    Qual i t y Envi ronm ent (5S)Qual i t y Envi ronm ent (5S)

    STEP BY STEPSTEP BY STEP

    IMPLEMENTATIONIMPLEMENTATION

  • 8/6/2019 QE - Step by Step Implementation

    2/63

    OUTLINE OF PRESENTATIONOUTLINE OF PRESENTATION

    INTRODUCTION TO QE ACTIVITIES AND ITS

    BENEFIT ROLES & RESPON SIBILIT IES OF THE COMMITTEE

    STEP BY STEP QE IMPLEMENTATION

    2

  • 8/6/2019 QE - Step by Step Implementation

    3/63

    PART 1PART 1

    INTRODUCT ION TO QE ACTIVIT IES AND ITS BENEFIT

    ROLES & RESPON SIBILITIES OF THE COMMITTEE

    3

  • 8/6/2019 QE - Step by Step Implementation

    4/63

    QE (5S) Management TechniquesQE (5S) Management Techniques

    INTRODUCTION

    Today, it is increasingly recognised that QE (5S) managementtechniques enhance productivity and competit iveness. In order tobecome a World Class Gemba, an organisation has to go through acontinuousand systematic processto :

    Identify, reduce and eliminate waste

    Enhance teamwork

    Enhance operation effectiveness in a better workingenvironment

    Form the basic advanced model for Productivity and QualityImprovement

  • 8/6/2019 QE - Step by Step Implementation

    5/63

    UN DERSTANDIN G QE (5S)

    QE (5S) is a management tool from Japan, that focuses onestablishing a quality environment in the organisation,ensuring adherence to standards and in the process, fosters

    the spirit of continual improvement.

    It focuses on five management techniques that are thefoundation for any organisations competit ive initiative. TheQE (5S) are defined with examplesasfollows.

  • 8/6/2019 QE - Step by Step Implementation

    6/63

    SORT

    To sort and systematically discarditems that are not needed in theworkplace

  • 8/6/2019 QE - Step by Step Implementation

    7/63

    SET IN ORDER

    To arrange necessary items in aneat and systematic manner sothat they can be easily retrievedfor use and to return after use.

  • 8/6/2019 QE - Step by Step Implementation

    8/63

    SHINE

    To clean and inspect theworkplace thoroughly so thatthere is no dirt on the floor,machinesand equipments.

  • 8/6/2019 QE - Step by Step Implementation

    9/63

    STANDARDISE

    To maintain a high standard ofworkplace organisation bykeeping everything clean andorderly at all times.

  • 8/6/2019 QE - Step by Step Implementation

    10/63

    SUSTAIN

    To train people to practise the QE(5S) system continuously so thatit becomes habitual and ingrainedin the culture of the organisation.

  • 8/6/2019 QE - Step by Step Implementation

    11/63

    W HY QE (5S)

    The QE (5S) concept is easy for everyone to understandbecause :

    It does not require the understanding of difficult

    terminologies. It is simple, driven by logic and natural to human

    behavior.

    It is within the reach of all type and size of industry ororganisation.

  • 8/6/2019 QE - Step by Step Implementation

    12/63

    W HAT IS NOT QE (5S)

    A housekeeping exercise

    A way to blame people for defects

    A way to force people to do their work

    A way to make people work harder and faster A monthly or yearly flavour e.g. Quality Month

  • 8/6/2019 QE - Step by Step Implementation

    13/63

    BENEFITS OF QE (5S) IMPLEMENTATION

    Today, many organisations have implemented the QE (5S)system with astonishing results as voiced by our customers,the CEOs and MDs of the Malaysian National QE (5S)AwardW inners :

    We have not seen any approach to improvement that is

    SIMPLER or more POW ERFUL that can be

    Implemented at LOW ER COST

  • 8/6/2019 QE - Step by Step Implementation

    14/63

    The benefitsare :

    Workplace becomescleaner and better organised.

    Shopfloor and office operation becomessafer.

    Visible results enhance the generation of more and betterideas.

    Lead-time reduced. Changeover time reduced by streamlining operations.

    Breakdownsand minor stopseliminated on production lines.

    Defectsreduced by mistake proofing.

    Clear methodsand standardsare established .

    In-processinventory isreduced.

    Space usage is improved.

    Customer complaints are reduced.

  • 8/6/2019 QE - Step by Step Implementation

    15/63

    KEYSTO Q E (5S) SUCCESS

    In order for the QE (5S) system to be successful, the mostimportant factor is the commitment, part icipation andinvolvement of EVERYONE and strong visible support fromtop management. Generally, QE (5S) activities should becarried out systematically asfollows:

    Visit QE (5S) model companies for continualimprovement.

    Train everyone adequately on QE (5S) Practices.

    Promote QE (5S) Campaign.

    Plan systematic approach following the Plan-Do-

    Check-Act (P-D-C-A) Cycle. Practise Performance Measurement and Reward

    System.

  • 8/6/2019 QE - Step by Step Implementation

    16/63

    HOW TO INITIATE QE (5S) IMPLEMENTATION

    The QE (5S) approach outlined in this guidebook is a simpleand systematic methodology which can be introduced andimplemented in any size and type of organisation.

    To start the QE (5S) : Step-by-Step Implementation, eachphase must be thoroughly analysed and addressed using the

    P-D-C-A Cycle and 5W 2H approach asfollows:

  • 8/6/2019 QE - Step by Step Implementation

    17/63

    PLAN

    Preparation :

    Provide training and education for everyone.

    Form QE (5S) Council. Set-up QE (5S) Zones.

    Determine QE (5S) object ives, goals andimplementation phases.

    Plan QE (5S) action plan and QE (5S) Launch.

  • 8/6/2019 QE - Step by Step Implementation

    18/63

    DO

    Sort :

    Identify what is necessary.

    Set in Order :

    Define what and how to arrange.

    Shine :

    Identify dirt sources.

    Identify root causes. Take action to eliminate dirt sourcesand root causes.

  • 8/6/2019 QE - Step by Step Implementation

    19/63

    Standardise :

    W ho isresponsible ?

    W hat actions to take to maintain the desired condition ?

    W hen must those actions be taken ?

    W here must they apply ? W hat proceduresneed to be followed ?

  • 8/6/2019 QE - Step by Step Implementation

    20/63

  • 8/6/2019 QE - Step by Step Implementation

    21/63

    CHECK

    Assessment :

    Conduct Internal QE (5S) Audit

    Benchmark within the department and with otherorganisations

    Ensure the established QE (5S) procedures are followed

    through

  • 8/6/2019 QE - Step by Step Implementation

    22/63

    ACT

    Continual Improvement :

    Develop QE (5S) practicesinto a HABIT

    Compare actual goalswith set goals

    Reward and recognise efforts of staff

    Register QE (5S) Certification

    Participate in National QE (5S) Competitions

    Review Plan-Do-Check-Act Cycle

    To ensure successful QE (5S) Implementation, each phasemust proceed accordingly as illustrated in the ROADMAPTO QE (5S) IMPLEMENTATION

  • 8/6/2019 QE - Step by Step Implementation

    23/63

    ROADMAPTO QE (5S) IMPLEMENTATION

    Improving organisation performance is an ongoing challenge andorganisations benefit best from a holistic approach, and here is anextremely useful ROADMAPTO QE (5S) IMPLEMENTATION.

    The fundamental process for Productivity and Quality

    Improvements A firm foundation for Continual Improvement

    Best Practices

    Key Performance Results

    PHASE 1 and 2 are the ENABLERS. PHASE 3 and 4 are the actual RESULTS

    achieved. After each cycle review :

    The phase which require improvement

    The approaches which wil l impact on the resul ts

    The self-assessment to gauge the effectiveness of actions taken

  • 8/6/2019 QE - Step by Step Implementation

    24/63

    ROADMAP TO QE (5S) IMPLEMENTATION

    P

    R

    E

    PA

    R

    A

    T

    I

    ON

    CONTINUAL CREATIVITY AND INNOVATION

    ENABLERS RESULTS

    Sort

    Set in order

    Shine

    Standardise

    Sustain

    CONTINUAL

    IMPROVEMENT

    SELF-ASSESSMENTAND QE (5S)CERTIFICATION

    PLAN DO CHECK ACT

    PHASE 1 PHASE 2 PHASE 3 PHASE 4

  • 8/6/2019 QE - Step by Step Implementation

    25/63

    STEP 1 : FORMATION OF QE (5S) COUNCIL

    Objectives:

    To enhance total participation at all levels of employees and developa continuous improvement culture and best performance spirit in theteams.

    QE (5S) Council

    QE (5S) Council comprises the following:

    QE (5S) Steering Committee

    Managing Director as Advisor

    General Manager as Chairman

    Head of Departments as Facilitators

    QE (5S) Training Committee

    QE (5S) Promotion Committee * QE (5S) Audit Committee

  • 8/6/2019 QE - Step by Step Implementation

    26/63

    The QE (5S) Steering Committee are responsible for developing theimplementation plan, and the selection of team members is to be basedon ability, organisational representation and expertise. The functions ofthe Training Committee, Promotion Committee and the AuditCommittee.

    QE (5S) implementation responsibilities are to be distributed throughoutthe organisation. Every member must know their own QE (5S)responsibilities and perform accordingly. It is the duty of the Chairmanto administer accountability for each of the responsibilities, as outlinedbelow:

    Appoint:

    QE (5S) Coordinator

    QE (5S) Facilitators and QE (5S) Leader from each department

  • 8/6/2019 QE - Step by Step Implementation

    27/63

    ROLE AND RESPONSIBILITIES OF:

    QE (5S) Chairman:

    Communicates with everyone involved.

    Ensures total organisation participation.

    Supports QE (5S) implementation activities.

    Establishes accountability for assigned responsibilities.

  • 8/6/2019 QE - Step by Step Implementation

    28/63

    QE (5S) Coordinator:

    Communicates with everyone involved.

    Facilitate work group implementation activities.

    Motivate and monitor implementation activities.

    Ensure total organisation participation.

    Act as a resource for information

  • 8/6/2019 QE - Step by Step Implementation

    29/63

    QE (5S) Facilitators:

    Support QE (5S) implementation.

    Communicate with everyone involved.

    Motivate work groups.

    Ensure employee implementation plan.

    Monitor measurement systems.

  • 8/6/2019 QE - Step by Step Implementation

    30/63

    QE (5S) Leaders:

    Participate in work group implementation process.

    Communicate with everyone involved.

    Monitor progress of group activities.

    Employees responsibilities

    Participate in group activities with full commitment

  • 8/6/2019 QE - Step by Step Implementation

    31/63

    STEP 2 : SET-UP QE (5S) ZONES

    QE (5S) Coordinator will demarcate the zones. QE (5S) Facilitators

    will assign responsibilities and divide activities into manageabletasks. This involves:

    Obtaining the layout of the entire work area and dividing eachsection

    into small zones

    Assigning one team to each section, determining the number ofpeople per team, and displaying the names of team members andtheir areas

    Ensuring that at least one person is assigned to each section andthere is a leader for every team

    Ensuring that section size and team strength are uniform

    Defining who is responsible for shared spaces

  • 8/6/2019 QE - Step by Step Implementation

    32/63

    STEP 3 : QE (5S) TRAINING

    Objectives :

    To disseminate QE (5S) methodology and prepare the workforce

    for meaningful participation in QE (5S) activities.

    This training programme, which is the starting point of QE (5S):

    Step-by-Step Implementation, encourages workers to becomeactively involved in the application exercises. This is the

    responsibility of the QE (5S) Training Committee.

    Once the preliminary training is completed, everyone will have

    the required basic knowledge, and be responsible for action inprogress. Plans describing implementation of the QE (5S)

    phases must be prepared and released during the QE (5S)

    declaration.

  • 8/6/2019 QE - Step by Step Implementation

    33/63

    The most common mistake organisations make when

    implementing the QE (5S) system, is the failure to train

    adequately at the outset. Training should proceed as follows:

    QE (5S) Awareness for Top Management

    QE (5S) Awareness for Operators

    Step-by-Step QE (5S) Implementation for Facilitators

    Step-by-Step Internal QE (5S) Audit

  • 8/6/2019 QE - Step by Step Implementation

    34/63

    STEP 4 : QE (5S) DECLARATION / LAUNCH

    Objectives :

    To announce the promotion plan for the sole purpose ofpromoting the establishment of QE (5S) activities.

    Guidelines for QE (5S) Launch :

    At this point, management must endorse the QE (5S) plan, settargets, policy, and goals for the Step-by-Step Implementation.

    Announcement of QE (5S) Policy, Objectives and Goals

    Announcement of QE (5S) Zones

    Announcement of the QE (5S) Slogan

    After the successful QE (5S) Launch, proceed to the Step-by-Step Implementation plan.

  • 8/6/2019 QE - Step by Step Implementation

    35/63

    QE (5S) COUNCIL

    Steering

    Committee

    Training

    Coordinator

    Promotion Audit

    The Steering Committee assist in implementing QE (5S) activities.

  • 8/6/2019 QE - Step by Step Implementation

    36/63

    An example of QE (5S) policy and goal

    We shall continuously maintain a high standard of QE (5S)practices at our workplace, through teamwork and selfdiscipline. In doing so, we shall achieve :-

    Improved productivity

    Consistent high quality products and services

    Timely delivery

    Reduced cost

    Safe working environment

    To be recognised as a National QE (5S) Model Company

    QE (5S) POLICY

    QE (5S) GOAL

  • 8/6/2019 QE - Step by Step Implementation

    37/63

    Functions

    Identify QE (5S) training for everyone.

    Schedule all types of QE (5S) training.

    QE (5S) Awareness Training

    Step-by-Step QE (5S) implementation for Facilitators

    Step-by-Step Internal QE (5S) Audit

    QE (5S) TRAINING COMMITTEE

  • 8/6/2019 QE - Step by Step Implementation

    38/63

    Functions

    Promote QE (5S) campaigns.

    Identify and recommend promotional activities.

    Recommend and grant rewards or recognition to

    individuals / groups who have participated or won in the

    promotional activities.

    Review the effectiveness of promotion campaigns.

    QE (5S) PROMOTION COMMITTEE

  • 8/6/2019 QE - Step by Step Implementation

    39/63

    Functions

    Develop QE (5S) evaluation criteria, guidelines and 3S

    Improvementstickers.

    Assist in sustaining QE (5S) activities through QE (5S)

    Internal Audit.

    Submit monthly audit summary report to top management.

    Develop guidelines for measuring the impact of audit.

    QE (5S) AUDIT COMMITTEE

  • 8/6/2019 QE - Step by Step Implementation

    40/63

    PART 2PART 2

    STEP BY STEP QE IMPLEMENTATION

    40

  • 8/6/2019 QE - Step by Step Implementation

    41/63

    Guidelines for Practising SORT

    Description:

    The first S focuses on eliminating unnecessary items in theworkplace.

    Guidelines:

    It is the series of steps which keep only

    what is needed

    the amount needed and

    when it is needed

    To implement the first S the Red-Tag process is commonlyemployed. The Red-Tag strategy helps to identify unwanteditems and determine their usefulness. There are six stepsinvolved in creating a successful Red-Tagging process.

  • 8/6/2019 QE - Step by Step Implementation

    42/63

    Step 1 : Launch the Red-Tag Project

    This is usually done by the QE (5S) Steering Committee by

    creating holding areas and planning for the disposal ofunwanted items using the Red-Tag form.

    Step 2 : Identify the Red-Tag Targets

    Specify the type of items and the physical work areas to be

    evaluated.

    Step 3 : Set Red-Tag Criteria

    Three questions need to be asked to determine if an item isnecessary.

    Is it useful ?

    How often is it needed ?

    How much is needed ?

  • 8/6/2019 QE - Step by Step Implementation

    43/63

    Step 4 : Attach the Tag.

    The Red-Tagging event must be quick and decisive. The

    target scope must be completed before the QE (5S) Lunch.

    Step 5 : Evaluate Red-Tagged Items.

    Decide what to throw and the actions required

  • 8/6/2019 QE - Step by Step Implementation

    44/63

    Figure 1. First S Action Plan

    Step 6 : Document the Results of Red-Tagging.

    Results must be logged for accounting purposes so that theorganisation can measure the improvements and savingsrealised through the process.

    UNNECESSARY ITEMS

    Throw away immediatelyItems having no valueand easy to dispose

    REQUIRED ACTION

    Look for buyer who offersthe best price

    Items having some salevalue

    Work out the least costlyand safest way for disposal

    Items having no value and theirdisposal is costly

  • 8/6/2019 QE - Step by Step Implementation

    45/63

    When Red-Tagging is completed and action taken as in Figure 1,workflow is reduced, communication between workers is improved andproductivity is enhanced.

    The key word in this description is the elimination of unnecessary items inthe workplace. Sorting is an excellent technique to transform a cluttered

    workplace layout into an effective area to improve efficiency and safety.

    Potential Impacts :

    Necessary items are identified and positioned in the rightworkplace and location.

    Unwanted items are eliminated.

    Searching time is reduced.

    Working environment is improved.

    Space utilisation is maximised.

  • 8/6/2019 QE - Step by Step Implementation

    46/63

    SORTSORT Elimination of unnecessary thingsElimination of unnecessary thingsor wastesor wastes

    Eliminate wastes of resources,Eliminate wastes of resources,

    materials, spaces, shelves,materials, spaces, shelves,

    cabinets, etc.cabinets, etc.

    Reduce WIP inventoryReduce WIP inventory

    EXPECTED RESULT OF 1EXPECTED RESULT OF 1STST SS

  • 8/6/2019 QE - Step by Step Implementation

    47/63

    Phase 2: QE (5S): Step-by-Step Implementation

    Guidelines for Practising SET IN ORDER

    Description:

    The second S reflects a very popular saying: A place for

    everything in its place. It emphasises safety, efficiency andeffective storage and consequently improves the appearance ofthe workplace.

    Guidelines:

    Once the first S has been successfully implemented, what is leftshould be arranged so that there is ease of use and storage asillustrated in Figure 2.

  • 8/6/2019 QE - Step by Step Implementation

    48/63

    Figure 2. Second S Action Plan

    NECESSARY ITEMS REQUIRED ACTION

    Items frequently used

    Items sometime used

    Items not used at allbut must kept

    Can be placed near thepoint of use

    Must be stored separatelyWith clear identification

    Can be placed furtheraway

    The process shown in Figure 2, eliminates waste in production orin clerical activities and ensures all materials, tools andequipments have designated locations which are easy to find.

  • 8/6/2019 QE - Step by Step Implementation

    49/63

    The second S includes activities such as:

    Mark reference materials with an oblique line to detect disorderfrom a distance.

    Put names and numbers on all jigs and tools.

    Store tools beside the machine with which they will be used

    according to sequence of work operations.

    Organise files and store using colour code to make it easy toidentify materials at a glance.

    Store similar items together.

    Store different items in separate rows.

    Do not stack items together, use rack or shelf.

    Use smalls bins to organise small items

  • 8/6/2019 QE - Step by Step Implementation

    50/63

    Use colour for quick identification of items.

    Label clearly each item and its storage area (Visual Control)

    Use see-through cover for better visibility.

    Use specially designed carts to organise tools, jigs andmeasuring devices that are needed for each particular machine.

    Create tool boards.

    The key word in this description is anyone. Labelling isspecifically for other people who need what is in area, when the

    area owner is away. The benefit is searching time reduced.When orderliness is established, there is no human energywaste or excess inventory.

  • 8/6/2019 QE - Step by Step Implementation

    51/63

    Potential Impacts:

    Items easily returned to its designated location after use.

    Required items easily located, stored and retrieved.

    First-In First-Out (FIFO) is practised.

    Retrieval time is reduced.

    Right Item, Right Place, Right Quantity and Right Method (4R) are inplace.

  • 8/6/2019 QE - Step by Step Implementation

    52/63

    EXPECTED RESULT OF 2EXPECTED RESULT OF 2ndnd SS

    No more searchingNo more searching

    Place for EverythingPlace for Everything

    a. Reduce settinga. Reduce setting--up timeup time

    b. Preventb. Prevent -- misplacing, leaking oilmisplacing, leaking oil-- wasting energy, materialswasting energy, materials

    -- products, etc.products, etc.

  • 8/6/2019 QE - Step by Step Implementation

    53/63

    c.Improvec.Improve -- space utilization,space uti lization,

    -- work condit ionswork conditions

    d. Eliminated. Eliminate -- searching time,searching t ime,

    -- dangerous conditionsdangerous conditions

    -- etc.etc.

  • 8/6/2019 QE - Step by Step Implementation

    54/63

    Guidelines for Practising SHINE

    Description:

    The third S stresses on cleanliness because it ensures a morecomfortable and safer workplace, as well as better visibility, whichreduces retrieval time and ensures higher quality work, product orservice.

    Guidelines:

    The third S is to thoroughly clean the work area. Daily follow-upcleaning is absolutely necessary to maintain a clutter-free

    workplace and a desirable environment. SHINE speaks for itself.Everyone enjoys working in a clean environment which raisesmorale and increases productivity.

  • 8/6/2019 QE - Step by Step Implementation

    55/63

    To successfully implement the third S as a daily value-adding activity, thefollowing steps must be practised.

    Step 1: Delegate Cleaning Assignments.

    Cleanliness is the responsibility of EVERY employee and theworkplace must be divided into distinct cleanliness areas, whichcan be based on:

    5S Zones:

    Show all the cleanliness areas and the names of the peopleresponsible for them.

    5S Schedules:

    Show in greater detail the different areas and the names othose responsible for them, including daily rosters.

  • 8/6/2019 QE - Step by Step Implementation

    56/63

    Step 2: Determine What is to be Cleaned.

    Develop targets and categories them for ease of use.

    Step 3: Determine the Methods to be Used.

    Decide on the tools and materials required and what is to becleaned in each area. Cleanliness must be practised daily and

    must take only a short time to execute. Standards must beadopted to ensure people do the cleaning efficiently.

    Step 4: Prepare the Cleaning Tools and Materials.

    Set up cleaning tools and the required materials in such a mannerso that they are easily retrieved for use.

  • 8/6/2019 QE - Step by Step Implementation

    57/63

    Step 5: Implement Cleanliness

    All equipment malfunction or defects must be fixed or

    reconditioned.

    The key word in this description is keeping the workplace andeverything in it clean and in good functional condition. This isachieved through the combination of the cleaning function and

    defect detection.Potential Impacts:

    Higher quality work and products.

    More comfortable and safer work environment

    Greater visibility and reduced retrieval time

    Lower maintenance cost

    Creates positives impression on visitors and during customerinspections

  • 8/6/2019 QE - Step by Step Implementation

    58/63

    Guideline for Practising STANDARDISEGuideline for Practising STANDARDISE

    Description:Description:

    The continue employment of the 3S will ensure a highstandard of workplace organisation.

    GuidelinesGuidelines::

    Once the 3S are in place, the next step is to concentrateon standardizing best practices. The plant must includethe creation of procedures and simple daily checklists

    which are to be visibly displayed at every workplace.

  • 8/6/2019 QE - Step by Step Implementation

    59/63

    Job responsibilities that include: W ho is responsible?(ownership)

    W hat actions must be taken to maintain thedesired condition?

    W hen must those actions be taken?

    W here must they apply?

    W hat procedures will be followed to ensure

    compliance? Cleaning procedures

    Maintenance schedules

    The checklists must serve as visual signpost to ensure thatthe daily 3S requirements are carried out habitually as bestpractices in the work area. Examples of checklists are:

  • 8/6/2019 QE - Step by Step Implementation

    60/63

    The key word is to consolidate the 3S establishing standard

    procedures. This activity is carries out to determine the bestwork practices and find ways of ensuring that everyonecarries out their individual activity in their workplace.

    PotentialPotential ImpactsImpacts::

    Better workplace standards.

    Better Visual Control Systems.

    Establishment of Rules and Standard Operation Procedure(SOP).

    Information sharing on required standards.

    Improvement in operation and workflow.

  • 8/6/2019 QE - Step by Step Implementation

    61/63

    Guidelines forGuidelines for PractisingPractising SUSTAINSUSTAIN

    DescriptionDescription::

    The fifth S is to make it a habit of maintaining the momentumof the previous four S to ensure sustainability of the systemand to make further improvement by encouraging effectiveuse of P-D-C-A Cycle.

    GuidelinesGuidelines:: Build awareness of the importance of 5S throughretraining.

    Reward and recognise efforts of staff. Use techniques / approaches / strategies to sustain

    activities.

    ReviewReview:: 5S Slogans and Posters 5S Newsletters to share the progress of 5S activities. 5S Achievements standards and performance indicators

  • 8/6/2019 QE - Step by Step Implementation

    62/63

    The last S stands for SUSTAIN which requires self-

    discipline without which it is impossible tomaintain consistent standards of quality, safetyand cleanliness.

    The key word is this description is shared values.Shared values are achieved through coaching andteam participation, not shouting orders andimposing penalties. The implementation of 5Sinvolves coaching to get the workers to do thesimple things right. Buying in to these basic

    values is the essential starting point to develop aWorld Class organisation.

  • 8/6/2019 QE - Step by Step Implementation

    63/63

    PotentialPotential ImpactsImpacts::

    Compliance to workplace rules.

    Team spirit and discipline are developed.

    The Kaizen mentality is inculcated in the

    employees.

    Adoption of best practices.

    Enhance operation effectiveness in a better workingenvironment.