PULSE SHAPING ISSUESFOR THE PETS TESTING PROGRAM
AT SLAC
A. CappellettiSLAC, 13-30 Oct 2008
![Page 2: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/2.jpg)
I
Q
CW @ 11.424 GHz
KLY.
KLY.
TWT
H Y B Other
experiment…
Delay (2 round trips) + Mode conversion
H Y B
STRUCTUREAMPLITUDE – PHASE DETECTION SYSTEM
LAPTOP (LABVIEW CODE)
ATTENUATOR
PH. SHIFTERATTENUATOR
-
AFG
MODULATION POWER SUPPLY
PULSE COMPRESSION
FEEDBACK
SYSTEM OVERVIEW
50 MW @ 1.5 ms /p2
![Page 3: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/3.jpg)
MODULATION• Amplitude and phase data seem to fit, so we should use polar data
instead of cartesian I-Q data, but practical concerns make I-Q data a better choice.
• Manipulating amplitude and phase of a carrier sine would be expensive, difficult and not as flexible as a circuit that uses I-Q waveforms. We control amplitude and phase of an RF carrier by operating the amplitudes of separate I and Q inputs.
![Page 4: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/4.jpg)
• ASTA (Accelerating Structure Test Area) hosts two 50 MW Klystrons, supplying up to 500 MW @ 64 ns (and almost 300 MW @ 260 ns); 90 MW if delay lines are not used.
• A relative phase shift of either 0 or 180 degrees allows to direct the power towards a specific hybrid output.
POWER SUPPLY
![Page 5: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/5.jpg)
• SLED II uses low-loss resonant lines (yielding flat-topped output pulses), 26 ft long, and mode transducers. 1 RTT (Round Trip Time) = 132 ns; we use 2 RTT.
• One compressed-pulse-time from the end, the phase of the input is reversed, so that the field reflected from the coupling interface adds constructively to the field emitted from the charged cavity; then the stored energy is extracted.
• We worked with 8 sub-intervals, 132 ns each.
PULSE COMPRESSION
![Page 6: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/6.jpg)
FEEDBACK SYSTEM
MIXER
AMP.
11.424 GHz signal
10 MHz signal
10.25 GHz
FM
1.174 GHz
Amp. Detection
Amp. - Phase Detection
f
A
A (slow…)
Low noise block downconverter ( LNB )
![Page 7: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/7.jpg)
• Non-idealities in the klystrons outputs, as well as in the pulse compressor, make the pulses not constant both in amplitude and in phase.
• As a result, the system produces pulses affected by ripple: this is deemed to be responsible of a 30 % loss in terms of efficiency (presently, efficiency level is 60%)
• Objective: developing an algorithm for point-by-point correction of the waveform which the system is initially fed.
FEEDBACK CORRECTION
![Page 8: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/8.jpg)
“Early” LabVIEW interface for coarse shaping…
System setup(…hardware/system interfacing… )
![Page 9: PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, 13-30 Oct 2008.](https://reader035.fdocuments.in/reader035/viewer/2022062517/56649e8a5503460f94b8fb83/html5/thumbnails/9.jpg)
• … but an automatic correction code is required to be developed, in the framework of a longer-term cooperation with SLAC
Training program;o SO (safety)o EOSH (environmental safety and health)o GERT (radiological training)o Electrical Safetyo RWT 1 (work in radiation areas)o ASTA Operatoro …