SPECIFICATIONS FOR Forbes Marshall Consultancy D No : C-504-PP9-23CENTRIFUGAL PUMP Kasarwadi PUNE - 34 Rev 0 Dt07.04.2009
A GENERAL E SEALING
1 Tag No Dye Pump 1 & 2 1 Shaft sealing Mechanical Seal2 Quantity 2 nos.(1W + 1S) 2 Material type & code TIWA3 Location Outdoor 3 Mechanical seal make *4 Make *5 Model *
B OPERATING CONDITIONS F PERFORMANCE CHARACTER
1 Service Effluent 1 NPSH Reqd in mtrs *2 Solid content Yes (Fibers Polyster/Cotton) 2 Efficiency *
3 65 to 70 3 KW @ Duty *4 Viscosity Cp 1 4 KW @ max capacity *5 Specific gravity 1 5 Pump speed RPM *6 Suction pressure MLC Negative suction of 10 MLC 6 Impeller Dia MM *7 NPSH Available M - 7 Performance curve No *
8 75 8 Safe minimum flow *9 Diff head reqd MLC 40 9 Shut off head *
10 Weight of the pump + plate *C TYPE OF CONSTRUCTION
G DRIVE SPECIFICATIONS1 Casing Single volute back pull out2 Casing mounting Horizontal 1 Type Electric motor3 Impeller type Closed 2 Enclosure TEFC IP 554 Lubrication Constant oil leveller 3 Transmission Directly coupled5 Bearing type Ball 4 Coupling Mfr / Type Love joy flexible6 Base plate Fabricated 5 Power Supply 415 V 3 phase7 End connection ASA 150#, ANSI B 16.5 RF 6 Motor Make *8 Nozzle size Suction / Discharge * / * 7 Motor rating / poles * / *
8 Motor frame size *D MATERIAL OF CONSTRUCTION
H ANCILLARIES1 Body SS3042 Internals SS316 1 Motor Required
2 Coupling Guard Required3 Conversion Kit Required
NOTES : 4 Flushing plan RequiredVENDOR TO FURNISH DATA MARKED THUS * 5 Foundation Bolts Required
ISSUED FOR INQUIRY I INSPECTION & TESTINGPRPD BY MRG
1 Running & Performance test RequiredClient Norbon Comtex Ltd. 2 NPSHProject Utility Distribution 3 Dismantling RequiredLocation Dhaka, Bangladesh 4 Hydro testing Required
Temperature o C
Capacity m3/hr