Quality Management Project

1
Mo’tasem H.Y.Abushanap, Bahçeşehir University Department of İndustrial Engineering, Bahçeşehir University Acknowledgments The appriciation and all thanks to My instructor Assist.Prof.Dr. Demet ÖZGÜR ÜNLÜAKIN , for the whole effort she gave by explaning concept and principle. And to Hamdi Abushanap co. For thier coboration by giving the required data and answering the questions. Conclusions In all statistical process control tools, the process appears to be in control according to the USL=50 and LSL= 35 m2 per 2 hours. Aim This İs an approach to check a stone cutting process if it is in control or not, by applying several methods and charts, such as: 1- Histogram. 2- Run chart. 3- Scattered chart. 4- statistical process control by the mean of X- bar, R, S and Moving averages, EMWA and cumulative sumation. Introduction A Quality management concept application, to verify a process whether it is in control or not ın a company. Company Name : Hamdi Abushanap and Parts co. Location: Amman-Jordan. Profession: Marble and Stone Products. X-Bar R chart X-Bar S chart I-MR chart EMWA chart CUSUM chart Process Capability Moving Average chart Run chart Scatterplot Probability Plot Timeseries Plot Histogram Critical to Quatlity Characters The CTQ of the cutting process could be specified as: 1- hardness: how hard the piece is. 2- Color: how much the color could be the same or homogenous. eng- [email protected]

description

By using:1-X-bar-R charts.2-X-bar-S charts.3- I-MR charts.4- EMWA.5-CUSUM.6- Process Capability.

Transcript of Quality Management Project

Page 1: Quality Management Project

Mo’tasem H.Y.Abushanap, Bahçeşehir UniversityDepartment of İndustrial Engineering, Bahçeşehir University

Acknowledgments

The appriciation and all thanks to My instructor Assist.Prof.Dr. Demet ÖZGÜR ÜNLÜAKIN, for the whole effort she gave by explaning concept and principle.

And to Hamdi Abushanap co. For thier coboration by giving the required data and answering the questions.

Acknowledgments

The appriciation and all thanks to My instructor Assist.Prof.Dr. Demet ÖZGÜR ÜNLÜAKIN, for the whole effort she gave by explaning concept and principle.

And to Hamdi Abushanap co. For thier coboration by giving the required data and answering the questions.

Conclusions

In all statistical process control tools, the process appears to be in control according to the USL=50 and LSL= 35 m2 per 2 hours.

Conclusions

In all statistical process control tools, the process appears to be in control according to the USL=50 and LSL= 35 m2 per 2 hours.

Aim This İs an approach to check a stone cutting process if it is in control or not, by applying several methods and charts, such as:1- Histogram.2- Run chart.3- Scattered chart.4- statistical process control by the mean of X-bar, R, S and Moving averages, EMWA and cumulative sumation.

 

Aim This İs an approach to check a stone cutting process if it is in control or not, by applying several methods and charts, such as:1- Histogram.2- Run chart.3- Scattered chart.4- statistical process control by the mean of X-bar, R, S and Moving averages, EMWA and cumulative sumation.

 

Introduction A Quality management concept application, to verify a process whether it is in control or not ın a company.Company Name : Hamdi Abushanap and Parts co.Location: Amman-Jordan.Profession: Marble and Stone Products.

Introduction A Quality management concept application, to verify a process whether it is in control or not ın a company.Company Name : Hamdi Abushanap and Parts co.Location: Amman-Jordan.Profession: Marble and Stone Products.

X-Bar R chart

X-Bar S chart

I-MR chart

EMWA chart

CUSUM chart

X-Bar R chart

X-Bar S chart

I-MR chart

EMWA chart

CUSUM chart

Process Capability

Moving Average chart

Run chart

Scatterplot

Probability Plot

Process Capability

Moving Average chart

Run chart

Scatterplot

Probability Plot

Timeseries Plot

Histogram

Timeseries Plot

Histogram

Critical to Quatlity Characters The CTQ of the cutting process could be specified as:1- hardness: how hard the piece is.2- Color: how much the color could be the same or homogenous.

 

Critical to Quatlity Characters The CTQ of the cutting process could be specified as:1- hardness: how hard the piece is.2- Color: how much the color could be the same or homogenous.

 

[email protected]