Public Workshop on the Sustainable Groundwater Management ...

31
Public Workshop on the Sustainable Groundwater Management Act - SGMA - October 2017

Transcript of Public Workshop on the Sustainable Groundwater Management ...

Page 1: Public Workshop on the Sustainable Groundwater Management ...

PublicWorkshopontheSustainableGroundwaterManagementAct

- SGMA-

October2017

Page 2: Public Workshop on the Sustainable Groundwater Management ...

WhyShouldWeCare?

ThislawCOULD resultin:• Limitsongroundwaterpumping

• Groundwaterfees/taxes

• Statecontroloflocalgroundwaterresources

Page 3: Public Workshop on the Sustainable Groundwater Management ...

Agenda

• WelcomeandOverview• ManagingGroundwater

– Whycare?– What’sRequired?• SGMAintheCosumnesSubbasin• Near-TermEffortsandGrantScope• PublicOutreach• NextSteps

SMGA=SustainableGroundwaterManagementAct

Page 4: Public Workshop on the Sustainable Groundwater Management ...

WelcomeandOverview

OriginsofSGMA

SGMA=SustainableGroundwaterManagementAct

GSA=GroundwaterSustainabilityAgency

Page 5: Public Workshop on the Sustainable Groundwater Management ...

ManagingGroundwater

• Whyshouldwecare?– Avoidstateintervention– Maintainlocalcontrol– Keepgroundwateravailable(sustainable)

• What’srequired?– FormGroundwaterSustainabilityAgencies(GSAs)– GroundwaterSustainabilityPlan(GSP)by2022– Achievesustainabilityby2042

ü

Page 6: Public Workshop on the Sustainable Groundwater Management ...

LawRequirements

• Lawalsocallsformeaningfulstakeholderengagement– Maintainlistofinterestedparties– Fosterbroadparticipationandinput– Considertheinterestsofbeneficialusesandusersofgroundwaterinthebasin,aswellaslandusesandpropertyinterestspotentiallyaffectedbygroundwaterusebasin

• Tonightisthepartofanongoingseriesofpublicoutreachefforts

Page 7: Public Workshop on the Sustainable Groundwater Management ...

SGMA– StateLegislature’sResponsetoOngoingProblem

SMGA=SustainableGroundwaterManagementAct

Page 8: Public Workshop on the Sustainable Groundwater Management ...

CriticallyOverdrafted Basins

Page 9: Public Workshop on the Sustainable Groundwater Management ...

What’srequired:SGMABasics

TheSustainableGroundwaterManagementAct1. Localcontrol(governance)ispreferred2. Ensuresustainablegroundwater3. Definethresholds&actionsinyourPlan4. ContinualperiodicStatereview5. AvoidStateintervention(State“backstop”)

SMGA=SustainableGroundwaterManagementAct

Page 10: Public Workshop on the Sustainable Groundwater Management ...

SGMAinCosumnesSubbasin

• Whowillmanageyourgroundwater• Localagencies• Agencyroles• WritingthePlan• Demonstratingsustainability

SMGA=SustainableGroundwaterManagementAct

Page 11: Public Workshop on the Sustainable Groundwater Management ...

Whowillmanageourgroundwater?

• Local:GroundwaterSustainabilityAgencies(GSAs)• 7GSAsinCosumnesSubbasin

– AmadorCountyGroundwaterManagementAuthority– Sloughhouse RCD– Omuchumne-HartnellWD– GaltID– ClayWD– CityofGalt– SacramentoCounty

Page 12: Public Workshop on the Sustainable Groundwater Management ...

Whowillmanageourgroundwater?

• Local:GroundwaterSustainabilityAgencies(GSAs)• 7GSAsinCosumnesSubbasin

– AmadorCountyGroundwaterManagementAuthority– Sloughhouse RCD– Omuchumne-HartnellWD– GaltID– ClayWD– CityofGalt– SacramentoCounty

AmadorCountyGroundwaterManagementAuthority

Page 13: Public Workshop on the Sustainable Groundwater Management ...

AuthorityMembers

• AmadorCounty

• AmadorWaterAgency

• JacksonValleyIrrigationDistrict

Page 14: Public Workshop on the Sustainable Groundwater Management ...

GroundwaterSustainabilityAgencies(GSAs)

• GSAeligibility– Publicagency– Locallandorwateruseresponsibility

• Flexiblemanagementstructure• CouldbeoneGSAforbasinor

multipleGSAsthatcoordinate• EmpowersGSAsto:

– Measureextractions– Conductstudies– Manageextractions– Assessfees– Achievesustainability

Page 15: Public Workshop on the Sustainable Groundwater Management ...

GSAs- GroundwaterSustainabilityAgencies-

GSA=GroundwaterSustainabilityAgency

Page 16: Public Workshop on the Sustainable Groundwater Management ...

SGMA RolesDWR=Calif.Dept.ofWaterResourcesSWRCB=StateWaterResourcesControlBoardGSA=GroundwaterSustainabilityAgency

Page 17: Public Workshop on the Sustainable Groundwater Management ...

Stepthree

AchieveSustainability

20yearsafteradoptionofplan

• Annualreports(waterextraction,storage)

• Prevent“undesirableresults”

SGMAStepstoCompliance

Stepone

FormGroundwaterSustainabilityAgency(ies)– GSA–

June30,2017

100%coverage:nomore,noless

Steptwo

DevelopGroundwaterSustainabilityPlan– GSP–

January31,2022• Sustainable

managementcriteria;

• Implementationthresholds&actions

SGMA=SustainableGroundwaterManagementActGSA=GroundwaterSustainabilityAgencyGSP=GroundwaterSustainabilityPlan

Page 18: Public Workshop on the Sustainable Groundwater Management ...

SGMA– ConsequencesofFailure(aka“StateIntervention”)

• StateWaterBoardstepsin• WaterExtraction/reportingFees

• MandatedWaterMeters• WaterPlanningFees• StateWaterBoardpreparesInterimPlan

• BasinstillneedstoprepareGSP

FeesFiling $130/wellProbation $40/AFInterimplan $55/AFDeminimis $100/well

Forag:over$300/acre*

*estimatedcost

SGMA=SustainableGroundwaterManagementActGSP=GroundwaterSustainabilityPlan

Page 19: Public Workshop on the Sustainable Groundwater Management ...

SustainabilityMeans…

… avoiding “undesirable results”

UndesirableResults1. Chronic lowering of groundwater levels2. Reductions in groundwater storage3. Seawater intrusion 4. Degradation of water quality 5. Significant land subsidence 6. Surface water depletions from groundwater

Page 20: Public Workshop on the Sustainable Groundwater Management ...

DevelopingThePlan

• TheGSAshaveuntilJanuary2022tocompleteaGroundwaterSustainabilityPlan

• ThesevenGSAsareworkingtodevelopasingleintegratedplanfortheBasin– TheplanwillhavespecificcomponentsuniquetoeachGSA

• Mustdemonstratesustainability

Page 21: Public Workshop on the Sustainable Groundwater Management ...

• Technicalanalysis– Conceptualmodel– Waterbudget

• Lookintothefuture…– Computermodel– Play“whatif”games

• Definemilestonesandthresholds 20422022

Projected Future

Howdoyoudemonstrate“sustainability”?

Page 22: Public Workshop on the Sustainable Groundwater Management ...

(Sub)Basin&GSAs- Piecesofawhole-

Staterequiressingle:– DataSet– Methodology– Coor.Agreement– PointofContact

Requirescoordinated:– GWmodels– Sustainableyields– Plans

GSA=GroundwaterSustainabilityAgency

Page 23: Public Workshop on the Sustainable Groundwater Management ...

ThePlanisaBIG challenge

Required• Coordination• Negotiation• Funding($2M+)• Lotsofoutreach• Complexscience• Jointfact-finding• Maintainautonomy

Otherfactors• Consequencesarehigh• Planisduein2022• Autonomy+SingleSubmittal

• After2022:annualreportsand5-yearupdates

Page 24: Public Workshop on the Sustainable Groundwater Management ...

DRAFTGrantApplication

• Incrementalapproach

• EachPhase– Governance– Coordination– TechnicalImplementation

– StakeholderEngagement

– Funding

ProjectManagementandAdministration

Phase1

GSPFoundation

2015– 2018

Phase2

BasinCharact.&Analysis

2018– 2019

Phase3

Sust.Planning

2019– 2020

Phase4

GSPPrep.&Submittal

2020–2022

Page 25: Public Workshop on the Sustainable Groundwater Management ...

Costs&Funding

StateGrantRequest37%

ExistingStateGrant2%WaterForum

30%

LocalAgencies

9%

Sac.County18%

CityofGalt4%

Page 26: Public Workshop on the Sustainable Groundwater Management ...

GrantFunding

• FundsfromProp1throughDWR• Grantsupto$1Mor50%(whicheverisless)• FundsONLYforPlanpreparation(andstudies)• OnlyoneapplicationperBasin• Demonstratedpublicengagement• Crediblescopeofworkneeded• Demonstrationofbasincollaborationkey

DWR=Calif.Dept.ofWaterResources

Page 27: Public Workshop on the Sustainable Groundwater Management ...

Conclusion:SGMAisComplexandHighStakes

Page 28: Public Workshop on the Sustainable Groundwater Management ...

GettingInvolved

• ThesevenGSAshaveorganizedintoaBasinWorkingGroup

• Meetingsareopentothepublic• Meetingsummariesarepostedtoawebpage

– cosumnes.waterforum.org• Periodicworkshopswillbeheldthroughouttheplanningeffort

• Draftdocumentswillbeavailableforpublicreviewandcomment.

Page 29: Public Workshop on the Sustainable Groundwater Management ...

QUESTIONSANDCOMMENTS

Page 30: Public Workshop on the Sustainable Groundwater Management ...

NextSteps

Next4Years• It’sallabouttheGrantApplication!!!– GrantapplicationsdueonNovember13th

• PreparethePlan– Analyses– UndesirableResults– Sustainableyield– ManagementActions

2022thru2042• ImplementthePlan• Monitoring• Reporting• Possibly:managementactions

• Unknown:long-termcosts

Page 31: Public Workshop on the Sustainable Groundwater Management ...

YourInput:EngagingWaterUsers+thePublic

Howdoweensureinterestedwaterusersarewellinformedandtheirperspectivesaremeaningfullyinformingplandevelopment?• Whatfrequencyofinvolvement?• Whereandwhen?• Whattopicsareofgreatestinteresttoyou?• Howtogetthewordout?