Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1...

48
Qty Unit Rate Amount BILL 1 : MAIN BUILDING (KES) (KES) BILL 1 : GODOWN ART CENTRE Element No.1 : Substructure (All Provisional) Clearing site A Clear site of grass, bushes, shrubs, hedges, grub up roots and cart away to tips as directed 11,516 sm 30 345,480.00 Excavations B Excavate to reduce levels not exceeding 600mm deep, load and cart away from site 6,910 m 3 300 2,073,000.00 C Excavate foundation trenches not exceeding 1500mm deep from reduced level 362 m 3 300 108,600.00 D Excavate column pits not exceeding 1500mm deep from reduced level 252 m 3 300 75,600.00 E Excavate to reduce levels exceeding 600mm deep, load and cart away from site. 1,500 m 3 450 675,000.00 Disposal of excavated materials F Return fill and ram selected excavated materials around foundations 358 m 3 100 35,800.00 G Imported fillings, rolled, levelled and compacted in 150mm layers to make up levels 113 m 3 400 45,200.00 H Load cart away 256 m 3 200 51,200.00 Planking and Strutting I Allow for Planking and strutting Item 20,000 20,000.00 Disposal of Water J Allow for keeping excavation free from all water Item 20,000 20,000.00 Carried to collection 3,449,880.00 Section No. 1: Measured Works BILL NO. 1: MAIN BUILDING Element No. 1: Substructures Proposed Redevelopment of the Godown Art Cntre for Godown Art Centre ©Anne Ikenye

Transcript of Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1...

Page 1: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Qty Unit Rate AmountBILL 1 : MAIN BUILDING (KES) (KES)BILL 1 : GODOWN ART CENTREElement No.1 : Substructure (All Provisional)

Clearing site

A Clear site of grass, bushes, shrubs, hedges, grub up roots and cart away to tips as directed

11,516 sm 30 345,480.00

Excavations

B Excavate to reduce levels not exceeding 600mm deep, load and cart away from site

6,910 m3 300 2,073,000.00

C Excavate foundation trenches not exceeding 1500mm deep from reduced level

362 m3 300 108,600.00

D Excavate column pits not exceeding 1500mm deep from reduced level 252 m3 300 75,600.00

E Excavate to reduce levels exceeding 600mm deep, load and cart away from site.

1,500 m3 450 675,000.00

Disposal of excavated materials

F Return fill and ram selected excavated materials around foundations 358 m3 100 35,800.00

G Imported fillings, rolled, levelled and compacted in 150mm layers to make up levels

113 m3 400 45,200.00

H Load cart away 256 m3 200 51,200.00

Planking and Strutting

I Allow for Planking and strutting Item 20,000 20,000.00

Disposal of Water

J Allow for keeping excavation free from all water Item 20,000 20,000.00

Carried to collection 3,449,880.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 1: SubstructuresProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne Ikenye

Page 2: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

BILL 1 : MAIN BUILDINGElement No.1 : Substructure (All Provisional) - Cont'd

Hardcore filling

A 300mm thick fillings, rolled, levelled and compacted in 150mm layers to make up levels

3,196 sm 450 1,438,200.00

B 50mm Stone dust blinding to surface of hardcore 3,196 sm 100 319,600.00

Damp Proof Membrane

C Single layer of 1000 gauge polythene sheeting laid on blinded hardcore with 150 mm side laps to receive concrete

3,196 sm 200 639,200.00

Anti - termite treatment

DTreat surface of hardcore with 'Dieldrin' or similar approved ant-termite solution applied strictly in accordance with the manufacturer's instructions

3,196 sm 160 511,360.00

Concrete work

Plain concrete (1:4:8) in : -

E 50mm blinding under strip foundations 25 sm 475 11,875.00

F Ditto under column bases 210 sm 475 99,750.00

Vibrated Reinforced Concrete Class 20 in :-

G Strip Foundations 76 m3 12,000 912,000.00

H Column bases 53 m3 12,000 636,000.00

I Columns 12 m3 12,000 144,000.00

J 100mm thick surface bed 3,196 sm 1,200 3,835,200.00

Carried to collection 8,547,185.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 1: SubstructuresProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No.1 : Substructure (All Provisional) - Cont'd

Page 3: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Supply and fix steel bar reinforcement including bending, hooking, tying wire, cutting spacers and supporting all in position

High yield square twisted bar reinforcement to B.S. 4461 :-

A 8mm diameter bars 1,027 kgs 150 154,050.00

B 10mm ditto 1,086 kgs 150 162,900.00

C 12mm ditto 2,204 kgs 150 330,600.00

16mm ditto 1,177 kgs 150 176,550.00Steel fabric mesh reinforcement to B.S. 4483

D BRC mesh fabric reinforcement ref A142 (weighing 2.2kg/sm) laid in ramp (measured net-no allowance made for lamps)

3,196 sm 450 1,438,200.00

Sawn formwork to: -

E Vertical sides of strip footing 302 sm 600 181,200.00

F Sides of column bases 210 sm 600 126,000.00

G Ditto columns 171 sm 600 102,600.00

H Vertical edges of slab 75 -150mm high 276 m 120 33,120.00

Masonoy

Medium chisel dressed natural stone walling bedded in cement and sand mortar as before described including reinforcing with hoop iron ties every alternate course.

I 200mm thick walling 453 sm 1,600 724,800.00

Carried to collection 3,430,020.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 1: SubstructuresProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne Ikenye

Page 4: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

BILL 1 : MAIN BUILDINGElement No.1 : Substructure (All Provisional) - Cont'd

Cement/sand (1:3)

A 12mm Thick external rendering to plinth surfaces finished smooth with a wood float

42 sm 250 10,500.00

B Prepare and apply two coats of bituminous paint to rendered surfaces externally

42 sm 300 12,600.00

Carried to collection 23,100.00

COLLECTION

Brought forward from page GF/1 3,449,880.00

Brought forward from page GF/2 8,547,185.00

Brought forward from page GF/3 3,430,020.00

Brought down from above 23,100.00

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 15,450,185.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 1: SubstructuresProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 2 : Reinforced Superstructure Concrete

Vibrated Reinforced concrete Class 20/20 in :-

Page 5: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

A Beams and lintols 204 m3 12,000 2,448,000.00

B 150mm thick suspended slab 6,348 sm 1,800 11,426,400.00

C Columns 82 m3 12,000 984,000.00

Supply and fix steel bar reinforcement including bending, hooking, tying wire, cutting spacers and supporting all in position

High tensile square twisted to BS 4461 as described in:-

D 8mm diameter bars 6,871 kgs 150 1,030,650.00

E 10mm ditto 46,844 kgs 150 7,026,600.00

F 12mm ditto 180,082 kgs 150 27,012,300.00

16mm ditto 12,159 kgs 150 1,823,850.00Sawn formwork as described to:-

G Horizontal soffits of slabs 6,348 sm 600 3,808,800.00

H Vertical sides and soffites of beams and lintols 1,701 sm 600 1,020,600.00

I Vertical edges of slab 75 - 150mm 612 m 120 73,440.00

J Vertical sides of columns 1,500 sm 600 900,000.00

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 57,554,640.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 2: Reinforced Concrete SuperstructureProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 3: Staircase

Vibrated reinforced concrete class 20 in:-

A Toe beams (1m3) Item 14,120.00

B Staircase 19 m3 12,000 228,000.00

Page 6: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

C 150mm thick landings 22 sm 1,800 39,600.00

Supply and fix steel bar reinforcement including bending, hooking, tying wire, cutting spacers and supporting all in position

High tensile square twisted to BS 4461 as described in:-

D 10mm diameter bars 183 kgs 150 27,450.00

E 12mm ditto 333 kgs 150 49,950.00

Sawn formwork as described to:-

F Sloping soffites of staircases 37 sm 600 22,200.00

G Ditto but landings 22 sm 600 13,200.00

H Vertical edges of risers and sides of toe beams girth 150 - 225mm 216 m 135 29,160.00

I Opening edge of string of 300 mm wide (extreme) including cutting to profile of treads and risers

40 m 120 4,800.00

STAIRCASE FINISHES

Cement and sand (1:3) in:

J 30mm thick screed finished to receivegranite tiles 22 sm 300 6,600.00

K Ditto to 300mm wide treads 216 lm 100 21,600.00

L Ditto to 150mm high risers 216 lm 55 11,880.00

M Ditto to 200-300mm wide edge of sloping staircase 40 lm 100 4,000.00

Carried to Collection 472,560.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 3: StaircaseProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 3: Staircase - Cont'd

Supply and fix approved polished granite floor tiles from an approved stockist

A 600 x 600 x 20mm thick fixed with an approved adhesive on prepared screed (m/s)

22 sm 1,200 26,400.00

B Ditto in 300mm wide treads and complete with and including approved non-slip grooves

216 lm 200 43,200.00

Page 7: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Supply and fix approved colour glazed ceramic floor tiles from an approved stockist - Cont'd

C 600 x 600 x 20mm thick fixed with an approved adhesive 150mm high risers

216 lm 180 38,880.00

D Ditto in 100mm x 20mm skirting 30 lm 150 4,500.00

E Ditto 200-300mm wide edge of sloping staircase 40 lm 200 8,000.00

F Raking cutting to ceramic tiles 40 lm 200 8,000.00

Prepare and apply one undercoat and two finishing coats of silk vinyl paint to

G Plastered soffites of suspended slab 22 sm 300 6,600.00

H Ditto slopping soffites 37 sm 300 11,100.00

Wrot mahogany joinery grade

I Ex 100 x 75mm moulded timber handrail fixed to balusters on dovetailed joint

26 m 1,250 32,500.00

J Extra over 100 x 75mm handrail for mitred joints 12 no 500 6,000.00

Cold formed steel sections to KS 02-104 once shop-primed with red-oxide.

60 x 60 x 6mm equal angle section

K Tread edge protection built into concrete steps 216 m 600 129,600.00

Carried to collection 314,780.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 3: StaircaseProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 3: Staircase - Cont'd

Balustrade

A

Mild steel balustrade comprisisng 50mm wide x 6mm thick flat bar top rail drilled with 5mm diameter holes for screwing in mahogany handrail (m.s.), supported by 1000mm high 50mm wide x 6mm thick flat bar sections at 500mm centers, infilled with 12mm diameter round bars welded horizontally to flat bar sections at 150mm centers.

26 m 5,000 130,000.00

Painting and decorating

Prepare and apply three coats plastic emulsion paint as described:-

Page 8: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

B Plastered soffits of stairs 37 sm 300 11,100.00

C Open edge of staircase, 300 mm wide (extreme) and to profile of treads and risers

40 m 90 3,600.00

Prepare and apply one coat aluminium primer on back of wood before fixing

D Surfaces not exceeding 100 mm girth 26 m 15 390.00

Knot, prime, stop and apply three coats matt polyurethane clear lacquer to woodwork as described

E Ditto not exceeding 100 mm girth 26 m 50 1,300.00

BALUSTRADES ON BALCONIES

F

Mild steel balustrade comprisisng 50mm wide x 6mm thick flat bar top rail drilled with 5mm diameter holes for screwing in mahogany handrail (m.s.), supported by 1000mm high 50mm wide x 6mm thick flat bar sections at 500mm centers, infilled with 12mm diameter round bars welded horizontally to flat bar sections at 150mm centers.(Balconies)

20 m 5,000 100,000.00

Carried to collection 246,390.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 3: StaircaseProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 3: Staircase - Cont'd

COLLECTION

Brought forward from page GF/6 472,560.00

Brought forward from page GF/7 314,780.00

Brought forward from page GF/8 246,390.00

Page 9: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 1,033,730.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 3: StaircaseProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 4: Superstructure Walling

Dressed natural stone walling bedded and jointed in cement and sand (1:4) mortar including reinforcing with 25mm wide hoop iron every alternate course

A 200mm thick walls externally 2,032 sm 1,500 3,048,000.00

B Ditto internally 3,119 sm 1,500 4,678,500.00

C 100mm thick walls internally 919 sm 1,500 1,378,500.00

Approved hessian based damp proof course

D 200mm wide 286 m 150 42,900.00

Page 10: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 9,147,900.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 4: Superstructure wallingProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 5: Windows

Window cill

A 100 x 150mm scratched clay bricks window cill 359 m 450 161,550.00

Metal windows in 3mm thick sections

Supply and fix the following purpose made cottage type Steel Casement windows in standard Z-Sections and fixed to 100x50mm steel subframe all round complete with intergrated burglar proofing in double 30 x 6mm thick flat bars, lugs, hinges, approved imported brass window stays and handles, with built-in permanent vents at top all primed with red lead oxide after fabrication

B Window overall size 4000 x 2500mm high comprising openable and fixed lights to Architect's detail

20 no 50,000 1,000,000.00

C Ditto size 4500 x 2500mm high 45 no 56,250 2,531,250.00

D Ditto size 600 x 600mm high 63 no 1,800 113,400.00

E Ditto size 4000 x 1,800mm high 4 no 36,000 144,000.00

F Ditto size 2500 x 2500mm high 9 no 31,250 281,250.00

Glazing

Page 11: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

G 4mm Thick clear sheet glass and glazing to metal with putty 791 sm 1,100 870,100.00

H 4mm Thick obscure glass ditto 23 sm 1,200 27,600.00

Curtain rods in wrought iron including painting

D 25mm diameter hollow section curtain rod welded both sides to end members fixed to wall (m/s)

368 lm 1,200 441,600.00

E 20mm diameter ditto but approximately 150mm long end bearers grouted into masonry wall and welded to wrought iron rods

156 no 225 35,100.00

Anodized silent gliss rails

Heavy duty overlapping curtain rail complete with rollers, clips and stopped ends

368 lm 370 136,160.00

Carried to collection 5,742,010.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 5: WindowsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 5: Windows - Cont'd

Window board

Wrot camphor or other equal and approved

A 150 x 25mm window board with one labour plugged 359 lm 300 107,700.00

B 25mm quadrant beading 359 lm 80 28,720.00

Painting and decorating

Prepare and apply three coats gloss oil paint to metal surfaces

C General surfaces of windows both sides measured both sides 1,628 sm 300 488,400.00

Knot, prime and prepare and apply three coats gloss oil paint on wood surfaces to:

D Surfaces not exceding 100mm girth 359 m 30 10,770.00

E Ditto 100 - 200mm girth 359 m 60 21,540.00

Carried to collection 6,979,690.00

Page 12: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

COLLECTION

Brought forward from page GF/11 5,742,010.00

Brought forward from above 6,979,690.00

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 12,721,700.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 5: WindowsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 6: Doors

In mild steel

Supply, assemble and fix the following heavy gauge casement framed doors primed before fixing, complete with 40 x 3mm thick m.s flat burglar proofing in small panes to match window panes average 200 x 150mm high welded on frame and all necessary fittings, including fixing framing to concrete or masonoy, making good disturbed surfaces and 25mm permanent vents with two layers of 1 and 5mm mosquito gauze all to Architects drawings and approval

A

Metal casement door overall size 1500 x 2100mm high, upper part 900 x 1000mm high in 16no. Equal glazed panes size 200 x 200mm high infilled with 5mm thick clear glass and glazing in putty and lower part 900 x 1100mm high infilled with 50 x 25mm R.H.S.

10 no 23,625 236,250.00

BDoor overall size 2500 x 2500mm high glazed with 6mm thick clear glass (m/s) including 75 x 50 x 3mm thick rebated frame plugged all round and to include hinges and rebated lock, Double swing door

10 no 46,875 468,750.00

C Ditto but 1800 x 2500mm high purpose made casement double door with two equal leaves size 1500 x 2100mm high

4 no 33,750 135,000.00

In wrot cypress

Page 13: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Supply and fix the following 45mm thick (finished) solid core panel door faced both sides with mahogany veneer door skins and hardwood lipped all round all to Architects details and approval

E Door size 900 x 2100mm high 70 no 8,500 595,000.00

F Size 1200 x 2100mm high ditto 16 no 12,500 200,000.00

Size 2500 x 2500mm high ditto but double leaf door 3 no 17,500 52,500.00Glazing

G 4 mm thick clear sheet glass and glazing to metal frame with putty in panes not exceeding 0.10 sm panes

39 sm 1,100 42,900.00

Carried to collection 1,730,400.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 6:DoorsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 6: Doors - Cont'd

Ironmongery

Supply and fix the following ironmongery complete with matching screws all as per "union" catalogue or other equal and approved

A 2 - Lever mortice door lock with approved aluminium handles 117 no 2,500 292,500.00

B 100mm heavy duty Brass butt hinges 148 prs 900 133,200.00

Frames & Finishings

Wrot Cypress prime grade

C 100 x 50mm Ditto 466 m 480 223,680.00

D 45 x 20mm Rounded architrave with two labours 466 m 90 41,940.00

E 20mm Diameter quadrant beading ditto 466 m 45 20,970.00

Steel plate holder bats

F 25mm wide x 150mm long x 3mm thick once bend and fish tailed at one end nailed onto back of frames

117 no 50 5,850.00

Painting & decorating

Prepare and apply one coat aluminium primer on back of wood before fixing

G Surfaces 0 - 100mm girth 466 m 25 11,650.00

Page 14: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Knot, prime, stop and apply three coats polyurethane clear lacquer to woodwork as described

H General surfaces of wood 383 sm 300 114,900.00

I General surfaces over 0 - 100 mm girth 466 m 40 18,640.00

Prepare and apply three coats gloss oil paint to metal surfaces on:-

J General surfaces of metal 224 sm 300 67,200.00

Carried to collection 930,530.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 6:DoorsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 6: Doors - Cont'd

COLLECTION

Brought forward from page GF/13 1,730,400.00

Brought forward from page GF/14 930,530.00

Page 15: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 2,660,930.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 6:DoorsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No.7: External wall finishes

Plaster

15 mm thick cement and sand (1:4) as described to:-

A Sides of walls and concrete surfaces 2,691 sm 250 672,750.00

B Ditto to window and door reveals not exceeding 100 mm girth 366 m 25 9,150.00

Prepare and apply one undercoat and two coats approved external plastic emulsion paint to:

C Externally rendered surfaces 2,691 sm 300 807,300.00

D Ditto but not exceeding 100mm girth 366 m 30 10,980.00

Page 16: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 1,500,180.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 7:External wall finishesProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 8: Internal wall finishes

Plaster

12mm thick gauged lime plaster (1:2:9) as described to:-

A Sides of walls or concrete surfaces 7,034 sm 300 2,110,200.00

B Door and window reveals not exceeding 100mm girth 502 m 30 15,060.00

15mm thick cement sand (1:4) in:

C Backing to receive ceramic wall tiles (measured separately) 1,071 sm 250 267,750.00

D Door and window reveals not exceeding 100mm girth 52 m 25 1,300.00

Approved "Saj" ceramic coloured wall tiles as described

E 200 x 250 x 6 mm thick tiles on screed backing (m.s) with straight joints and pointing in matching cement grout

1,071 sm 1,400 1,499,400.00

F Ditto to door and window reveals not exceeding 100mm girth 52 m 140 7,280.00

Painting and decorating

Prepare and apply three coats plastic emulsion paint to:

G Plastered walls 7,034 sm 200 1,406,800.00

H Door and window reveals not exceeding 100mm girth 502 m 20 10,040.00

Page 17: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 5,317,830.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 8:Internal wall finishesProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No. 9: Floor finishes

Cement and sand (1:3) in

A 25mm thick screed receivefloor finishes 8,677 sm 300 2,603,100.00

Supply and and fix approved rustic ceramic floor tiles from an approved stockist

B 330 x 330 x 10mm thick non-slip tiles fixed with an approved adhesive on prepared screed (m/s)

2,046 sm 1,200 2,455,200.00

C 100 x 10mm thick ceramic tiles skirting 923 lm 150 138,450.00

Supply and and fix approved polished granite floor tiles from an approved stockist

600mmx600mmx20mm Polished Granite tiles with an approved adhesive on prepared screed (m/s)

4,513 sm 1,800 8,123,400.00

20x100mm high granite tiles skirting 1,066 lm 220 234,520.00

Supply and and fix approved Hardwood strips flooring from an approved stockist

8mm thick hardwood strips flooring,Machine sanded and applied with 3 coats of clear polyrethene varnish fixed with approved adhesive in approved pattern on 32mm thick cement sand (1:4) bed.

714 sm 5,680 4,055,520.00

100 mm high x 20 mm thick wrot mahogany skirting with rounded top and coved junction at bottom stained and varnished to approval.

265 lm 320 84,800.00

Supply and and fix approved Carpet flooring from an approved stockist

Carpet on 50mm cement screed 1,127 sm 350 394,450.00

20x100mm high granite tiles skirting 161 lm 220 35,420.00

Supply and and fix approved Quarry floor tiles from an approved stockist

40 mm thick quarry tiles laid on 20 mm thick cement and sand (1:3) backing

277 sm 2,500 692,500.00

100 mm high x 40 mm thick quarry tiles skirting laid on 20 mm thick cement and sand (1:3) backing

61 lm 250 15,250.00

Page 18: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 18,124,860.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 9:Floor finishesProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeBILL 1 : MAIN BUILDINGElement No.10: Ceiling finishes

Cement/sand (1:3) in

A 12mm thick plaster to ceiling trowelled hard and smooth internally 5,000 sm 300 1,500,000.00

Prepare and apply one undercoat and two finishing coats of silk vinyl paint to

B Plastered ceiling internally 5,000 sm 300 1,500,000.00

Ceiling boards

C12mm thick chipboard ceiling fixed on and including 50 x 50mm sawn cypress brandering at 600mm centers both ways nailed to truss joists(m/s) all s to architect details

3,678 sm 1,200 4,413,600.00

D Extra over ceiling for trap door size 700 x 700mm. 5 no 1,000 5,000.00

Prepare and apply one undercoat and two finishing coats of plastic emulsion paint on

E General surfaces of boards 3,678 sm 200 735,600.00

Page 19: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

TOTAL CARRIED TO SUMMARY OF BILL NO. 1 8,154,200.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 10:Ceiling finishesProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 11JOINERY FITTINGS

THE FOLLOWING IN BUILT - IN LOW LEVEL KITCHEN WORKTOP & CUPBOARDS

A 100mm thick concrete (1:3:6) plinth 27 sm 850 22,950.00

B Sawn formwork to edges 75-150mm high 32 lm 60 1,920.00

C Form rebate size 50 x 50mm to edge of plinth 32 lm 100 3,200.00

D 100mm thick concrete (1:2:4) suspended slab reinforced with and including BRC ref A142 as before described

27 sm 1,290 34,830.00

E Sawn formwork to soffites of suspended slab 27 sm 600 16,200.00

F Edge of suspended slab not exceeding 100mm wide 36 lm 120 4,320.00

Wrot prime grade camphor in

G 50 x 50mm frame with three labours plugged 84 lm 360 30,240.00

H Ditto mullion 30 lm 360 10,800.00

I 50 x 25mm bearers 36 lm 180 6,480.00

J 30 x 20mm architrave 36 lm 75 2,700.00

K 25mm quadrant beading 36 lm 90 3,240.00

L 25 x 15mm lipping to blockboard 24 lm 55 1,320.00

25mm thick post-formed medium density fibre (MDF) board birch laminated both sides in:

M Door size 450 x 900mm high with hardwood lipping all round 8 no 1,380 11,040.00

Door size 700 x 900mm high with hardwood lipping all round 8 no 2,145 17,160.00

Door size 500 x 900mm high with hardwood lipping all round 12 no 1,535 18,420.00

Page 20: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Carried to Collection 166,400.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 11: Joinery FittingsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 11JOINERY FITTINGS -Cont'd

20mm thick blockboard in

A Bottom 27 sm 1,565 42,255.00

B Shelves 5 sm 1,565 7,825.00

C Sides/divisions 5 sm 1,565 7,825.00

D Form or leave 900 x 600mm hole in 100mm thick concrete slab 4 no 500 2,000.00

E Chase 50 x 50mm deep into wall for building in concrete top (m/s) and make good to match

18 lm 250 4,500.00

Cement/sand (1:3) in

F 10mm screed prepared to receive granite slab(m/s) 27 sm 200 5,400.00

G Ditto to edge 100mm wide 19 lm 20 380.00

Approved green granite slab in

H 20mm thick fixed with an approved adhesive on prepared screed 27 sm 14,000 378,000.00

I Ditto to edges 100mm wide 19 lm 1,400 26,600.00

J 100mm high skirting 22 lm 1,400 30,800.00Ironmongery as “UNION” or other equal and approved

K Approved magnetic ball catch 28 no 350 9,800.00

L Approved mapler hinges 28 prs 650 18,200.00

M 100mm long aluminium D-door pull handle 28 no 500 14,000.00

N 50mm long aluminium barrel bolt 28 no 350 9,800.00

ODrawer size 400 x 550 x 150mm deep comprising 20mm MDF laminate front and 12mm sides and back, 6mm thick plywood base, 38 x 25mm drawer stopper including easy pull track rollers

8 no 1,250 10,000.00

Drawer size 450 x 550 x 150mm deep comprising 20mm MDF laminate front and 12mm sides and back, 6mm thick plywood base, 38 x 25mm drawer stopper including easy pull track rollers

4 no 1,350 5,400.00

Page 21: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Carried to Collection 567,385.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 11: Joinery FittingsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 11JOINERY FITTINGS -Cont'd

Painting

Prepare and spray paint three coats of automotive paint on:-

A General surfaces of wood 101 sm 450 45,450.00

B Ditto exceeding 100mm but not exceeding 200mm girth 174 lm 60 10,440.00

THE FOLLOWING IN HIGH LEVEL KITCHEN CABINETS

25mm thick post-formed medium density fibre (MDF) board in:

C Top faced both sides with 3mm thick birch laminate 8 sm 2,800 22,400.00

D Shelves ditto 4 sm 2,800 11,200.00

E Bottom ditto 8 sm 2,800 22,400.00

F Sides/partitions ditto 4 sm 2,800 11,200.00

G 500 x 600mm high doors hardwood lipped all round ditto 12 no 1,685 20,220.00

I 450 x 600mm high doors hardwood lipped all round ditto 6 no 1,585 9,510.00

650 x 600mm high doors hardwood lipped all round ditto 8 no 1,785 14,280.00

Wrot prime grade cypress

J 50 x 25mm bearers plugged to walls 21 lm 70 1,470.00

K 20 x 15mm lipping 21 lm 35 735.00

Ironmongery as "UNION" or other equal and approved

L Approved magnetic ball catch 26 no 350 9,100.00

M Approved mapler hinges 26 prs 650 16,900.00

N 100mm long aluminium D-door pull handle 26 no 500 13,000.00

O 50mm long aluminium barrel bolt 26 no 350 9,100.00

Carried to Collection 167,100.00

Section No. 1: Measured Works

Page 22: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

BILL NO. 1: MAIN BUILDINGElement No. 11: Joinery FittingsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 11JOINERY FITTINGS -Cont'd

THE FOLLOWING IN STORE SHELVING

Mild steel in:

H 25 x 25 x 2mm thick bearers 59 lm 450 26,550.00

I 25mm thick blockboard fixed to S.H.S. frames as directed 16 sm 1,400 22,400.00

J 25 x 10mm cypress lipping to blockboard 31 lm 60 1,860.00

Prepare and apply three coats of gloss oil paint on:-

K General surfaces of wood 32 sm 250 8,000.00

L Surfaces of metal not exceeding 100mm girth 90 lm 100 9,000.00

Carried to Collection 67,810.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 11: Joinery FittingsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 11JOINERY FITTINGS -Cont'd

COLLECTION

Page 23: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Brought forward from page MH/20 166,400.00

Brought forward from page MH/21 567,385.00

Brought forward from page MH/22 167,100.00

Brought forward from page MH/23 67,810.00

ELEMENT NO. 11: JOINERY FITTINGSTOTAL CARRIED TO SUMMARY OF BILL NO. 1 968,695.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 11: Joinery FittingsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 12ROOFING (All Provisional)

Roof construction

The following in framed steel trusses hoisted and placed 9300mm above ground level including all fixing accessories

Page 24: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

A 100 x 50mm wall plate rag bolted to wall at 600mm centres. 378 lm 500 189,000.00

B 100 X 100 SHS (Steel curved rafter) 4,970 lm 300 1,491,000.00

E 100 X 100 SHS (Steel curved rafter) common rafters 5,211 lm 300 1,563,300.00

F 25 x 50mm SHS battens 17,259 lm 150 2,588,850.00

G

H 75 X 50 RHS (Steel struts and ties) 3895 lm 150 584,250.00

Roof covering

"Decra" stone coated steel tiles as manufactured by or other equal and approved, laid onand including 25 x 50 mm SHS battens at 300mm centres, including 500 gauge polythene sheet, all in accordance with manufacturers instructions

I Covering to curved roof 5,231 sm 3800 19,877,800.00

Carried to Collection 26,294,200.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 12: RoofingProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 12ROOFING (All Provisional) - Cont'd)

Fascia/barge boared

Wrot prime grade cypress

A 200 x 25mm fascia/barge board 701 lm 320 224,320.00

C 25mm quadrant beading with one labour 701 lm 120 84,120.00

Page 25: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Prepare and apply one undercoat and two finishing coats of satin oil paint to:

D Timber Barge boardes 100-200mm girth 701 lm 150 105,150.00

Rain water goods

18 SWG galvanized mild steel rainwater goods primed before fixing with lapped riveted and soldered joints including all labours

E 150 x 150mm box gutter fixed between roof system 262 lm 675 176,850.00

Approved Upvc plastic pipes

F 100mm diameter down pipe fixed on masonoy surfaces with approved holderbats

202 lm 600 121,200.00

G Extra over down pipe for swanneck 22 no 180 3,960.00

H Ditto for shoe 22 no 180 3,960.00

I Extra over ditto for 300 x 300 x 300 fulbora out let 22 no 840 18,480.00

J Stopped ends 22 no 180 3,960.00

K Bends 22 no 180 3,960.00

L Knees 22 no 180 3,960.00

Carried to Collection 749,920.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 12: RoofingProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 12ROOFING (All Provisional) - Cont'd)

COLLECTION

Brought forward from page MH/28 26,294,200.00

Brought forward from page MH/29 749,920.00

Page 26: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

ELEMENT NO. 12: ROOFINGTOTAL CARRIED TO SUMMARY OF BILL NO. 1 27,044,120.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 12: RoofingProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 13MECHANICAL INSTALLATIONS

Plumbing, Drainage & Sanitary Fittings Installations

A Provide the prime cost sum of Two Million, Five hundred thousand, Three hundred shillings for Mechanical installations

Sum 2,500,000.00

B Add for Profit % 125,000.00

CAllow for general attendance on specialist installing water storage tanks, cold & hot water systems, sanitary fittings, soil& waste stacks, connections, drain runs & manholes

Item 50,000.00

Builder's Work in Connection With Mechanical Installations (All Provisional)

Chasing and making good for small pipes in:

D Stone or concrete block walls 128 lm 75 9,600.00

Page 27: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

Holes for small pipes through

E Ceramic wall tiles 65 no 150 9,750.00

Holes for large pipes through;

F Ceramic wall pipes 10 no 200 2,000.00

Holes and sleeves for small pipes through

G Stone or concrete block walls 65 no 100 6,500.00

Holes and sleeves for large pipes through

H Stone or concrete block walls 10 no 120 1,200.00

ELEMENT NO. 12: MECHANICAL INSTALLATIONSTOTAL CARRIED TO SUMMARY OF BILL NO. 1 2,704,050.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 13: Mechanical InstallationsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne IkenyeELEMENT NO. 14ELECTRICAL INSTALLATIONS

Electrical Installation Services

AProvide the prime cost sum of five millio for Electrical works connections & installations 5,000,000.00

B Add for Profit % 250,000.00

C Allow for general attendance on specialist installing mains switchboard, power and lighting systems

Item 50,000.00

Builder's Work in Connection With Electrical Installations (All Provisional)

Cut away for and attend in all trades on the Sub - Contractor installing the following points in a mainly concealed system, including chases, holes & recesses, notching timber etc and making good all finishes

D 25 x 25mm deep chase in solid concrete block or stone walling for conduits

678 lm 100 67,800.00

E 50 x 50mm deep ditto 251 lm 120 30,120.00

Page 28: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

F 75 x 75 x 50 mm deep recess in solid stone walling for switches, sockets etc

74 no 90 6,660.00

G 300 x 200 x 150mm ditto for submain cables 4 no 350 1,400.00

H 450x 300 x 100mm adaptable box for distribution board 1 no 350 350.00

I 600 x 600mm ditto for metre board 2 no 650 1,300.00

ELEMENT NO. 13: ELECTRICAL INSTALLATIONSTOTAL CARRIED TO SUMMARY OF BILL NO. 1 5,407,630.00

Section No. 1: Measured WorksBILL NO. 1: MAIN BUILDINGElement No. 14: Electrical InstallationsProposed Redevelopment of the Godown Art Cntrefor Godown Art Centre©Anne Ikenye

Page 29: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 30: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 31: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 32: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 33: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 34: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 35: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 36: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 37: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 38: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 39: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 40: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 41: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 42: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 43: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 44: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 45: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 46: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 47: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square
Page 48: Qty Unit Rate Amount BILL 1 : MAIN BUILDING BILL 1 ...realestates.uonbi.ac.ke/sites/default/files/cae/artsdesign... · Qty Unit Rate Amount BILL 1 : MAIN BUILDING ... High yield square

159,678,970.00