Quantitatively Engineered Grout Curtains

54
Quantitatively Engineered Grout Curtains David B. Wilson, P.E. Trent L. Dreese, P.E. Case: 3-Line Grout Curtain with Drains Headwater: EL 1000 Tailwater: EL 886 Bottom of Grout Curtain: EL 742 Grout Curtain Permeability: 8e-05 ft/min Rock Conductivity Functions: As shown q (curtain) = 2.39e-02 cfm/ft q (under) = 3.68e-04 cfm/ft q (total) = 2.42e-02 cfm/ft = 0.18 gpm/ft 1e-03 ft/min 1.5e-03 ft/min 1e-04 ft/min 1e-05 ft/min 2e-03 ft/min 1e-05 ft/min 8 9 0 900 910 920 950 960 970 980 9 9 0 2.3861e-002 3.6848e-004 STA 13+00 100 150 200 250 300 350 400 450 500 550 600 650 700 Elevation (ft) (x 1000) 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 SANDSTONE SANDSTONE SANDSTONE 1E-05 m/s (80 Lugeons) 5E-06 m/s (40 Lugeons) 3E-06 m/s (20 Lugeons) ORIGINAL GROUND TEST TRENCH GRADE FINISHED GRADE 512A 513 514A MUDSTONE 3E-07 m/s ( 2 Lugeons) MUDSTONE 3E-06 m/s (20 Lugeons) MUDSTON E 5E-07 m/s (4 Lugeons) BOTTOM OF GROUT CURTAIN SANDSTONE SANDSTONE SANDSTONE 1E-05 m/s (80 Lugeons) 5E-06 m/s (40 Lugeons) 3E-06 m/s (20 Lugeons) ORIGINAL GROUND ORIGINAL GROUND TEST TRENCH GRADE TEST TRENCH GRADE FINISHED GRADE FINISHED GRADE 512A 513 514A MUDSTONE 3E-07 m/s ( 2 Lugeons) MUDSTONE 3E-06 m/s (20 Lugeons) MUDSTON E 5E-07 m/s (4 Lugeons) BOTTOM OF GROUT CURTAIN BOTTOM OF GROUT CURTAIN 2005 Tri-Service Infrastructure Conference “Re-Energizing Engineering Excellence”

Transcript of Quantitatively Engineered Grout Curtains

Page 1: Quantitatively Engineered Grout Curtains

Quantitatively Engineered Grout Curtains

David B. Wilson, P.E.Trent L. Dreese, P.E.

Case: 3-Line Grout Curtain with DrainsHeadwater: EL 1000Tailwater: EL 886Bottom of Grout Curtain: EL 742Grout Curtain Permeability: 8e-05 ft/minRock Conductivity Functions: As shown

q (curtain) = 2.39e-02 cfm/ftq (under) = 3.68e-04 cfm/ftq (total) = 2.42e-02 cfm/ft = 0.18 gpm/ft1e-03 ft/min

1.5e-03 ft/min

1e-04 ft/min

1e-05 ft/min

2e-03 ft/min

1e-05 ft/min

890

900

910

920

950

96097

0980

990

2.3

86

1e

-00

2

3.6

84

8e

-00

4

STA 13+00100 150 200 250 300 350 400 450 500 550 600 650 700

Elev

atio

n (ft

) (x

100

0)

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0.95

1.00

1.05

SANDSTONE

SANDSTONE

SANDSTONE

1E-05 m/s (80 Lugeons)

5E-06 m/s (40 Lugeons)

3E-06 m/s (20 Lugeons)

ORIGINAL GROUND

TEST TRENCH GRADE

FINISHED GRADE

512A

513514A

MUDSTONE 3E-07 m/s ( 2 Lugeons)

MUDSTONE3E-06 m/s (20 Lugeons)

MUDSTONE5E-07 m/s (4 Lugeons)

BOTTOM OF GROUT CURTAIN

SANDSTONE

SANDSTONE

SANDSTONE

1E-05 m/s (80 Lugeons)

5E-06 m/s (40 Lugeons)

3E-06 m/s (20 Lugeons)

ORIGINAL GROUNDORIGINAL GROUND

TEST TRENCH GRADETEST TRENCH GRADE

FINISHED GRADEFINISHED GRADE

512A

513514A

MUDSTONE 3E-07 m/s ( 2 Lugeons)

MUDSTONE3E-06 m/s (20 Lugeons)

MUDSTONE5E-07 m/s (4 Lugeons)

BOTTOM OF GROUT CURTAINBOTTOM OF GROUT CURTAIN

2005 Tri-Service Infrastructure Conference

“Re-Energizing Engineering Excellence”

Page 2: Quantitatively Engineered Grout Curtains

Introduction

Page 3: Quantitatively Engineered Grout Curtains

Grouting – It Seems So Simple !

Page 4: Quantitatively Engineered Grout Curtains

Interesting Grouting Comments• “The foundation wasn’t groutable”

• “Grouting isn’t reliable as a long-term solution”

• “There’s no way to know how the grouting will perform untilwe fill it up.”

• “The only person that can understand the grouting work isthe guy onsite that’s in charge of the program”

• “We spent $2,000,000 and didn’t accomplish anything. Idon’t think we’ll ever be authorized to try grouting again.”

• “We grouted until we ran out of budget and then we quit.”

Page 5: Quantitatively Engineered Grout Curtains

Grouting Program Failures

• Inability to reliably predict performance in advance

• Unsatisfactory initial performance

• Unsatisfactory long-term performance

• Cost overruns, project delays, & claims

• Inability to effectively communicate need for grouting,amount of grouting required, and results of grouting

Page 6: Quantitatively Engineered Grout Curtains

The Central Question

Is There Something Fundamentally Wrong withGrouting, or Does the Grouting Precisely Reflect

How We Approach & Execute the Work ?

Page 7: Quantitatively Engineered Grout Curtains

Grouting 2005• Grouting results can be predicted

• Grouting can be designed, modeled, specified, andverifiably constructed to achieve quantitative results

• Grouting results can be clearly understood andcommunicated

• Contracting alternatives exist that will provideincentives for quality equipment and workmanshipand which will prevent cost growth and claims

• Grouting is a reliable & cost effective method forseepage control

Page 8: Quantitatively Engineered Grout Curtains

Tools Enabling Successful QuantitativeDesign and Construction

• Quantitative site characterization, quantitativemodeling, and quantitative design of grouting

• Balanced stable grouts

• Electronic monitoring and control of operations

• Computer analysis & presentation of results

• Best Value Contracting and Partnering

Page 9: Quantitatively Engineered Grout Curtains

Quantitative Design &Construction of Grouting

Page 10: Quantitatively Engineered Grout Curtains

What Do We Need for QuantitativeDesign & Construction ?

• Thorough understanding of site geology

• Pre-grouting permeabilities

• Workable model for pre- and post-grouting conditions

• Performance requirements

• Design parameters for grouting (width & permeability)

• Real-Time Analysis & Verification to Evaluate Results andProvide Basis for Required Program Modifications in Field

• Ability to Communicate Results to All Project Participants

Page 11: Quantitatively Engineered Grout Curtains

Site Geology

Page 12: Quantitatively Engineered Grout Curtains

Site Geology Information Required• Regional & Site Specific Geologic Information

• Fracture Information for each geologic unit or sub-unit– Fracture orientations– Fracture widths– Fracture spacings– Fracture continuity– Fracture filling

• Special Conditions– Conditions at interface at which grouting is to start– Special geologic conditions (i.e. karst features; non-lithified zones;

concentrated fracture zones; water loss zones; artesian zones; etc)

Page 13: Quantitatively Engineered Grout Curtains

Geologic Data Collection

Page 14: Quantitatively Engineered Grout Curtains

Outcrop Mapping andConventional Coring

Page 15: Quantitatively Engineered Grout Curtains

Video Logging &Geophysical Techniques

McCook Reservoir Test Grouting – Chicago District USACE

Page 16: Quantitatively Engineered Grout Curtains

Pre-Grouting Permeabilities&

Flow Regimes

Page 17: Quantitatively Engineered Grout Curtains

Data Sources

Page 18: Quantitatively Engineered Grout Curtains

Permeability & Flow Regime Data Sources

• Geologic Information

• Piezometer Data

• Boundary Conditions (HW, TW, Seepage ExitPoints)

• Short Stage Pressure Tests in Holes withAppropriate Orientations

Page 19: Quantitatively Engineered Grout Curtains

Data Validation & Integration

• Validate the available data

• All valid data must be integrated

• Study it until it truly makes qualitative andquantitative sense. In most cases, sufficient validdata exists to do a model that and produces areasonable representation of current conditions.

• Don’t ignore anomolies. Something is going on.

Page 20: Quantitatively Engineered Grout Curtains

SANDSTONE

SANDSTONE

SANDSTONE

1E-05 m/s (80 Lugeons)

5E-06 m/s (40 Lugeons)

3E-06 m/s (20 Lugeons)

ORIGINAL GROUND

TEST TRENCH GRADE

FINISHED GRADE

512A

513514A

MUDSTONE 3E-07 m/s ( 2 Lugeons)

MUDSTONE3E-06 m/s (20 Lugeons)

MUDSTONE5E-07 m/s (4 Lugeons)

BOTTOM OF GROUT CURTAIN

Page 21: Quantitatively Engineered Grout Curtains

Grouting Models

Page 22: Quantitatively Engineered Grout Curtains

Discrete Fracture Flow Modelsvs.

Porous Media Flow Models

Page 23: Quantitatively Engineered Grout Curtains

Flow through Rock is DiscreteFracture Flow

Page 24: Quantitatively Engineered Grout Curtains

Discrete Fracture Models

• Based on flow through parallel plates

• Q = Wgb3i / 12m– b = fracture width– W = fracture access length– i = gradient from entry to exit boundary points– g = unit weight of water– m = dynamic visosity of water

Page 25: Quantitatively Engineered Grout Curtains

For 20 ungrouted 2mm fractures 20 ft long eachand under I = 5, Q = 20 x 20 x 5 = 2000 gpm

Page 26: Quantitatively Engineered Grout Curtains

Q = 700 gpm per ft of length(Under i = 1)

Page 27: Quantitatively Engineered Grout Curtains

So Why Not Use Discrete Fracture Models ?

• Fractures aren’t parallel plates

• Fracture width “b” is extremely difficult to ascertain.

• Generally don’t know fracture continuity, which isessential for “W” term

• Requires knowing number fractures in eachfracture set as well as size distribution

Page 28: Quantitatively Engineered Grout Curtains

Porous Media Flow Models

Page 29: Quantitatively Engineered Grout Curtains

Why Porous Media Models Work• Scale of problem is generally ok (i.e. fracture density

relative to volume being modeled is such that itapproximates a porous media).

• Data easy to get – packer tests determine equivalent rockmass permeability

• For well-grouted rock, the residual permeability iscomprised of very small flow paths that very closelyapproximates a porous media

• After grouting, assuming we achieve about a two-ordermagnitude of permeability reduction, the ungrouted rock oneither side does not control behavior.

Page 30: Quantitatively Engineered Grout Curtains

Examples of Porous MediaModels

Page 31: Quantitatively Engineered Grout Curtains

Case: 3-Line Grout Curtain with DrainsHeadwater: EL 1000Tailwater: EL 886Bottom of Grout Curtain: EL 742Grout Curtain Permeability: 8e-05 ft/minRock Conductivity Functions: As shown

q (curtain) = 2.39e-02 cfm/ftq (under) = 3.68e-04 cfm/ftq (total) = 2.42e-02 cfm/ft = 0.18 gpm/ft1e-03 ft/min

1.5e-03 ft/min

1e-04 ft/min

1e-05 ft/min

2e-03 ft/min

1e-05 ft/min

890

900

910

920

950

96097

0980

9902

.38

61

e-0

02

3.6

84

8e

-00

4

STA 13+00100 150 200 250 300 350 400 450 500 550 600 650 700

Ele

vatio

n (ft

) (x

100

0)

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0.95

1.00

1.05

PENN FOREST DAM REPLACEMENT PROJECTFINAL GROUT CURTAIN - VALLEY SECTION

Page 32: Quantitatively Engineered Grout Curtains

114 114

No Containment System 1-Lu Grout Curtain

Sophisticated 3D Flow Model

Page 33: Quantitatively Engineered Grout Curtains

(OB)

(R)

(SR)

(J)

(K)

(E)

(W)

(BFA)

Scales (S)

H

qx = k * H/W *T

QT = Σ (qx * L)

W

Chicago McCook Reservoir

Chicago District, USACE

Page 34: Quantitatively Engineered Grout Curtains

Things to Remember• The sophistication of the model is far less

important than the quality of the data and thefundamental correctness of the model

• Defective grouting (i.e. missed fractures) may leakvery badly due to discrete fracture flow rules and isfurther aggravated by increased gradients.Essential to directly access all fractures atappropriate interval while grouting.

• Poor grouting (i.e. partially unfilled fractures) willleak proportionally to the residual fracturethickness cubed. Essential to go to very tightrefusal criteria and use non-bleed grouts.

Page 35: Quantitatively Engineered Grout Curtains

Establishing ProjectPerformance Requirements

Page 36: Quantitatively Engineered Grout Curtains

Methods for Setting Performance Requirements

• Permissible total seepage rates or unit seepage rates

• Desired pressure distributions

• Gradient limitations

• Residual fracture widths

• Cost-benefit analyses

• Compatibility with other elements in combined cutoffsystems

• Environmental considerations

Page 37: Quantitatively Engineered Grout Curtains

Examples of ProjectPerformance Requirements

Page 38: Quantitatively Engineered Grout Curtains

Penn ForestReplacement Dam• Length = 2500 ft• Head = 180 ft

• Design Total ResidualSeepage < 200 gpm

• Required ResidualPermeability = 3 Lugeon

Page 39: Quantitatively Engineered Grout Curtains

Table 6.3Benefit of Seepage Reduction vs. Cost of Grouting - $25 Million Project

Cost of Seepage per MGD = $3,125,000

Curtain Configurationand PerformanceCharacteristics

EstimatedSeepageQuantity(MGD)

Total Valueof Residual

Seepage

Cost BenefitAchieved byAlternative

ConstructionCost for

Alternative

BenefitCostRatio

IncrementalBenefits forIncreasedIntensity

IncrementalCosts forIncreasedIntensity

Ungrouted w/ Drains 1.27 $3,969,000

1-Line Curtain (5 Lu) 0.46 $1,438,000 $2,531,000 $1,335,000 1.90 $2,531,000 $1,335,000

3-Line Curtain (3 Lu) 0.23 $719,000 $3,250,000 $2,410,000 1.35 $719,000 $1,075,000

3-Line Curtain (1 Lu) 0.08 $250,000 $3,769,000 $2,870,000 1.31 $519,000 $460,000

Table 6.4Benefit of Seepage Reduction vs Cost of Grouting - $30 Million Project

Cost of Seepage per MGD = $3,750,000

Curtain Configurationand PerformanceCharacteristics

EstimatedSeepageQuantity(MGD)

Total Valueof Residual

Seepage

Cost BenefitAchieved byAlternative

ConstructionCost for

Alternative

BenefitCostRatio

IncrementalBenefits forIncreasedIntensity

IncrementalCosts forIncreasedIntensity

Ungrouted w/ Drains 1.27 $4,763,000

1-Line Curtain (5 Lu) 0.46 $1,725,000 $3.038,000 $1,335,000 2.28 $3,038,000 $1,335,000

3-Line Curtain (3 Lu) 0.23 $862,500 $3,900,500 $2,410,000 1.62 $862,500 $1,075,000

3-Line Curtain (1 Lu) 0.08 $300,000 $4,463,000 $2,870,000 1.56 $562,500 $460,000

Hunting Run DamPump Storage Drought Supply

Incremental Cost Benefit Analysis – Grouting Cost vs. Water Value5 Lu Criteria Selected

Page 40: Quantitatively Engineered Grout Curtains

Mississinewa DamSlurry Wall Pre-Grouting

• Prevent catastrophicloss of slurry duringpanel excavation

• Minimum groutingnecessary

• Entire 12-ft widthgrouted to 10 Lu to limitroutine slurry loss tomanageable rates

Embankment,Till, & Alluvium

Liston Creek

Mississinewa

Page 41: Quantitatively Engineered Grout Curtains

(OB)

(R)(SR)

(J)

(K)

(E)

(W)

(BFA)

Scales (S)

Chicago McCook CSO Storage Reservoir Perimeter Grouting

• Grout as tightly aspossible forenvironmentalcontainment

• Hydraulic fluxcompatibility withsoil-bentonitecutoff inoverburden

• 0.1 Lugeon Goal

Page 42: Quantitatively Engineered Grout Curtains

Grouting Design Parameters

Page 43: Quantitatively Engineered Grout Curtains

Parameters Required forGrouting Design

• Width of grouted zone for single and multiple lineconfigurations– Radius of spread varies with fracture size, pressure, duration, mix– Reasonable to assume 5 ft effective radius of spread

• Realistically achievable residual permeability for single andmultiple line configurations

“This is where it gets a bit dicey”

Page 44: Quantitatively Engineered Grout Curtains

Generally Available Design Guidelines• Readily groutable materials

– k > 1 x 10-3 cm/sec (> 100 Lugeons)– Reductions of 1-3 orders of magnitude

(depending on a number of factors)

• Marginally groutable materials– k = 1 x 10-4 cm/sec (10 Lugeons)– Reductions of 1-2 orders of magnitude

(depending on a number of factors)

• Barely groutable materials– k < 1 x 10-5 cm/sec (1 Lugeon)– Require special measures

Page 45: Quantitatively Engineered Grout Curtains

Given the potential range ofresidual permeabilities, is

expected Q = 10 gpm or 100 gpmor 1,000 gpm or 10,000 gpm, and

what are the “factors” thatdetermine the results we should

reasonably expect?

Page 46: Quantitatively Engineered Grout Curtains

Factors Affecting Grouting• Geology• Drilling technique• Grout Materials• Grout Mixes• Mixing Equipment• Hole Washing• Grout Pumping

Equipment• System Setup• Valves and fittings• Bleed• Grouting technique

• Hole spacing• Hole depth• Hole sequencing• Hole staging• Pressures• Contractor experience• Refusal criteria• Contract incentives &

disincentives• Inspection & control• Testing & analysis

Page 47: Quantitatively Engineered Grout Curtains

Realities of Grouting

• Grouting results are absolutely affectedby all of the factors

• Some variables have been essentiallyeliminated in current industry practice

• Remaining variables can be groupedinto various design / constructionperformance levels

Page 48: Quantitatively Engineered Grout Curtains

QEGC Predicted Results vs. Project Results

1.0E-08

1.0E-07

1.0E-06

1.0E-05

1.0E-04

1 2 3 4

Grouting M & T Level

Res

idua

l Per

mea

bilit

y (m

/s)

SINGLE LINE

TRIPLE LINE

(80 Lu)

(800 Lu)

(8 Lu)

(1 Lu)

Page 49: Quantitatively Engineered Grout Curtains

Real-Time Analysis & Verificationand Communication of Results

Page 50: Quantitatively Engineered Grout Curtains

IntelliGrout Control & Analysis Center

Page 51: Quantitatively Engineered Grout Curtains

ContractingIssues

Page 52: Quantitatively Engineered Grout Curtains

Contracting for Performance

• Must structure and prepare contract documents to ensure that you get theend products and services desired

• Quality of equipment and personnel is critical

• Contracts must not contain disincentives to achieving quality results

• Low bid contracting doesn’t work – operating at this level is not acommodity

• Best Value Selection is being used by USACE and is best option

Page 53: Quantitatively Engineered Grout Curtains

Special RecognitionMike Klosterman, Geologist, HQ USACE

Steve Hornbeck, Geologist, Louisville District

Tim Flaherty, Geologist, Louisville District

Kevin Jefferson, Contracting Officer, Louisville District

Bill Rochford, Engineer, Chicago District

Joe Kissane, Geologist, Chicago District

Larry Green, Contracting Officer, Chicago District

Mark Harris, Geologist, Little Rock District

Pat Jordan, Geologist, Little Rock District

Jon Wedgeworth, COR, Little Rock District

R. Leroy Arnold, Engineer, Little Rock District

Page 54: Quantitatively Engineered Grout Curtains

Thank You

David B. Wilson P. E. Gannett Fleming, Inc.717-763-7211