(QA_QC Welding,piping engineer

8
AHMED HAMDY HUSSEIN Al hadad,Bassyon,Gharbia ,Egypt. [email protected] [email protected] +201062428708 - +201204330189 Objective To aspire challenging and dynamic career in Mechanical, Piping, Welding Quality controls Quality assurance, where I can apply and improve my knowledge and experience. Profile Skills and Strength Certification s More than 6 years of experience as QA/QC Welding & Piping Inspector for projects related to Oil & Gas, Petrochemicals, Water and Steels of esteemed organization like Saudi Aramco ,Enppi , Petroenergy , Petromaint , Tarrad Co. -Good knowledge of Construction, Inspection, Testing, Pre- Commissioning and Commissioning Related to Pipelines/Piping & Static Equipments, Mechanical Structures, Vessels, Tanks etc., for Oil, Gas, Petrochemicals, Water and Steel Industries. - Good knowledge of NDT activities. - Good knowledge in preparation of Hydro test Packages. - Good knowledge in preparation of QCP, ITP, WPS & PQR. - Good knowledge of ASME, API, Saudi Aramco, AWS and other International Stds. - Capable of handling group of Inspectors and Workmen. - Aramco approval status one as QA_QC Mech'l Welding Inspector - API653 Certified Tank Inspector(20-Mar-15exam) - API570Certified Piping Inspector(13-Feb-15 exam) - CWI Certificate No.: 12042151 Expiration date :Apr/1/2015 - ASNT Level II in - Visual Test (VT) - Radiographic Test (RT) - Ultrasonic Test(UT) - Liquid Penetration Test (PT)

Transcript of (QA_QC Welding,piping engineer

Page 1: (QA_QC  Welding,piping engineer

AHMED HAMDY HUSSEIN

Al hadad,Bassyon,Gharbia ,Egypt.

[email protected]

[email protected]

+201062428708 - +201204330189

ObjectiveTo aspire challenging and dynamic career in Mechanical, Piping, WeldingQuality controls Quality assurance, where I can apply and improve myknowledge and experience.

Profile

Skills and Strength

Certifications

More than 6 years of experience as QA/QC Welding &Piping Inspector for projects related to Oil & Gas, Petrochemicals, Waterand Steels of esteemed organization like Saudi Aramco ,Enppi , Petroenergy , Petromaint , Tarrad Co.

-Good knowledge of Construction, Inspection, Testing, Pre- Commissioning and Commissioning Related to Pipelines/Piping & Static Equipments, Mechanical Structures, Vessels, Tanks etc., for Oil, Gas, Petrochemicals, Water and Steel Industries. - Good knowledge of NDT activities. - Good knowledge in preparation of Hydro test Packages. - Good knowledge in preparation of QCP, ITP, WPS & PQR. - Good knowledge of ASME, API, Saudi Aramco, AWS and other International Stds. - Capable of handling group of Inspectors and Workmen.

- Aramco approval status one as QA_QC Mech'l Welding Inspector

- API653 Certified Tank Inspector(20-Mar-15exam)- API570Certified Piping Inspector(13-Feb-15 exam)- CWI Certificate No.: 12042151 Expiration date :Apr/1/2015- ASNT Level II in- Visual Test (VT)- Radiographic Test (RT)- Ultrasonic Test(UT)- Liquid Penetration Test (PT)- Magnetic Particles Test (MT)

- Languages : Arabic (Native Language),English(Very Good)

- Operating Systems : Windows XP/7/8- Software : Microsoft Office(Word, Excel, PowerPoint)

Education - University : Suez Canal - Faculty : Petroleum and Mining Engineering.- Department : Metallurgy and Material Science

Page 2: (QA_QC  Welding,piping engineer

- Date of Graduation : Jul-2010

Duties of QA/QC

Position

- Responsible for all aspects related to Project quality assurance and quality control.

- Completion of necessary documentation to verify the work performed (WPS, WPQ).

- Ensuring that inspection requests are implemented.- Ensuring that all test reports are verified to meet the contract

requirements.- To ensure all materials delivered to site are inspected and conform to

specified requirements.- Issue and administer Non Conformance Reports as necessary and ensure

follow up.- Completion of final quality documentation in a presentable manner in

accordance with the conditions of contract.- Responsible for overseeing / auditing of subcontractor Quality

Management systems.- Controlling all inspection activities on site (Welding Inspection, Testing

the Welders, Dimensional Survey, NDE Operation (VT, RT, PT, MT, UT).- Check welding equipment, weld preparation, fit up, cleanliness, preheat,

interpass cleaning, interpass temperature, PWHT, electrode storage and handling etc

- familiar with international codes, Aramco standards, inspection and testing requirement for pre- welding, in processes welding and post welding activities.

- Carry out the inspections as per approved ITP, check sheets and related procedures.

- Review company specifications, drawings, method statements, QC procedures and inspection test plans. Maintain daily reports and log of daily activities.- Familiar preparation of Weld Map.- Control and verification of electrode storage and distribution.- Regular and timely raised RFI?s to witness and verify technical- Inspection and materials testing as required by ITP?s and IFC Drawings.- Support the Project Management Team and QA/QC Manager.

Duties Of Piping Inspector

- Follow pre-fabrication and erection of piping and pipe supports.

- Walking-down of piping systems and punch listing.

- Hydro-testing, pneumatic testing and verifying mechanical completion.

- Pre-commissioning, commissioning and startup of different systems.

- Follow-up implementation of Safety instructions on site.

- Supervision and follow up of the fabrication and maintenance of stationary equipment (vessels, towers, Heat -exchangers, etc.).

Page 3: (QA_QC  Welding,piping engineer

Professional Experience

- Studying the vendor drawings and preparing drawings for fabrication.

- Performing necessary modifications on site.

- The pre-commissioning & commissioning of utilities lines.

AS QA/QC managerClient / BAPETCO&SHELL Main Contractor / ENPPISubcontractor / PETROJETProject / ASSIL&KARAM GAS DEVELOPMENT

(Sep-2014------present)

As QA/QC senior welding & piping inspector Client / BAPETCO&SHELL Main Contractor / ENPPISubcontractor / PETROJETProject / ASSIL&KARAM GAS DEVELOPMENT

(June-2013------Sep-2014)

Project scope:- Construction of new Karam trunk line duplex st.st(25km)- Construction of new Assil trunk line cs (15km)- Construction of new flow line, Manifolds- Construction of new well heads- Construction of new 5 tanks.- CRP(Co2 Removal Plant erection- Construction of new project yard - Extension for new operation yard- Construction of second condition material yard - Increase the capacity bed project construction camp - Construction of new sewage line to handle the new building and new

RO building - Modularised Amine Plant, including incinerator/hot oil heater –

Page 4: (QA_QC  Welding,piping engineer

Global Process Systems- Inlet facilities for Assil & Karam separately, including cooling and

metering- Control Room - Field Auxilary Room (FAR) for control systems and power

distribution- RO unit for Amine Plant with additional capacity for BED3- Storage tanks (4x) for Amine (2x), Water and Hot oil- Flare systems (HP and LP) and knock-out vessels- Fuel gas systems, drains, firewater system, instrument air

distribution, roads, foundations, etc.- Future space for mercury removal and pre-pre-compression

As QC welding, Mechanical inspector (Dec- 2012-----June-2013) Client / SAUDI ARAMCO (KSA) Contractor / R.H.Al-Marri & sons company for contracting Project / Shaybah NGL (pipe line Diam. 36”) at KSA length 637 km

As QA/QC Engineer (Jan-2012----- Oct-2012)Client / PETROENERGYContractor / PETROLINES (SPPC (Sudanian Petroleum Pipelines Co). Project / HADIDA BALILA PIPELINE 190 KM 12” pipeline CS X65 and its related facilities

Page 5: (QA_QC  Welding,piping engineer

As welding inspector

Alexandria Petroleum Maintenance co.( Petromaint) (May- 2009-----June-2010)

Client

Projects :

PETROBEL - Maintenance & Inspection on Temsah Glycol

Regeneration Units (GR1&GR2) on plot piping (12”)

GUPCO - Fabrication of Well 25,27&44 Pipeline at EL Razzak fields

- Fabrication of Well 12&amriya Pipeline at Abo EL Gharadik fields

Pharaohs Gold Mine

- Fabrication of (7) tanks used for heavy fuel & Diesel tanks

- Fabrication of pipe network (heavy fuel, Diesel, cooling water, Waste water, Steam, potable water) for tank farm

Petromaint - Fabrication of (5) tanks for Petroshahd

As QA/QC Engineer

International Company for Project &contracts (TARRAD CO.) (Aug- 2008--------May- 2009)& (June- 2010------Jan 2012)

Ezz Suez Flat Steel

Water Cooled Duct Line (PIPING) (Roof Panel & Elbow)

Rolling Factory Ezz DK.

Page 6: (QA_QC  Welding,piping engineer

- Steel structure supports for Roller Table- Steel structure supports for weighting system

AMOC- Fabrication of soft water line- Fabrication of VR tank (15000 m3)

Edarra for Urban dev.

- Fabrication of firefighting line

EZZ DK- Major repair for reformer & recuperator at

D.R plant- CCM cooling beam ,sep. wall, roller tables- Fabrication of compressor network (seal legs

lines, flushing water lines, sensing lines and gas compressor lines…..)

- Fabrication of slurry pipe line (5”)

TARRADCO Work shop

- Fabrication of (10) oil tanks capacity 1000 ib - Fabrication of ASHTEK truce app. 100 ton- Fabrication of AMOC piping for tanks drain

Diam. 6”- Fabrication of (7) tanks for GUPCO