QCF326_Bolt Torque Report
2
PROJEC : TWO ADDITIONAL CRUDE TANKS PROJECT QUALITY CONTROL FORM QCF 326 OWNER : BINH SON REFINING AND PETROCHEMICAL Co.Ltd PROJ. N : SUBCONTRACTOR : SYSTEM TEST PACK NO : AREA/ISOMETRIC NUMBER : SHT N O : DWG N O : JOINT REFERENCE/LOCATION : SPEC N O : FLANGE DETAILS (SIZE/RATING/TYPE) : GASKET DETAILS (TYPE/SIZE/MAT=L) : BOLT SIZE : N O . OF BOLTS : BOLTING MATERIAL : REQUIRED TORQUE : N O . OF STEPS : WRENCH MANUFACTURER : SERIAL NUMBER : CALIBRATION DATE : TIGHTENING SEQUENCE : REMARKS : SIGNED : THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS. Name Name Signature Signature Date Date 8455003 CONTRACTOR OWNER BOLT TORQUE REPORT DATE NAME SUBCONTRACTOR
-
Upload
masoodibrahim12 -
Category
Documents
-
view
122 -
download
0
description
DETAILS
Transcript of QCF326_Bolt Torque Report
APROJECT:TWO ADDITIONAL CRUDE TANKS PROJECTQUALITY CONTROL FORMQCF326OWNER:BINH SON REFINING AND PETROCHEMICAL Co.LtdBOLT TORQUE REPORTPROJ. NO:8455003SUBCONTRACTOR :SYSTEM TEST PACK NO :AREA/ISOMETRIC NUMBER :SHT NO :DWG NO :JOINT REFERENCE/LOCATION :SPEC NO :FLANGE DETAILS (SIZE/RATING/TYPE) :GASKET DETAILS (TYPE/SIZE/MAT=L) :BOLT SIZE :NO. OF BOLTS :BOLTING MATERIAL :REQUIRED TORQUE :NO. OF STEPS :WRENCH MANUFACTURER :SERIAL NUMBER :CALIBRATION DATE :TIGHTENING SEQUENCE :REMARKS :SIGNED :SUBCONTRACTORNAMEDATETHE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.CONTRACTOROWNERNameNameSignatureSignatureDateDate