    SR. NO. BUILDING DESIGN & RELATED ASPECTS CUSTOMER REMARK

    1 Floor Levels :-

    (i) Top of finished floor slab for CCR.

    (ii)Ground Floor Finish Lvl. (clear height require isapp. 3.6 mtr for single & 6.0 for dual) Bottom of

    roof slab for CCR.

    2 Height of Required False flooring

    3Civil drawing related to the CCR floor & its

    elevation is required.

    4 Conference Room required? Capacity

    5No. of operator stations with CPU , servers &

    monitors? Also technical s ecs of each item.

    6 No. of panels and their sizes?

    7 No. of emergency fire exits at first floor?

    8

    IS the facility manned 24 hrs/days?____ If so when

    are the shift changes?__ &___

    9Typical monitoring and control tasks at console

    stations ?

    10

    Any requirement of see -through duplex gallery /

    duplex board conference room attached to the

    control room.

    11

    Where will you expect to handle emergency

    conditions ? Are the emergency situation rooms

    required? Where ?

    12Would it be advantageous to provide office space for

    any other 'Full time ' Building Occupants?

    13

    What will be the ceiling height ? What type of

    ducting is preferred through floor or ceiling ?

    14

    Type , number and all dimension of all

    equipmentsto be kept on control desks including

    monitor c u hone rinter etc.

    15Type of Video wall suggested ( front or rear

    acess),their dimension & resolutions.

    16Any requirement of separate printer rooms for

    printer ?

    17Any possiblity of clubbing units together ? Can LVS

    be shared between two units?

    18Are any emergency lighting system required ?

    19Any Constant lighting system required for control

    room?

    20What is frequency of movement of people between

    Engineering room & Control room?

    21

    Can the first landing floor be the First floor thereby-

    having all services in the ground floor (virtual

    basement)?- we recommend

    22What does the reception area convey ( just a

    reception or a lounge which educates visitors of the

    Date : 10/02/2012

    Questionaire to design the control room

  • 8/21/2019 PWSPL

    2/2

    23

    Do we have a Vaastu compatible building thereby

    using Indian building concepts of design and

    construction?

    24

    Incorporate Landscape elements in the control room

    ( mummified plants/pebbles/glass flooring/water

    body etc) meeting the control room standards at the

    same time

    25Conference room at upper level and training

    auditorium at lower level

    26 Any power plant related symbolic sculpture/motif(e.g. bushing etc) to be used at any location?

    27 Are any supervisory desk required ? How many?

    28 Storage capacity for Document/ Locker/ Storewell?

    29

    Any requirement of storage cabinets . Do you

    require to maintain any hardcopies of any documents

    in control room. If any , indicate numbers ?

    30 No. of seating arrangement in Reception area?

    31No. of Male Employes for Utility & Rest room

    Design?

    32No. of Female Employes for Utility & Rest room

    Design?

    33 How many seating capacity you required for Dining?

    34How many seating capacity you required for

    Conference Room?

    35No. of personal Meeting Room you required with

    seating capacity?

    36 Seating capacity for viewing gallary?

    37Typical 'occupancy' of the Control room at a time

    (Total no. of people ) ?

    38 No. of person for Shift & Maintenance?

    39 Any special need for Shift & Maintenance?

    40Any requirements of window / natural lights . It may

    effects LVS .