Public Training Schedule 2018 PT.MMS di Indonesia (1,11...
Transcript of Public Training Schedule 2018 PT.MMS di Indonesia (1,11...
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING1 Statistical Process Control BERBASIS MINITAB 14 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 13-15 26-28 24-26 28-30 26-28 5.950.0002 BASIC CIVIL 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 04-07 7.950.0003 CARTOGRAFI 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 03-06 7.950.000
4CATHODIC PROTECTION CORROSION CONTROL ANDPREVENTION
4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 11-14 7.950.000
5CIVIL CONSTRUCTION OBSERVATION of EXECUTIONBUILDING
4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 17-20 7.950.000
6CIVIL CONSTRUCTION PENGAWASAN PELAKSANAANBANGUNAN
4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 03-06 7.950.000
7 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 18-21 7.950.0008 DOKUMEN KONTROL 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 17-20 7.950.0009 FUZZY LOGIC CONTROL 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 04-07 7.950.000
10 GAS AND LIQUID FLOW MEASUREMENT 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 10-13 7.950.000
11PROCESS CONTROL SYSTEMS APPLICATION, DESIGN,AND TUNING
4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 11-14 7.950.000
12SUPERVISORY CONTROL AND DATA ACQUISITION(SCADA)
4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 03-06 7.950.000
13 Survey & Mapping 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 11-14 7.950.00014 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 29-31 05-07 26-28 5.950.00015 CHOKE AND CONTROL VALVE 4 22-25 20-23 20-23 17-20 28-31 04-07 17-20 28-31 18-21 22-25 20-23 10-13 7.950.000
16MARINE CORROSION AND PREVENTION FOR OFFSHORESTRUCTURE
3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 6.500.000
17 ADVANCED FLOW MEASUREMENT 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 01-04 19-22 17-20 8.500.00018 ADVANCED PID CONTROLLER 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 08-11 26-29 03-06 8.500.00019 CONTROL AND CHOKE VALVES 4 15-18 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 15-18 05-08 10-13 8.500.00020 CONTROL SYSTEM FUNDAMENTALS 4 22-25 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 22-25 12-15 18-21 8.500.00021 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 4 16-19 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 16-19 13-16 03-06 8.500.00022 FISCAL AND CUSTODY METERING 4 23-26 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 23-26 19-22 10-13 8.500.00023 FLOW ASSURANCE IN PIPING SYSTEMS 4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 18-21 8.500.000
24 FLUID FLOW – GAS METERING AND CUSTODY TRANSFER 5 08-12 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 01-05 05-09 03-07 9.500.000
25 HUMAN MACHINE INTERFACE (HMI) 4 02-05 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 08-11 12-15 11-14 8.500.00026 OPC (OPEN PROCESS CONTROL) 4 15-18 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 15-18 20-23 17-20 8.500.00027 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 02-05 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 01-04 13-16 18-21 8.500.00028 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 09-12 19-22 04-07 8.500.000
PUBLIC TRAINING SCHEDULE 2018 DI BANDUNG
29 SCADA SYSTEMS 4 16-19 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 16-19 26-29 11-14 8.500.00030 Ultrasonic Gas Flow Meter 5 22-26 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 22-26 05-09 17-21 9.500.000
31WELLHEAD INSTRUMENTATION AND HYDRAULICCONTROL SYSTEMS
4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 29-01 12-15 03-06 8.500.000
32WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA100.11a
4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 02-05 20-23 10-13 8.500.000
33 CALIBRATION ISO IEC 17025 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000
34DESIGN OF EXPRIMENTS (DOE) FUNDAMENTAL CONCEPTAND APPLICATION
4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000
35Electrical Test Instrumentation dan Sistem Pengukuran(Measurements)
4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000
36 Instrumentation Systems 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.00037 Measurements Systems 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.00038 Energy Audit and Application 4 15-18 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 15-18 12-15 17-20 8.500.00039 STATISTIK INDUSTRI 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 27-30 10-13 01-04 12-15 17-20 7.950.000
40CATHODIC PROTECTION FOR MINE STEEL STRUCTUREAND MINING SUPORTING FACILITIES
4 29-01 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 29-01 05-08 03-06 8.750.000
41 Cathodic Protection for Onshore and Offshore Structure 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.750.000
42 CORROSION AND SCALING PREVENTION 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 04-07 8.750.000
43 Corrosion Engineering for Non Corrosion Engineers 4 22-25 06-09 06-09 03-06 29-01 04-07 03-06 31-03 04-07 22-25 06-09 11-14 8.750.000
44INTERNAL AND EXTERNAL CORROSION CONTROL ANDMONITORING FOR PIPELINE AND SURFACE FACILITY
4 16-19 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 16-19 05-08 17-20 8.750.000
45 CCTV INSTALASI, PEMROGRAMAN DAN PERAWATAN 3 29-31 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 29-31 12-14 26-28 5.950.000
46 ADVANCED CCTV Perencanaan, Desain dan Implementasi 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 13-15 17-19 22-24 19-21 19-21 5.950.000
47 INSTRUMENTATION AND CONTROL SYSTEM 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 08-11 06-09 11-14 7.950.00048 Scale In Oilfield Water 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 09-12 12-15 04-07 7.950.000
49 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 15-18 19-22 11-14 7.950.000
50PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURANDAN PENGUJIAN
3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.000
51BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM
4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000
52 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 18-21 7.950.00053 CALLIBRATION OF MEASURING TOOL 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 17-20 7.950.000
54CONTROL VALVE OPERATION, MAINTENANCE, ANDTROUBLESHOOTING
4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 18-21 7.950.000
55 FINITE ELEMENT METHODS (FEM) 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 18-21 7.950.00056 Flow Measurement and Control Element 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 04-07 7.950.00057 INDUSTRIAL METROLOGY 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 10-13 7.950.00058 Inspeksi dan Korosi 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 18-21 7.950.00059 MEASUREMENT SYSTEM ANALYSIS 4 22-25 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 22-25 13-16 03-06 7.950.00060 ANSYS BASIC FLUENT CFD 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 9.500.00061 ANSYS INTERMEDIATE FLUENT CFD 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 30-02 17-20 29-01 19-22 17-20 9.500.00062 ANSYS ADVANCED FLUENT CFD 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 03-06 9.500.000
63ADVANCE PROCESS CONTROL, INSTRUMENTATION ANDMETERING
4 15-18 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000
64OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM)
4 22-25 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000
65 PROCESS CONTROL AND INSTRUMENTATION 4 29-01 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.00066 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.000
67SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZINGAND SELECTION
4 08-11 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.000
68FLUID FLOW MEASUREMENT AND METER PROVING INOIL AND GAS INDUSTRY
4 30-02 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 30-02 06-09 03-06 7.950.000
69GPS(Global Positioning System) for mining andPetroleum
4 15-18 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 15-18 19-22 10-13 8.500.000
70 INDUSTRIAL COMBUSTION AND BURNER 4 22-25 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 22-25 05-08 17-20 8.500.00071 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 8.750.00072 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.500.00073 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.950.00074 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MECHANICAL1 BOILER CONTROL SYSTEMS ENGINEERING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.950.0002 PLUMBING SYSTEM AND MAINTENANCE 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 22-24 26-28 26-28 6.500.000
3SISTEM KONTROL RHVAC (REFRIGERATION HEATINGVENTILATING AND AIR CONDITIONING)
5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 06-10 03-07 29-02 05-09 10-14 9.500.000
4 REFRIGERATION RETROFIT 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 8.500.0005 Pipeline Risk & Integrity Management 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 6.950.000
6Piping & Pipeline System Design, Specification,Installation & Maintenance
4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 10-13 8,500,000
7PLANT LIFE MANAGEMENT THROUGH RELIABILITYBASED INSPECTION
5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 01-05 19-23 17-21 9.500.000
8 QC for Water Network (Pipeline) Construction 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 10-12 28-30 26-28 6.950.0009 Risk Based Inspection 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 13-15 12-14 24-26 14-16 12-14 6.950.000
10 Basic CNC 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 13-15 10-12 15-17 12-14 10-12 7.250.000
11COMPRESSOR OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OF FAILUREANALYSIS
4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 7.950.000
12 MACHINERY FLUID MECHANICS 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.00013 PELUMAS DAN SISTEM PELUMASAN 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 01-04 05-08 10-13 7.950.000
14ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OFHEAVY DUTY EQUIPMENT
4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 15-18 19-22 03-06 7.950.000
15ELECTRO-PNEUMATICS SYSTEM PRINCIPLES ANDAPPLICATION
4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 10-13 7.950.000
16 INSTRUMENTATION AND CONTROL SYSTEM 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.00017 KONTROL ELEKTRIK 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 01-04 12-15 04-07 7.950.00018 MECHATRONICS APPLICATION IN INDUSTRY 4 08-11 20-23 20-23 17-20 22-25 04-07 17-20 28-31 18-21 08-11 20-23 11-14 7.950.00019 Mekatronika 4 16-19 27-02 27-30 24-27 29-01 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.00020 PNEUMATIC SYSTEM AND APPLICATION 4 23-26 06-09 06-09 03-06 08-11 05-08 03-06 07-10 04-07 23-26 06-09 03-06 7.950.00021 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 30-02 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 30-02 13-16 10-13 7.950.00022 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 02-05 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.950.00023 REKAYASA HIDROLIK AND APLIKASI 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 09-12 26-29 04-07 7.950.00024 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 15-17 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00025 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 01-04 12-15 10-13 7.950.00026 MANAJEMEN MATERIAL 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 15-18 26-29 03-06 7.950.00027 Manajemen Perbengkelan 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 22-25 05-08 11-14 7.950.00028 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 13-16 11-14 29-01 13-16 18-21 7.950.000
29AC & REFRIGERATION PRINCIPLES, OPERATION ANDTROUBLESHOOTING
4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 10-13 7.950.000
30 ADVANCED VIBRATION MONITORING TECHNIQUE 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 03-06 7.950.00031 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 17-20 7.950.00032 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 7.950.000
33CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE
4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 04-07 7.950.000
34 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 10-13 7.950.000
35COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING
4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 11-14 7.950.000
36 DIESEL ENGINES OPERATION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 10-13 7.950.000
37GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING
4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 17-20 7.950.000
38 HYDRAULICS SYSTEMS Engineering Applications 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 02-05 06-09 18-21 7.950.000
39HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING
4 09-12 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 09-12 13-16 04-07 7.950.000
40 MATERIAL ATTITUDE USES AND PROBLEMS 4 23-26 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 23-26 06-09 10-13 7.950.00041 MATERIAL IDENTIFICATION 4 30-02 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 30-02 13-16 17-20 7.950.00042 METALLURGY FOR NON METALLURGIST 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 11-14 7.950.000
43 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 18-21 7.950.000
44OPERATING AND MAINTENANCE OF HEAVY DUTYEQUIPMENTS
4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 10-13 7.950.000
45 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 11-14 7.950.000
46 PRACTICAL WELDING 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 17-20 7.950.00047 PRACTICE CONSIDERATIONS OF ARC WELDING 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 03-06 7.950.00048 ROTOR BALANCING AND SHAFT ALIGNMENT 4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 04-07 7.950.00049 Welding 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 03-06 7.950.00050 Welding Joint Inspection 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 11-14 7.950.00051 Welding Metallurgy 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 18-21 7.950.00052 Welding Oxy Acetylene 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 04-07 7.950.00053 MANAJEMEN BENGKEL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 01-04 05-08 03-06 7.950.00054 THERMAL SPRAY COATING 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.500.00055 MATERIAL HANDLING & PACKAGING 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 08-11 26-29 17-20 7.950.00056 AEROENGINE BEARING INSPECTION 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 29-31 19-21 26-28 6.500.00057 AIR COMPRESSOR 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000
58 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 08-10 05-07 26-28 5.950.000
59 BEARING LUBRICATION TECHNOLOGY 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 03-06 7.950.000
60 Compressor and Prime Mover Operation & Maintenance 3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 31-02 28-30 26-28 6.500.000
61 GAS TURBINE OPERATION & MAINTENANCE 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 17-20 7.950.00062 Machinery Diagnostic 4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 04-07 7.950.00063 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 24-26 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 24-26 26-28 26-28 6.500.00064 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 29-31 05-07 26-28 5.950.00065 Vibration Monitoring & Control System 3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 31-02 14-16 26-28 6.500.000
66MANAJEMEN POST WELD HEAT TREATMENT TEORI,STANDARD PROSEDUR DAN APLIKASI
3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 6.500.000
67MATERIAL CERTIFICATION REQUIREMENT FOR OIL ANDGAS INDUSTRY
3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 30-01 03-05 08-10 05-07 03-05 6.500.000
68PROTECTIVE COATING TECHNOLOGY FOR CORROSIONCONTROL
3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 6.500.000
69 ROTATING EQUIPMENTS 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 6.500.00070 ANALISIS VIBRASI 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 13-16 03-06 01-04 05-08 03-06 8.500.00071 PIPING SYSTEM 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 27-30 10-13 08-11 12-15 10-13 8.500.000
72MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN
4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 7.950.000
73 PELUMASAN MESIN 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 7.950.00074 PEMBANGKIT UAP (BOILER) 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 7.950.00075 PENGGERAK MULA (PRIME MOVER) 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 7.950.00076 TURBIN GAS 4 15-18 20-23 20-23 17-20 22-25 04-07 17-20 31-03 18-21 15-18 20-23 04-07 7.950.00077 TURBIN UAP 4 23-26 27-02 27-30 24-27 29-01 25-28 24-27 07-10 25-28 23-26 27-30 11-14 7.950.000
78PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING
4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 29-01 19-22 11-14 8.750.000
79 Chiller and Cooling Tower Design and Operation 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 6.500.000
80DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM
5 15-19 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 15-19 12-16 03-07 9.500.000
81 HVAC SYSTEM Operation & Maintenance 4 22-25 12-15 19-22 16-19 07-10 05-08 16-19 13-16 17-20 22-25 19-22 10-13 8.500.000
82PETROLEUM INDUSTRIAL REFRIGERATION OPERATIONAND MAINTENANCE
4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 17-20 8.500.000
83 Practical and Advanced Course on HVAC Systems 4 02-05 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 01-04 06-09 03-06 8.500.000
84CENTRIFUGAL PUMP Selection, Operation, andMaintenance
5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.500.000
85Gas Compressor Operation, Maintenance &Troubleshooting
4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 13-16 17-20 15-18 19-22 17-20 8.500.000
86 Hydraulics Power System 5 22-26 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 22-26 26-30 03-07 9.500.000
87KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN,DAN TROUBLESHOOTING
4 29-01 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 29-01 05-08 10-13 8.500.000
88PUMP AND COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING
5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 01-05 12-16 17-21 9.500.000
89 SISTEM HIDROLIK DAN PNEUMATIK 4 02-05 12-15 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 03-06 8.500.00090 NON DESTRUCTIVE TEST(NDT) 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.00091 ASME PTC 4 – 1 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.950.00092 BASIC GAS ENGINE 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 10-13 7.950.000
93Belt Conveyor Technology, Design Cacilation andTroubleshooting
4 22-25 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 22-25 19-22 17-20 7.950.000
94BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING
4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 04-07 7.950.000
95COAL FIRED POWER PLANT COMBUSTION OPERATION &MAINTENANCE
4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 01-04 06-09 11-14 7.950.000
96 DIESEL ENGINE OPERATION AND MAINTENANCE 4 09-12 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 09-12 13-16 18-21 7.950.00097 DIESEL GUNSET OPERATION AND MAINTENANCE 4 16-19 20-23 20-23 17-20 22-25 05-08 17-20 07-10 18-21 16-19 20-23 03-06 7.950.000
98GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING
4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 10-13 7.950.000
99 OPERATION & MAINTENANCE OF BOILER 4 30-02 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 30-02 05-08 17-20 7.950.000
100OPERATION, MAINTENANCE AND TROUBLESHOOTINGOF GAS TURBINE
4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 04-07 7,950,000
101 Perawatan Belt Conveyor 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000
102STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE
4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 13-16 24-27 15-18 26-29 11-14 7.950.000
103TRANSMISI DAYA MEKANIK (MECHANICAL POWERTRANSMISSION)
4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 31-03 11-14 29-01 13-16 03-06 7.950.000
104 VALVE 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 07-10 18-21 01-04 20-23 10-13 7.950.000
105Turbomachinery Operation, Maintenance andTroubleshooting
4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 09-12 27-30 17-20 7.950.000
106 PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 27-30 03-06 16-19 05-08 04-07 7.950.000
107 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 01-04 26-29 03-06 7.950.000
108 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 08-11 05-08 10-13 7.950.000
109BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING
4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000
110POMPA DAN KOMPRESOR OPERASI, PERAWATAN DANTROUBLESHOOTING
4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 02-05 06-09 18-21 7.950.000
111 Pump Operation, Maintenance & Troubleshooting 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 07-10 18-21 16-19 20-23 10-13 7.950.000
112OPERATION AND MAINTENANCE OF HEAVY DUTYEQUIPMENT
4 15-18 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.950.000
113 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 5,950,000114 BEARING AND OIL LUBRICATION FOR MACHINERY 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000
115BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING
4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 15-18 12-15 10-13 8.500.000
116COMPRESSOR Operation, Maintenance andTroubleshooting
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.750.000
117GAS AND STEAM TURBINE Operation, Maintenance AndTroubleshooting
4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 29-01 26-29 03-06 8.500.000
118GAS TURBINE PRINCIPLES, INSPECTION, OPERATION,MAINTENANCE AND TROUBLESHOOTING
4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 01-04 05-08 11-14 8.500.000
119HEAT EXCHANGERS Operation, maintenance andtroubleshooting
4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 07-10 11-14 08-11 13-16 18-21 8.500.000
120HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING
4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 16-19 20-23 04-07 8.500.000
121 Lubrication and Bearing Technology 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 28-31 25-28 23-26 27-30 10-13 8.500.000122 LUBRIKASI Prinsip Dasar dan Aplikasi 3 31-02 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 31-02 07-09 26-28 6.500.000
123OIL FILM BEARING (JOURNAL DAN THRUST BEARINGHYDRODYNAMIC BEARINGS)
4 02-05 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 02-05 12-15 17-20 8.500.000
124 PIPELINE Design, Testing, Inspection And Maintenance 4 09-12 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 09-12 19-22 03-06 8.500.000
125Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties
4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 11-14 8.500.000
126PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING
4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 22-25 05-08 18-21 8.500.000
127PUMP AND COMPRESSOR OPERATION, MAINTENANCEAND TROUBLESHOOTING
4 29-01 12-15 13-16 10-13 07-10 25-28 10-13 07-10 11-14 29-01 13-16 04-07 8.500.000
128 Refractory and Heat Insulation 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 13-16 18-21 01-04 20-23 10-13 8.500.000
129REFRIGERATION OPERATION, MAINTENANCE ANDTROUBLESHOOTING
4 08-11 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000
130 ROTATING EQUIPMENT 4 16-19 06-09 06-09 03-06 29-01 05-08 03-06 31-03 04-07 16-19 06-09 03-06 8.500.000
131STEAM TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING
4 23-26 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 23-26 12-15 11-14 8.500.000
132 ELECTROPLATING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 03-06 9.250.000133 FAILURE ANALYSIS METHODS AND CASES 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 10-13 7.950.000
134PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM(ELECTROPLATING)
4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 17-20 9.250.000
135ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DANPERAWATAN
4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000
136ANALISIS DAN PENGUKURAN GETARAN MEKANIK(ANALYSIS AND MEASURING OF VIBRATION MACHINERY)
4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 10-13 7.950.000
137 BEARING AND OIL LUBRICATION FOR MACHINERY 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 04-07 7.950.000138 COATING SYSTEM AND PROTECTION CORROSION 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.950.000139 CONVEYOR OPERASI DAN PERAWATAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 04-07 7.950.000
140DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OFJIGS AND FIXTURES)
4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 11-14 7.950.000
141 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 17-20 7.950.000
142 DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 03-06 7.950.000
143 DYNAMIC OF MACHINE TOOLS 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 10-13 7.950.000144 HAND TOOL UTILIZATION 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 11-14 7.950.000145 HEAVY DUTY EQUIPMENT 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 17-20 7.950.000146 HYDRAULIC CONTROL SYSTEM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 03-06 7.950.000
147KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS ANDDYNAMICS OF MACHINERIES)
4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 11-14 7.950.000
148 MACHINERY NOISE AND PROBLEM SOLVING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 7.950.000
149 MANUFACTURING PROCESS TO USE CNC MACHINING 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.950.000
150 MANUFACTURING PROCESSES TO USE CASTING 4 09-12 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 09-12 27-30 11-14 7.950.000
151 MANUFACTURING PROCESSES TO USE METAL FORMING 4 15-18 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 15-18 06-09 17-20 7.950.000
152MEASUREMENT TECHNIQUE FOR MAINTENANCE ANDOPERATION LATHE MACHINE
4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 10-13 7.950.000
153 NON DESTRUCTIVE TEST 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 04-07 7.950.000154 OXY ACETYLENE WELDING 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 03-06 8.500.000
155PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIALSELECTION)
4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 10-13 7.950.000
156 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 18-21 7.950.000
157PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST)
4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000
158PERLAKUAN PANAS LOGAM (HEAT TREATMENT FORMETAL)
4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 03-06 7.950.000
159 PNEUMATIC CONTROL SYSTEM 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 10-13 7.950.000160 PRODUCTION OF HELICAL GEAR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 03-06 7.950.000161 PROSES PEMESINAN (MACHINING) 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 04-07 7.950.000162 PUMP OPERATION AND MAINTENANCE 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 11-14 7.950.000163 SISTEM PEMIPAAN (PIPING) 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 18-21 7.950.000164 TESTING OF MACHINE TOOLS 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 03-06 7.950.000
165Transmisi Daya Mekanik (Mechanical PowerTransmission)
4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 18-21 7.950.000
166TROUBLE SHOOTING, INSPECTION, AND MONITORINGOF MACHINERY
4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 04-07 7.950.000
167 BASIC WELDING 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.950.000168 GAS METAL ARC WELDING (LAS MIGMAG) 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 8.950.000169 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 8.950.000
170 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 18-21 8.950.000171 OXY ACETYLENE WELDING (LAS ASETILIN) 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 07-10 18-21 01-04 20-23 04-07 8.950.000172 WELDING INSPECTION 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 09-12 27-30 11-14 9.500.000173 WELDING METALLURGY 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 28-31 04-07 16-19 06-09 17-20 8.950.000174 WELDING SAFETY 3 24-26 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 24-26 14-16 26-28 6.950.000175 WELDING TECHNOLOGY 4 30-02 19-22 19-22 16-19 29-01 04-07 16-19 06-09 17-20 30-02 19-22 03-06 8.950.000176 BRAZING 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 02-05 26-29 10-13 8.950.000
177ANALISIS GETARAN DALAM PERAWATAN ROTARYEQUIPMENT
4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000
178 BENGKEL ALAT BERAT 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000179 BOILER WATER TREATMENT 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 10-13 7.950.000180 CENTRIFUGAL COMPRESSOR 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 01-04 05-08 18-21 7.950.000
181CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE
4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 08-11 13-16 04-07 7.950.000
182 CENTRIFUGAL PUMP AND SEAL 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 16-19 20-23 11-14 7.950.000183 CORROSION AND CATHODIC PROTECTION 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 17-20 7.950.000184 HEAVY EQUIPMENT MANAGEMENT 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 10-13 7.950.000
185 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 09-12 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 09-12 19-22 18-21 7.950.000
186 NON DESTRUCTIVE TESTING (NDT) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 15-18 26-29 04-07 7.950.000
187OPERASI DAN PEMELIHARAAN TURBIN GAS DANGENERATOR
4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 22-25 05-08 11-14 7.950.000
188 POMPA OPERASI DAN PERAWATAN 4 29-01 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 29-01 13-16 17-20 7.950.000189 ROTATING EQUIPMENTS 4 16-19 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 16-19 06-09 18-21 7.950.000190 TURBIN & GENERATOR OPERATION 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 02-05 26-29 17-20 7.950.000191 VALVE (CHOKE & CONTROL VALVE) 4 09-12 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 09-12 05-08 03-06 7.950.000192 WELDING INSPECTION 4 15-18 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 15-18 13-16 10-13 7.950.000193 LIQUID PENETRANT TESTING 5 29-02 05-09 05-09 02-06 07-11 04-08 02-06 30-03 03-07 29-02 05-09 17-21 11.500.000194 MAGNETIC PARTICLE TESTING 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 01-05 12-16 03-07 11.500.000
195 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000
196 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.000197 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000
198 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000
199ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSEPEOPLE
3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.500.000
200PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT
3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.950.000
201PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000
202 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.000203 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000
204Electric motor Operation, Maintenance &Troubleshooting
4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000
205 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000
206 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MAINTENANCE1 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 08-10 05-07 17-19 07-09 05-07 6.950.000
2 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 15-16 24-25 15-16 26-27 27-28 3.950.0003 ADVANCED MAINTENANCE MANAGEMENT 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 17-20 7.950.000
4MACHINERY CONDITION MONITORING FOR PREDICTIVEAND PREVENTIVE MAINTENANCE
4 08-11 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 08-11 19-22 18-21 7.950.000
5MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING
4 16-19 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 16-19 26-29 04-07 7.950.000
6MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR
4 29-01 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 29-01 26-29 17-20 7.950.000
7 MAINTENANCE AND SPARE PART MANAGEMENT 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 03-06 7.950.000
8 FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 03-05 07-09 26-28 6.500.000
9 Production Optimization and Minimize Down Time 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 26-28 6.500.00010 RELIABILITY CENTERED MAINTENANCE (RCM) 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 15-17 28-30 26-28 6.500.000
11RELIABILITY CENTERED MAINTENANCE (RCM) IncreasingSafety & Reliability in Gas Pipeline System
3 22-24 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 22-24 07-09 26-28 6.500.000
12 MAINTENANCE MANAGEMENT 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 03-05 19-21 26-28 6.500.00013 SPARE PARTS MAINTENANCE MANAGEMENT 3 10-12 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 10-12 26-28 26-28 6.500.000
14EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION
3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 26-28 5.950.000
15 MAINTENANCE CONTROL AND MONITORING 3 10-12 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 10-12 12-14 26-28 6.500.00016 THE ECONOMICS OF MAINTENANCE MANAGEMENT 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.00017 MAINTENANCE PLANNING AND SCHEDULING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 6.500.00018 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 4 08-11 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000
19 RELIABILITY CENTERED MAINTENANCE 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 6.500.00020 Integrated Maintenance Management 4 02-05 20-23 20-23 17-20 07-10 04-07 17-20 30-02 18-21 02-05 20-23 18-21 7.950.000
21 Effective and Efficient of Maintenance Management 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 10-12 28-30 26-28 5.950.000
22 Total Productive Maintenance (TPM) 4 22-25 06-09 06-09 03-06 28-31 04-07 03-06 28-31 04-07 22-25 06-09 18-21 7.950.000
23PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVEMAINTENANCE)
4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 31-03 11-14 09-12 13-16 03-06 7.950.000
24TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVEMAINTENANCE UNTUK KENDARAAN)
4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 30-02 05-08 04-07 7.950.000
25 TEKNIK PERAWATAN MEKANIK 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 01-04 12-15 11-14 7.950.00026 MAINTENANCE OF MACHINE TOOLS 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7,950,000
27COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT
4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 15-18 19-22 03-06 7.950.000
28 Maintenance Strategic Planning 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 13-16 04-07 23-26 06-09 04-07 7.950.00029 MAINTENANCE SYSTEM AND DOCUMENTATION 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 28-31 11-14 30-02 13-16 11-14 7.950.00030 MANAGING MAINTENANCE RESOURCES 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 30-02 17-20 02-05 19-22 18-21 7.950.000
31RELIABILITY CENTERED MAINTENANCE & RISK BASEDINSPECTION
5 22-26 19-23 12-16 09-13 21-25 25-29 09-13 27-31 10-14 22-26 12-16 10-14 8.950.000
32 ROOT CAUSE ANALYSIS 4 29-01 12-15 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 17-20 7.950.00033 Spare Part Management 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 01-04 27-30 04-07 7.950.00034 ADVANCED MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 17-20 7.950.00035 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 10-13 7.950.00036 MAINTENANCE MANAGEMENT 4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 16-19 26-29 03-06 7.950.00037 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 23-26 05-08 10-13 7.950.00038 MAINTENANCE SYSTEM AND COST 4 30-02 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 30-02 12-15 18-21 7.950.00039 MODERN MAINTENANCE MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 18-21 7.950.000
40PERENCANAAN DAN PENJADWALAN PERAWATAN(MAINTENANCE PLANNING AND SCHEDULING)
4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.000
41 PREDICTIVE MAINTENANCE 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.00042 RELIABILITY CENTERED MAINTENANCE (RCM) 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 10-13 7.950.00043 TEKNOLOGI PERAWATAN MESIN 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 17-20 7.950.00044 Total Productive Maintenance (TPM) 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 10-13 7.950.00045 PREVENTIVE MAINTENANCE 4 02-05 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 01-04 20-23 03-06 7.950.00046 PREVENTIVE MAINTENANCE GENERATOR 4 08-11 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 08-11 27-30 10-13 7.950.000
47CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.500.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - ELECTRICAL
1 ADVANCED CONTROL FOUNDATION 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.0002 FLOWMETERING AND CUSTODY TRANSFER 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 08-11 12-15 17-20 7.950.0003 PRACTICAL PROCESS CONTROL 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000
4Implementasi DSP (digital signal processing) DalamSistem Komunikasi
4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13 7.950.000
5INDUSTRIAL ROBOTICS SENSING, PLANNING, ANDCONTROL
4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 08-11 26-29 10-13 7.950.000
6AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATIONAND MAINTENANCE
4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 18-21 7.950.000
7GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING
4 23-26 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 23-26 19-22 03-06 7.950.000
8 PLC ( Tingkat dasar ) 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 18-21 7.950.0009 PLC (TINGKAT MAHIR) 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 04-07 7.950.000
10 POWER FACTOR IMPROVEMENT 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 10-13 7.950.00011 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 18-21 7.950.000
12SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGALISTRIK
4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 10-13 7.950.000
13 SISTEM INSTALASI TENAGA LISTRIK 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 17-20 7.950.00014 TRANFORMER OPERATION & MAINTENANCE 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 04-07 7.950.00015 Uninterupted Power Suply 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 10-13 7.950.000
16PERFORMANCE ANALISYS AND MAINTENANCE OFELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR
4 08-11 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000
17PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR AND ENGINEER
4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 8.500.000
18PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATOR ANDJUNIOR SUPERVISOR
4 22-25 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 22-25 27-30 04-07 8.500.000
19DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES,MAINTENANCE, OPERATION, PROGRAMMING &TROUBLESHOOTING
5 29-02 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 29-02 19-23 03-07 9.500.000
20 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 02-05 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 02-05 27-30 11-14 8.500.000
21 Electrical Control Wiring 4 09-12 06-09 06-09 03-06 22-25 04-07 03-06 31-03 04-07 09-12 06-09 17-20 8.500.00022 PLC COMMUNICATION AND LAN 4 22-25 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 22-25 27-30 03-06 8.500.000
23PLC OPERATION, PROGRAMMING, TROUBLESHOOTINGAND MAINTENANCE
4 30-02 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 30-02 05-08 10-13 8.500.000
24 ACDC ELECTRICAL MOTOR CONTROL 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.000
25 BASIC ELECTRICAL 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.00026 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 08-11 05-08 03-06 7.950.00027 DISTRIBUTION SYSTEM PROTECTION 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 15-18 12-15 10-13 7.950.00028 Electric Installation In Hazardous Area 4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 07-10 18-21 22-25 20-23 18-21 7.950.00029 ELECTRICAL CALIBRATION 3 31-02 28-02 28-30 25-27 30-01 25-27 25-27 14-16 26-28 31-02 28-30 26-28 5.950.000
30 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 02-05 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 02-05 06-09 04-07 7.950.000
31ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE
5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 08-12 12-16 10-14 8.950.000
32 ELECTRICAL POWER SYSTEM ANALYSIS 4 16-19 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 16-19 19-22 17-20 7.950.000
33ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION
4 23-26 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 23-26 26-29 03-06 7.950.000
34 ELECTRICAL POWER SYSTEM PROTECTION 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 29-01 05-08 10-13 7.950.00035 ELECTRICAL SYSTEM GENERATORSET 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 01-04 12-15 18-21 7.950.00036 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 08-11 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 08-11 20-23 04-07 7.950.00037 GENERATOR EXCITATION SYSTEM 4 15-18 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 15-18 27-30 11-14 7.950.00038 GROUNDING SYSTEM AND LIGHTNING PROTECTION 4 22-25 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 22-25 06-09 17-20 7.950.000
39High Voltage Electrical Equipmment Operation,Maintenance and Repair
5 29-02 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 29-02 12-16 03-07 8.950.000
40INSTRUMENTATION ELECTRIC Operation andMaintenance
4 02-05 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 02-05 19-22 10-13 7.950.000
41 LV AND MV GENERATOR 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 09-12 26-29 18-21 7.950.00042 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 16-19 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 16-19 05-08 03-06 7.950.000
43 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 23-26 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 23-26 12-15 11-14 7.950.000
44 POWER ELECTRICAL INSTALLATION SYSTEM 4 29-01 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 29-01 20-23 17-20 7.950.00045 POWER ELECTRONICS 4 02-05 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 01-04 27-30 04-07 7.950.00046 POWER PROTECTION RELAY SYSTEM 4 08-11 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 08-11 06-09 10-13 7.950.00047 POWER TRANSFORMER 4 15-18 12-15 13-16 10-13 15-18 26-29 10-13 31-03 11-14 15-18 13-16 18-21 7.950.00048 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 22-25 20-23 19-22 16-19 22-25 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000
49 Soft Starter (Operation, Protection and Maintanance) 3 31-02 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 31-02 26-28 26-28 5.950.000
50TRANSMISSION AND DISTRIBUTION OPERATION ANDMAINTENANCE
4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 27-30 03-06 02-05 05-08 11-14 7.950.000
51Uninterruptible Power Suply Operation andMaintenance
4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 30-02 10-13 09-12 12-15 17-20 7.950.000
52 VARIABLE FREQUENCY DRIVES 4 16-19 19-22 20-23 17-20 14-17 04-07 17-20 07-10 18-21 16-19 20-23 04-07 7.950.00053 VARIABLE SPEED DRIVES 4 23-26 27-02 27-30 24-27 21-24 25-28 24-27 13-16 25-28 23-26 27-30 10-13 7.950.00054 POWER DISTRIBUTION TRANSFORMER 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 28-31 04-07 29-01 06-09 18-21 7.950.000
55 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 31-03 11-14 01-04 13-16 03-06 7.950.000
56 TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN 3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000
57 ELECTRONIC SWITCHBOARD RESCUE 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 5.950.00058 GARDU INDUK 3 22-24 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 22-24 05-07 26-28 5.950.00059 Electrical Panel Design 3 31-02 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 31-02 12-14 26-28 5.950.00060 Electrical Safety For Electrical Technician 4 02-05 19-22 20-23 17-20 15-18 04-07 17-20 07-10 18-21 02-05 20-23 11-14 7.950.00061 Motor Rewinding 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 14-16 26-28 10-12 28-30 26-28 6.500.000
62Perhitungan Perkiraan Biaya Proyek Mekanikal ElektrikalUntuk Bangunan Gedung
2 18-19 08-09 08-09 05-06 02-03 07-08 05-06 20-21 06-07 18-19 08-09 26-27 3.950.000
63Power Transformer (Operation, Testing, Asessment AndMaintenance)
4 23-26 12-15 13-16 10-13 22-25 26-29 10-13 28-31 11-14 23-26 13-16 17-20 7.950.000
64 ELECTRICAL SAFETY FOR POWER LINE 3 29-31 21-23 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 26-28 5.950.000
65TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGIPADA BANGUNAN GEDUNG
4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 23-26 26-29 17-20 7.950.000
66 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 01-03 05-07 03-05 6.750.000
67Pemrograman Mikrokontroler AVR denganCodeVisionAVR
3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 08-10 12-14 10-12 6.750.000
68 Pemrograman Mikrokontroler untuk Robotika 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 6.750.000
69ADVANCE COURSE ON LIGHTNING PROTECTION ANDGROUNDING SYSTEM
5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 30-03 24-28 15-19 26-30 03-07 9.500.000
70Lightning Protection and Grounding System for Oil & GasRefinery and Petrochemical Installation
3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 26-28 6.950.000
71LIGHTNING PROTECTION AND GROUNDING SYSTEM FORPOWER PLANT, TRANSMISSION, DISTRIBUTION ANDLARGE INDUSTRY
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 13-15 10-12 29-31 12-14 10-12 6.950.000
72 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 8.500.000
73 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 8.500.000
74PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES,OPERATION AND PROGRAMMING
4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 8.500.000
75SCADA (SUPERVISORY CONTROL AND DATAACQUISITION) PRINCIPLES, HARDWARE SYSTEM,OPERATION & PROGRAMMING
4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 8.500.000
76 NUMERICAL CONTROL AND ROBOTIC 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.00077 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 18-21 7.950.000
78Electric motor Operation, Maintenance &Troubleshooting
4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000
79 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000
80 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.00081 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000
82 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - IT1 AUTOCAD COSTUMIZATION 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 11-14 7.950.000
2 INFORMATION TECHNOLOGY & TELECOMUNICATION 4 22-25 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 22-25 27-30 17-20 7.950.000
3 Holistic Information Security 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.0004 Information Security System 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 01-03 12-14 10-12 5.950.0005 OPTIMALISASI CYBER PUBLIC RELATION 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.0006 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 27-29 24-26 15-17 26-28 26-28 5.950.0007 TEKNIK DESAIN GRAFIS PADA WEB 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 5.950.0008 TEKNIK DESAIN WEB 3 31-02 13-15 14-16 11-13 30-01 25-27 11-13 08-10 12-14 31-02 14-16 12-14 5.950.0009 ADVANCE MICROSOFT EXCEL 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 22-24 19-21 26-28 5.950.000
10 ADVANCE MICROSOFT POWERPOINT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 14-16 26-28 08-10 28-30 26-28 5.950.00011 ADVANCE MICROSOFT WORD 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 29-31 05-07 15-17 07-09 05-07 5.950.000
12MICROSOFT EXCEL VISUAL BASIC For Application (VBA-MACRO)
3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 01-03 12-14 24-26 14-16 12-14 5.950.000
13BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITHAUTOCAD)
5 15-19 05-09 05-09 02-06 14-18 04-08 02-06 30-03 03-07 15-19 05-09 03-07 8.950.000
14BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITHAUTOCAD)
2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000
15 BASIC TELECOMMUNICATION PABX 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.00016 BASIC VSAT SYSTEM 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 5.950.00017 FIBER OPTIC SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 6.500.000
18 Fraud Management in telecommunication business 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 08-10 28-30 26-28 5.950.000
19 INTERNETWORKING DENGAN TCP IP 3 17-19 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 17-19 07-09 26-28 5.950.00020 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 08-10 12-14 24-26 14-16 10-12 5.950.000
21NETWORK MANAGEMENT AND OPERATIONS SUPPORTSYSTEM
3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 14-16 19-21 31-02 21-23 17-19 5.950.000
22 POWER LINE CARRIER 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 5.950.00023 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.000
24 MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI 4 15-18 12-15 12-15 09-12 15-18 26-29 09-12 06-09 10-13 15-18 12-15 11-14 8.500.000
25 MIKROTIK FUNDAMENTAL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 29-31 26-28 29-31 28-30 26-28 5.950.00026 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 6.500.000
27INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY(I T I L) VERSION 3.1
4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 30-02 25-28 15-18 27-30 04-07 7.950.000
28 MASTERING MICROSOFT EXCEL 2007 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 20-21 24-25 11-12 26-27 26-27 3.950.000
29CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICALAUTOCAD OR CATIA)
4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 11-14 7.950.000
30 Teknologi CAD CAM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 11-14 7.950.00031 PENGEMBANGAN SITUS WEB 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 5.950.000
32COLLABORATION MS Office AND EFFECTIVEPRESENTATION
3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 5.950.000
33PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT)
2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
34 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 5.950.00035 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MINING1 BATUBARA 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 6.500.0002 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 08-11 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 08-11 12-15 10-13 7.950.0003 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 15-18 19-22 17-20 7.950.000
4 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
5 PEMINDAHAN TANAH MEKANIS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 5.950.0006 VENTILASI TAMBANG 3 03-05 12-14 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 6.500.000
7EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN
3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 13-15 19-21 10-12 21-23 19-21 5.950.000
8 PERENCANAAN TAMBANG TERBUKA 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.0009 PEMBORAN EKSPLORASI BATUBARA 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MIGAS1 GAS PROCESSING AND EQUIPMENT 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.500.000
2BASIC OF SURFACE OPERATION AND MAINTENANCE FOROIL AND GAS INDUSTRIES
4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 10-13 7.950.000
3PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL
4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 03-06 7.950.000
4 Oil and Gas Measurements 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.0005 GAS DEHYDRATION AND GLYCOL REGENERATION 4 30-02 12-15 13-16 10-13 08-11 25-28 10-13 07-10 11-14 30-02 13-16 18-21 8.750.000
6GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS
4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 13-16 18-21 02-05 20-23 03-06 8.750.000
7GAS HANDLING, CONDITIONING, AND PROCESSINGFACILITIES
4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 03-06 7.950.000
8 OIL AND GAS HANDLING FACILITIES 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 28-31 11-14 16-19 13-16 18-21 7.950.000
9OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION
4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 31-03 18-21 23-26 20-23 03-06 7.950.000
10 Drilling operations for operator in oil and gas industries 4 29-01 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 29-01 05-08 10-13 8.500.000
11NATURAL GAS PROCESSING - FRACTINATION ANDREFREGERATION
4 08-11 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 08-11 19-22 03-06 8.500.000
12PETROLEUM ENGINEERING FOR NON PETROLEUMEMPLOYEE
4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 30-02 24-27 15-18 26-29 11-14 8.500.000
13PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FORPETROLEUM PRODUCTION SYSTEM
4 30-02 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 30-02 13-16 04-07 8.500.000
14 PRODUCTION LOGGING 4 02-05 20-23 20-23 17-20 22-25 05-08 17-20 28-31 18-21 02-05 20-23 10-13 8.500.000
15SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL &GAS INDUSTRY
3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 10-12 28-30 26-28 6.500.000
16 WATER FLOODING 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 17-20 8.500.00017 WP&B, AFE and POD 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 23-26 12-15 03-06 8.500.00018 ARTIFICIAL LIFT 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 29-01 19-22 11-14 8.500.000
19OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING
4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 01-04 26-29 18-21 8.500.000
20 Advanced Oil and Gas Production System 3 29-31 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 29-31 26-28 26-28 7.950.000
21BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &ENVIRONMENTAL CONSIDERATION
3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 7.950.000
22 Basic Petroleum Engineering 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 08-10 12-14 26-28 7.950.000
23 Basic Reservoir Engineering for Non Petroleum Engineer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 7.950.000
24ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCE ANDTROUBLESHOOTING
3 31-02 07-09 07-09 04-06 28-30 04-06 04-06 08-10 05-07 31-02 07-09 03-05 7.950.000
25 FORMATION DAMAGE AND WELL STIMULATION 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 03-05 14-16 10-12 7.950.000
26NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS
3 10-12 21-23 21-23 18-20 07-09 06-08 18-20 29-31 19-21 10-12 21-23 19-21 7.950.000
27 Oil & Gas Production System 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 30-01 24-26 17-19 26-28 26-28 7.950.00028 OIL & GAS MEASUREMENT AND CALCULATION 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 06-08 03-05 24-26 05-07 05-07 7.950.00029 OIL AND GAS HANDLING FACILITIES 3 29-31 12-14 12-14 09-11 30-01 27-29 09-11 13-15 10-12 29-31 12-14 12-14 7.950.000
30OIL AND GAS WELLS STIMULATION BY ACIDIZING ANDHYDRAULIC FRACTURING
3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 01-03 19-21 17-19 7.950.000
31Oil Field, and 100 Methods to Maintain and IncreaseProduction
3 08-10 28-02 28-30 25-27 09-11 25-27 25-27 01-03 26-28 08-10 28-30 26-28 7.950.000
32PETROLEUM ENGINEERING FOR NON PETROLEUMENGINEERS
3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 08-10 05-07 15-17 07-09 03-05 7.950.000
33PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS
3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 14-16 12-14 22-24 14-16 10-12 7.950.000
34PRODUCTION OPERATION MANAGEMENT FORMANAGERS
3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 29-31 19-21 31-02 21-23 19-21 7.950.000
35Pump Selection, Design and Operation for Oil and GasSurface Production Facilities
3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 7.950.000
36SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING
3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 10-12 05-07 05-07 7.950.000
37 Surface Production Operation and Equipments 3 17-19 12-14 12-14 09-11 16-18 27-29 09-11 13-15 10-12 17-19 12-14 12-14 7.950.00038 WELL COMPLETION AND WORK OVER 3 24-26 19-21 19-21 16-18 23-25 06-08 16-18 27-29 17-19 24-26 19-21 17-19 7.950.00039 BLOWOUT PREVENTION AND WELL CONTROL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 01-03 26-28 29-31 28-30 26-28 7.950.00040 ARUS MINYAK KORPORATE 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 01-03 07-09 03-05 7.950.000
41MODERN HYDROCARBON WELL PRODUCTION LOGGINGDATA ANALYSIS AND INTERPRETATION
3 08-10 13-15 14-16 11-13 09-11 27-29 11-13 14-16 12-14 08-10 14-16 10-12 7.950.000
42OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT
4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 8.750.000
43 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.950.000
44PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN (Petroleum Economics)
4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 8.500.000
45 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000
46PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT
3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.950.000
47PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000
48 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.00049 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.00050 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
HSE1 MANAJEMEN LINGKUNGAN 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 17-20 7.950.0002 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 15-19 26-30 03-07 8.950.000
3AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE
4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 22-25 05-08 10-13 7.950.000
4 APPLIED ERGONOMICS AT WORKPLACE 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 17-20 7.950.0005 AUTHORISED GAS TESTING 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 03-06 8.500.0006 BASIC SAFETY ORIENTATION FOR CONTRACTORS 5 08-12 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 08-12 26-30 10-14 9.250.0007 CANTEEN HYGIENE 2 15-16 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 15-16 08-09 26-27 3.950.000
8 CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) 4 23-26 12-15 13-16 10-13 22-25 25-28 10-13 13-16 11-14 23-26 13-16 18-21 7.950.000
9 ELECTRICAL SAFETY 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 01-03 19-21 31-02 21-23 26-28 6.500.00010 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 08-10 24-26 03-05 26-28 26-28 5.950.00011 HEALTH IMPACT ASSESSMENT (HIA) 4 08-11 05-08 05-08 02-05 08-11 04-07 02-05 13-16 03-06 08-11 05-08 04-07 7.950.000
12INCIDENT INVESTIGATION, PREVENTION AND PROACTIVEIMPROVEMENT
3 17-19 12-14 12-14 09-11 14-16 25-27 09-11 27-29 10-12 17-19 12-14 10-12 6.500.000
13 JOB SAFETY ANALYSIS (JSA) 2 22-23 19-20 19-20 16-17 21-22 07-08 16-17 20-21 17-18 22-23 19-20 17-18 3.950.00014 K3 RUMAH SAKIT 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 20-21 27-28 29-30 29-30 26-27 3.950.00015 LOCKOUT TAGOUT (LOTO) 2 04-05 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 01-02 08-09 03-04 3.950.00016 MANAGING SAFE WORK 4 09-12 12-15 13-16 10-13 07-10 25-28 10-13 30-02 11-14 09-12 13-16 11-14 7.950.00017 MATERIAL SAFETY DATA SHEETS (MSDS) 2 15-16 21-22 21-22 18-19 17-18 06-07 18-19 20-21 19-20 15-16 21-22 19-20 3.950.00018 MODERN SAFETY MANAGEMENT (MSM) 4 23-26 26-01 26-29 23-26 22-25 26-29 23-26 06-09 24-27 23-26 26-29 04-07 7.950.00019 OHSAS 180012007 AUDITOR 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 27-31 03-07 29-02 05-09 10-14 9.250.00020 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 03-04 12-13 27-28 3.950.000
21PANITIA PEMBINA KESELAMATAN DAN KESEHATANKERJA (P2K3)
4 08-11 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000
22PENERAPAN PENGENDALIAN BISING TERPADU DITEMPAT KERJA
3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 17-19 28-30 26-28 6.500.000
23 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 08-10 03-05 22-24 05-07 03-05 5.950.000
24PERLINDUNGAN LINGKUNGAN DAN PENGELOLAANLIMBAH B3
4 29-01 12-15 13-16 10-13 28-31 25-28 10-13 13-16 11-14 29-01 13-16 10-13 7.950.000
25 PERMIT TO WORK (PTW) 2 04-05 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 04-05 19-20 17-18 3.950.00026 Process Hazard Analysis (PHA) 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 10-12 26-28 26-28 5.950.00027 Process Hazard Analysis (PHA) for Facilitator 4 15-18 06-09 06-09 03-06 15-18 05-08 03-06 30-02 04-07 15-18 06-09 04-07 7.950.00028 Process Safety Management 3 24-26 12-14 12-14 09-11 23-25 25-27 09-11 06-08 10-12 24-26 12-14 12-14 5.950.00029 PROJECT HSE MANAGEMENT 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 13-15 19-21 31-02 21-23 19-21 6.500.000
30RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENTBASED ON ISO 31000
2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000
31 SAFETY AUDITS AND SITE INSPECTION 3 08-10 05-07 05-07 02-04 09-11 06-08 02-04 29-31 03-05 08-10 05-07 03-05 5.950.00032 SAFETY OFFICER DEVELOPMENT PROGRAM 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 10-14 9.250.00033 SAFETY TRAINING FOR THE LABORATORY 3 22-24 13-15 19-21 16-18 21-23 04-06 16-18 08-10 17-19 22-24 19-21 17-19 6.500.00034 SELF CONTAINED BREATHING APPARATUS(SCBA) 1 29-29 26-26 26-26 23-23 28-28 25-25 23-23 20-20 24-24 29-29 26-26 28-28 2.950.00035 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 08-12 05-09 05-09 02-06 07-11 04-08 02-06 27-31 03-07 01-05 05-09 03-07 9.250.00036 WORKING AT HEIGHT 2 15-16 19-20 22-23 19-20 14-15 04-05 19-20 20-21 20-21 15-16 22-23 20-21 3.950.00037 PENERAPAN HACCP 4 23-26 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 23-26 27-30 03-06 7.950.000
38IDENTIFIKASI BAHAYA, PENILAIAN, PENGENDALIANRESIKO (HIRAC) DAN ANALISA BAHAYA DI PEKERJAAN(JSA)
5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 10-14 9.500.000
39 Pengelolaan K3 di Pergudangan 4 16-19 26-01 26-29 23-26 15-18 26-29 23-26 27-30 24-27 16-19 26-29 04-07 8.500.00040 Supervisor SMK3 Kontraktor 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 26-28 5.950.00041 PENERAPAN BEHAVIOR BASED SAFETY 3 02-04 19-21 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 19-21 6.500.00042 PENGELOLAAN B3 DAN LIMBAH B3 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 03-06 8.500.00043 FIRE ALARMS & PROTECTION 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 18-21 7.950.00044 HAZARDOUS MATERIAL HANDLING 4 30-02 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 30-02 26-29 11-14 7.950.00045 INDUSTRIAL POLLUTION CONTROL 4 15-18 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 15-18 20-23 10-13 7.950.00046 JOB SAFETY ANALYSIS TRAINING 4 29-01 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000
47LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADAINDUSTRI KIMIA
4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 11-14 7.950.000
48 Water Treatment 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 17-20 7.950.000
49AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE
4 22-25 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 22-25 19-22 10-13 7.950.000
50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 17-20 7.950.00051 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 10-13 7.950.00052 BEHAVIOR BASED SAFETY (BBS) 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 6.500.00053 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 03-06 8.500.00054 HAZARDOUS MATERIALS SAFE HANDLING 4 22-25 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 22-25 12-15 10-13 8.500.000
55HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS INLOGISTICS ACTIVITIES
4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000
56 Hot Works 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 01-03 28-30 26-28 6.500.00057 HSE MANAGEMENT SYSTEM 4 09-12 06-09 06-09 03-06 08-11 04-07 03-06 31-03 04-07 09-12 06-09 04-07 8.500.00058 HSE WORK PRACTICES AT CONFINED SPACE 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 08-10 12-14 17-19 14-16 12-14 6.500.000
59JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATANPEKERJAAN
3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 13-15 19-21 24-26 21-23 19-21 6.500.000
60 MANAGING CONTRACTOR SAFETY 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 6.500.000
61 MODERN SAFETY AND LOSS CONTROL MANAGEMENT 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 30-02 03-06 02-05 05-08 03-06 8.500.000
62OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT(HSE) AUDITING
5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.250.000
63Occupational Health, Safety and Environment (HSE) onPaper and Pulp Industry
4 15-18 12-15 19-22 16-19 21-24 05-08 16-19 13-16 17-20 15-18 19-22 17-20 8.500.000
64ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTSIN ONSHORE DRILLING OPERATIONS
4 22-25 27-02 27-30 24-27 28-31 25-28 24-27 28-31 25-28 22-25 27-30 04-07 8.500.000
65ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTSIN ONSHORE DRILLING OPERATIONS FOR MANAGERSAND SUPERINTENDENTS
3 29-31 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 29-31 07-09 26-28 6.500.000
66PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN(FIRE PREVENTION & PROTECTION)
3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 6.500.000
67 PRODUCTION SAFETY SYSTEM 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 08-12 19-23 17-21 8.500.00068 PROFESSIONAL ACCIDENT INCIDENT INVESTIGATION 3 17-19 26-28 26-28 23-25 14-16 25-27 23-25 13-15 24-26 17-19 26-28 26-28 6.500.000
69SAFETY MANAGEMENT FOR SUPERVISORS ANDMANAGERS
4 23-26 05-08 05-08 02-05 22-25 04-07 02-05 30-02 03-06 23-26 05-08 03-06 8.500.000
70 TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 30-02 13-16 11-14 8.500.00071 WAREHOUSE SAFETY MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 02-05 19-22 17-20 8.500.00072 HIRADC 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 27-29 26-28 08-10 28-30 26-28 6.500.00073 PROCESS SAFETY MANAGEMENT 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 04-07 8.500.00074 Chemical Hazard Safety in Mining and Workplace 4 08-11 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 08-11 19-22 17-20 8.750.00075 HAZARDOUS MATERIAL HANDLING 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 7.950.00076 HAZID (HAZARD IDENTIFICATON) 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 29-01 19-22 17-20 7.950.00077 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 04-07 7.950.00078 WASTE WATER TREATMENT & MANAGEMENT 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 22-25 26-29 18-21 7.950.00079 Water Treating and Chemicals 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 29-01 06-09 03-06 7.950.00080 PENGENDALIAN PENCEMARAN AIR 3 08-10 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 08-10 21-23 26-28 6.500.00081 PENGENDALIAN PENCEMARAN UDARA 3 17-19 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 17-19 28-30 26-28 6.500.00082 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 01-04 19-22 10-13 7.950.000
83 ISU PEMENUHAN KUALITAS DAN KEAMANAN PANGAN 4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 08-11 26-29 17-20 7.950.000
84 PEMENUHAN PERSYARATAN PERIZINAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 15-18 05-08 03-06 7.950.00085 POTENSI DAN PERKEMBANGAN INDUSTRI PANGAN 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 22-25 12-15 11-14 7.950.00086 HSE MANAGEMENT SYSTEM INTERNAL AUDITOR 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 01-04 12-15 17-20 8.500.00087 PRODUCTION SYSTEM SAFETY 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 10-13 7.950.00088 FIT FOR DUTY 2 22-23 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 22-23 19-20 26-27 3.950.00089 SURVEILANS KESEHATAN PEKERJA 2 29-30 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 29-30 26-27 27-28 3.950.00090 APLIKASI PROGRAM PERLINDUNGAN PERNAFASAN 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 01-02 05-06 26-27 4.500.00091 FOOD HYGIENE SANITATION AND MONITORING 2 08-09 12-13 12-13 09-10 03-04 27-28 09-10 20-21 10-11 08-09 12-13 27-28 4.500.00092 HEARING CONSERVATION PROGRAM 2 15-16 21-22 21-22 18-19 02-03 07-08 18-19 20-21 19-20 15-16 21-22 26-27 4.500.000
93 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 24-25 28-01 28-29 25-26 03-04 28-29 25-26 20-21 26-27 24-25 28-29 27-28 4.500.00094 Higiene Sanitasi Makanan Berbasis HACCP 2 31-01 07-08 07-08 04-05 02-03 04-05 04-05 20-21 05-06 31-01 07-08 26-27 4.500.000
95CATERING SERVICE, HYGIENE & SANITATION (INCLUDINGPERSONAL HYGIENE)
3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 6.500.000
96Penerapan Hazard Analysis Critical Control Point(HACCP) pada Pengelolaan Makanan
3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 26-28 5.950.000
97 BEHAVIOR BASED SAFETY 2 15-16 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.00098 CSMS AWARENESS 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.500.00099 HSE LEADERSHIP 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 03-04 4.500.000
100 INCIDENT INVESTIGATION 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 01-03 12-14 10-12 6.500.000
101AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOREXECUTIVES
3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6.500.000
102 EMERGENCY PREPAREDNESS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 6.500.000
103ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS)
3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 08-10 05-07 26-28 6.500.000
104 ENVIRONMENTAL MONITORING KEY TO POLUTION FREE 3 15-17 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 15-17 12-14 26-28 6.500.000
105 HSE AUDIT TECHNIQUES 3 22-24 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 22-24 21-23 26-28 6.500.000
106OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTALIN THE OIL & GAS INDUSTRY
3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 31-02 28-30 26-28 6.500.000
107WASTE HANDLING & TREATMENT IN THE OIL & GASINDUSTRIES
3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 03-05 07-09 26-28 6.500.000
108 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 08-10 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 08-10 12-14 26-28 6.950.000
109 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
110 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.950.000111 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.950.000
112CATERING & ACCOMMODATION MANAGEMENT(INCLUDING TABLE MANNER)
4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.950.000
113 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 3.950.000114 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 5.950.000115 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 8.750.000116 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000
117OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT
4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 8.750.000
118 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN
1 ACCOUNT RECEIVABLE MANAGEMENT 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.0002 Accounting Information Systems 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.0003 Asset Management 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000
4BALANCED SCORECARD (BSC) CONCEPT ANDIMPLEMENTATION
2 15-16 05-06 05-06 02-03 14-15 07-08 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000
5 BASIC ACCOUNTING 3 22-24 13-15 14-16 11-13 21-23 25-27 11-13 27-29 12-14 22-24 14-16 12-14 5.950.0006 BASIC AUDIT FINANCE 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 30-01 19-21 31-02 21-23 19-21 5.950.000
7 BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 03-05 28-30 26-28 5.950.000
8 BUDGET PLANNING, CONTROLLING & ANALYSING 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 14-16 05-07 10-12 07-09 05-07 5.950.0009 BUDGETING AND PROJECT COST CONTROL 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 29-31 10-12 17-19 12-14 10-12 5.950.000
10 BUDGETING AND REPORTING 3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 01-03 17-19 24-26 19-21 17-19 5.950.00011 CASH MANAGEMENT 2 29-30 26-27 26-27 23-24 28-29 28-29 23-24 20-21 24-25 29-30 26-27 26-27 3.950.00012 CUSTOMER RELATION MANAGEMENT(CRM) 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 13-15 19-21 15-17 21-23 19-21 5.950.00013 Export import 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000
14 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000
15 FINANCE FOR NON FINANCE MANAGER 3 24-26 07-09 07-09 04-06 23-25 06-08 04-06 29-31 05-07 24-26 07-09 05-07 5.950.00016 Financial Planning and Budgeting for Banking 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 01-03 12-14 31-02 14-16 12-14 5.950.000
17 Holistic CSR and Sustainable Community Development 2 02-03 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 04-05 22-23 20-21 3.950.000
18 HR Based On Competency for Recruitment 2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00019 INTERMEDIATE ACCOUNTING 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00020 Key Account Management 2 29-30 19-20 19-20 16-17 28-29 07-08 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000
21LAPORAN KEUANGAN PEMAHAMAN DANPENGGUNAANNYA
3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 30-01 26-28 01-03 28-30 26-28 5.950.000
22 Managing Training Function 3 10-12 07-09 07-09 04-06 09-11 04-06 04-06 08-10 05-07 10-12 07-09 05-07 5.950.00023 OUTSOURCING MANAGEMENT 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.00024 PETTY CASH MANAGEMENT & ADMINISTRATION 2 25-26 21-22 21-22 18-19 24-25 07-08 18-19 20-21 19-20 25-26 21-22 19-20 3.950.00025 PROBLEM SOLVING AND DECISION MAKING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 31-03 03-06 02-05 05-08 03-06 7.950.000
26PROFIT PLANNING COST - VOLUME - PROFITRELATIONSHIP ANALYSIS
3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000
27 Project Cost Estimation & Cost Control 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000
28 Standard Operational Procedure, Accounting & Finance 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 27-29 26-28 22-24 28-30 26-28 5.950.000
29 Total Quality Management 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000
30 TRAINING EVALUATION AND MEASUREMENT METHOD 2 18-19 26-27 26-27 23-24 17-18 25-26 23-24 15-16 24-25 18-19 26-27 26-27 3.950.000
31 TRAINING NEED ANALYSIS 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.000
32Training untuk pegawai persiapan masa pensiun(training pra-purnabakti)
5 29-02 19-23 12-16 09-13 28-01 25-29 09-13 27-31 10-14 29-02 12-16 10-14 8.950.000
33 ACCOUNT PAYABLE MANAGEMENT 2 04-05 12-13 22-23 19-20 03-04 06-07 19-20 01-02 20-21 03-04 22-23 20-21 3.950.00034 COST ACCOUNTING 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5.950.00035 FIXED ASSET 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 13-15 05-07 15-17 07-09 05-07 5.950.00036 ANALISIS KEEKONOMISAN PROYEK 3 22-24 13-15 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00037 SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 17-19 5.950.00038 COST VOLUME PROFIT ANALYSIS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 08-10 24-26 03-05 26-28 26-28 5.950.000
39INTERNATIONAL FINANCIAL REPORTING STANDARD(IFRS)
2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 20-21 03-04 11-12 05-06 03-04 4.500.000
40 TREASURY AND CASH FLOW MANAGEMENT 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 15-16 13-14 18-19 15-16 13-14 4.500.00041 Strategi Menangani Proyek Bermasalah 3 24-26 21-23 21-23 18-20 23-25 04-06 18-20 29-31 19-21 24-26 21-23 19-21 5.950.00042 ADVANCE SECURITY MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 01-04 26-29 03-06 7.950.00043 ANALISIS BEBAN KERJA 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 20-21 17-18 29-30 19-20 17-18 3.950.00044 ANALITYCAL HIERARCHY PROCESS 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000
45IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAIALAT UKUR PERFORMANSI KARYAWAN
3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 5.950.000
46 KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING) 2 22-23 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 22-23 21-22 19-20 3.950.000
47 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 20-21 26-27 31-01 28-29 27-28 3.950.00048 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 04-05 07-08 07-08 04-05 03-04 04-05 04-05 30-31 05-06 03-04 07-08 05-06 3.950.00049 MANAJEMEN LOGISTIK 3 10-12 13-15 14-16 11-13 09-11 27-29 11-13 06-08 12-14 10-12 14-16 12-14 5.950.00050 MANAJEMEN PENGEMBANGAN PRODUK 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 13-15 19-21 17-19 21-23 19-21 5.950.00051 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 2 24-25 01-02 29-30 26-27 23-24 25-26 26-27 20-21 27-28 24-25 29-30 26-27 3.950.00052 MANAJEMEN PROYEK 3 31-02 07-09 07-09 04-06 30-01 04-06 04-06 29-31 05-07 31-02 07-09 05-07 5.950.00053 OPERATION MANAGEMENT 2 02-03 12-13 12-13 09-10 02-03 27-28 09-10 01-02 10-11 04-05 12-13 10-11 3.950.00054 PEMILIHAN PEMASOK (VENDOR) 2 08-09 19-20 19-20 16-17 07-08 07-08 16-17 09-10 17-18 08-09 19-20 17-18 3.950.00055 STANDARD OPERATING PROCEDURE 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.00056 STUDI KELAYAKAN PROYEK 2 29-30 14-15 14-15 11-12 28-29 25-26 11-12 27-28 12-13 29-30 14-15 12-13 3.950.000
57TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATESOCIAL RESPONSIBILITY)
2 04-05 21-22 21-22 18-19 03-04 06-07 18-19 02-03 19-20 01-02 21-22 19-20 3.950.000
58 VALUE ENGINEERING (REKAYASA NILAI) 2 10-11 28-01 28-29 25-26 09-10 27-28 25-26 06-07 26-27 10-11 28-29 26-27 3.950.00059 Sistem Informasi manajemen Pergudangan 2 17-18 07-08 07-08 04-05 16-17 07-08 04-05 13-14 05-06 17-18 07-08 05-06 3,950,00060 Sistem Life Cycle Costing 2 22-23 12-13 15-16 12-13 21-22 28-29 12-13 20-21 13-14 22-23 15-16 13-14 3,950,00061 ANALISIS KEPUTUSAN 2 31-01 22-23 22-23 19-20 30-31 04-05 19-20 29-30 20-21 31-01 22-23 20-21 3.950.00062 MANAJEMEN PRODUKSI 2 02-03 01-02 29-30 26-27 02-03 25-26 26-27 30-31 27-28 03-04 29-30 27-28 3.950.00063 METODE PENGAMBILAN KEPUTUSAN 2 11-12 08-09 08-09 05-06 10-11 06-07 05-06 08-09 06-07 11-12 08-09 06-07 3.950.00064 BUSINESS PROCESS REENGINEERING 2 02-03 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 01-02 26-27 27-28 3.950.000
65LOGISTICS AND SUPPLY CHAIN MANAGEMENT CONCEPT,STRATEGY AND IMPLEMENTATION
4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 15-18 12-15 17-20 7.950.000
66 MANAJEMEN STRATEGI 3 22-24 21-23 21-23 18-20 21-23 06-08 18-20 30-01 19-21 22-24 21-23 26-28 5.950.00067 PRACTICAL PROJECT EVALUATION AND FINANCING 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 3.950.000
68PROJECT MANAGEMENT WITH MICROSOFT PROJECTAPPLICATION,Win QSB & MONTE CARLO SIMULATION
3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 03-05 5.950.000
69 RISK-BASED MANAGEMENT 3 10-12 12-14 14-16 11-13 07-09 27-29 11-13 13-15 12-14 10-12 14-16 10-12 5.950.00070 STRATEGI PENGEMBANGAN BISNIS 3 17-19 19-21 19-21 16-18 16-18 06-08 16-18 29-31 17-19 17-19 19-21 19-21 5.950.00071 SUPPLY CHAIN MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 01-03 26-28 24-26 28-30 26-28 5.950.00072 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 7.950.00073 PROJECT MANAGEMENT 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.950.00074 ACCOUNT OfficeR 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00075 AUDITING SDM 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.00076 BUSINESS STRATEGY FOR MANAGERS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 03-05 5.950.00077 COSTUMER SERVICE(CS) 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 5.950.000
78 KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER) 5 15-19 19-23 19-23 16-20 14-18 04-08 16-20 27-31 17-21 15-19 19-23 17-21 8.950.000
79KEPEMIMPINAN (LEADERSHIP LOWER LEVELMANAGER)
3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000
80KEPEMIMPINAN (LEADERSHIP MIDDLE LEVELMANAGER)
4 29-01 06-09 06-09 03-06 28-31 04-07 03-06 07-10 04-07 29-01 06-09 03-06 7.950.000
81 KEWIRANIAGAAN (SALESMANSHIP) 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 14-16 12-14 01-03 14-16 10-12 5.950.00082 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000
83 MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA) 3 15-17 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000
84MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OF ORGANIZATIONBEHAVIOR)
3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 24-26 05-07 05-07 5.950.000
85 MANAJEMEN STRATEGI 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 13-15 10-12 31-02 12-14 12-14 5.950.00086 MANUSIA DALAM KERJA (MEN IN WORK) 2 04-05 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 3.950.000
87MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT)
3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 29-31 24-26 10-12 26-28 26-28 5.950.000
88PENGANTAR KONSEP MANAJEMEN(INTRODUCTION TOMANAGEMENT)
2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 3.950.000
89 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 05-06 3.950.00090 TEAM DEVELOPMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 05-07 5.950.00091 TEKNIK NEGOSIASI 3 10-12 13-15 14-16 11-13 09-11 25-27 11-13 13-15 12-14 10-12 14-16 10-12 5.950.00092 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 04-07 7.950.000
93 GOOD CORPORATE GOVERNANCE 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 03-05 5.950.00094 HOW TO IMPROVE BUSINESS PERFORMANCE 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.00095 KEMADYAAN 5 08-12 26-02 26-30 23-27 07-11 25-29 23-27 27-31 24-28 01-05 26-30 03-07 8.500.000
96 MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000
97 MANAJEMEN OPERASI – PRODUKSI 3 15-17 13-15 12-14 09-11 14-16 25-27 09-11 06-08 10-12 15-17 12-14 10-12 5.950.00098 PERFORMANCE MANAGEMENT 3 22-24 19-21 21-23 18-20 21-23 06-08 18-20 14-16 19-21 22-24 21-23 19-21 5.950.00099 SIX SIGMA CHAMPIONS 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 27-29 24-26 31-02 26-28 26-28 5.950.000
100 HANDLING CUSTOMER COMPLAINT 2 08-09 12-13 15-16 12-13 07-08 25-26 12-13 20-21 13-14 11-12 15-16 13-14 3.950.000101 PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN 3 17-19 21-23 19-21 16-18 16-18 06-08 16-18 08-10 17-19 17-19 19-21 17-19 5.950.000102 MARKETING MANAGEMENT 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 29-31 05-07 29-31 07-09 05-07 5.950.000103 MANAJEMEN PERPUSTAKAAN 3 02-04 13-15 12-14 09-11 02-04 25-27 09-11 01-03 10-12 03-05 12-14 10-12 5.950.000104 Pengendalian Dokumen ISO 9001 2015 4 02-05 12-15 13-16 10-13 07-10 25-28 10-13 06-09 11-14 01-04 13-16 17-20 7.950.000
105Pemahaman Integrasi Sistem Manajemen ISO 14001-2015, ISO 9001-2015, dan ISO 45001-2016
3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 5.950.000
106 Pengendalian Dokumen Integrasi ISO 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.950.000107 COST CONTROL AND ESTIMATING 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 04-07 7.950.000108 FEASIBILITY STUDY & PROJECT EVALUATION 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 11-14 7.950.000109 MATERIAL MANAGEMENT 4 02-05 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 02-05 20-23 03-06 7.950.000110 Office MANAGEMENT AND FILING SYSTEM 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 04-07 7.950.000
111Akuntansi Perpajakan pada Badan Usaha Milik Negara(BUMN)
3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 08-10 05-07 26-28 5.950.000
112 Fraud Prevention, Detection And Investigation Audit 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 26-28 5.950.000
113 General Affairs Management 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 06-08 17-19 22-24 19-21 17-19 5.950.000114 Hubungan Industrial Dan Tenaga Kerja 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000
115 ISO 26000 UNDERSTANDING AND IMPLEMENTING CSR 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 29-31 05-07 01-03 07-09 03-05 5.950.000
116 Legal Due Diligence (LC Perdagangan) 3 10-12 13-15 14-16 11-13 07-09 25-27 11-13 01-03 12-14 10-12 14-16 10-12 5.950.000
117Keterampilan Pengelolaan Hubungan Industrial SampaiDengan Penyelesaian Perselisihan
3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 08-10 19-21 17-19 21-23 19-21 5.950.000
118 Merger Dan Akuisisi 2 25-26 01-02 29-30 26-27 24-25 28-29 26-27 20-21 27-28 25-26 29-30 26-27 3.950.000119 Pengendalian Kinerja Bisnis Dan Aliran Kas 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 5.950.000120 QA & QC Inspection Program 3 08-10 21-23 21-23 18-20 02-04 04-06 18-20 29-31 19-21 08-10 21-23 26-28 6.500.000121 CONTEMPORARY LEADERSHIP 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 26-28 5.950.000122 CUSTOMER SERVICE IN CREDIT UNION 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000123 KEWIRAUSAHAAN PRA PURNA BAKTI 4 02-05 05-08 05-08 02-05 08-11 04-07 02-05 06-09 03-06 02-05 05-08 10-13 8.500.000124 MOSSAD STRATEGY ON BUSINESS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 30-01 05-07 29-31 07-09 03-05 5.950.000125 PERSUASIVE MARKETING 3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000
126 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 01-03 03-05 24-26 05-07 05-07 5.950.000127 Warehouse Management For Project & Services 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 3.950.000128 Supply Chain Management For Project & Services 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000129 MANAJEMEN PERPAJAKAN 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 22-24 19-21 26-28 5.950.000
130INDONESIA TAX OUTLOOK 2015-2016 DAN TAXAMNESTY
2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 4.500.000
131Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPHBadan
3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 26-28 5.950.000
132 TRANSFER PRICING DOCUMENTATION 2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 20-21 10-11 08-09 12-13 26-27 4.500.000133 Fraud Risk Management 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 30-01 19-21 15-17 21-23 26-28 5.950.000134 CUSTOMER LOYALITY STRATEGY 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 26-28 5,950,000135 Crisis Management 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 15-17 05-07 26-28 5.950.000
136 INTERVIEWING SKILL FOR RECRUITMENT PROMOTION 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 5.950.000
137QUALITY MANAGEMENT SYSTEM ISO 9001 2008STANDARD (SISTEM MANAJEMEN MUTU)
3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 29-31 19-21 26-28 5.950.000
138 SECURITY MANAGEMENT SYSTEM 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000139 BASIC LEADERSHIP 3 08-10 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000
140DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAANTERKAIT MENGHADAPI ERA GLOBALISASI
2 18-19 14-15 15-16 12-13 02-03 25-26 12-13 20-21 13-14 18-19 15-16 26-27 3.950.000
141 HOUR OF CHANGE MANAGEMENT 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 08-10 19-21 24-26 21-23 26-28 5.950.000142 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 31-02 28-02 28-30 25-27 28-30 27-29 25-27 14-16 26-28 31-02 28-30 26-28 5.950.000
143HUKUM KEIMIGRASIAN TERKAIT PEMBERIAN IJINMEMPERKERJAKAN TENAGA KERJA ASING
3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 29-31 03-05 03-05 05-07 03-05 5.950.000
144 LOBBYING AND SCHEDULLING 3 10-12 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 10-12 12-14 10-12 5.950.000145 MAN POWER PLANNING 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000146 PROBLEM SOLVING & DECISION MAKING 3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 13-15 24-26 22-24 26-28 26-28 5.950.000147 STRATEGI MEMBANGUN IMAGE CORPORATE 3 29-31 07-09 07-09 04-06 30-01 04-06 04-06 27-29 05-07 29-31 07-09 05-07 5.950.000148 TRANSFORMATION LEADERSHIP 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 01-03 12-14 01-03 14-16 12-14 5.950.000149 MANAJEMEN RESIKO 3 08-10 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 08-10 21-23 19-21 5.950.000150 INTELLIGENT AND INVESTIGATION SKILLS 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000151 ASSET SECURITY MANAGEMENT 3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 29-31 03-05 24-26 05-07 03-05 5.950.000152 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 31-02 12-14 12-14 09-11 28-30 25-27 09-11 30-01 10-12 31-02 12-14 10-12 5.950.000153 MEASURING CUSTOMER SATISFACTION 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 03-05 19-21 17-19 5.950.000154 Training Analysis Program 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 10-12 26-28 26-28 5.950.000155 CREATIVE ACCOUNTING DAN DISCLOSURE 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 5.950.000156 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 15-17 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 15-17 12-14 26-28 5.950.000157 ASSET MANAGEMENT 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000158 ASSET MANAGEMENT BERBASIS ICT 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 03-05 5.950.000
159DOCUMENT CONTROL ( VERIFICATION ANDCLASSIFICATION )
3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 30-01 10-12 08-10 12-14 10-12 5.950.000
160DOCUMENT MANAGEMENT SYSTEM AND ELECTRONICFILING
3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 08-10 19-21 15-17 21-23 17-19 5.950.000
161 MANAGEMENT INFORMATION SYSTEM 3 24-26 28-02 28-30 25-27 21-23 25-27 25-27 14-16 26-28 24-26 28-30 26-28 5.950.000
162MANAGEMENT OF DOCUMENT CONTROL & MODERNLIBRARY
3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 29-31 05-07 31-02 07-09 05-07 5.950.000
163 Office MANAGEMENT AND ELECTRONIC FILING SYSTEM 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 01-03 12-14 03-05 14-16 12-14 5.950.000
164 Office MODERN FILING MANAGEMENT 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 10-12 19-21 19-21 5.950.000165 EFFECTIVE REPORT WRITING TECHNIQUE 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 13-15 24-26 17-19 26-28 26-28 5.950.000166 Office AUTOMATION SKILL 3 22-24 05-07 05-07 02-04 23-25 06-08 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000167 TATACARA PENYUSUNAN SILABUS DIKLAT 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 30-01 10-12 29-31 12-14 10-12 5.950.000
168 COMERCIAL CONTRACT DRAFTING AND MANAGEMENT 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 08-10 05-07 26-28 5.950.000
169 CONTRACT MANAGEMENT 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 30-01 17-19 22-24 19-21 17-19 5.950.000170 Cost control 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 08-10 26-28 29-31 28-30 26-28 5.950.000171 Creative Problem Solving 4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 13-16 04-07 02-05 06-09 04-07 7.950.000172 Effective Business Letters Writing 3 10-12 13-15 14-16 11-13 02-04 27-29 11-13 29-31 12-14 10-12 14-16 12-14 5.950.000
173Effective Inventory Management and ModernWarehousing for Support Personal
4 16-19 20-23 20-23 17-20 15-18 05-08 17-20 31-03 18-21 16-19 20-23 18-21 7.950.000
174 Excellent Supervisory 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 27-30 10-13 01-04 12-15 10-13 7.950.000175 Integrated and Effective Logistic Management 4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 07-10 25-28 15-18 27-30 04-07 7.950.000
176 Leadership Skill How Become a More Effective Leader 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 14-16 05-07 22-24 07-09 26-28 5.950.000
177 Modern Office Administration and Filling System 4 09-12 26-01 26-29 23-26 08-11 25-28 23-26 06-09 24-27 09-12 26-29 03-06 7.950.000
178PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAIOPERASIONAL
4 23-26 12-15 12-15 09-12 22-25 26-29 09-12 27-30 10-13 23-26 12-15 10-13 7.950.000
179PRODUCTION PLANNING AND INVENTORY CONTROL(PPIC)
3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 30-01 17-19 31-02 19-21 17-19 5.950.000
180TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN,TRAINING BUDGET AND TRAINING IMPACTEVALUATION(TIE)
3 15-17 12-14 14-16 11-13 14-16 27-29 11-13 29-31 12-14 15-17 14-16 12-14 5.950.000
181MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAANBERBASIS TI
2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000
182 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 06-08 24-26 29-31 26-28 26-28 5.950.000183 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 29-31 05-07 26-28 5.950.000184 CAREER MANAGEMENT 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 5.950.000185 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.000
186ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL
4 09-12 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 09-12 27-30 04-07 7.950.000
187 INTEGRATED HUMAN RESOURCES MANAGEMENT 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 5.950.000188 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 08-11 05-08 05-08 02-05 08-11 05-08 02-05 06-09 03-06 08-11 05-08 03-06 7.950.000
189PELAKSANAAN DAN PERMASALAHAN PENGADAANTANAH PEMBEBASAN LAHAN
3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 13-15 10-12 15-17 12-14 10-12 5.950.000
190PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS
4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 27-30 18-21 22-25 20-23 17-20 7.950.000
191 PLANNING AND ORGANIZE TRAINING 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 01-03 26-28 29-31 28-30 26-28 5.950.000192 TRAINING DEVELOPMENT MANAGEMENT 3 17-19 19-21 19-21 16-18 16-18 04-06 16-18 29-31 17-19 17-19 19-21 19-21 5.950.000193 Salesmanship Skills 2 25-26 26-27 26-27 23-24 24-25 25-26 23-24 20-21 24-25 25-26 26-27 26-27 4.500.000194 BASIC RELATIONSHIP MANAGEMENT FOR LEADERS 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 27-29 03-05 29-31 05-07 03-05 5.950.000
195COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIPTRAINING
3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000
196 DEVELOVING HIGH PERFORMANCE TEAMS 2 25-26 08-09 08-09 05-06 24-25 06-07 05-06 20-21 06-07 25-26 08-09 06-07 3.950.000197 EFFECTIVE EXECUTIVE SECRETARY 2 01-02 12-13 12-13 09-10 31-01 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000198 FILLING SYSTEM FOR SECRETARY 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 29-31 24-26 10-12 26-28 26-28 5.950.000199 HR MANAGEMENT 2 22-23 14-15 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000200 HR MANAGEMENT OF CHANGE 3 29-31 21-23 21-23 18-20 28-30 06-08 18-20 06-08 19-21 29-31 21-23 19-21 5.950.000
201 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 2 04-05 01-02 29-30 26-27 02-03 27-28 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000
202INVENTORY MANAGEMENT AND COST INVESTMENTRECOVERY
4 16-19 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 16-19 13-16 11-14 7.950.000
203 Logistic Management 2 24-25 19-20 19-20 16-17 23-24 06-07 16-17 20-21 17-18 24-25 19-20 17-18 3.950.000
204LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT
3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 5.950.000
205 MAN POWER PLANNING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 03-05 5.950.000206 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 07-10 10-13 09-12 12-15 10-13 7.950.000207 MATERIAL MANAGEMENT FOR PROJECT 4 15-18 20-23 20-23 17-20 14-17 04-07 17-20 13-16 18-21 15-18 20-23 18-21 7.950.000208 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 25-26 01-02 29-30 26-27 24-25 25-26 26-27 20-21 27-28 25-26 29-30 26-27 3.950.000209 PLAN LAY OUT Office 3 29-31 07-09 07-09 04-06 28-30 06-08 04-06 29-31 05-07 29-31 07-09 05-07 5.950.000210 SERVICE EXCELLENT 3 03-05 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 01-03 14-16 12-14 5.950.000211 SUPERVISORY LEADERSHIP AND DECISSION MAKING 3 08-10 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 08-10 19-21 17-19 5.950.000
212 WAREHOUSE MANAGEMENT OPERATION AND CONTROL 2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 27-28 3.950.000
213 Warehousing & Distribution Management 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 27-29 10-12 31-02 12-14 10-12 5.950.000214 TAX ACCOUNTING 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 13-15 03-05 22-24 05-07 26-28 5.950.000
215RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN,BANDING DAN GUGATAN
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 27-29 10-12 29-31 12-14 10-12 5.950.000
216 MANAJEMEN MUTU TERPADU 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 17-18 3.950.000
217TOTAL QUALITY MANAGEMENT SERIES MANAJEMENMUTU TERPADU
2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.000
218 BUILDING A TEAM 2 22-23 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 22-23 12-13 26-27 3.950.000219 CAREER PLANNING SYSTEM 2 29-30 19-20 19-20 16-17 03-04 04-05 16-17 20-21 17-18 29-30 19-20 27-28 3.950.000220 COMPENSATION SYSTEM DEVELOPMENT 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 27-28 3.950.000
221COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT
2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 20-21 12-13 15-16 14-15 10-11 3.950.000
222 EFFECTIVE PERFORMANCE APPRAISAL 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 3.950.000223 EFFECTIVE TRAINING MANAGEMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 30-01 05-07 03-05 07-09 03-05 5.950.000
224HUMAN RESOURCES MANAGEMENT FOR NON-HRMANAGER
2 10-11 12-13 15-16 12-13 09-10 27-28 12-13 20-21 13-14 10-11 15-16 12-13 3.950.000
225 JOB COMPETENCY PROFILING 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 19-20 3.950.000226 MEASURING TRAINING IMPACT 2 25-26 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 25-26 29-30 27-28 3.950.000227 PERFORMANCE BASED PAY 2 01-02 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 01-02 05-06 06-07 3.950.000
228STRATEGIC HUMAN RESOURCES MANAGEMENT FORGLOBAL COMPETITIVE ADVANTAGE
2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 20-21 17-18 11-12 19-20 20-21 3.950.000
229 WORKLOAD ANALYSIS 2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 20-21 24-25 18-19 26-27 26-27 3.950.000230 ACTIVITY BASED MANAGEMENT 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000
231NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS ANDMAKE YOU MORE EFFECTIVE NEGOTIATOR
2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000
232 STRATEGIC MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 06-08 05-07 15-17 07-09 05-07 5.950.000233 Supply Chain Management (SCM) 2 24-25 14-15 14-15 11-12 23-24 28-29 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000234 Supplier Management 2 31-01 21-22 21-22 18-19 30-31 04-05 18-19 20-21 19-20 31-01 21-22 19-20 3.950.000235 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 08-11 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.950.000
236ASPEK HUKUM DAN PENYELESAIAN KONFLIKPERTANAHAN
3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 22-24 05-07 26-28 5.950.000
237 ANTI MONOPOLI 3 29-31 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 29-31 12-14 26-28 5.950.000238 HUKUM KEPAILITAN 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 01-03 19-21 26-28 5.950.000
239 HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000
240HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGANBISNIS
3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 29-31 05-07 15-17 07-09 26-28 5.950.000
241 HUKUM TINDAK PIDANA KORUPSI 3 24-26 13-15 14-16 11-13 21-23 25-27 11-13 01-03 12-14 24-26 14-16 10-12 5.950.000
242STRATEGI MENGANTISIPASI RISIKO TINDAK PIDANA(KORUPSI)
3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 08-10 19-21 31-02 21-23 17-19 5.950.000
243TINDAK PIDANA PENCUCIAN UANG DAN PERANAN BANKUNTUK MENCEGAHNYA
3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 14-16 26-28 03-05 28-30 26-28 5.950.000
244TIPIKOR DALAM PENGELOLAAN KEUANGANPERUSAHAAN & PERBANKAN
3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 27-29 03-05 10-12 05-07 03-05 5.950.000
245 BERITA ACARA PEMERIKSAAN 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 30-01 10-12 17-19 12-14 12-14 5.950.000246 MARITIME & SHIPPING LAW IN INDONESIA 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 06-08 17-19 22-24 19-21 19-21 5.950.000247 HUKUM DAN KONTRAK KONSTRUKSI 3 29-31 26-28 26-28 23-25 30-01 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000248 BASIC OF SUPPLY CHAIN MANAGEMENT 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000249 EFFECTIVE LINE BALANCING 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 20-21 03-04 29-30 05-06 03-04 3.950.000
250FILLING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF
3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000
251INFORMATION SYSTEMS AND INFORMATIONTECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT
3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000
252 ISO WAREHOUSING 2 24-25 07-08 07-08 04-05 23-24 04-05 04-05 20-21 05-06 24-25 07-08 27-28 3.950.000253 KOMPUTERISASI PERGUDANGAN 2 31-01 14-15 15-16 12-13 30-31 28-29 12-13 20-21 13-14 31-01 15-16 13-14 3.950.000
254MAINTENANCE MANAGEMENT (FOR MANUFACTUREAND OIL & GAS COMPANY)
3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 06-08 19-21 03-05 21-23 19-21 6.500.000
255MEASURING AND MANAGING COST ESCALATION INPROJECT
2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 3.950.000
256 MODERN WAREHOUSE DESIGN 2 25-26 12-13 12-13 09-10 24-25 27-28 09-10 20-21 10-11 25-26 12-13 10-11 3.950.000257 NEGOTIATION SKILL FOR PURCHASING STAFF 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 14-16 17-19 31-02 19-21 17-19 5.950.000
258OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES
3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 01-03 28-30 26-28 5.950.000
259PLANNING AND MANAGING INVENTORIES IN A SUPPLYCHAIN
3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 01-03 03-05 08-10 05-07 05-07 5.950.000
260 PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 5.950.000261 PROJECT EVALUATION AND FINANCING 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000
262 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 27-29 05-07 03-05 07-09 03-05 5.950.000
263 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 30-01 10-12 10-12 12-14 10-12 5.950.000264 RFID for WAREHOUSE 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 3.950.000
265STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAHSAKIT
3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 06-08 26-28 24-26 28-30 26-28 5.950.000
266STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASIMICROSOFT EXCEL
3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 5.950.000
267TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLYCHAIN
3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 12-14 5.950.000
268 VENDOR MANAGED INVENTORY 2 08-09 21-22 21-22 18-19 07-08 07-08 18-19 20-21 19-20 08-09 21-22 19-20 3.950.000269 Workload Analysis 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000270 ENTERPRISE RESOURCES PLANNING (ERP) 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 03-06 7,950,000271 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 10-12 5.950.000
272 PROJECT COST MANAGEMENT 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 13-15 19-21 03-05 21-23 19-21 5.950.000
273PROJECT MANAGEMENT IN ENGINEERING,PROCUREMENT & CONSTRUCTION
3 10-12 28-02 28-30 25-27 09-11 27-29 25-27 27-29 26-28 10-12 28-30 26-28 5.950.000
274 ADVANCED LAND TRANSPORT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 05-07 5.950.000275 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6,500,000
276JOB DESCRIPTION ANALYSIS, DEVELOPMENT, ANDDESIGN
2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000
277 Project Management (3 Hr) 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 08-10 05-07 26-28 6,500,000278 PROJECT MANAGEMENT (PM) (5Hr) 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 17-21 9,500,000279 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 12-14 21-23 18-20 21-23 04-06 18-20 06-08 19-21 22-24 21-23 26-28 6,500,000
280STRATEGIC HUMAN RESOURCE MANAGEMENT ANDORGANIZATION DEVELOPMENT
3 31-02 28-02 28-30 25-27 28-30 25-27 25-27 14-16 26-28 31-02 28-30 26-28 6,500,000
281 Strategic Performance Management 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 29-31 05-07 03-05 07-09 03-05 6,500,000282 Strategic Planning 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 30-03 10-14 08-12 12-16 10-14 9,500,000283 CRYSTALL BALL 3 15-17 12-14 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000
284DECISION MAKING BY USING STRATEGIC THINKING(PENDEKATAN SISTEMIK DAN NEW 7 TOOLS APPROACH)
2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000
285INOVASI DAN KREATIFITAS MENUJU ORGANISASIPEMBELAJARAN
2 02-03 14-15 12-13 09-10 02-03 27-28 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000
286 LEADERSHIP FOR MANAGER 4 08-11 19-22 20-23 17-20 07-10 04-07 17-20 27-30 18-21 08-11 20-23 18-21 7.950.000287 ADMINISTRASI KEPABEANAN 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 27-30 17-20 01-04 19-22 17-20 7.950.000
288Custom facility, Shipping Documents & Export ImportProcedure
2 08-09 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.000
289 EFFECTIVE PUBLIC RELATIONS SKILL 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000290 Export-Import 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 06-08 10-12 22-24 12-14 10-12 5.950.000291 Export-Import and Incoterm 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 13-15 19-21 29-31 21-23 19-21 5.950.000292 FREIGHT FORWARDING 2 02-03 28-01 28-29 25-26 03-04 25-26 25-26 20-21 26-27 04-05 28-29 27-28 3.950.000293 Incoterm 2010 2 10-11 08-09 08-09 05-06 10-11 07-08 05-06 20-21 06-07 10-11 08-09 06-07 3.950.000
294PEMAHAMAN SHIPPING DOCUMENT & PROSEDURKEPABEANAN
3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 29-31 12-14 17-19 14-16 12-14 5.950.000
295 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 10-13 7.950.000
296 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 27-29 10-12 01-03 12-14 26-28 5.950.000297 Office Automation 2 11-12 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 11-12 26-27 26-27 3.950.000298 PROBLEM SOLVING & DECISION MAKING 3 15-17 05-07 05-07 02-04 16-18 06-08 02-04 06-08 03-05 15-17 05-07 03-05 5.950.000299 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 3 08-10 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 08-10 07-09 26-28 5.950.000300 SUPPLY MARKET ANALYSIS 4 16-19 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 16-19 12-15 10-13 7.950.000301 TOTAL COST OF OWNERSHIP ANALYSIS 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 30-01 24-26 31-02 26-28 26-28 5.950.000
302 CONTRACT MANAGEMENT 4 08-11 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 08-11 05-08 03-06 7.950.000303 PAJAK DAN PROSEDUR IMPLEMENTASI 4 15-18 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 15-18 12-15 10-13 7.950.000304 TAX AND FINANCIAL CONTROL 3 22-24 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 22-24 19-21 26-28 5.950.000305 Inventory Management Manufacturing Industry 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 04-07 7.950.000306 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 23-26 20-23 17-20 7.950.000307 Perancangan Tata Letak Pabrik 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 11-14 7.950.000308 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 04-07 7.950.000309 PRODUCTION AND PLANNING CONTROL 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 11-14 7.950.000
310 Production Handling Separation and Measurement 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.950.000
311 QUALITY CONTROL OF PRODUCT 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 17-20 7.950.000312 QUALITY SYSTEM ENGINEERING 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 03-06 7.950.000313 SYSTEM AND COST PRODUCTION 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 04-07 7.950.000314 ANALISA KEUANGAN 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 26-27 4.500.000
315ANALISA KREDIT MODAL KERJA KONTRAKTOR DANSTANDBY KREDIT
2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 20-21 24-25 15-16 26-27 27-28 4.500.000
316 ANALISA PERKREDITAN 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 7.950.000317 BASIC ACCOUNTING 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 17-20 7.950.000
318PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORANARUS KAS_CASH FLOW
2 02-03 21-22 21-22 18-19 02-03 04-05 18-19 20-21 19-20 01-02 21-22 26-27 4.500.000
319 PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY) 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 4.500.000320 PENYELESAIAN KREDIT BERMASALAH 2 17-18 08-09 08-09 05-06 16-17 06-07 05-06 20-21 06-07 17-18 08-09 03-04 4.500.000321 PENYUSUNAN DAN ANALISA SCORING RATING 2 25-26 12-13 15-16 12-13 24-25 27-28 12-13 20-21 13-14 25-26 15-16 13-14 4.500.000
322PENYUSUNAN PERATURAN INTERNAL PERKREDITANBANK
3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 06-08 19-21 31-02 21-23 19-21 5.950.000
323 GOOD CORPORATE GOVERNANCE 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 13-15 26-28 03-05 28-30 26-28 5.950.000324 Audit Perkreditan Bank 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 29-31 03-05 10-12 05-07 05-07 5.950.000
325 Pencegahan dan Audit Fraud di Lingkungan Perbankan 3 17-19 13-15 12-14 09-11 16-18 25-27 09-11 01-03 10-12 17-19 12-14 10-12 5.950.000
326 COST MANAGEMENT 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000327 DASAR-DASAR PERBENDAHARAAN 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 06-09 03-06 22-25 05-08 10-13 7.950.000328 MANAJEMEN RISIKO INVESTASI 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 17-20 7.950.000
329MANAJEMEN KEUANGAN UNTUK NON MANAJERKEUANGAN
2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 26-27 3.950.000
330 STUDY KELAYAKAN BISNIS 2 08-09 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 08-09 26-27 27-28 3.950.000331 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 15-18 26-29 03-06 7.950.000332 FINANCING CONDOTEL HOTEL OPERATION 4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.950.000
333MANAGEMENT OF OUTSOURCE STAFF HOUSING ANDCATERING SERVICES
4 29-01 12-15 13-16 10-13 14-17 25-28 10-13 07-10 11-14 29-01 13-16 18-21 7.950.000
334 Service Recovery Create Loyal Customers for Life 3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 10-12 28-30 26-28 5.950.000335 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 4 15-18 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 15-18 26-29 10-13 7.950.000
336PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT)
2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
337 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 5.950.000338 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000
339Change & conflict management and dealing with difficultpeople
2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000
340 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 3.950.000341 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000342 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.000343 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.000344 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 3.950.000345 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 5.950.000346 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 5.950.000347 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 5.950.000348 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 5.950.000349 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.950.000350 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000351 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.500.000
352ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSEPEOPLE
3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.500.000
353CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.500.000
354PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN (Petroleum Economics)
4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 8.500.000
355CATERING & ACCOMMODATION MANAGEMENT(INCLUDING TABLE MANNER)
4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.950.000
356COMMUNICATION, ASSERTIVENESS AND CONFLICTMANAGEMENT
2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 3.950.000
357 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.950.000358 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 5.950.000
359HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP
2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 3.950.000
360 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.000361 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN - PROCUREMENT1 Prinsip dasar dan prosedur pengadaan barang & jasa 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.000
2 HARGA PERKIRAAN SENDIRI (HPS) 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 03-04 3.950.0003 ASPEK TKDN 2 29-30 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 29-30 19-20 26-27 3.950.0004 INTEGRATED PROCUREMENT MANAGEMENT 2 08-09 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 08-09 05-06 26-27 3.950.000
5TEKNIK DAN METODE PENYUSUNAN HPS OE (HARGAPERKIRAAN SENDIRI) ATAS PENGADAAN BARANG DANJASA
3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 08-10 03-05 31-02 05-07 05-07 5.950.000
6 Procurement & Purchasing Management 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.0007 Strategic Sourcing & Vendor Management 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000
8Metode Penyusunan Spesifikasi & Harga PerkiraanSendiri
2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000
9 Negotiation Skills For Procurement 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00010 Procurement Progress & Order Monitoring 2 29-30 14-15 14-15 11-12 28-29 28-29 11-12 20-21 12-13 29-30 14-15 12-13 3.950.00011 Procurement Fraud & Audit 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 20-21 19-20 03-04 21-22 19-20 3.950.00012 BASIC PROCUREMENT & PURCHASING 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 13-15 24-26 22-24 26-28 26-28 5.950.00013 PROCUREMENT MANAGEMENT 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 20-21 17-18 01-02 19-20 17-18 3.950.00014 PROCUREMENT STRATEGY 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 20-21 24-25 08-09 26-27 26-27 3.950.00015 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 24-26 13-15 14-16 11-13 23-25 25-27 11-13 06-08 12-14 24-26 14-16 12-14 5.950.00016 E-PROCUREMENT (E-Proc) 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 06-08 24-26 22-24 26-28 26-28 5.950.00017 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 19-21 5.950.000
18SUSTAINABLE PROCUREMENT IN RELATION WITHQUALITY ASSURANCE
4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 16-19 06-09 04-07 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MOTIVASI DAN PERSONALDEVELOPMENT
1 Communication SKILL 2 08-09 14-15 15-16 12-13 07-08 25-26 12-13 06-07 13-14 08-09 15-16 13-14 3.950.0002 Dynamic Interpersonal & Comunication Skills 2 22-23 28-01 28-29 25-26 21-22 27-28 25-26 20-21 26-27 22-23 28-29 27-28 3.950.0003 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 31-01 07-08 07-08 04-05 30-31 07-08 04-05 27-28 05-06 31-01 07-08 05-06 3.950.000
4 Effective public speaking and business presentation 2 04-05 12-13 12-13 09-10 03-04 28-29 09-10 30-31 10-11 03-04 12-13 10-11 3.950.000
5 CARA MENYENANGKAN MEMBANGUN TIM IMPIAN 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 01-04 26-29 03-06 7.950.0006 Constructive Anger Management 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 5.950.0007 Menjadi pribadi yang asertif 3 29-31 12-14 14-16 11-13 28-30 27-29 11-13 29-31 12-14 29-31 14-16 12-14 5.950.0008 Menjadi pribadi yang berpengaruh 3 02-04 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 03-05 21-23 19-21 5.950.0009 Motivating staff for excellent performance 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 13-15 03-05 17-19 05-07 26-28 5.950.000
10 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 3.950.000
11BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT &SECRETARY
3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000
12 EFFECTIVE MASTER OF CEREMONY (MC) 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 27-29 19-21 01-03 21-23 17-19 5.950.00013 ACHIEVEMENT MOTIVATION 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 3.950.00014 Advance Negotiation Skill 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 5.950.00015 CHANGE YOUR MINDSET 4 02-05 12-15 13-16 10-13 08-11 25-28 10-13 30-02 11-14 01-04 13-16 11-14 7.950.00016 MC (MASTER OF CEREMONY) 3 02-04 12-14 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 5.950.000
17COMMUNICATION, ASSERTIVENESS AND CONFLICTMANAGEMENT
2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 3.950.000
18 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.950.00019 TOTOK AURA MENUJU TOTAL BEAUTY 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 03-05 19-21 17-19 5.950.00020 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 5.950.000
21HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP
2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 3.950.000
22 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.00023 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.950.00024 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.00025 ASSERTIVE TRAINING 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.00026 BRAIN POWER 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000
27CAPACITY BUILDING(MEMBANGUN KAPASITAS DANKEMAMPUAN)
3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 10-12 5.950.000
28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 03-05 05-07 05-07 5.950.00029 INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT) 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 13-15 10-12 10-12 12-14 12-14 5.950.000
30PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENTMOTIVATION TRAINING)
3 22-24 13-15 14-16 11-13 23-25 25-27 11-13 30-01 12-14 22-24 14-16 10-12 5.950.000
31 PEOPLE SKILL 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 08-10 17-19 29-31 19-21 17-19 5.950.00032 PRIBADI EFEKTIF 2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000
33SENSITIVITY TRAINING (TURNING POINT ATAU NEWBORN)
3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 14-16 10-12 15-17 12-14 12-14 5.950.000
34 TEKNIK PRESENTASI 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 3.950.00035 TRAINING OF TRAINER 3 22-24 28-02 28-30 25-27 23-25 27-29 25-27 29-31 26-28 22-24 28-30 26-28 5.950.00036 ACHIEVEMENT MOTIVATION 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.00037 EFFECTIVE COMMUNICATION SKILL 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 06-08 10-12 31-02 12-14 10-12 5.950.00038 EFFECTIVE PRESENTATION SKILLS 3 03-05 19-21 21-23 18-20 02-04 06-08 18-20 14-16 19-21 01-03 21-23 19-21 5.950.00039 EMOTIONAL QUETIENTS 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 29-31 26-28 10-12 28-30 26-28 5.950.00040 ICE BREAKING AND ENERGIZERS 3 29-31 21-23 19-21 16-18 28-30 06-08 16-18 13-15 17-19 29-31 19-21 17-19 5.950.00041 TRAINING OF TRAINER (TOT) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000
42 Train the trainers 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 18-21 7.950.00043 ACHIEVEMENT MOTIVATION TRAINING 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 3.950.00044 CAPACITY BUILDING SOFT SKILL PROGRAM 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 5.950.00045 BREATHING ARTS FOR CREATIVE THINKING 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00046 EFFECTIVE STRATEGY TO CONTROL STRESS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 26-28 5.950.00047 ESQ FOR PEAK PERFORMANCE 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 29-31 19-21 24-26 21-23 26-28 5.950.00048 HUMAN PERFORMANCE AND LIMITATION 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 5.950.000
49MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADIYANG UNGGUL
2 15-16 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000
50 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 21-23 21-23 18-20 07-09 06-08 18-20 14-16 19-21 08-10 21-23 19-21 5.950.000
51 MANAGING PRESSURE FOR PEAK PERFORMANCE 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 01-03 12-14 26-28 5,950,00052 Stress Management Strategies 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 14-16 05-07 08-10 07-09 05-07 5.950.000
53HYPNO-PRESENTATION SKILL UNLOCKING YOURPOTENTIAL POWER
3 17-19 07-09 07-09 04-06 16-18 06-08 04-06 08-10 05-07 17-19 07-09 26-28 5.950.000
54 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 3 24-26 13-15 14-16 11-13 23-25 27-29 11-13 14-16 12-14 24-26 14-16 12-14 5.950.000
55IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT
3 31-02 19-21 19-21 16-18 30-01 04-06 16-18 29-31 17-19 31-02 19-21 19-21 5.950.000
56 SEVEN HABITS WITH NLP APPROACH 3 02-04 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 01-03 07-09 05-07 5.950.00057 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 14-16 17-19 03-05 19-21 17-19 5.950.00058 FINDING YOUR ESSENTIAL SELF 3 15-17 05-07 05-07 02-04 14-16 04-06 02-04 01-03 03-05 15-17 05-07 03-05 5.950.00059 INTERPERSONAL COMMUNICATION SKILL 2 08-09 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 08-09 08-09 06-07 3.950.000
60 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 24-25 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 24-25 21-22 17-18 3.950.000
61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 14-15 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 13-14 3.950.000
62PERSONALITY DEVELOPMENT BERBASIS EMOTIONALAND SPRITUAL QUETIENTS
4 29-01 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 29-01 12-15 03-06 7.950.000
63 STRESS & CONFLICT MANAGEMENT 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 01-03 24-26 31-02 26-28 26-28 5.950.00064 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 06-10 10-14 01-05 12-16 10-14 8.950.000
65CORPORATE BUILDING DALAM MEMBANGUN KULTURDAN ETIKA INTERNAL ORGANISASI
3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000
66MODEL PEMBINAAN ANGGOTA YANG EXCELLENTDALAM DUNIA KERJA PERUSAHAAN
3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.000
68CHANGE & CONFLICT MANAGEMENT AND DEALINGWITH DIFFICULT PEOPLE
2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000
69COLLABORATION MS Office AND EFFECTIVEPRESENTATION
3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 5.950.000
70Change & conflict management and dealing with difficultpeople
2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000
71 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 3.950.00072 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 3.950.00073 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.00074 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.00075 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 3.950.00076 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 5.950.00077 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 5.950.00078 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 5.950.00079 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 5.950.00080 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.950.00081 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING1 Kalibrasi dan Tera 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.0002 Kalibrasi Massa & Dimensi 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.0003 SAP 2000 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.0004 TEKLA STRUCTURE 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 06-08 03-05 08-10 05-07 03-05 5.950.000
5ISO 10012 MEASUREMENT MANAGEMENT SYSTEMFOR SUPPORTING ISO 9001 CERTIFICATION
2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000
6 MANAJEMEN KALIBRASI 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.0007 Root Cause Analysis 2 15-16 22-23 22-23 19-20 14-15 07-08 19-20 15-16 20-21 15-16 22-23 20-21 3.950.000
ENGINEERING - MECHANICAL1
ELEMEN MESIN DESIGN, MAINTENANCE ANDTROUBLESHOOTING
3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000
2INSTALLATION, MAINTENANCE ANDTROUBLESHOOTING OF GAS COMPRESSOR AND PIPINGSYSTEM
3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
3 PRINSIP DASAR PENYUSUNAN TROUBLESHOOTING 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 30-01 03-05 29-31 05-07 03-05 5.950.000
4ROTATING EQUIPMENT PUMP, COMPRESSOR, GASTURBINE, MAINTENANCE AND TROUBLESHOOTING
3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.000
ENGINEERING - MAINTENANCE1 Maintenance Management 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 3.950.0002 MAINTENANCE PLANNING & SCHEDULING 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000
3RELIABILITY CENTERED MAINTENANCE (RCM) ININDUSTRY
3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000
4 ROOT CAUSE ANALYSIS (RCA) IN INDUSTRY 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 01-03 05-07 03-05 5.950.0005 TURNAROUND & SHUTDOWNS MANAGEMENT 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 10-12 5.950.0006 AUTONOMOUS MAINTENANCE 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.0007 MAINTENANCE MANAJEMEN 2 10-11 01-02 29-30 26-27 09-10 27-28 26-27 08-09 27-28 10-11 29-30 26-27 3.950.000
8PRACTICAL PROBLEM SOLVING FOR MAINTENANCE ANDENGINEER
1 12-12 09-09 09-09 06-06 11-11 04-04 06-06 10-10 07-07 12-12 09-09 07-07 2.250.000
9 TPM (TOTAL PREVENTIVE MAINTENANCE) 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 26-27 3.950.000
10ZERO BREAK DOWN THROUGH SMALL DEFECTELIMINATION
1 02-02 05-05 05-05 02-02 04-04 06-06 02-02 30-30 03-03 01-01 05-05 03-03 2.250.000
11 TOTAL PRODUCTIVE MAINTENANCE 2 08-09 14-15 14-15 11-12 07-08 25-26 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000
PUBLIC TRAINING SCHEDULE 2018 DI JAKARTA
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - IT
1Database Management System Development AndGraphic Display With Access 2010 And SQL Method
3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000
2Excellent Automation Office Data Processing System andData Export with visual basic aplication excel 2007
2 15-16 19-20 19-20 16-17 14-15 07-08 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000
3Excellent Automation Office Data Processing System andData Export With Visual Basic Aplication Excel 2010
2 22-23 26-27 26-27 23-24 21-22 28-29 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000
4 Mastering Excel 2010 For Office Data Processing 2 31-01 12-13 12-13 09-10 30-31 28-29 09-10 29-30 10-11 31-01 12-13 10-11 3.950.0005 COBIT 4.1 Foundation 2 04-05 01-02 29-30 26-27 02-03 25-26 26-27 02-03 27-28 04-05 29-30 26-27 3.950.0006 COBIT 5 Foundation 2 11-12 07-08 07-08 04-05 10-11 06-07 04-05 09-10 05-06 11-12 07-08 05-06 3.950.0007 ITIL V.3 FOUNDATION 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.0008 ITIL V2011Foundation with Intl Cert. Exam Preps 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 14-16 24-26 17-19 26-28 26-28 5.950.0009 GRAPHIC DESIGN & DESKTOP PUBLISHING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.950.000
10 IT HELPDESK 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 14-16 17-19 15-17 19-21 17-19 5.950.000
11Financial Accounting Information System DevelopmentWith Excel 2007 and VBA
2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000
12Financial Accounting Information System DevelopmentWith Excel 2010 and VBA
2 04-05 14-15 15-16 12-13 02-03 25-26 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000
13Implementation Of Payroll Admisnistration System WithExcel 2010 For HRD
3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 10-12 21-23 19-21 5.950.000
14 Inventory System Development Using Acces 2007 2 17-18 28-01 28-29 25-26 16-17 27-28 25-26 15-16 26-27 17-18 28-29 27-28 3.950.00015 Inventory System Development Using Acces 2010 2 24-25 05-06 05-06 02-03 23-24 04-05 02-03 20-21 03-04 24-25 05-06 03-04 3.950.000
16Mastering Microsoft Project 2007 (Concept andApplication)
2 02-03 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
17POS AND INVENTORY SYSTEM DEVELOPMENT WITHUSING ACCESS 2010
2 25-26 14-15 14-15 11-12 24-25 27-28 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000
18Powerful Database Analysis and Dashboard Reportingwith Excel 2010
2 01-02 21-22 21-22 18-19 31-01 04-05 18-19 30-31 19-20 01-02 21-22 19-20 3.950.000
19Workload Analysis Implementation With Excel 2007 forHR & Non HR
2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
20 ISO IEC 20000 IT SERVICE MANAGEMENT 2 29-30 08-09 08-09 05-06 28-29 06-07 05-06 27-28 06-07 29-30 08-09 03-04 3.950.00021 ISO IEC 38500 IT-GOVERNANCE 2 04-05 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.00022 ISO 20000 Foundation 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.00023 IT BUSINESS ANALYSIS 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000
24 IT PROJECT MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 27-29 26-28 24-26 28-30 26-28 5.950.00025 IT RISK MANAGEMENT 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 03-07 9.500.00026 IT Strategic Planning 2 04-05 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.00027 Managing Software Requirements 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 30-01 19-21 03-05 21-23 19-21 5.950.000
28PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASIBUMN
3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5,950,000
29 SOFTWARE PROJECT MANAGEMENT 3 29-31 13-15 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.00030 SOFTWARE QUALITY ASSURANCE 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.00031 SOFTWARE TESTING FOUNDATION 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.00032 Systems Analysis and Design 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.00033 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 14-16 19-21 31-02 21-23 19-21 5.950.00034 GRAFIC DESIGN & PRODUCT PACKAGING 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.000
35COMPREHENSIVE WEBSITE WRITING SKILL FORCORPORATE BRANDING
2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000
36DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)
2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 26-27 3.950.000
37MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAIMEDIA KOMUNIKASI CSR
1 22-22 07-07 07-07 04-04 21-21 04-04 04-04 20-20 05-05 22-22 07-07 05-05 2.250.000
38TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILEBERBASIS DIGITAL
1 04-04 28-28 28-28 25-25 04-04 29-29 25-25 01-01 26-26 03-03 28-28 28-28 2.250.000
39TRAVEL WRITER DAN KETERAMPILAN MENULISPERJALANAN WISATA MELALUI MEDIA ONLINE
2 10-11 05-06 05-06 02-03 09-10 05-06 02-03 08-09 03-04 10-11 05-06 03-04 3.950.000
40Presentation Skill With Power Point 2007, Swishmax andULEAD
3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 01-03 24-26 03-05 26-28 26-28 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - PETROLEUM & MINING
1 CHEMICALS TREATMENT FOR PRODUCED WATER 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 01-03 12-14 10-12 6.500.0002 Oilfield Production Chemicals 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.500.000
3MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGASINDONESIA
2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.000
4TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUETENTANNG SMELTER
2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000
HSE1 ACCIDENT INVESTIGATIONS 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000
2Assesment And Evaluation Of Waste Water TreatmentSystem (WWT)
2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000
3 Basic K3 (Non-certification) 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 3.950.0004 Clean Development Mechanism (CDM) 2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 13-14 24-25 15-16 26-27 26-27 3.950.0005 Contractor Safety Management System 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.0006 HSE Risk Assesment 2 29-30 14-15 14-15 11-12 28-29 28-29 11-12 27-28 12-13 29-30 14-15 12-13 3.950.0007 Improvement Of Waste Water Treatment 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 01-02 19-20 03-04 21-22 19-20 3.950.0008 Job Safety Analysis 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 08-09 26-27 10-11 28-29 27-28 3.950.0009 Permit To Work System 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 15-16 05-06 17-18 07-08 05-06 3.950.000
10 Penanganan Limbah B3, Bahan Berbahaya dan Beracun 1 24-24 12-12 16-16 13-13 23-23 27-27 13-13 20-20 14-14 24-24 16-16 14-14 2.500.000
11 Pandemic Preparedness for Leaders 1 29-29 12-12 12-12 09-09 28-28 25-25 09-09 27-27 10-10 29-29 12-12 10-10 2.250.00012 HAZARD IDENTIFICATION & KYT TRAINING 1 24-24 07-07 07-07 04-04 23-23 04-04 04-04 20-20 05-05 24-24 07-07 05-05 2.250.00013 Advanced Rigging 5 22-26 19-23 19-23 16-20 21-25 04-08 16-20 27-31 17-21 22-26 19-23 17-21 9.500.00014 Basic rigging 5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 30-03 24-28 29-02 26-30 03-07 9.500.00015 Basic Scaffolding 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.950.00016 Forklift Safety 1 08-08 12-12 12-12 09-09 02-02 25-25 09-09 20-20 10-10 08-08 12-12 26-26 2.250.00017 CONFINED SPACE 1 15-15 19-19 19-19 16-16 14-14 08-08 16-16 13-13 17-17 15-15 19-19 17-17 2.250.000
18ASPEK DAN DAMPAK LINGKUNGAN SISTEMMANAJEMEN ISO 14001-2004
2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000
19 HSE Internal Audit Based on ISO 19011-2011 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000
20INTEGRATED QHSE MANAGEMENT SYSTEM (ISO 9001-2008, ISO 14001 2004 & OHSAS 18001-2007)
4 22-25 12-15 13-16 10-13 21-24 25-28 10-13 28-31 11-14 22-25 13-16 11-14 7.950.000
21 INTERNAL AUDIT HSE 2 31-01 21-22 21-22 18-19 30-31 07-08 18-19 20-21 19-20 31-01 21-22 19-20 3.950.000
22Internal Audit OHSAS 18001-2007 Based on ISO 19011-2013
2 17-18 12-13 12-13 09-10 16-17 25-26 09-10 15-16 10-11 17-18 12-13 10-11 3.950.000
23Internal Audit Integrated QHSE Management SystemBased on ISO 19011-2011
4 23-26 20-23 20-23 17-20 22-25 05-08 17-20 27-30 18-21 23-26 20-23 18-21 7.950.000
24 INTERPRETING & DOCUMENTING OF OHSAS 18001 2007 2 18-19 19-20 19-20 16-17 17-18 06-07 16-17 13-14 17-18 18-19 19-20 17-18 3.950.000
25Understanding & Implementing Of HSE (Health, Safety& Environment) Management Systems
2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 08-09 19-20 10-11 21-22 19-20 3.950.000
26 Pemahaman, Dokumentasi & Implementasi SMK3 2 30-31 14-15 12-13 09-10 29-30 25-26 09-10 27-28 10-11 30-31 12-13 10-11 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN1 PRIMAVERA P6 FOR PROJECT MANAGEMENT(PM) 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 27-29 17-19 29-31 19-21 17-19 5.950.0002 PROJECT MANAGEMENT OFFICE 2 15-16 12-13 12-13 09-10 14-15 28-29 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
3 BERITA ACARA PEMERIKSAAN 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.0004 INTELLIGENT & INVESTIGATION 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.0005 SECURITY RISK ASSESSMENT 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.0006 INVESTIGATIVE TECHNIQUES 2 02-03 21-22 21-22 18-19 02-03 07-08 18-19 30-31 19-20 01-02 21-22 19-20 3.950.0007 RISK MANAGEMENT FUNDAMENTAL 2 10-11 28-01 28-29 25-26 09-10 28-29 25-26 06-07 26-27 10-11 28-29 27-28 3.950.0008 TEKNIK NLP INVESTIGATION 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 15-16 05-06 17-18 07-08 05-06 3.950.0009 INTERVIEW AND INTERROGATION 2 24-25 14-15 14-15 11-12 23-24 25-26 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000
10 ADVANCE SECURITY INVESTIGATION 2 31-01 22-23 22-23 19-20 30-31 06-07 19-20 29-30 20-21 31-01 22-23 20-21 3.950.000
11COMMUNITY SAFETY, CRIME PREVENTION AND SOCIALCONTROL
2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000
12 INTELLIGENT & BOMB THREAT 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 08-10 05-07 10-12 07-09 05-07 5.950.00013 INTELLIGENT SECURITY DALAM INDUSTRI 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 13-14 13-14 18-19 15-16 13-14 3.950.00014 INVESTIGATION REPORTING 2 25-26 19-20 19-20 16-17 24-25 04-05 16-17 20-21 17-18 25-26 19-20 17-18 3.950.00015 PENGAMANAN OBYEK VITAL 2 01-02 26-27 26-27 23-24 31-01 25-26 23-24 30-31 24-25 01-02 26-27 27-28 3.950.00016 PROSEDUR DAN RENCANA AKSI SEKURITI 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 02-03 03-04 04-05 05-06 03-04 3.950.00017 SECURITY INCIDENT REPORT WRITING 2 08-09 14-15 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00018 SECURITY VULNERABILITY ASSESSMENT 2 15-16 21-22 21-22 18-19 14-15 07-08 18-19 15-16 19-20 15-16 21-22 19-20 3.950.00019 TEKNIK WAWANCARA PEMERIKSAAN 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.00020 Shipping Agency 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00021 ISO IEC 17020 2012 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.00022 SOAR Analysis 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.00023 SWOT Analysis 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 3.950.00024 SIKAP KERJA 5S 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.00025 HR Audit (Audit SDM) 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00026 7 Management Tools 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00027 7 QC Tools (7 Alat Pengendali Mutu) 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00028 Dasar-dasar Manajemen Produksi 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.00029 Dasar-dasar Organisasi 2 02-03 28-01 28-29 25-26 02-03 25-26 25-26 30-31 26-27 01-02 28-29 27-28 3.950.00030 Finance for Non Finance Staff 2 10-11 07-08 07-08 04-05 09-10 07-08 04-05 08-09 05-06 10-11 07-08 05-06 3.950.00031 Gemba Kaizen (Continuous Improvement) 2 17-18 14-15 15-16 12-13 16-17 27-28 12-13 15-16 13-14 17-18 15-16 13-14 3.950.00032 HR for Non HR 2 25-26 21-22 21-22 18-19 24-25 04-05 18-19 20-21 19-20 25-26 21-22 19-20 3.950.00033 Human Resources Management 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 29-31 26-28 31-02 28-30 26-28 5.950.00034 Kepemimpinan Gemba 2 11-12 12-13 12-13 09-10 10-11 25-26 09-10 09-10 10-11 11-12 12-13 10-11 3.950.00035 Manajemen Mutu 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.00036 Manajemen Supervisi 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 06-08 17-19 08-10 19-21 17-19 5.950.00037 Marketing for Non Marketing Staff 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 15-16 26-27 15-16 28-29 27-28 3.950.00038 Materials Management 2 24-25 07-08 07-08 04-05 23-24 04-05 04-05 20-21 05-06 24-25 07-08 05-06 3.950.00039 Pelatihan Aplikasi DELTA 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 29-31 12-14 31-02 14-16 12-14 5.950.00040 Penerapan Program 5S 2 03-04 22-23 22-23 19-20 03-04 06-07 19-20 30-31 20-21 01-02 22-23 20-21 3.950.000
41 Pengenalan Program 5S 1 11-11 02-02 30-30 27-27 10-10 25-25 27-27 09-09 28-28 11-11 30-30 26-26 2.250.00042 Perencanaan & Pengendalian Produksi 3 17-19 07-09 07-09 04-06 16-18 06-08 04-06 13-15 05-07 17-19 07-09 05-07 5.950.00043 Perilaku Organisasi 3 24-26 12-14 12-14 09-11 23-25 26-28 09-11 27-29 10-12 24-26 12-14 10-12 5.950.000
44PROSDEM Pemecahan Masalah dan PengambilanKeputusan
3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 17-19 5.950.000
45 Quality Awareness Peduli Mutu 2 04-05 26-27 26-27 23-24 02-03 28-29 23-24 20-21 24-25 03-04 26-27 27-28 3.950.00046 Service Excellence 2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 09-10 03-04 11-12 05-06 03-04 3.950.00047 Statistical Quality Control 2 15-16 14-15 15-16 12-13 14-15 25-26 12-13 15-16 13-14 15-16 15-16 13-14 3.950.00048 Teknik Rapat 2 01-02 28-01 28-29 25-26 31-01 27-28 25-26 30-31 26-27 01-02 28-29 26-27 3.950.00049 Teknik Wawancara 1 02-02 07-07 07-07 04-04 04-04 06-06 04-04 30-30 05-05 05-05 07-07 05-05 2.250.00050 Training for Trainers 2 17-18 19-20 19-20 16-17 16-17 07-08 16-17 13-14 17-18 17-18 19-20 17-18 3.950.00051 Training Management 2 24-25 01-02 29-30 26-27 23-24 25-26 26-27 20-21 27-28 24-25 29-30 27-28 3.950.00052 Work Force Management 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000
53BEING A GREAT SUPERVISOR SUPERVISORS THE MOSTIMPORTANT POSITION OF THE ORGANIZATIONOPERATIONALLY
2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000
54 Engagement and Retention 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000
55 Lean Thinking In Improving Workplace Performance 2 24-25 14-15 14-15 11-12 23-24 25-26 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000
56 Suppliers Evaluation 2 31-01 21-22 21-22 18-19 30-31 04-05 18-19 29-30 19-20 31-01 21-22 19-20 3.950.00057 The AIDDA-SPIN Selling System 2 10-11 08-09 08-09 05-06 09-10 06-07 05-06 08-09 06-07 10-11 08-09 06-07 3.950.00058 Total Quality Management 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 13-14 13-14 18-19 15-16 13-14 3.950.00059 Workforce Management 2 25-26 22-23 22-23 19-20 24-25 07-08 19-20 20-21 20-21 25-26 22-23 20-21 3.950.00060 5S - Housekeeping Management 2 01-02 26-27 26-27 23-24 31-01 25-26 23-24 30-31 24-25 01-02 26-27 27-28 3.950.00061 Managers Training of Enlightment 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 02-03 03-04 04-05 05-06 03-04 3.950.00062 Probing Techniques 2 11-12 14-15 12-13 09-10 10-11 27-28 09-10 09-10 10-11 11-12 12-13 10-11 3.950.00063 KEY PERFORMANCE INDICATORS 2 29-30 07-08 07-08 04-05 28-29 04-05 04-05 27-28 05-06 29-30 07-08 05-06 3.950.000
64ELECTRONIC FILING & DOCUMENT MANAGEMENTSYSTEM
3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000
65 FUNDAMENTALS OF STRATEGIC PLANNING 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000
66MODERN OFFICE ADMINISTRATION FOR EXECUTIVESECRETARY AND EXECUTIVE ADMINISTRATION
2 08-09 05-06 05-06 02-03 07-08 07-08 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000
67NEGOTIATION AND LOBBYING SKILLS FOR DECISIONMAKER
2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
68OUTSOURCING MANAGEMENT Memberdayakan TenagaOutsourcing
2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
69OUTSOURCING MANAGEMENT MEMBERDAYAKANTENAGA MITRA KERJA (TMK) DI PERUSAHAAN
2 01-02 28-01 28-29 25-26 31-01 28-29 25-26 30-31 26-27 01-02 28-29 27-28 3.950.000
70ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFSMETHOD BASED ON DOCUMENT REGULATION
3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000
71 Office Management And Filing System 2 08-09 01-02 29-30 26-27 07-08 25-26 26-27 06-07 27-28 08-09 29-30 26-27 3.950.000
72PAYROLL ADMINISTRATION SYSTEM IMPLEMENTATIONWITH EXCEL 2010 & VBA
2 18-19 07-08 07-08 04-05 17-18 07-08 04-05 13-14 05-06 18-19 07-08 05-06 3.950.000
73 Profesional General Affair Officer With Data Processing 2 10-11 08-09 08-09 05-06 09-10 06-07 05-06 08-09 06-07 10-11 08-09 06-07 3.950.000
74Training Need Analysis which Comprehensive AndEffective
2 15-16 12-13 15-16 12-13 14-15 25-26 12-13 15-16 13-14 15-16 15-16 13-14 3.950.000
75 A3 REPORT 2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 27-28 24-25 29-30 26-27 26-27 3.950.00076 CONTINUOUS IMPROVEMENT 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.00077 IMPLEMENTASI 5R 2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00078 Security Risk Assessment for Leaders 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
79 Security Risk Management for High Risk Industries 3 08-10 26-28 26-28 23-25 07-09 26-28 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000
80 Teknik Investigasi Fraud Berbasis NLP 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 13-15 03-05 15-17 05-07 03-05 5.950.000
81 Teknik Komunikasi Safety yang Prima Berbasis NLP 1 22-22 13-13 13-13 10-10 21-21 29-29 10-10 20-20 11-11 22-22 13-13 11-11 2.250.000
82 Teknik Komunikasi Security yang Prima Berbasis NLP 1 30-30 21-21 21-21 18-18 29-29 04-04 18-18 28-28 19-19 30-30 21-21 19-19 2.250.000
83 Teknik Penyusunan SOP Security 2 04-05 01-02 29-30 26-27 03-04 25-26 26-27 01-02 27-28 03-04 29-30 26-27 3.950.00084 Teknik Wawancara Investigasi Berbasis NLP 2 11-12 08-09 08-09 05-06 10-11 05-06 05-06 09-10 06-07 11-12 08-09 06-07 3.950.00085 Terrorism Risk Management for Leaders 1 18-18 14-14 14-14 11-11 17-17 27-27 11-11 16-16 12-12 18-18 14-14 12-12 2.250.000
86 FORMASI PENDALAMAN IFRS-PSAK terbaru 2013-2015 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000
87INTERNATIONAL FINANCIAL REPORTING STANDARDS(IFRS)
2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
88 5S IN MANUFACTURING 1 15-15 19-19 19-19 16-16 14-14 04-04 16-16 13-13 17-17 15-15 19-19 17-17 2.250.00089 ENHANCING MANAGERIAL SKILL & LEADERSHIP 2 29-30 05-06 05-06 02-03 28-29 05-06 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000
90FAILURE MANAGEMENT WITH FAILURE MODE ANDEFFECT ANALYSIS
1 02-02 12-12 12-12 09-09 02-02 27-27 09-09 30-30 10-10 01-01 12-12 10-10 2.250.000
91 GEMBA KAIZEN 2 08-09 20-21 20-21 17-18 07-08 07-08 17-18 06-07 18-19 08-09 20-21 18-19 3.950.00092 GUGUS KENDALI MUTU (GKM) & PDCA DELTA 2 16-17 28-01 28-29 25-26 15-16 28-29 25-26 14-15 26-27 16-17 28-29 27-28 3.950.00093 INCREASING MANUFACTURING PROFIT 2 31-01 13-14 13-14 10-11 30-31 25-26 10-11 29-30 11-12 31-01 13-14 11-12 3.950.00094 LEAN MANUFACTURING SYSTEM 2 03-04 22-23 22-23 19-20 03-04 05-06 19-20 31-01 20-21 02-03 22-23 20-21 3.950.000
95MANAGEMENT OPERATING SYSTEM THROUGH RACICONCEPT
1 18-18 08-08 08-08 05-05 17-17 07-07 05-05 16-16 06-06 18-18 08-08 06-06 2.250.000
96 Manufacturing Cost Improvement 2 25-26 14-15 15-16 12-13 24-25 28-29 12-13 20-21 13-14 25-26 15-16 13-14 3.950.000
97MASTERING QC 7 TOOLS FOR PROBLEM SOLVING &IMPROVEMENT
2 01-02 19-20 19-20 16-17 31-01 07-08 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
98 Production Optimization and Minimize Down Time 2 18-19 12-13 12-13 09-10 17-18 27-28 09-10 13-14 10-11 18-19 12-13 10-11 3.950.000
99 Manufacturing Planning & Control 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000100 Practical Supply Chain Management 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000101 Principle of Manufacturing Management 2 02-03 12-13 12-13 09-10 02-03 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000102 Principle of Operation Planning 2 08-09 19-20 19-20 16-17 07-08 06-07 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000103 PRODUCTION PLAN & INVENTORY CONTROL 2 15-16 28-01 28-29 25-26 14-15 28-29 25-26 13-14 26-27 15-16 28-29 27-28 3.950.000
104 Project Planning And Control Using microsoft project 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000
105 Project Planning And Control Using Oracle Primavera P6 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000
106Enterprise Resource Planing (ERP) with SAP BusinessOne
3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5,950,000
107 KOMPUTER AKUNTANSI DAN PAJAK UMKM 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3,950,000
108 PROJECT MANAGEMENT FOR NON PROJECT MANAGER 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.500.000
109TINGKAT KOMPONEN DALAM NEGERI (TKDN)PERATURAN, PENERAPAN DAN EVALUASI
2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 4.500.000
110CREATIVE PROBLEM SOLVING AND SHARP DECISIONMAKING
2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000
111 CUSTOMER SERVICE EXCELLENT 2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000
112EFFECTIVE HANDLING COMPLAINT AND PROBLEMSOLVING
2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000
113 LEADERSHIP DEVELOPMENT PROGRAM 2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 27-28 3.950.000114 LEADERSHIP FOR FORMEN 2 31-01 07-08 07-08 04-05 30-31 06-07 04-05 30-31 05-06 31-01 07-08 05-06 3.950.000115 POSITIVE FIGHTER FOR SALES PEOPLE 2 04-05 14-15 14-15 11-12 03-04 25-26 11-12 01-02 12-13 03-04 14-15 12-13 3.950.000
116POWERFUL MARKETING AND SALES TO BOOSTINGYOUR TARGET
2 17-18 01-02 29-30 26-27 16-17 27-28 26-27 15-16 27-28 17-18 29-30 26-27 3.950.000
117 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 2 01-02 12-13 15-16 12-13 31-01 28-29 12-13 27-28 13-14 01-02 15-16 13-14 3.950.000
118 SERVICE WITH DELIGHT (FOR GA & SUPPORT TEAM ) 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 09-10 24-25 11-12 26-27 27-28 3.950.000
119STRATEGIC HUMAN RESOURCE MANAGEMENT ANDORGANIZATION DEVELOPMENT
3 17-19 05-07 05-07 02-04 16-18 06-08 02-04 13-15 03-05 17-19 05-07 03-05 5.950.000
120 SUPERVISORY PROGRAM 2 24-25 14-15 12-13 09-10 23-24 27-28 09-10 20-21 10-11 24-25 12-13 10-11 3.950.000
121 MANAGING AND CONDUCTING MEETING EFFECTIVELY 2 04-05 28-01 28-29 25-26 03-04 28-29 25-26 30-31 26-27 01-02 28-29 26-27 3,950,000
122 TFT -FOR ICE BREAKER 2 08-09 08-09 08-09 05-06 07-08 06-07 05-06 06-07 06-07 08-09 08-09 06-07 3,950,000
123 BUSINESS PROCESS MANAGEMENT 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
124ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM
2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000
125ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM COMPLETE IMPLEMENTATION
5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 27-31 24-28 29-02 26-30 03-07 8.950.000
126ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM CORE IMPLEMENTATION
3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 26-28 5.950.000
127ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM INTERNAL AUDIT
2 08-09 14-15 14-15 11-12 07-08 25-26 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000
128ISO 28000 SUPPLY CHAIN SECURITY MANAGEMENTSYSTEM
2 17-18 21-22 21-22 18-19 16-17 04-05 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000
129ISO 31000 - RISK MANAGEMENT PRINCIPLES ANDGUIDELINES
2 24-25 26-27 26-27 23-24 23-24 27-28 23-24 20-21 24-25 24-25 26-27 26-27 3.950.000
130 ISO IEC 9000 2008 QUALITY MANAGEMENT SYSTEM 2 10-11 22-23 22-23 19-20 09-10 07-08 19-20 08-09 20-21 10-11 22-23 20-21 3.950.000131 RISK MANAGEMENT ON OPERATIONAL BUSINESS 2 18-19 28-01 28-29 25-26 17-18 25-26 25-26 13-14 26-27 18-19 28-29 27-28 3.950.000132 Records Management System (RMS) 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000
133 Teknik-Teknik Pembenahan Dokumen Arsip In Aktif 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000
134 Customer Care and Service Excellence 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000135 Accounting For Non Accountant 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 01-03 19-21 17-19 5.950.000136 Advance Business Process Management 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000137 ADVANCED PROJECT MANAGEMENT 2 15-16 05-06 05-06 02-03 14-15 07-08 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000138 BUSINESS ANALYSIS FOUNDATION 2 22-23 12-13 12-13 09-10 21-22 28-29 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000139 Business Process Mapping 2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 27-28 20-21 29-30 22-23 20-21 3.950.000140 ESSENTIALS OF PROJECT MANAGEMENT 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.000141 Human Resources Policies And SOP HRD 2 24-25 19-20 19-20 16-17 23-24 07-08 16-17 20-21 17-18 24-25 19-20 17-18 3.950.000142 ISO 27001 FOUNDATION TRAINING 2 02-03 08-09 08-09 05-06 03-04 04-05 05-06 30-31 06-07 01-02 08-09 06-07 3.950.000143 IT BALANCED SCORECARD 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000144 KPIs With Balance Score Card 2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000145 LOGISTICS MANAGEMENT TRAINING 3 29-31 12-14 14-16 11-13 28-30 27-29 11-13 29-31 12-14 29-31 14-16 12-14 5.950.000146 PMBOK PROJECT MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 13-15 05-07 15-17 07-09 05-07 5.950.000147 PRACTICAL BALANCED SCORECARD 3 24-26 13-15 12-14 09-11 23-25 27-29 09-11 27-29 10-12 24-26 12-14 10-12 5.950.000148 Practical Planning And Controlling Project 3 31-02 19-21 19-21 16-18 30-01 04-06 16-18 01-03 17-19 31-02 19-21 17-19 5.950.000149 Primavera P6 Professional Fundamental 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 08-10 24-26 01-03 26-28 26-28 5.950.000150 PROJECT COST ESTIMATION 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.000151 PROJECT COST MANAGEMENT 3 22-24 21-23 21-23 18-20 21-23 04-06 18-20 29-31 19-21 22-24 21-23 19-21 5.950.000152 PROJECT FINANCING 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 30-01 26-28 29-31 28-30 26-28 5.950.000153 PROJECT LEADERSHIP 2 02-03 07-08 07-08 04-05 02-03 07-08 04-05 20-21 05-06 04-05 07-08 05-06 3.950.000
154 PROJECT MANAGEMENT based on PRINCE2 3 08-10 13-15 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000155 Project Management For HR Profesional 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000156 PROJECT MANAGEMENT FUNDAMENTALS 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 27-29 24-26 24-26 26-28 26-28 5.950.000157 PROJECT MANAGEMENT IN SALES 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 31-02 07-09 05-07 5.950.000158 PROJECT MANAGEMENT IN MARKETING 3 03-05 12-14 14-16 11-13 02-04 27-29 11-13 08-10 12-14 01-03 14-16 12-14 5.950.000
159 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 10-12 21-23 21-23 18-20 09-11 04-06 18-20 14-16 19-21 10-12 21-23 19-21 5.950.000
160 PROJECT QUALITY MANAGEMENT 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000161 PROJECT RISK MANAGEMENT 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000162 SUPPLY CHAIN MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 01-03 05-07 15-17 07-09 05-07 5.950.000163 CORPORATE CASH MANAGEMENT 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000164 CORPORATE FINANCE 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 03-04 3.950.000165 FINANCIAL ACCOUNTING FOR NON 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000166 FINANCIAL-ACCOUNTING ANALYSIS & REPORTING 2 22-23 19-20 19-20 16-17 21-22 06-07 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000167 STRATEGIC BUSINESS & FINANCIAL ANALYSIS 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 27-28 3.950.000168 THE STATEMENT OF CASH FLOW 2 04-05 07-08 07-08 04-05 03-04 07-08 04-05 30-31 05-06 03-04 07-08 05-06 3.950.000169 ACCOUNT PAYABLE MANAGEMENT 2 10-11 14-15 14-15 11-12 09-10 25-26 11-12 06-07 12-13 10-11 14-15 12-13 3.950.000170 Basic Professional Salesperson 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000171 Boosting Sales Promotion Girl or Boy (SPG or SPB) 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.000172 Design & Delivery Sales Presentation 2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000173 Managing Objection, Customer Solution 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000174 Service Quality (Level Basic) 2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 13-14 12-13 15-16 14-15 12-13 3.950.000175 Service Quality (Level Intermediate) 2 24-25 21-22 21-22 18-19 23-24 07-08 18-19 20-21 19-20 24-25 21-22 19-20 3.950.000176 Strategic Way Of Selling 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.000177 The Art Of Persuasive Negotiation & Closing Sales 2 04-05 07-08 07-08 04-05 03-04 04-05 04-05 01-02 05-06 03-04 07-08 05-06 3.950.000178 ASPECTS OF CONTRACT 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000179 HUKUM KEPAILITAN 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000180 AUDIT OPERASIONAL & KINERJA 2 15-16 26-27 26-27 23-24 02-03 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000
181BASIC AUDIT TECHNIQUES & TOOLS FOR THE NEWAUDITORS
3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000
182 Dasar-Dasar Audit Internal 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000
183MEMBANGUN & MENGEMBANGKAN INTERNAL AUDITDEPARTEMENT
2 02-03 19-20 19-20 16-17 03-04 07-08 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
184Peran Auditor Internal Dalam Mencegah Kecurangan(Fraud)
2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000
185 SKILLS FOR THE BEGINNING AUDITORS 2 17-18 08-09 08-09 05-06 14-15 04-05 05-06 15-16 06-07 17-18 08-09 06-07 3.950.000186 FRAUD & INVESTIGATIVE AUDITING 2 25-26 14-15 14-15 11-12 24-25 25-26 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000187 HR Audit 2 31-01 21-22 21-22 18-19 30-31 06-07 18-19 30-31 19-20 31-01 21-22 19-20 3.950.000188 Soul Selling 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000
189 CREATIVE PROBLEM SOLVING AND DECISION MAKING 2 22-23 19-20 19-20 16-17 21-22 06-07 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000
190 MANAGING AND SUPERVISING PEOPLE AT WORK 2 04-05 07-08 07-08 04-05 03-04 07-08 04-05 01-02 05-06 03-04 07-08 05-06 3.950.000191 MANAJEMEN ATASAN 2 10-11 14-15 14-15 11-12 09-10 25-26 11-12 08-09 12-13 10-11 14-15 12-13 3.950.000192 MANAJEMEN PERKANTORAN MODERN 2 17-18 21-22 21-22 18-19 16-17 04-05 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000193 MANAJEMEN PERUBAHAN 2 24-25 01-02 29-30 26-27 23-24 27-28 26-27 20-21 27-28 24-25 29-30 26-27 3.950.000194 MANAJEMEN SUMBER DAYA MANUSIA 2 02-03 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000195 MENJADI SEKRETARIS PROFESIONAL 2 18-19 26-27 26-27 23-24 17-18 25-26 23-24 13-14 24-25 18-19 26-27 27-28 3.950.000196 PROFESSIONAL ADMINISTRATION SKILLS 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.000197 SUPERVISORY MANAGEMENT 2 04-05 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000198 EFFECTIVE MEETING PLANING 2 22-23 12-13 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000199 REPORT WRITING 2 29-30 21-22 21-22 18-19 28-29 04-05 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000200 Technical Report Writing & Presentation Skills 3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 03-05 28-30 26-28 5.950.000201 INTERNAL QUALITY AUDIT ISO 9001_2015 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 4.500.000202 TOTAL QUALITY CONTROL 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 4.500.000203 Advance Supervisory Management 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000
204ANALISIS KEBUTUHAN PELATIHAN (TRAINING NEEDSANALYSIS)
2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000
205 Influential Leadership Excellence 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 5.950.000206 Leader as a C.O.A.C.H 3 03-05 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 5.950.000207 Practical Customer Service 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.000208 Working as a Team Excellence 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000
209EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYAKEPABEANAN
3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000
210 L C, UCP 600, ISBP DAN EXIM TRADE FINANCE 3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 08-10 05-07 03-05 5.950.000211 MANAGEMENT EXPORT–IMPORT 2 15-16 12-13 12-13 09-10 14-15 28-29 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
212EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYAKEPABEANAN PLUS VISIT TJ. PRIOK
3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000
213SYSTEM PERPAJAKAN KEPABEANAN PELABUHAN DANIT INVENTORY KAWASAN BERIKAT
2 29-30 01-02 29-30 26-27 28-29 25-26 26-27 20-21 27-28 29-30 29-30 26-27 3.950.000
214 Media Relation and Communication 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000215 Media Relations Strategy & Executions 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000216 Media Relations Strategy for Effective Promotion 2 22-23 12-13 12-13 09-10 21-22 28-29 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000217 Lean Manufacturing 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000218 Lean Warehousing 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000219 CORPORATE COMMUNITY RELATION 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000
220CSR COMMUNICATION AND SOCIAL BRANDINGBUILDING
2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000
221CSR COMMUNICATION FOR ORGANIZATIONALLEGITIMACY IN SOCIAL MEDIA
2 29-30 26-27 26-27 23-24 28-29 27-28 23-24 27-28 24-25 29-30 26-27 26-27 3.950.000
222 CSR COMMUNICATION IN OFFICIAL WEBSITE 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000223 CSR PATNERSHIP & STAKEHOLDER RELATIONSHIP 2 08-09 14-15 14-15 11-12 07-08 28-29 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000224 CSR STRATEGIC & CORPORATE REPUTATION 2 17-18 21-22 21-22 18-19 16-17 07-08 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000
225CUSTOMER RETENTION MARKETING MEMBANGUNHUBUNGAN LEBIH BAIK DENGAN PELANGGAN
2 24-25 28-01 28-29 25-26 23-24 25-26 25-26 20-21 26-27 24-25 28-29 27-28 3.950.000
226 EFFECTIVE CSR COMMUNICATION IN MASS MEDIA 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.000
227IMC DRIVER FOR INTEGRATED MARKETINGCOMMUNICATIONS (IMC)
2 04-05 12-13 15-16 12-13 03-04 27-28 12-13 01-02 13-14 03-04 15-16 13-14 3.950.000
228 INTEGRATED CORPORATE COMMUNICATION 2 10-11 22-23 22-23 19-20 09-10 06-07 19-20 08-09 20-21 10-11 22-23 20-21 3.950.000
229INTERNAL COMMUNICATION AND CHANGECOMMUNICATION
2 18-19 01-02 29-30 26-27 17-18 28-29 26-27 13-14 27-28 18-19 29-30 26-27 3.950.000
230KOMUNIKASI ORGANISASI PENINGKATAN KINERJAKOPERASI
2 25-26 08-09 08-09 05-06 24-25 07-08 05-06 20-21 06-07 25-26 08-09 06-07 3.950.000
231 MANAGING ISSUE AND RESPONDING TO CRISIS 2 01-02 14-15 12-13 09-10 31-01 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000
232MEDIA RELATIONS PRACTICE DAN TECHNIQUES INMEDIA RELATIONS
2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 02-03 17-18 04-05 19-20 17-18 3.950.000
233 OPTIMALISASI CYBER PUBLIC RELATIONS 3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 08-10 24-26 10-12 26-28 26-28 5.950.000234 PROFESSIONAL WRITING AND PUBLISHING 2 22-23 12-13 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000
235 SHARIAH BANK & CORPORATE SOCIAL RESPONSIBILITY 2 29-30 21-22 21-22 18-19 28-29 07-08 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000
236STRATEGI KOMUNIKASI PEMASARAN PRODUK DAN JASAKOPERASI
2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 30-31 27-28 01-02 29-30 26-27 3.950.000
237COMPREHENSIVE IN HOUSE MAGAZINE WRITING SKILLFOR CORPORATE BRANDING
2 08-09 07-08 07-08 04-05 07-08 04-05 04-05 06-07 05-06 08-09 07-08 05-06 3.950.000
238COMPREHENSIVE NEWSLETTER WRITING SKILL FORCORPORATE BRANDING
2 17-18 14-15 15-16 12-13 16-17 28-29 12-13 13-14 13-14 17-18 15-16 13-14 3.950.000
239COMPREHENSIVE PROBLEM SOLVING OF DIRECTMARKETING
2 24-25 22-23 22-23 19-20 23-24 06-07 19-20 20-21 20-21 24-25 22-23 20-21 3.950.000
240 COMPREHENSIVE SUSTAINABLE REPORT WRITING SKILL 2 31-01 26-27 26-27 23-24 30-31 25-26 23-24 29-30 24-25 31-01 26-27 27-28 3.950.000
241CUSTOMER SERVICE SKILL (MENINGKATKANHUBUNGAN HARMONIS DENGAN PELANGGAN MELALUICUSTOMER SERVICE)
2 10-11 12-13 12-13 09-10 09-10 27-28 09-10 08-09 10-11 10-11 12-13 10-11 3.950.000
242DIGITAL MARKETING COMMUNICATIONS UNTUKMENINGKATKAN PENJUALAN
2 18-19 19-20 19-20 16-17 17-18 04-05 16-17 15-16 17-18 18-19 19-20 17-18 3.950.000
243 FACILITATION SKILL FOR COMMUNITY DEVELOPMENT 2 01-02 05-06 05-06 02-03 31-01 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000
244HANDLING NEGATIVE COMMENT OR COMPLAIN INSOCIAL MEDIA
2 04-05 14-15 14-15 11-12 03-04 25-26 11-12 02-03 12-13 04-05 14-15 12-13 3.950.000
245MANAJEMEN USAHA KECIL Untuk mendukung ProgramCSR bidang Ekonomi
2 11-12 21-22 21-22 18-19 10-11 07-08 18-19 09-10 19-20 11-12 21-22 19-20 3.950.000
246 MEDIA HANDLING & COMMUNICATION SKILLS 2 15-16 01-02 29-30 26-27 14-15 27-28 26-27 13-14 27-28 15-16 29-30 27-28 3.950.000
247MERANCANG MEDIA PROMOSI WISATA YANG EFEKTIFDAN EFISIEN
2 29-30 12-13 15-16 12-13 28-29 28-29 12-13 27-28 13-14 29-30 15-16 13-14 3.950.000
248PELATIHAN PROMOSI WISATA MELALUI VIDEO YANGEFEKTIF DAN EFISIEN
2 02-03 22-23 22-23 19-20 02-03 05-06 19-20 30-31 20-21 01-02 22-23 20-21 3.950.000
249PENGEMBANGAN KETERAMPILAN FASILITATORPEMBERDAYAAN MASYARAKAT
2 17-18 08-09 08-09 05-06 16-17 07-08 05-06 15-16 06-07 17-18 08-09 06-07 3.950.000
250 SKILL AND ATTRIBUTE FOR NEW PUBLIC RELATIONS 2 23-24 14-15 12-13 09-10 22-23 27-28 09-10 20-21 10-11 23-24 12-13 10-11 3.950.000
251TEKNIK DAN SKILL PERIKLANAN KORPORAT MELALUIAUDIO VISUAL
1 31-31 19-19 19-19 16-16 30-30 04-04 16-16 29-29 17-17 31-31 19-19 17-17 2.250.000
252 Annual Report Writing 2 18-19 12-13 14-15 11-12 17-18 25-26 11-12 13-14 12-13 18-19 14-15 12-13 3.950.000
253 Best Practice In Online Event Community Management 2 25-26 20-21 20-21 17-18 24-25 07-08 17-18 20-21 18-19 25-26 20-21 18-19 3.950.000
254 Brand Engagement Di Media Sosial 2 01-02 01-02 29-30 26-27 31-01 27-28 26-27 30-31 27-28 01-02 29-30 26-27 3.950.000255 Brand Strategy & Creativity 2 04-05 07-08 07-08 04-05 02-03 04-05 04-05 02-03 05-06 04-05 07-08 05-06 3.950.000
256 Corporate Advertising & Media Placement Strategy 2 11-12 14-15 15-16 12-13 10-11 28-29 12-13 09-10 13-14 11-12 15-16 13-14 3.950.000
257 Corporate Identity Process And Development 2 15-16 22-23 22-23 19-20 14-15 06-07 19-20 15-16 20-21 15-16 22-23 20-21 3.950.000258 CSR Communication Management 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 27-28 3.950.000259 Effective Business Writing And Communication 2 29-30 08-09 08-09 05-06 28-29 07-08 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000
260Maketing Communication For Cooperatives And Small-Medium Businesses
2 02-03 12-13 12-13 09-10 03-04 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000
261 Problem Solving Of Direct Marketing 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000262 Proposal And Business Report 2 17-18 28-01 28-29 25-26 16-17 28-29 25-26 13-14 26-27 17-18 28-29 26-27 3.950.000263 Consultative Selling Process 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000264 Inbound & Outbound Sales Call 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000265 Leadership Skill For Sales Leader 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 01-03 12-14 10-12 5.950.000266 Retail Sales Training 2 08-09 19-20 19-20 16-17 07-08 06-07 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000267 Solution Selling Skill For Pharmaceutical Industry 2 31-01 14-15 15-16 12-13 30-31 27-28 12-13 29-30 13-14 31-01 15-16 13-14 3.950.000268 The 7 Skills of Salesmanship 2 04-05 21-22 21-22 18-19 02-03 04-05 18-19 02-03 19-20 04-05 21-22 19-20 3.950.000269 CHANGE MANAGEMENT 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000270 CREATIVE & INNOVATIVE THINKING 2 15-16 07-08 07-08 04-05 14-15 07-08 04-05 13-14 05-06 15-16 07-08 05-06 3.950.000271 CUSTOMER SERVICE TRAINING 2 24-25 14-15 14-15 11-12 23-24 28-29 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000272 EXCELLENT SUPERVISORY SKILLS 2 04-05 28-01 28-29 25-26 03-04 25-26 25-26 01-02 26-27 03-04 28-29 27-28 3.950.000273 GOAL SETTING 2 10-11 08-09 08-09 05-06 09-10 07-08 05-06 08-09 06-07 10-11 08-09 06-07 3.950.000
274 How To Manage & Motivate an Excellent Team 2 17-18 12-13 15-16 12-13 16-17 27-28 12-13 15-16 13-14 17-18 15-16 13-14 3.950.000275 KREATIVITAS DAN INOVASI 2 25-26 19-20 19-20 16-17 24-25 04-05 16-17 20-21 17-18 25-26 19-20 17-18 3.950.000276 LEADERSHIP FOR OFFICER & STAFF 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 27-28 27-28 29-30 29-30 26-27 3.950.000277 LEADERSHIP SKILLS FOR TOP MANAGEMENT 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 02-03 03-04 04-05 05-06 03-04 3.950.000278 LEADERSHIP TRAINING 2 11-12 14-15 12-13 09-10 10-11 25-26 09-10 09-10 10-11 11-12 12-13 10-11 3.950.000279 Managerial Skills & Leadership Training 2 18-19 21-22 21-22 18-19 17-18 07-08 18-19 13-14 19-20 18-19 21-22 19-20 3.950.000280 MANAJEMEN KONFLIK 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 27-28 3.950.000
281MEMBANGUN BUDAYA PERUSAHAAN YANG KUAT DANUNGGUL
2 04-05 12-13 14-15 11-12 03-04 28-29 11-12 30-31 12-13 01-02 14-15 12-13 3.950.000
282MEMOTIVASI ANGGOTA TIM DAN STAF UNTUKMENINGKATKAN PRODUKTIVITAS MEREKA
2 08-09 22-23 22-23 19-20 07-08 06-07 19-20 06-07 20-21 08-09 22-23 20-21 3.950.000
283 MENGOPTIMALKAN KINERJA KARYAWAN BACK OFFICE 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 15-16 26-27 15-16 28-29 26-27 3.950.000
284 MOTIVASI MENJUAL 2 01-02 14-15 15-16 12-13 31-01 27-28 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000285 Salesmanship 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 01-02 17-18 03-04 19-20 17-18 3.950.000286 SELLING SKILLS 2 10-11 01-02 29-30 26-27 09-10 28-29 26-27 08-09 27-28 10-11 29-30 27-28 3.950.000287 SERVICE EXCELLENT 2 17-18 05-06 05-06 02-03 16-17 06-07 02-03 13-14 03-04 17-18 05-06 03-04 3.950.000288 Star Employee 2 25-26 12-13 12-13 09-10 24-25 25-26 09-10 20-21 10-11 25-26 12-13 10-11 3.950.000289 TEAM BUILDING 2 29-30 21-22 21-22 18-19 28-29 07-08 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000290 PELATIHAN TEAM WORK 2 04-05 26-27 26-27 23-24 03-04 27-28 23-24 02-03 24-25 04-05 26-27 26-27 3.950.000291 TIME MANAGEMENT 2 11-12 07-08 07-08 04-05 10-11 04-05 04-05 09-10 05-06 11-12 07-08 05-06 3.950.000292 USING PSYCHOLOGICAL TECHNIQUES IN SELLING 2 18-19 14-15 14-15 11-12 17-18 28-29 11-12 15-16 12-13 18-19 14-15 12-13 3.950.000293 Conflict Management & Handling Difficult People 2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 30-31 06-07 01-02 08-09 06-07 3.950.000294 SALES FIGHTER 2 24-25 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 24-25 29-30 26-27 3.950.000295 BASIC MANAGERIAL AND LEADERSHIP 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000296 FUNDAMENTAL SUPERVISORY TRAINING 2 22-23 05-06 05-06 02-03 21-22 05-06 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000297 TEAM BUILDING SESSION 2 16-17 07-08 07-08 04-05 15-16 07-08 04-05 14-15 05-06 16-17 07-08 05-06 3.950.000298 DASAR-DASAR MANAJEMEN 2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000299 KEPEMIMPINAN (LEADERSHIP) 2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 13-14 12-13 15-16 14-15 12-13 3.950.000300 KETERAMPILAN SUPERVISI (SUPERVISORY SKILL) 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 03-05 07-09 05-07 5.950.000301 MANAJEMEN WAKTU (TIME MANAGEMENT) 2 10-11 12-13 15-16 12-13 09-10 27-28 12-13 08-09 13-14 10-11 15-16 13-14 3.950.000302 MANAJEMEN STRATEGI (STRATEGIC MANAGEMENT) 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 15-16 20-21 17-18 22-23 20-21 3.950.000303 MEMBINA KELOMPOK KERJA 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 29-31 26-28 24-26 28-30 26-28 5.950.000304 PENGAMBILAN KEPUTUSAN (DECISION MAKING) 2 02-03 14-15 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000305 Practical Problem Solving 2 22-23 08-09 08-09 05-06 21-22 04-05 05-06 20-21 06-07 22-23 08-09 06-07 3.950.000306 DOCUMENT CONTROLLER 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
307INTEGRATED ISO 9001-2008 & ISO 14001-2004MANAGEMENT SYSTEM
2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000
308 Internal Audit ISO 17025-2005 Based on ISO 19011-2011 2 04-05 01-02 29-30 26-27 03-04 28-29 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000
309 Internal Audit ISO 14001-2004 Based on ISO 19011-2012 2 11-12 07-08 07-08 04-05 10-11 04-05 04-05 09-10 05-06 11-12 07-08 05-06 3.950.000
310 Interpreting & Documenting of ISO 9001 with IWA-2 2 01-02 26-27 26-27 23-24 31-01 27-28 23-24 20-21 24-25 01-02 26-27 27-28 3.950.000
311 Interpreting & Documenting of ISO 9001 with IWA-4 2 02-03 08-09 08-09 05-06 02-03 04-05 05-06 02-03 06-07 04-05 08-09 06-07 3.950.000
312 Interpreting & Documenting of ISO 14001-2004 2 08-09 14-15 14-15 11-12 07-08 28-29 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000
313 INTERPRETING AND DOCUMENTING OF ISO 9001 2008 2 22-23 28-01 28-29 25-26 21-22 25-26 25-26 20-21 26-27 22-23 28-29 26-27 3.950.000
314 INTERPRETING OF ISO 9001 2008 1 29-29 05-05 05-05 02-02 28-28 08-08 02-02 31-31 03-03 29-29 05-05 03-03 2.250.000
315INTERNAL QUALITY AUDIT ISO 9001 2008 Based on ISO19011 2011
2 04-05 12-13 15-16 12-13 03-04 27-28 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000
316 Understanding and Documenting of ISO 9001-2008 2 15-16 01-02 29-30 26-27 14-15 28-29 26-27 15-16 27-28 15-16 29-30 27-28 3.950.000
317PEMAHAMAN & PENERAPAN SISTEM MANAJEMENKEAMANAN INFORMASI ISO 27001-2005
2 24-25 06-07 06-07 03-04 23-24 06-07 03-04 20-21 04-05 24-25 06-07 04-05 3.950.000
318Training SOP (Standard Operating Procedure) Writing &Improvement
2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 01-02 20-21 03-04 22-23 20-21 3.950.000
319DOCUMENTING AND IMPLEMENTING OF ISO 9001 2008FOR SERVICE INDUSTRIES
2 11-12 26-27 26-27 23-24 10-11 27-28 23-24 09-10 24-25 11-12 26-27 26-27 3,950,000
320 Key Changes ISO 9001.2008 to ISO 9001.2015 1 17-17 08-08 08-08 05-05 16-16 04-04 05-05 13-13 06-06 17-17 08-08 06-06 2.250.000
321 Understanding and Documenting of ISO 9001 2015 2 25-26 12-13 14-15 11-12 24-25 28-29 11-12 20-21 12-13 25-26 14-15 12-13 3,950,000
322 IT HELPDESK 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 14-16 17-19 15-17 19-21 17-19 5.950.000
323Financial Accounting Information System DevelopmentWith Excel 2007 and VBA
2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000
324Financial Accounting Information System DevelopmentWith Excel 2010 and VBA
2 04-05 14-15 15-16 12-13 02-03 25-26 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000
325Implementation Of Payroll Admisnistration System WithExcel 2010 For HRD
3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 10-12 21-23 19-21 5.950.000
326 Inventory System Development Using Acces 2007 2 17-18 28-01 28-29 25-26 16-17 27-28 25-26 15-16 26-27 17-18 28-29 27-28 3.950.000327 Inventory System Development Using Acces 2010 2 24-25 05-06 05-06 02-03 23-24 04-05 02-03 20-21 03-04 24-25 05-06 03-04 3.950.000
328Mastering Microsoft Project 2007 (Concept andApplication)
2 02-03 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
329POS AND INVENTORY SYSTEM DEVELOPMENT WITHUSING ACCESS 2010
2 25-26 14-15 14-15 11-12 24-25 27-28 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000
330Powerful Database Analysis and Dashboard Reportingwith Excel 2010
2 01-02 21-22 21-22 18-19 31-01 04-05 18-19 30-31 19-20 01-02 21-22 19-20 3.950.000
331Workload Analysis Implementation With Excel 2007 forHR & Non HR
2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
332 ISO IEC 20000 IT SERVICE MANAGEMENT 2 29-30 08-09 08-09 05-06 28-29 06-07 05-06 27-28 06-07 29-30 08-09 03-04 3.950.000333 ISO IEC 38500 IT-GOVERNANCE 2 04-05 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000334 ISO 20000 Foundation 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.000335 IT BUSINESS ANALYSIS 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000336 IT PROJECT MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 27-29 26-28 24-26 28-30 26-28 5.950.000337 IT RISK MANAGEMENT 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 03-07 9.500.000338 IT Strategic Planning 2 04-05 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.000339 Managing Software Requirements 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 30-01 19-21 03-05 21-23 19-21 5.950.000
340PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASIBUMN
3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5,950,000
341 SOFTWARE PROJECT MANAGEMENT 3 29-31 13-15 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000342 SOFTWARE QUALITY ASSURANCE 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.000343 SOFTWARE TESTING FOUNDATION 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000344 Systems Analysis and Design 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000345 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000346 GRAFIC DESIGN & PRODUCT PACKAGING 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.000
347COMPREHENSIVE WEBSITE WRITING SKILL FORCORPORATE BRANDING
2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000
348DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)
2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 26-27 3.950.000
349MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAIMEDIA KOMUNIKASI CSR
1 22-22 07-07 07-07 04-04 21-21 04-04 04-04 20-20 05-05 22-22 07-07 05-05 2.250.000
350TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILEBERBASIS DIGITAL
1 04-04 28-28 28-28 25-25 04-04 29-29 25-25 01-01 26-26 03-03 28-28 28-28 2.250.000
351TRAVEL WRITER DAN KETERAMPILAN MENULISPERJALANAN WISATA MELALUI MEDIA ONLINE
2 10-11 05-06 05-06 02-03 09-10 05-06 02-03 08-09 03-04 10-11 05-06 03-04 3.950.000
352MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGASINDONESIA
2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.000
353TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUETENTANNG SMELTER
2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000
354IMPROVING PERFORMANCE THROUGH COACHING andCOUNSELLING
2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 29-30 20-21 29-30 22-23 20-21 3.950.000
355 COACHING & COUNSELING 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000356 Sales Coaching Skill For Leader 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 13-14 26-27 15-16 28-29 27-28 3.950.000
357 COACHING & KONSELING YANG EFEKTIF 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000358 DIRECTING COACHING COUNSELING DELEGATING 1 08-08 19-19 19-19 16-16 07-07 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.000359 COACHING AND COUNSELING 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.000360 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.000361 Kebiasaan Efektif Menuju Sukses 2 04-05 08-09 08-09 05-06 03-04 06-07 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000362 Manajemen Stres 1 02-02 14-14 14-14 11-11 02-02 29-29 11-11 03-03 12-12 05-05 14-14 12-12 2.250.000363 Teknik Presentasi 2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000364 The Champion Training 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000365 Developing Excellent Internal Trainer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000
366SPEAKING FOR BUSINESS (PRESENTATION,NEGOTIATION & LOBBYING)
2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000
367 EFFECTIVE COMMUNICATION FOR MANAGERS 1 08-08 19-19 19-19 16-16 02-02 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.000368 Analytical Thinking & Problem Solving 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000
369 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000
370 Talent Management 2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000371 Fundamental Strategic Thinking Skill 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.000372 SMART GOALS SETTING 1 22-22 21-21 21-21 18-18 21-21 05-05 18-18 20-20 19-19 22-22 21-21 19-19 2.250.000
373BUILDING POTENTIAL LEADER THROUGH POSITIVEHABITS
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000
374EXCELLENT MOTIVATION AND TEAM WORK OUTBOUNDTRAINING
2 15-16 22-23 22-23 19-20 14-15 04-05 19-20 13-14 20-21 15-16 22-23 20-21 2.950.000
375 Sales Presentation Skill 2 24-25 07-08 07-08 04-05 23-24 07-08 04-05 20-21 05-06 24-25 07-08 05-06 3.950.000376 NLP FOR NEGOTIATION 2 22-23 22-23 22-23 19-20 21-22 06-07 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000377 HAPPY PENSION 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000378 TEAM & COMMITMENT BUILDING 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 26-27 3.950.000379 MASA PERSIAPAN PENSIUN (MPP) 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.000380 SEVEN HABITS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000381 PROCUREMENT MANAGEMENT 2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 20-21 03-04 11-12 05-06 03-04 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MOTIVASI & PERSONALDEVELOPMENT
1INTERPERSONAL COMMUNICATION FOR SELFDEVELOPMENT
2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000
2 METAZONE Class 1 22-22 05-05 05-05 02-02 21-21 05-05 02-02 20-20 03-03 22-22 05-05 03-03 2.250.0003 STRESS MANAGEMENT FOR PRODUCTIVE PEOPLE 1 29-29 12-12 12-12 09-09 28-28 27-27 09-09 27-27 10-10 29-29 12-12 10-10 2.250.0004 Dynamic Presentation Skill 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
5 Komunikasi Cerdas 2 17-18 07-08 07-08 04-05 16-17 07-08 04-05 15-16 05-06 17-18 07-08 05-06 3.950.0006 Self Coaching for Life Optimization 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000
7MY VALUE… SEBUAH TRAINING MOTIVASI UNTUKKARYAWAN
2 04-05 26-27 26-27 23-24 02-03 25-26 23-24 02-03 24-25 04-05 26-27 27-28 3.950.000
8 POWERFUL COMMUNICATION SKILL 2 10-11 19-20 19-20 16-17 09-10 07-08 16-17 08-09 17-18 10-11 19-20 17-18 3.950.000
9POWERFUL PUBLIC SPEAKING(From Designing Trainingto Powerful Delivery)
2 22-23 08-09 08-09 05-06 21-22 04-05 05-06 20-21 06-07 22-23 08-09 06-07 3.950.000
10 SAY NO!!! To GIVE UP 2 02-03 21-22 21-22 18-19 02-03 06-07 18-19 02-03 19-20 04-05 21-22 19-20 3.950.00011 commitment to change 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.00012 communication for best result 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00013 Personal Development 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.00014 PUBLIC SPEACING & PRESENTATION SKILLS 2 01-02 14-15 12-13 09-10 31-01 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.00015 Excellent Communication at Work 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.00016 Powerful Presentation Excellence 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 5.950.000
17PRESENTATION AND EFFECTIVE COMMUNICATIONSKILLS
2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 15-16 03-04 15-16 05-06 03-04 3.950.000
18 15 ETOS KERJA DAN KEPRIBADIAN 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00019 CHARACTER BUILDING 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000
20MERANCANG DAN MENYAMPAIKAN PRESENTASI YANGBERKARAKTER, UNIK, DAN MENARIK
2 24-25 08-09 08-09 05-06 23-24 07-08 05-06 20-21 06-07 24-25 08-09 06-07 3.950.000
21 EFFECTIVE COMMUNICATION SKILL 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.00022 EFFECTIVE PRESENTATION SKILLS 2 08-09 12-13 15-16 12-13 07-08 27-28 12-13 06-07 13-14 08-09 15-16 13-14 3.950.00023 PRESENTATION SKILL BASED ON NLP 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000
24Presentation Skill With Power Point 2007, Swishmax andULEAD
3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 01-03 24-26 03-05 26-28 26-28 5.950.000
25 EFFECTIVE COMMUNICATION FOR MANAGERS 1 08-08 19-19 19-19 16-16 02-02 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.00026 Analytical Thinking & Problem Solving 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000
27 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000
28 Talent Management 2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.00029 Fundamental Strategic Thinking Skill 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.00030 SMART GOALS SETTING 1 22-22 21-21 21-21 18-18 21-21 05-05 18-18 20-20 19-19 22-22 21-21 19-19 2.250.000
31BUILDING POTENTIAL LEADER THROUGH POSITIVEHABITS
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000
32EXCELLENT MOTIVATION AND TEAM WORK OUTBOUNDTRAINING
2 15-16 22-23 22-23 19-20 14-15 04-05 19-20 13-14 20-21 15-16 22-23 20-21 2.950.000
33 Sales Presentation Skill 2 24-25 07-08 07-08 04-05 23-24 07-08 04-05 20-21 05-06 24-25 07-08 05-06 3.950.00034 NLP FOR NEGOTIATION 2 22-23 22-23 22-23 19-20 21-22 06-07 19-20 20-21 20-21 22-23 22-23 20-21 3.950.00035 TEKNIK MEMBACA DAN MENULIS 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000
36 Kreativitas 2 18-19 22-23 22-23 19-20 17-18 07-08 19-20 13-14 20-21 18-19 22-23 20-21 3.950.00037 ACHIEVEMENT MOTIVATION 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.00038 ACHIEVMENT ORIENTATION 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.00039 EMOTIONAL INTELLIGENSI 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 27-28 3.950.00040 MANAJEMEN STRES 2 31-01 08-09 08-09 05-06 30-31 06-07 05-06 29-30 06-07 31-01 08-09 06-07 3.950.00041 MENINGKATKAN KECERDASAN EMOSI 2 11-12 22-23 22-23 19-20 10-11 07-08 19-20 09-10 20-21 11-12 22-23 20-21 3.950.00042 TRAINING FOR TRAINERS (TOT) 2 15-16 07-08 07-08 04-05 14-15 07-08 04-05 15-16 05-06 15-16 07-08 05-06 3.950.00043 Managing Stress for Practical Purpose 3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 14-16 19-21 10-12 21-23 19-21 5.950.00044 Personal Excellence Winner Attitude 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.00045 EMOTIONAL INTELLIGENCE 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 29-31 19-21 31-02 21-23 19-21 5.950.00046 TRAINING FOR TRAINER 2 01-02 05-06 05-06 02-03 31-01 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.00047 EMPOWERING EMOTIONAL INTELLIGENCE 1 15-15 26-26 26-26 23-23 14-14 27-27 23-23 13-13 24-24 15-15 26-26 26-26 2.250.000
48KESEHATAN MENTAL & PSYCHO ENERGY - SELFTHERAPY
1 29-29 14-14 14-14 11-11 28-28 28-28 11-11 27-27 12-12 29-29 14-14 12-12 2.250.000
49 PSYCHO ENERGY THERAPY 1 04-04 20-20 20-20 17-17 04-04 07-07 17-17 01-01 18-18 03-03 20-20 18-18 2.250.00050 SELF EMPOWERING TRAINING 2 09-10 27-28 27-28 24-25 08-09 28-29 24-25 07-08 25-26 09-10 27-28 27-28 3.950.00051 ACHIEVEMENT MOTIVATION TRAINING 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000
52 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000
53 KETERAMPILAN KOMUNIKASI DAN INTERAKSI 2 24-25 21-22 21-22 18-19 23-24 07-08 18-19 20-21 19-20 24-25 21-22 19-20 3.950.00054 MENTALITAS DASAR 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 30-01 03-05 31-02 05-07 03-05 5.950.00055 TEKNIK HUBUNGAN ANTAR MANUSIA 2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 13-14 24-25 18-19 26-27 26-27 3.950.00056 HAPPY PENSION 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.00057 TEAM & COMMITMENT BUILDING 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 26-27 3.950.00058 MASA PERSIAPAN PENSIUN (MPP) 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.00059 SEVEN HABITS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000
60IMPROVING PERFORMANCE THROUGH COACHING andCOUNSELLING
2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 29-30 20-21 29-30 22-23 20-21 3.950.000
61 COACHING & COUNSELING 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.00062 Sales Coaching Skill For Leader 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 13-14 26-27 15-16 28-29 27-28 3.950.00063 COACHING & KONSELING YANG EFEKTIF 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00064 DIRECTING COACHING COUNSELING DELEGATING 1 08-08 19-19 19-19 16-16 07-07 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.00065 COACHING AND COUNSELING 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.00066 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.00067 Kebiasaan Efektif Menuju Sukses 2 04-05 08-09 08-09 05-06 03-04 06-07 05-06 01-02 06-07 03-04 08-09 06-07 3.950.00068 Manajemen Stres 1 02-02 14-14 14-14 11-11 02-02 29-29 11-11 03-03 12-12 05-05 14-14 12-12 2.250.00069 Teknik Presentasi 2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.00070 The Champion Training 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00071 Developing Excellent Internal Trainer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000
72SPEAKING FOR BUSINESS (PRESENTATION,NEGOTIATION & LOBBYING)
2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING1 MANAJEMEN PERAWATAN BANGUNAN GEDUNG 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 30-01 10-12 29-31 12-14 10-12 5.950.0002 QA & QC PEMELIHARAAN BANGUNAN GEDUNG 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.0003 QUALITY ASSURANCE FOR ENGINEER 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 27-29 03-05 15-17 05-07 03-05 5.950.0004 SHIP’S HANDLING 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 13-15 19-21 29-31 21-23 19-21 5.950.0005 INSTRUMENTATION AND CONTROL SYSTEMS 4 08-11 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 08-11 26-29 03-06 8.500.0006 DASAR-DASAR REKAYASA PERANCANGAN PABRIK 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 6.950.0007 Simulasi Proses Kimia Dengan Hysys 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.950.000
8CHEMICAL ENGINEERING FUNDAMENTALS FOR NONENGINEER
4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000
9 Amoniak Handling Fasilities 4 16-19 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 16-19 05-08 04-07 7.950.00010 CORROSION MANAGEMENT 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 11-14 7.950.00011 INDUSTRIAL AUTOMATION & CONTROL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 03-06 7.950.000
12INSTRUMENTASI PENGUKURAN LANJUT (ADVANCEINSTRUMENTATION)
4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 10-13 7.950.000
13POTENSI KESALAHAN PADA SISTEM PENGUKURAN,SENSOR, DAN INSTRUMENTASI PENGUKURAN
4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 17-20 7.950.000
14 PROCESS CONTROL INSTRUMENTATION 4 15-18 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 15-18 27-30 03-06 7.950.00015 SCADA UNTUK ENGINEER 4 22-25 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 22-25 06-09 10-13 7.950.00016 SCADA UNTUK OPERATOR & TEKNISI 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 18-21 7.950.00017 SISTEM PENGUKURAN DAN KALIBRASI 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 04-07 7.950.00018 DASAR TEKNIK KENDALI UNTUK INDUSTRI 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 15-18 19-22 17-20 7.950.00019 Building Maintanance 3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.00020 DRAUGHT SURVEY 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 08-11 19-22 17-20 7.950.00021 MANAJEMEN PROYEK KONSTRUKSI 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.00022 SUPERVISI PROYEK BANGUNAN GEDUNG 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.00023 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.00024 MANAJEMEN PROYEK KONSTRUKSI 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.00025 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 03-05 28-30 26-28 5.950.00026 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.00027 Aviation & Airport Operations 2 08-09 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 08-09 08-09 26-27 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MECHANICAL1 PNEUMATIC AND HYDRAULIC SYSTEMS 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 10-13 8.500.000
PUBLIC TRAINING SCHEDULE 2018 DI YOGYAKARTA
2HYDRAULLIC ANALYSIS FOR PIPING AND PIPELINENETWORK
4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 8.500.000
3HEAT EXCHANGERS STANDARD DESIGN,MAINTENANACE AND INSPECTION
4 15-18 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 15-18 27-30 11-14 7.950.000
4PUMP OPERATION, MAINTENANCE &TROUBLESHOOTING
4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 17-20 7.950.000
5 BASIC MACHINERY VIBRATION 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 03-06 7.950.0006 BASIC VIBRATION ANALYSIS 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 10-13 7.950.000
7CENTRIFUGAL COMPRESSOR PERFORMANCE &CONDITION EVALUATION
4 15-18 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 15-18 12-15 18-21 7.950.000
8COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING
4 22-25 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 22-25 20-23 04-07 7.950.000
9 FLANGE AND JOINT INTEGRITY 4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 17-20 7.950.00010 MACHINERY VIBRATION ANALYSIS 4 23-26 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 23-26 26-29 18-21 7.950.00011 PIPESTRESS ANALYSIS USING SOFTWARE CAESAR II 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 11-14 7.950.00012 TEORI DAN APLIKASI BELT CONVEYOR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 11-14 7.950.000
13 AC AND REFRIGERATION SAFETY AND CONTROL SYSTEM 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 10-13 7.950.000
14 AC CONTROLLING SYSTEM 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 5.950.000
15 BASIC GAS COMPRESSOR OPERATION & MAINTENANCE 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000
16 BASIC MECHANICAL 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7.950.00017 BASIC PIPELINE ENGINEERING 4 15-18 12-15 13-16 10-13 14-17 25-28 10-13 07-10 11-14 15-18 13-16 11-14 7.950.00018 BASIC REFRIGERATION 4 23-26 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 23-26 20-23 18-21 7.950.000
19BEARING TECHNOLOGY AND ENGINE LUBRICATIONSYSTEM
3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 29-31 26-28 31-02 28-30 26-28 5.950.000
20 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 03-05 07-09 05-07 5.950.00021 HYDRAULICS AND PNEUMATICS 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 06-08 10-12 10-12 12-14 10-12 5.950.000
22INTEGRATED PIPELINE DESIGN, OPERATION DANMAINTENANCE
4 16-19 19-22 19-22 16-19 15-18 04-07 16-19 13-16 17-20 16-19 19-22 17-20 7.950.000
23 METALLURGY IN WELDING 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
24OPERASI DAN PERAWATAN SISTEM POMPASENTRIFUGAL
4 08-11 20-23 20-23 17-20 07-10 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000
25 PIPELINE FOR NON PIPELINE 4 15-18 27-02 27-30 24-27 14-17 26-29 24-27 28-31 25-28 15-18 27-30 04-07 7.950.00026 PIPELINE INSPECTOR 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 23-26 06-09 10-13 7.950.00027 PROCESS PIPING & PIPELINE SYSTEM 4 30-02 12-15 12-15 09-12 29-01 25-28 09-12 06-09 10-13 30-02 12-15 17-20 7.950.00028 RECIPROCATING COMPRESSOR 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 26-28 5.950.00029 VIBRATION ANALYSIS 3 17-19 05-07 05-07 02-04 16-18 06-08 02-04 30-01 03-05 17-19 05-07 03-05 5.950.00030 REFRIGERATION_OPERATION AND MAINTENANCE 4 22-25 12-15 13-16 10-13 21-24 25-28 10-13 07-10 11-14 22-25 13-16 11-14 7.950.000
31 TROUBLESHOOTING AC SPLIT DUCT 4 29-01 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 18-21 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MAINTENANCE1
MAINTENANCE MANAGEMENT (PDM, PM, & Pro-ActiveMaintenance)
4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 04-07 7.950.000
2ADVANCE MAINTENANCE PLANNING, SCHEDULLING,AUDITING, BENCHMARKING & IMPROVEMENT
3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000
3MAINTENANCE PLANNING, SCHEDULLING AND WORKCONTROL
3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000
4MODERN MAINTENANCE MANAGEMENT BY MEANS OFRELIABILITY
4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000
5RELIABILITAS SISTEM SEBUAH CARA UNTUK MENILAIKEBERHASILAN MAINTENANCE
3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 27-29 24-26 10-12 26-28 26-28 5.950.000
ENGINEERING - ELECTRICAL1 4G LTE RF PLANNING 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.0002 FUNDAMENTAL CONTROLLER AND VALVE 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 30-02 24-27 01-04 26-29 03-06 8.500.000
3PEMBANGKIT dan PENGUKURAN LISTRIK TEGANGANTINGGI
4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 06-09 03-06 08-11 05-08 10-13 8.500.000
4POWER GENERATOR DAN AUTOMATIC VOLTAGEREGULATOR
4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 17-20 8.500.000
5 PREVENTIVE DAN PERBAIKAN MESIN LAS LISTRIK 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 27-30 17-20 22-25 19-22 04-07 8.500.0006 STABILITAS SISTEM TENAGA LISTRIK 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 31-03 25-28 29-01 27-30 11-14 8.500.0007 SUBSTATION EQUIPMENT & CONTROL RELAY 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 07-10 04-07 02-05 06-09 18-21 8.500.0008 UN INTERRUPTIBLE POWER SUPPLY (UPS) 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 13-16 11-14 09-12 13-16 03-06 8.500.0009 ELECTRICAL SAFETY EXPLOSION 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 10-13 8.500.000
10 ENGINEERING IN MINING - POWER SYSTEM PROTECTION 4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 30-02 24-27 23-26 26-29 17-20 8.500.000
11 INDUSTRIAL CONTROL SYSTEMS 4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 06-09 03-06 30-02 05-08 04-07 8.500.000
12 ARC Flash Protection For Electrical Safety Professionals 2 02-03 12-13 12-13 09-10 02-03 28-29 09-10 20-21 10-11 01-02 12-13 26-27 3.950.000
13 Induction Machine Maintenance 2 08-09 19-20 19-20 16-17 03-04 07-08 16-17 20-21 17-18 08-09 19-20 27-28 3.950.000
14 Perlengkapan Dan Sistem Distribusi Tegangan Tinggi 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 13-15 26-28 15-17 28-30 26-28 5.950.000
15 Teknik Proteksi Korosi 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 27-29 05-07 22-24 07-09 26-28 5.950.00016 Variable Frequency Drive or Variable Speed Drives 4 29-01 12-15 13-16 10-13 28-31 26-29 10-13 31-03 11-14 29-01 13-16 11-14 7.950.00017 SOLAR PHOTOVOLTAIC BUILDING SYSTEM 4 02-05 20-23 20-23 17-20 08-11 05-08 17-20 07-10 18-21 02-05 20-23 18-21 7.950.000
18 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 15-17 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 15-17 19-21 26-28 5.950.00019 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 22-25 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 22-25 26-29 17-20 7.950.00020 BASIC ELECTRICAL 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 29-31 05-07 26-28 5.950.00021 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 26-28 5.950.000
22DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES ANDAPPLICATION
4 08-11 20-23 20-23 17-20 14-17 04-07 17-20 13-16 18-21 08-11 20-23 03-06 8.500.000
23DISTRIBUTION SYSTEM FUZZY LOGIC & METERING LOADCONTROL
4 16-19 27-02 27-30 24-27 21-24 25-28 24-27 28-31 25-28 16-19 27-30 10-13 7.950.000
24ELECTRIC MOTOR SYSTEM PRINCIPLES, APPLICATIONS &CONTROL
4 23-26 06-09 06-09 03-06 28-31 05-08 03-06 31-03 04-07 23-26 06-09 18-21 7.950.000
25ELECTRICAL MACHINES, DRIVES, TRANSFORMER ANDPOWER SYSTEM
3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 08-10 12-14 31-02 14-16 26-28 5.950.000
26 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 13-16 17-20 02-05 19-22 04-07 7.950.000
27 ESTIMASI PROYEK KELISTRIKAN 4 15-18 05-08 05-08 02-05 22-25 05-08 02-05 30-02 03-06 15-18 05-08 17-20 7.950.00028 FIRE PREVENTION & PROTECTION SYSTEM 4 22-25 12-15 12-15 09-12 29-01 26-29 09-12 06-09 10-13 22-25 12-15 03-06 7.950.00029 GARDU INDUK 3 29-31 21-23 21-23 18-20 02-04 04-06 18-20 13-15 19-21 29-31 21-23 26-28 5.950.00030 GROUNDING SYSTEM 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 28-31 25-28 01-04 27-30 10-13 7.950.000
31 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 08-10 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000
32 INSTRUMENTATION AND CALIBRATION 4 16-19 12-15 13-16 10-13 14-17 26-29 10-13 07-10 11-14 16-19 13-16 18-21 7.950.00033 LIGTNING PROTECTION & GROUNDING SYSTEM 3 24-26 19-21 19-21 16-18 21-23 04-06 16-18 14-16 17-19 24-26 19-21 26-28 5.950.00034 MEKATRONIKA 4 30-02 26-01 26-29 23-26 28-31 25-28 23-26 27-30 24-27 30-02 26-29 04-07 7.950.000
35MICROCONTROLLER APPLICATION IN INDUSTRIALPLANTS
3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 26-28 5.950.000
36 PEMBANGKIT DAN DISTRIBUSI LISTRIK 3 10-12 12-14 12-14 09-11 09-11 27-29 09-11 06-08 10-12 10-12 12-14 12-14 5.950.000
37POWER DISTRIBUTION SYSTEM OPERATION ANDCHARACTERISTIC
3 15-17 21-23 21-23 18-20 16-18 04-06 18-20 13-15 19-21 15-17 21-23 17-19 5.950.000
38POWER DISTRIBUTION SYSTEM PROTECTION ANDRELAYING
4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 28-31 25-28 22-25 27-30 03-06 7.950.000
39 POWER MANAGEMENT SYSTEM 3 29-31 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 29-31 07-09 26-28 5.950.000
40 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 02-05 12-15 13-16 10-13 07-10 26-29 10-13 07-10 11-14 01-04 13-16 10-13 7.950.000
41 PROCESS CONTROL AND LOOP 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 08-11 19-22 18-21 7.950.000
42PROGRAMMABLE LOGIC CONTROLLER (PLC) ADVANCEDAND APPLICATED
4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 16-19 26-29 04-07 8.500.000
43PROGRAMMABLE LOGIC CONTROLLER (PLC) PRINCIPLES,HARDWARE AND SOFTWARE, DIAGNOSTICS ANDTROUBLESHOOTING
4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 23-26 05-08 11-14 7.950.000
44SUPERVISORY CONTROL AND DATA ACQUISITIONSYSTEM (SCADA)
4 30-02 12-15 12-15 09-12 08-11 26-29 09-12 06-09 10-13 30-02 12-15 17-20 7.950.000
45 TEKNIK INSTALASI DAN PROTEKSI LISTRIK 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 13-15 19-21 03-05 21-23 26-28 5.950.000
46TEKNIK LISTRIK TEGANGAN RENDAH & TINGGI DANELEKTROINSTRUMENT
4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 09-12 27-30 03-06 7.950.000
47 TRANSMISI DAN DISTRIBUSI LISTRIK 3 15-17 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 15-17 07-09 26-28 5.950.00048 SUBSTATION SWITCHYARD 150 KV 3 22-24 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 22-24 14-16 10-12 5.950.00049 PRESSURE TRANSMITTER 4 29-01 19-22 19-22 16-19 29-01 04-07 16-19 13-16 17-20 29-01 19-22 18-21 7.950.00050 MV SWITCHGEAR & Power Circuit Breaker 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 01-04 26-29 04-07 7.950.00051 Power Generation Operation & Control 4 08-11 05-08 05-08 02-05 14-17 05-08 02-05 30-02 03-06 08-11 05-08 11-14 7.950.00052 Management and Audit Energy 4 16-19 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 16-19 12-15 17-20 7.950.00053 POWER GENERATOR & AVR 4 23-26 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 23-26 20-23 03-06 7.950.00054 AC DC Electrical Motor Drive 4 30-02 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 30-02 27-30 10-13 7.950.000
55ADVANCED ELECTRICAL MOTOR (Operation maintenancetroubleshooting and Failure)
4 02-05 06-09 06-09 03-06 15-18 05-08 03-06 31-03 04-07 02-05 06-09 18-21 7.950.000
56 Electrical Maintenance 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 07-10 11-14 09-12 13-16 04-07 7.950.00057 Infrared Thermography 4 15-18 19-22 19-22 16-19 29-01 04-07 16-19 13-16 17-20 15-18 19-22 11-14 7.950.00058 Instrumentation Electric and Control System 4 22-25 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 22-25 26-29 17-20 7.950.000
59Manajemen Perawatan gedung dan fasilitas sertapencegahannya terhadap bahaya kebakaran
4 29-01 05-08 05-08 02-05 14-17 05-08 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000
60 Mengaplikasikan Teknik Pencahayaan 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 01-04 12-15 10-13 7.950.000
61 Switchgear MCC Electrical Syatem and Troubleshooting 4 08-11 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000
62Uninterruptible Power Supply (UPS) Power SupplyAnalysis and Troubleshooting
4 16-19 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 16-19 27-30 04-07 7.950.000
63 ALARM AND PROTECTIVE DEVICES 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 17-20 7.950.00064 ELECTRICAL SAFETY 4 09-12 26-01 26-29 23-26 15-18 25-28 23-26 27-30 24-27 09-12 26-29 11-14 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MINING1 COALBED METHANE 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 27-29 17-19 15-17 19-21 17-19 6.500.0002 APPLIED MINING GEOSTATISTICS 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 10-12 7.500.000
3BASIC OF GEOLOGY MAPPING AND MININGEXPLORATION
3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 06-08 17-19 22-24 19-21 17-19 7.500.000
4 COAL AND MINERAL MINING LAW 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 7.500.000
5 Dasar-Dasar Teknik Eksplorasi dan Pemetaan Air tanah 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 03-05 7.500.000
6 Genesa Mineral dan Batubara 3 08-10 13-15 14-16 11-13 07-09 25-27 11-13 01-03 12-14 08-10 14-16 12-14 7.500.000
7Geoteknik untuk Perancangan Lereng Penambangan(Best Practice and Case Study)
3 17-19 21-23 21-23 18-20 16-18 04-06 18-20 08-10 19-21 17-19 21-23 19-21 7.500.000
8 Manajemen Eksplorasi 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 14-16 26-28 24-26 28-30 26-28 7.500.0009 Geothermal System and Technology 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 29-31 05-07 31-02 07-09 05-07 7.500.000
10 Monitoring Kestabilan Lereng 3 03-05 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 03-05 12-14 10-12 7.500.00011 PENGOLAHAN EMAS 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 10-12 19-21 17-19 7.500.00012 KUALITAS BATUBARA DAN STOCKPILE MANAGEMENT 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 13-15 24-26 15-17 26-28 26-28 7.500.000
13MINING TRAINING - BEST PRACTICE MANAGEMENTEXPLORASI
3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 27-29 03-05 22-24 05-07 03-05 7.500.000
14 STUDY KELAYAKAN INVESTASI PERTAMBANGAN 3 29-31 13-15 14-16 11-13 28-30 25-27 11-13 01-03 12-14 29-31 14-16 12-14 7.500.00015 BASIC COAL MINING 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 19-21 7.500.00016 COAL HANDLING 3 08-10 28-02 28-30 25-27 07-09 27-29 25-27 14-16 26-28 08-10 28-30 26-28 7.500.00017 TEKNIK REKLAMASI LAHAN PASCA PENAMBANGAN 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13 7.950.00018 Geoteknik Terapan Untuk Perencanaan Lereng 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 01-04 26-29 03-06 8.500.00019 GEOTEKNIK DALAM TAMBANG TERBUKA 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 08-11 05-08 10-13 8.500.00020 PERENCANAAN DALAM TAMBANG TERBUKA 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 27-30 10-13 15-18 12-15 17-20 8.500.00021 Implementasi K3 Di Sektor Pertambangan 2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 5.500.000
22 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 20-21 5.500.000
23 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 31-01 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 31-01 05-06 03-04 5.500.000
24BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000
ENGINEERING - MIGAS
1COST CONTROL AND FINANCIAL REPORTING OF THEUPSTREAM OPERATION OF OIL AND GAS UNDERINDONESIA PSC
3 08-10 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000
2 DRILLING ENGINEERING FOR NON- DRILLING ENGINEERS 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000
3OIL AND GAS CONTRACT MANAGEMENT PRINCIPLESAND PRACTICES
3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.000
4 PETROLEUM ECONOMICS, RISK & FISCAL ANALYSIS 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 30-01 17-19 29-31 19-21 17-19 5.950.0005 PLACED INTO SERVICES (PIS) 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 06-08 26-28 01-03 28-30 26-28 5.950.0006 POD, WP&B, AFE 3 10-12 07-09 07-09 04-06 07-09 04-06 04-06 14-16 05-07 10-12 07-09 05-07 5.950.000
7PTK 041 2011 PEMELIHARAAN FASILITAS PRODUKSIMINYAK DAN GAS BUMI
3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 29-31 12-14 17-19 14-16 12-14 5.950.000
8UPSTREAM OIL & GAS PROJECT_PETROECONOMICEVALUATION AND ANALYSIS
3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 08-10 24-26 31-02 26-28 26-28 5.950.000
9OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATIONS
4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.950.000
10 OIL AND WATER HANDLING FACILITIES 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 28-31 18-21 02-05 20-23 10-13 7.950.00011 OFFSHORE WELLHEAD PLATFORM OPERATION 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 6.500.00012 PIGGING OPERATIONS 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000
13PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMANPENGADAAN BARANG DAN JASA INDUSTRI HULU MIGAS
3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 03-05 05-07 03-05 5.950.000
14 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000
15MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GASINDUSTRY
3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 26-28 5.950.000
16PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS
3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 01-03 19-21 24-26 21-23 19-21 5.950.000
17BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
HSE1 PERSONAL TRANSFER SAFETY 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.0002 SAFE FUEL TRANSFER 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.0003 SAFE NAVIGATION LESSON & ENGINE ROOM SAFETY 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 06-08 10-12 22-24 12-14 10-12 5.950.0004 SHIP’S STORAGE AND SAFE STORAGE 2 10-11 08-09 08-09 05-06 09-10 07-08 05-06 20-21 06-07 10-11 08-09 06-07 3.950.0005 WORKING ALOFT AND WORKING OVER SIDE 2 18-19 14-15 15-16 12-13 17-18 28-29 12-13 20-21 13-14 18-19 15-16 13-14 3.950.0006 CONTRACTOR SAFETY MANAGEMENT SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000
7SISTEM MANAJEMEN KESEHATAN DAN KESELAMATANKERJA
3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 06-08 10-12 17-19 12-14 10-12 5.950.000
8 EFFLUENT PRODUCED WASTE WATER 4 29-01 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 29-01 05-08 10-13 7.950.0009 H2S AWARENESS 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 7.950.000
10 PRODUCED WATER TREATMENT FOR RE-INJECTION 4 08-11 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 08-11 19-22 04-07 7.950.00011 HYDROCARBON 4 23-26 06-09 06-09 03-06 29-01 04-07 03-06 07-10 04-07 23-26 06-09 18-21 7.950.00012 DANGEROUS GOODS 2 22-23 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 22-23 12-13 26-27 3.950.00013 TAHAPAN DAN METODE PENYUSUNAN AMDAL 3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 27-29 03-05 08-10 05-07 03-05 5.950.00014 TRAINING OF TRAINERS SAFETY 3 15-17 13-15 14-16 11-13 14-16 27-29 11-13 14-16 12-14 15-17 14-16 12-14 5.950.00015 Basic Safety 2 15-16 19-20 19-20 16-17 14-15 06-07 16-17 20-21 17-18 15-16 19-20 17-18 5.500.00016 HACCP 2 17-18 28-01 28-29 25-26 16-17 25-26 25-26 20-21 26-27 17-18 28-29 27-28 5.500.00017 Hazard Identification & Risk Assesment (HIRA) 2 24-25 08-09 08-09 05-06 23-24 06-07 05-06 20-21 06-07 24-25 08-09 06-07 5.500.00018 Incident Investigation 2 11-12 01-02 29-30 26-27 10-11 28-29 26-27 20-21 27-28 11-12 29-30 26-27 5.500.000
19 Job Safety Analysis (JSA) 2 25-26 14-15 12-13 09-10 24-25 25-26 09-10 20-21 10-11 25-26 12-13 10-11 5.500.00020 Manajemen Risiko K3 2 15-16 12-13 14-15 11-12 14-15 28-29 11-12 20-21 12-13 15-16 14-15 12-13 5.500.000
21 Panitia Pembina Keselamatan & Kesehatan Kerja (P2K3) 2 29-30 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 29-30 28-29 26-27 5.500.000
22 Regulasi Keselamatan Kerja 2 24-25 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 24-25 29-30 27-28 5.500.000
23SMK3 (Sistem Manajemen Keselamatan & KesehatanKerja)
2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 13-14 24-25 18-19 26-27 26-27 5.500.000
24KESELAMATAN DAN KESEHATAN KERJA PADAPELAKSANAAN PROYEK KONSTRUKSI
3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.000
25 MARINE SAFETY MANAGEMENT 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 09-12 27-30 04-07 7.950.00026 OIL POLLUTION 4 23-26 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 23-26 13-16 17-20 7.950.00027 BASIC SAFETY MANAGEMENT 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.00028 MODERN SAFETY MANAGEMENT 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.00029 Implementasi K3 Di Sektor Pertambangan 2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 5.500.000
30 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 20-21 5.500.000
31 ALARM AND PROTECTIVE DEVICES 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 17-20 7.950.00032 ELECTRICAL SAFETY 4 09-12 26-01 26-29 23-26 15-18 25-28 23-26 27-30 24-27 09-12 26-29 11-14 7.950.00033 SHIP’S SECURITY OFFICER 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.00034 KESELAMATAN PELAYARAN 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.00035 OIL TANKERS AND TERMINALS SAFETY 4 02-05 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 01-04 06-09 03-06 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN1
CORPORATE SOCIAL RESPONSBILITY (COMMUNITYDEVELOPMENT)
3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
2 EFFECTIVE BUSINESS WHITER (WHITE PAPER) 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 30-01 03-05 29-31 05-07 03-05 5.950.0003 EFFECTIVE PR CAMPAIGN TECHNIQUE 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.0004 GENERAL AFFAIR MANAGEMENT DEVELOPMENT 3 10-12 21-23 21-23 18-20 09-11 04-06 18-20 14-16 19-21 10-12 21-23 19-21 5.950.000
5HOW TO MANAGE CHANGE, CONFLICT AND DIFFICULTEMPLOYEE TO CREATE PRODUCTIVITY
3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000
6INTERACTION AND TELEPHONE COURTESY (IMPROVETELEPHONE SKILL CALL CENTER)
3 24-26 07-09 07-09 04-06 23-25 06-08 04-06 01-03 05-07 24-26 07-09 05-07 5.950.000
7 MANAJEMEN KEARSIPAN DAN TATA KELOLA KANTOR 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.0008 MARKETING THINK GLOBAL BUT ACTION LOCAL 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.0009 OFFICE MANAGEMENT (MANAJEMEN KEARSIPAN) 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 14-16 19-21 29-31 21-23 19-21 5.950.000
10PR STRATEGY PR FOR EXCELLENTSECRETARYADMINISTRATION
3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 01-03 28-30 26-28 5.950.000
11 QUALITY CUSTOMER SERVICE (SERVICE EXCELLENT) 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 06-08 10-12 17-19 12-14 10-12 5.950.000
12THE LOYALIST MEMBANGUN MENTAL LOYALITASKARYAWAN
3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 13-15 17-19 24-26 19-21 17-19 5.950.000
13 TIME MANAGEMENT 3 03-05 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 03-05 5.950.00014 AUDIT OPERASIONAL KINERJA 3 08-10 13-15 14-16 11-13 07-09 25-27 11-13 08-10 12-14 08-10 14-16 12-14 5.950.000
15ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFSMETHOD BASED ON DOCUMENT REGULATION
3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 5.950.000
16 Humas 2 22-23 01-02 29-30 26-27 21-22 28-29 26-27 20-21 27-28 22-23 29-30 26-27 3.950.00017 CSR Communication 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 29-31 10-12 01-03 12-14 10-12 5.950.000
18ACCOUNTING AND FINANCE FOR NON-FINANCIALMANAGERS
3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000
19 BASIC ACCOUNTING 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 03-05 5.950.00020 FINANCIAL STATEMENT ANALYSIS 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.00021 DECISION MAKING BY USING STRATEGIC THINKING 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.00022 DESAIN CSR DAN PENGUKURAN KINERJANYA 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000
23INOVASI DAN KREATIFITAS MENUJU ORGANISASIPEMBELAJARAN
2 22-23 12-13 12-13 09-10 21-22 27-28 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000
24LIFE CYCLE COSTING AND SUSTAINABILITYMANUFACTURING
3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 06-08 19-21 29-31 21-23 19-21 5.950.000
25 MANAJEMEN GEDUNG DAN KANTOR 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 13-15 26-28 03-05 28-30 26-28 5.950.000
26REDESAIN KOMPETENSI SDM DAN PENGEMBANGANKNOWLEDGE MANAJEMEN
3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 29-31 05-07 10-12 07-09 05-07 5.950.000
27 TEKNIK PENINGKATAN PRODUKTIVITAS KERJA 3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 08-10 17-19 24-26 19-21 17-19 5.950.000
28 INTRAPRENEURSHIP (CORPORATE ENTREPRENEURSHIP) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 29-01 26-29 03-06 7.950.000
29 PERSIAPAN PENSIUN (PRE-RETIREMENT TRAINING) 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 01-04 05-08 10-13 8.500.00030 LEMBAGA KEUANGAN MIKRO SYARIAH 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 08-10 12-14 26-28 5.950.00031 PEOPLE EQUITY 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000
32BIMBINGAN TEKNIS MEMBUAT PERENCANAANSTRATEGIS SEKOLAH
2 22-23 01-02 29-30 26-27 21-22 25-26 26-27 20-21 27-28 22-23 29-30 26-27 3.950.000
33 PENYUSUNAN RENSTRA DESA 2 01-02 08-09 08-09 05-06 31-01 04-05 05-06 20-21 06-07 01-02 08-09 06-07 3.950.00034 Persiapan Purnabhakti 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 02-05 13-16 11-14 7.950.000
35Audit Sosial Dan Corporate Social Performance (CSP)Bagi Manajer Dan Pengelola Perusahaan
3 10-12 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 10-12 21-23 19-21 5.950.000
36Mengembangkan Elemen-Elemen Strategis Unik BagiUpaya Meningkatkan Kinerja Competitive AdvantageUKM
3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 01-03 24-26 17-19 26-28 26-28 5.950.000
37Meningkatkan Kemampuan Modal Sosial UKM SebagaiUpaya Meningkatkan Kinerja Bisnis
3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 08-10 03-05 24-26 05-07 03-05 5.950.000
38 Mewujudkan Harmonisasi Organisasi 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.000
39 LOSS PRVENTION AND MODERN SECURITY 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000
40 PENGAMANAN MELEKAT (CLOSE PROTECTION GUARD) 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 03-04 3.950.000
41TEKNIK PEMERIKSAAN (INVESTIGASI) DAN PRESENTASIPENGUNGKAPAN KASUS
2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000
42 Persiapan Masa Pensiun Orientasi Pendirian Usaha Baru 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000
43 BISNIS PELAYARAN 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 01-03 19-21 17-19 5.950.00044 BUSINESS LEGAL CONTRACT DRAFTING 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 30-01 17-19 22-24 19-21 17-19 5.950.000
45CARA EFEKTIF MELAKUKAN PROSES PENAGIHANHUTANG
2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000
46 FRAUD MANAGEMENT 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 10-12 5.950.00047 LEGAL DRAFTING AND WRITING 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 27-29 19-21 15-17 21-23 19-21 5.950.000
48MEKANISME PENYUSUNAN PERJANJIAN DANPEMBUATAN DOKUMEN HUKUM DALAM MENANGANIKREDIT MACET OLEH PERUSAHAAN
2 25-26 28-01 28-29 25-26 24-25 25-26 25-26 20-21 26-27 25-26 28-29 27-28 3.950.000
49 PELAKSANAAN KONTRAK 2 31-01 08-09 08-09 05-06 30-31 07-08 05-06 20-21 06-07 31-01 08-09 06-07 3.950.000
50PENYUSUNAN KONTRAK BISNIS, NEGOSIASI DANNYELESAIAN SENGKETA
3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000
51PERANCANGAN PEMBUATAN PERATURAN PERUNDANG-UNDANGAN (LEGAL DRAFTING)
3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000
52TATACARA BERACARA PERKARA PERSELISIHANHUBUNGAN INDUSTRIAL DI PENGADILAN HUBUNGANINDUSTRIAL
2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000
53HUBUNGAN INDUSTRIAL DAN HUKUMKETENAGAKERJAAN
3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 29-31 10-12 31-02 12-14 10-12 5.950.000
54 EMPLOYEE ENGAGEMENT 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 3.950.00055 MANAJEMEN PENGEMBANGAN PRODUK PERBANKAN 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 13-16 24-27 22-25 26-29 03-06 7.950.00056 PROFESSIONAL SALESMANSHIP 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 26-27 3.950.00057 STRATEGIC BRAND MANAGEMENT 2 02-03 12-13 12-13 09-10 02-03 28-29 09-10 20-21 10-11 01-02 12-13 10-11 3.950.00058 STRATEGIC PUBLIC RELATION 2 08-09 21-22 21-22 18-19 07-08 07-08 18-19 20-21 19-20 08-09 21-22 19-20 3.950.00059 Continous Improvement And Creativity 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 27-29 26-28 17-19 28-30 26-28 5.950.000
60PENERAPAN ISPS CODE DAN ISM CODE DALAMPELAYARAN
3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000
61 INCOTERM DALAM EKSPOR-IMPOR 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 03-05 5.950.00062 CUSTOM CLEARANCE 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000
63CUSTOM PROCEDURE, SHIPPING & EXPORT-IMPORTDOCUMENT
3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000
64 PORT MANAGEMENT 3 24-26 07-09 07-09 04-06 23-25 04-06 04-06 08-10 05-07 24-26 07-09 05-07 5.950.000
65 SHIPPING AGENCY 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 14-16 12-14 31-02 14-16 12-14 5.950.00066 Maritime And Shipping Law 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 03-05 21-23 19-21 5.950.00067 Bisnis Pelayaran 3 10-12 26-28 26-28 23-25 09-11 25-27 23-25 30-01 24-26 10-12 26-28 26-28 5.950.00068 GENERAL CHARTER CONDITION (GENCON) 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 06-08 03-05 17-19 05-07 03-05 5.950.00069 Hukum Perkapalan 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 13-15 10-12 22-24 12-14 10-12 5.950.00070 Shipping Management 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000
71REDUCTION COST DENGAN ACTIVITY BASED COST (ABC)SYSTEM
3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000
72PENYUSUNAN PERENCANAAN STRATEGIK DAN EVALUASIKINERJA DENGAN MENGGUNAKAN ANALISA SWOT BSC
3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000
73 Perhitungan Unit Cost 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.00074 TEKNIK PENULISAN LAPORAN YANG EFEKTIF 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 01-03 19-21 17-19 5.950.00075 JOURNALISM TRAINING 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00076 Quantum Teaching 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 06-08 24-26 01-03 26-28 26-28 5.950.000
77 Manajemen Rekam Medis dan Informasi Kesehatan 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000
78 Penyusunan Renstra SI-TI di Rumah Sakit 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000
79SISTEM INFORMASI MANAJEMEN RUMAH SAKIT (SIM-RS)
3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
80 MANAJEMEN PERPUSTAKAAN 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 30-01 10-12 22-24 12-14 10-12 5.950.000
81SISTEM MANAGEMENT MUTU ISO 9001 2008 UNTUKPERPUSTAKAAN
3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 06-08 17-19 29-31 19-21 17-19 5.950.000
82 Audit Internal dan MR 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 13-15 24-26 01-03 26-28 26-28 5.950.00083 PERSUASIVE SELLING SKILLS WORKSHOP 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00084 PERSUASIVE-SELLING SKILLS WORKSHOP 2 24-25 12-13 12-13 09-10 23-24 27-28 09-10 20-21 10-11 24-25 12-13 10-11 3.950.00085 QUANTUM LEADERSHIP SKILLS WORKSHOP 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 13-15 19-21 31-02 21-23 19-21 5.950.00086 BREAKTHROUGH LEADERSHIP AND DRIVING CHANGE 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.00087 BUSINESS PROCESS AND PROJECT MANAGEMENT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 29-31 26-28 08-10 28-30 26-28 5.950.00088 COMMERCIAL FINANCIAL AWARENESS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 01-03 05-07 17-19 07-09 05-07 5.950.00089 DEVELOPING EXECUTIVE LEADERSHIP SKILLS 3 24-26 13-15 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000
90EFFECTIVE MANAGEMENT SKILLS FOR MIDDLEMANAGEMENT
3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000
91EFFECTIVE MANAGEMENT USING FINANCIALPERFORMANCE
3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 5.950.000
92 ESSENTIAL MANAGEMENT SKILLS 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 06-08 10-12 15-17 12-14 10-12 5.950.00093 FINANCIAL MODELLING AND DECISION MAKING 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 13-15 17-19 22-24 19-21 17-19 5.950.00094 FINANCIAL RISK MANAGEMENT 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 29-31 26-28 29-31 28-30 26-28 5.950.00095 FORMULATING CORPORATE STRATEGY 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 5.950.000
96 FUNDAMENTALS OF SUPPLY CHAIN MANAGEMENT 3 08-10 13-15 14-16 11-13 07-09 27-29 11-13 08-10 12-14 08-10 14-16 12-14 5.950.00097 INSPIRATIONAL LEADERSHIP AND CHANGE 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 14-16 19-21 17-19 21-23 19-21 5.950.00098 INSPIRATIONAL LEADERSHIP AND CREATIVITY 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 27-29 24-26 24-26 26-28 26-28 5.950.00099 LEADERSHIP AND DEVELOPMENT OF TALENT 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 30-01 03-05 31-02 05-07 03-05 5.950.000
100 LEADERSHIP SKILLS FOR SUPERVISORS 3 03-05 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 03-05 12-14 10-12 5.950.000101 MANAGEMENT MASTERCLASS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 13-15 17-19 10-12 19-21 17-19 5.950.000102 ORGANIZATIONAL DEVELOPMENT 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 29-31 26-28 15-17 28-30 26-28 5.950.000103 RISK MANAGEMENT AND DRIVING CHANGE 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 5.950.000104 STRATEGIC DECISION MAKING 3 29-31 13-15 14-16 11-13 28-30 27-29 11-13 08-10 12-14 29-31 14-16 12-14 5.950.000105 STRATEGIC FINANCIAL MANAGEMENT 3 02-04 21-23 21-23 18-20 02-04 06-08 18-20 14-16 19-21 01-03 21-23 19-21 5.950.000
106STRATEGIC PEOPLE MANAGEMENT FOR IMPROVEDPERFORMANCE
3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000
107 SUCCESSFUL PERFORMANCE MANAGEMENT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 03-05 5.950.000108 SUCCESSFUL PROJECT MANAGEMENT 3 24-26 12-14 12-14 09-11 23-25 27-29 09-11 06-08 10-12 24-26 12-14 10-12 5.950.000109 SUCCESSFUL STRATEGIC MANAGEMENT 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 13-15 17-19 31-02 19-21 17-19 5.950.000
110 SUCCESSFUL SUPERVISORY SKILLS FOR TEAM LEADERS 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000
111 THE ADVANCED MANAGEMENT PROGRAMME 3 10-12 07-09 07-09 04-06 09-11 04-06 04-06 01-03 05-07 10-12 07-09 05-07 5.950.000112 THE SENIOR MANAGEMENT PROGRAMME 3 15-17 13-15 14-16 11-13 14-16 27-29 11-13 08-10 12-14 15-17 14-16 12-14 5.950.000
113TRANSFORMATIONAL LEADERSHIP AND STRATEGYFORMULATION
3 22-24 21-23 21-23 18-20 21-23 06-08 18-20 14-16 19-21 22-24 21-23 19-21 5.950.000
114 BUILDING GREAT TEAMWORK 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000115 CONTRACT ADMINISTRATION & NEGOTIATION 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000116 EXCELLENT SUPERVISORY SKILLS 2 08-09 07-08 07-08 04-05 07-08 07-08 04-05 06-07 05-06 08-09 07-08 05-06 3.950.000117 LEADERSHIP SKILLS 2 17-18 14-15 14-15 11-12 16-17 25-26 11-12 15-16 12-13 17-18 14-15 12-13 3.950.000118 MANAJEMEN PERUSAHAAN 2 24-25 21-22 21-22 18-19 23-24 04-05 18-19 20-21 19-20 24-25 21-22 19-20 3.950.000
119MEMPERKUAT STRATEGI PENGANGGARAN DANMENGEKSPLORASI PERAMALAN, PENGENDALIAN BIAYADAN MASALAH PERILAKU
2 31-01 01-02 29-30 26-27 30-31 27-28 26-27 29-30 27-28 31-01 29-30 26-27 3.950.000
120
MENDAPATKAN KETERAMPILAN, WAWASAN DANKOMPETENSI YANG DIBUTUHKAN DALAMMEMENANGKAN NEGOSIASI MELALUI WIN-WINSOLUTION
2 04-05 08-09 08-09 05-06 02-03 06-07 05-06 02-03 06-07 04-05 08-09 06-07 3.950.000
121 PROBLEM SOLVING AND DECISION MAKING 2 25-26 26-27 26-27 23-24 24-25 25-26 23-24 20-21 24-25 25-26 26-27 27-28 3.950.000122 PROFITABLE SELLING SKILLS 2 01-02 05-06 05-06 02-03 31-01 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000123 PUBLIC SERVICE AND MARKETING 2 02-03 14-15 12-13 09-10 03-04 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000124 SERVICE EXCELLENCE 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 09-10 17-18 11-12 19-20 17-18 3.950.000
125TEKNIK PENYUSUNAN PROSEDUR DAN KEBIJAKANPENCEGAHAN KECURANGAN DAN PENYELEWENGAN
2 15-16 28-01 28-29 25-26 14-15 28-29 25-26 15-16 26-27 15-16 28-29 26-27 3.950.000
126 LEGAL AUDIT & LEGAL OPINION DRAFTING 3 29-31 12-14 14-16 11-13 28-30 25-27 11-13 27-29 12-14 29-31 14-16 12-14 5.950.000127 LEADERSHIP WITH NLP 2 04-05 21-22 21-22 18-19 02-03 04-05 18-19 01-02 19-20 03-04 21-22 19-20 3.950.000128 Balance Scorecard 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 27-29 10-12 22-24 12-14 10-12 5.950.000
129MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAANBERBASIS TI
2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 20-21 24-25 15-16 26-27 26-27 3950000
130 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000131 EQUIPMENT MATERIALS SPECIFICATION 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 27-29 10-12 22-24 12-14 26-28 5.950.000132 INVENTORY REDUCTION 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000133 LOGISTIC INTERNAL SUPPLY CHAIN MANAGEMENT 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 06-08 24-26 01-03 26-28 26-28 5.950.000134 WAREHOUSING 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 13-15 03-05 08-10 05-07 03-05 5.950.000135 LOGISTIC OPERATION 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 29-31 12-14 15-17 14-16 10-12 5.950.000136 PAJAK PENGHASILAN 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 22-24 19-21 26-28 5.950.000137 ESTIMASI DAN ANALISIS BIAYA PROYEK 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000138 MANAJEMEN PERGUDANGAN (WAREHOUSING) 3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 05-07 5.950.000139 MANAJEMEN PRODUKSI DAN OPERASI 3 24-26 13-15 14-16 11-13 23-25 25-27 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000140 PROJECT MANAGEMENT 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.000141 INFORMASI, DOKUMENTASI DAN PERPUSTAKAAN 5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 06-10 24-28 29-02 26-30 03-07 9.250.000142 LAYANAN PERPUSTAKAAN BERBASIS TI 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 01-03 05-07 26-28 5.950.000143 MANAJEMEN PERPUSTAKAAN 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 27-29 10-12 08-10 12-14 10-12 5.950.000144 PERPUSTAKAAN DIGITAL 2 15-16 19-20 19-20 16-17 14-15 07-08 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000145 PROJECT FEASIBILITY STUDY 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000146 SUPPLY CHAIN MANAGEMENT (SCM) 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000147 Manajemen Transportasi 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000148 Time Management 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000149 Effective Training Management 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 06-08 17-19 22-24 19-21 17-19 5.950.000150 ANALISA JABATAN 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 03-05 5.950.000151 COMPENSATION & BENEFIT SYSTEM 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 13-15 10-12 08-10 12-14 10-12 5.950.000152 FRAUD PREVENTION AND DETECTION 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000153 KEY PERFORMANCE INDICATOR 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 3.950.000154 MANAJEMEN RISIKO 2 15-16 19-20 19-20 16-17 14-15 06-07 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000155 ORGANIZATIONAL CHANGE 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000156 ANALISA LAPORAN KEUANGAN DASAR 2 29-30 07-08 07-08 04-05 28-29 07-08 04-05 20-21 05-06 29-30 07-08 05-06 3.950.000157 MANAJEMEN STRATEGI 2 04-05 14-15 14-15 11-12 03-04 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.000158 PEMBELAJARAN AKUNTANSI IFRS 2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 20-21 19-20 10-11 21-22 19-20 3.950.000
159ALTERNATIVE DISPUTE RESOLUTION (ADR) ALTERNATIVEPENYELESAIAN SENGKETA (APS )
2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 26-27 3.950.000
160 KREDIT BERMASALAH 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 17-18 3.950.000
161MENATA OUTSOURCING SESUAI SURAT EDARANMENAKERTRANS RI
2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 20-21 24-25 08-09 26-27 27-28 3.950.000
162 PERSELISIHAN HUBUNGAN INDUSTRIAL 2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000163 General Affairs Management System 3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 30-01 12-14 22-24 14-16 10-12 5.950.000164 AIR AND SEA CARGO HANDLING 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.000165 FLIGHT OPERATION MANAGEMENT 3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 29-31 19-21 26-28 5.950.000166 AIR CARGO 2 18-19 14-15 14-15 11-12 03-04 25-26 11-12 20-21 12-13 18-19 14-15 27-28 3.950.000167 CSR COMMUNITY DEVELOPMENT 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000
168MONITORING DAN EVALUASI PROGRAM CSR DANCOMMUNITY DEVELOPMENT
3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 5.950.000
169STAKEHOLDER MAPPING DALAM CSR THROUGH TEAMBUILDING
3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 26-28 5.950.000
170PEMETAAN STAKEHOLDER DAN PERENCANAANPROGRAM CSR
3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 5.950.000
171Manajemen Pengadaan Tanah Untuk KepentinganUmum
3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 13-15 03-05 08-10 05-07 03-05 5.950.000
172 Administrasi Pertanahan Desa 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000
173Pengadaan Tanah Untuk Pembangunan BagiKepentingan Umum
3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000
174Penyusunan Dokumen Perencanaan Pengadaan TanahUntuk Kepetingan Umum (DP2TUP)
3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000
175 CONTRACT MANAGEMENT 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 03-05 5.950.000176 INVENTORY AND WAREHOUSE MANAGEMENT 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000177 LEADERSHIP FOR QUALITY MANAGEMENT 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000178 PDCA (Planning, Doing, Checking, Acting) 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 03-05 21-23 19-21 5.950.000179 PROJECT MANAGEMENT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 06-08 03-05 17-19 05-07 03-05 5.950.000180 RISK MANAGEMENT 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 13-15 10-12 22-24 12-14 10-12 5.950.000181 SUPERVISORY MANAGEMENT 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000182 SUPPLY CHAIN MANAGEMENT 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 01-03 28-30 26-28 5.950.000183 TRANSPORTATION MANAGEMENT 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.000
184TERM OF REFFERENCE PENYUSUNAN HOSPITALDISASTER PLAN
5 29-02 19-23 19-23 16-20 28-01 04-08 16-20 06-10 17-21 29-02 19-23 17-21 9.500.000
185 Analisis Beban Kerja 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 5.500.000186 Balanced Scorecard 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 5.500.000187 Career Management 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 5.500.000188 Community Development 2 29-30 07-08 07-08 04-05 28-29 07-08 04-05 20-21 05-06 29-30 07-08 05-06 5.500.000189 Corporate Social Responsibility 2 04-05 14-15 14-15 11-12 03-04 28-29 11-12 20-21 12-13 03-04 14-15 12-13 5.500.000190 General Affair (GA) 2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 20-21 19-20 10-11 21-22 19-20 5.500.000191 Hubungan Industrial 2 31-01 12-13 15-16 12-13 30-31 27-28 12-13 20-21 13-14 31-01 15-16 13-14 5.500.000192 Kalkulasi Perhitungan Tunjangan Hari Raya (THR) 2 01-02 19-20 19-20 16-17 31-01 06-07 16-17 20-21 17-18 01-02 19-20 17-18 5.500.000193 Key Perfomance Indicator (KPI) 2 04-05 26-27 26-27 23-24 03-04 27-28 23-24 20-21 24-25 01-02 26-27 27-28 5.500.000
194 Leadership 2 08-09 07-08 07-08 04-05 07-08 07-08 04-05 20-21 05-06 08-09 07-08 05-06 5.500.000195 Manajemen Sumber Daya Manusia 2 22-23 21-22 21-22 18-19 21-22 04-05 18-19 20-21 19-20 22-23 21-22 19-20 5.500.000196 Regulasi Ketenagakerjaan 2 04-05 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 04-05 12-13 10-11 5.500.000197 Teknik Penyusunan PKWT, PP & PKB 2 25-26 07-08 07-08 04-05 24-25 07-08 04-05 20-21 05-06 25-26 07-08 05-06 5.500.000
198Teknik Penyusunan Silabus Dan Rencana PelaksanaanPelatihan (RPP)
2 01-02 14-15 14-15 11-12 31-01 28-29 11-12 27-28 12-13 01-02 14-15 12-13 5.500.000
199 Training & Development Management 2 02-03 21-22 21-22 18-19 02-03 04-05 18-19 30-31 19-20 01-02 21-22 19-20 5.500.000200 Training Need Analysis 2 08-09 28-01 28-29 25-26 07-08 25-26 25-26 08-09 26-27 08-09 28-29 27-28 5.500.000201 Housekeeping Management 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 7.950.000202 COMPLAINT HANDLING MANAGEMENT 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000203 CREATIVE PROBLEM SOLVING 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000204 EFFECTIVE LEADERSHIP 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 5.950.000205 SELF MANAGEMENT MANAGEMENT BY OBJECTIVE 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.000
206KELUHAN (GRIEVANCES) SUMBER DAYA MANUSIA DIERA TERKINI
4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.950.000
207 COMPETENCIES MAPPING & DEVELOPMENT 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 10-13 7.950.000208 ISPS CODE 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 15-18 26-29 03-06 7.950.000209 JETTY OPERATION 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 30-01 03-05 22-24 05-07 26-28 5.950.000210 LOADING AND UPLOADING 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 29-01 12-15 10-13 7.950.000211 MARINE AND TERMINAL OPERATION 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 01-04 20-23 18-21 7.950.000212 MARINE SURVEYOR TRAINING 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 16-19 06-09 11-14 7.950.000213 PORT MANAGEMENT 4 30-02 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 30-02 19-22 03-06 7.950.000214 SHIPPING MANAGEMENT 4 02-05 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 02-05 26-29 10-13 7.950.000215 SHIPPING REPORTING SYSTEMS 4 08-11 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 08-11 05-08 18-21 7.950.000216 TANKER OPERATION 4 15-18 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 15-18 12-15 04-07 7.950.000217 PILOT, JETTY AND LOADING MASTER 4 22-25 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 22-25 20-23 11-14 7.950.000218 ISM CODE 4 29-01 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 29-01 27-30 17-20 7.950.000219 LOADING UNLOADING pelabuhan curah kering 4 09-12 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 09-12 13-16 10-13 7.950.000220 PROJECT MANAGEMENT DENGAN PRIMAVERA 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000
221APPLIED FACILITY SECURITY RISK ASSESSMENT WITHSOFTWARE FASRIM
2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 7.000.000
222APPLIED PROCESS SECURITY RISK ASSESSMENT (FAILUREMODE AND EFFECT ANALYSIS)
2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000
223APPLIED SECURITY ANALYSIS (CRIME TREND, ROOT-CAUSE, COST-BENEFIT) UTILIZING SOFTWARE SYSCAT
2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 7.000.000
224DESIGNING COST EFFECTIVE SECURITY SYSTEM (BENEFIT-COST ANALYSIS METHOD)
2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 03-04 3.950.000
225DESIGNING KPI FOR SECURITY DEPARTMENT ANDSECURITY WORK PLAN PROPOSAL
2 02-03 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 01-02 14-15 12-13 3.950.000
226SECURITY AWARENESS PROGRAM AND PROMOTINGIMAGE FOR SECURITY
2 10-11 21-22 21-22 18-19 09-10 07-08 18-19 20-21 19-20 10-11 21-22 19-20 3.950.000
227 CONTRACT MANAGEMENT 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 5.950.000
228CONTRACT MANAGEMENT, STRATEGY ANDADMINISTRATION FOR OIL AND GAS COMPANY
3 29-31 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 29-31 12-14 26-28 5.950.000
229 GOOD CORPORATE GOVERNANCE (GCG) 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 5.950.000230 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000231 MANAJEMEN PROYEK KONSTRUKSI 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000232 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000233 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000234 Aviation & Airport Operations 2 08-09 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 08-09 08-09 26-27 3.950.000235 SHIP’S SECURITY OFFICER 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000236 KESELAMATAN PELAYARAN 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000237 OIL TANKERS AND TERMINALS SAFETY 4 02-05 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 01-04 06-09 03-06 7.950.000238 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 31-01 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 31-01 05-06 03-04 5.500.000
239BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000
240 Mastering Your Health For Best Performance 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000
241 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000
242 Job Hunting For Beginner 2 18-19 05-06 05-06 02-03 17-18 04-05 02-03 20-21 03-04 18-19 05-06 03-04 5.500.000243 Seven Habbits 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 06-07 17-18 11-12 19-20 17-18 5.500.000244 MANAJEMEN PROYEK KONSTRUKSI 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.000245 SUPERVISI PROYEK BANGUNAN GEDUNG 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.000
246PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMANPENGADAAN BARANG DAN JASA INDUSTRI HULU MIGAS
3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 03-05 05-07 03-05 5.950.000
247 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000
248MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GASINDUSTRY
3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 26-28 5.950.000
249 GREAT TEAMWORK AND SYNERGY 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 5.950.000250 CAPACITY BUILDING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000
251 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000
252 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000
253 SERVICE EXCELLENT with NLP 2 11-12 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 11-12 08-09 06-07 3.950.000254 PERFORMANCE GOALS SETTING 2 10-11 12-13 15-16 12-13 09-10 28-29 12-13 08-09 13-14 10-11 15-16 13-14 3.950.000
255 COMMUNICATION SKILLS FOR SALES 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 5.950.000256 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MANAJEMEN - PROCUREMENT1
ASPEK HUKUM DAN OE PENGADAAN BARANG JASAPEMERINTAH
3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 01-03 19-21 17-19 5.950.000
2TEKNIK OWNER ESTIMATE DAN PENGADAAN BARANGJASA
4 16-19 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 16-19 13-16 11-14 7.950.000
3 CONTRACT AND PROCUREMENT FRAUD IDENTIFICATION 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 01-03 05-07 03-05 5.950.000
4PEMBUATAN DELIK HUKUM PENGADAAN BARANG JASAPERUSAHAAN
2 04-05 14-15 15-16 12-13 02-03 27-28 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000
5 BEST PRACTICES IN MANAGING PROCUREMENT 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000
6BID AND TENDERING MANAGEMENT LEADING TOCONTRACT
3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000
7 EFFECTIVE PROJECT PROCUREMENT MANAGEMENT 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.0008 Basic Procurement & Purchasing 3 24-26 21-23 21-23 18-20 23-25 04-06 18-20 01-03 19-21 24-26 21-23 19-21 5.950.0009 METODA PENYUSUNAN HPS PERUSAHAAN 3 24-26 07-09 07-09 04-06 23-25 04-06 04-06 08-10 05-07 24-26 07-09 05-07 5.950.000
10 PROCUREMENT AND CONTRACT MONITORING 3 10-12 26-28 26-28 23-25 09-11 25-27 23-25 30-01 24-26 10-12 26-28 26-28 5.950.000
11PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS
3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 01-03 19-21 24-26 21-23 19-21 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
MOTIVASI & PERSONAL DEVELOPMENT
1 GREAT TEAMWORK AND SYNERGY 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 5.950.0002 CHARACTER BUILDING 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.0003 COMMUNICATION SKILL 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.0004 LOBBY & NEGOTIATION SKILL 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.0005 MIND MAPPING AND HYPNOSIS FOR PROFESIONAL 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000
6MOTIVATION YOUR SELF (ACHIEVEMENT MOTIVATIONTRAINING)
3 22-24 13-15 14-16 11-13 21-23 25-27 11-13 08-10 12-14 22-24 14-16 12-14 5.950.000
7 PROFESSIONAL PUBLIC SPEAKING 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 01-03 05-07 10-12 07-09 05-07 5.950.0008 THE POWER OF POSITIVE MIND 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 27-29 24-26 31-02 26-28 26-28 5.950.0009 COMMUNICATION SKILLS 2 29-30 08-09 08-09 05-06 28-29 07-08 05-06 20-21 06-07 29-30 08-09 06-07 3.950.000
10 ACHIEVEMENT MOTIVATION TRAINING 2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000
11 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000
12 INSPIRATIONAL PRESENTATION WITH NLP TECHNIQUES 2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000
13 BASIC – ADVANCE CLINICAL HYPNOTHERAPY WORKSHOP 3 29-31 13-15 14-16 11-13 28-30 27-29 11-13 06-08 12-14 29-31 14-16 12-14 5.950.000
14 BECOMING AN INSPIRING & INFLUENCE TEACHER 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 20-21 19-20 03-04 21-22 19-20 3.950.00015 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 3.950.00016 SELF-TRANSFORMATION MANAGEMENT WORKSHOP 2 02-03 01-02 29-30 26-27 02-03 28-29 26-27 20-21 27-28 04-05 29-30 26-27 3.950.00017 THE PARENTING NOBLE 2 18-19 14-15 14-15 11-12 17-18 25-26 11-12 20-21 12-13 18-19 14-15 12-13 3.950.00018 ACHIEVEMENT MOTIVATION 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00019 COMMUNICATION SKILLS 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 27-28 17-18 29-30 19-20 17-18 3.950.00020 PRESENTATION SKILLS 2 18-19 22-23 22-23 19-20 17-18 07-08 19-20 13-14 20-21 18-19 22-23 20-21 3.950.00021 EFFECTIVE PRESENTATION SKILLS 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 10-12 5.950.00022 OPTIMALISASI PENGELOLAAN TALENTA 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000
23DEVELOPING POSITIVE PERSONAL CHARACTER INPROBLEM SOLVING
2 22-23 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 22-23 19-20 26-27 3.950.000
24 NEGOTIATION SKILL 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 14-16 12-14 31-02 14-16 12-14 5.950.00025 Training of Trainer 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 05-07 5.950.00026 PRESENTATION SKILL FOR THE BEGINNERS 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.00027 COMMUNICATION SKILLS 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.00028 POWERFULL PRESENTATION (basic) 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 31-02 07-09 05-07 5.950.00029 SELF MANAGEMENT EMOTION AND STRESS 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 08-10 12-14 03-05 14-16 12-14 5.950.00030 CAPACITY BUILDING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000
31 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000
32 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000
33 SERVICE EXCELLENT with NLP 2 11-12 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 11-12 08-09 06-07 3.950.00034 PERFORMANCE GOALS SETTING 2 10-11 12-13 15-16 12-13 09-10 28-29 12-13 08-09 13-14 10-11 15-16 13-14 3.950.00035 COMMUNICATION SKILLS FOR SALES 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 5.950.000
36Pencarian Minat, Bakat, dan Kecerdasan Dasar melaluiAnalisis Sidik Jari bagi Pekerja & Profesional
2 02-03 08-09 08-09 05-06 02-03 06-07 05-06 20-21 06-07 03-04 08-09 06-07 5.500.000
37Pencarian Minat, Bakat, dan Kecerdasan Dasar melaluiAnalisis Sidik Jari bagi Pelajar & Mahasiswa
2 10-11 14-15 15-16 12-13 09-10 27-28 12-13 20-21 13-14 10-11 15-16 13-14 5.500.000
38 TOT (TRAINING OF TRAINER) 2 22-23 07-08 07-08 04-05 21-22 07-08 04-05 20-21 05-06 22-23 07-08 05-06 3.950.00039 Training Of Trainer (TOT) 2 15-16 08-09 08-09 05-06 14-15 06-07 05-06 15-16 06-07 15-16 08-09 06-07 5.500.00040 Effective Presentation Skills 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000
41MEMBANGUN PROFESSIONAL BEHAVIOR DENGANKECERDASAN EMOSI DAN KECERDASAN SPIRITUAL
2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000
42 THE POWER OF SELF HEALING 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.00043 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.00044 Mastering Your Health For Best Performance 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000
45 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000
46 Job Hunting For Beginner 2 18-19 05-06 05-06 02-03 17-18 04-05 02-03 20-21 03-04 18-19 05-06 03-04 5.500.00047 Seven Habbits 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 06-07 17-18 11-12 19-20 17-18 5.500.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des HargaSERTIFIKASI KEMNAKER RI:Bdg/Jkt/Yogya
1 Ahli K3 Kimia 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 9.950.0002 Ahli K3 Listrik 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 11.950.0003 Ahli K3 Umum 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 9.500.0004 Ahli K3 Pesawat Angkat dan Angkut 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0005 Ahli K3 Pesawat Tenaga dan Produksi 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0006 Ahli K3 Pesawat uap dan bejana tekan 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0007 Auditor SMK3 4 02-05 12-15 26-29 23-26 28-31 25-28 23-26 13-16 24-27 22-25 26-29 03-06 7.500.0008 Petugas K3 Kimia 6 15-20 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 08-13 05-10 10-15 7.500.0009 Teknisi K3 Listrik 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 06-10 17-21 01-05 19-23 17-21 6.950.000
10 Petugas K3 Madya Ruang Terbatas (Confined Space) 3 15-17 05-07 12-14 09-11 14-16 04-06 09-11 06-08 03-05 01-03 12-14 03-05 6.500.00011 Petugas K3 Utama Ruang Terbatas (Confined Space) 5 15-19 05-09 12-16 09-13 14-18 04-08 09-13 06-10 03-07 01-05 12-16 03-07 6.750.00012 Petugas Penyelamat (Rescuer) Ruang Terbatas 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 24-26 05-07 17-19 6.500.00013 Petugas K3 Pemantauan Lingkungan Kerja 6 08-13 19-24 19-24 16-21 14-19 04-09 16-21 06-11 17-22 08-13 12-17 10-15 8.950.00014 Teknisi K3 Deteksi Gas 2 29-30 14-15 15-16 12-13 31-01 25-26 12-13 20-21 13-14 29-30 15-16 10-11 4.000.00015 juru ikat (rigger) 3 03-05 12-14 19-21 16-18 02-04 04-06 16-18 14-16 17-19 15-17 19-21 10-12 3.500.00016 operator pita transport (conveyor) 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 17-19 3.950.00017 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 1 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 27-29 03-05 08-10 05-07 03-05 5.500.00018 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 2 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 15-18 12-15 10-13 6.500.00019 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 3 4 22-25 19-22 20-23 17-20 21-24 04-07 17-20 06-09 18-21 22-25 20-23 17-20 6.500.00020 TENAGA KERJA BANGUNAN TINGGI (TKBT) TINGKAT 2 2 15-16 05-06 26-27 26-27 21-22 25-26 26-27 13-14 27-28 29-30 29-30 17-18 3.950.00021 juru Las (Welder) SMAW kelas 1 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 17.500.00022 juru Las (Welder) SMAW kelas 2 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 17.000.00023 juru Las (Welder) SMAW kelas 3 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 16.500.00024 juru Las (Welder) GTAW kelas 1 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 17.500.00025 juru Las (Welder) GTAW kelas 2 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 17.000.00026 juru Las (Welder) GTAW kelas 3 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 16.500.00027 operator forklift 3 03-05 12-14 19-21 16-18 02-04 04-06 16-18 14-16 17-19 08-10 19-21 10-12 3.500.00028 operator gondola 3 02-04 13-15 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 17-19 5.750.00029 operator crane 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 13-16 03-06 22-25 05-08 03-06 5.750.000
PUBLIC TRAINING SCHEDULE 2018 SERTIFIKASI K3 DI 3 KOTA: BANDUNG / JAKARTA / YOGYAKARTA
30 operator genset 4 15-18 12-15 12-15 09-12 28-31 26-29 09-12 27-30 10-13 15-18 12-15 10-13 6.950.00031 operator alat berat 4 02-05 19-22 20-23 17-20 07-10 04-07 17-20 06-09 18-21 01-04 20-23 17-20 7.500.00032 operator boiler kelas 1 6 08-13 05-10 05-10 16-21 14-19 04-09 16-21 06-11 17-22 08-13 12-17 10-15 6.500.00033 operator boiler kelas 2 4 08-11 05-08 05-08 16-19 14-17 04-07 16-19 06-09 17-20 08-11 12-15 10-13 5.500.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des HargaSERTIFIKASI BNSP RI: Bdg/Jkt/Yogya
1 Ahli K3 Umum Muda 4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 06-09 17-20 15-18 19-22 03-06 7.750.0002 Ahli K3 Umum Madya 5 22-26 19-23 12-16 09-13 28-01 25-29 09-13 27-31 10-14 22-26 12-16 17-21 8.250.0003 Ahli K3 Umum Utama 6 08-13 05-10 19-24 23-28 14-19 25-30 23-28 06-11 24-29 15-20 12-17 10-15 9.500.0004 HAZARD Operability Study (HAZOP) 4 02-05 05-08 05-08 02-05 21-24 05-08 02-05 13-16 03-06 08-11 05-08 17-20 7.750.0005 Operator Migas 4 15-18 12-15 12-15 09-12 28-31 25-28 09-12 27-30 10-13 15-18 12-15 04-07 7.750.0006 Pengawas K3 Migas 6 22-27 19-24 19-24 16-21 14-19 04-09 16-21 06-11 17-22 22-27 12-17 10-15 9.250.0007 Pengawas Utama K3 Migas 6 15-20 19-24 19-24 23-28 14-19 25-30 23-28 06-11 24-29 15-20 12-17 17-22 9.500.0008 Safety Inspector 4 02-05 06-09 06-09 03-06 22-25 04-07 03-06 13-16 04-07 01-04 06-09 03-06 7.750.0009 Investigasi Insiden 4 08-11 12-15 13-16 10-13 29-01 25-28 10-13 28-31 11-14 09-12 13-16 10-13 7.750.000
10 Operator Gas Tester 4 16-19 19-22 19-22 16-19 07-10 05-08 16-19 30-02 17-20 16-19 19-22 17-20 7.750.00011 Auditor SMK3 4 22-25 19-22 26-29 23-26 14-17 26-29 23-26 06-09 24-27 22-25 26-29 04-07 7.750.00012 Internal Auditor SMK3 3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 10-12 26-28 26-28 5.950.00013 Petugas K3 Laboratorium 4 29-01 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 29-01 05-08 11-14 7.750.00014 FIREMAN 1 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 27-28 17-18 15-16 12-13 17-18 5.750.00015 FIREMAN 2 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 27-29 17-19 15-17 12-14 17-19 6.750.00016 FIRE OFFICER 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 27-30 17-20 15-18 12-15 17-20 7.750.00017 HIMU 4 22-25 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 15-18 13-16 10-13 7.750.00018 HIMA 5 22-26 05-09 05-09 02-06 07-11 04-08 02-06 06-10 03-07 22-26 05-09 03-07 8.500.00019 HIU 5 08-12 19-23 19-23 16-20 21-25 04-08 16-20 27-31 17-21 01-05 19-23 17-21 8.950.00020 Pengawas SMK3 Kontraktor (CSMS) 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 03-06 7.750.00021 PETUGAS K3 FASILITAS KESEHATAN 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 11-14 7.750.00022 Petugas Penanganan Bahaya Gas H2S 3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 29-31 19-21 26-28 5.950.00023 SAFETYMAN MIGAS 3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 01-03 28-30 26-28 5.950.00024 SAFETYMAN UMUM 3 08-10 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 08-10 07-09 26-28 5.950.00025 Petugas P3K 3 15-17 12-14 14-16 11-13 14-16 25-27 11-13 13-15 12-14 15-17 14-16 26-28 5.950.000