QUARTER - Troy Resources Quarterly...2 32,26 7 6.0 1 106.0 2 88.2 9 75.7 8 5,52 9 84,22 8 7,63 9 4 7...
Transcript of QUARTER - Troy Resources Quarterly...2 32,26 7 6.0 1 106.0 2 88.2 9 75.7 8 5,52 9 84,22 8 7,63 9 4 7...
M
KE
OP
Br
Ar
EX
Ar
MARCH QUA
EY POINTS
No lost time
New high groutside the
Ore grade western end
Second higAndorinhas
Casposo onJune quarte
The compan(net of silveUS$549/oz
PERATIONS
azil, AndoriIncrease in coupled wienabled hig
Gold producproduction
Unit cash co
rgentina, CaPlant modifperformancfor April sethroughput
Production
Unit cash credits).
XPLORATION
rgentina, CaNew high grincluding: o Hole C
1,470g/downho
o Hole C2,266g/and 5.445.43g/
These new south east o
Julieta Maingrading 4.7Au_eq from
Troy ResoT: +6
ARTER HIGH
e accidents in
rade mineralisexisting Mini
intersectiond of the Caspo
ghest quarter.
n track to acer.
ny produced er credits) coin the previou
inhas ore widths aith improvedgh quarterly go
ction 11,369oon record.
osts to US$582
asposo fications and ce made throuee the plant in the June q
of 4,318oz go
costs of US$
N
asposo and rade mineralis
CA‐11‐297; 1/t silver or 2ole. CA‐11‐300; 1/t silver or 340m at 8.18g//t Au_eq fromintercepts arof the existing
n Zone South71g/t gold anm 60.35m dow
ources NL| ABN 361 8 9481 1277 |
HLIGHTS
the Company
sation at Kamng Reserve at
s at Julieta oso leases.
ly production
hieve budget
15,687oz golompared to 1us quarter.
nd higher grad mining proold productio
oz is second h
2/oz.
improvemenugh the quarton track to uarter.
old and 72,069
$974/oz gold
Castaño Nusation at Kam
.90m at 6.37.35g/t Au_e
.35m at 3.45.82g/t Au_e/t gold and 2,m 311m downhe located outg Mining Rese
h Vein drillingd 31.68g/t s
wnhole.
3 006 243 750 | F: +61 8 9321 82
y.
mila SE Extensit Casposo.
on the nor
n on record
t throughput
d at US$690/3,532oz gold
ades with depoductivity han to continue
ighest quarte
nts to operatiter and plannachieve budg
9oz silver.
d (net of silv
uevo mila SE Extensi
36g/t gold aeq from 270.6
46g/t gold aeq from 306.4,607g/t silver hole. tside and to trve.
g yields: 18.75ilver or 5.16g
Ground Floor, 44237 | E: troy@tro
ion
rth
at
in
/oz at
pth ave .
erly
ing ned get
ver
ion
and 6m
and 4m or
the
5m g/t
B
CO
CO Co“Scoiddumpr “Winfabu “Pse “OexinthpoIf brw "Simw5kancole
4 Ord Street, Wesyres.com.au | W
razil, AndorSignificant target less plant with 2,510ppb gJune quart
ORPORATE
The amoupaid shareand April n
OMMENTA
ommenting oStrategically tompany. Operentifying anduring comm
modifications tractice.
We started to the month aster pace thudget through
Pleasingly Andecond highest
Of most sigxploration rtersections inheir own rigotential to offresults contiring an additith the aim of
Similarly, althomportant, theye now have okm structure nd untested womplete airbngth of the st
QF
st Perth, WA 6005: www.troyres.co
rinhas gold‐in‐soil than 2km fropeak values gold. The targer.
nt owing on s was paid tonetting A$1.15
ARY
n the quarterhis has been rationally at Cd understandimissioning anto both the p
o see improveof March anhrough April. hput rates in t
dorinhas contquarterly pro
gnificance hoesults at Cn the Kamila eht but impofset the schednue with theional rig to sf bringing the
ough the ore y are strategiore grade minwith the majowith drilling. orne and grtructure to ide
QUARTERFor the three
5, Australia om.au
anomalies aom the Andorranging betwrget will be d
the remainino the Compa55 million.
r, Troy CEO Pan important
Casposo our fong the issuesnd making lant but also
ements flowinnd they haveWe still ex
the June quart
tinues to perfoduction.
owever wereCasposo. Thextension zoneortant also duled drop ine same trend,site to compblock to Reso
grade interceically very signeralisation aority of this sWe are curreround geophentify addition
RLY REPOe months end31 March 20
at the Marcirinhas processween 343ppb rill tested in
g 350,000 pany during Ma
Paul Benson st quarter for ocus has beens with the cir
the requito the operat
ng on from the continued apect to achiter.
orm well with
e the excelhe high gre are excellenbecause of n grade in yea, we will looklete infill drilource status.
epts at Julieta gnificant becat either end otructure coveently planninghysics along nal drill target
RT ded 011
nho sing and the
artly arch
said, the n on rcuit isite ting
hese at a ieve
h its
lent rade nt in the
ar 3. k to ling
are ause of a ered g to the ts”.
OP
CA
Pro
Pro
Hea
Hea
Rec
Rec
Gol
Silv
Pro(oz
Cas(pe
Cas(pe*No(1) B
(2) B
(3) C
Mi
Tot
Go
Silv
Wa
Oc Thequaonacc
En TheEnvandnowseswesaf
PERATIONS
ASPOSO, AR
oduction
ocessed (t)
ad Grade Gold
ad Grade Silve
covery Gold (%
covery Silver (
ld Produced (
ver Produced
oduced Gold E)
sh Cost Net Sier oz of gold)
sh Cost Co‐proer oz of gold eote: Only minor p
Based on the ratio
By‐product costin
Co‐product costin
ining
tal Ore Mined
old Grade (g/t
ver Grade (g/t
aste Mined (B
ccupational
ere were no arter. A totally 5 minor incidents.
nvironment
ere were no vironmental md training hasw a requiremssion on an inell as regular efety training.
S
RGENTINA (
d (g/t)
er (g/t)
%)
(%)
oz)
(oz)
Equivalent(1)
lver Credits (2
oduct (3) equivalent) production occurr
o of sales prices r
g
ng
d (t)
)
t)
BCM)
l, Health an
lost time injul of 84,548 mnjuries treated
environmentmonitoring ans progressed
ment to undergndividual basieducational se
(Troy 100%
Marc201
Quarte
22,26
6.8
130.1
87.8
77.3
4,31
72,06
6,112) A$96
US$97
A$1,14US$1,15
red prior to 1 Janu
realised
March 2011
Quarter
70,491
7.42
108.98
192,906
nd Safety
uries or accidman hours wed as a result
tal issues durnd implementwell during tgo a training is pre‐employessions as par
through Tr
ch 11 er
9 Montto Mar
2011
62 32,26
87 6.0
11 106.0
82 88.2
39 75.7
18 5,52
69 84,22
18 7,63
69 74
47 53 uary 2011
9 Monthto Marc
201
160,90
7.3
106.5
821,30
dents during tere worked wof work relat
ing the quartation of systethe quarter. Iand informatyment on sitert of our ongo
roy Resourc
thsch1*
62
05
06
25
72
25
27
31
hsh 1
08
4
6
07
the with ted
ter. ems t is tion e as oing
P DufoseoblepeSinom A emopMof Thnuanplfiranmcole Bylin~6thbuofinreci Trthtracstprpe
ces Argentin
rocessing
uring the quocused on speection where bstacle to acvels. In parteriods of highmilarly, the cot achieve vo
modifications.
number of smployed to perational gu
Merrill Crowe sf these will no
he plant desumerous stopnd to allow tant averagedrst week of Apnd over 700 modifications mompleted, wevels in the Jun
y the end of tne with budg6% below budhe final tailingudget recoverf the material time due teturning to a rcuit.
raining and sthe quarter butaining of locactivities to refaff is being rocess superversonnel.
QF
na Ltd)
uarter work ecific areas in filtering issu
chieve a ramticular tailinger than anticilarification anolumes requir
pecialist consaddress theidelines. Modsection and taot be seen unt
sign throughpppages assoche relevant m around 250tpril average thtpd in the made througe still expect ne quarter.
the quarter met for silver dget primarilygs. This has nries are expeclost by the loo recovery ocollection po
taff performat most of thesal staff remaifine and optimstrengthenedvisors from
QUARTERFor the three
on commissthe Merrill Cues continuemp up to bugs filtering wipated levels nd precipitatiored under th
sultants and ese issues difications weails filtering btil the June qu
put is 1,100tciated with tmodifications tpd during thhroughput halast week ofh April or stt to reach de
metallurgical reat ~80% withy due to the now been pacted in the Juow recoveries of some of ond and from
ance remainedse areas are nns high on thmise the operd by the adBrazil plus s
RLY REPOe months end31 March 20
ioning the pCrowe and taild to provideudget throughwas affectedof clay in the on sections coe design with
contractors wand to proere made to ut the full imuarter.
tpd. Due to he issues abto be made,
he quarter. Ind reached 570f April. With ill planned toesign through
ecoveries werh gold recoveinability to wrtly rectified ne quarter. Sowill be recovethe liquid lothere to the
d an issue dunow well in hhe list of ongration. Procesddition of sespecialist trai
RT ded 011
2
plant lings e an hput d by ore. ould hout
were ovide the pact
the ove, the the 0tpd the
o be hput
re in eries wash and ome ered osses mill
uring and, oing ssing enior ning
OP Thethesysmause An Juamoalsdedme
Mi Dugraat t97. Wiminfocconconlargto Trosup Thetheordtak
Co In relapprevunquacas Theaccequ6,1
PERATIONS
e maintenance addition ofstem for maintenance pred in Australia
agreement han to assistonitoring and o metallurgy dicated teametallurgical lab
ining
ring the quartade of 7.42g/tthe end of th.66g/t silver.
th the slowerne has estabcus to movenstruction dntract was enge excavatorsprovide five 4oy is currentpervisory staff
e current mine moment weder to ensureke over a num
osts
the early yeatively minopropriate to venue is deduit cash cost arter Caspososh cost of US$
e alternate mcounting, whuivalent”. Usi118oz Au_eq a
S
ce departmenf an experienmaintenance rocedures anda.
has been mad in two arreporting of and plant opm of experboratory as an
ter 70,491t oft gold and 10e quarter wa
r than plannedblished a large to waste uring the qntered into ws and a similar40 tonne dumtly sourcing f for the mine
ning contract ie have the poe high producmber of tasks t
ears of the or contributouse “by‐producted from thper ounce ofo produced 4$974/oz net of
method of rephere the silving co‐producat a cash cost
nt has been snced supervisis being
d planning ba
de with the Ureas of protailings dump
ptimisation. Thts and alsond when requ
f ore was min08.98g/t silvers 145,877 at 7
d ramp up in ge ore stockppre‐strip an
quarter. A swith Sullair for contract wasmp trucks to aadditional e
e.
s due to expirossibility to exctivity it is liko be done in‐
mine life whor to total uct” accounthe cost base f gold produ,318oz of golf silver credits
porting is usiver is convect costing theof US$1153 /
strengthened sor. A databinstalled w
ased on syste
University of Scessing namp behaviour ahis will give uo access to ired.
ed at an averar. Stockpiled o7.10g/t gold a
milling rates tpile allowing td tailings dseparate supor provision os also negotiatarrive early Juengineering a
re in June andxtend this butkely that we whouse.
here silver isrevenue, it ing where silto determineced. During tld at an averas.
ng “co‐produerted to “ge mine producoz Au_eq.
by ase with ems
San mely and us a a
age ore and
the the dam pply of 3 ted une. and
d at t in will
s a is
ver e a the age
uct” gold ced
ThloAsw2,USca
A AdsoinWhaacsp A subycodrw
he high unit ower than plans throughput,ill decrease c465oz of goS$477/oz net ash cost contin
Administrati
dministration ome work froclude purcha
With the moreave customs cquire furthepace.
power supplupplier of elecy end of theompleted andraw is in the hen undergro
QF
cost is predonned producti, and thus prcommensuratld were prodof silver crednue to fall as g
ion
on site is bom the San sing and store frequent exagent visit r equipment
y contract is ctric energy ise calendar yd we can go oorder of 3M
ound mining st
QUARTERFor the three
ominantly a ion due to theroduction incrtely. In the mduced at a udits. We expegold producti
being strengJuan office res control inxport of doré regularly theto assist an
being drawns expected toyear when thon grid powe
MW expected tarts.
RLY REPOe months end31 March 20
reflection of e slower rampreases, unit cmonth of Maunit cash cosct to see the on increases.
thened to mto site. This the near futand the nee
ere is a neednd a small o
n up with a l come into efhe 500kV liner. Current poto go to 4.5
RT ded 011
3
the p up. costs arch, st of unit
move will
ture. d to d to ffice
arge ffect e is ower MW
O
AN
Oc ReiForwo
En Theinc Thenowwitpla
Pro Unto 7.2oreaddtheconsaf Miredfac(3.implow Golowon
PERATIONS
NDORINHAS
ccupation, H
inarda has achr the quarter orked with no
nvironment
ere were nocidents during
e old tailings dw going to thth topsoil at tanted with nat
oduction Re
derground prbe strong du
28g/t gold proe body width dition, improe Melechete ntributed to fety.
ll feed gradeduction over tct that the m14g/t gold) fpacted by thewer throughpu
ld productionwer than the ly partially off
S
S, BRAZIL (T
Tonnes Mil
Head Grade(g/t gold)
Recovery (%
Gold Produ(oz)
Cash Cost (per oz)
Health and
hieved 527 daa total of 21lost time inju
o environmeng the quarter.
dam is now fuhe new dam. he end of thetural vegetatio
esults and S
roduction tonuring the quaoduced. With and grade haved rock supstopes from
significant in
e was 6.54g/the previous mill treated for two weeke failure of a ut for a 3 wee
n for the quprevious quafsetting lower
Troy 100% t
M
Qu
lled 5
e
%)
uced 1
A
US
Safety
ays without a 10,285 personry.
ntal problem
ull. Tailings froThe old dam
e wet season aon.
Summary
nnages and garter with 50mining at greave increasedpport systemsm the footwncreases in p
t gold for thquarter mostlow grade Lks. Mill throumill motor wek period.
arter of 11,3arter with higr milled grade
through Re
March 2011
uarter Q
7,464
6.54
93.7
1,369
A$579
S$582 U
lost time injunnel hours we
s, accidents
om the plant a will be cappand then will
grade continu0,890t of ore eater depth td as per plan.s and accessiwall have aproductivity a
he quarter. Ttly reflected tLagoa Seca oghput was a
which resulted
369oz was 14gher throughps.
inarda Min
March2010
Quarter
9 Mto
58,329 1
3.90
90.6
6,633
A$853
US$768 U
ury. ere
or
are ped be
ued at
the In ing lso and
The the ore lso d in
4% put
neração Ltda
Months March2011
9 Mto
174,007 1
6.78
93.5
34,364
A$606
US$584 U
QF
a)
Months March2010
72,968
4.63
91.5
23,760
A$709
US$628
QUARTERFor the three
December 2010
Quarter
55,122
8.10
93.7
13,196
A$556 US$549
RLY REPOe months end31 March 20
RT ded 011
4
O
SA
Oc TheMa
En ThelaydisfroKalare HethedamWo Wireh‘fodu
Ge Tenaromin
PERATIONS
ANDSTONE,
ccupation, H
ere were noarch quarter.
nvironment
e rehabilitatioy down aremantled and om the mine lgoorlie for teas will be com
avy rains durie Lord Nelsomaged the bork has started
th the advehabilitated wallow up’ momps should gr
eneral
n tonnes of gound the goldneral processi
S
AUSTRALIA
Tonnes Mil
Head Grade(g/t gold)
Recovery (%
Gold Produ(oz)
Cash Cost (per oz) * (Sandstone
December qua
Health and
lost time in
on the mininga was commoved off sitand mill wastreatment. Smpleted early
ing the quarteon and the Bboundary fencd on repairing
ent of the aste dumps histure in winrow further a
gold bearing d room and ming facilities in
A (Troy 100
M
Qu
lled
e
%)
uced
e completed prodarter resulting fro
Safety
njuries record
g contractor’smpleted withte. All contams also removSeeding of ay next quarter
er damaged mBulchina wasce line and fg the dumps,
rain new ghas occurred nter the vegnd stabilise th
material was mills and shippn Kelmscott fo
0%)
March 2011
uarter Q
‐ 1
‐
‐
‐
‐ ‐
AU
uction during Sepm final site clean
ded during t
s workshop a infrastructu
minated matered and sent ll rehabilitati.
many sectionste dumps, afence line roaroad and fenc
growth on tand with sometation on the dumps.
extracted froped to Nagromor treatment.
March2010
Quarter
9 Mto
103,322
2.64
91.4
7,994
A$1,039US$930 Uptember 2010, 33nup)
the
and ure rial to ion
s of and ad. ce.
the me the
om m’s
C
Months March2011
9 Mto
96,992 3
1.72
92.8
5,321*
A$846US$758 U36 additional oun
Rehabil
Contractor’s W
QF
Months March2010
58,387
2.36
93.23
25,049
A$960US$875 nces were recover
itation at Lor
Workshop InfrRipped Read
QUARTERFor the three
December 2010
Quarter
‐
‐
‐
336*
‐ ‐
red during the
rd Henry Wast
rastructure Ady for Seeding
RLY REPOe months end31 March 20
te Dumps
rea Cleared ag
RT ded 011
5
and
EX
AR(Tr Thethr
Ka In extDeknoExtof strhoscomhoshaeac Onforint26.343thedrisouFig An hoVe6.3270silv3063111). TherhycurSouto thereq Respotdri
XPLORATION
RGENTINA, roy 100% th
e main focusree drill rigs cu
amila South
early Januarytensions of thposit. The cuown veins (Inctension Vein) infill and steucturally comsts the Kammprised of a les planned toallow depths ch hole (abou
March 15, 2r CA‐11‐295 erval as 14.70.24g/t Au_eq3.0m to 357.2e early Marclling has foutheast of thegure 1, Figure
additional 8 les have interin assay resu36g/t gold an0.6m, includiver or 62.50g6.4m to 3071.0m to 316.4
ese interceptyolite dyke anrrent drilling hutheast Extenthe southeaste undergrounquired and pla
sults to datetential new zlling complete
N
CASPOSO
hrough Troy
s of the currurrently in op
heast Target
y, 2011 Troy he main veinurrent prograca Vein, B Veat depth andep‐out extensmplex northwmila and Mseries of norto test B Vein/(+/‐ 100m) at 250m – 350
2011 Troy anand final a0m at 7.79g/t from 342.502m: at 8.04g/ch drilling of ocussed on e second dyke2 and Figure 3
holes (3,175.4rsected the Inults include; d 1,470g/t silng 0.80m at g/t Au_eq fro7.15m: 1.35m40m: 5.40m a
s are all locad outside thehas confirmednsion Vein at which reprend Resourceanned.
e have beenone of minered to date at
y Argentina
ent program eration at Cas
t
commenced ns that compam is designin, Aztec Veind along strike tsional drill hwest southeasMercado Dethwest to sou/Southeast Exand the Inca m).
nnounced preassays have t gold and 1,0m that includ/t Au and 1,3Hole CA‐11delineating e at the Kamil3).
4m) have beeca Vein. SigniHole CA‐11‐lver or 27.35g14.23g/t gol
om 271.7m, Hm at 35.82g/at 45.43g/t A
ted southease current Minid that both Inre mineraliseesents potentie but additio
n very encouralisation suggKamila SE Exte
a Ltd)
is drilling wsposo.
drilling on trise the Kamed to test tn and Southeathrough a seroles within tst corridor thposits. Drilliutheast orientxtension Vein Vein deeper
eliminary resuconfirmed t292g/t silver des 14.2m fro333g/t Ag. Sin‐295, follow‐the Inca Vea SE Target (s
en drilled and ficant new In‐297; 1.90m g/t Au_eq frod and 3,379gHole CA‐11‐30/t Au_eq; au_eq (see Tab
t of the secong Reserve. Tca Vein and td and continal extensions onal drilling
uraging with gested from tension Target
with
the mila the ast ries the hat ing ted at in
ults the or om nce ‐up ein see
all nca at
om g/t 00; and ble
ond The the nue to is
a the t.
Nevededere
ew high gradein widths haensity is insufelineate the equired and is
Figure 1: KaPolar
Figure 2: Kam
QF
de mineralisatas been encoficient to cleaextent of thin progress.
amila Southeaization ‐ Resis
mila Southeas
QUARTERFor the three
tion associatountered. To arly define orie zone. Add
ast Zone Geolstivity & Drill
st Zone Geolo
RLY REPOe months end31 March 20
ed with variadate the drilientation and itional drilling
logy, InducedCollars
ogy and Drillin
RT ded 011
6
able lling /or g is
ng
EX
Jul Thethetesminandwitbet Soudrion wit3.581m44mintDri201exiat doteximpsysdri Thethi11‐Jul JU‐3.7
XPLORATION
FigureInca
lieta Target
e second rig ie area below tsting the posneralogy fromd a change in th an improvetween 50m –
utheast Vein lling producethe Southern
th 8.0m at 655g/t Au_eq fm; and RC‐10m and 3.0mercepts are oilling commen11 with the custing Resourcdepth for a minant to moxture changprovement instems at deptlling (see Figu
e first three 2s potential no‐32 to JU‐11‐ieta Main Zon
‐11‐32; 0.65m78g/t Au_eq f
N
e 3: Kamila SE a Vein Gold Eq
t
is drilling at tthe existing Rssibility at dm calcite domivein texture ement in gra100m below t
Zone: In 201ed two encoun Vein system6.96g/t Au_erom 52m and0‐39 with 12m at 6.65g/tpen down dipnced at the Jurrent prograce. The objectchange in vore silica domges hopefun grade. This hs between 4ure 4, Figure 5
2011 DC drillorthwest tren35 targeted tne. Significant
m at 2.85g/t from 62.40m d
Target Longitquivalent (gra
the Julieta Maesource with epth for a cinant to morechanges hopede. We are tthe existing d
10, Reverse Curaging gold m. These incleq from 33md 3.0m at 5.66.0m at 9.86gt Au_eq fromp/plunge. DiamJulieta Main m testing thetive of testingvein mineralominate and a lly associat drilling is tar40m – 80m be5, Figure 6 and
holes were nding vein systhe Southern assay interva
gold and 65downhole.
tudinal Sectioam /metres)
ain Zone testithe objectivechange in vee silica dominaefully associatargeting deptrilling.
Circulation “Rassays intervuded; RC‐10‐
m plus 5.0m 6g/t Au_eq frog/t Au_eq from 60m. Themond Core “DZone in Mar
e area below tg the possibilgy from calcchange in veed with rgeting the veelow the existid Table 2).
planned to testem: Holes JVein set at t
als include:
5.0g/t silver
on
ing e of ein ate ted ths
RC” vals ‐38 at om om ese DC” rch the lity cite ein an ein ing
est JU‐the
or
JU4.inAugrfr
F
Ad1.fr3gdo JU5.in10nago74 JU4.2.94
U‐11‐33; 12.7m.80g/t Au_encluding 2.0mu_eq from 5rading 19.24gom 61.6m to
igure 4 Julieta
dditional min.96m at 1.96gom 85.5m – 8g/t silver orownhole.
U‐11‐34: 18.75.16g/t Au_encluding 8.45m0.04g/t Au_eqarrow high gold and 73g/t4.5m downho
U‐11‐35: 4.76m.85g/t Au_eq.54g/t gold a4.1m downho
QF
m grading 4.5q from 56.at 6.73g/t go56.7m to 58/t gold and 663.4m downh
Main Zone GeoAssay H
neralised integ/t gold and 86.5m as wel0.98g/t Au
5m grading 4.q from 60.m at 9.18g/tq from 60.35grade intervat silver or 11.ole.
m grading 4.2q from 84.34and 29g/t silole.
QUARTERFor the three
54g/t gold an.75m to 69old and 37g/t8.75m down66g/t silver orhole.
ology with 201Highlights
ercepts in J7g/t silver oll as 4.7m at 0u_eq from 9
.71g/t gold an
.35m to 79t gold and 605m to 68.8m al of 0.65m g.34g/t Au_eq
24g/t gold an4m downholelver or 2.96g
RLY REPOe months end31 March 20
nd 18g/t silve9.4m downh silver or 7.25nhole and 1r 20.18g/t Au_
1 Drill Collars a
U‐11‐33 inclor 2.06g/t Au_0.95g/t gold 94.5m to 99
nd 32g/t silve9.1m downh0.46g/t silverdownhole angrading 10.30from 73.85m
nd 43g/t silvee and 4.68mg/t Au_eq fr
RT ded 011
7
r or hole 5g/t .8m _eq
and
ude _eq and .2m
er or hole r or nd a 0g/t m to
r or m at rom
EX
Fig
Fig
Ca Troouttheto combeebeedelho
XPLORATION
gure 5: LongitLocation of
gure 6: JulietaVie
asposo Nort
oy’s Reverse Cts along strikee quarter 6 hoRCCAN‐11‐1
mmenced on en drilled in en plagued blays in sourcinles are display
N
tudinal SectioNew and Pro
a Main Zone New looking to
te Target
Circulation “Re and at deptoles were com17) totalling January 6th 8 holes (see by mechanicang replacemeyed in Figure 7
on of Main Julposed Hole P
New Access Tro the Southwe
C” rig is drillinth on Casposmpleted Marc
481m. Sinc2011, a totaFigure 8). Thl problems went parts. Resu7 and Table 3
lieta Zone witierce Points
rack & Drill Paest
ng shallow steo Norte. Durih (RCCAN‐11‐ce the drillil of 622m hahis program hwith the rig aults from rece.
th
ad
ep‐ing ‐12 ing ave has and ent
Ta MonLuasDemanww–m A suseto(cthex
A(T ThCaThscupin Atvegrwst
Fig
arget Asses
Mapping and ngoing and wucia vein whssays were repetailed struct
mineralogy andnd other struould be to ranork will be aiCentre for Ex
model to aid in
detailed airburvey is beingelected vein to southeast overed by yohis we are pxpedite surfac
ARGENTINA,Troy earnin
he first phase astaňo and cohis drill progrcoping of the p to 100m betersected nar
t Dios Protégéein as expectrade assays. ith some prelill high in the
QF
ure 7: Locatio
ssment and
sampling of we are currenhere some eported late lasural vein focud textures as ctural data isnk outcroppinded by the Uxploration Tarranking the v
orne (helimagplanned as wargets and pocorridor betounger volcanputting accesce work.
, CASTAÑO g 100%)
of Diamond Comprised of 27ram was planthree outcro
elow surface. rrow veins at t
é Vein and Sated but geneVein texturesiminary fluid system above
QUARTERFor the three
on RC holes C
Ground Fo
f other outcrntly building dencouraging cst year. ussed mappinwell as recos underway. Tng vein targetniversity of Wrgeting who aveins for drillin
g‐magnetics awell as additioortions of thetween Mercaniclastics). Inss tracks int
NUEVO
Core drilling w7 shallow holnned as a wiopping vein syTo date all othe targeted d
an Agustin Veerally resulteds and vein minclusion wore the boiling z
RLY REPOe months end31 March 20
asposo Norte
ollow‐Up
ropping veinsdrill pads on channel samp
ng recording vrding orientatThe current ps for drilling. TWestern Austrare building ang.
and radiometronal IP work oe main northwado and Julpreparation
to that area
was completedes (see Figurede spaced inystems to depof the holes hdepths.
in drilling hit d in narrow mineralogy alrk suggest we zone.
RT ded 011
8
e
s is the ples
vein tion plan This ralia a 3D
rics) over west ieta for to
d at e 8). itial pths have
the low ong are
EX Whassindanddepdepa starcon Degoiyea
Fig
BR(Tr Thedelfocin‐sthr
XPLORATION
hile the drillinsays, vein cdicate we ared higher ore gpth. At the pths of about tructure withrget depth. Dnsidered.
tailed reloggiing and followar which will i
gure 8: CastaňPro
RAZIL, ANDOroy 100% th
e rainy seasolays in fieldcused on the soil anomaliesrough geologic
N
ng has generacomposition, e near the togrades, if presSan Pedro V 40m below sh some brecciDeeper drilling
ng and surfaw‐up drilling nclude some
ňo Nuevo Driotégé Vein &
ORINHAS hrough Rein
n has resulted work. Explevaluation ofs at Marcinhocal mapping a
ally returned atextures a
p of the epitsent, are likelyVein the holeurface. Each hation but littlg of that str
ce alteration is scheduled deep drilling.
lling – St AguSan Pedro Ve
narda Mine
d in difficultieoration durif the recently o and Lagoa Seand rock samp
anomalous gond mineralothermal systey to be foundes targeted thole intersecte veining at tructure is bei
mapping is ofor later in t
stin Vein , Dioein
eração Ltda
es in access ang this periidentified goeca East Targepling.
old ogy em, at the ted the ing
on‐the
os
)
and iod old‐ets
ThMsigbestgrbedesugadononoth47 ThcadeFoquthexst Atdisinth
Atwnogrinthtobeadun
he Marcinho TMamão Minegnificant goletween 343prike length orab chip sampetter gold aeformed BIFulphides. Thearimpo workinown dip poteot test the ortheast or ehis extension 70ppbb, 418p
he mineralisaarbonate altereveloped in ormations “Buartz veins anhe BIF bandingxposed in therike. The shea
t the top of thsplaying well nistral displache folding at th
Figure 9: SMarcin
t Lagoa Seca ith anomaloortheast strureywacke seqtrusives. Thishe nearby Lago date no exeen identifiedditional rocnderway in or
QF
Target is locat. Grid based‐in‐soil anopb gold and f 1,400m witples (see Figuassays are s with qua Marcinho Mangs. Earlier hential below tpossibility oxtensions to area produc
ppb, 362ppb a
ation is assocration as well the host roIFs”. The BIFnd quartz veing. The controle workings haar cuts the BIF
he hillock the developed drcement whichhe Mamão M
Soil Grid at Mho Main and
East, gold‐inus gold valuuctural trenduence in assos target has aoa Seca Pit buposures of thed. Detailedk grab samprder to better
QUARTERFor the three
ted 1.2km noed soil samomalies (pea2,510ppb goth coincident ure 9 and Tabassociated wrtz veins caain Target is eistoric drillingthe garimpo. of any poteeast. Recent
ced gold valuand 343ppb go
ciated with as patchy dis
ock which is Fs are cut bnlets are develling west ‐ noas been mappF foliation and
BIFs are intenrag folds with h is a similarine. RC Drillin
Marcinho AreaMarcinho SW
n‐soil and roues have ded within thociation witha similar struut one key elehe ultramaficd geological pling over thdefine drill ta
RLY REPOe months end31 March 20
orth‐northwesmpling identifk values raold) occur oveanomalous r
ble 4 below). with intensivarrying oxidieast of Marcig focussed on These holes ntial plunge soil samplinges as 2,510pold.
silicification seminated pya Banded I
by “en echeleloped paralleorthwest sheaped over a 40d banding.
nsively deformboth dextral r deformationng is planned.
– Including W Targets
ck grab sampefined an eahe host me deformed feuctural settingement is missc intrusives h
mapping he anomaliesargets.
RT ded 011
9
st of fied nge er a rock The vely ized nho the did to
g in ppb,
and yrite Iron on” el to ar is 00m
med and n to
ples ast–eta‐elsic g as ing; have and s is
CO
Co At comrespos At sitevisis oandThenocontalme
At wittheand(“ACoforart
OMMUNITY
ommunity
Troy we undemmunities wsponsibilities sitive impact w
Casposo in Are tours for aiting the opeongoing withd educationale communityrmal with twntinues to suks by local edicine.
Andorinhas ith the local coe constructiond associatedAME”), has rempany to enar Company emticle manufact
Y
erstand that wwith which wseriously anwe have had o
rgentina we wanyone from ration. Norma support for courses in th relations offwo full timeupport local doctors on
in Brazil the ommunity andn of the Flore facilities. Teceived consiable them to mployees. In rtured.
we need to bwe operate. nd are prouon these com
will shortly comthe local areal communityschools and
he nearby towfice continues employees. radio stationhygiene an
Company cond elected offista do AraguaThe Floresta derable assismanufacturereturn, the AM
e valued by tWe take o
d of the vemunities.
mmence weeea interested y relations wospecial traini
wn of Calingass to function The Compas and presend preventati
ntinues to wocials assistingaia football ovLadies Groutance from te work uniformME are paid p
the our ery
kly in
ork ing sta. as
any nts ive
ork g in val up, the ms per
Flo
Floresta do Ar
oresta Ladies G
QF
raguaia Footba
Group ladies gro
QUARTERFor the three
all Complex und
oup with Reina
RLY REPOe months end31 March 20
der constructio
arda work over
RT ded 011
10
on
ralls
F
CA As miladdsec Trosubquahelperhelat $ Theappreqgrobal In Macas
DE TroLimterSep As fac
NE TroMa
FINANCE RE
ASH POSITIO
at 31 Marchllion in availadition, Troy curity for vario
oy’s wholly bsidiaries hearter end, Reld 289 ouncesr ounce) andld 883 ounces$1,400 per ou
e Troy group’proximates Aquirement of oup is requirelance of A$5.0
addition RMLarch 2011 whsh was receive
EBT FACILIT
oy has a debmited, totallinrm to 31 Marptember 2011
at 31 Marchcility and drew
ET DEBT & L
oy’s Debt lessarch 2011, tot
EPORT
ON
h 2011, Troy able cash withheld A$2.7 ous environm
owned Bld cash depeinarda Mines of gold awad Troy Resous of gold equiunce).
s available caA$8.6 millionthe Investec ed to maintai0 million.
L sold US$2.9 hich was receed the beginn
TY
bt facility witng A$35.0m. Tch 2013. The 1.
h 2011 Troy w a further A$
LIQUID ASS
s available castaled approxim
within Austrh major Austmillion in caental bonds.
Brazilian andposits of A$ração Ltda (“aiting sale (A$rces Argentinvalent awaitin
sh and gold a as at 31 Mdebt facility in a minimum
million worteivable at quing of April.
th Investec BThe facility hfirst 25% is r
had drawn A3.0m on 5 Ap
ETS
sh and liquid mately A$18.4
ralia held A$5ralian banks. ash deposits
d Argentine1.9 million. “RML”) in Bra$0.4m at $1,4na Ltd (“TRAng sale (A$1.2
nd silver bulliMarch 2011. is that the Trm available ca
h of gold on uarter end. T
Bank (Australas a three‐yerepayable by
A$27.0m of tril 2011.
assets as at 4 million.
5.1 In as
ean At azil 400 L”) 2m
ion A
roy ash
30 The
lia) ear 30
his
31
G DugoavCaUapqu Duofouwthtopr
H Th
EX DuwArto
CA CawArfoA$Br
OLD SALES
uring the quaold at an aveverage Cash Cash Margin nderground pproximately uarter.
uring the quaf gold equivaunce. The avhich gives a che high silver o process, saleroduction.
EDGING
he Troy group
XPLORATIO
uring the quaas A$2.3 mrgentina, A$0o Sandstone, w
APITAL EXP
apital and devas A$3.6 millrgentina on tor the local $2.2 million wrazil for ongoi
QF
arter, RML in erage price oCost was US$of US$816 pdevelopmentUS$176 pe
arter, TRAL inlent at an average cash cocash margin ocontent and res can be grea
is totally unh
ON EXPENDI
rter, total expillion. Of th.25 million towithin Austral
PENDITURE
velopment exion. This washe Casposo Ppower line cwas incurred ng undergrou
QUARTERFor the three
Brazil sold 1of US$1,398 582 per ouncper ounce ft capital eer ounce pro
n Argentina soverage price ost was US$of US$264 peresulting timeater than 1 mo
hedged.
ITURE
ploration expeis A$2.0 mio Brazil and thia.
xpenditure dus made up ofProject includicommitment.at the Ando
und developm
RLY REPOe months end31 March 20
11,599 ouncesper ounce. ce, which givefor the quarxpenditure woduced for
old 1,514 ounof US$1,4171,153 per ouer ounce. Duee for the refinonth in arrear
enditure incurllion related he net remain
uring the quaA$1.4 millioning A$0.8 mil. The remainrinhas projec
ment.
RT ded 011
11
s of The es a rter. was the
nces per
unce e to nery rs of
rred to
nder
rter n in lion ning ct in
C
Di DaPauKenGoFreJohRo
Sto AuTor
CORPORATE
rectors
vid Dix, Non‐ul Benson, CEn Nilsson, Exeordon Chambeed Grimwade,hn Jones, Nonbin Parish, No
ock Exchan
stralian Stockronto Stock Ex
Hole ID Ea
CA‐11‐285 243
CA‐11‐286 243
CA‐11‐288 243
CA‐11‐289 243
CA‐11‐291 243
CA‐11‐292 243
CA‐11‐293 243
CA‐11‐295 243
E INFORMA
Executive ChaEO, Managing ecutive Directers, Non‐Exec, Non‐Executivn‐Executive Dion‐Executive
ge Listings
k Exchange, ASxchange, TSX
asting (m)
Northing (m)
39201 6547791
39280 6547837
39403 6547808
39519 6547806
39458 6547813
39531 6547736
39389 6547810
39458 6547733
ATION
airman Director or utive Directorve Director rector Director
SX code: TRY code: TRY
Table 1: Kamila
Depth (m)
Az
299.6 45
310.6 45
344.5 45
250.3 45
266.3 45
367 45
320.5 45
380.5 45
r
Southeast Zone De
z Dip
5 ‐80
5 ‐70
5 ‐70
5 ‐60
5 ‐60
5 ‐60
5 ‐60
5 ‐65
Is
O
U
Fo PaT:AnT:
eep Drilling Summa
From (m)
To (m
270.75 272.1
218.45 219.4
329.35 330.5
330.5 331.6
217.8 218.7
218.7 220.2
243.2 243.7
250.50 251.0
251.00 251.6
296.35 297.2
334.00 334.6
334.60 335.3
337.20 338.2
343.00 344.0
344.00 345.0
345.00 346.0
346.00 347.0
347.00 348.0
348.00 349.0
ssued Capita
Ordinary Shar
Unlisted
Employee Opt
Employee Per
Investec (Aust
or further info
aul Benson, C +61 8 9481 1nnette Ellis, P +61 8 6314 6
ary of Assay Results
m) Length* (m)
1 1.35
4 0.95
5 1.15
6 1.1
7 0.9
2 1.5
7 0.5
00 0.50
65 0.65
20 0.85
60 0.60
30 0.70
20 1.00
00 1.00
00 1.00
00 1.00
00 1.00
00 1.00
00 1.00
QF
al
res
tions
rformance Rig
tralia) Bank O
ormation plea
EO Troy Reso1277 |E: troy@Purple Commu6300 | E: aellis
s ‐ March Quarter
Gold Grade (g/t)
Silver Grade (g/t)
0.16 44
0.35 55
0.33 99
2.17 726
0.89 106
2.38 184
1.43 259
1.22 155
0.15 29
0.15 18
0.38 86
0.47 123
0.87 301
3.75 1752
1.01 1134
0.51 438
0.81 582
21.55 2171
3.78 853
QUARTERFor the three
ghts
Options
se contact:
ources NL @troyres.comunications s@purplecom
Grade (g/t)
(Au_eq) (m
0.79 1.Au
1.14 0.A
1.74 2.2Au
12.54
2.40 2.Au5.01
5.13
4.8Au_1fro
3.43 1.Au_e
0.56
0.41 0.
Au_e
1.61 1.Au(In
2.23
5.17 1.
Au_(In
28.78
17.21 14.Au_e
6.77
Inc355m
go
9.12
and4m go
52.56
15.97
RLY REPOe months end31 March 20
87,968,82
2,945,50
60,00
1,585,29
.au
m.com.au
Interval at g/t Au_eq) ‐
Vein
35m at 0.79g/t u_eq (Inca Vein)
95m at 1.14g/t Au_eq K SEXT
25m at 7.02g/t u_eq (Inca Vein)
40m at 4.03g/t _eq (Inca Vein)
80m at 4.45g/t _eq incl 0.8m at 1.76g/t Au_eq om244.5m (Inca
Vein)
15m at 1.81g/t eq from 250.50m (Inca Vein)
85m at 0.41g/t eq from 296.35m (Inca Vein)
30m at 1.94g/t _eq from 334m nca Vein splay?)
00m at 5.17g/t _eq from 337.2m nca Vein splay?)
70m at 26.24g/t eq from 342.50m (Inca Vein)
cluding 347m – m: 8m at 12.55g/t old & 1513.4g/t
silver
d 351m – 355m: grading 16.83g/t old & 1791.5g/t
silver
RT ded 011
12
23
00
00
93
Not
Gol
Pro
The
Gol
CA‐11‐296 243
CA‐11‐297 243
te: (*) The colum
1. Au_eq grThe go
d equivalency is
cessing recoverie
e equivalency is c
d equivalency is 2. NSR – No3. Gold by F4. Silver by
by induct2006. M
Hole ID E
JU‐11‐32 2
JU‐11‐33 2
JU‐11‐34 2
JU-11-35 2
39496 6547741
39382 6547878
mn length represe
rade calculated uold equivalent cu
determined by m
es were determi
calculated by the
calculated by tho Significant ResuFA and either a gthree techniquetively coupled plethod numbers w
asting (m) Nort
(m
2433980 6551
2433968 6551
2433953 6551
2433953 6551
350.3 45
370 45
ents downhole w
using a gold to silut‐off was determ
Au/Ag ra
Au Price
Ag Price
Au proce
Ag procemetal price and r
ned by metallurg
e formula ‐ Gold:
e formula: Au_eqults All samples wgravimetric or AAes: four‐acid digeasma with opticawere GMA, ICP‐A
Tab
thing m)
Depth (m)
1534 149.45
1552 126.55
1587 117.2
1587 144.15
5 ‐60
5 ‐60
widths. At this tim
ver ratio of 1:70mined according
atio 1:70.0
US$933
US$15.
essing recovery 9
essing recovery 8recovery factors.
gical testwork ca
Silver ratio = (g
= (9
= 70
q g/t = Au g/t + (were prepared anAS finish, using mstion followed byal emission spectAR‐39 and silver 4
ble 2: Julieta Target
Az Dip
-45 -65
-45 -65
includi
ng
and
-45 -65
includi
ng
and
0 -90
349.00 350.0
350.00 351.0
351.00 352.0
352.00 353.0
353.00 354.0
354.00 355.0
355.00 355.6
355.60 356.4
356.40 357.2
358.00 359.2
268.80 269.1
270.60 271.7
271.70 272.5
me the Company
. As per May 201to the paramete
00
3.33/oz
.50/oz
93.7%
80.6% Metal prices we
rried out by inde
gold price ÷ silve
933.33 ÷ 15.5) x (
0.00
(Ag g/t ÷ 70.00)nd assayed by Al
method gold 4‐50 y AAS reading fotroscopy (ICP‐OE4A‐50.
t Diamond Core Sig
From (m)
To (m)
62.4 63.05
65.55
66.5
101 102
56.75
69.45
56.75
58.75
61.6 63.4
85.5 86.5
94.5 99.2
60.35
79.1
60.35
68.8
73.85
74.5
84.3 85.1
85.1 86.1
86.1 87.1
00 1.00
00 1.00
00 1.00
00 1.00
00 1.00
00 1.00
60 0.60
40 0.80
20 0.80
20 1.20
15 0.35
70 1.10
50 0.80
has insufficient d
10 Current Caspoers below:
ere the average p
ependent consult
r price) x (gold re
(.937 ÷ .806)
lex Stewart (Assaor gold 4A‐50 fo
or check samples ES) reading for al
nificant Assay Resu
Length* (m)
GoGra(g/
0.65 2.8
0.95 0.7
1 1.7
12.7 4.5
2 6.7
1.8 19.
1 1.9
4.7 0.9
18.75 4.7
8.45 9.1
0.65 10.
0.76 4.8
1.0 2.3
1 2.
QF
1.74 470
6.07 1447
15.65 1197
30.55 2834
3.83 743
17.29 2392
4.46 696
3.71 1766
2.51 1352
0.66 185.5
0.22 67
0.63 81
14.23 3379
data to estimate
so NI‐43101 Tech
prices assumed in
tants on diamond
ecovery ÷ silver r
ayers) Argentina or samples with gup to February 2l samples in mine
ults – March 2011
old de /t)
Silver Grade (g/t)
G
85 65
77 4
70 4
54 18
73 37
24 66
96 7
95 3
71 32
18 60
30 73
82 11
35 13
4 41
QUARTERFor the three
8.45
26.74
32.75
71.04 352
302
14.44
51.46
14.40
28.94
21.82
3.31 1.
Au_(In
1.18 0.
Au_
1.79 1.9Au_
62.50
true widths.
hnical Report
n the Casposo life
d drill core from
recovery)
Laboratory in Mgold>10g/t 2006, aqua regia eralised intersec
Grade (g/t) (Au_eq)
Int
3.78 0.65
0.83 0.95mAu_e
1.76 1m at
4.80 12.7mAu_e
7.25 2m at
20.18 1.8m Au_e
2.06 1m at
0.98 4.7m Au_e
5.16 18.75Au_e
10.04 8.45mAu_e
11.34 0.65mAu_e
4.98
4.762.54
2.99
RLY REPOe months end31 March 20
m – 353m: 1m at 0.55g/t gold & 2834g/t silver
20m at 3.31g/t _eq from 358.0m nca Vein splay?)
35m at 1.18g/t _eq from 268.8m (Inca Vein)
90m at 27.35g/t _eq from 270.6m (Inca Vein )
e of mine plan.
Casposo.
endoza Argentin
digestion followctions after Febru
erval (m at g/t Au_eq)
5m at 3.78 g/t Au_eq
m at 0.83 g/t q
t 1.76 g/t Au_eqm at 4.80 g/t q
t 7.25 g/t Au_eqat 20.18 g/t q
t 2.06 g/t Au_eqat 0.98 g/t q m at 5.16 g/t q
m at 10.04 g/t q
m @ 11.34 g/t q
6m @ 4.85 g/t Au_eq
RT ded 011
13
na.
wed uary
Not
Not
te: (*) The colum
Hole ID Ea
RCCAN‐11‐12
2
RCAN‐11‐13 2
RCAN‐11‐14 2
te: (*) The colum
mn length represe
asting (m) Nort
(m
2439464 655
2439411 65512
2439360 65512
mn length represe
Table 2
ents downhole w
thing m)
Azimuth
1237 355
248.54 350
239.56 15
ents downhole w
Sample ID
908277
908286
908273
908280
908283
908272
908278
908314
908279
908208
908285
908311
908290
908312
908304
908211
908298
908274
908284
2: Julieta Target Dia
widths. At this tim
Table 3: Caspo
h Dip Depth (m)
‐65 102
‐80 81
‐45 66
widths. At this tim
Table 4: ASignificant R
East
630012,00
630009,00
630009,00
630043,00
630007,00
629979,00
630047,00
629833,00
630046,00
626694,00
630004,00
629080,24
630885,00
629956,00
629196,87
626440,00
629204,07
630085,00
630005,00
amond Core Signific
87.1 88.1
88.1 89.1
94.1 94.8
94.8 95.8
95.8 96.8
96.8 97.8
97.8 98.78
me the Company
oso Norte RC Drillin
From m
To m
34.0 35.0
35.0 36.0
40.0 40.5
40.5 41.0
41.0 41.5
41.5 42.0
41.0 41.5
41.5 42.0
42.0 42.5
42.5 43.0
me the Company
Andorinhas MarcinRock Chip Grab Sam
North
9175920,00
9175927,00
9175923,00
9175935,00
9176030,00
9175932,00
9175930,00
9175987,00
9175928,00
9177829,00
9176013,00
9175724,19
9176236,00
9175967,00
9175671,64
9177824,00
9175721,36
9175947,00
9176014,00
cant Assay Results –
1 5.7
1 6.0
0.7 1.3
1 1.9
1 0.
1 4.1
0.98 4.3
has insufficient d
ng Significant Assay
Length* (m)
GoGra(g/
1.0 8.0
1.0 6.8
0.5 1
0.5 5
0.5 4
0.5 1
0.5 1.3
0.5 0.5
0.5 2.2
0.5 2.0
has insufficient d
nho Target mpling Results
Rock Type
VQZ
SBI
VQZ
VQZ
VQZ
VQZ
VQZ
VQZ
SBI
VQZ
VQZ
SBI
SBI
VQZ
VQZ
SSW
SBI
VQZ
SBI
QF
– March 2011 (cont
74 77
04 63
35 20
99 25
6 7
14 41
31 52
data to estimate
y Results
old ade /t)
Silver Grade (g/t)
G
01 131
87 76
0 1
5 1
4 1
7 1
39 5
54 2
28 6
03 6
data to estimate
Au_ppm
32.88
22.67
22.37
14.80
9.17
8.61
7.51
7.34
6.93
6.40
5.31
5.12
4.90
4.77
4.43
3.21
3.01
2.58
2.47
QUARTERFor the three
t.)
6.84
6.94
1.64
4.68
2.35
0.70
4.73
5.05
true widths.
Grade (g/t) (Au_eq)
Int
9.88 2m a
7.96
2.24 2m a
incl Au_
1.20
1.72
2.39
1.46
2m a
incA
0.57
2.37
2.12
true widths.
RLY REPOe months end31 March 20
8m @ 2.96 g/t Au_eq
terval (m at g/t Au_eq)
at 8.92g/t Au_eq from 34m
at 1.89g/t Au_eq from 40m
0.50m at 2.39g/t _eq from 41.50m
at 1.63g/t Au_eq from 41m
cl 1m at 2.24g/t Au_eq from 42
RT ded 011
14
NoteAssa Geo
Info“quahas persFor the Com Thismanmatprodequ
e: All samples wereay on a 50 gram cha
ological information
Is a full time emp
Has sufficient exdefined in the 20
Is a member of t
Has consented in
rmation of a scientalified person” undsufficient experienson” as defined in “further informationgeology, samples c
mpany’s website.
report contains fnagement and are berially from the reduction, developmeipment failure, dela
e prepared and assarge with an AAS fi
in this Report has b
ployee of Troy Reso
xperience which is 004 Edition of the ‘A
he Australasian Inst
n writing to the incl
tific or technical nater National Instrumce, which is relevan“National Instrumenn regarding the Comcollection and testi
forward‐looking stbased on what manesults expressed orent and/or exploraays in obtaining gov
908281
908306
908275
908289
908149
908276
ayed by the RML Minish.
been compiled by T
ources NL
relevant to the typAustralasian Code fo
titute of Mining and
usion of this data
ture in this report wment 43‐101 – “Stant to the style of mnt 43‐101 – Standarmpany’s projects inng procedures plea
tatements. These nagement believes tr implied in the foration activities, chavernmental approva
Table 4: ASignificant Rock
630095,00
629205,30
629958,00
630898,00
628509,00
629960,00
Mine site laboratory
Troy’s Vice Presiden
pe of deposit undeor Reporting of Exp
d Metallurgy
was prepared undendards of Disclosur
mineralisation and trds of Disclosure foBrazil, Australia an
ase refer to the tec
forward‐looking sto be reasonable asrward‐looking statenges in project parals or in the comme
Andorinhas Marcink Chip Grab Samplin
9175959,00
9175667,03
9175966,00
9176196,00
9175504,00
9175968,00
y with selected che
nt Exploration & Bus
er consideration anploration Results, M
r the supervision ore for Mineral Projetype of deposit undr Mineral Projects”nd Argentina, includchnical reports filed
statements reflect ssumptions. A numements. Such factrameters as plans encement of operat
nho Target ng Results (cont.)
VQZ
VQZ
VQZ
VQZ
SBI
VQZ
eck sampling by SGS
siness Developmen
nd to the activity wineral Resources an
f Peter J. Doyle, Vicects”, a Fellow of thder consideration, a. Mr Doyle has revding a description od which are availab
management’s cumber of factors couldtors include, amongcontinue to be reftions.
QF
2.35
2.17
1.46
1.24
1.17
1.14
S Mineral Services L
t, Peter Doyle, who
which he is undertand Ore Reserves’
ce President Explorahe Australasian Instand to the activity hiewed and approveof Troy’s quality assle under the Comp
urrent beliefs based cause actual resulg others, future prined, variations in
QUARTERFor the three
Laboratory using M
o:
aking to qualify as
ration and Business titute of Mining anhe is undertaking, ted the information surance program, qpany’s profile at ww
ed on informationlts, performance, orices of gold, the aore grade or recov
RLY REPOe months end31 March 20
Method FA50 being
a Competent Perso
Development of Trd Metallurgy. Mr. Dto qualify as a “quacontained in this reuality control measww.sedar.com or o
n currently availabor achievements to actual results of cuvery rates, plant an
RT ded 011
15
Fire
on as
roy, a Doyle alified eport. sures, n the
ble to differ urrent nd/or