SR. NO. BUILDING DESIGN & RELATED ASPECTS CUSTOMER REMARK
1 Floor Levels :-
(i) Top of finished floor slab for CCR.
(ii)Ground Floor Finish Lvl. (clear height require isapp. 3.6 mtr for single & 6.0 for dual) Bottom of
roof slab for CCR.
2 Height of Required False flooring
3Civil drawing related to the CCR floor & its
elevation is required.
4 Conference Room required? Capacity
5No. of operator stations with CPU , servers &
monitors? Also technical s ecs of each item.
6 No. of panels and their sizes?
7 No. of emergency fire exits at first floor?
8
IS the facility manned 24 hrs/days?____ If so when
are the shift changes?__ &___
9Typical monitoring and control tasks at console
stations ?
10
Any requirement of see -through duplex gallery /
duplex board conference room attached to the
control room.
11
Where will you expect to handle emergency
conditions ? Are the emergency situation rooms
required? Where ?
12Would it be advantageous to provide office space for
any other 'Full time ' Building Occupants?
13
What will be the ceiling height ? What type of
ducting is preferred through floor or ceiling ?
14
Type , number and all dimension of all
equipmentsto be kept on control desks including
monitor c u hone rinter etc.
15Type of Video wall suggested ( front or rear
acess),their dimension & resolutions.
16Any requirement of separate printer rooms for
printer ?
17Any possiblity of clubbing units together ? Can LVS
be shared between two units?
18Are any emergency lighting system required ?
19Any Constant lighting system required for control
room?
20What is frequency of movement of people between
Engineering room & Control room?
21
Can the first landing floor be the First floor thereby-
having all services in the ground floor (virtual
basement)?- we recommend
22What does the reception area convey ( just a
reception or a lounge which educates visitors of the
Date : 10/02/2012
Questionaire to design the control room
-
8/21/2019 PWSPL
2/2
23
Do we have a Vaastu compatible building thereby
using Indian building concepts of design and
construction?
24
Incorporate Landscape elements in the control room
( mummified plants/pebbles/glass flooring/water
body etc) meeting the control room standards at the
same time
25Conference room at upper level and training
auditorium at lower level
26 Any power plant related symbolic sculpture/motif(e.g. bushing etc) to be used at any location?
27 Are any supervisory desk required ? How many?
28 Storage capacity for Document/ Locker/ Storewell?
29
Any requirement of storage cabinets . Do you
require to maintain any hardcopies of any documents
in control room. If any , indicate numbers ?
30 No. of seating arrangement in Reception area?
31No. of Male Employes for Utility & Rest room
Design?
32No. of Female Employes for Utility & Rest room
Design?
33 How many seating capacity you required for Dining?
34How many seating capacity you required for
Conference Room?
35No. of personal Meeting Room you required with
seating capacity?
36 Seating capacity for viewing gallary?
37Typical 'occupancy' of the Control room at a time
(Total no. of people ) ?
38 No. of person for Shift & Maintenance?
39 Any special need for Shift & Maintenance?
40Any requirements of window / natural lights . It may
effects LVS .