QESTRAIN –project Personnel training model for integrated quality-environment-safety managements...

30
QESTRAIN –project Personnel training model for integrated quality-environment- safety managements system in hospitals and public health services 1st Internal Report Lohja Hospital Area and Lohja Health Centre Sykli Environmental School of Finland

Transcript of QESTRAIN –project Personnel training model for integrated quality-environment-safety managements...

Page 1: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

QESTRAIN –project

Personnel training model for integrated quality-environment-safety managements

system in hospitals and public health services

1st Internal Report

Lohja Hospital Area and Lohja Health CentreSykli Environmental School of Finland

Page 2: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

QESTRAIN -project The main targets of Lohja Health Centre

Basis:– Holistic approach (quality-safety-environment)– Practical tools– Work towards learning organization

Main targets :– Commitment of management– Holistic view of quality– International and local cooperation

Page 3: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

The main targets of Lohja Health Centre…

• Management commitment:– Economy, process, staff & client perspective– Strategies of the Health Centre and the Hospital Area– Practical working instruments– Management education

• Holistic view of quality– Safety, quality, environment = Quality Policy– Unite existing quality projects: common procedures, common target

and criteria– Continued quality control– Practical quality methods

• International & local cooperation– Sharing & making use of knowledge– Examples

• Safety plan “How to encounter an aggressive client / patient”• Long term patients excretion function• Implementation of guidelines for treatment / caring

– Common work, common world

Page 4: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

QESTRAIN -project The main targets of Lohja Hospital Area

• To have a good continuation to the successfully started quality work to continue with quality

• To combine quality, environmental and safety activities (QES) together (= holistic approach) by having QUALITY of operations as the viewpoint

• To highlight the quality view in the managemetn of operations

• The continuous development and training of QES

• Cooperation with Lohja Health Centre with the QES issues and activities

Page 5: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1 – Evaluationof needs and existing problems

Objective:

to identify the areas as related to the development of quality-environmental-safety issues at Lohja Hospital Area and Lohja Health Centre for the basis of the development of the training model

– strenghts, best practices

– develomental areas and issues

– problematic areas and issues

Page 6: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1 - Evaluation02 – 05 / 2003

• Survey of work done and existing material 02 –05 / 2003– including interviews and discussions

• Management review & meeting 27.03. 2003 / 03.04.2003 – project info, basic concepts and managements views

• Personnel informations 4.4.2003 / 06.05.2003– project info & basic concepts

• Questionnaires 23.04. – 09.05.2003– specified personnel groups, working groups and departments

• Work shops (2 – 3 hours) spring and autumn 2003– specified personnel groups, working groups and departments

• Management system audit at Health Centre – physiotheraphy and clinical laboratory, 13. & 14.05.2003

resp.

Page 7: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Survey of work done and existing material

02 – 05 / 2003

• Organization and operational surroundings• Environmental review and programme• Quality work

– EQFM approach /hospital area– ITE –method / health centre

• Occupational safety and security• Including interviews and discussions with key

persons reports 06/2003

Page 8: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Management review and meeting

• general information of the project– the objectives of the project– the objectives and targets of pilot

organizations– schedule and resources

• review of total quality (QES) and management systems & processes

• management interview• managements view of the most important

areas

Page 9: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Personnel information

• general information of the project– the objectives of the project– the objectives and targets of pilot

organizations• personnel´s role, schedule and resources• review of total quality (QES) and

management systems & processes• managements view of the most important

areas

Page 10: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Questionnaire23.04. – 09.05.2003

• Target groups at the hospital area:– multiprofessional quality group– nursing quality group– environmental group and ”agents” of the departments– occupational health and safety organization– security group– management group

• Target groups at the health centre:– Health & family counselling / as group answer– Hospital wards / in connection with the work shops, group answers– Technical service (partly) / in connection with the work shop– Doctors

• Questionnaire possibly used in connection with the work shops at autumn?

reports 06/2003

Page 11: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Work shops

• 2 – 3 hours per group• Facilitator (subcontractor) used• At health centre:

– hospital wards – excretion function problem• 07.05. ja 20.05.2003 • continuation at autumn – process model

– technical service (part) 22.05.2003 - questionnaire– dental care at autumn 2003 – process model– health and family counselling at autumn 2003 – process

model

• At hospital area:– Dates only agreed for autumn

Page 12: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Management system audits

• Based on standards ISO 9001, ISO 14001 and OHSAS 18001

• Lohja Health Centre – Physiotheraphy– Clinical laboratory– several years experience on ITE –method

(based on main elements of ISO 9001)– one day audits

Page 13: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 3 – Testing of the training model

02 –08 / 2004

Objective:

to test the personnel training models developed together for the implementation of quality – environmental – safety issues– On the basis of the needs of pilot

organizations

raportti 09 / 2004

Page 14: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation

• Management reviews and meetings– Management´s objectives & key areas for the project and for

the training– Linkage with other programmes and projects

• Balanced Scorecard / both organizations• Human Resource Strategy / City of Lohja, Health Centre• Organizational groups / Lohja Hospital Area• EFQM Approach / Lohja Hospital Area• ITE –method / Lohja Health Centre, departments• Environmental Programme / both organizations• Security/safety programme / both organizations

– Management´s commitment– Resources for the project– Training for the modelling and charting of processes!!

Page 15: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation…

• Personnel information– One hour sessions for all personnel– Project leaflets– No discussion generated– Use of Intranet instead?– For smaller groups instead?

Page 16: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation…

• Survey of the work done & existing material– Information for the review of the present state / 1st task

for the development of integrated) managements system

– Detailed information of the training needs, needs for improvement, good & best practices

– Further discussion with the management vs management review + departments / groups training needs categorized based on the importance of each item

Page 17: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation…• Questionnaire

– Questions based on:• Management system elements / standards• Legal requirements / environmental, occupational safety,

hazardous chemicals legislation– Tailored for both organizations

• Specific programmes, plans, procedures, organizations / utilization of the results of the survey

– Answers

• Individually use of statistics vs answering percentages/personnel groups

• As groups by discussing no possibility for the use of statistics BUT as a tool for discussion

– Results / need for further information, training etc.• Further discussion with the management vs management

review + departments / groups training needs categorized based on the importance of each item

Page 18: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation…

• Work shops:– 2 –3 hours per work shop– Facilitator & trainer as external agents– Delayed start, continued during autumn – Process approach!– Example: excretion function at Lohja Health Centre,

hospital wards• Real, long term problem intertwining quality, environmental

and safety aspects• Multiprofessional discussion needed work shop

participants from different personnel groups• Problem defining & problem solving • Process approach: patient´s day - as a concrete model • Continues on September process model / chart

Page 19: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task 1.1. – Results of the evaluation…

• Management system audits– As system audits difficult

• At departmental level vs system elements• No top management commitment to system

elements & procedures– As a tool for

• training & discussion ok• As a tool for further development ok

– Results clear nonconformancies to requirements– Audit as a tool e.g. for

• Orientation programme for new employees

Page 20: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Orientation material

• The following material was used as orientation for total quality (QES), management systems and processes– at the management meetings– at personnel informations

• Linkage with Balanced Scorecard

• Linkage with EFQM

Page 21: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

PlanReview of present state

Goals

DoAction programmeObjectives and targetsActivities

CheckAchievement of objectives

Level of operations

ActNew objectivesDevelopmental issues

DEMING CIRCLE AND CONTINUOUS IMPROVEMENT

Page 22: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Task of pilot organization

Values of parent organization

Customer needs

Legislation

Expectations of society and

interest groups

Needs of personnel

Vision

Strategy

Goals

OPERATIONS

Core processes

Support processes

Results

- customer feedback

- financial result- outputs

- personnel safisfaction

- etc.

Resources

- know how- technology- economy

- cooperational tahot

Control

- responsibilities, SOP´s, instructions, training

- measures- conrol of onconformancies- development of processes

Assessment

Development of operations

Ob

ject

ives

Page 23: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

NE

ED

S O

F C

US

TO

ME

RS

AN

D

INT

ER

ES

T G

RO

UP

S

SA

TIS

FA

CT

ION

OF

CU

ST

OM

ER

S A

ND

INT

ER

ES

T

GR

OU

PS

CORE PROCESSES

Services to the customers

core process

support process

management process

Nees of teams and personnel

Economical, quality, environmental and safety objectives

SUPPORT PROCESSESFinancial Man´ HR ManagementIT Managment Interest group coop´nHousekeeping Communication

Satisfaction of teams and personnel

Achievement of economica, quality, environmental and safety objectives

Eco

no

mic

al, q

ual

ity,

en

viro

nm

enta

l an

d

safe

ty g

oal

s&o

bje

ctiv

es

Ach

ievemen

t of eco

no

mical, q

uality, en

viron

men

tal and

safety

ob

jectives

PROCESS MODEL OF OPERATIONS

Page 24: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Management System

• Standards: • ISO 9001 (quality)

• ISO 14001 (environment)

• OHSAS 18001 (occupational health & safety)

Management and development of qualoity, environmental and safety issues:

- review of the present state

- identification & determination of important QES -aspects

- developmental objectives and activities

- responsibilities, procdures, instructions and control of operations

- training and communication

- assessment of operations, follow up and continuous improvement

Page 25: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

MODEL OF INTEGRATED MANAGEMENT SYSTEM

SAFETY

QUALITY

Managed:• responsibilities• continuous follow up• nonconformancies• corrective & preventive actions

Managed:• responsibilities• continuous follow up• nonconformancies• corrective & preventive actions

Improved:• goals & objectives• actions• responsibilities & resources• schedule• follow up

Improved:• goals & objectives• actions• responsibilities & resources• schedule• follow up

instructonstraining

communication

contin

uous im

pro

vem

ent

Follow up and development• internal audit• management review• suggestions for improvement

Follow up and development• internal audit• management review• suggestions for improvement

TOIMINTAYMPÄRISTÖoperations

present state• remarkable environmental aspect• risk categories• important success factors

processes products

Policy

ENVIRONMENT

PRODUCTIVITY

Page 26: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

BALANCED SCORECARD (BSC)

(Tasapainotettu tuloskortti)

• The implementation of strategy

• Measurements of operations and results Critical success factors

1. customer view

2. economical view

3. personnel view

4. effectivity / process view

• Objectives and measures for the different levels / units / processes of the organization

Page 27: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

BSC and Management Systems together

• BSC and integrated Management System approaches can be applied simultaneously

• Problems: double work • Different elements can be taken for specified

purposes:

- setting up of goals and objectives & implementation of strategy -> BSC

- development and management of operations -> management system

- assessment and development -> BSC

Page 28: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

Resources

INP

UT

S

OU

TP

UT

S

Control

BASIC PROCESS MODEL

Personnel: knowledge, skills,

attitudes

Surroundings, machines,

equipments, materials, etc

Economical resources

Instructions, responsibilities

Training

Control of nonconformancies,

improvement of processmeasures, follow up

Page 29: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

patient taken in

patient taken in

Inspection and diagnosis

Inspection and diagnosis

treatment activities

treatment activities

Follow up and assessment

Follow up and assessment

• Actions in different phases of the process

• Critical factors (quality, environment, safety)

• Flow of information between the different phases of the process

• Issues to be documented

• Records to be created

Utilization of process descriptions in the planning of integrated management system

(example)

Page 30: QESTRAIN –project Personnel training model for integrated quality-environment-safety managements system in hospitals and public health services 1st Internal.

WHAT IS NEEDED:

• Identification of QES aspects and critical success factors together

• Review of processes as a whole

• Ideas and development

• Agreements of common procedures and principles

• Documentation of procedures and instructions

• Communication and training

• Assessment and follow up

• Integration of QRS issues to the planning and management of other operations