![Page 1: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/1.jpg)
1
PV Plant Performance Ratio (PR)Measurements and Limitationsof Acceptance Test PR
Amiram Roth-DeblonRegional Managing Director Asia Pacificjuwi Renewable Energies Private Limited (Singapore)06.06.2012
![Page 2: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/2.jpg)
Contents
1. juwi at a glance
2. Definitions: Solar Power Plant Performance
3. How to monitor PV plant performance
2
![Page 3: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/3.jpg)
3
Renewable Energy Projects –We Make it Happen
![Page 4: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/4.jpg)
4
juwi at a Glance
Established1996, privately owned by 2 founders
Workforce> 1,750 employees
Revenueapprox. 800 Mil. € in 2010approx. 1 billion € in 2011
Headquartes of the juwi group in Wörrstadt, Germany
Number of Renewable Power Plantsapprox. 2,000 installations
Total Capacityapprox. 1,900 megawatts
Total Investment (since 1996)approx. 4.0 billion €
Annual Energy Outputapprox. 3.5 billion kilowatt-hoursCorresponds to the annual electricitydemand of one million households
Annual Reduction of Emissionsapprox. 2.5 billion kg of CO2
![Page 5: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/5.jpg)
5
Our Vision
Hydro
Pow
er
Geotherm
alEnergy
Bioenergy
Solar
Energy
Wind
Energy
Electrom
obility
Green
Buildings
Work together to implement renewable energieseconomically and reliably with passion.
100% Renewable Energies
Energy EfficiencyClean Power Production
Research & Development Cooperations
![Page 6: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/6.jpg)
6
Our Services: It‘s all about the project
Consulting &Acquisition
Planning DevelopmentFinancing &Sales
Construction Management
![Page 7: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/7.jpg)
7
Offices, Projects and New Markets
Headquarters in Germany
Western EuropeFrance, Great Britain
Southern EuropeItaly, Spain, Greece
Eastern EuropeCzech Republic, Poland, Bulgaria
AmericasUSA, Costa Rica, Chile
AsiaIndia, Singapore
AfricaSouth Africa
![Page 8: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/8.jpg)
8
Selected ReferencesLieberose, Brandenburg, GermanyFree-field / 71 megawatts
Blue Wing, Texas, USAFree-field / 16 megawatts
Torreilles, Pyrenees, FranceFree-field / 12 megawatts
Rajkot, Gujarat, IndiaFree-field / 10 megawatts
Goodyear, Phillipsburg, GermanyRooftop / 7.4 megawatts
Selected References: Solar Energy
Goodyear Rooftop, Phillipsbrug Germany (7.4MW)
Former military area in Brandenburg, Germany (71 MW)
![Page 9: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/9.jpg)
Selected References: Solar Energy
Selected ReferencesRajasthan, IndiaFree-field / 5.3 megawatts
Drachevo, BulgariaFree-field / 3.5 megawatts
Tambo Real, ChileFree-field / 1.2 megawatts
Covered Market, Verona, ItalyRooftop / 1.67 megawatts
Mont Jali, Kigali, Rwanda (Africa)Free-field / 250 kilowatts
Rajkot, Gujarat, India (10 MW)
Surendranagar, Gujarat, India (2.5 MW)
![Page 10: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/10.jpg)
2. Definitions: Solar Power PlantPerformance
10
![Page 11: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/11.jpg)
Monitoring unit
Measurement ofPV plant parameters
Measurement ofmeteorological
parameters
How to monitor PV plant performance
Calculation ofperformanceindicators
Reference YieldFinal YieldSpecific YieldPerformanceRatioAvailability
![Page 12: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/12.jpg)
12
PV plant performance indicators - I
![Page 13: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/13.jpg)
13
PV plant performance indicators - II
Further generic performance indicators
AvAvAvAv : Availability [%]Real operation time / theoretical maximum operation time
CUFCUFCUFCUF : Capacity Utilization Factor [%]ETU / theoretical maximum energy with continuous operation at nominal capacity
![Page 14: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/14.jpg)
What is the Performance Ratio?
PR =Actual Yield
Ideal Yield
PR =
X
![Page 15: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/15.jpg)
Where are the losses in the PV plant?
LV AC-Cable HV AC-CableDC-Cable
EIN (theoretical) Eout (real)
PR = Quality Factor
Losses
![Page 16: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/16.jpg)
16
PR – The Ultimate PV Performance indicator
The Performance of any PV power plant, anywhere, is ultimately defined bythe PR
Now the question arises:How do we determine the PR as precisely as possible….
Any investor or bank wants a simple and reliable method to determine the PR
A rule of thumb would be:Use a simple formula with as few parameters as possibleMeasure as precise as possible
![Page 17: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/17.jpg)
17
Details of PR Calculation
![Page 18: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/18.jpg)
18
PR DeterminationTwo parameters are the key
![Page 19: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/19.jpg)
19
3. How to monitor PV plant performance
![Page 20: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/20.jpg)
20
How can these values be measured?How precise are these measurements?
Yf or ETU (Real Yield) is always available� just read the utility meter� Simple and precise (0.2% to 2%)� Can be done remotely
gPV (Global Irradiation in the module plane)� needs meteorological sensors or satellite data� Subject to various limitations� Much less precise (2% to 15%)
![Page 21: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/21.jpg)
PR: Pyranometer vs. Satellite
Pyranometer & External Weather-Station Satellite
Satellite
What are the PROs & CONs?
Local External
High Accuracy Independent source
Short Intervals No soiling-problems
Measuring in module-plane No calibration of sensors
No gaps
![Page 22: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/22.jpg)
22
Rules for Solar irradiation measurements
Some fundamental rules are:Do not use Crystalline Irradiation sensors(only for auxiliary data or small systems, not precise enough for Power plants)
Pyranometers are the best choice but:− Use the best ones available (CMP 11, Secondary class, Calibrated)− Use at least two, to minimise measurement errors− Make sure the sensor is installed and used properly− Soiling will have a significant effect
Install a powerful monitoring systemIndependent of inverters (i.e. skytron energy or similar)
Engage a professional Operation and Maintenance provider− As backup, use independently provided satellite data and a calculated PR
![Page 23: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable](https://reader031.fdocuments.in/reader031/viewer/2022011909/5f6a195a98af306d8a415ef6/html5/thumbnails/23.jpg)
23
Thank You Very Much forYour Attention!
Contact:Amiram Roth-Deblonjuwi Renewable Energies Private Limited20 Havelock Road, # 02-25 Central Square,Singapore 059765Tel. +65 64 28 86 70 Mob. +65 84 98 74 66Fax. +49. (0)6732. 96 [email protected]