? Prefab is about building better. It offers the following key benefits: WHY PREFAB? HEALTH + SAFETY Reducing time at height on site reduces health and safety incidents. PrefabNZ Value Case 2014 Email Postal | [email protected] | www.prefabnz.com PO Box 19-063 Courtenay Place Wellington 6149 New Zealand QUALITY 91 % of new houses have defects 87 % of houses have quality defects BRANZ SR316 2014 TIME 60 % of construction time can be reduced through offsite construction. PrefabNZ Value Case 2014 DESIGN prefab does not mean repetitive design or standardised housing outcomes. PrefabNZ Value Case 2014 PRODUCTIVITY 10% lift in construction industry productivity equates to a 1% lift in Gross Domestic Product. PWC 2010 Price Waterhouse Coopers estimates a 10 % 1 G.D.P % = COST PrefabNZ Value Case 2014 15 % saving $32,000 157m 2 Prefab delivery can mean a saving of about 15% in total construction cost – $32,000 for a 157m2 house. SUSTAINABILITY International research points to waste minimisation savings in the order of 2.5% of the traditional tender price. % PrefabNZ Value Case 2014 2.5

Transcript of QUALITY TIME 60 Prefab A4... · 2017. 5. 30. · Prefab is about building better. It offers the...

Page 1: QUALITY TIME 60 Prefab A4... · 2017. 5. 30. · Prefab is about building better. It offers the following key benefits: WHY PREFAB? HEALTH + SAFETY Reducing time at height on site

?

Prefab is about building better.

It offers the following key benefits:

WHY PREFAB?

H E A L T H + S A F E T Y

Reducing time at height on site reduces health and safety incidents.

PrefabNZ Value Case 2014

Email Postal

| [email protected]

|

www.prefabnz.com

PO Box 19-063Courtenay PlaceWellington 6149New Zealand

Q U A L I T Y

91%

of new houses have defects

87%

of houses have quality defects

BRANZ SR316 2014

T I M E

60 %

of construction time can be reduced through offsite construction.

PrefabNZ Value Case 2014

D E S I G N

prefab does not mean repetitive design or standardised housing outcomes.

PrefabNZ Value Case 2014

P R O D U C T I V I T Y

10% lift in construction industry productivity equates to a 1% lift in Gross Domestic Product.

PWC 2010

Price Waterhouse Coopers estimates a

10% 1 G.D.P%=

C O S T

PrefabNZ Value Case 2014

15%saving

$32,000157m2

Prefab delivery can mean a saving of about 15% in total construction cost – $32,000 for a

157m2 house.

S U S T A I N A B I L I T Y

International research points to waste minimisation savings in the order of 2.5% of the traditional tender price.

%

PrefabNZ Value Case 2014

2.5