QCF326_Bolt Torque Report

2
PROJEC : TWO ADDITIONAL CRUDE TANKS PROJECT QUALITY CONTROL FORM QCF 326 OWNER : BINH SON REFINING AND PETROCHEMICAL Co.Ltd  PROJ. N : SUBCONTRACTOR : SYSTEM TEST PACK NO : AREA/ISOMETRIC NUMBER : SHT N O  : DWG N O  : JOINT REFERENCE/LOCATION : SPEC N O  : FLANGE DETAILS (SIZE/RATING/TYPE) : GASKET DETAILS (TYPE/SIZE/MAT=L) : BOLT SIZE :  N O . OF BOLTS : BOLTING MATERIAL : REQUIRED TORQUE :  N O . OF STEPS : WRENCH MANUFACTURER : SERIAL NUMBER : CALIBRATION DATE : TIGHTENING SEQUENCE : REMARKS : SIGNED : THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.  Name Name  Signature Signature  Date Date 8455003 CONTRACTOR OWNER  BOLT TORQUE REPORT DATE  NAME SUBCONTRACTOR 

description

DETAILS

Transcript of QCF326_Bolt Torque Report

APROJECT:TWO ADDITIONAL CRUDE TANKS PROJECTQUALITY CONTROL FORMQCF326OWNER:BINH SON REFINING AND PETROCHEMICAL Co.LtdBOLT TORQUE REPORTPROJ. NO:8455003SUBCONTRACTOR :SYSTEM TEST PACK NO :AREA/ISOMETRIC NUMBER :SHT NO :DWG NO :JOINT REFERENCE/LOCATION :SPEC NO :FLANGE DETAILS (SIZE/RATING/TYPE) :GASKET DETAILS (TYPE/SIZE/MAT=L) :BOLT SIZE :NO. OF BOLTS :BOLTING MATERIAL :REQUIRED TORQUE :NO. OF STEPS :WRENCH MANUFACTURER :SERIAL NUMBER :CALIBRATION DATE :TIGHTENING SEQUENCE :REMARKS :SIGNED :SUBCONTRACTORNAMEDATETHE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.CONTRACTOROWNERNameNameSignatureSignatureDateDate