PURCHASING MANAGEMENT Course Assignment REVISION 18

Transcript of PURCHASING MANAGEMENT - Qmuzik Technologiesapps.qmuzik.com/Training/qm8pdf/Purchase Management.pdf1....

  • PURCHASING MANAGEMENT Course Assignment

    REVISION 18

  • COPYRIGHT © 1997 BY QMUZIK

    All rights reserved. The contents, nor any part thereof, nor the format, the

    configuration or any other aspect thereof may be copied, transformed, reworked,

    reverse engineered, stored or transmitted, irrespective of the mode or method

    thereof, or in any other way be dealt with other than only with the express prior

    written permission of QMuzik.

  • Set Purchasing

    Business Rules

    Create Planned

    Order with MRP

    Run.

    Firm

    Planned Order

    Release

    Purchase Order

    Movement „Out‟

    or „Into‟ Store

    Firm a Planned

    Purchase Order

    Release a Firm

    Purchase Order

    External

    Modification Order

    Subcontracted Purchase

    Order

    Add Characteristics to

    Purchase Line

    Release Purchase Order

    with Unit Of Measure and

    Currency Conversion

    Release a Purchase Order

    Back-to-Back with Sales

    Link a Shipment

    Document.

    Request for RFQ

    Purchasing Analysis

    Basic Purchase Order Process

    View Detail Flows On:

    Inventory%20and%20Material%20Management.doc#Exercise3a1Inventory%20and%20Material%20Management.doc#Exercise3a1Inventory%20and%20Material%20Management.doc#Exercise3a1Movements.doc#Jump2PurchManCourseMovements.doc#Jump2PurchManCourse

  • Add Firm

    Order

    Create Firm Order

    and Requisition

    Print Stock Replenishment

    Requisition

    Only on Non-Fixed Account Parts

    Mail to

    Responsible Person

    Release Requisition by

    Responsible Person

    Firm a Planned Purchase Order

  • Firmed Order Add Header Add Line Defaults Add Detail for Order

    Print Purchase Order

    Edit Line

    Delete Line

    Release a Firm Purchase Order

  • Add Purchase

    Order Header

    Line Add

    (Status = Firmed)

    Add Requirements Print Stock Replenishment

    for Modification Order

    Print Released

    Modification Purchase

    Order

    Release Order

    Mail to Storeman Message to

    Storeman

    Supplier to Store

    To Receive Modified Parts

    External Modification Order

    Movements.doc#Jump2PurchManCourseExMod

  • Create

    Planned

    Order with

    MRP Run

    Select

    Planned

    Purchase

    Order

    Firm

    Purchase

    Order

    Print

    Replenishments

    Release

    Purchase

    Order

    Print

    Released

    Purchase

    Order

    Issue Parts

    „Stores to order

    Requirements‟

    Perform

    „Supplier to

    Stores‟

    Movement

    Receive Stock from Subcontractor

    Subcontracted Purchase Order

    Inventory%20and%20Material%20Management.doc#Exercise3a1Inventory%20and%20Material%20Management.doc#Exercise3a1Inventory%20and%20Material%20Management.doc#Exercise3a1Inventory%20and%20Material%20Management.doc#Exercise3a1

  • Retrieve Order Line Activate

    Characteristics

    Select „Linked to

    Destination‟

    Add Values Select Table Name Create

    Characteristics

    Add Characteristics to Purchase Line

  • Release a Firmed Purchase Order

    (Change Contractual Currency)

    Select New

    Contractual Unit of

    Measure

    Select the

    Conversion

    Button

    Change Unit Price

    Apply to Activate

    Settings Transaction

    Apply to Exit

    Conversion

    Release Purchase Order with Unit of

    Measure and Currency Conversion

  • Create a Sales

    Order Header

    Add a Customer

    Spares Line

    Create a Purchase

    Order Header

    Add Purchase

    Order Line

    Defaults

    Add Purchase

    Order Line Detail

    View Purchase

    Order

    Create Shipment

    Document

    Release a Purchase Order

    Back-to-Back with Sales.

    Link a Shipment Document

  • Firm Purchase

    order

    Create Purchase

    Order RFQ

    View/Print

    Purchase Order

    RFQ

    Release Purchase

    Order From Quote

    View Results On

    RFQ

    REQUEST FOR QUOTATION

  • Revision 18 : 14 July 2005 Page 1

    Purchase Management Course Assignment

    INTRODUCTION

    This course addresses the management of purchase orders. Purchase orders are used to replenish parts, which are marked as purchased parts.

    OBJECTIVES : You will learn about System Configuration / Division Rules / Requisition Configuration / Part Master and how to:

    EXERCISE 1 : Firm a Planned Purchase Order

    EXERCISE 2 : Print a Stock Replenishment Requisition

    EXERCISE 3 : Release a Firm Purchase Order

    EXERCISE 4 : Print a Purchase Order

    EXERCISE 5 : Change a Purchase Order

    EXERCISE 6 : Delete a Purchase Order Line

    EXERCISE 7A : Add a Modification Purchase Order

    EXERCISE 7B : Add Modification Purchase Order Requirements

    EXERCISE 7C : Print a Stock Replenishment Requisition (Refer to Exercise 3)

    EXERCISE 7D : Release the Modification Purchase Order (Refer to Exercise 4)

    EXERCISE 7E : Print the Released Modification Purchase Order (Refer to Exercise 5)

    EXERCISE 7F : Send a message to the storeman to issue the required part

    EXERCISE 8 : Firm and Release a Subcontracted Purchase Order

    EXERCISE 9 : Add Characteristics to a Purchase Order Line

    EXERCISE 10 : Release a Purchase Order with UOM and Currency Conversions

    EXERCISE 11 : Release a Purchase Order back-to-back with sales.

    EXERCISE 12 : Link a Shipment Document.

    EXERCISE 13 : Purchasing Analysis.

    EXERCISE 14 : Request For Quotation process.

    APPENDIX A : Examples of Purchasing Procedures as used in Project Management

    environments

    APPENDIX B : Journals for Purchase Orders

    APPENDIX C : Purchase Order Type Summary

  • Revision 18 : 14 July 2005 Page 2

    Purchase Management Course Assignment

    SYSTEM CONFIGURATION

    FIELDS APPLICABLE TO THE PURCHASING FUNCTION

    SYSTEM CONFIGURATION The following fields need to be set on system configuration to enable the purchasing department to operate correctly within the constraints or policies of the company:

    1. LEAD-TIME DAYS (PURCHASING) MAXIMUM When adding Part Master Records and the Source is Purchased, you will not be able to specify a lead-

    time > the days specified in system configuration.

    FIGURE 1

    LEAD-TIME DAYS

    2. PURCHASE DE-COUPLE TIME (DAYS) MAXIMUM When adding a Part Master Record and the Source is Purchased, you will not be able to specify de-

    couple time > the days in system configuration.

    3. PURCHASE ORDER FIRMING ALLOWED WITHOUT MRP ORDER If “Yes” you will be able to create Firm Purchase Orders (PO Line Status = F (firmed) for Stocked items

    where no MRP Planned Purchase Order exist. This can only be done via the Stock Purchase Order Requisition function.

    4. PURCHASE ORDER MANUAL RELEASE (NO SOURCE ORDER)

    If setting = Allow, you will be able to create Released Purchase Orders for Stocked Items if no Planned

    or Firm Purchase Orders exist. This can only be done via the Released Purchase Order Generation function.

    NOTES:

    The above is only applicable to Fixed Account Parts. Rework, Modification and Repair Purchase Orders must be firmed first.

    5. PURCHASE ORDERS PLANNED TO RELEASED ALLOWED

  • Revision 18 : 14 July 2005 Page 3

    Purchase Management Course Assignment

    If = Allow, no Firming required, then you will be able to directly release a Planned Purchase Order. If = Allow only if Buyer is also the Planner, then the system will only allow you to release a planned

    order if the Buyer on the Released Purchase Order is also the Part Planner.

    NOTES:

    The above is only applicable to Fixed Account Parts.

    Rework, Modification and Repair Purchase Orders must be firmed first.

    6. PURCHASE ORDER RECEIVING DAYS EARLY

    This setting will apply to the Movements Till Date when performing the Supplier to Store or Supplier to

    Inspection movements. The Completion Dates Till field date defaults to a date = Today‟s Date + Days (Working Days) specified. Only outstanding Purchase Order Lines with a Completion Date < will be allowed to be received.

    7. PURCHASE ORDER RECEIVING DAYS ERROR

    If “No”, the Storeman will be allowed to adjust the Completion Dates Till Date to any date in the future.

    8. PURCHASE ORDER RELEASE OPTION

    If = Allow Deviation from Firm Order if Buyer is also the Planner, then you will be allowed to change the

    Firm Purchase Order Quantity and Date if the Buyer on the Released Purchase Order is also the Part Planner.

    If = Allow Deviation from Firm Order Date and Quantity, then you will be able to change the Quantity

    and Date of the Firm Purchase Order when releasing the order.

    9. PURCHASE ORDER RELEASE PRICE DEFAULT If = No Default then the system will not insert a price for the part during the releasing of the order. If = Last Purchase Price then the system will default the last Purchase Price to the Unit Price of the

    order to be released. If = Part Financial Year Data, then the system will default the Standard Price for the current financial

    year to the Unit Price of the order to be released. If = Requisition Unit Price, then the system will default the Unit Price from the Requisition to the Unit

    Price of the Order to be Released. This is only applicable to Non-fixed Account Parts and Non-stock Requisitions.

    If = Supplier List Price then the system will default the Buying Price and Discount Records from the

    External Organisation Parts table.

    10. PURCHASE ORDER RELEASE BACK-TO-BACK WITH SALES ALLOWED

    If “Yes” then the System will enable the mode “Back to Back with Sales Orders” on the

    function “Release Purchase Order Generation.

    12. UOM FORCE PREDEFINE OF CONVERSION

  • Revision 18 : 14 July 2005 Page 4

    Purchase Management Course Assignment

    If in your company you purchase in a different Unit of Measure than your Stocked Unit of Measure then this setting will, if “No”, allow the Buyer to specify a Unit of Measure Conversion when Releasing the order.

    If “Yes” and a Unit of Measure Conversion are applicable when releasing the Purchase Order, then the

    Unit of Measure should have been predefined in the Part Unit of Measure Conversion function.

    13. DAYS SUPPLY MAXIMUM

    When adding a Part Master Record this will be the maximum number of days you will be able to

    specify in the field days supply.

    14. NUMBER CONTROL On the second tab the option to set Auto Numbering is available. When set to “Yes” no userdefined

    number can be used. The system will provide a number when a “Released” Purchase Order is generated.

    DIVISION SETTINGS

    15. DIVISION MAY PLACE PURCHASE ORDERS

    This setting if = Yes will allow this division to place purchase orders (= Purchasing Division on

    Purchase Orders).

    FIGURE 15

    DIVISION PURCHASE ORDERS

    16. PURCHASE PRICE VARIANCES

    The system will either stop or warn the user by means of a stop or warn icon if the unit price on a

    purchase order lines varies with the lesser of the stop or warn percentages or amount measured against the part‟s standard value.

  • Revision 18 : 14 July 2005 Page 5

    Purchase Management Course Assignment

    FIGURE 16

    DIVISION PURCHASE VARIANCE

    Warn = The system will warn you of the deviation but will still allow you to release the line. Mail is sent to the Division Accountant.

    Stop = The system will not allow you to release the line.

    17. ALLOW UP-ADJUST PURCHASE ORDER QUANTITY If “Yes” the system will allow Up-adjustments (Change) on the Purchase Order line quantity if no account or

    Node exists on the order line.

    18. PURCHASE ORDER UPDATED BY

    This setting determines the user‟s Authorised to perform changes to Purchase Orders.

    19. ALLOW CURRENT YEAR COST UPDATE VIA PART MASTER If “Yes” the system willallow the user tochange the current material/subcontract cost 20. ALLOW NEXT YEAR COST UPDATE VIA PART MASTER If “Yes” the system willallow the user tochange the material/subcontract cost for next year

    PART MASTER SETTINGS

    21. DECIMAL MOVEMENTS ALLOWED 22. SOURCE 23. FIXED ACCOUNT 24. SERIALISED 25. LOT CONTROLLED 26. BUYER 27. ORDER POLICY 28. LEAD TIME 29. DECOUPLE TIME 30. PREFFERED SUPPLIER 31. LAST SUPPLIER 32. ALTERNATE SUPPLIER 33. YIELD 34. CONTROLLING STORE 35. SHORT CLOSE TOLERANCE 36. OVER RECEIPT PERCENT 37. FINANCIAL YEAR DATA 38. LAST AVERAGE COST 39. LAST PURCHASE PRICE 40. LONG DESCRIPTION If a long description exists it will be used by the system 41. REVISION

  • Revision 18 : 14 July 2005 Page 6

    Purchase Management Course Assignment

    42. STOCK 43. ATTRIBUTES

    OTHER FUNCTIONS RELATED TO PURCHASING

    44. PART UNIT OF MEASURE CONVERSION

    FIGURE 44 PART UNIT OF MEASURE

    CONVERSION

    When purchasing in a different Unit

    of Measure than your base U.O.M.

    this ratio will be used when

    releasing a Purchase Order line and

    if this ratio is enforced the Buyer

    will not be able to deviate from this

    ratio.

    45. FREIGHT TERM This function is used to define and maintain the freight terms used in your company.It is specified on both purchasing and sales orders thus describing the terms of delivery as related to specified unit price. Freight terms also indicate if additional cost will

    possibly be applicable. 46. INSPECTION CRITERIA This function is used to define the method to be applied, for the verification of quality and conformance to specification, when receiving purchased or manufactured goods or shipping goods to your customers. This criteria is entered on purchase, production and sales orders. 47. SETTLEMENT TERM This function is used to define settlement agreements. 48. SUPPLIER CATALOQUES The function (also referred to as Catalogues) serves the purpose to: Create buying records, where a cross-reference can be established between your parts and those of Your suppliers. As an option, link list prices to such records with added detail such as freight- and settlement terms,

    trade discounts and additional cost not incorporated in the list price. Create multiple list price records over time with different effective dates, thus retaining a history of past prices as well as visibility of prices becoming effective on a future date. Create catalogues for non-stock items for which you do not have a stocked part number (e.g. stationery or office equipment catalogues applied as a lookup when non-stock requisitions require such items). Rank supplier preferences for a part and allocate preference percentages which will result in automatic splitting of MRP suggested orders between suppliers as per user-defined ratios.

  • Revision 18 : 14 July 2005 Page 7

    Purchase Management Course Assignment

    Specify that Purchase orders can be automatically released for selected buying records against a predefined blanket Purchase order for a user-defined release horizon.

    49. PART SUBSTITUTES Part Standard Item This function is used to cross reference all parts in your inventory, where the parts are the same item but have different part numbers assigned to them, using a standard item number of your choice. This is especially useful where a lack of standardisation in the past resulted in a scenario as described above and is primarily applicable to "standard" items that are bought from suppliers "off-the-shelf". RELATED TOPIC: Part Substitutes Standard Item Master Standard Item Master Records can be created for standard items, where the description on the Part Master is not sufficient to fully describe the part. Parts are linked to a standard item master record via the Part Standard Item function. 50. EXTERNAL ORGANISATION This function is used to define and maintain data for all external organisations your company has business dealings with. These can include your customers, suppliers, banks and other. The values specified for vat, trade, settlement, inspection and freight terms, as well as contractual currency and billing/shipping address, are applied as defaults when creating either purchase or customer orders, but can be changed on such orders if not applicable for the specific contracts in question. Suppliers can be qualified by the creditors clerk if the creditor trading status is set to “active if qualified”. 51. ORDER CROSS REFERENCE This Order Cross Reference function enables cross referencing between replenishment orders and the

    requirements they are bound to satisfy once they are received/completed into stock. The cross reference can be done from quote, firm, or released replenishment order lines to quote,

    firm, or released requirements. The function displays available order lines of a selected replenishment order (or all replenishment order lines for a selected part) that have outstanding quantities not yet cross referenced to requirements.

    Security Only the Buyer/Planner of the replenishment order can perform the cross reference. Once the link exists, the Buyer/Planner of the replenishment order can only up-adjust the already

    linked quantity, whereas, only the Buyer/Planner of the requirement order can down-adjust the quantity or undo the cross reference.

  • Revision 18 : 14 July 2005 Page 8

    Purchase Management Course Assignment

    EXERCISE 1

    FIRM A PLANNED PURCHASE ORDER

    Use the Stock Purchase Order Requisition function to firm a planned purchase order.

    TIP:

    If the part number does not populate in the list box, check if the part does have material cost or average cost on the part master.

    The account is only necessary when working with a „Non-Fix-Account‟ part.

    FIGURE 1.1

    PLANNED TO FIRM

    NOTES:

    Do a Supply and Demand Inquiry on a Fixed Account Part to view suggested Planned Purchase Orders.

    Do line splitting on your first planned purchase order line; i.e. create more than one line for the single order suggested by MRP. You will have to adjust the completion date to a future date when creating the second line.

    Planned purchase orders are firmed to enable you to print a purchase requisition (stock replenishment requisition).

    For line splitting (Step 3) change the quantity to less than the suggested quantity.

    Follow the steps in Figure 1.1.

  • Revision 18 : 14 July 2005 Page 9

    Purchase Management Course Assignment

    TIPS:

    The Mode Create Manual Firm Order(s) will only be enabled if the setting on the system configuration allows it.

    If the setting allows manual orders but planned orders do exist, then the mode will also be disabled.

    FIGURE 1.2

    FIRMED

    NOTE:

    The firm order and line number created will be displayed in the message field.

    FIGURE 1.3

    MAIL TO

    RELEASE THE REQUISITION

    NOTES:

    Only when the part was a non-fix-account part.

  • Revision 18 : 14 July 2005 Page 10

    Purchase Management Course Assignment

    FIGURE 1.4

    RELEASE THE REQUISITION

  • Revision 18 : 14 July 2005 Page 11

    Purchase Management Course Assignment

    EXERCISE 2

    PRINT A STOCK REPLENISHMENT REQUISITION

    Use the Print Documentation function. (or Stock Purchase Order Requisition function.)

    FIGURE 2.1

    PRINT STOCK REQUISITION

    NOTES:

    Print the stock replenishment requisition and hand it to your presenter.

    Follow the steps in Figures 2.1 and 2.2.

    FIGURE 2.2

    PRINT REQUISITION

  • Revision 18 : 14 July 2005 Page 12

    Purchase Management Course Assignment

    EXERCISE 3

    RELEASE THE FIRM PURCHASE ORDER

    Use the Release Purchase Order Generation function and release the firm purchase order you have just created.

    FIGURE 3.1

    PURCHASE ORDER HEADER

    NOTES:

    The Buyer must be equal to the buyer on the firm purchase order. If not, change the Firm Order.

    Follow steps in Figures 3.1 and 3.3.

    FIGURE 3.2

    PURCHASE ORDER LINE

    DEFAULTS

    NOTE:

    The released purchase order number cannot be the same as the firm purchase order number.

    TIP: The released purchase order number cannot be the same as the firm purchase order number. The firmed order gets deleted and the released order created in its place. Therefore if the order number is equal for both an illogical situation arises.

  • Revision 18 : 14 July 2005 Page 13

    Purchase Management Course Assignment

    FIGURE 3.3

    PURCHASE ORDER LINE DETAIL

    NOTES:

    Scroll to the right to view the enabled (white) fields. All enabled fields‟ data can be changed if necessary (Step 3).

    Repeat the steps for the 2nd

    Line.

    TIPS: The Firm Purchase Order Number will not populate if:

    The Buyer on the Firm Purchase Order is not equal to the Buyer on the Released PurchaseOrder The Division on the Firm Purchase Order differs from the Released Purchase Order Generation

    Service Requisitions will not populate if: The Supplier on the Service Requisition is not equal to the Supplier on the Released Purchase Order and if the Payment Currency on the Service Requisition is not equal to the payment currency on the purchase order.

    Requisitions must have a status of released.

  • Revision 18 : 14 July 2005 Page 14

    Purchase Management Course Assignment

    EXERCISE 4

    PRINT A PURCHASE ORDER

    Use the Purchase Order function to print a purchase order.

    FIGURE 4.1

    PURCHASE ORDER

    NOTES:

    Print the purchase order and hand it to the presenter.

    Go to the Purchase Order function and perform an inquiry on the order just released.

    Follow the steps in Figure 4.1.

    Printing Tip:

    For printing the first time it is necessary to setup the printers. It can afterwards be changed in the

    „Print Library Users Defaults‟ function.

  • Revision 18 : 14 July 2005 Page 15

    Purchase Management Course Assignment

    EXERCISE 5

    PURCHASE ORDER CHANGES

    Use the Purchase Order function to change purchase orders.

    FIGURE 5.1

    PURCHASE ORDER CHANGES

    NOTES:

    Perform an inquiry on the released purchase order you have just created on line 1.

    Follow the steps in Figure 5.1.

    View amendment number in step 2. Each time you do a change on the line, the amendment number will increase by 1.

    Change the following: - Delivery date - Order quantity Note that both cannot be changed simultaneously.

    FIGURE 5.2

    PURCHASE ORDER CHANGES

    NOTES:

    This function is used to view the change history of purchase orders. The selected fields on the first tab determines what changes for purchase orders in the company will be logged. The default is select all.

  • Revision 18 : 14 July 2005 Page 16

    Purchase Management Course Assignment

    FIGURE 5.3

    PURCHASE ORDER CHANGES

    NOTES:

    This function is used to view the change history of purchase orders. The selected fields on the first tab determines what changes for purchase orders in the company will be logged. The default is select all.

    FIGURE 5.4

    PURCHASE ORDER CHANGES

    NOTES:

    Select a specific change as in step 1 to see the before and after values as in step 2.

  • Revision 18 : 14 July 2005 Page 17

    Purchase Management Course Assignment

    EXERCISE 6

    DELETE A PURCHASE ORDER LINE

    Use the Purchase Orders function to delete a purchase order line.

    FIGURE 6.1

    LINE DELETE

    NOTES:

    Perform an inquiry on line one of your purchase order.

    Follow the steps in Figure 6.1.

  • Revision 18 : 14 July 2005 Page 18

    Purchase Management Course Assignment

    EXERCISE 7A

    ADD AN (EXTERNAL) MODIFICATION PURCHASE ORDER Use the Purchase Orders function to create a modification purchase order. External Rework and Repair Orders follow the same process as a Modification Order except requirements are create automatically. You may add or change the requirements for a Repair Orders.

    FIGURE 7.1

    PURCHASE ORDER HEADER

    NOTE:

    Follow the steps in Figures 7.1 and 7.2.

    FIGURE 7.2

    PURCHASE ORDER LINE

    NOTE:

    The line status must be Firm.

  • Revision 18 : 14 July 2005 Page 19

    Purchase Management Course Assignment

    EXERCISE 7B

    ADD MODIFICATION PURCHASE ORDER REQUIREMENTS

    Use the Purchase Orders function. Tab the Requirements tab.

    FIGURE 7.3

    ORDER REQUIREMENTS

    NOTE:

    Follow the steps in Figure 7.3.

    EXERCISE 7C

    PRINT A STOCK REPLENISHMENT FOR THE MODIFICATION

    ORDER

    (Refer to Exercise 2)

    EXERCISE 7D

    RELEASE THE MODIFICATION PURCHASE ORDER

    (Refer to Exercise 3)

    EXERCISE 7E

    PRINT THE RELEASED MODIFICATION PURCHASE ORDER

    (Refer to Exercise 4)

  • Revision 18 : 14 July 2005 Page 20

    Purchase Management Course Assignment

    EXERCISE 7F SEND A MESSAGE TO THE STOREMAN TO ISSUE THE REQUIRED

    PART

    Use the Movement function.

    FIGURE 7.4A

    MOVEMENTS

    NOTE:

    Follow the steps in Figures 7.4A and

    7.4B.

    FIGURE 7.4B

    INSTRUCTION TO STOREMAN

  • Revision 18 : 14 July 2005 Page 21

    Purchase Management Course Assignment

    FIGURE 7.4C

    MESSAGE

    NOTE:

    The storeman will receive the following message: (See Figure 7.4C)

  • Revision 18 : 14 July 2005 Page 22

    Purchase Management Course Assignment

    EXERCISE 8 Firm and Release a Subcontracted Purchase Order

    Firm the Planned Subcontracted Purchase Order.

    Use the Stock Purchase Order Requisition function to firm a Planned Order.

    SYSTEM CONFIGURATION SETTING:

    Purchase Order Firming allowed without MRP Order. Yes: The mode Create Manual Firm Order(s) will be enabled. No: The mode Create Manual Firm Order(s) will be disabled. If the setting allows manual orders but planned orders do exist, then the mode will also be disabled.

    FIGURE 8.3

    PLANNED TO FIRM

    NOTES:

    If you want to do line splitting, do the following:

    FIGURE 11.� Change the quantity too less than the suggested quantity.

    FIGURE 11.� Adjust the completion date to a future date when creating a second line.

    Planned Purchase Orders are firmed to enable you to print a purchase requisition (Stock Replenishment requisition).

    The Firm Order and Line Number will be displayed in the message field after you have clicked on the Add button. Remember to write this down.

    Follow the steps in Figure 9.3.

    TIP:

    If the part number does not populate in the list box, check if the part does have material cost on the part master.

    Print a Stock Replenishment Order (Refer to Figure 2.1 – Exercise 2)

    Release the Sub Contracted Purchase Order (Refer to Figures 3.1 – 3.3 – Exercise 3)

    Enter an Order Number XX007 (XX = First 2 characters of your name / surname)

    TIP:

    If the part number does not populate in the list box:

  • Revision 18 : 14 July 2005 Page 23

    Purchase Management Course Assignment

    1. Is the Division the same as the one on the Firmed Purchase Order? 2. Is the buyer the same as the one on the Firmed Purchase Order?

    Print the Released Subcontracted Purchase Order (Refer to Figure 4.1 – Exercise 4)

    MOVEMENTS TO BE PERFORMED FOR SUB CONTRACTED PURCHASE ORDERS

    Do a Store to Order Requirements (Refer to Figure 7.4B – Exercise 7F)

    Do a Supplier to Stores Movement

  • Revision 18 : 14 July 2005 Page 24

    Purchase Management Course Assignment

    EXERCISE 9

    ADD CHARACTERISTICS TO A PURCHASE ORDER LINE

    Use the Purchase Order function to add characteristics to a purchase order line. Characteristics are user-defined attributes. Any number of characteristics (attributes) can be defined and linked to any System business object (i.e. colour of item or special delivery instructions to a purchase order line)

    FIGURE 9.1

    ORDER LINE INQUIRY

    NOTE:

    Follow the steps in Figures 9.1 to 10.3.

    FIGURE 9.2

    CHARACTERISTIC LINK

  • Revision 18 : 14 July 2005 Page 25

    Purchase Management Course Assignment

    FIGURE 9.3

    CHARACTERISTIC LINK

    ADD VALUES

    SELECT TABLE NAME

    CREATE CHARACTERISTICS

  • Revision 18 : 14 July 2005 Page 26

    Purchase Management Course Assignment

    EXERCISE 10 RELEASE A PURCHASE ORDER WITH UNIT OF MEASURE AND

    CURRENCY CONVERSIONS

    Use the Release Purchase Order Generation function.

    FIGURE 10.1

    ADD HEADER

    NOTES:

    For this exercise the system configuration setting: UOM Force Predefine of Conversion = YES.

    Follow the steps in Figures 10.1 to 10.5.

    The scenario here is that you want to purchase in a different unit of measure than the stocked UOM and you purchase in a different currency (i.e. Import Orders).

    A firm purchase order must already exist for a part that already have a unit of measure conversion specified (see Part UOM Conversion function).

    FIGURE 10.2

    PURCHASE ORDER LINE

    DEFAULTS

    NOTES:

    The Currency Exchange Rate display is derived from the Currency table and is equal to the Selling Price for the Date on which the Order is released.

    If no Exchange Rate exists, then the Exchange Rate will be one to one.

    You will always be allowed to change the Currency Exchange Rate when releasing an Order.

    If Forward Cover Applies is selected, the Exchange Rate will be fixed and not subject to change.

  • Revision 18 : 14 July 2005 Page 27

    Purchase Management Course Assignment

    FIGURE 10.3

    PURCHASE ORDER LINE DETAIL

    NOTE:

    Step number 13 is only applicable if the Supplier on the Firm Purchase Order is not equal to the Supplier specified in the Header of the Released Purchase Order.

    UOM on Parts UOM Conversions can be defined in „volume‟, „weight‟ and „dimensions‟.

    FIGURE 10.4

    ADD PART UOM CONVERSIONS

    FIGURE 10.5

    ADD UNIT PRICE

  • Revision 18 : 14 July 2005 Page 28

    Purchase Management Course Assignment

    FIGURE 10.6

    LINE DETAIL

  • Revision 18 : 14 July 2005 Page 29

    Purchase Management Course Assignment

    EXERCISE 11

    RELEASE A PURCHASE ORDER BACK-TO-BACK WITH

    SALES

    Use the Customer Order Function to create a Sales Order.

    Fig 11.1

    CREATE A CUSTOMER ORDER

    Notes:

    Follow the steps in Fig 11.1 to create

    a header for your Customer Order.

    Fig 11.2

    ADD A CUSTOMER SPARES LINE Notes: Use a Customer Spares Line Type for the course. Make sure the Part is a fixed account part.

    Set the shipping dates in advance to

    provide for the lead and decouple

    time.

    System Configuration setting : Purchase Order Release Back-to-Back with Sales Allow = Yes.

  • Revision 18 : 14 July 2005 Page 30

    Purchase Management Course Assignment

    Fig 11.3

    Fig 11.4

  • Revision 18 : 14 July 2005 Page 31

    Purchase Management Course Assignment

    Fig 11.5

    Note on receipt of goods it will be automatically allocated to the Customer Order Line.

  • Revision 18 : 14 July 2005 Page 32

    Purchase Management Course Assignment

    EXERCISE 12

    LINK A SHIPMENT DOCUMENT

    A Shipment Document is optionally created when advanced notice is received about a shipment for a purchase order sent to a supplier. Use the Shipment Document Function to create and link it to a Purchase Order.

    Fig 12.1

    VIEW THE PURCHASE ORDER

    Notes:

    View the steps in figure 12.1 to be

    able to understand the next steps.

    1. Freight Terms (Purchase Order Additional Cost Applicable) = Yes 2. Inspection Criteria (Receipt of Items Via Inspection) = „Optional‟ or „Always Force‟.

    Fig 12.2

    CREATE SHIPMENT DOCUMENT.

    Notes:

    Shipment Document number is user defined – should be the same as the number on the shipment document received from the supplier.

    Recall the acquired Purchase order and add the additional costs.

    Follow the steps in fig 12.2 to link a

    Shipment Document.

  • Revision 18 : 14 July 2005 Page 33

    Purchase Management Course Assignment

    Fig 12.3

    VIEW RESULTS.

    Notes:

    When fully linked it will disappear from the available line grit.

    Selecting linked lines will display the additional cost added when linked.

    Only „partial Receipt‟ if permitted by External Organisation function.

  • Revision 18 : 14 July 2005 Page 34

    Purchase Management Course Assignment

    EXERCISE 13

    PURCHASING ANALYSIS

    The Purchasing Analysis function is used to analise purchase orders.

    Fig 13.1

    SELECT SELECTION CRITERIA

    Notes:

    We have selected to see all released purchase orders lines for a specific buyer.

    Read the online help on the option “Planned Orders With A MRP Action Date Till”

    Fig 13.2

    SELECT DISPLAY COLUMNS

    Notes:

    Step 1:

    Select additional columns to be displayed.

  • Revision 18 : 14 July 2005 Page 35

    Purchase Management Course Assignment

    Fig 13.3

    VIEW RESULTS.

    Notes:

    You may select a purchase order and jump via the buttons at bottom of screen to other analysis functions.

    Fig 13.4

    REPORTS

    Notes:

    Fig 13.5

    REPORTS

    Notes:

  • Revision 18 : 14 July 2005 Page 36

    Purchase Management Course Assignment

    EXERCISE 14

    REQUEST FOR QUOTE PROCESS (RFQ)

    Fig 14.1

    FIRM PURCHASE ORDERS

    Notes:

    Step 1: MRP created orders need to be firmed before quotes can be requested.

    The Purchase Order RFQ function is used to request quotations.

    Fig 14.2

    CREATE PURCHASE ORDER RFQ

    Notes:

    Follow the steps in figure 14.2 to create a request for quotation.

  • Revision 18 : 14 July 2005 Page 37

    Purchase Management Course Assignment

    Fig 14.3

    CREATE PURCHASE ORDER RFQ

    Notes:

    Notice the system created the RFQ number. Follow the steps in figure 14.3.

    Fig 14.4

    CREATE PURCHASE ORDER RFQ

    Notes:

    Select all the firm order lines which are to be part of the RFQ.

  • Revision 18 : 14 July 2005 Page 38

    Purchase Management Course Assignment

    Fig 14.5

    CREATE PURCHASE ORDER RFQ

    Notes:

    Step 1:

    Go to the first tab and firm the RFQ before adding the possible suppliers who are to act on the RFQ.

    Fig 14.6

    VIEW PURCHASE ORDER RFQ

    Notes:

  • Revision 18 : 14 July 2005 Page 39

    Purchase Management Course Assignment

    Fig 14.7

    Notes:

    We have accepted a quote and now create a released purchase order.

    Fig 14.8

    Notes:

    Note the outomatic reference to the RFQ number.

  • Revision 18 : 14 July 2005 Page 40

    Purchase Management Course Assignment

    Fig 14.9

    VIEW RESULTS.

    Notes:

    This tab on the Purchase Order RFQ function shows all the possible suppliers expected to make a quote.

    Fig 14.10

    VIEW RESULTS.

    Notes:

    The last tab on the Purchase Order RFQ function shows the purchase order this Request for Quotation resulted in.

  • Revision 18 : 14 July 2005 Page 41

    Purchase Management Course Assignment

    LESSON SUMMARY

    On completion of the purchase management course, students will be able to manage purchase orders through its entire life cycle.

    TO DO THIS

    Firm a Planned Purchase Order. Use the STOCK PURCHASE ORDER requisition.

    Print a Stock Replenishment Requisition. Use the PRINT REPORTS function. Use the STOCK REQ tab.

    Release a Firmed Purchase Order. Use the RELEASE PURCHASE ORDER GENERATION function.

    Print Purchase Order. Use the PURCHASE ORDER function.

    Change a Released Purchase Order. Use the PURCHASE ORDER function. Use the PO LINE STATUS HISTORY function

    Delete a Purchase Order. Use the PURCHASE ORDER function.

    Add a Modification Purchase Order. Use the PURCHASE ORDER function.

    Firm and Release a Subcontracted Purchase Order Line

    Use the STOCK PURCHASE ORDER REQUISITION function.

    Add Specifications to a Purchase Order Line. Use the PURCHASE ORDER function.

    Add Characteristics to Purchase Order Line Use the PURCHASE ORDER and CHARACTERISTICS function.

    Release a Purchase order with UOM and Currency Conversions.

    Use the RELEASE PURCHASE ORDER GENERATION and UNIT OF MEASURE CONVERSION function.

    Release a Purchase Order Back-to-Back with Sales Use the RELEASE PURCHASE ORDER GENERATION function.

    Add a Shipment Document Use the SHIPMENT DOCUMENT function.

    Perform Purchasing Analysis Use the PURCHASING ANALYSIS function.

    Request For Proposal Use the PURCHASE ORDER RFQ function

  • Revision 18 : 14 July 2005 Page 42

    Purchase Management Course Assignment

    APPENDIX A : Examples of Purchasing Procedures as used in Project

    Management Environments

    Example 1 - Buying Non Stock Items Add a Non Stocked purchase Order Requisition Create Purchase Order through Released Purchase Order Generation

    function (From Non Stock Requisition Option)

    Perform Supplier to Store movement (do not have to specify store)

    Example 2 - Buying a Stocked Non Fixed Account MRP planned part Add a Stocked Purchase Order Requisition through the Stock Purchase

    Order Requisition function Release Stocked Purchase Order Requisition Create Purchase Order through Released Purchase Order Generation

    function (From Firmed Order) Perform Supplier to Store movement

    Example 3 - Buying a Stocked Fixed Account MRP planned part Create Purchase Order through Released Purchase Order Generation

    function (Manual Option) Perform Supplier to Store movement Add a Stores Issue Requisition (no price) Perform Stores to Requisition movement

  • APPENDIX B : Journals for Purchase Orders

    SUPPLIER GOODS RECEIVING

    STORE

    DT STORES STOCK (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    CT CREDITORS SUSPENSE (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    1.1 RECEIVE “FIXED ACCOUNT” PURCHASED ITEMS AND INVOICE (Movement to and from Suppliers)

    C.J. PRINSLOO

    REV : 01

    11/11/97

    LEGEND:

    Fin - Financial

    Mat - Material Cost

    Yr - Year

    DT STORES STOCK (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    CT INCOMING INSPECTION (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    INSPECTION

    TO STORE

    ADD INVOICE LINK INVOICELINE TO

    RECEIVED

    PURCHASEORDER LINE

    DT CREDITOR SUSPENSE (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    CT TRADE CREDITORS (DIVISION)

    ((Invoice Unit Price + VAT) * Qty Invoiced)

    DT VAT PURCHASES (DIVISION)

    (VAT * Qty Unvoiced)

    VARIANCES:

    a. If Invoice Unit Price > Part Fin Yr Mat Cost

    DT CREDITOR PRICE VARIANCE (DIVISION)

    ((Invoice Unit Price * Qty Invoiced)

    - (Part Fin Yr Mat Cost * Qty Invoiced)

    b. If Invoice Unit Price < Part Fin Yr Mat Cost

    CT CREDITORS PRICE VARIANCE (DIVISION)

    ((Invoice Unit Price * Qty Invoiced)

    - (Part Fin Yr Mat Cost * Qty Invoiced)INSPECTION

    OR

    SUPPLIER TO STORE

    SUPPLIER

    TO

    INSPECTION

    DT INCOMING INSPECTION (DIVISION)

    (Part Fin Yr Mat * Qty Received)

    CT CREDITORS SUSPENSE (DIVISION)

    (Part Fin Yr Mat * Qty Received)

  • SUPPLIER

    STORE

    DT CREDITORS SUSPENSE (DIVISION)

    (Part Fin Yr Mat * Qty Returned)

    CT STORES STOCK (DIVISION)

    (Part Fin Yr Mat * Qty Returned)

    1.2 RETURN “FIXED ACCOUNT” PURCHASED ITEMS TO SUPPLIER (Movements to and from Suppliers)

    STORE TO SUPPLIER

    (Return item to Supplier)

    C.J. PRINSLOO

    REV : 02

    18/11/97

    LEGEND:

    Fin - Financial

    Mat - Material Cost

    Yr - Year

    DT CREDITORS SUSPENSE (DIVISION)

    (Part Fin Yr Mat * Qty Returned)

    CT INCOMING INSPECTION

    (Part Fin Yr Mat * Qty Returned)

    CT CREDITORS SUSPENSE (DIVISION)

    ((Part Fin Yr Mat) * Qty Returned)

    DT TRADE CREDITORS

    ((Invoice Unit Price + VAT) * Qty Returned)

    CT VAT PURCHASES

    (VAT * Qty Returned)

    VARIANCES:

    a. If Invoice Unit Price > Part Fin Yr Mat Cost

    CT CREDITOR PRICE VARIANCE

    ((Invoice Unit Price * Qty Returned)

    - (Part Fin Yr Mat Cost * Qty Returned)

    b. If Invoice Unit Price < Part Fin Yr Mat Cost

    DT CREDITORS PRICE VARIANCE

    ((Invoice Unit Price * Qty Returned)

    - (Part Fin Yr Mat Cost * Qty Returned)

    INSPECTION

    INSPECTION TO SUPPLIER

    (Return item to Supplier)

    APPLY CREDIT INVOICE LINE

    CREDITORS DEPARTMENT

  • SUPPLIER STORE

    DT ACCOUNT OR NODE SPECIFIED FOR REQUISITION

    ((Purchase Order Unit Price) * Qty Received)

    CT CREDITORS PROVISIONING (DIVISION)

    ((Purchase Order Unit Price) * Qty Received)

    1.3 RECEIVE “NON-STOCK” OR “NON-FIXED ACCOUNT STOCK” PURCHASED ITEMS AND INVOICE (Movements to and from Suppliers)

    C.J. PRINSLOO

    REV : 02

    18/11/97

    ADDINVOICE

    DT CREDITOR PROVISIONING (DIVISION

    ((Purchase Order Unit Price) * Qty Invoiced)

    CT TRADE CREDITORS (DIVISION)

    ((Invoice Unit Price + VAT) * Qty Invoiced)

    DT VAT PURCHASES

    (VAT * Qty Invoiced)

    VARIANCES:

    If Invoice Unit Price < Purchase Order Unit Price

    DT ACCOUNT OR *NODE SPECIFIED FOR THE

    REQUISITIONINSPECTION

    SUPPLIER TO STORE

    OR

    DT ACCOUNT OR NODE SPECIFIED FOR REQUISITION

    ((Purchase Order Unit Price) * Qty Received)

    CT CREDITORS PROVISIONING (DIVISION)

    ((Purchase Order Unit Price) * Qty Received)

    SUPPLIER TOINSPECTION

    LINKINVOICE

    TO

    RECEIVEDPURCHASE

    ORDERLINE

    NOTE:

    The node is indirectly linked to a GL account (usually the WIP project through management account),

    the material resource used for the material budget

    NODE

    AA000

    MATERIAL BUDGET

    MAT RESOURCE (E.G. PROCUREMENT LOCAL)

    MAT RESOURCE (E.G. PROCUREMENT OVERSEAS)

    ACCOUNT

    ALX1

    AST9

    REQ NO

    AAACY

    AABCY

    INSPECTION TO STORE

    (Non-stock or Non-fixed Account Stock Items)

  • SUPPLIER

    STORE

    1.4 RETURN “NON-STOCK” OR “NON-FIXED ACCOUNT STOCK” PURCHASED ITEMS

    STORE TO SUPPLIER

    (Return Item to Supplier)

    C.J. PRINSLOO

    REV : 02

    21/11/97

    INSPECTION

    RETURN TO SUPPLIER

    (Return Item to Supplier)

    APPLY CREDIT INVOICE LINE

    DT CREDITOR PROVISIONING (DIVISION

    ((Purchase Order Unit Price) * Qty Returned)

    CT ACCOUNT OR *NODE SPECIFIED FOR THE

    REQUISITION

    ((Purchase Order Unit Price) * Qty Returned)

    NOTE:

    The node is indirectly linked to a GL account (usually the WIP project through management account),

    the material resource used for the material budget

    NODE

    AA000

    MATERIAL BUDGET

    MAT RESOURCE (E.G. PROCUREMENT LOCAL)

    MAT RESOURCE (E.G. PROCUREMENT OVERSEAS)

    ACCOUNT

    ALX1

    AST9

    REQ NO

    AAACY

    AABCY

    CT CREDITOR PROVISIONING (DIVISION

    ((Purchase Order Unit Price) * Qty Returned)

    DT TRADE CREDITORS (DIVISION)

    ((Invoice Unit Price + VAT) * Qty Returned)

    CT VAT PURCHASES (DIVISION)

    (VAT * Qty Returned)

    VARIANCES:

    If Invoice Unit Price < Purchase Order Unit Price

    CT ACCOUNT OR *NODE SPECIFIED FOR THE

    REQUISITION

    DT CREDITOR PROVISIONING (DIVISION

    ((Purchase Order Unit Price) * Qty Returned)

    CT ACCOUNT OR *NODE SPECIFIED FOR THE

    REQUISITION

    ((Purchase Order Unit Price) * Qty Returned)

    CREDITORS DEPARTMENT

    (Credit)

  • SUB-CONTRACTORMATERIAL STORE

    (Your Company)

    DT WIP MATERIAL PURCHASES (DIVISION)

    ((Part Fin Yr Mat) * Qty Issued)

    CT STORES STOCK (DIVISION)

    ((Part Fin Yr Mat) * Qty Issued)

    1.5 SUB-CONTRACT “FIXED ACCOUNT” PURCHASED ITEM AND INVOICE

    (Movements to and from Suppliers)

    STORE TO ORDER REQUIREMENTS

    (Issue Material / Items)

    C.J. PRINSLOO

    REV : 02

    21/11/97

    LEGEND:

    Fin - Financial

    Yr - Year

    Mat - Material Cost

    Subc - Sub-contract Cost

    DT STORES STOCK (DIVISION)

    ((Part Fin Yr Mat + Subc) * Qty Received)

    CT CREDITOR PRICE VARIANCE (DIVISION)

    ((Part Fin Yr Subc) * Qty Received)

    CT WIP MATERIAL PURCHASES (DIVISION)

    ((Part Fin Yr Mat) * Qty Received)

    VARIANCES:

    If Part Fin Yr Mat > Mat Cost Issued

    CT MATERIAL BUDGET VARIANCE (DIVISION) WITH DIFF.

    If Part Fin Yr Mat < Mat Cost Issued

    DT MATERIAL BUDGET VARIANCE (DIVISION)

    DT INCOMING INSPECTION (DIVISION)

    ((Part Fin Yr Mat + Subc) * Qty Received)

    CT CREDITOR PRICE VARIANCE (DIVISION)

    ((Part Fin Yr Subc) * Qty Received)

    CT WIP MATERIAL PURCHASES (DIVISION)

    ((Part Fin Yr Mat) * Qty Received)

    VARIANCES:

    If Part Fin Yr Mat > Mat Cost Issued

    CT MATERIAL BUDGET VARIANCE (DIVISION) WITH DIFF.

    If Part Fin Yr Mat < Mat Cost Issued

    DT MATERIAL BUDGET VARIANCE (DIVISION)

    INSPECTION

    SUPPLIER TO INSPECTION

    (Return Sub-contracted Item)

    SUPPLIER TO

    STORE

    (Return Sub-contracted Item)

    GOODS RECEIVING STORE

    (Your Company)

    INSPECTION TO STORE

    DT STORES STOCK (DIVISION)

    ((Part Fin Yr Mat + Subc) * Qty Received)

    CT INCOMING INSPECTION (DIVISION)

    ((Part Fin Yr Subc) * Qty Received)

    ADD INVOICE

    LINK INVOICE

    TO RECEIVED

    PURCHASE

    ORDER LINE

    DT CREDITOR PRICE VARIANCE (DIVISION)

    ((Part Fin Yr Subc) * Qty Invoiced)

    CT TRADE CREDITORS (DIVISION)

    ((Invoiced Unit Price + VAT) * Qty Invoiced)

    DT VAT PURCHASES (DIVISION)

    (VAT * Qty Invoiced)

    OR

    SubcontractPurchase Order

  • SUB-CONTRACTORMATERIAL STORE

    (Your Company)

    DT WIP PROJECT MANAGEMENT (or Account for Node/Resource) (F)

    ((Part Fin Yr Mat) * Qty Issued)

    CT STORES STOCK (DIVISION)(F)

    ((Part Fin Yr Mat) * Qty Issued)

    1.6 SUB-CONTRACT “NON-FIXED ACCOUNT” PURCHASED ITEM AND INVOICE

    (Movements to and from Suppliers)

    STORE TO ORDER REQUIREMENTS

    (Issue Material / Items)

    C.J. PRINSLOO

    REV : 00

    02/12/97

    LEGEND:

    Fin - Financial

    Yr - Year

    Mat - Material Cost

    Subc - Sub-contract Cost

    (F) - Fixed Account Items

    Only

    DT WIP PROJECT MANAGEMENT

    (i.e. Account for Node/Resource)

    (Purchase Unit Price * Qty Received)

    CT CREDITOR PROVISIONING (DIVISION)

    (Purchase Unit Price * Qty Received)

    INSPECTION

    SUPPLIER TO INSPECTION

    (Return Sub-contracted Item)

    SUPPLIER TO

    STORE

    (Return Sub-contracted Item)

    GOODS RECEIVING STORE

    (Your Company)

    INSPECTION TO STOREADD INVOICE

    LINK INVOICE

    TO RECEIVED

    PURCHASE

    ORDER LINE

    DT CREDITOR PROVISIONING (DIVISION)

    (Purchase Unit Price * Qty Invoiced)

    CT TRADE CREDITORS (DIVISION)

    ((Invoice Unit Price + VAT) * Qty Invoiced)

    DT VAT PURCHASES (DIVISION)

    (VAT * Qty Invoiced)

    OR

    DT WIP PROJECT MANAGEMENT

    (i.e. Account for Node/Resource)

    (Purchase Unit Price * Qty Received)

    CT CREDITOR PROVISIONING (DIVISION)

    (Purchase Unit Price * Qty Received)

    SubcontractPurchase Order

  • APPENDIX C : Purchase Order Type Summary

    1. Stock Purchase Order a. Buys New inventory items b. Gives demand from – requirement of others orders

    Sales forecast – safety stock policies on parts Stores issue requisitions

    2. Subcontract orders

    a. Has requirements from a Bom for components needed by supplier to make a part

    3. Rework order a. Reworks inventory at a supplier (Use Quarantine stock)

    4. Purchase repair order a. Requirements for the repairable part (Waiting Repair) b. Can have additional requirements c. Can pay supplier d. Will deliver a repaired part to stock e. Always financed against node or account

    5. Non Stock Purchase Orders a. Buys non stock items, financed against node or account, needs a non stock requisition

    6. Service Requisitions – link purchase order.