Question 1 What is a reasonable length of time in months for standards from approval of a proposed...

12

Click here to load reader

description

Question 2.1 Identify one step and time requirements to comment on in support of mission requirements  Because of the volume of data, the responses are being referred to an editing committee 37 replied; 33 skipped

Transcript of Question 1 What is a reasonable length of time in months for standards from approval of a proposed...

Page 1: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

FGDC Standards Process Review

• 70 attempts• After Question 1, only 37 people

completed the survey

Page 2: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 2.1

Identify one step and time requirements to comment on in support of mission requirementsBecause of the volume of data, the responses

are being referred to an editing committee

37 replied; 33 skipped

Page 3: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 2.2

30 replied; 40 skipped

Identify a second step and time requirements to comment on in support of mission requirementsBecause of the volume of data, the responses

are being referred to an editing committee

Page 4: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 2.3

27 replied; 43 skipped

Identify a third step and time requirements to comment on in support of mission requirementsBecause of the volume of data, the responses

are being referred to an editing committee

Page 5: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 3.13.1. All FGDC agencies should participate in the review and approval

process of FGDC standards.

62%

38%

YesNo

37 replied; 33 skipped

Page 6: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 3.23.2. All CG members or active designees will represent their

Department/ Agency on standards activities that affect their mission or business areas.

YesNo

37 replied; 33 skipped

Page 7: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 3.33.3. Upon receipt of a standards proposal (step 2), the SWG should

review the submission for completeness and then present the proposal for the CG to determine if the standard should be

introduced into the FGDC standards process.

YesNo

37 replied; 33 skipped

jmaitra
Given overwhelming support, should this be written into the FGDC Standards Directives?
Page 8: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 4

• Standards to submit to FGDC for review and recommendation in FY 2010 – North American Profile of ISO 19115 Geographic

Information- Metadata and NAP of Methodology for Feature Cataloging

– Addresses– Review of existing Wetlands Classification Standard– Cultural Resources Standard– Shoreline Data Standard– Buildings and Facilities (with GSA)

37 replied; 33 skipped

Page 9: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 5Does your agency use standards other than FGDC standards?

73%

27%

37 replied; 33 skipped

Page 10: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 6Do you support the idea that FGDC endorse implementation standards that enable interoperability, such as the suite of

standards listed in the GSDI Cookbook?

92%

8%

YesNo

37 replied; 33 skipped

Page 11: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 7

• What other activities should the SWG address this year?Because of the volume of data, the responses

are being referred to an editing committee

37 replied; 33 skipped

jmaitra
For discussion at FGDC Standards WG meeting
Page 12: Question 1 What is a reasonable length of time in months for standards from approval of a proposed standards project to FGDC endorsement? 70 replies.

Question 8• Contact information• Agencies participating

– DOI/USGS/FGDC: 5 – DOI/BLM: 4 – DOC/NOAA: 4 – USDA/NRCS: 4 – DOI/USGS: 3 – DOI/NPS: 3 – DOI/FWS: 2 – Library of Congress: 2 – DOC/Census: 1 – DOD/DISDI: 1 – EPA: 1 – DHS/FEMA: 1 – USDA/Forest Service: 1 – USDA/APHIS: 1

33 replied; 37 skipped

jmaitra
No regular participation from BLM
jmaitra
No regular participation by NRCS
jmaitra
No regular participation by NPS
jmaitra
Follow up with BLM, NRCS, NPS