PURPOSE & NEED Uneasy About Roundabouts? 42nd & Q Street · 42nd & Q Street Improvements The...

2
An overview of the City of Omaha’s 42 nd & Q Street Bridge Replacement and Intersection Improvement Project OPW 50079 / MAPA5057(9) /CN 22279 Safety Is At The Center of This Project The purpose of the Q Street bridge replacement is to correct deficiencies at this structurally deficient bridge. The purpose of the intersection improvements is to improve safety at the Tintersection of 42 nd Street west of the Q Street bridge where crash rates exceed average rates for similar signalized intersections in the state. Concerns have also been raised about high speed vehicles and pedestrian safety. PURPOSE & NEED 42 nd & Q Street The Road Ahead Uneasy About Roundabouts? Tentative Project Schedule Milestone Target Date Preliminary Design July 2012 Environmental Assessment July 2012 Final Design April 2013 RightofWay Acquisition February 2014 Project Letting June 2014 Construction Begins August 2014 Construction Complete November 2015 Studies show you won’t be for long. Questions or Comments? If you have questions or require additional information, please contact: Harry Owen, PE City of Omaha Public Works Department [email protected] 4024445923 Kyle Anderson, PE, PTOE Felsburg Holt & Ullevig [email protected] 4024454405 Source: NCHRP Synthesis 264 Before Construction 68% had negative or very negative attitude After Construction 73% had positive or very positive attitude No negative attitudes Pedestrian Safety Benefits Cross one direction of travel at a time Pedestrian refuge in splitter island Shorter exposure distances Pedestrian crashes are reduced 75% (Source: Insurance Institute for Highway Safety) Slower speeds reduce pedestrian fatalities 20 mph 5% chance of fatality 30 mph 45% chance of fatality 40 mph 85% chance of fatality (Source: Killing Speed and Saving Lives, UK Dept. of Transportation, London, England)

Transcript of PURPOSE & NEED Uneasy About Roundabouts? 42nd & Q Street · 42nd & Q Street Improvements The...

Page 1: PURPOSE & NEED Uneasy About Roundabouts? 42nd & Q Street · 42nd & Q Street Improvements The project at 42nd & Q Street will replace the Q Street bridge over the BNSF Railway tracks

An overview of the City of Omaha’s

42nd & Q Street Bridge Replacement and Intersection Improvement Project

OPW 50079 / MAPA‐5057(9) /CN 22279

Safety Is At The Center of This Project

The purpose of the Q Street bridge replacement is to correct deficiencies at this structurally deficient bridge. 

The purpose of the intersection improvements is to improve safety at the T‐intersection of 42nd

Street west of the Q Street bridge where crash rates exceed average rates for similar signalized intersections in the state.  Concerns have also been raised about high speed vehicles and pedestrian safety.

PURPOSE & NEED 4 2 n d & Q S t r e e t The Road Ahead

Uneasy About Roundabouts?

Tentative Project Schedule

Milestone Target DatePreliminary Design July 2012Environmental Assessment July 2012Final Design April 2013Right‐of‐Way Acquisition February 2014Project Letting June 2014Construction Begins August 2014Construction Complete  November 2015

Studies show you won’t be for long.

Questions or Comments?If you have questions or require additional information, 

please contact:

Harry Owen, PECity of Omaha Public Works Department

[email protected]‐444‐5923

Kyle Anderson, PE, PTOEFelsburg Holt & Ullevig

[email protected]‐445‐4405

Source: NCHRP Synthesis 264

Before Construction• 68% had negative or very negative attitude After Construction• 73% had positive or very positive attitude • No negative attitudes

Pedestrian Safety BenefitsCross one direction of travel at a timePedestrian refuge in splitter islandShorter exposure distancesPedestrian crashes are reduced 75%(Source:  Insurance Institute for Highway Safety)Slower speeds reduce pedestrian fatalities

20 mph  ‐ 5% chance of fatality30 mph  ‐ 45% chance of fatality40 mph  ‐ 85% chance of fatality

(Source:  Killing Speed and Saving Lives, UK Dept. of Transportation, London, England)

Page 2: PURPOSE & NEED Uneasy About Roundabouts? 42nd & Q Street · 42nd & Q Street Improvements The project at 42nd & Q Street will replace the Q Street bridge over the BNSF Railway tracks

42nd & Q Street ImprovementsThe project at 42nd & Q Street will replace the Q Street bridge over the BNSF Railway tracks and reconstruct the roadway on each side of  the bridge (from approximately 41st Street to 44th Street).  Both of the 42nd

Street intersections with Q Street will be replaced with roundabouts.  

Safety Is At The Center of This Project

The existing signalized pedestrian crossing between 44th & 45th Streets will be relocated further east closer to  the roundabout.

The offset alignment of the new bridge will keep Q Street open to traffic during construction.

A new 4‐lane bridge over the BNSF Railway tracks will include sidewalk on both sides of Q Street.

42nd Street will be widened to 3‐lanes south of Q Street.

The southbound two‐lane approach will allow traffic to get in the correct lane prior to entering the roundabout based on their destination.

Refuge islands mean pedestrians only need to cross one lane at a time.