MECHANICALCOURT YARD
CHILLER
GYMNASIUM
BOYS
BOYS
GIRLS
GIRLS
ELEV
MECH
STOR
CONCESSION
ENTRANCE AREA
STOR MECHANICAL
WEIGHT ROOM
B102ROTC
OFF
SHOWER
P.E. DRESSING
STORAGE
BOILER
TRAINING
STORAGE
CORRIDOR
ATHLETIC
BOY'S J.V. TEAMDRESSING AREA
SHOWER
ROTCOFFICE
CONFERROOM
R/R
OFFOFFOFF
STORAGE
GYMNASIUM
MINI GYMB103
P.E.DRESSING ROOM
STORSTOR
COACHESOFFICE
ATHLETICDIRECTOR
SHOWERBOY'S VARSITY TEAM
DRESSING
B101
STOR
LOBBY
R/R
OFF
OFF
GIRLS
BOYSFRONTSTAIRWELL
BACKSTAIRWELL
R/R
MINI GYM
SECRETARY
GAS METERGENERATOR
F106F107
F108
F109
F110F111
R/R
R/R
R/R
R/R SHOWER
SHOWER
SHOWER
SHOWER
LAUNDRY
ELECTRICAL
MAIN POWER
FITNESS ROOM
SHOWER
B101D
B101A B101B B101C
B100
B100B B100A
B100C
R/RB100D B102A B102B
B102C
B102D
B102E
B137
B137A
B137B
B137C
B136
B136AR/R
B136B
B136CB136D
B135
B135A
B134
B138
B128C
B128
B128A
B128B
B130B129
B103A
B106B107
B107AB108
B108A
B108B
B108C
B108D
B108E
B113B113A
B113B B113C
B113D
B113E
B114
B114A
B114BB114C
B114D
B114E
B114F
B114G
B127
F113 F114F115
F110A F110B
F109AF109B
F108A F108B
F107B F107A
F118
F119F119A
F120
F116
F117
F99
F100
R/RF101
F102
R/RF104
MECHF105
CUSTODIALF103
CLOSETSTORF102A
F112
NWHSB-BUILDINGFIRST FLOOR
NWHSF-BUILDINGFIRST FLOOR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNorthwestern High School2503 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHWESTERNHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
GIRLS
BOYS
WRK.RM.
R/R
STOR
OFFSTORAGE
COORD.
REC.ASST.PRIN.
PROGRAMCOORD.
D110A
D110B
COURT YARD
MUSICLIBRA
PRACT
PRACT
OFFICE
WORKROOM
E107STOR
PREP
CONFERENCE
SEC
MEN
WOMEN
D127JULIETDRESSING
D104
D107
STOR
GIRLSBOYS
MECHANICAL
R/R
STAIRWELL
ELEC
E108CONFERENCE
CLASSROOME114
STORD109A
OFFD109B
ENSEMBLEROOMD110F
STORD110C
LIBRARYD110D
OFFICED110E
BANDROOM
D110
STORD110G
MULTI PURPOSEMUSIC ROOM
D109ELECTRICAL/GENERATOR
D-HALL DOWN
DARKD100C
OFFD101A
CLASSROOM
D116
GIRLSR/R
D115
BOYSR/R
D128
CUSTODIALD114
CLOSET
D113
STORD112
R/RD111
KILND100D
ART ARTD102 D101 D100
STORD104A
STORD105A
PRE-VOCATIONAL
D105
D104A
STOR
STORDRAMA
R/RD107A
STORD108
STAGED129
STORD106A
DRESSINGROMEO
D106
R/RD106B
DIMMERD126
R/RD121
R/R
D120
LOBBYENTRANCE
D118
D129
STOR
D117
ELEVEQUIP ELEV
D117A
AUDITORIUMD129
PROJ.D126
TICKET
CLASSROOME113
CLASSROOME112
CLASSROOME111
R/RE110
CLASSROOME109
CLASSROOME116
CLASSROOME118
STOR
PREP CLASSROOM
E115CLASSROOM
E117
CLASSROOME106
CLASSROOME105
CLASSROOME104
CLASSROOME103
CLASSROOME102
CLASSROOME101
CLASSROOME100
CUSTODIALE125
CLOSET
E115A
E115B
E116A
E116B
E130E129
E131
E123
E126
E124
E127E127A
E128
E108A E108B
E107A
E107B
E107C
E107D
E107E
E120E
E120
E120A E120B
E120C
E120D E120F
E120G E120H
D129A
D100BD101B
NWHSE-BUILDINGFIRST FLOOR
NWHSD-BUILDINGFIRST FLOOR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNorthwestern High School2503 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHWESTERNHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
CLASSROOMA216
CLASSROOMA217
CLASSROOMA218
CLASSROOMA219
CLASSROOMA220
CLASSROOMA221
CLASSROOMA222
CLASSROOMA223
CLASSROOMA224 CLASSROOM
A225
CLASSROOMA226
MECHA236
CLASSROOMA210
CLASSROOMA209CLASSROOM
A208CLASSROOM
A207CLASSROOM
A206CLASSROOM
A205CLASSROOM
A204CLASSROOM
A203
CLASSROOMA202
CLASSROOMA201
MECHA242
CLASSROOMA215
CLASSROOMA228
CLASSROOMA227
CLASSROOMA212
CLASSROOMA211
R/RA240
R/RA238
R/RA237
OFFICEA241
A239
CUSTODIALA243
CLOSET
ELEV
CLASSROOMA229
CLASSROOMA230
CLASSROOMA213
CLASSROOMA214
R/RA232
R/RA234
R/RA235
OFFICEA231
A233
CUSTODIALA244
CLOSET
LOUNGEA206A
R/RA206B
R/RA206C
LABA205A
AHSA205B
A STAIR 2A STAIR 3
A STAIR 1A STAIR 4
A200
STORF209
F217
GIRLSF205
CUSTODIALF205A
CLOSET
BOYSF204
F207
F200
F215
NWHSF-BUILDINGSECOND FLOOR
RHHSA-BUILDINGSECOND FLOOR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNorthwestern High School2503 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHWESTERNHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
CLASSROOME213
CLASSROOME212
CLASSROOME211
CLASSROOME210
E213A
E209
CLASSROOME200
CLASSROOME201
CLASSROOME202
CLASSROOME203
E200A
CLASSROOME208
CLASSROOME205
CLASSROOME214
CLASSROOME215
STORE207
STORE206
MECHE217
STORE204
R/RE216
R/RE219
ELEC
CUSTODIALE219
CLOSET
E218
WORKRME220
R/RE220A
R/RE220B
CLASSROOMD208
STORAGED209
CLASSROOMD210
CLASSROOMD200
CLASSROOMD201
CLASSROOMD202
CLASSROOMD203
CLASSROOMD204R/R
D218R/RD217
LOUNGED216
R/RD215
R/RD214
CLASSROOMD205
CLASSROOMD206
CLASSROOMD207
STORD207A
ELEVELECTD219
MECHANICALD220
CUSTODIALE221
CLOSET
NWHSE-BUILDINGSECOND FLOOR
NWHSD-BUILDINGSECOND FLOOR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSNorthwestern High School2503 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
NORTHWESTERNHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/A
N/A
GUIDANCE
STORAGE
AUDIOVISUAL
ART
RES
STOR B-HALL
PRIN.
LOUNGEELECT
R/R
READINGRECOVERY
R/R
CURRICULUMCOORDINATOR
VAULTFOYER
STOR
B116
OFFICE
TEACHERLOUNGE
TEACHERWORKROOM D-HALL
HEALTHROOM
CONFR/R
R/R
WAITINGAREA
PORTICO
RECPT.VAULTLOBBY
ELEC
C.C.
CAFETERIA
STORAGE
STOR
FOOD PREP
OFF
R/R
MECH
CANWASH
STOR
A-HALL
STOR
CONF
KILN
R/R
OFFICER/R
WORKROOMLOWER
STORAGE
MULTI-PURPOSE
ELEC.
R/RGIRLS
OFFICE
R/R
C-HALL
OFF
R/R
R/R
STOR
M-1 M-2
C115A
C115CLASSROOM
C113CC113A
R/RC113B
C113CLASSROOM
C113DSTORC111D
OFFC111A C111C
C111CLASSROOM
R/RC111B
C109CLASSROOM
C107CLASSROOM
C105CLASSROOM
C103CLASSROOM
R/RC109A
R/RC107A
R/RC105A
R/RC103A
C117CLASSROOM
C117A
R/RC118
CUSTODIALCLOSETC119
C114CLASSROOM
C112CLASSROOM
C110CLASSROOM
C108CLASSROOM
C106CLASSROOM
C104CLASSROOM
R/RC114A
R/RC112A
R/RC110A
R/RC108A
R/RC106A
R/RC104A
C102CLASSROOM
C123STOR
ELECTC102A
C102BR/R
C101A
C101B
C121C101
CLASSROOM
C100COFF
C100B
CUSTODIALCLOSETC120
C100A
C100LIBRARY
C118
R/RD116
R/RD117
D110
C112
D111 C113
ELECD114
D106
D100BD100A
D100
D103D126
D104
D105
B116DB116C
A117
A117BA117A
A116
A115
R/RBOYSA113 A112
A112A
A111CLASSROOM
A110CLASSROOM
A104CLASSROOM
A103CLASSROOM
A102CLASSROOM
A105CLASSROOM
A106CLASSROOM
A107CLASSROOM
A108CLASSROOM
A109TURNEY
R/RGIRLSA120
R/RBOYSA118
CUSTODIALCLOSET A119
A121
A122D102
STORA123D101
ELECA124
A129
A129A
A129B
A127A125
B122
B115CLASSROOM
B114CLASSROOM
B113CLASSROOM
B112CLASSROOM
B111CLASSROOM
B110CLASSROOM
R/RB114A
R/RB115A
R/RB114B
R/RB115B
R/RB112A
R/RB113A
R/RB112B
R/RB113B
R/RB110A
R/RB111A
R/RB110B
R/RB111B
B117
R/RGIRLSB118
R/RBOYSB119
B124 B120
B120A
B121B121A
B116A
109
110
108
107 106104A
105
104
102100
101
100A
ASSIS PRINC
ELECTSTOR
FREEZERCOOLER
A114
D109D108
D107
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSOakdale Elementary School1129 Oakdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
OAKDALEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/A
N/A
MEDIA CENTER
STOR
STOR
R/R
LOCKERS
KITCHENSERVING
DISH ROOM
COOLER/ FREEZER
OFF
DRY STOR.
MECH. RM
LOBBY
STAGE
RAMP
GYMNASIUM
CAFETERIA
R/R
ELECR/R
PRINC
STOR R/R
CONF
PROGRAM TEACHER
R/R
RECOVERY
BOOKKEEPING
STORPTO
RECEPTION
HEALTH
SECRETARYWORKROOM
RR
RECORDS
GUIDANCEWORKROOM
ELEC. RM
KILN
A100
CONF
TELECOM
STOR
STOR
STOR STOR
STORSTO
R
RR
RR
OFF STOR
RR
MECH
R/R STORAGE
R/R
ELEC
OBSERVATION
STOR
R/R
STORAGE
ELE
LOUNGE
CUSTODIAL
R/R
STOR
STOR
STOR
Mobile Unit 2
STOR
RRSTO
R
RR
Mobile Unit 1
RRRR
Mobile Unit 4
STORSTO
RSTO
R
STOR
RRRR
Mobile Unit
OFFICE OFFICE OFFICE
STOR
STOR
R/R R/R
OFF
OFF
R/R R/R
B127CLASSROOM
B126CLASSROOM
B125CLASSROOM
B124CLASSROOM
R/RBOYS
R/RGIRLS OFFICE
B123CLASSROOM
B122CLASSROOM
B120CLASSROOM
B121CLASSROOM
B118CLASSROOM
B119CLASSROOM
OBSERVATION
OBSERVATION OBSERVATION
B117CLASSROOM
B116CLASSROOM
B115CLASSROOM
R/RBOYS
R/RGIRLS
C133CLASSROOM
C132CLASSROOM
C131CLASSROOM
C130CLASSROOM
OBSERVATION OBSERVATION
C129CLASSROOM
C128CLASSROOM
C127CLASSROOM
C126CLASSROOM
OBSERVATION OBSERVATION
C125CLASSROOM
C124CLASSROOM
R/R
R/RLOUNGE
A103ART
A101CLASSROOM
A102CLASSROOM
A104MUSIC
A105CLASSROOM
A106CLASSROOM
CLOSET
D108CLASSROOM
D110CLASSROOM
D112CLASSROOM D114
CLASSROOM
OBSERVATION
OBSERVATION
D107CLASSROOM D109
CLASSROOMD111
CLASSROOM
R/R R/R
R/R
OBSERVATION
OBSERVATION
D113CLASSROOM
D116CLASSROOMR/R
D115CLASSROOM
R/R
CUSTODIALCLOSET
CUSTODIALCLOSET
CUSTODIALCLOSET
CUSTODIALCLOSET
WIRING
D116A
D116B
D116C
D115A
D115B
D115C
D113D
D113C
D113A
R/RD111C
D111A
D109AD107A
D109CD107C
D111BD113B
D107BD109B
D107D
D114D
D114BD112B
D114CD112C
D114AD112A
D110AD108A
R/R R/RD110CD108C
D108BD110B
D108D
A95
A106A
A96
A97
A98
C133AC133B C132A C132B
C131A C130AC129A C128A
C131BC129B
C130BC128BC131C
R/RC129C
R/RC130CR/R
C128C
C127A C126AC125A C124A
R/RC127BC125B
C126BC124BC127C
R/RC125C
R/RC126CR/R
C124C
A93
C102
C101
A94C
A94B
A94A94A
A104A
A103C
A103B
A103A
120
120A
122
121
121B121A
119118
116
114
112
103101
102
104 113
111104A109107A107B
107108
110
105
B124AB125A B128B129
B122AB120A
B123AB121A
B118AB116A
B119AB117A
99 97
B114
B113B112
B111
100
E101E101A
E101B
E101CE102
E103
E104
F110
F109F108
E101
F107
F104F106
F106AF105
F103A
F102
F103
F101
A99
D100
C100B100
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSOld Pointe Elementary School380 Old Pointe School RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
OLD POINTEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
B128
B125
OFF
B124
GIRLS
ELEC
B123
STOR R-H
CORR
IDOR
B120
STORAGE
CUSTODIAL
B122
D106
CORECLASSROOM
D104
D105
CORECLASSROOM
D103
CORECLASSROOM
E.S.O.L.CLASSROOMD102
D108
MECH.D115 IT
OFFICED107
CORECLASSROOM
D101STORAGE
D109
D110
ELEC.
CUSTODIAL
D100OFFICE
D112 D113BOYS GIRLS
VESTIBULE D HALL
D111
A114 A113
A112
A111
STOR 1
A110
OFF
STOR
STORAGE
STOR
STOR
TEACHERWORKROOM
D116
RECOVERYROOM
D119
RECOVERYROOM
A108
A104 A105
GIRLS 1
A109
BOYS 1
A119 A117 A116
A118 A115
COURTYARD
BOYSGIRLS
STORE
WASHCAN
CUSTODIALCLOSET
CHILLER
LOADING DOCK
KITCHEN
STRINGS
ROOM
OFF R/R R/R
FREEZER
COOLEROFFICE
STOR
PANTRY RM
GENERATOR
MULTI PURPOSE
MECH
LIBRARY
CAFETERIA
GUIDANCE
VAULTRECEPTION
COUN. COUN. COUN.
A101 A102
WRK TEACH
LOUNGE
A107
SAFETYOFFICER
A131
A128WORK ROOM
A129
A130
ATTENDENCEOFFICE
CONFERENCEA125
PYSCHOLOGIST
A127
ELEC.A124
A123
MENTALHEALTHWORKER
MECH.A122
RECP.A121
A126
W
STOR
R/R LOUNGE
STOR
VAULT
ENTRANCEA120
M
BOOKROOM
CONF. SEC PRIN 3ASST ASST
PRIN 2 PRIN 1
PRINCONF
STOR
STUDIOTV
C100E STOR
R/R
STORAGE
E100
DRAMAROOM
PROP. E124ROOM
STORAGEE123
STORAGE
ASST
OFFICE
A103
BOYS
B121KILN
SHOWER
R/RBOYS
STORAGE
BOYSLOCKER
OFFICE
CHORUS STOR
OFF
STOR
R/R
C119
ROOM
GIRLSLOCKER
OFFICE
STORAGE
PRACT.2
R/R
R/R
GYM
STAGESTORAGE
LAUND.
ELEC
STORAGE
TEAMLOCKERROOM
E101STAGE
LOCKER ROOME103
E118
E117
STORAGEE122
E121
SHOWER
R/R
LOBBYE112
E115
VESTIBLUEE110
E109VEST.
VEST.
MECH.E108
E107MECH.
R/RE106
R/RE104
VESTIBULEE120
PROP.ROOME119
AUDITORIUM
VESTIBLUEE114
VEST.
E113
E102
CONTROLROOM
STORAGE
STORAGEE111
VESTIBULE
BOYS DRESSING ROOM
BAND
B126
B127
STOR
C100
C101
C110
C112
C104C105
C113
C102
C 103C109
C108C106
C107
C111E
B125A
B123A
B123B
B123C
B116
B115
B117
B121A
B119
A113B
A113A
A110A
A STAIR 2
A STAIR 3
A STAIR 1
A151 A109A
A143A145
A146A144
A107C A107B A107A
A107D
A112B A112A
A147
A148 A149 A150
A150A
C102G C101A
C102E
C102ADISH ROOM
C102B
C102C
C102D
C113B
C113A
C100D C100C C100B C100A
A138A
A138A139 A140 A141
A136
A137
A135
A128A
A134 A133
A132AA132B
A142
C108A
C107B
C110A
C107A
C120
C106A
C118C117
C116
C104B
C104A
C112B
C112C C115 C114
C-HALL
C111A
C111B
C111C
E109AE102A
E101A
E110A
E114A
C111D
ELEV
ELEV
D118
CLASSROOM CLASSROOM
CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM
R/RD114
R/R
CUSTODIALCLOSET
CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM
CLASSROOM
CLASSROOM
A106
CUSTODIALCLOSET
A STAIR 4
CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM
CLASSROOM
CLASSROOM
CLASSROOMCLASSROOMCLASSROOM
A150B
CUSTODIALCLOSET
CLOSET
AUDIOVISUAL
R/RHEALTH
A132
GIRLSDRESSINGROOM
E105
CUSTODIALCLOSET
PRACT.1C112A
CUSTODIALCLOSET
EQUIPC111
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTS2631 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
RAWLINSON ROADMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
A214
CUSTODIAL
BOYS
A211
STOR
A213
A215A216
STOR
ELEV
A220HVAC
A218
A219
A217
A203 A204
A208
A-HALL UP
A201 A202
A206 A207
GIRLS
A223
A224
BOYS
STORAGE
A222
CONF.
A200
M
W
A221
GIRLS
A205
A209
A210
A212
R-H
A STAIR 2
A STAIR 3
A230
A232A231
A STAIR 4
A STAIR 1
A225
A226
A229A228
A227
A227A
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM CLASSROOM
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLOSET
CLASSROOM
CUSTODIALCLOSET
A224A
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTS2631 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
RAWLINSON ROADMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
N/A
PLAY YARD
CAFETERIA
LIBRARY
COMPUTER LAB
COURTYARD
MECH.
CONF.
PRINC.AREAWORK
SEC.
AREAWAITING
RECEP.
LOBBYLOUNGE
LOUNGE
D128
WORKROOM
ELECSTOR
STORD130
CLASSROOMD129
CLASSROOM
OFFICE
D131CLASSROOM
OFFICE
D132CLASSROOM
OFF
D133CLASSROOM
STOR
STORSTOR
STOR
STOR
ELEC
E105CLASSROOM
E104CLASSROOM
E103CLASSROOM
E102CLASSROOM
E101CLASSROOM
R/RR/R
D120CLASSROOM
R/R
D121A
READREC
D121B
READREC
D122
R/R R/R
D124GUID.
D126RECOVERY
D127
BOOKROOM
R/RGIRLS
B114CLASSROOM
B112CLASSROOM
B110CLASSROOM
B108CLASSROOM
A109MULTI-PURPOSE
STOROFFICE
OFF
STOR
A108MUSIC
STOR
KILNA107ART
A106CLASSROOM
A105CLASSROOM
R/R
STORR/R
SPEECH
R/R TEACHPROG
B115CLASSROOM
B113CLASSROOM
B111CLASSROOM
B109CLASSROOM
R/RBOYS
READING ROOMSUPPLEMENTAL
OFF
TVSTUDIO
AVROOM
STORSTORRESOURCE
C116CLASSROOM
C117CLASSROOM
C118CLASSROOM
C119CLASSROOM
R/R
ELEC STORPAPER
OFF
A103CLASSROOM
A102CLASSROOM
A101CLASSROOM
A100CLASSROOM
ELEC CUSTODIALCLOSET
C115
C116B
R/RC116A
R/RC117A
R/RC117B
R/RC118B
R/RC118A
R/RC119A
R/RC119B
C120
C119
C112
PANTRYC113
C111
R/RC111A
R/RC111B
C111C
RMC111D
C110STAGE
C110A
C114 A116
R/RA100B
R/RA100A
R/RA101A
R/RA101B
R/RA102B
R/RA102A
R/RA103A
R/RA103B
A115
A114
A112
A113
B117
B105
A104
R/RA104A
A104B
A104C100
101
102
102A
R/R102B
R/R102C
B106
104
102D103A 105
107
106
111
110R/R110B
110A
A111
108109
E101A
E101B
R/RE103A
R/RE103B
R/RE102A
R/RE102B
R/RE105A
R/RE105B
R/RE104A
R/RE104B
R/RA105A
R/RA106A
A110
A119AA119
A107A
A107B
A108A
A108B
A109B A109A
R/RD125
B116
E106
E107
E108
D133AD133B
R/RD133C
D133D
STORD132B
R/RD132C
D132A STORD131A
R/RD131C
D131D
D130A
R/RD130B
R/RD129B D129A
D134D135
COMPUTER LABD123
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRichmond Drive Elementary School1162 Richmond DriveRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
RICHMOND DRIVEELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
COURT YARD
LOBBY
RHHSA-BUILDINGFIRST FLOOR
RHHSB-BUILDINGFIRST FLOOR
B-HALL
A160
DISTANCELEARNING
LAB
A101LIBRARY
STORA119
CLASSROOMA114
A115
PERIODSTORAGE
A116
AVSTORAGE
A117
RESORCEOFFICE
A118
R/RGIRL
CUSTODIALA121
CLOSET
A120
R/RBOYS
A159
MEDIAOFFICE
A158
TAPESTORAGE
CLASSROOMA113
CLASSROOMA109
CLASSROOMA108
CLASSROOMA107
CLASSROOMA106
CLASSROOMA105
CLASSROOMA104
A157
ROTCOFFICE
A156
UNIFORMSTORAGE
A155
ELEVEQUIP
A153
ELEVSTOR
A154ELEV
CLASSROOMA103
CLASSROOMA102
PRINCIPALA127
SEC. 3A128
REC.A126
REC.A129
CONF. OFFICEA132
A133
BREAKROOM
A134
ASST.PRIN 1
SEC. 1A135
A136
ASST.PRIN 2
SEC. 2A141
COUN.A142
AULT.A140
A139
ASST.PRIN 3
HEALTHA143
R/RA144
R/RA138
CUSTODIALA145
CLOSETSTORAGE
A137
A161
BOILERROOM
A162MECHCOUN.
A152
COUN.A150
COUN.A149
COUN.A148
COUN.A147
STORA146
RECEP.A151
R/RA123
R/RA125
A124
FINANCEOFFICE
A122
ATTENDANCE
CLASSROOMB117
CLASSROOMB116
CLASSROOMB114
CLASSROOMB112
CLASSROOMB111
CLASSROOMB113
CLASSROOMB115
CLASSROOMB108
CLASSROOMB106
CLASSROOMB105
CLASSROOMB103
STORB116B
STORB114B
B133
R/RGIRL
B130
R/RGIRL
B129
ELECROOM
CLASSROOMB131
CLASSROOMB132
STORAGEB131AR/R R/R
WORKROOM
TEACHERSLOUNGE
B118A
R/RSHOWER B117A
STORAGE
B123STOR
R/RB121
R/RB122
B100
LOBBYHALL
B128STORAGE
B152
R/RGIRL
B150
R/RBOYS
TMH CLASSB118
CANTEENB101
CLASSROOMB102
B104 B110
BOILERROOM
B109STORAGE
B109PANTRYR/R
B148
R/RB146
STORB148
LINB146
B142OFF.
B143FREEZ
B144COOLER
FOODPREP
B135
CANWASH
B139
DISHROOM B141
STOR
CAFETERIAB101
A STAIR 2A STAIR 3
A STAIR 1A STAIR 4
A143A
A139A
A131A130
B135 B134B131B
B120
B119
B114A
A STAIR 2A STAIR 3
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRock Hill High School320 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROCK HILLHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
C-109
RHHSF-BUILDINGFIRST FLOOR
GYMNASIUM
CONCESSION
LOBBY
CHILLER MECHANICAL
WATERHEATER
GENERATORTRASFORMER/MAIN ENERGY SOURCE
F-HA
LL D
OWN
C-HALL
C-HALL
SHOWERC133
R/RC132
C133
ATHLDIR
C105
VARSITYLOCKER
C130
COACHESOFFICE
C128
CLASSROOM
C127
TRAININGROOM
C126
COACHESDRESS
C129STOR
C104
BOYS JVLOCKERROOM
C121SHOWER
C117SHOWER
C123STOR
C122R/R
C119R/R
C118R/R
C120LAUNDRY
C104
BOYS PELOCKERROOM
C112STOR
C113
COACOFF
C114R/R
C115STORAGE
MINI GYMC103
C153
ELECROOM
C101BSTORAGE
C101B
P.ECLASSROOM
C101ASTORAGE
C111
R/RBOYS
LOBBYC100
C152
R/RGIRLS
C148OFF
C149STOR
C150STOR 3
A147STOR 4
C108
GIRLSVARSITY
LOCKER RMC146
STOR
C145SHOWER
C144SHOWER
R/R
C142STOR
C107
GIRLSP.E
LOCKER RM
C141OFF
C140R/R
C139R/RC138
C137STOR
C136STORAGE
C155
C124
WEIGHTROOM
C135
ATHLSECC134
STOR
C106GYMNASIUM
C110CONCESSION
C151ELEC
RHHSC-BUILDINGFIRST FLOOR
F119STOR
F118
F117OFF
F116BOYS 1
F115BOYS 2
F114GIRLS 2
F113GIRLS 1
F112OFF
F111BOYS
F110GIRLS
F109
ELEVEQUIP F108
ELEV
F101STOR
F102GIRLS
F104STOR
F103
F105
CUSTODIALCLOSET
F106BOYS
F107MECH
F100
F120
F118A F118B
F115BF115A
F114A F114B
F113BF113A
F1STAIR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRock Hill High School320 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROCK HILLHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
E-117
D-109
ELECTRICAL/GENERATOR
RHHSE-BUILDINGFIRST FLOOR
RHHSD-BUILDINGFIRST FLOOR
D-HALL DOWN
E-HALL DOWN
PRACTICED100B
OFFID100C
STORD100A
LIBRARYD100D
CLASSROOMD101
CLASSROOMD102
D116
GIRLSR/R
D115
BOYSR/R D114
CUSTODIALD111
CLOSET
D113
ELECD112
R/RD106
OFFD109A
OFFD109B
ENSEMBLEROOMD110F
STORD110C
LIBRARYD110D
OFFICED110E
BANDROOM
D110
STORAGED110A
STORAGED110B
DRAMAD103
STORD103A
STORD104A
PRE-VOCATIONAL
D114
STORD104A
R/RD106A
DRESSINGJULIETTE
D106
STORAGE 1D129
STAGED129
STORD125
DRESSINGROMEO
D114
R/RD105A
DIMMERD126
R/RD122
R/RD121
LOBBYENTRANCE
D123
D129
STORD119
D118
ELEVEQUIPELEV
D117
CLASSROOME106
CLASSROOME105
CLASSROOME104
CLASSROOME103
CLASSROOME102
CLASSROOME101
CLASSROOME100
CLASSROOME110
CLASSROOME111
CLASSROOME112
CLASSROOME113
CLASSROOME114
CLASSROOME115
CLASSROOME116
STORE109
FACULTYWRK RM
E135
R/RE136
R/RE129
R/RE126
ARTE107
ARTE108
CUSTODIALE138
CLOSET
SECURITYE137
ASSISTE119
PRINC E118RECEP
E122
PSYCHOLOGISTE123
STORAGEE120 E121
E134KILN
DARKROOM
E133
STORE131
STORE130
STORE132
CUSTODIALE128
CLOSET
ELECE127
ELEVE125 CONFERECE
STOR
AUDITORIUMD129
PROJ.D126
TICKET
D100
CHORUSROOM
E1 STAIR
D119A
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRock Hill High School320 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROCK HILLHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
RHHSA-BUILDINGSECOND FLOOR
RHHSF-BUILDINGSECOND FLOOR
A-HALL UP
CLASSROOMA224
CLASSROOMA223
CLASSROOMA222
CLASSROOMA219
CLASSROOMA218
CLASSROOMA217
CLASSROOMA216
CLASSROOMA213
CLASSROOMA212
CLASSROOMA211
CLASSROOMA210
MECHA243
CLASSROOMA207
CLASSROOMA206
CLASSROOMA205
CLASSROOMA204
CLASSROOMA201
CLASSROOMA234
CLASSROOMA231
CLASSROOMA230
CLASSROOMA229
CLASSROOMA228
MECHA250
CLASSROOMA225
CLASSROOMA221
CLASSROOMA220
CLASSROOMA232
CLASSROOMA233
CLASSROOMA215
CLASSROOMA214
CLASSROOMA202
CLASSROOMA203
STORA247
GIRLSA248
R/R
BOYSA251
R/R
STORA253
A249STOR
A252
CUSTODIALCLOSET
GIRLSA245
R/R
BOYSA242
R/R
ROOMA246
DARK
STORA240
A241
CUSTODIALCLOSET
STOR
A239
T.LOUNGE
A238
R/RWOMEN
A237
R/RMAN
A235
WORKROOM
A236RESORCE
A200LOBBY
F200STORAGE UP
F201
F202F-HALL UP
R/RF206
R/RF205
F204
CUSTODIALCLOSET
RHHSC-BUILDING
ELEVF203
F2STAIRB
F2STAIRA
A STAIR 2A STAIR 3
A STAIR 1A STAIR 4
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRock Hill High School320 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROCK HILLHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
MECHANICALSTOR
AUDITORIUM
ELEC
STAGE
RHHSE-BUILDINGSECOND FLOOR
RHHSD-BUILDINGSECOND FLOOR
COURT YARD
D-HALL UP
E-HALL UP
CLASSROOME210
CLASSROOME211
CLASSROOME212
CLASSROOME213
STORE213
STORE209
LOUNGEE222
FACULTY
E224R/R
E223R/R
R/RE219
GIRLS
R/RE217
BOYS
E204STOR
CLASSROOME203
CLASSROOME202
CLASSROOME201
CLASSROOME200
STORE216
CLASSROOME205
CLASSROOME208
E207STORAGE
E206STORAGE
MECHE221
CLASSROOME215
CLASSROOME214
E218ELEC
CUSTODIALE220
CLOSET
E226
CLASSROOMD200
CLASSROOMD201
CLASSROOMD202
CLASSROOMD203
CLASSROOMD204
R/RD214
GIRLSR/RD215
BOYS LOUNGEFACULTY
D217R/R
D218R/R
CLASSROOMD205
CLASSROOMD206
CLASSROOMD207
D219STORAGE
D213D212
D211
CLASSROOMD210
STORAGED209
CLASSROOMD208
ELEVD212
E2 STAIR
D216
D2 STAIR
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRock Hill High School320 West Springdale RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROCK HILLHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/A
N/A
MULTI-PURPOSE
STORAGE
CAFETERIAFOOD
MECH.
PANTRY
VEST.
STOR.
IT BOOK
VAULT
HEALTHSTOR.
LIBRARY
STOR.
LITERACY
CORRIDOR
A-HALL
AVPRIN.
TVSTUDIO
RECOVROOM
CONF.
ELEC
COUNSELOR
OFFICE
B-HALL
ELEC 2
LOUNGE
READRECOV.
C-HALL
D-HALL
D100 D101
D102
OFFICE
CUSTODIAL
STOR
PREP.
STAGE
DEN
HVAC
ART MUSIC
STORAGEOFFICE
C96CLASSROOM
C98CLASSROOM
C100CLASSROOM
C102CLASSROOM
ESL
C95CLASSROOM
C97CLASSROOM
C99CLASSROOM
C101CLASSROOM
R/RBOYS
STORAGE
R/RBOYS
R/RGIRLS
R/R
R/R
STORAGEKILN
ELECT
SPEECH
C104CLASSROOM
C106CLASSROOM
C108CLASSROOM
C110CLASSROOM
C112CLASSROOM
CLOSET
C113CLASSROOM
C111CLASSROOM
C109CLASSROOM
C107CLASSROOM
C105CLASSROOM
C103CLASSROOM
STOR STOR
STOR
STORSTOR
C116CLASSROOM
C115CLASSROOM
C114CLASSROOM
OFFICE
OFFICER/R
CUSTODIALCLOSET
ELEC
B100CLASSROOM
B101CLASSROOM
B102CLASSROOM
B103CLASSROOM
PROG
TB PYP
RECEPR/R
A104CLASSROOM
A105CLASSROOM
A106CLASSROOM
A107CLASSROOM
R/R
R/R
B104CLASSROOM
B105CLASSROOM
B106CLASSROOM
B107CLASSROOM
R/RGIRLS
READINGRECOVERY
R/R
R/R STOR
A107B
A107AR/R
R/RA106B
A106AR/R
R/RA105B
A105AR/R
R/RA104B
A104A
A100
103
101
101A
100
104
105106
104A
107 A108
A109
A110
A112
A115
A114
A113
A116
B109B108
A117
R/R
R/RB107B
B107AR/R
R/RB106B
B106AR/R
R/RB105B
B105AR/R
R/RB104B
B104A
B118B119
B120
B122
B124B123
B125
B127
B128B129
B132B131
B130
B138
B132
B133
B134
B134AB135
B139
R/RC96A
R/RC98A
R/RC100A
R/RC102A
R/RC106A
R/RC108AR/R
C110AR/R
C112A D95
D97
D95 D94
D96
D98D99
R/RC104A
C122
C120
R/RC111A
R/RC113A
C117
C119
R/RC107A
R/RC109A R/R
R/RC105B
C105AR/R
R/RC103B
C103A
D100A D100B
D100C
D101AD101B
C114AC114B
C114CC114D
C115A
C115CR/RC115B
C116AC116C
R/RC116B
D102A D102B
B136
B137
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSRosewood Elementary School2240 Rosewood DriveRock Hill, SC 29732
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
ROSEWOODELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
7TH GRADE GALLERY
PROPSTOR
_____OFFICE 1
PRINCIPALOFFICE
RESOURCEOFFICER
BOOK
WKRM
R/R
STOR L
1
R/R
ELECT
CONF CURR.
RECORD
STOR
WKRM
WAITING 2
RECPT
WAITING 1CHECK IN
HEALTH OFF
COPY
R/R
ATTENDOFF
STOR
A-HALL
GIRLS
TCHR
R/R 1 COMPUTER CLASS
CAREERS LAB
BAND
BEHAVIORALINTERVENTION
ORCHESTRA
STAGE
GIRLSDRESSING
REAR STAGE
BOYSDRESSING
R/R R/R
AUDITORIUM
STOR R
ELEC
R/R
STORAGE
PROSTOR
TOOL
WKRM/LIBREPAIR
BANDSTO.
ORCH.STOR. ART
ROOM
R/R 2
PROSTOR
DARKRM
MATSTOR
BUS LOOPCOVERED DROP-OFF
KILNRM
CONF CONTROLCENTER
HOMEARTSLAB
CHORAL
PROJECTION ROOM
A-109 BOYS
R/R
STOR
WKRM/LIBREPAIR
CNTRLROOM TV STUDIO
PRO
MATSTOR
TEACHERWKRM
STO
ELEC
R/R
OFF 8 OFF 7 OFF 6 GUIDANCE OFF-3
6TH GRADE GALLERY
KEYBOARDINGCAREER
STOR
GUIDLIB
STOR GIRLS
OFF 5 OFF 4
READING ROOM
TROPHY
OFF/WKRM
MEDIAPROD
PTO
PERSTOR ELE
R/R
TECHOFF
A/VSTOR
PEERMED B-157
SECOFF-2
ASST.PRIN.
CONFR/R 2
B-HALL
TCHRWKRM
1
RCPTR/R 1
CENTRALSUPPLY
FOOD PREP
CHEM
DRY STORAGE
OFF
R/RR/R
R/R
LOCKERFREEZER
DOCK
SERVING
COOLER
MECHELEC
STOROFF
MATSTOR
MULTIPURPOSE ROOM
GIRLS P.E.LOCKERS
BOYS P.E.
BOYS TEAM LOCKERS
YARD EQUIP STORAGE
P.E. STO
R/R
OFF 4
GYMR/R
STOROFF 3
R/RSTOR
OFF 2
EQUIPSTORAGE
MECH
TEAMSTOR
STOR BOYS SUP
GIRLS SUP
STOR
BOYS
8TH GRADE GALLERY
SERVING
CAFETERIA
STORBOYS
TICKETBOOTH
STOR
STOR
R/R
WORKROOM
2ELEC
R/R ELEC
GIRLS TEAM LOCKERS
CONCESSION
LAUND
OFF 1
R/R
STOR
C-HALL
C-125GIRLS
TEAMSTOR
P.E. STOR
STOR
STOR
WORKROOM
COACH
RM
STOR
LOCKER
196A
CLASSROOM
197
A-100
CLASSROOMA-102
CLASSROOMA-104
CLASSROOMA-106
CLASSROOMA-108
CLASSROOMA-110
CLASSROOMA-112
CLASSROOMA-114
CLASSROOMA-116
CLASSROOMA-118
CLASSROOMB-100
CLASSROOMB-102
CLASSROOMB-104
CLASSROOMB-106
CLASSROOMB-108
CLASSROOMB-110
CLASSROOMB-112
CLASSROOMB-114
CLASSROOMB-116 CLASSROOM
B-118 CLASSROOMC-100 CLASSROOMC-102 CLASSROOMC-104 CLASSROOMC-106
CLASSROOMC-108 CLASSROOMC-110 CLASSROOMC-112 CLASSROOMC-114 CLASSROOMC-116 CLASSROOMC-118
CLASSROOMA-101
CLASSROOMA-103
CLASSROOMA-105
CLASSROOMA-107
CLASSROOMA-111
CLASSROOMA-113
CLASSROOMB-101
CLASSROOMB-103 CLASSROOM
B-105 CLASSROOMC-101 CLASSROOMC-103
CLASSROOMC-105CLASSROOMC-107 CLASSROOMC-109
CLASSROOMC-111
AWARENESS
131
132
133A133 134
134A155
159
157
152A
152B
152C
152
148D148C150
151147A153
172
178
179
172A
172C
172B
173D
173E 173F
R/R173C
173B
195173
198
194
180
190
199
193
189
192
194A 193A
191B
105
200
201
103
191
101
113
107
109
113A111
116A
106
118
102
116
115
108
191A
120
110
151
188B
188A
131A 131B
130
130A
147 149
143
141A 141
145
148
148B
148A
146144
144B
144A
142
162G
162H
162
162A 162B
A-104A
A-118A
A-120
B-102A
A-101A
A-105A
A-119
A-121
A-115
A-111A
A-117B-101A B-107 B-130B
B-130A
B-130C B-130D B-130E B-130F
B-130HB-130IB-130J
B-130G
B-121B
B-121AB-124
B-123
B-122
B-121 B-105A
B-120
C-119
C-120
C-128C-100A
C-113
C-111A
C-107A
C-127
C-123C-103A
C-121
162D 163163
165
168167
164
162E
162F169
170
196
181 182
184B
184A
185
186
187
187A
190A
184184B
202
2
STORAGE 2STORAGE 1
CUSTODIAL173A
CLOSETCUSTODIAL
172FCLOSET LOCKERS
STOR
B-130
188
172D 172E
171
140
118A
100
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSaluda Trail Middle School2300 Saluda StreetRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SALUDA TRAILMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
F.E.
F.E.
F.E.
F.E.
F.E.F.E. F.E.F.E.F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.
F.E.
A100
A133
CONF.
FEMALE RR
BOILER
CAFETERIA
MEDIA CENTER
CONF.AV
STORAV
PROD
WKRM
MECH STOR
B120APREP
B101APREP
STOR
ADMINISTRATION
GUIDANCE
OFF CONF.
SEC.
ELEC
RR
PRINCIPALSEC. 2
SEC 3
WKRM 2
CONF 2OFFICE OFFICE
MECHHEALTH
OFFICE OFFICE
RECORDS
SEC WKRM 1
ATTEND.
RR
RR
RR
ELEC
RR
RR
RR
MALERR FEMALE
RR
MALE
FEMALE
AUDITORIUM
STAGE
MAIN GYM
MINI GYM
MECH
LOCKER
COOLER
DRYGOODS
ELEC
STOR
KITCHEN
OFF.KIT. DISH RM.
SERVE
MECH.
RR
C100
C101
C103
C104
C105
C106
C107
C109
RR
OFF OFF MALERR
STOR
ELEC
RR
OFF
PRAC UNIFORMENSEMBLE
STOR
PRAC
PIANO LAB
C105D
C105B
OFFC106A
STORKILN
C107ASTOR
C108ASTORKILN
SHOPELECT
MECH
STOR STAGE STOR
STOR STOR RR
RR
DRESSING
RR
DRESSING
ELEC
STOR
PRACTICE
ELEC
MUS.LIBR.
STOR
RR
CONCESSIONS FOYER MAIN GYM STOR 1
OFF
LOBBY
WAITING
WAITING
MAIN GYM STOR
LOBBY
BOYSTEAM
ATH. DIR.
STOR
HEATER
STOR.GYMMINI
WEIGHT RM
STOR
BOILER
ATH.
OFFOFF
RR
LAUNDRY
LOCKER
MALECOACHES
ELEC
STORWHIRL
TRAINING
GIRLSTEAM
LOCKER ROOMFOOTBALL
CONF.
WKRMWKRM
ELECT.
DATA
CONF.
ELEC
WKRM
STOR
OFF
STOR
OFF
STOR
OFF OFF
CORRIDOR
FOYER
CORRIDOR
COMMONS
HEAT
MECH 1
CORRIDOR
COACHES
CHASE
ATHLETIC
MECH.
ELEV
STOR
OFF
DATAWKRM
ELEV
STOR
A136A135
A137
A138
A139A140
A141
A142 A143
A156
A145
A146
A147
B125
A158
C CORRIDOR
DRAMA
CHORUS
MULTI-PURPOSE
ORCHESTRA
C103B
BAND
C103LLOBBY
C104LLOBBY
C104A
ROTC
ART
ART
ART
I.T.E. C110
COMPS
LOCKER LOCKER
REAR GYM CORRIDOR
ELEV.
RR
LOCKER
RR
RR
OFF
STAIRS
CLASSROOM ATHLETIC
VARSITY
RR
RR
SEC.LOCKER ROOM
RR
OFFICE
AUDITORIUM CORRIDOR
STAIRS
FREEZER
STOR
RR
LOADING DOCK
PRIN.
REC./
CONF.
FRONT STAIRS
MIDDLE STAIRS
BACK STAIRS
STAIRS
2
MC109
1
CLASSROOMA114
CLASSROOMA113
CLASSROOMA112
CLASSROOMA111
CLASSROOMA110
CLASSROOMA109
CLASSROOMA107
CLASSROOMA108
CLASSROOMA106
CLASSROOMA115
A139A
R/RA139B
A149
A148
CUSTODIALA150
CLOSET
CLASSROOMA119
CLASSROOMA118
CLASSROOMA117
CLASSROOMA120
CLASSROOMA121
CLASSROOMA122
CLASSROOMA124
CLASSROOMA123
MECHA174
A175
CLASSROOMA116
RRA140A
R/RA140B
A153
CUSTODIALA151
CLOSET
A152
PREPA124A
PREPA105A
A155
CLASSROOMA105
CLASSROOMA104
CLASSROOMA103
CLASSROOMA102
CLASSROOMA101
A103AA103B
BOILERA176
MECHA177
CLASSROOMA126 CLASSROOM
A125
A125B
MECHA125A
CLASSROOMA127
CLASSROOMA128
CLASSROOMA130
CLASSROOMA131
CLASSROOMA132
A140
RRA147A
R/RA147B
A157
R/RA159
CUSTODIALA159A
CLOSET
A133A
R/RA160
CUSTODIALA160A
CLOSET
DATAA159
CLASSROOMA134
MC107
MC111 MC105OFF
MC103
MC102
MC101
MC104MC106
A162OFF A164
A166
A168OFF A170
OFF A172
OFF A163
WKRMA165
A167OFF A169
OFF A171
A161CLASSROOM
B100
CLASSROOMB101CLASSROOM
B102
CLASSROOMB103
CLASSROOMB104
MECHB140
CLASSROOMA129
BOILERB139
CLASSROOMB105
CLASSROOMB106
CLASSROOMB107
CLASSROOMB108
CLASSROOMB109 CLASSROOM
B110
B126
B127STOR
B128B129
B129BRR
B129A
B131
CLASSROOMB112
CLASSROOMB113
CLASSROOMB114
CLASSROOMB117
CLASSROOMB116
CLASSROOMB115
CLASSROOMB119
CLASSROOMB118
CLASSROOMB120
CUSTODIALCLOSET
CONF.
FEMALE RR
RR
OFF
DATAWKRM B138
CLASSROOMB111
B137
B136STOR
B135B134
B134BRR
B134A
B133
CUSTODIALCLOSET
B132
CLASSROOMB122CLASSROOM
B121CLASSROOM
B123CLASSROOM
B124
F100
F101
F101A
205
F104
F105
F102
F103D
F103
F103B
F103A
206
CUSTODIALCLOSET
207
CUSTODIALCLOSETF103E
MC100
100 101
102
101A
103303
103A
304A
304306 308 310 312
DATA314
OFFICE316
OFFICE318
OFFICE320
CONF322OFFICE
301
OFFICE302
OFFICE305
OFFICE307 315
203
203B
203A
202
202A
201
309
312RR311
200
RR208
F103C
D111
D99
D101LOBBY
D102CONTROL
D103LOBBY
D104FOYER
D105
D100 D100A
D100B
C96
C91
C92
C93
RRC95
CUSTODIALCLOSET
C94
C100A
C92A
E100A
E100
E100
204
E101
E102
E103
E104
E105
E106
E107
LOCKERE108
RRE109
E111
E110
E112
E137
E114 E115
E115CPOOLE115BE115A
E116
E117E120
E120A E120B
E121E118
E119
E125E122
E123A
D106A
D106BRR
D106D
D106C
D106D106E
D108
D109
D110D109A
C99C109CC109B
C107 C97
CUSTODIALCLOSET
C98
C108
C108B
C106B C105A
C105CSTOR
OFFC104B C104C
PRACC103C
C104D
C113
C112
C103A
C102ASTORC103B C103C
C111
C102
STORC101A
OFFC101B C101C
C101D
C114
E136
C116C117
STOR C118
STOR C119
C120
E135B
E135
E126A
C121
E126
E135A
E133
E132A
RRE134
RRE131
E132
E130
E130A E129FEMALE
RR
E127
CUSTODIALCLOSET
C98 E124
E123CE123B
E123
B99
A173
B130
B133A
E121A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSouth Pointe High School801 Neely RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SOUTH POINTEHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
ELEC
D209STOR
BALCONY
STOR 1
A236STORA237
STOR
STOR
DRINK MACHINE
PREP
A252WKRM
A251
A250
STOR
CONF.
A249 A248OFF OFF
ELEV
A204APREP
STOR
A239
A241
A240
A238OFF OFF
CONF.
A242WKRM
STOR
RR
GYM BALCONY
ELEV
MECH
CO
RR
IDO
R 2 C
OR
RID
OR
3
HALL
CO
RR
IDO
R 1
CLASSROOMA213
CLASSROOMA212
CLASSROOMA211
CLASSROOMA210
CLASSROOMA209
CLASSROOMA208
CLASSROOMA206
CLASSROOMA207
CLASSROOMA205
CLASSROOMA214
RR
RR
A242A
R/RA242B
A155
A254
CLASSROOMA218
CLASSROOMA217
CLASSROOMA216
CLASSROOMA219
CLASSROOMA220
CLASSROOMA221
CLASSROOMA223
CLASSROOMA222
CLASSROOMA215
STORA244
A245
A246OFF
DATA
A243WKRM
RRA243A
R/RA243B
A223APREP
CLASSROOMA204
CLASSROOMA203
CLASSROOMA202
CLASSROOMA201
CLASSROOMA225
CLASSROOMA226
CLASSROOMA227
CLASSROOMA224
STORA227
CLASSROOMA228
CLASSROOMA229
CLASSROOMA231
CLASSROOMA232
CLASSROOMA233
CLASSROOMA234
CLASSROOMA235
CLASSROOMA200
E201
E200
MECH E202
D204A
D201RRD203
CUSTODIALCLOSET
D202
D204
D205
D200
MECH D207
D206
RRD210
RRD212
CUSTODIALCLOSET
D211
MECH D213
MECH D270
A201A
A201B
A269
PREPA231A
DATAA253
RRD267
A266
CUSTODIALCLOSET
D268
CUSTODIALA256
CLOSET
RRA258
A259
CUSTODIALA257
CLOSET
A261ELEC
BOILER
MECHA260
A261
BOILER
MECHA263
A263A
A262ELEC
CLASSROOMA230
RRA252A
R/RA252B
A264
RRD265
CUSTODIALCLOSET
D265A
STOR
PREPA202A
A202B
A271
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSouth Pointe High School801 Neely RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SOUTH POINTEHIGH SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/AN/A
E-131-H
D-HALL
C-HALL
B-HALL
A-HALL
F133
F125
E119
D113
C116
B103
F133H F133G F133F
OFF
STOR
I104
FOOD PREP
GAS/WATER CAFETERIA
H96
B135
B135B
B-135A B135D
B138
B137
B133
B134B132
B129
B-129-SR
B128B127
B122B125GYM-HALL
B130 B128B
B-123
A-HALL
C-HALL
D-HALL
MECH
CAN WASH
STOR
SCHOOL STORE
AUDITORIUMLOBBY
AUDITORIUM/SEATING AREA
SOUNDBOOTH
GIRLS BOYS
CHORUSH101
H-HA
LL
ELECGIRLS
B109STOR
STOR
BOYS
MEN
BOYS
WOMEN
STOR
GIRLS
OFF-1
STAGE
STOR
DIMMER
MUSICROOM
ELEC
OFF-3
COOL
FREE
OFFICE
PANTRY
R/R
OFF-2
STAGESTORAGE
STOR
CONFERENCE ROOMA/V STOR
LIBRARY
PERIODICALS
A/V STOR 2
LIBRARY
ELEC
ELEC
C115
BOYS
STOR
STOR
STOR
ELEC
E127
ELEC
DARKROOM
STOR
BOYSGYM
HVAC
GENERATOR
GIRLS
G-HA
LL
STOR
BOYS
GIRLS
STOR 2
GIRLS
STOR 3
LAUNDRY
STOR
ELECSTOR
BOYSLOCKER ROOM
PEACTIVITY
ROOM
R/R
ATHLETE DIR.
OFFICE
STORR/R
PE
BOYSLOCKERROOM
GIRLSLOCKER ROOMGIRLS
OFFICEGIRLS
BOYS
STOR
SHOWER
GIRLSSHOWER
BOILER
MECH.ROOM
HW
CANTEENBOYS STOR
COUNSELOR
LOBBYWAITCORRIDOR
NURSE
DATA
RESOURCE
HEALTH
CONF.
SHOP 1CLASSROOM CLASSROOM CLASSROOM
F127F128F129CLASSROOM
F130
SHOP 2
1
CLASSROOM CLASSROOM CLASSROOME121E122E123
CLASSROOME124
CLASSROOME125
CLASSROOME126
CLASSROOM CLASSROOM CLASSROOMD-115D116D117
CLASSROOMD118
CLASSROOMD119
CLASSROOMD120
CLASSROOMA102
CLASSROOM CLASSROOM CLASSROOMC109C110C111
CLASSROOMC112C113
CLASSROOMC114
CLASSROOM
CLASSROOM CLASSROOM CLASSROOMB104B105B106
CLASSROOMB107
CLASSROOMB108
CLASSROOMA108
CLASSROOMA100
CLASSROOMA101
CLASSROOMA103 MENTAL
F131
CLASSROOMA-108
OFFICE113
112
111
110PRINC.ASST.109
COUNSELOR108
CONF.107
PRINC.ASST.106
COUNSELOR105
CONF.104
PRINC.ASST.103
R/R116
R/R115
COORDHEALTH
118
117 R/R121A
119HEALTHMENTAL
121
BREAK122
CUSTODIAL138
CLOSET
RECORDS123
114 101
R/R126A
102
PRINC.131
RECEP.132
CONF.130
VAULT129
STORAGE128
LOUNGE126
R/R136R/R135
BOOK134KEEP
COPY133ROOM
CORRIDOR124
CORR
IDOR
137
CUSTODIAL127CLOSET
ELECTRICAL139ROOM
E-HALLE-HALL
F-HALL
A106 A105
A104
A107
139A
B102B103AB101
B107A
STORB108A
B112B110
B111
B135C
B137A
B126
B124
B127A
R/RB128A
R/RB129
BOYSR/RB131
B130A
D122
D123
D124
D121
D100
D114
C108
F133A
F133B
F133C F133D
F133E
F98
F99
F132A
F132B
F96
F132F126
E120E130
E129
E128
I101BI101A
I101
I101C
I103
I102B
I102A
I102
I100
H102B
H102C H102E
CLASSROOMH100
H102DH102A
H102
H102F
H97
H99
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSullivan Middle School1825 Eden TerranceRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SULLIVANMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1st FLOORNOT TO SCALE
B-HALL
C-HALL
D-HALL
E-HALL
F225
STOR
R/R
H-HA
LLH-
HALL
R/R
STORAGE
STOR
3
GIRLS
STOR
BOYS
2
BOYS
STOR 1
STOR
STORLARGE
STOR.
STOR
BOYS
1
G-HA
LL
STOR
BOYS
STOR
GIRLS
2
3STOR
GIRLSCLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
F227F228F229F230F231F232
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOME221E222E223E224E225E226
F-HALL
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOMD215D216D217D218D219D220
CLASSROOM CLASSROOM CLASSROOM CLASSROOMROOM
CLASSROOMC209
C211C211C212C213C214 CLASS
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOMB204B205B206B207B208GIRLS
F233
F234
F226
E220
E219
E227
E228
D-221
D200
D214
D213
C208
C211A
C214A
C215
B209
B208A
B203 B202
B201
B200
C200
E200
F200BUILDING SYSTEM : FLOORING
TYPEFLOORING SYSTEM VCT
LEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/AN/A
N/A
N/AN/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSullivan Middle School1825 Eden TerranceRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SULLIVANMIDDLE SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2nd FLOORNOT TO SCALE
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
B112MULTI-PURPOSE
CORRIDOR
B110KINDERGARTEN
A101AUXIL
STAGE
BOY'S
CAFETERIA
KINDERGARTEN
PLAY AREA
ELECT
VAULT
GUID
OFFICE
B108
STOR
STOR
LOUNGE
GIRL'S
B109KINDERGARTEN
STOR.
KITCHEN
ELEC
STOR.GIRL'S
STAFF
BOY'S
ELECT
STOR
STAFF
STOR.
MECH
STOR
CORRIDOR
STOR
STOR
STOR
ELECTC120
MUSICJAN
OFFSTOR.
CORRIDOR
STOR. KILN
TIME-OUTLOUNGE
TIME-OUT
E129ART
WORK
CORR
IDOR
BOY'SJAN.STOR. ELECT
STOR
OFF
MEDIA CENTER
STOR CONF
CORRIDOR
COURTYARD 1
COURTYARD 2
COURTYARD 3
CONF.
PRINCIPAL R/R
R/R
STOR.
HEALTH
RECEPTION SECT'Y
WORKCLASSROOM
A106CLASSROOM
A105CLASSROOM
A104CLASSROOM
A103CLASSROOM
A102
CLASSROOMC113
CLASSROOMC114
CLASSROOMC115
CLASSROOMC116
CLASSROOMC117
CLASSROOMC118
CLASSROOME126
CLASSROOME125
CLASSROOME124
CLASSROOME123
CLASSROOM
D119
CLASSROOM
D120
CLASSROOM
F140
CLASSROOM
F130
CLASSROOM
F129
CLASSROOM
F128
CLASSROOM
F127
A107
R/RA105A
R/RA105B
R/RA106A
R/RA106B
R/RA103A
R/RA103B
R/RA104A
R/RA104B
R/RA101A
R/RA101B
R/RA102A
R/RA102B
R/RA125A
R/RA125B
R/RA126A
R/RA126B
R/RA123A
R/RA123B
R/RA124A
R/RA124B
107
106 103102
101100
108
104
106A
99A100
109
G101
G103
G105
G107
G104
G100
B108BB108A
R/RB108C
OFFICESTORB110BB110A
R/RB110C
OFFICE STORB109B B109A
R/RB109CB112A
B112B
CORRIDORB100
G102
G106
G108A
G108
G110
G104 R/R
G109
G111
G113
G115
G117
G119
C101
C119
C121
C122
C120B C120A CORRIDORC100
G121
G123
G125
E126CE128
R/RA128B
CLA128A
E127
E129B E129A
D118
D125
D121
D124
D123
D122
D122A
D100
R/RA120A
R/RD120B
R/RA119A R/R
D119B
F132
F100
F133
F123
F124F125
F122
FREEZER
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSunset Park Elementary School1036 Ogden RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SUNSET PARKELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 1ST FLOORNOT TO SCALE
LOUNGE
CLASSROOM
F231
CLASSROOM
F230
CLASSROOM
F229
CLASSROOM
F228
CLASSROOM
F227
F132
F122
CORRIDOR
F200
GIRLSF224
STOR.F223A
F223
F226
R/RF225
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETE
N/A
N/AN/A
N/AN/A
N/AN/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSSunset Park Elementary School1036 Ogden RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
SUNSET PARKELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - 2ND FLOORNOT TO SCALE
WORK ROOM
GUIDANCE
STOR
R/R
R/R
R/R
CONF.ROOM
R/R
FRON
T HA
LL
R/R
R/R
R/R
CAN WASH
STAGE
A-HALLA-HALL
B-HALLB-HALL
C-HALLC-HALL
C123
B-119
SHOWER
STOR
PANTRY FREEZER
COOLER
ELEC
STORBOOK
RM
ELEC
GUID KILN
STOR
ELEC
OFF
OFF
COMPUTER ROOM
R/R
OFF STOR
STORSTOR
STOROFFSTOROFFICE
BOY'S
GIRL'S
A112
C125
STOR
CAFETERIAFOOD PREP
B109
WORK ROOM B115
STORB116
B120MUSIC
PRINCIPAL
RECEPTION
VAULT
RR
RR
CONF
CUSTODIALCLOSET
C115CLASSROOM
C116CLASSROOM
C117CLASSROOM
C118CLASSROOM
C120CLASSROOM
C121CLASSROOM
C124ARTBOYS
R/RGIRLS
R/RBOYS
R/RGIRLS
STOR
R/RBOYS
R/RGIRLS
R/RBOYS
R/RGIRLS
STOR
C119
R/R
CUSTODIALCLOSET
R/R
B113CLASSROOM
B114CLASSROOM
BOYS
R/RGIRLS
R/RBOYS
R/RGIRLS
CUSTODIALCLOSET
B118CLASSROOM
B117CLASSROOM
R/RSTORSTOR
B112CLASSROOM
R/RBOYS
R/RGIRLS
CUSTODIALCLOSET
STORB111
LIBRARY
STOR
CUSTODIALCLOSET
B110LOUNGE
CUSTODIALCLOSET
R/R R/R
CUSTODIALCLOSET
A101CLASSROOM
A102CLASSROOM
A103CLASSROOM
A104CLASSROOM
A105CLASSROOM
A106CLASSROOM
A107CLASSROOM
A108CLASSROOM
A109CLASSROOM
A110CLASSROOM
A111CLASSROOM
STORR/R R/R
R/R
R/RA112A A112B
A112C
A112D
A111D
A111BA111A
A111C
A110BA110A
A110CA109C
A109B
A109D
110
A100
109
105
106
103
101A
101
102A107A
106A
108A107
104A
HEALTH104
102
108
100
B107
B108
B111A
B111B
B111C
B122
B111D
B111E
B112B
B112A
B113B
B113A
B114B
B114A
B115A
B117A
B118A
B118B
B121
B120A B120B
C124A
C124B
C121AC1210C118A
C118BC117B
C117AC116A
C116BC115B
C115AC114
C126
C113
B106AB106B100
B102
B104
B101
B103
B105
OFF
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSThe Children's Elementary School929 Sylvia Circle RoadRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
THE CHILDREN'SELEMENTARY SCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
120
STORAGE 123 MEN
122
TRAINING 124
MAPPING 116 R/R
111R/R110
WORK AREA 115
AUXILLARY OFFICE 102
MECHANICAL 118
DISPATCH 101
STOR 113
TPX MONITOR 114
R/R 104
R/R 103
AREA COORD
R/R106
STORAGE 109
SHOWER
DIRECTOR 108
SUPPORT ASSISTANT
107
WASHROOM117
R/R
WOMAN121
R/R
DRIVER'S WORKSTATION
A 105
COMPUTER COORD 112
AREA
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODVINYLSPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
SEALED CONCRETEN/A
N/AN/A
N/A
N/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by JLF checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSTransportation Complex1060 Goldenrod DriveRock Hill, SC 29730
consultants
HII-1709700
12.31.17
BUILDING SYSTEM -FLOORING
TRANSPORTATIONCOMPLEX
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE
MEDIA CENTER
NURSE
ART
STOR
OFFICE
ELEC 2
MECH
MUSIC
STOR
BOOKKEEPER
R/R
OFFICE
COVE
RED
PLAY
ARE
A
B-HALL
MULTI-PURPOSE
C-HALL
D120
D121
D122 D124
D-HALL
D126 D128 C130 C131 C132
C133
C134
C135
C-HA
LL
VESTIBULE
RECORDS
VAULT
A-HALL
R/RWOMEN
MENWOMEN
MECH/ELEC
B100 B102 B104 B106 B108
B110
B111
B112
STAGE
MEN
FREEZ.
COOLER
OFFICE
TRASH
CAFETERIA
LOADING DOCK
PANTRY
STOR
PRINCIPAL
R/R
STOR
RECEPTION
GUIDANCE
GIRLS
STOR
STOR
ELEC
BOYS
FOOD PREP
BOOK ROOM
SPEECHROOM
OFFICECONFERENCE ROOM
CURRICULUMCOOR.
TEACHERWORKROOM
TEACHERSLOUNGE
C129
STOR.C129A
OFFICEC129B
CLASSROOMCLASSROOM
CLASSROOM
C126
STOR.C126A
OFFICEC126B
CONF.C126C
CLASSROOM
CLASSROOM
C125READINGRECOVERY
STORAGEC125A
STOR
STOR
WOMEN
MEN
HEALTHROOM
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOMD132
D135
D131
D133
D130
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOMD123 D125 D127 D129
C136
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
B101CLASSROOM
B103CLASSROOM
B105CLASSROOM
B107CLASSROOM
B109CLASSROOM
KINDERGARTEN
KINDERGARTEN
KINDERGARTEN
B112A
B111A B112B
B112C
B110D
C130A
C131A
C132A
C133A
C134A
C135A
B111BB111C
B110A
B110B
B110C
DRESSING
STOR
STOR
STOR
STOR
STOR
C124
C127A
C127
A125A
A125B
B114 B116 B120
B122
B115
B117
A125A121A119
A117
A115
A111A109
A107A106
A105
A108
A101A100
A104
A103
A101A
A120D
A102A
A102B
A102
A110
A112
A114
A116
A118 A124A
A124B
A124C
A124
A124D
A124E
B118
A120
CAN WASH
A120AA120BDRESSING
A120C
OFFICE
R/R
R/R
BOYSD120A
GIRLSD120A
GIRLSD122A BOYS
D122B
GIRLSD126A BOYS
D-126B
R/R
R/R
R/RGIRLSD127BBOYS
D127A
GIRLSD123BBOYS
D123A
GIRLSD121B BOYS
D121A
R/R
R/R
R/R
B113FAC. R/R
C-HA
LL
C-HALL
B-HA
LL
A104AR/R
A128
A126
CUSTODIALCLOSET
KILNC125B
C129C
CUSTODIALCLOSET
GIRLSC127
BOYSC128
ELEC
CUSTODIALCLOSET
ELEC
CUSTODIALCLOSET
BUILDING SYSTEM : FLOORINGTYPE
FLOORING SYSTEM VCTLEGEND
CARPET
TERRAZZO
PAINTED CONCRETE
CERAMIC TILEEPOXY
HARDWOODTERRANOVASPORT COURTRUBBER
STAGE HARDWOOD
QUARRY TILE
CONCRETEN/AN/AN/A
N/AN/A
N/A
N/AN/A
Heery International
This document is the property of Heery International, Inc. and Heery International Inc. retains allrights therein, including copyrights. It may only be used in a manner consistent with HeeryInternational Inc.'s rights while Heery International, Inc. is providing services for the specific projectidentified or referred to herein or extensions thereto. It may not be used for any other purposeexcept with the express written agreement of, and compensation to, Heery International Inc.
WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42"Copyright © 2010 by Heery International, Inc. all rights reserved.
drawn by TML checked by
sheet number
sheet titlekey plan
item date
dateissued as
seal/signature
project number
Inc.434 Fayetteville Street,Suite 2010Raleigh, NC 27601919.838.6755
ROCK HILLSCHOOL DISTRICT 3
FACILITY CONDITIONASSESSMENTSYORK ROAD ELEMENTARY2254 West Main StreetRock Hill, SC 29732
consultants
HII-1709700
9.06.17
BUILDING SYSTEM -FLOORING
YORK ROAD ELEMENTARYSCHOOL
FLOORING
F-11
F-1BUILDING SYSTEMS - FLOORINGNOT TO SCALE