PUMP STATION REHABILITAITON on a budget
Transcript of PUMP STATION REHABILITAITON on a budget
PUMP STATION REHABILITAITON
ON A BUDGET
An Operators Solution to a Safety and Operational Challenge
PRESENTERS:
JIM BAIRD, GENERAL MANAGER ROSEBURG URBAN SANITARY AUTHORITY
JADE MECHAM, PROJECT MANAGER IIJACOBS ENGINEERING
Fairgrounds pump station owned by Douglas County,operated and maintained under contract by Roseburg Urban Sanitary Authority.
Constructed in 1970.
Operations and Maintenance provided by Roseburg Urban Sanitary Authority through the Authority’s contract with Jacobs Engineering.
O&M included equipment replacement by RUSA and reimbursed by the County.
ORIGINAL DESIGN
EXISTING PUMP STATION
• ORIGINAL DESIGN VACUUM-PRIMING
PUMP , ABOVE-GROUND DESIGN
• CONSTRUCTED A SUBMERSIBLE PUMP
WITH GUIDE RAILS, WET WELL
MOUNTED DESIGN
• WHAT CHANGED ???
ORIGINAL DESIGN22 feet of lift in the design (actual lift 24 feet).Approaching the limit of a vacuum priming pump.
WHAT WAS THE OPERATOR LEFT WITH ?
• A FULL CIRCLE METAL WET WELL COVER
• ACCESS HATCHES FABRICATED INTO THE COVER
• CONTROL PANEL MOUNTED ON THE COVER
• ELECTRICAL CONDUCTOR WITH SEAL-OFFS
• SHUTOFF VALVES MOUNTED INSIDE THE WET WELL
• CHECK VALVES MOUNTED INSIDE THE WET WELL
• DISCHARGE ELBOWS MOUNTED TO A STEEL PLATE INSTALLED IN THE
BOTTOM OF WET WELL
• THANK YOU DESIGN ENGINEER !!!!!!!!!!!!!!
IMPROVEMENTS REQUIRED
AS PART OF AN ANNUAL PUMP STATION INSPECTION THE RUSA STAFF
DETERMINED THE FOLLOWING:
• THE PUMPS WERE IN NEED OF REPLACING
• ONE OF THE CHECK VALVES WAS LEAKING
• THE METAL HATCH WAS DETERIORATING CREATING SAFETY CONCERNS
• THE LOCATION OF THE CONTROL PANEL WAS PROBLEMATIC
• THE PUMP STATION WAS PAST IT’S DESIGN LIFE AND A HAZARD TO OPERATE
BUDGET AND TIME CONSTRAINTS
• DOUGLAS COUNTY HAS SEEN DECREASED REVENUE OVER SEVERAL YEARS
• THE FAIRGROUNDS COMPLEX HAS A VERY LIMITED BUDGET FOR REPAIRS
• THE DOUGLAS COUNTY FAIR IN AUGUST IS PEAK FLOW SEEN DURING THE YEAR
• QUESTION:
• HOW TO MAKE THE NECESSARY IMPROVEMENTS ON A LIMITED BUDGET
• HOW TO COMPLETE THE PROJECT WITHIN THE CONSTRUCTION WINDOW.
• HOW TO REPLACE THE EQUIPMENT WHILE MAINTAINING THE FLOW.
THE PLAN
STAGED IMPROVEMENTS OVER TIME
PROJECT COST
THE PLAN
STAGED IMPROVEMENTS OVER TIME
PROJECT COST
BE CAREFUL WHAT YOU ASK FORDOUGLAS COUNTY BUGET
COMMITTEE LOOKED AT THE BOTTOM LINE $52,000 AND
FUNDED ALL THE IMPROVEMENTS FOR ONE YEAR
THE NEW PLAN
• LAYOUT NEW PUMP ELBOWS TO
MOUNT IN THE EXISITNG WET
WELL
• ELIMINATE THE NEED FOR SHUT-
OFF VALVES AND CHECK VALVES
• LAYOUT A DUAL FORCE MAIN
• ADD A NEW MANHOLE TO THE
EXSITNG GRAVITY SEWER
PUMP SELECTION
INSTALL A NEW MANHOLE
New manhole constructed over existing gravity sewer. Tideflex check valves installed on each force main.
NEW DUAL FORCE MAIN
Installed approximately 160 feet of dual force main. This length is about as far as you want to use a dual force main.
MAKE NEW FORCE MAIN/WET WELL CONNECTION
INSTALL NEW CONDUITS AND A CONTROL PANEL SLAB
New underground power service. New power and level control conduits to existing wet well.
INSTALL NEW CONTROL PANEL SHELTER
INSTALL A NEW FULL CIRCLE ALUMINUM HATCH WITH FALL CONTROL
Out with the old
In with the new
THE BIG CHALLENGE
• INSTALL NEW PUMP ELBOWS
• INSTALL NEW DISCHARGE PIPING
• INSTALL NEW PUMP GUIDE RAILS
• MAKE THE PIPE CONNECTION FROM THE DISCHARGE
PIPING TO THE NEW FORCE MAIN
• INSTALL THE NEW PUMPS AND WIRE THEM TO THE
CONTROL PANEL
• REINSTALL THE LEVEL CONTROL
ALL OF THIS WORK NEEDED TO BE DONE IN ONE DAY AS WE
COULD NOT UTILIZE A BYPASS PUMPING SYSTEM DUE TO
THE SITE CONSTRAINTS.
ALL HANDS ON DECK !!!!!
• REMOVAL ALL OF THE INTERIOR
PIPING, SHUT-OFF VALVES AND
CHECK VALVES
• REMOVE THE EXISTING PUMP
ELBOWS
• REMOVE THE STEEL PLATE IN
THE BOTTOM OF THE WET WELL
D -DAY
REMOVE THE PUMPS
GUIDE BARS MUST GO SCRAP THE HATCH
THE REAL WORK BEGINS
DISCHARGE PIPE NEEDS TO BE
REMOVED
CAN’T UNSCREW THE BOLTS
GET THE SAW
SAFETY FIRST
FIVE WATCHING ONE
WORKING
BUILDING FROM THE BOTTOM UP
NEW PUMP ELBOWS READY TO LOWER
SAFETY FIRST
FIVE WATCHING ONE
WORKING
JUST ANOTHER DAY AT RUSA
TIME TO WIRE UP THE PUMPS
CONNECT THE DISCHARGE PIPING TO THE FORCE MAIN
NEW PUMPS LOWERED INTO PLACE
THE END OF A LONG DAY
A JOB WELL DONECompleted August 3rd just in time for the Douglas County Fair• $52,000 in new equipment and improvements
• New pump elbows• New pumps• New power feed (no more overhead wires)• New discharge piping• New guide rail system• New full circle hatch with fall control • New control panel shelter• New SCADA (Mission M800 real-time monitoring)• New manual transfer switch• New dual force main and discharge manhole
RUSA completed the site improvements over several days.RUSA and Jacobs Engineering made the final push in a 14 hour day with the collection crew of 7, one person from the Engineering department and Jacobs head mechanic.
A needed improvement completed by a great group of professionals.