PUNE CONSTRUCTION ENGINEERING RESEARCH
FOUNDATION
Project on Construction Waste Management
Reuse & Recycle
To Achieve
“Zero Debris”
PCERF is an NGO established with the initiative of prominent construction professionals from Pune.
PCERF
• Research & Development in construction materials methods.
• To organize seminars & workshop. • To update knowledge of professionals. • To provide a common platform for interaction.• Education through Exhibition “Constro”.• To publish books, newsletters , reports on various topics
for the building industry. • To establish a well-equipped laboratory and training
center.
PCERF Objectives
• Present working methods of construction projects.
• Mass work, speed, quality, use of machinery.• Every work on sq.ft. basis.• Measurement sheets, quantity surveying &
supervision become secondary part.• Piece workers achieve speed irrespective of
Economy saving of material, clearing & cleaning before & after completion of day’s work.
Introduction Construction Waste Management (CWM)
Introduction Construction Waste Management (CWM)
• Major part of debris is created during foundation. R.C.C. frame work, brickwork and plaster - 50% of project work.
• Indirect waste of natural resources -Sand,Bricks, Quarry metal, along with cement.
• No control on site , helplessness of promoters & builders.
• There are exceptions , but % is very less.• Generally huge debris is created.• Huge amount spend on transportation, removal by
machine • Spoiling Environment & Ecology of nature & National
Wealth .
Introduction Construction Waste Management (CWM)
• Practically not possible to transport & recycle in factory .• Ban on dumping Debris on fertile land, river Bed or road
sides by local authorities.• Grave situations are created day by day.• Find out solutions to reuse & recycle all debris with in the
site itself to achieve minimum or “Zero Debris” situations avoiding heavy transport cost.
• Joint efforts by PCERF and C’Cure for creating “Construction Rubble” in the form of regular or irregular shapes, Road dividers, curbing stones, bricks, blocks & other useful items.
• Awareness to evaluate National Waste of Resources by creating non-productive debris neglecting it, transporting wasting fuel.
Project: Objectives (CWM)
• Evaluation of construction waste & possible recovery.
• Data collection:
– Case study of 4/5 projects – start to finish –with the help of contractor, promoter, builder – jointly with the help of PCERF & C’ Cure team – 1 year.
– At random data collection – by PCERF & C’Cure team , on various sites, with prior permission of the owners ,evaluation of quantity at particular stage of construction ,type of materials and costing, w.r.t. to built up area. Also recording supervisory staff appointed for the work, w.r.t built up area. This will help in preparing R& D documentation & introduction to project.
Project: Objectives (CWM)
• To find out standards of consumption on sq.ft basis with the help of case studies.
• To create Awareness about reuse & recycle amongst promoters & builders.
• To find out the cause & care taken by the builder to control the waste.
• To formulate solutions to avoid construction waste
Project: Objectives (CMW)• Introducing the concept of “Site Keeping”
contracts on sqft basis for systematic planning, cleaning, storage & protection of materials.
• Looking at the general apathy of labour and supervisors, need of mechanism of self operating screening system on site .
• Generally debris is collected in huge quantity in open ducts of the project, unfortunately it gets automatically cured, due to excess curing it requires breaking & cutting with JCB machines, at the time of handing over & cleaning.
• To promote curing by gravity basis against electrical pump directly.
Project: Objectives (CWM)
• Invention of heavy mechanically operated vibrating screening platform of suitable size be installed in duct area. With continuous vibrations automatic screening will create usable crushed sand which can be used immediately, with in ‘ few’ days time ,for non concrete items like pcc, brickwork, filler material below flooring ,etc.
• Boulders or large size brick bat , concrete bulbs, plastered mortar, etc. be separated by various shoots by tilting the screen mechanically .This will create pure construction waste( debris) for recycling.
• In addition to molding fly ash bricks and tiles in factory we can prepare , on site “Concrete Rubble” out of construction waste.
Project: Objectives (CWM)
• Using system of table vibrator or orbiter sander and suitable moulds ( either uniform or variable size) We can create “Concrete Rubble” at site. Construction waste will get directly consumed with cement, fly ash and screen crush sand. This rubble can be used for rubble walls in foundation, compound walls, for soling below flooring, road dividers, curbing, blocks, pavement tiles and or for decorative items in Garden and Landscaping.
DEMOLITION WASTE
Factors Creating Construction Waste• Concrete: Mixer, RMC pump, Lift, Sukada,
Platform .• Brick Work: Pieces, unused mortar, patli, lintels
& chajja .• Cement Plaster: Bulk mortar, ideal period, non
cleanliness.• Water: Curing by electric pump – huge wastage.
THREE – POINT ACTION FOR PMC
• The primary responsibility for removal of debris would be that of generator.
• The generator of waste should inform the civic authority in writing in advance before undertaking such activity.
• In case of new construction ,the advance is to be deposited with the application for sanction of the building plan.
Results:• New DP to have Debris Dumping Policy.• PMC is following state Govt. and trying to create
scientifically designed dumping ground for collecting debris for recycling.
• In Mumbai it will be use for special Economic Zones.
THREE – POINT ACTION FOR PMC
Remedies:• Incentive to supervisors and separate contract
for site keeping on sq.ft. basis. • To develop separate accounts and record for
construction waste on site evaluation wrt to standards .
• Judicial planning for material purchases, storing at site ,separating with time management.
THREE – POINT ACTION FOR PMC Remedies:• Awarding site keeping contract on sft basis, for day to
day.• Cleaning, screening , protecting, separation and proper
storage.• Avoid curing by direct application of pump.• Make a habit of gravitational curing method.• Reuse maximum possible material on site itself.• As far as possible allow one agency to work and
complete its job in given time.• Give 25% more time for completion of job.• Keep perfect record of purchase of cement, sand ,stone
metal ,bricks, sagol etc.
THREE – POINT ACTION FOR PMC
• The primary responsibility for removal of debris would be that of generator. Local body will purchase providing containers and service for removal with nominal charges.
• The generator of waste should inform the civic authority in writing in advance before undertaking such activity. Will deposit container rent .Fine & penalty for defaulters.
• In case of new construction ,the advance is to be deposited with the application for sanction of the building plan.
• PCERF is trying to create a Bond between Promoters , Builders , Academicians ,Students Professionals and Consultants through this research project.
QUESTIONNAIRE
Sr.No. Yes/ No1 In your site visits are you happy with day
today cleanliness of the work? .(Give % of satisfaction)
20% to 75%
2 Do you have vigilance visits for at random checking ?
Yes / No
3:1
3 Do you insist consumption of mortar within an hour ?
3:1
4 Do you employ separate labour force to minimize day to day waste or zero debris?
2:2
5 Are you interested to minimize by reuse and recycling of construction waste on site?
Yes
QUESTIONNAIRE
Sr.No. Yes/ No6 Are you maintaining accounts to
evaluate the cost of the wastage of cement, bricks, aggregates and water during construction?
3:1
7 Can you supply the data of wastage in terms of quantity and the cost of removal I.e breaking, filling, transporting for cleaning the site at the time of finishing work w.r.t. built up area of the project?
Will try
QUESTIONNAIRE
Sr.No. Yes/ No
7a How many trucks of debris removed from your site? Give nos & Quantity w.r.t. total built up area of the project. Do you use JCB to remove debris on site?
Throw away
Or
Back Filling
Yes/ No
7b How many hours are engaged with JCB to clear the debris from site & cost?
QUESTIONNAIRE
Sr.No. Yes/ No7 C Are you screening the debris on 10
mm to 12 mm mesh to extract crush sand for reuse in masonry walls PCC etc?
No
8 Are your supervisors on site are able to control wastage created by petty contractors to your satisfaction?
No
QUESTIONNAIRE
Sr.No. Yes/ No
9 What method do you apply for curing the work after completion of R.C.C. work to avoid wastage of water?By electric motor – pump setBy gravityTo avoid wastage of water.
Pump
10 Will you allow college students to visit your site to collect information about construction waste at random or periodically?
Yes
QUESTIONNAIRE
Sr.No. Yes/ No
11 Will you collect data and provide detail information by taking special efforts on your on going project/ projects, to study wastage of all costly building materials?
Yes / No
3: 1
12 Will you like to adopt concept of “Site Keeping Contracts” similar to house keeping, to minimize construction waste?
Yes
• Joint Meeting with Engineering College.
• Maximum number of students who can participate from one college.
• The level of technical staff required from the college.
• The calendar period for starting of the data collection and finishing the entire work as expected .
• Sponsoring the traveling & other expenses of students by Promoters & Builders.
DATA COLLECTION WITH THE HELP OF STUDENTS
Guidelines For The Survey
• Method of Execution of project, staff and its working
• Day to day contact of the site in charge and collecting information with his help or independently.
• No of site visits by group of 5 – during 60 days.• Method of storage of materials at site.• No of labour working on site.• Adopting method of calculating quantity of
debris and wastage of materials used.
Guidelines For The Survey
• Method of curing- pump and gravity • Wastage of water-minimum required and
actually adopted.• Recording observations stage of
constructions , built up area under work, quantity of materials laying on site for use, details' of ongoing works .
• Generation of debris during work by which work? How much?
Guidelines For The Survey
• Testing of recycled products.
• Possible use of Ferro cement technique for reuse and recycle process and products.
• Regular mesh screening with 15mm,10mm and 6 mm and using simple moulds like bucket and Ghamelas.
Standards Derived For Evaluation of Debris
• For arriving of standards on construction work reuse and recycle to achieve “Zero Debris” case study of one project self supervised without watchman & without supervisor . For Example sample standard are presented here. All other standards will be derived in process.
Case study at 25, Madhavbaug, Pune.
Site Keeping ,Screening & Handling of Debris.
• Details of Expenditure (Exp. For) : • Transport Of debris away from site after screening of demolition
of old existing structure for connecting new construction.• 05.12.09 4 x 550 = 2,200• 23.01.10 1 x 550 = 550• 30.01.10 2 x 550 = 1,100• 14.01.10 2 x 550 = 1,100• 25.01.10 2 x 550 = 1,100
---------- ---------
11 Trucks 6,050 -------------------------------------
A• ======= =====
Case study
• (Labour) :By contract- Lump sum for screening of above debris.
• 16.10.09 Rs. 2,000• 12.11.09 Rs. 2,000• 28.11.09 Rs. 500• 23.01.10 Rs. 500
--------
Rs. 5,000 -------------------- B
=====
Case study• (Labour) :Daily wages for screening cahwl o&
double screening of debris.• 27.02.10 3 Female x 150 = 450• 23.04.10 5 ½ Female x 150 = 825 • 01.05.10 2 Female x 150 = 300• 10.05.10 5 & 8 Female x 150 = 2,200• 17.05.10 10 = 1,300
----------
Rs. 5,075 -----C
======
B+ C = Rs. 10,075/-
Case study
• Demolition of old work :
• Total expenses for transport of 11 trucks Rs. 6,050/- to thrown away debris -------A
• Total expenses for screening and cleaning the open site – Rs. 10,075/- ---------(B+C)
Case study
• Material cost received from above :•
• Brick pieces – 2200 s.ft. thick / 4” = 710 cft i.e.3.5 trucks @ 5000/- = 17,500 ( all used for water proofing.)
• Fine sand 3/8 sieve : After Plastering • 300 cft chaal : Is screened after 1st screening received (112.50 cft)
sand @ 40/- use for brickwork, under flooring. 4,480.00
• 3/4 2nd screening :100.00 cft sand @ 40/- used below flooring 4,000.00
• Balance Pure Chal or shingles : 100.00 cft @ 20/- used below flooring for crushing to drainage line and pee . 2,000.00
•
Case study
• Fine sand received from:
• Rabbit or Malawa 200 cft• (+) 2nd Stage 72 cft• (+) additional last stage 28 cft • ---------------• Screening total 300 cft @ Rs. 20/-
6000.00
---------------Total Rs. 33,980.00
---------------------------D =========
Case study
• Now after completion of flooring balance on site of waste materials
• Brickbat small 50 cft
• Rabbit with concrete & brick bat 150 cft
• Broken pieces of kota stone 100 cft
• Useful for pee below paving etc. Which is negligible approaching for Zero Debris.
Case study
• Single Bungalow of area 4,500 sft. Plot built up area 4000 sft. (period 12 months) :
• Labour charges 10075 ÷ 4000 = 2.50 per sft.• Transportation Exp. 6050 ÷ 4000 = 1.50 per sft.• Material Recovered 33980 ÷ 4000 = 8.50 per sft.• Normally this material is not separated and reuse it is thrown away by
truck away from the site involving additional transport cost that material which we have reused is therefore spend to purchase same quantity to complete the job.
• By reuse we have save on transport of following material.• By keeping all the time cleanlyness on site we have saved loss of cement
bags assuming average 1” layer of cement mortar on 4000 sft built up area.
Case studyValue of the material saved : • 40 bags cement @ 270/- = 10,800
• Additional sand required
600 cft @ 40/- = 24,000
• Additional brickbat
2.00 trucks @ 5000/- = 10,000
• Additional Metal
1 brass @ 1500/- = 1,500
• Transport of debris
6 trucks @ Rs.800/- per truck = 4,800 ------------
Rs. 51,100 ---------E
• Total Saving and Recovery
• D + E =Rs. 33980 + Rs. 51100 = Rs. 85080 say 85000/- -------F
Now assuming :
Total Recovery & Saving Rs. 85000/- ---- -----F
Less Expenses for recovery Rs. 10075/- -----(B+C) - ---------------- Net Gain Rs. 74,925/-
Say Rs. 75,000/- --------- G• Gain is Rs. 75000 ÷ 4000 = Rs. 18.50 per sft. • For all practical purposes say Rs. 20/- per sft. • Net saving for 4000 sft. Is Rs. 80000/-• For Big project of 1,00,000 sft Gain Rs. 20,00,000/-• For project of 5,00,000 sft. Gain Rs. 1,00,00,000/-
Conclusion : Out of total saving Rs. 20/- per sft. On built up area promoter or Builder can easily spent Rs. 5/- to 10/- per sft. By giving ‘Site Keeping” contract for Zero Debris and create new field in modern Royal Construction. (without any monetary loss) getting max. satisfaction & Healthy feelings at any hours of the day on site.
Case study At most satisfaction of cleanlyness, quality work
Sample Units:- Standards derived from the case study
Consumption of Cement
• Total• Bill No.• 02.05 -50 } 255 bags RCC• 07.05 - 50 }
1. 30.05 - 100 }• 04.06 - 15 }• 30.07 -40 }
2. 12.08 - 100 } 300 RCC/UC
• 02.09 - 100 }• 09.09 - 100 }
3. 02.10 - 200 } 300 RCC/UCR
• 10.10 - 100 }
4. 09.11 - 100 } 220
Brick work Nov/Dec• 07.12 - 120 }
• 5. 16.02.10- 100 bags plaster 1st Jan.10 Feb 10
• 6. 06.03.10- 140 bags plaster March 10
• 12.04.10- 100 bags waterproofing
• 7. 29.04.10- 10 bags waterproofing, plumbing
• 29.05.10- 100 bags Flooring & plumbing.
• ---------------
• 1,525 bags• 1525 ÷ 4000 = .381 bags
• i.e. 38.10 bags/100 sft.• Say 40 bags/ 100 sft5.
Case study
M.S. & Tor Steel • Bill No.• 1. 02.05.09 to17.07.09 = 1,10,625.00 - 1,10,625.00• 2. 13.08.09 = 3,909.00• 31.08.09 = 90,136.00
• 05.09.09= 19,482.00 1,13,527.00
• 3. • 16.09.09 = 1,00,320.00• 23.09.09 = 14,511.00• 06.10.09 = 8,840.00• 12.10.09 = 41,321.00• ------------------------• 1,64,992.00 1,64,992.00• 4• 05.11.09 = 9,591.00• 14.11.09 = 7,366.00• 21.11.09 = 5,208.00• -----------------• 22,165.00• ========== Total 4,11,309.00
• 13000 ÷ 4000 = 3.25 kg / sft. On Built-up area with Negligible Wastage of 1% i.e. 130 kg
Say 13 ton
Site
BUNGLOW OVER HEAD TANK- GRAVITY CURING
CONSTRUCTION WASTE
ALL IN ONE DEBRIS – NO SCREENING
SEPERATED DEBRIS- PARTLY SCREENED
CONSTRUCTION WASTE SCREENED AND HARD DEBRIS
CONSTRUCTION WASTE
SEPRATION – GRADING CRUSHED SAND AFTER SCREENING OF DEBRIS
CONSTRUCTION WASTE
PROTECTION OF DEBRIES FROM EXCARATED SOIL – DRAINGE LINE WORK
BOTTOM & SIDES FILLED WITH CHAWL OR DEBRIS
“Concrete Rubble”
RECYCLING RECYCLING
COMMERCIAL USE POSSIBLE
CURBING Gutters
ROAD DIVIDERS
THANK YOUPresentation By – R. D. Nagarkar Ex. Comm. Member ,P.C.E.R.F.
Chairman, Constro 2007