Public Training Schedule 2018 PT.MMS di Indonesia (1,11...

89

Transcript of Public Training Schedule 2018 PT.MMS di Indonesia (1,11...

Page 1: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 2: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 3: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 4: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 5: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING1 Statistical Process Control BERBASIS MINITAB 14 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 13-15 26-28 24-26 28-30 26-28 5.950.0002 BASIC CIVIL 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 04-07 7.950.0003 CARTOGRAFI 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 03-06 7.950.000

4CATHODIC PROTECTION CORROSION CONTROL ANDPREVENTION

4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 11-14 7.950.000

5CIVIL CONSTRUCTION OBSERVATION of EXECUTIONBUILDING

4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 17-20 7.950.000

6CIVIL CONSTRUCTION PENGAWASAN PELAKSANAANBANGUNAN

4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 03-06 7.950.000

7 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 18-21 7.950.0008 DOKUMEN KONTROL 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 17-20 7.950.0009 FUZZY LOGIC CONTROL 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 04-07 7.950.000

10 GAS AND LIQUID FLOW MEASUREMENT 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 10-13 7.950.000

11PROCESS CONTROL SYSTEMS APPLICATION, DESIGN,AND TUNING

4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 11-14 7.950.000

12SUPERVISORY CONTROL AND DATA ACQUISITION(SCADA)

4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 03-06 7.950.000

13 Survey & Mapping 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 11-14 7.950.00014 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 29-31 05-07 26-28 5.950.00015 CHOKE AND CONTROL VALVE 4 22-25 20-23 20-23 17-20 28-31 04-07 17-20 28-31 18-21 22-25 20-23 10-13 7.950.000

16MARINE CORROSION AND PREVENTION FOR OFFSHORESTRUCTURE

3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 6.500.000

17 ADVANCED FLOW MEASUREMENT 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 01-04 19-22 17-20 8.500.00018 ADVANCED PID CONTROLLER 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 08-11 26-29 03-06 8.500.00019 CONTROL AND CHOKE VALVES 4 15-18 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 15-18 05-08 10-13 8.500.00020 CONTROL SYSTEM FUNDAMENTALS 4 22-25 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 22-25 12-15 18-21 8.500.00021 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 4 16-19 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 16-19 13-16 03-06 8.500.00022 FISCAL AND CUSTODY METERING 4 23-26 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 23-26 19-22 10-13 8.500.00023 FLOW ASSURANCE IN PIPING SYSTEMS 4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 18-21 8.500.000

24 FLUID FLOW – GAS METERING AND CUSTODY TRANSFER 5 08-12 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 01-05 05-09 03-07 9.500.000

25 HUMAN MACHINE INTERFACE (HMI) 4 02-05 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 08-11 12-15 11-14 8.500.00026 OPC (OPEN PROCESS CONTROL) 4 15-18 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 15-18 20-23 17-20 8.500.00027 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 02-05 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 01-04 13-16 18-21 8.500.00028 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 09-12 19-22 04-07 8.500.000

PUBLIC TRAINING SCHEDULE 2018 DI BANDUNG

Page 6: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

29 SCADA SYSTEMS 4 16-19 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 16-19 26-29 11-14 8.500.00030 Ultrasonic Gas Flow Meter 5 22-26 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 22-26 05-09 17-21 9.500.000

31WELLHEAD INSTRUMENTATION AND HYDRAULICCONTROL SYSTEMS

4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 29-01 12-15 03-06 8.500.000

32WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA100.11a

4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 02-05 20-23 10-13 8.500.000

33 CALIBRATION ISO IEC 17025 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000

34DESIGN OF EXPRIMENTS (DOE) FUNDAMENTAL CONCEPTAND APPLICATION

4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000

35Electrical Test Instrumentation dan Sistem Pengukuran(Measurements)

4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000

36 Instrumentation Systems 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.00037 Measurements Systems 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.00038 Energy Audit and Application 4 15-18 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 15-18 12-15 17-20 8.500.00039 STATISTIK INDUSTRI 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 27-30 10-13 01-04 12-15 17-20 7.950.000

40CATHODIC PROTECTION FOR MINE STEEL STRUCTUREAND MINING SUPORTING FACILITIES

4 29-01 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 29-01 05-08 03-06 8.750.000

41 Cathodic Protection for Onshore and Offshore Structure 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.750.000

42 CORROSION AND SCALING PREVENTION 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 04-07 8.750.000

43 Corrosion Engineering for Non Corrosion Engineers 4 22-25 06-09 06-09 03-06 29-01 04-07 03-06 31-03 04-07 22-25 06-09 11-14 8.750.000

44INTERNAL AND EXTERNAL CORROSION CONTROL ANDMONITORING FOR PIPELINE AND SURFACE FACILITY

4 16-19 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 16-19 05-08 17-20 8.750.000

45 CCTV INSTALASI, PEMROGRAMAN DAN PERAWATAN 3 29-31 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 29-31 12-14 26-28 5.950.000

46 ADVANCED CCTV Perencanaan, Desain dan Implementasi 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 13-15 17-19 22-24 19-21 19-21 5.950.000

47 INSTRUMENTATION AND CONTROL SYSTEM 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 08-11 06-09 11-14 7.950.00048 Scale In Oilfield Water 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 09-12 12-15 04-07 7.950.000

49 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 15-18 19-22 11-14 7.950.000

50PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURANDAN PENGUJIAN

3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.000

51BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM

4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000

52 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 18-21 7.950.00053 CALLIBRATION OF MEASURING TOOL 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 17-20 7.950.000

Page 7: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

54CONTROL VALVE OPERATION, MAINTENANCE, ANDTROUBLESHOOTING

4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 18-21 7.950.000

55 FINITE ELEMENT METHODS (FEM) 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 18-21 7.950.00056 Flow Measurement and Control Element 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 04-07 7.950.00057 INDUSTRIAL METROLOGY 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 10-13 7.950.00058 Inspeksi dan Korosi 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 18-21 7.950.00059 MEASUREMENT SYSTEM ANALYSIS 4 22-25 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 22-25 13-16 03-06 7.950.00060 ANSYS BASIC FLUENT CFD 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 9.500.00061 ANSYS INTERMEDIATE FLUENT CFD 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 30-02 17-20 29-01 19-22 17-20 9.500.00062 ANSYS ADVANCED FLUENT CFD 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 03-06 9.500.000

63ADVANCE PROCESS CONTROL, INSTRUMENTATION ANDMETERING

4 15-18 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000

64OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM)

4 22-25 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000

65 PROCESS CONTROL AND INSTRUMENTATION 4 29-01 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.00066 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.000

67SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZINGAND SELECTION

4 08-11 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.000

68FLUID FLOW MEASUREMENT AND METER PROVING INOIL AND GAS INDUSTRY

4 30-02 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 30-02 06-09 03-06 7.950.000

69GPS(Global Positioning System) for mining andPetroleum

4 15-18 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 15-18 19-22 10-13 8.500.000

70 INDUSTRIAL COMBUSTION AND BURNER 4 22-25 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 22-25 05-08 17-20 8.500.00071 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 8.750.00072 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.500.00073 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.950.00074 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MECHANICAL1 BOILER CONTROL SYSTEMS ENGINEERING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.950.0002 PLUMBING SYSTEM AND MAINTENANCE 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 22-24 26-28 26-28 6.500.000

3SISTEM KONTROL RHVAC (REFRIGERATION HEATINGVENTILATING AND AIR CONDITIONING)

5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 06-10 03-07 29-02 05-09 10-14 9.500.000

4 REFRIGERATION RETROFIT 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 8.500.0005 Pipeline Risk & Integrity Management 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 6.950.000

6Piping & Pipeline System Design, Specification,Installation & Maintenance

4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 10-13 8,500,000

Page 8: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

7PLANT LIFE MANAGEMENT THROUGH RELIABILITYBASED INSPECTION

5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 01-05 19-23 17-21 9.500.000

8 QC for Water Network (Pipeline) Construction 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 10-12 28-30 26-28 6.950.0009 Risk Based Inspection 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 13-15 12-14 24-26 14-16 12-14 6.950.000

10 Basic CNC 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 13-15 10-12 15-17 12-14 10-12 7.250.000

11COMPRESSOR OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OF FAILUREANALYSIS

4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 7.950.000

12 MACHINERY FLUID MECHANICS 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.00013 PELUMAS DAN SISTEM PELUMASAN 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 01-04 05-08 10-13 7.950.000

14ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OFHEAVY DUTY EQUIPMENT

4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 15-18 19-22 03-06 7.950.000

15ELECTRO-PNEUMATICS SYSTEM PRINCIPLES ANDAPPLICATION

4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 10-13 7.950.000

16 INSTRUMENTATION AND CONTROL SYSTEM 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.00017 KONTROL ELEKTRIK 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 01-04 12-15 04-07 7.950.00018 MECHATRONICS APPLICATION IN INDUSTRY 4 08-11 20-23 20-23 17-20 22-25 04-07 17-20 28-31 18-21 08-11 20-23 11-14 7.950.00019 Mekatronika 4 16-19 27-02 27-30 24-27 29-01 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.00020 PNEUMATIC SYSTEM AND APPLICATION 4 23-26 06-09 06-09 03-06 08-11 05-08 03-06 07-10 04-07 23-26 06-09 03-06 7.950.00021 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 30-02 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 30-02 13-16 10-13 7.950.00022 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 02-05 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.950.00023 REKAYASA HIDROLIK AND APLIKASI 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 09-12 26-29 04-07 7.950.00024 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 15-17 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00025 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 01-04 12-15 10-13 7.950.00026 MANAJEMEN MATERIAL 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 15-18 26-29 03-06 7.950.00027 Manajemen Perbengkelan 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 22-25 05-08 11-14 7.950.00028 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 13-16 11-14 29-01 13-16 18-21 7.950.000

29AC & REFRIGERATION PRINCIPLES, OPERATION ANDTROUBLESHOOTING

4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 10-13 7.950.000

30 ADVANCED VIBRATION MONITORING TECHNIQUE 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 03-06 7.950.00031 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 17-20 7.950.00032 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 7.950.000

33CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE

4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 04-07 7.950.000

34 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 10-13 7.950.000

35COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING

4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 11-14 7.950.000

36 DIESEL ENGINES OPERATION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 10-13 7.950.000

Page 9: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

37GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING

4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 17-20 7.950.000

38 HYDRAULICS SYSTEMS Engineering Applications 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 02-05 06-09 18-21 7.950.000

39HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING

4 09-12 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 09-12 13-16 04-07 7.950.000

40 MATERIAL ATTITUDE USES AND PROBLEMS 4 23-26 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 23-26 06-09 10-13 7.950.00041 MATERIAL IDENTIFICATION 4 30-02 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 30-02 13-16 17-20 7.950.00042 METALLURGY FOR NON METALLURGIST 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 11-14 7.950.000

43 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 18-21 7.950.000

44OPERATING AND MAINTENANCE OF HEAVY DUTYEQUIPMENTS

4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 10-13 7.950.000

45 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 11-14 7.950.000

46 PRACTICAL WELDING 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 17-20 7.950.00047 PRACTICE CONSIDERATIONS OF ARC WELDING 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 03-06 7.950.00048 ROTOR BALANCING AND SHAFT ALIGNMENT 4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 04-07 7.950.00049 Welding 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 03-06 7.950.00050 Welding Joint Inspection 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 11-14 7.950.00051 Welding Metallurgy 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 18-21 7.950.00052 Welding Oxy Acetylene 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 04-07 7.950.00053 MANAJEMEN BENGKEL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 01-04 05-08 03-06 7.950.00054 THERMAL SPRAY COATING 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.500.00055 MATERIAL HANDLING & PACKAGING 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 08-11 26-29 17-20 7.950.00056 AEROENGINE BEARING INSPECTION 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 29-31 19-21 26-28 6.500.00057 AIR COMPRESSOR 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000

58 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 08-10 05-07 26-28 5.950.000

59 BEARING LUBRICATION TECHNOLOGY 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 03-06 7.950.000

60 Compressor and Prime Mover Operation & Maintenance 3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 31-02 28-30 26-28 6.500.000

61 GAS TURBINE OPERATION & MAINTENANCE 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 17-20 7.950.00062 Machinery Diagnostic 4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 04-07 7.950.00063 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 24-26 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 24-26 26-28 26-28 6.500.00064 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 29-31 05-07 26-28 5.950.00065 Vibration Monitoring & Control System 3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 31-02 14-16 26-28 6.500.000

66MANAJEMEN POST WELD HEAT TREATMENT TEORI,STANDARD PROSEDUR DAN APLIKASI

3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 6.500.000

Page 10: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

67MATERIAL CERTIFICATION REQUIREMENT FOR OIL ANDGAS INDUSTRY

3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 30-01 03-05 08-10 05-07 03-05 6.500.000

68PROTECTIVE COATING TECHNOLOGY FOR CORROSIONCONTROL

3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 6.500.000

69 ROTATING EQUIPMENTS 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 6.500.00070 ANALISIS VIBRASI 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 13-16 03-06 01-04 05-08 03-06 8.500.00071 PIPING SYSTEM 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 27-30 10-13 08-11 12-15 10-13 8.500.000

72MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN

4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 7.950.000

73 PELUMASAN MESIN 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 7.950.00074 PEMBANGKIT UAP (BOILER) 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 7.950.00075 PENGGERAK MULA (PRIME MOVER) 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 7.950.00076 TURBIN GAS 4 15-18 20-23 20-23 17-20 22-25 04-07 17-20 31-03 18-21 15-18 20-23 04-07 7.950.00077 TURBIN UAP 4 23-26 27-02 27-30 24-27 29-01 25-28 24-27 07-10 25-28 23-26 27-30 11-14 7.950.000

78PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING

4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 29-01 19-22 11-14 8.750.000

79 Chiller and Cooling Tower Design and Operation 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 6.500.000

80DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM

5 15-19 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 15-19 12-16 03-07 9.500.000

81 HVAC SYSTEM Operation & Maintenance 4 22-25 12-15 19-22 16-19 07-10 05-08 16-19 13-16 17-20 22-25 19-22 10-13 8.500.000

82PETROLEUM INDUSTRIAL REFRIGERATION OPERATIONAND MAINTENANCE

4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 17-20 8.500.000

83 Practical and Advanced Course on HVAC Systems 4 02-05 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 01-04 06-09 03-06 8.500.000

84CENTRIFUGAL PUMP Selection, Operation, andMaintenance

5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.500.000

85Gas Compressor Operation, Maintenance &Troubleshooting

4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 13-16 17-20 15-18 19-22 17-20 8.500.000

86 Hydraulics Power System 5 22-26 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 22-26 26-30 03-07 9.500.000

87KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN,DAN TROUBLESHOOTING

4 29-01 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 29-01 05-08 10-13 8.500.000

88PUMP AND COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING

5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 01-05 12-16 17-21 9.500.000

89 SISTEM HIDROLIK DAN PNEUMATIK 4 02-05 12-15 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 03-06 8.500.00090 NON DESTRUCTIVE TEST(NDT) 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.00091 ASME PTC 4 – 1 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.950.00092 BASIC GAS ENGINE 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 10-13 7.950.000

93Belt Conveyor Technology, Design Cacilation andTroubleshooting

4 22-25 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 22-25 19-22 17-20 7.950.000

Page 11: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

94BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING

4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 04-07 7.950.000

95COAL FIRED POWER PLANT COMBUSTION OPERATION &MAINTENANCE

4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 01-04 06-09 11-14 7.950.000

96 DIESEL ENGINE OPERATION AND MAINTENANCE 4 09-12 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 09-12 13-16 18-21 7.950.00097 DIESEL GUNSET OPERATION AND MAINTENANCE 4 16-19 20-23 20-23 17-20 22-25 05-08 17-20 07-10 18-21 16-19 20-23 03-06 7.950.000

98GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 10-13 7.950.000

99 OPERATION & MAINTENANCE OF BOILER 4 30-02 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 30-02 05-08 17-20 7.950.000

100OPERATION, MAINTENANCE AND TROUBLESHOOTINGOF GAS TURBINE

4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 04-07 7,950,000

101 Perawatan Belt Conveyor 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000

102STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE

4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 13-16 24-27 15-18 26-29 11-14 7.950.000

103TRANSMISI DAYA MEKANIK (MECHANICAL POWERTRANSMISSION)

4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 31-03 11-14 29-01 13-16 03-06 7.950.000

104 VALVE 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 07-10 18-21 01-04 20-23 10-13 7.950.000

105Turbomachinery Operation, Maintenance andTroubleshooting

4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 09-12 27-30 17-20 7.950.000

106 PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 27-30 03-06 16-19 05-08 04-07 7.950.000

107 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 01-04 26-29 03-06 7.950.000

108 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 08-11 05-08 10-13 7.950.000

109BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING

4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000

110POMPA DAN KOMPRESOR OPERASI, PERAWATAN DANTROUBLESHOOTING

4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 02-05 06-09 18-21 7.950.000

111 Pump Operation, Maintenance & Troubleshooting 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 07-10 18-21 16-19 20-23 10-13 7.950.000

112OPERATION AND MAINTENANCE OF HEAVY DUTYEQUIPMENT

4 15-18 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.950.000

113 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 5,950,000114 BEARING AND OIL LUBRICATION FOR MACHINERY 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000

115BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING

4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 15-18 12-15 10-13 8.500.000

116COMPRESSOR Operation, Maintenance andTroubleshooting

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.750.000

117GAS AND STEAM TURBINE Operation, Maintenance AndTroubleshooting

4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 29-01 26-29 03-06 8.500.000

Page 12: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

118GAS TURBINE PRINCIPLES, INSPECTION, OPERATION,MAINTENANCE AND TROUBLESHOOTING

4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 01-04 05-08 11-14 8.500.000

119HEAT EXCHANGERS Operation, maintenance andtroubleshooting

4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 07-10 11-14 08-11 13-16 18-21 8.500.000

120HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING

4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 16-19 20-23 04-07 8.500.000

121 Lubrication and Bearing Technology 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 28-31 25-28 23-26 27-30 10-13 8.500.000122 LUBRIKASI Prinsip Dasar dan Aplikasi 3 31-02 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 31-02 07-09 26-28 6.500.000

123OIL FILM BEARING (JOURNAL DAN THRUST BEARINGHYDRODYNAMIC BEARINGS)

4 02-05 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 02-05 12-15 17-20 8.500.000

124 PIPELINE Design, Testing, Inspection And Maintenance 4 09-12 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 09-12 19-22 03-06 8.500.000

125Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties

4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 11-14 8.500.000

126PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 22-25 05-08 18-21 8.500.000

127PUMP AND COMPRESSOR OPERATION, MAINTENANCEAND TROUBLESHOOTING

4 29-01 12-15 13-16 10-13 07-10 25-28 10-13 07-10 11-14 29-01 13-16 04-07 8.500.000

128 Refractory and Heat Insulation 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 13-16 18-21 01-04 20-23 10-13 8.500.000

129REFRIGERATION OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 08-11 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000

130 ROTATING EQUIPMENT 4 16-19 06-09 06-09 03-06 29-01 05-08 03-06 31-03 04-07 16-19 06-09 03-06 8.500.000

131STEAM TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING

4 23-26 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 23-26 12-15 11-14 8.500.000

132 ELECTROPLATING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 03-06 9.250.000133 FAILURE ANALYSIS METHODS AND CASES 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 10-13 7.950.000

134PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM(ELECTROPLATING)

4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 17-20 9.250.000

135ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DANPERAWATAN

4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000

136ANALISIS DAN PENGUKURAN GETARAN MEKANIK(ANALYSIS AND MEASURING OF VIBRATION MACHINERY)

4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 10-13 7.950.000

137 BEARING AND OIL LUBRICATION FOR MACHINERY 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 04-07 7.950.000138 COATING SYSTEM AND PROTECTION CORROSION 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.950.000139 CONVEYOR OPERASI DAN PERAWATAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 04-07 7.950.000

140DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OFJIGS AND FIXTURES)

4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 11-14 7.950.000

141 DISAIN ALAT PENEKAN DAN PEMBENTUK 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 17-20 7.950.000

Page 13: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

142 DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 03-06 7.950.000

143 DYNAMIC OF MACHINE TOOLS 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 10-13 7.950.000144 HAND TOOL UTILIZATION 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 11-14 7.950.000145 HEAVY DUTY EQUIPMENT 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 17-20 7.950.000146 HYDRAULIC CONTROL SYSTEM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 03-06 7.950.000

147KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS ANDDYNAMICS OF MACHINERIES)

4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 11-14 7.950.000

148 MACHINERY NOISE AND PROBLEM SOLVING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 7.950.000

149 MANUFACTURING PROCESS TO USE CNC MACHINING 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.950.000

150 MANUFACTURING PROCESSES TO USE CASTING 4 09-12 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 09-12 27-30 11-14 7.950.000

151 MANUFACTURING PROCESSES TO USE METAL FORMING 4 15-18 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 15-18 06-09 17-20 7.950.000

152MEASUREMENT TECHNIQUE FOR MAINTENANCE ANDOPERATION LATHE MACHINE

4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 10-13 7.950.000

153 NON DESTRUCTIVE TEST 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 04-07 7.950.000154 OXY ACETYLENE WELDING 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 03-06 8.500.000

155PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIALSELECTION)

4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 10-13 7.950.000

156 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 18-21 7.950.000

157PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST)

4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000

158PERLAKUAN PANAS LOGAM (HEAT TREATMENT FORMETAL)

4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 03-06 7.950.000

159 PNEUMATIC CONTROL SYSTEM 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 10-13 7.950.000160 PRODUCTION OF HELICAL GEAR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 03-06 7.950.000161 PROSES PEMESINAN (MACHINING) 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 04-07 7.950.000162 PUMP OPERATION AND MAINTENANCE 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 11-14 7.950.000163 SISTEM PEMIPAAN (PIPING) 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 18-21 7.950.000164 TESTING OF MACHINE TOOLS 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 03-06 7.950.000

165Transmisi Daya Mekanik (Mechanical PowerTransmission)

4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 18-21 7.950.000

166TROUBLE SHOOTING, INSPECTION, AND MONITORINGOF MACHINERY

4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 04-07 7.950.000

167 BASIC WELDING 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.950.000168 GAS METAL ARC WELDING (LAS MIGMAG) 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 8.950.000169 GAS TUNGSTEN ARC WELDING (LAS TIG) 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 8.950.000

Page 14: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

170 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 18-21 8.950.000171 OXY ACETYLENE WELDING (LAS ASETILIN) 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 07-10 18-21 01-04 20-23 04-07 8.950.000172 WELDING INSPECTION 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 09-12 27-30 11-14 9.500.000173 WELDING METALLURGY 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 28-31 04-07 16-19 06-09 17-20 8.950.000174 WELDING SAFETY 3 24-26 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 24-26 14-16 26-28 6.950.000175 WELDING TECHNOLOGY 4 30-02 19-22 19-22 16-19 29-01 04-07 16-19 06-09 17-20 30-02 19-22 03-06 8.950.000176 BRAZING 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 02-05 26-29 10-13 8.950.000

177ANALISIS GETARAN DALAM PERAWATAN ROTARYEQUIPMENT

4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000

178 BENGKEL ALAT BERAT 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000179 BOILER WATER TREATMENT 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 10-13 7.950.000180 CENTRIFUGAL COMPRESSOR 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 01-04 05-08 18-21 7.950.000

181CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE

4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 08-11 13-16 04-07 7.950.000

182 CENTRIFUGAL PUMP AND SEAL 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 16-19 20-23 11-14 7.950.000183 CORROSION AND CATHODIC PROTECTION 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 17-20 7.950.000184 HEAVY EQUIPMENT MANAGEMENT 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 10-13 7.950.000

185 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 09-12 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 09-12 19-22 18-21 7.950.000

186 NON DESTRUCTIVE TESTING (NDT) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 15-18 26-29 04-07 7.950.000

187OPERASI DAN PEMELIHARAAN TURBIN GAS DANGENERATOR

4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 22-25 05-08 11-14 7.950.000

188 POMPA OPERASI DAN PERAWATAN 4 29-01 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 29-01 13-16 17-20 7.950.000189 ROTATING EQUIPMENTS 4 16-19 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 16-19 06-09 18-21 7.950.000190 TURBIN & GENERATOR OPERATION 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 02-05 26-29 17-20 7.950.000191 VALVE (CHOKE & CONTROL VALVE) 4 09-12 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 09-12 05-08 03-06 7.950.000192 WELDING INSPECTION 4 15-18 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 15-18 13-16 10-13 7.950.000193 LIQUID PENETRANT TESTING 5 29-02 05-09 05-09 02-06 07-11 04-08 02-06 30-03 03-07 29-02 05-09 17-21 11.500.000194 MAGNETIC PARTICLE TESTING 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 01-05 12-16 03-07 11.500.000

195 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000

196 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.000197 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000

198 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000

199ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSEPEOPLE

3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.500.000

200PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT

3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.950.000

Page 15: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

201PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK

4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000

202 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.000203 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000

204Electric motor Operation, Maintenance &Troubleshooting

4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000

205 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000

206 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 3.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MAINTENANCE1 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 08-10 05-07 17-19 07-09 05-07 6.950.000

2 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 15-16 24-25 15-16 26-27 27-28 3.950.0003 ADVANCED MAINTENANCE MANAGEMENT 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 17-20 7.950.000

4MACHINERY CONDITION MONITORING FOR PREDICTIVEAND PREVENTIVE MAINTENANCE

4 08-11 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 08-11 19-22 18-21 7.950.000

5MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING

4 16-19 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 16-19 26-29 04-07 7.950.000

6MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR

4 29-01 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 29-01 26-29 17-20 7.950.000

7 MAINTENANCE AND SPARE PART MANAGEMENT 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 03-06 7.950.000

8 FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 03-05 07-09 26-28 6.500.000

9 Production Optimization and Minimize Down Time 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 26-28 6.500.00010 RELIABILITY CENTERED MAINTENANCE (RCM) 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 15-17 28-30 26-28 6.500.000

11RELIABILITY CENTERED MAINTENANCE (RCM) IncreasingSafety & Reliability in Gas Pipeline System

3 22-24 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 22-24 07-09 26-28 6.500.000

12 MAINTENANCE MANAGEMENT 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 03-05 19-21 26-28 6.500.00013 SPARE PARTS MAINTENANCE MANAGEMENT 3 10-12 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 10-12 26-28 26-28 6.500.000

14EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION

3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 26-28 5.950.000

15 MAINTENANCE CONTROL AND MONITORING 3 10-12 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 10-12 12-14 26-28 6.500.00016 THE ECONOMICS OF MAINTENANCE MANAGEMENT 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.00017 MAINTENANCE PLANNING AND SCHEDULING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 6.500.00018 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 4 08-11 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000

Page 16: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

19 RELIABILITY CENTERED MAINTENANCE 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 6.500.00020 Integrated Maintenance Management 4 02-05 20-23 20-23 17-20 07-10 04-07 17-20 30-02 18-21 02-05 20-23 18-21 7.950.000

21 Effective and Efficient of Maintenance Management 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 10-12 28-30 26-28 5.950.000

22 Total Productive Maintenance (TPM) 4 22-25 06-09 06-09 03-06 28-31 04-07 03-06 28-31 04-07 22-25 06-09 18-21 7.950.000

23PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVEMAINTENANCE)

4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 31-03 11-14 09-12 13-16 03-06 7.950.000

24TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVEMAINTENANCE UNTUK KENDARAAN)

4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 30-02 05-08 04-07 7.950.000

25 TEKNIK PERAWATAN MEKANIK 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 01-04 12-15 11-14 7.950.00026 MAINTENANCE OF MACHINE TOOLS 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7,950,000

27COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT

4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 15-18 19-22 03-06 7.950.000

28 Maintenance Strategic Planning 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 13-16 04-07 23-26 06-09 04-07 7.950.00029 MAINTENANCE SYSTEM AND DOCUMENTATION 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 28-31 11-14 30-02 13-16 11-14 7.950.00030 MANAGING MAINTENANCE RESOURCES 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 30-02 17-20 02-05 19-22 18-21 7.950.000

31RELIABILITY CENTERED MAINTENANCE & RISK BASEDINSPECTION

5 22-26 19-23 12-16 09-13 21-25 25-29 09-13 27-31 10-14 22-26 12-16 10-14 8.950.000

32 ROOT CAUSE ANALYSIS 4 29-01 12-15 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 17-20 7.950.00033 Spare Part Management 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 01-04 27-30 04-07 7.950.00034 ADVANCED MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 17-20 7.950.00035 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 10-13 7.950.00036 MAINTENANCE MANAGEMENT 4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 16-19 26-29 03-06 7.950.00037 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 23-26 05-08 10-13 7.950.00038 MAINTENANCE SYSTEM AND COST 4 30-02 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 30-02 12-15 18-21 7.950.00039 MODERN MAINTENANCE MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 18-21 7.950.000

40PERENCANAAN DAN PENJADWALAN PERAWATAN(MAINTENANCE PLANNING AND SCHEDULING)

4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.000

41 PREDICTIVE MAINTENANCE 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.00042 RELIABILITY CENTERED MAINTENANCE (RCM) 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 10-13 7.950.00043 TEKNOLOGI PERAWATAN MESIN 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 17-20 7.950.00044 Total Productive Maintenance (TPM) 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 10-13 7.950.00045 PREVENTIVE MAINTENANCE 4 02-05 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 01-04 20-23 03-06 7.950.00046 PREVENTIVE MAINTENANCE GENERATOR 4 08-11 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 08-11 27-30 10-13 7.950.000

47CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.500.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - ELECTRICAL

Page 17: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

1 ADVANCED CONTROL FOUNDATION 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.0002 FLOWMETERING AND CUSTODY TRANSFER 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 08-11 12-15 17-20 7.950.0003 PRACTICAL PROCESS CONTROL 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000

4Implementasi DSP (digital signal processing) DalamSistem Komunikasi

4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13 7.950.000

5INDUSTRIAL ROBOTICS SENSING, PLANNING, ANDCONTROL

4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 08-11 26-29 10-13 7.950.000

6AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATIONAND MAINTENANCE

4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 18-21 7.950.000

7GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING

4 23-26 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 23-26 19-22 03-06 7.950.000

8 PLC ( Tingkat dasar ) 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 18-21 7.950.0009 PLC (TINGKAT MAHIR) 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 04-07 7.950.000

10 POWER FACTOR IMPROVEMENT 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 10-13 7.950.00011 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 18-21 7.950.000

12SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGALISTRIK

4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 10-13 7.950.000

13 SISTEM INSTALASI TENAGA LISTRIK 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 17-20 7.950.00014 TRANFORMER OPERATION & MAINTENANCE 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 04-07 7.950.00015 Uninterupted Power Suply 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 10-13 7.950.000

16PERFORMANCE ANALISYS AND MAINTENANCE OFELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR

4 08-11 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000

17PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR AND ENGINEER

4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 8.500.000

18PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATOR ANDJUNIOR SUPERVISOR

4 22-25 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 22-25 27-30 04-07 8.500.000

19DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES,MAINTENANCE, OPERATION, PROGRAMMING &TROUBLESHOOTING

5 29-02 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 29-02 19-23 03-07 9.500.000

20 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 02-05 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 02-05 27-30 11-14 8.500.000

21 Electrical Control Wiring 4 09-12 06-09 06-09 03-06 22-25 04-07 03-06 31-03 04-07 09-12 06-09 17-20 8.500.00022 PLC COMMUNICATION AND LAN 4 22-25 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 22-25 27-30 03-06 8.500.000

23PLC OPERATION, PROGRAMMING, TROUBLESHOOTINGAND MAINTENANCE

4 30-02 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 30-02 05-08 10-13 8.500.000

24 ACDC ELECTRICAL MOTOR CONTROL 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.000

Page 18: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

25 BASIC ELECTRICAL 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.00026 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 08-11 05-08 03-06 7.950.00027 DISTRIBUTION SYSTEM PROTECTION 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 15-18 12-15 10-13 7.950.00028 Electric Installation In Hazardous Area 4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 07-10 18-21 22-25 20-23 18-21 7.950.00029 ELECTRICAL CALIBRATION 3 31-02 28-02 28-30 25-27 30-01 25-27 25-27 14-16 26-28 31-02 28-30 26-28 5.950.000

30 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 02-05 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 02-05 06-09 04-07 7.950.000

31ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE

5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 08-12 12-16 10-14 8.950.000

32 ELECTRICAL POWER SYSTEM ANALYSIS 4 16-19 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 16-19 19-22 17-20 7.950.000

33ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION

4 23-26 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 23-26 26-29 03-06 7.950.000

34 ELECTRICAL POWER SYSTEM PROTECTION 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 29-01 05-08 10-13 7.950.00035 ELECTRICAL SYSTEM GENERATORSET 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 01-04 12-15 18-21 7.950.00036 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 08-11 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 08-11 20-23 04-07 7.950.00037 GENERATOR EXCITATION SYSTEM 4 15-18 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 15-18 27-30 11-14 7.950.00038 GROUNDING SYSTEM AND LIGHTNING PROTECTION 4 22-25 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 22-25 06-09 17-20 7.950.000

39High Voltage Electrical Equipmment Operation,Maintenance and Repair

5 29-02 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 29-02 12-16 03-07 8.950.000

40INSTRUMENTATION ELECTRIC Operation andMaintenance

4 02-05 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 02-05 19-22 10-13 7.950.000

41 LV AND MV GENERATOR 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 09-12 26-29 18-21 7.950.00042 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 16-19 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 16-19 05-08 03-06 7.950.000

43 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 23-26 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 23-26 12-15 11-14 7.950.000

44 POWER ELECTRICAL INSTALLATION SYSTEM 4 29-01 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 29-01 20-23 17-20 7.950.00045 POWER ELECTRONICS 4 02-05 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 01-04 27-30 04-07 7.950.00046 POWER PROTECTION RELAY SYSTEM 4 08-11 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 08-11 06-09 10-13 7.950.00047 POWER TRANSFORMER 4 15-18 12-15 13-16 10-13 15-18 26-29 10-13 31-03 11-14 15-18 13-16 18-21 7.950.00048 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 22-25 20-23 19-22 16-19 22-25 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000

49 Soft Starter (Operation, Protection and Maintanance) 3 31-02 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 31-02 26-28 26-28 5.950.000

50TRANSMISSION AND DISTRIBUTION OPERATION ANDMAINTENANCE

4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 27-30 03-06 02-05 05-08 11-14 7.950.000

51Uninterruptible Power Suply Operation andMaintenance

4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 30-02 10-13 09-12 12-15 17-20 7.950.000

52 VARIABLE FREQUENCY DRIVES 4 16-19 19-22 20-23 17-20 14-17 04-07 17-20 07-10 18-21 16-19 20-23 04-07 7.950.00053 VARIABLE SPEED DRIVES 4 23-26 27-02 27-30 24-27 21-24 25-28 24-27 13-16 25-28 23-26 27-30 10-13 7.950.00054 POWER DISTRIBUTION TRANSFORMER 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 28-31 04-07 29-01 06-09 18-21 7.950.000

Page 19: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

55 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 31-03 11-14 01-04 13-16 03-06 7.950.000

56 TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN 3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000

57 ELECTRONIC SWITCHBOARD RESCUE 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 5.950.00058 GARDU INDUK 3 22-24 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 22-24 05-07 26-28 5.950.00059 Electrical Panel Design 3 31-02 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 31-02 12-14 26-28 5.950.00060 Electrical Safety For Electrical Technician 4 02-05 19-22 20-23 17-20 15-18 04-07 17-20 07-10 18-21 02-05 20-23 11-14 7.950.00061 Motor Rewinding 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 14-16 26-28 10-12 28-30 26-28 6.500.000

62Perhitungan Perkiraan Biaya Proyek Mekanikal ElektrikalUntuk Bangunan Gedung

2 18-19 08-09 08-09 05-06 02-03 07-08 05-06 20-21 06-07 18-19 08-09 26-27 3.950.000

63Power Transformer (Operation, Testing, Asessment AndMaintenance)

4 23-26 12-15 13-16 10-13 22-25 26-29 10-13 28-31 11-14 23-26 13-16 17-20 7.950.000

64 ELECTRICAL SAFETY FOR POWER LINE 3 29-31 21-23 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 26-28 5.950.000

65TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGIPADA BANGUNAN GEDUNG

4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 23-26 26-29 17-20 7.950.000

66 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 01-03 05-07 03-05 6.750.000

67Pemrograman Mikrokontroler AVR denganCodeVisionAVR

3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 08-10 12-14 10-12 6.750.000

68 Pemrograman Mikrokontroler untuk Robotika 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 6.750.000

69ADVANCE COURSE ON LIGHTNING PROTECTION ANDGROUNDING SYSTEM

5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 30-03 24-28 15-19 26-30 03-07 9.500.000

70Lightning Protection and Grounding System for Oil & GasRefinery and Petrochemical Installation

3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 26-28 6.950.000

71LIGHTNING PROTECTION AND GROUNDING SYSTEM FORPOWER PLANT, TRANSMISSION, DISTRIBUTION ANDLARGE INDUSTRY

3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 13-15 10-12 29-31 12-14 10-12 6.950.000

72 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 8.500.000

73 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 8.500.000

74PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES,OPERATION AND PROGRAMMING

4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 8.500.000

75SCADA (SUPERVISORY CONTROL AND DATAACQUISITION) PRINCIPLES, HARDWARE SYSTEM,OPERATION & PROGRAMMING

4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 8.500.000

76 NUMERICAL CONTROL AND ROBOTIC 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.00077 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 18-21 7.950.000

78Electric motor Operation, Maintenance &Troubleshooting

4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000

Page 20: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

79 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000

80 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.00081 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000

82 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - IT1 AUTOCAD COSTUMIZATION 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 11-14 7.950.000

2 INFORMATION TECHNOLOGY & TELECOMUNICATION 4 22-25 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 22-25 27-30 17-20 7.950.000

3 Holistic Information Security 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.0004 Information Security System 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 01-03 12-14 10-12 5.950.0005 OPTIMALISASI CYBER PUBLIC RELATION 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.0006 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 27-29 24-26 15-17 26-28 26-28 5.950.0007 TEKNIK DESAIN GRAFIS PADA WEB 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 5.950.0008 TEKNIK DESAIN WEB 3 31-02 13-15 14-16 11-13 30-01 25-27 11-13 08-10 12-14 31-02 14-16 12-14 5.950.0009 ADVANCE MICROSOFT EXCEL 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 22-24 19-21 26-28 5.950.000

10 ADVANCE MICROSOFT POWERPOINT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 14-16 26-28 08-10 28-30 26-28 5.950.00011 ADVANCE MICROSOFT WORD 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 29-31 05-07 15-17 07-09 05-07 5.950.000

12MICROSOFT EXCEL VISUAL BASIC For Application (VBA-MACRO)

3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 01-03 12-14 24-26 14-16 12-14 5.950.000

13BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITHAUTOCAD)

5 15-19 05-09 05-09 02-06 14-18 04-08 02-06 30-03 03-07 15-19 05-09 03-07 8.950.000

14BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITHAUTOCAD)

2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000

15 BASIC TELECOMMUNICATION PABX 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.00016 BASIC VSAT SYSTEM 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 5.950.00017 FIBER OPTIC SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 6.500.000

18 Fraud Management in telecommunication business 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 08-10 28-30 26-28 5.950.000

19 INTERNETWORKING DENGAN TCP IP 3 17-19 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 17-19 07-09 26-28 5.950.00020 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 08-10 12-14 24-26 14-16 10-12 5.950.000

21NETWORK MANAGEMENT AND OPERATIONS SUPPORTSYSTEM

3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 14-16 19-21 31-02 21-23 17-19 5.950.000

22 POWER LINE CARRIER 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 5.950.00023 Teknologi dan Bisnis di WiMAX dan Sub WiMAX 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.000

Page 21: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

24 MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI 4 15-18 12-15 12-15 09-12 15-18 26-29 09-12 06-09 10-13 15-18 12-15 11-14 8.500.000

25 MIKROTIK FUNDAMENTAL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 29-31 26-28 29-31 28-30 26-28 5.950.00026 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 6.500.000

27INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY(I T I L) VERSION 3.1

4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 30-02 25-28 15-18 27-30 04-07 7.950.000

28 MASTERING MICROSOFT EXCEL 2007 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 20-21 24-25 11-12 26-27 26-27 3.950.000

29CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICALAUTOCAD OR CATIA)

4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 11-14 7.950.000

30 Teknologi CAD CAM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 11-14 7.950.00031 PENGEMBANGAN SITUS WEB 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 5.950.000

32COLLABORATION MS Office AND EFFECTIVEPRESENTATION

3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 5.950.000

33PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT)

2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000

34 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 5.950.00035 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MINING1 BATUBARA 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 6.500.0002 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 08-11 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 08-11 12-15 10-13 7.950.0003 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 15-18 19-22 17-20 7.950.000

4 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

5 PEMINDAHAN TANAH MEKANIS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 5.950.0006 VENTILASI TAMBANG 3 03-05 12-14 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 6.500.000

7EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN

3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 13-15 19-21 10-12 21-23 19-21 5.950.000

8 PERENCANAAN TAMBANG TERBUKA 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.0009 PEMBORAN EKSPLORASI BATUBARA 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MIGAS1 GAS PROCESSING AND EQUIPMENT 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.500.000

2BASIC OF SURFACE OPERATION AND MAINTENANCE FOROIL AND GAS INDUSTRIES

4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 10-13 7.950.000

Page 22: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

3PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL

4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 03-06 7.950.000

4 Oil and Gas Measurements 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.0005 GAS DEHYDRATION AND GLYCOL REGENERATION 4 30-02 12-15 13-16 10-13 08-11 25-28 10-13 07-10 11-14 30-02 13-16 18-21 8.750.000

6GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS

4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 13-16 18-21 02-05 20-23 03-06 8.750.000

7GAS HANDLING, CONDITIONING, AND PROCESSINGFACILITIES

4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 03-06 7.950.000

8 OIL AND GAS HANDLING FACILITIES 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 28-31 11-14 16-19 13-16 18-21 7.950.000

9OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION

4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 31-03 18-21 23-26 20-23 03-06 7.950.000

10 Drilling operations for operator in oil and gas industries 4 29-01 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 29-01 05-08 10-13 8.500.000

11NATURAL GAS PROCESSING - FRACTINATION ANDREFREGERATION

4 08-11 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 08-11 19-22 03-06 8.500.000

12PETROLEUM ENGINEERING FOR NON PETROLEUMEMPLOYEE

4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 30-02 24-27 15-18 26-29 11-14 8.500.000

13PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FORPETROLEUM PRODUCTION SYSTEM

4 30-02 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 30-02 13-16 04-07 8.500.000

14 PRODUCTION LOGGING 4 02-05 20-23 20-23 17-20 22-25 05-08 17-20 28-31 18-21 02-05 20-23 10-13 8.500.000

15SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL &GAS INDUSTRY

3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 10-12 28-30 26-28 6.500.000

16 WATER FLOODING 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 17-20 8.500.00017 WP&B, AFE and POD 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 23-26 12-15 03-06 8.500.00018 ARTIFICIAL LIFT 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 29-01 19-22 11-14 8.500.000

19OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING

4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 01-04 26-29 18-21 8.500.000

20 Advanced Oil and Gas Production System 3 29-31 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 29-31 26-28 26-28 7.950.000

21BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &ENVIRONMENTAL CONSIDERATION

3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 7.950.000

22 Basic Petroleum Engineering 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 08-10 12-14 26-28 7.950.000

23 Basic Reservoir Engineering for Non Petroleum Engineer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 7.950.000

24ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCE ANDTROUBLESHOOTING

3 31-02 07-09 07-09 04-06 28-30 04-06 04-06 08-10 05-07 31-02 07-09 03-05 7.950.000

25 FORMATION DAMAGE AND WELL STIMULATION 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 03-05 14-16 10-12 7.950.000

26NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS

3 10-12 21-23 21-23 18-20 07-09 06-08 18-20 29-31 19-21 10-12 21-23 19-21 7.950.000

Page 23: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

27 Oil & Gas Production System 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 30-01 24-26 17-19 26-28 26-28 7.950.00028 OIL & GAS MEASUREMENT AND CALCULATION 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 06-08 03-05 24-26 05-07 05-07 7.950.00029 OIL AND GAS HANDLING FACILITIES 3 29-31 12-14 12-14 09-11 30-01 27-29 09-11 13-15 10-12 29-31 12-14 12-14 7.950.000

30OIL AND GAS WELLS STIMULATION BY ACIDIZING ANDHYDRAULIC FRACTURING

3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 01-03 19-21 17-19 7.950.000

31Oil Field, and 100 Methods to Maintain and IncreaseProduction

3 08-10 28-02 28-30 25-27 09-11 25-27 25-27 01-03 26-28 08-10 28-30 26-28 7.950.000

32PETROLEUM ENGINEERING FOR NON PETROLEUMENGINEERS

3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 08-10 05-07 15-17 07-09 03-05 7.950.000

33PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS

3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 14-16 12-14 22-24 14-16 10-12 7.950.000

34PRODUCTION OPERATION MANAGEMENT FORMANAGERS

3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 29-31 19-21 31-02 21-23 19-21 7.950.000

35Pump Selection, Design and Operation for Oil and GasSurface Production Facilities

3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 7.950.000

36SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING

3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 10-12 05-07 05-07 7.950.000

37 Surface Production Operation and Equipments 3 17-19 12-14 12-14 09-11 16-18 27-29 09-11 13-15 10-12 17-19 12-14 12-14 7.950.00038 WELL COMPLETION AND WORK OVER 3 24-26 19-21 19-21 16-18 23-25 06-08 16-18 27-29 17-19 24-26 19-21 17-19 7.950.00039 BLOWOUT PREVENTION AND WELL CONTROL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 01-03 26-28 29-31 28-30 26-28 7.950.00040 ARUS MINYAK KORPORATE 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 01-03 07-09 03-05 7.950.000

41MODERN HYDROCARBON WELL PRODUCTION LOGGINGDATA ANALYSIS AND INTERPRETATION

3 08-10 13-15 14-16 11-13 09-11 27-29 11-13 14-16 12-14 08-10 14-16 10-12 7.950.000

42OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT

4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 8.750.000

43 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.950.000

44PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN (Petroleum Economics)

4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 8.500.000

45 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000

46PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT

3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.950.000

47PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK

4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000

48 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.00049 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.00050 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 5.950.000

Page 24: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

HSE1 MANAJEMEN LINGKUNGAN 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 17-20 7.950.0002 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 15-19 26-30 03-07 8.950.000

3AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE

4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 22-25 05-08 10-13 7.950.000

4 APPLIED ERGONOMICS AT WORKPLACE 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 17-20 7.950.0005 AUTHORISED GAS TESTING 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 03-06 8.500.0006 BASIC SAFETY ORIENTATION FOR CONTRACTORS 5 08-12 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 08-12 26-30 10-14 9.250.0007 CANTEEN HYGIENE 2 15-16 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 15-16 08-09 26-27 3.950.000

8 CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) 4 23-26 12-15 13-16 10-13 22-25 25-28 10-13 13-16 11-14 23-26 13-16 18-21 7.950.000

9 ELECTRICAL SAFETY 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 01-03 19-21 31-02 21-23 26-28 6.500.00010 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 08-10 24-26 03-05 26-28 26-28 5.950.00011 HEALTH IMPACT ASSESSMENT (HIA) 4 08-11 05-08 05-08 02-05 08-11 04-07 02-05 13-16 03-06 08-11 05-08 04-07 7.950.000

12INCIDENT INVESTIGATION, PREVENTION AND PROACTIVEIMPROVEMENT

3 17-19 12-14 12-14 09-11 14-16 25-27 09-11 27-29 10-12 17-19 12-14 10-12 6.500.000

13 JOB SAFETY ANALYSIS (JSA) 2 22-23 19-20 19-20 16-17 21-22 07-08 16-17 20-21 17-18 22-23 19-20 17-18 3.950.00014 K3 RUMAH SAKIT 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 20-21 27-28 29-30 29-30 26-27 3.950.00015 LOCKOUT TAGOUT (LOTO) 2 04-05 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 01-02 08-09 03-04 3.950.00016 MANAGING SAFE WORK 4 09-12 12-15 13-16 10-13 07-10 25-28 10-13 30-02 11-14 09-12 13-16 11-14 7.950.00017 MATERIAL SAFETY DATA SHEETS (MSDS) 2 15-16 21-22 21-22 18-19 17-18 06-07 18-19 20-21 19-20 15-16 21-22 19-20 3.950.00018 MODERN SAFETY MANAGEMENT (MSM) 4 23-26 26-01 26-29 23-26 22-25 26-29 23-26 06-09 24-27 23-26 26-29 04-07 7.950.00019 OHSAS 180012007 AUDITOR 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 27-31 03-07 29-02 05-09 10-14 9.250.00020 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 03-04 12-13 27-28 3.950.000

21PANITIA PEMBINA KESELAMATAN DAN KESEHATANKERJA (P2K3)

4 08-11 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000

22PENERAPAN PENGENDALIAN BISING TERPADU DITEMPAT KERJA

3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 17-19 28-30 26-28 6.500.000

23 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 08-10 03-05 22-24 05-07 03-05 5.950.000

24PERLINDUNGAN LINGKUNGAN DAN PENGELOLAANLIMBAH B3

4 29-01 12-15 13-16 10-13 28-31 25-28 10-13 13-16 11-14 29-01 13-16 10-13 7.950.000

25 PERMIT TO WORK (PTW) 2 04-05 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 04-05 19-20 17-18 3.950.00026 Process Hazard Analysis (PHA) 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 10-12 26-28 26-28 5.950.00027 Process Hazard Analysis (PHA) for Facilitator 4 15-18 06-09 06-09 03-06 15-18 05-08 03-06 30-02 04-07 15-18 06-09 04-07 7.950.00028 Process Safety Management 3 24-26 12-14 12-14 09-11 23-25 25-27 09-11 06-08 10-12 24-26 12-14 12-14 5.950.00029 PROJECT HSE MANAGEMENT 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 13-15 19-21 31-02 21-23 19-21 6.500.000

30RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENTBASED ON ISO 31000

2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000

Page 25: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

31 SAFETY AUDITS AND SITE INSPECTION 3 08-10 05-07 05-07 02-04 09-11 06-08 02-04 29-31 03-05 08-10 05-07 03-05 5.950.00032 SAFETY OFFICER DEVELOPMENT PROGRAM 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 10-14 9.250.00033 SAFETY TRAINING FOR THE LABORATORY 3 22-24 13-15 19-21 16-18 21-23 04-06 16-18 08-10 17-19 22-24 19-21 17-19 6.500.00034 SELF CONTAINED BREATHING APPARATUS(SCBA) 1 29-29 26-26 26-26 23-23 28-28 25-25 23-23 20-20 24-24 29-29 26-26 28-28 2.950.00035 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 08-12 05-09 05-09 02-06 07-11 04-08 02-06 27-31 03-07 01-05 05-09 03-07 9.250.00036 WORKING AT HEIGHT 2 15-16 19-20 22-23 19-20 14-15 04-05 19-20 20-21 20-21 15-16 22-23 20-21 3.950.00037 PENERAPAN HACCP 4 23-26 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 23-26 27-30 03-06 7.950.000

38IDENTIFIKASI BAHAYA, PENILAIAN, PENGENDALIANRESIKO (HIRAC) DAN ANALISA BAHAYA DI PEKERJAAN(JSA)

5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 10-14 9.500.000

39 Pengelolaan K3 di Pergudangan 4 16-19 26-01 26-29 23-26 15-18 26-29 23-26 27-30 24-27 16-19 26-29 04-07 8.500.00040 Supervisor SMK3 Kontraktor 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 26-28 5.950.00041 PENERAPAN BEHAVIOR BASED SAFETY 3 02-04 19-21 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 19-21 6.500.00042 PENGELOLAAN B3 DAN LIMBAH B3 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 03-06 8.500.00043 FIRE ALARMS & PROTECTION 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 18-21 7.950.00044 HAZARDOUS MATERIAL HANDLING 4 30-02 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 30-02 26-29 11-14 7.950.00045 INDUSTRIAL POLLUTION CONTROL 4 15-18 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 15-18 20-23 10-13 7.950.00046 JOB SAFETY ANALYSIS TRAINING 4 29-01 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000

47LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADAINDUSTRI KIMIA

4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 11-14 7.950.000

48 Water Treatment 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 17-20 7.950.000

49AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE

4 22-25 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 22-25 19-22 10-13 7.950.000

50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 17-20 7.950.00051 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 10-13 7.950.00052 BEHAVIOR BASED SAFETY (BBS) 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 6.500.00053 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 03-06 8.500.00054 HAZARDOUS MATERIALS SAFE HANDLING 4 22-25 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 22-25 12-15 10-13 8.500.000

55HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS INLOGISTICS ACTIVITIES

4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000

56 Hot Works 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 01-03 28-30 26-28 6.500.00057 HSE MANAGEMENT SYSTEM 4 09-12 06-09 06-09 03-06 08-11 04-07 03-06 31-03 04-07 09-12 06-09 04-07 8.500.00058 HSE WORK PRACTICES AT CONFINED SPACE 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 08-10 12-14 17-19 14-16 12-14 6.500.000

59JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATANPEKERJAAN

3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 13-15 19-21 24-26 21-23 19-21 6.500.000

60 MANAGING CONTRACTOR SAFETY 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 6.500.000

61 MODERN SAFETY AND LOSS CONTROL MANAGEMENT 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 30-02 03-06 02-05 05-08 03-06 8.500.000

Page 26: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

62OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT(HSE) AUDITING

5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.250.000

63Occupational Health, Safety and Environment (HSE) onPaper and Pulp Industry

4 15-18 12-15 19-22 16-19 21-24 05-08 16-19 13-16 17-20 15-18 19-22 17-20 8.500.000

64ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTSIN ONSHORE DRILLING OPERATIONS

4 22-25 27-02 27-30 24-27 28-31 25-28 24-27 28-31 25-28 22-25 27-30 04-07 8.500.000

65ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTSIN ONSHORE DRILLING OPERATIONS FOR MANAGERSAND SUPERINTENDENTS

3 29-31 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 29-31 07-09 26-28 6.500.000

66PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN(FIRE PREVENTION & PROTECTION)

3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 6.500.000

67 PRODUCTION SAFETY SYSTEM 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 08-12 19-23 17-21 8.500.00068 PROFESSIONAL ACCIDENT INCIDENT INVESTIGATION 3 17-19 26-28 26-28 23-25 14-16 25-27 23-25 13-15 24-26 17-19 26-28 26-28 6.500.000

69SAFETY MANAGEMENT FOR SUPERVISORS ANDMANAGERS

4 23-26 05-08 05-08 02-05 22-25 04-07 02-05 30-02 03-06 23-26 05-08 03-06 8.500.000

70 TRANSPORTATION SAFETY MANAGEMENT SYSTEM 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 30-02 13-16 11-14 8.500.00071 WAREHOUSE SAFETY MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 02-05 19-22 17-20 8.500.00072 HIRADC 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 27-29 26-28 08-10 28-30 26-28 6.500.00073 PROCESS SAFETY MANAGEMENT 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 04-07 8.500.00074 Chemical Hazard Safety in Mining and Workplace 4 08-11 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 08-11 19-22 17-20 8.750.00075 HAZARDOUS MATERIAL HANDLING 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 7.950.00076 HAZID (HAZARD IDENTIFICATON) 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 29-01 19-22 17-20 7.950.00077 HAZOPS(HAZARD AND OPERABILITY STUDIES) 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 04-07 7.950.00078 WASTE WATER TREATMENT & MANAGEMENT 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 22-25 26-29 18-21 7.950.00079 Water Treating and Chemicals 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 29-01 06-09 03-06 7.950.00080 PENGENDALIAN PENCEMARAN AIR 3 08-10 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 08-10 21-23 26-28 6.500.00081 PENGENDALIAN PENCEMARAN UDARA 3 17-19 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 17-19 28-30 26-28 6.500.00082 DUKUNGAN TEKNOLOGI BARU DAN MODERN 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 01-04 19-22 10-13 7.950.000

83 ISU PEMENUHAN KUALITAS DAN KEAMANAN PANGAN 4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 08-11 26-29 17-20 7.950.000

84 PEMENUHAN PERSYARATAN PERIZINAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 15-18 05-08 03-06 7.950.00085 POTENSI DAN PERKEMBANGAN INDUSTRI PANGAN 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 22-25 12-15 11-14 7.950.00086 HSE MANAGEMENT SYSTEM INTERNAL AUDITOR 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 01-04 12-15 17-20 8.500.00087 PRODUCTION SYSTEM SAFETY 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 10-13 7.950.00088 FIT FOR DUTY 2 22-23 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 22-23 19-20 26-27 3.950.00089 SURVEILANS KESEHATAN PEKERJA 2 29-30 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 29-30 26-27 27-28 3.950.00090 APLIKASI PROGRAM PERLINDUNGAN PERNAFASAN 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 01-02 05-06 26-27 4.500.00091 FOOD HYGIENE SANITATION AND MONITORING 2 08-09 12-13 12-13 09-10 03-04 27-28 09-10 20-21 10-11 08-09 12-13 27-28 4.500.00092 HEARING CONSERVATION PROGRAM 2 15-16 21-22 21-22 18-19 02-03 07-08 18-19 20-21 19-20 15-16 21-22 26-27 4.500.000

Page 27: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

93 MENGELOLA KESEHATAN DI TEMPAT KERJA 2 24-25 28-01 28-29 25-26 03-04 28-29 25-26 20-21 26-27 24-25 28-29 27-28 4.500.00094 Higiene Sanitasi Makanan Berbasis HACCP 2 31-01 07-08 07-08 04-05 02-03 04-05 04-05 20-21 05-06 31-01 07-08 26-27 4.500.000

95CATERING SERVICE, HYGIENE & SANITATION (INCLUDINGPERSONAL HYGIENE)

3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 6.500.000

96Penerapan Hazard Analysis Critical Control Point(HACCP) pada Pengelolaan Makanan

3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 26-28 5.950.000

97 BEHAVIOR BASED SAFETY 2 15-16 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.00098 CSMS AWARENESS 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.500.00099 HSE LEADERSHIP 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 03-04 4.500.000

100 INCIDENT INVESTIGATION 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 01-03 12-14 10-12 6.500.000

101AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOREXECUTIVES

3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6.500.000

102 EMERGENCY PREPAREDNESS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 6.500.000

103ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS)

3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 08-10 05-07 26-28 6.500.000

104 ENVIRONMENTAL MONITORING KEY TO POLUTION FREE 3 15-17 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 15-17 12-14 26-28 6.500.000

105 HSE AUDIT TECHNIQUES 3 22-24 21-23 21-23 18-20 02-04 04-06 18-20 14-16 19-21 22-24 21-23 26-28 6.500.000

106OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTALIN THE OIL & GAS INDUSTRY

3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 31-02 28-30 26-28 6.500.000

107WASTE HANDLING & TREATMENT IN THE OIL & GASINDUSTRIES

3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 03-05 07-09 26-28 6.500.000

108 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 08-10 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 08-10 12-14 26-28 6.950.000

109 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

110 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.950.000111 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.950.000

112CATERING & ACCOMMODATION MANAGEMENT(INCLUDING TABLE MANNER)

4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.950.000

113 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 3.950.000114 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 5.950.000115 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 8.750.000116 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000

117OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT

4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 8.750.000

118 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN

Page 28: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

1 ACCOUNT RECEIVABLE MANAGEMENT 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.0002 Accounting Information Systems 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.0003 Asset Management 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000

4BALANCED SCORECARD (BSC) CONCEPT ANDIMPLEMENTATION

2 15-16 05-06 05-06 02-03 14-15 07-08 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000

5 BASIC ACCOUNTING 3 22-24 13-15 14-16 11-13 21-23 25-27 11-13 27-29 12-14 22-24 14-16 12-14 5.950.0006 BASIC AUDIT FINANCE 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 30-01 19-21 31-02 21-23 19-21 5.950.000

7 BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 08-10 26-28 03-05 28-30 26-28 5.950.000

8 BUDGET PLANNING, CONTROLLING & ANALYSING 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 14-16 05-07 10-12 07-09 05-07 5.950.0009 BUDGETING AND PROJECT COST CONTROL 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 29-31 10-12 17-19 12-14 10-12 5.950.000

10 BUDGETING AND REPORTING 3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 01-03 17-19 24-26 19-21 17-19 5.950.00011 CASH MANAGEMENT 2 29-30 26-27 26-27 23-24 28-29 28-29 23-24 20-21 24-25 29-30 26-27 26-27 3.950.00012 CUSTOMER RELATION MANAGEMENT(CRM) 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 13-15 19-21 15-17 21-23 19-21 5.950.00013 Export import 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000

14 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000

15 FINANCE FOR NON FINANCE MANAGER 3 24-26 07-09 07-09 04-06 23-25 06-08 04-06 29-31 05-07 24-26 07-09 05-07 5.950.00016 Financial Planning and Budgeting for Banking 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 01-03 12-14 31-02 14-16 12-14 5.950.000

17 Holistic CSR and Sustainable Community Development 2 02-03 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 04-05 22-23 20-21 3.950.000

18 HR Based On Competency for Recruitment 2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00019 INTERMEDIATE ACCOUNTING 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00020 Key Account Management 2 29-30 19-20 19-20 16-17 28-29 07-08 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000

21LAPORAN KEUANGAN PEMAHAMAN DANPENGGUNAANNYA

3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 30-01 26-28 01-03 28-30 26-28 5.950.000

22 Managing Training Function 3 10-12 07-09 07-09 04-06 09-11 04-06 04-06 08-10 05-07 10-12 07-09 05-07 5.950.00023 OUTSOURCING MANAGEMENT 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.00024 PETTY CASH MANAGEMENT & ADMINISTRATION 2 25-26 21-22 21-22 18-19 24-25 07-08 18-19 20-21 19-20 25-26 21-22 19-20 3.950.00025 PROBLEM SOLVING AND DECISION MAKING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 31-03 03-06 02-05 05-08 03-06 7.950.000

26PROFIT PLANNING COST - VOLUME - PROFITRELATIONSHIP ANALYSIS

3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000

27 Project Cost Estimation & Cost Control 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000

28 Standard Operational Procedure, Accounting & Finance 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 27-29 26-28 22-24 28-30 26-28 5.950.000

29 Total Quality Management 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000

30 TRAINING EVALUATION AND MEASUREMENT METHOD 2 18-19 26-27 26-27 23-24 17-18 25-26 23-24 15-16 24-25 18-19 26-27 26-27 3.950.000

31 TRAINING NEED ANALYSIS 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.000

Page 29: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

32Training untuk pegawai persiapan masa pensiun(training pra-purnabakti)

5 29-02 19-23 12-16 09-13 28-01 25-29 09-13 27-31 10-14 29-02 12-16 10-14 8.950.000

33 ACCOUNT PAYABLE MANAGEMENT 2 04-05 12-13 22-23 19-20 03-04 06-07 19-20 01-02 20-21 03-04 22-23 20-21 3.950.00034 COST ACCOUNTING 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5.950.00035 FIXED ASSET 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 13-15 05-07 15-17 07-09 05-07 5.950.00036 ANALISIS KEEKONOMISAN PROYEK 3 22-24 13-15 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00037 SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 17-19 5.950.00038 COST VOLUME PROFIT ANALYSIS 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 08-10 24-26 03-05 26-28 26-28 5.950.000

39INTERNATIONAL FINANCIAL REPORTING STANDARD(IFRS)

2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 20-21 03-04 11-12 05-06 03-04 4.500.000

40 TREASURY AND CASH FLOW MANAGEMENT 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 15-16 13-14 18-19 15-16 13-14 4.500.00041 Strategi Menangani Proyek Bermasalah 3 24-26 21-23 21-23 18-20 23-25 04-06 18-20 29-31 19-21 24-26 21-23 19-21 5.950.00042 ADVANCE SECURITY MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 01-04 26-29 03-06 7.950.00043 ANALISIS BEBAN KERJA 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 20-21 17-18 29-30 19-20 17-18 3.950.00044 ANALITYCAL HIERARCHY PROCESS 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000

45IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAIALAT UKUR PERFORMANSI KARYAWAN

3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 5.950.000

46 KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING) 2 22-23 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 22-23 21-22 19-20 3.950.000

47 LIFE CYCLE COSTING (WHOLE LIFE COSTING) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 20-21 26-27 31-01 28-29 27-28 3.950.00048 MANAJEMEN KOMPENSASI BERBASIS KINERJA 2 04-05 07-08 07-08 04-05 03-04 04-05 04-05 30-31 05-06 03-04 07-08 05-06 3.950.00049 MANAJEMEN LOGISTIK 3 10-12 13-15 14-16 11-13 09-11 27-29 11-13 06-08 12-14 10-12 14-16 12-14 5.950.00050 MANAJEMEN PENGEMBANGAN PRODUK 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 13-15 19-21 17-19 21-23 19-21 5.950.00051 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 2 24-25 01-02 29-30 26-27 23-24 25-26 26-27 20-21 27-28 24-25 29-30 26-27 3.950.00052 MANAJEMEN PROYEK 3 31-02 07-09 07-09 04-06 30-01 04-06 04-06 29-31 05-07 31-02 07-09 05-07 5.950.00053 OPERATION MANAGEMENT 2 02-03 12-13 12-13 09-10 02-03 27-28 09-10 01-02 10-11 04-05 12-13 10-11 3.950.00054 PEMILIHAN PEMASOK (VENDOR) 2 08-09 19-20 19-20 16-17 07-08 07-08 16-17 09-10 17-18 08-09 19-20 17-18 3.950.00055 STANDARD OPERATING PROCEDURE 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.00056 STUDI KELAYAKAN PROYEK 2 29-30 14-15 14-15 11-12 28-29 25-26 11-12 27-28 12-13 29-30 14-15 12-13 3.950.000

57TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATESOCIAL RESPONSIBILITY)

2 04-05 21-22 21-22 18-19 03-04 06-07 18-19 02-03 19-20 01-02 21-22 19-20 3.950.000

58 VALUE ENGINEERING (REKAYASA NILAI) 2 10-11 28-01 28-29 25-26 09-10 27-28 25-26 06-07 26-27 10-11 28-29 26-27 3.950.00059 Sistem Informasi manajemen Pergudangan 2 17-18 07-08 07-08 04-05 16-17 07-08 04-05 13-14 05-06 17-18 07-08 05-06 3,950,00060 Sistem Life Cycle Costing 2 22-23 12-13 15-16 12-13 21-22 28-29 12-13 20-21 13-14 22-23 15-16 13-14 3,950,00061 ANALISIS KEPUTUSAN 2 31-01 22-23 22-23 19-20 30-31 04-05 19-20 29-30 20-21 31-01 22-23 20-21 3.950.00062 MANAJEMEN PRODUKSI 2 02-03 01-02 29-30 26-27 02-03 25-26 26-27 30-31 27-28 03-04 29-30 27-28 3.950.00063 METODE PENGAMBILAN KEPUTUSAN 2 11-12 08-09 08-09 05-06 10-11 06-07 05-06 08-09 06-07 11-12 08-09 06-07 3.950.00064 BUSINESS PROCESS REENGINEERING 2 02-03 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 01-02 26-27 27-28 3.950.000

Page 30: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

65LOGISTICS AND SUPPLY CHAIN MANAGEMENT CONCEPT,STRATEGY AND IMPLEMENTATION

4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 15-18 12-15 17-20 7.950.000

66 MANAJEMEN STRATEGI 3 22-24 21-23 21-23 18-20 21-23 06-08 18-20 30-01 19-21 22-24 21-23 26-28 5.950.00067 PRACTICAL PROJECT EVALUATION AND FINANCING 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 3.950.000

68PROJECT MANAGEMENT WITH MICROSOFT PROJECTAPPLICATION,Win QSB & MONTE CARLO SIMULATION

3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 03-05 5.950.000

69 RISK-BASED MANAGEMENT 3 10-12 12-14 14-16 11-13 07-09 27-29 11-13 13-15 12-14 10-12 14-16 10-12 5.950.00070 STRATEGI PENGEMBANGAN BISNIS 3 17-19 19-21 19-21 16-18 16-18 06-08 16-18 29-31 17-19 17-19 19-21 19-21 5.950.00071 SUPPLY CHAIN MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 01-03 26-28 24-26 28-30 26-28 5.950.00072 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 7.950.00073 PROJECT MANAGEMENT 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.950.00074 ACCOUNT OfficeR 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00075 AUDITING SDM 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.00076 BUSINESS STRATEGY FOR MANAGERS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 03-05 5.950.00077 COSTUMER SERVICE(CS) 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 5.950.000

78 KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER) 5 15-19 19-23 19-23 16-20 14-18 04-08 16-20 27-31 17-21 15-19 19-23 17-21 8.950.000

79KEPEMIMPINAN (LEADERSHIP LOWER LEVELMANAGER)

3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000

80KEPEMIMPINAN (LEADERSHIP MIDDLE LEVELMANAGER)

4 29-01 06-09 06-09 03-06 28-31 04-07 03-06 07-10 04-07 29-01 06-09 03-06 7.950.000

81 KEWIRANIAGAAN (SALESMANSHIP) 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 14-16 12-14 01-03 14-16 10-12 5.950.00082 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000

83 MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA) 3 15-17 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000

84MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OF ORGANIZATIONBEHAVIOR)

3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 24-26 05-07 05-07 5.950.000

85 MANAJEMEN STRATEGI 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 13-15 10-12 31-02 12-14 12-14 5.950.00086 MANUSIA DALAM KERJA (MEN IN WORK) 2 04-05 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 3.950.000

87MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT)

3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 29-31 24-26 10-12 26-28 26-28 5.950.000

88PENGANTAR KONSEP MANAJEMEN(INTRODUCTION TOMANAGEMENT)

2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 3.950.000

89 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 05-06 3.950.00090 TEAM DEVELOPMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 06-08 05-07 03-05 07-09 05-07 5.950.00091 TEKNIK NEGOSIASI 3 10-12 13-15 14-16 11-13 09-11 25-27 11-13 13-15 12-14 10-12 14-16 10-12 5.950.00092 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 04-07 7.950.000

Page 31: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

93 GOOD CORPORATE GOVERNANCE 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 03-05 5.950.00094 HOW TO IMPROVE BUSINESS PERFORMANCE 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.00095 KEMADYAAN 5 08-12 26-02 26-30 23-27 07-11 25-29 23-27 27-31 24-28 01-05 26-30 03-07 8.500.000

96 MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000

97 MANAJEMEN OPERASI – PRODUKSI 3 15-17 13-15 12-14 09-11 14-16 25-27 09-11 06-08 10-12 15-17 12-14 10-12 5.950.00098 PERFORMANCE MANAGEMENT 3 22-24 19-21 21-23 18-20 21-23 06-08 18-20 14-16 19-21 22-24 21-23 19-21 5.950.00099 SIX SIGMA CHAMPIONS 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 27-29 24-26 31-02 26-28 26-28 5.950.000

100 HANDLING CUSTOMER COMPLAINT 2 08-09 12-13 15-16 12-13 07-08 25-26 12-13 20-21 13-14 11-12 15-16 13-14 3.950.000101 PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN 3 17-19 21-23 19-21 16-18 16-18 06-08 16-18 08-10 17-19 17-19 19-21 17-19 5.950.000102 MARKETING MANAGEMENT 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 29-31 05-07 29-31 07-09 05-07 5.950.000103 MANAJEMEN PERPUSTAKAAN 3 02-04 13-15 12-14 09-11 02-04 25-27 09-11 01-03 10-12 03-05 12-14 10-12 5.950.000104 Pengendalian Dokumen ISO 9001 2015 4 02-05 12-15 13-16 10-13 07-10 25-28 10-13 06-09 11-14 01-04 13-16 17-20 7.950.000

105Pemahaman Integrasi Sistem Manajemen ISO 14001-2015, ISO 9001-2015, dan ISO 45001-2016

3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 5.950.000

106 Pengendalian Dokumen Integrasi ISO 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.950.000107 COST CONTROL AND ESTIMATING 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 04-07 7.950.000108 FEASIBILITY STUDY & PROJECT EVALUATION 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 11-14 7.950.000109 MATERIAL MANAGEMENT 4 02-05 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 02-05 20-23 03-06 7.950.000110 Office MANAGEMENT AND FILING SYSTEM 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 04-07 7.950.000

111Akuntansi Perpajakan pada Badan Usaha Milik Negara(BUMN)

3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 08-10 05-07 26-28 5.950.000

112 Fraud Prevention, Detection And Investigation Audit 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 26-28 5.950.000

113 General Affairs Management 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 06-08 17-19 22-24 19-21 17-19 5.950.000114 Hubungan Industrial Dan Tenaga Kerja 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000

115 ISO 26000 UNDERSTANDING AND IMPLEMENTING CSR 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 29-31 05-07 01-03 07-09 03-05 5.950.000

116 Legal Due Diligence (LC Perdagangan) 3 10-12 13-15 14-16 11-13 07-09 25-27 11-13 01-03 12-14 10-12 14-16 10-12 5.950.000

117Keterampilan Pengelolaan Hubungan Industrial SampaiDengan Penyelesaian Perselisihan

3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 08-10 19-21 17-19 21-23 19-21 5.950.000

118 Merger Dan Akuisisi 2 25-26 01-02 29-30 26-27 24-25 28-29 26-27 20-21 27-28 25-26 29-30 26-27 3.950.000119 Pengendalian Kinerja Bisnis Dan Aliran Kas 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 5.950.000120 QA & QC Inspection Program 3 08-10 21-23 21-23 18-20 02-04 04-06 18-20 29-31 19-21 08-10 21-23 26-28 6.500.000121 CONTEMPORARY LEADERSHIP 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 26-28 5.950.000122 CUSTOMER SERVICE IN CREDIT UNION 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000123 KEWIRAUSAHAAN PRA PURNA BAKTI 4 02-05 05-08 05-08 02-05 08-11 04-07 02-05 06-09 03-06 02-05 05-08 10-13 8.500.000124 MOSSAD STRATEGY ON BUSINESS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 30-01 05-07 29-31 07-09 03-05 5.950.000125 PERSUASIVE MARKETING 3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000

Page 32: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

126 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 01-03 03-05 24-26 05-07 05-07 5.950.000127 Warehouse Management For Project & Services 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 3.950.000128 Supply Chain Management For Project & Services 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000129 MANAJEMEN PERPAJAKAN 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 22-24 19-21 26-28 5.950.000

130INDONESIA TAX OUTLOOK 2015-2016 DAN TAXAMNESTY

2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 4.500.000

131Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPHBadan

3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 26-28 5.950.000

132 TRANSFER PRICING DOCUMENTATION 2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 20-21 10-11 08-09 12-13 26-27 4.500.000133 Fraud Risk Management 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 30-01 19-21 15-17 21-23 26-28 5.950.000134 CUSTOMER LOYALITY STRATEGY 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 26-28 5,950,000135 Crisis Management 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 15-17 05-07 26-28 5.950.000

136 INTERVIEWING SKILL FOR RECRUITMENT PROMOTION 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 5.950.000

137QUALITY MANAGEMENT SYSTEM ISO 9001 2008STANDARD (SISTEM MANAJEMEN MUTU)

3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 29-31 19-21 26-28 5.950.000

138 SECURITY MANAGEMENT SYSTEM 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000139 BASIC LEADERSHIP 3 08-10 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000

140DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAANTERKAIT MENGHADAPI ERA GLOBALISASI

2 18-19 14-15 15-16 12-13 02-03 25-26 12-13 20-21 13-14 18-19 15-16 26-27 3.950.000

141 HOUR OF CHANGE MANAGEMENT 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 08-10 19-21 24-26 21-23 26-28 5.950.000142 HUBUNGAN INDUSTRIAL KEPEGAWAIAN 3 31-02 28-02 28-30 25-27 28-30 27-29 25-27 14-16 26-28 31-02 28-30 26-28 5.950.000

143HUKUM KEIMIGRASIAN TERKAIT PEMBERIAN IJINMEMPERKERJAKAN TENAGA KERJA ASING

3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 29-31 03-05 03-05 05-07 03-05 5.950.000

144 LOBBYING AND SCHEDULLING 3 10-12 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 10-12 12-14 10-12 5.950.000145 MAN POWER PLANNING 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000146 PROBLEM SOLVING & DECISION MAKING 3 22-24 26-28 26-28 23-25 23-25 27-29 23-25 13-15 24-26 22-24 26-28 26-28 5.950.000147 STRATEGI MEMBANGUN IMAGE CORPORATE 3 29-31 07-09 07-09 04-06 30-01 04-06 04-06 27-29 05-07 29-31 07-09 05-07 5.950.000148 TRANSFORMATION LEADERSHIP 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 01-03 12-14 01-03 14-16 12-14 5.950.000149 MANAJEMEN RESIKO 3 08-10 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 08-10 21-23 19-21 5.950.000150 INTELLIGENT AND INVESTIGATION SKILLS 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000151 ASSET SECURITY MANAGEMENT 3 24-26 05-07 05-07 02-04 21-23 04-06 02-04 29-31 03-05 24-26 05-07 03-05 5.950.000152 GENERAL AFFAIRS MANAGEMENT SYSTEM 3 31-02 12-14 12-14 09-11 28-30 25-27 09-11 30-01 10-12 31-02 12-14 10-12 5.950.000153 MEASURING CUSTOMER SATISFACTION 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 03-05 19-21 17-19 5.950.000154 Training Analysis Program 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 10-12 26-28 26-28 5.950.000155 CREATIVE ACCOUNTING DAN DISCLOSURE 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 5.950.000156 PENCEGAHAN FRAUD DAN INVESTIGATIF 3 15-17 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 15-17 12-14 26-28 5.950.000157 ASSET MANAGEMENT 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000158 ASSET MANAGEMENT BERBASIS ICT 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 03-05 5.950.000

Page 33: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

159DOCUMENT CONTROL ( VERIFICATION ANDCLASSIFICATION )

3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 30-01 10-12 08-10 12-14 10-12 5.950.000

160DOCUMENT MANAGEMENT SYSTEM AND ELECTRONICFILING

3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 08-10 19-21 15-17 21-23 17-19 5.950.000

161 MANAGEMENT INFORMATION SYSTEM 3 24-26 28-02 28-30 25-27 21-23 25-27 25-27 14-16 26-28 24-26 28-30 26-28 5.950.000

162MANAGEMENT OF DOCUMENT CONTROL & MODERNLIBRARY

3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 29-31 05-07 31-02 07-09 05-07 5.950.000

163 Office MANAGEMENT AND ELECTRONIC FILING SYSTEM 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 01-03 12-14 03-05 14-16 12-14 5.950.000

164 Office MODERN FILING MANAGEMENT 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 10-12 19-21 19-21 5.950.000165 EFFECTIVE REPORT WRITING TECHNIQUE 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 13-15 24-26 17-19 26-28 26-28 5.950.000166 Office AUTOMATION SKILL 3 22-24 05-07 05-07 02-04 23-25 06-08 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000167 TATACARA PENYUSUNAN SILABUS DIKLAT 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 30-01 10-12 29-31 12-14 10-12 5.950.000

168 COMERCIAL CONTRACT DRAFTING AND MANAGEMENT 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 08-10 05-07 26-28 5.950.000

169 CONTRACT MANAGEMENT 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 30-01 17-19 22-24 19-21 17-19 5.950.000170 Cost control 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 08-10 26-28 29-31 28-30 26-28 5.950.000171 Creative Problem Solving 4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 13-16 04-07 02-05 06-09 04-07 7.950.000172 Effective Business Letters Writing 3 10-12 13-15 14-16 11-13 02-04 27-29 11-13 29-31 12-14 10-12 14-16 12-14 5.950.000

173Effective Inventory Management and ModernWarehousing for Support Personal

4 16-19 20-23 20-23 17-20 15-18 05-08 17-20 31-03 18-21 16-19 20-23 18-21 7.950.000

174 Excellent Supervisory 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 27-30 10-13 01-04 12-15 10-13 7.950.000175 Integrated and Effective Logistic Management 4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 07-10 25-28 15-18 27-30 04-07 7.950.000

176 Leadership Skill How Become a More Effective Leader 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 14-16 05-07 22-24 07-09 26-28 5.950.000

177 Modern Office Administration and Filling System 4 09-12 26-01 26-29 23-26 08-11 25-28 23-26 06-09 24-27 09-12 26-29 03-06 7.950.000

178PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAIOPERASIONAL

4 23-26 12-15 12-15 09-12 22-25 26-29 09-12 27-30 10-13 23-26 12-15 10-13 7.950.000

179PRODUCTION PLANNING AND INVENTORY CONTROL(PPIC)

3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 30-01 17-19 31-02 19-21 17-19 5.950.000

180TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN,TRAINING BUDGET AND TRAINING IMPACTEVALUATION(TIE)

3 15-17 12-14 14-16 11-13 14-16 27-29 11-13 29-31 12-14 15-17 14-16 12-14 5.950.000

181MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAANBERBASIS TI

2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000

182 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 06-08 24-26 29-31 26-28 26-28 5.950.000183 KEWIRAUSAHAAN ENTERPRENEURSHIP 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 29-31 05-07 26-28 5.950.000184 CAREER MANAGEMENT 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 5.950.000185 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.000

Page 34: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

186ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL

4 09-12 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 09-12 27-30 04-07 7.950.000

187 INTEGRATED HUMAN RESOURCES MANAGEMENT 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 5.950.000188 LEADERSHIP AND EFFECTIVE SUPERVISORY 4 08-11 05-08 05-08 02-05 08-11 05-08 02-05 06-09 03-06 08-11 05-08 03-06 7.950.000

189PELAKSANAAN DAN PERMASALAHAN PENGADAANTANAH PEMBEBASAN LAHAN

3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 13-15 10-12 15-17 12-14 10-12 5.950.000

190PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS

4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 27-30 18-21 22-25 20-23 17-20 7.950.000

191 PLANNING AND ORGANIZE TRAINING 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 01-03 26-28 29-31 28-30 26-28 5.950.000192 TRAINING DEVELOPMENT MANAGEMENT 3 17-19 19-21 19-21 16-18 16-18 04-06 16-18 29-31 17-19 17-19 19-21 19-21 5.950.000193 Salesmanship Skills 2 25-26 26-27 26-27 23-24 24-25 25-26 23-24 20-21 24-25 25-26 26-27 26-27 4.500.000194 BASIC RELATIONSHIP MANAGEMENT FOR LEADERS 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 27-29 03-05 29-31 05-07 03-05 5.950.000

195COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIPTRAINING

3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000

196 DEVELOVING HIGH PERFORMANCE TEAMS 2 25-26 08-09 08-09 05-06 24-25 06-07 05-06 20-21 06-07 25-26 08-09 06-07 3.950.000197 EFFECTIVE EXECUTIVE SECRETARY 2 01-02 12-13 12-13 09-10 31-01 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000198 FILLING SYSTEM FOR SECRETARY 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 29-31 24-26 10-12 26-28 26-28 5.950.000199 HR MANAGEMENT 2 22-23 14-15 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000200 HR MANAGEMENT OF CHANGE 3 29-31 21-23 21-23 18-20 28-30 06-08 18-20 06-08 19-21 29-31 21-23 19-21 5.950.000

201 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 2 04-05 01-02 29-30 26-27 02-03 27-28 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000

202INVENTORY MANAGEMENT AND COST INVESTMENTRECOVERY

4 16-19 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 16-19 13-16 11-14 7.950.000

203 Logistic Management 2 24-25 19-20 19-20 16-17 23-24 06-07 16-17 20-21 17-18 24-25 19-20 17-18 3.950.000

204LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT

3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 5.950.000

205 MAN POWER PLANNING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 03-05 5.950.000206 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 07-10 10-13 09-12 12-15 10-13 7.950.000207 MATERIAL MANAGEMENT FOR PROJECT 4 15-18 20-23 20-23 17-20 14-17 04-07 17-20 13-16 18-21 15-18 20-23 18-21 7.950.000208 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR 2 25-26 01-02 29-30 26-27 24-25 25-26 26-27 20-21 27-28 25-26 29-30 26-27 3.950.000209 PLAN LAY OUT Office 3 29-31 07-09 07-09 04-06 28-30 06-08 04-06 29-31 05-07 29-31 07-09 05-07 5.950.000210 SERVICE EXCELLENT 3 03-05 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 01-03 14-16 12-14 5.950.000211 SUPERVISORY LEADERSHIP AND DECISSION MAKING 3 08-10 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 08-10 19-21 17-19 5.950.000

212 WAREHOUSE MANAGEMENT OPERATION AND CONTROL 2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 27-28 3.950.000

213 Warehousing & Distribution Management 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 27-29 10-12 31-02 12-14 10-12 5.950.000214 TAX ACCOUNTING 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 13-15 03-05 22-24 05-07 26-28 5.950.000

215RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN,BANDING DAN GUGATAN

3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 27-29 10-12 29-31 12-14 10-12 5.950.000

Page 35: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

216 MANAJEMEN MUTU TERPADU 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 17-18 3.950.000

217TOTAL QUALITY MANAGEMENT SERIES MANAJEMENMUTU TERPADU

2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.000

218 BUILDING A TEAM 2 22-23 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 22-23 12-13 26-27 3.950.000219 CAREER PLANNING SYSTEM 2 29-30 19-20 19-20 16-17 03-04 04-05 16-17 20-21 17-18 29-30 19-20 27-28 3.950.000220 COMPENSATION SYSTEM DEVELOPMENT 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 27-28 3.950.000

221COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT

2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 20-21 12-13 15-16 14-15 10-11 3.950.000

222 EFFECTIVE PERFORMANCE APPRAISAL 2 31-01 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 31-01 28-29 26-27 3.950.000223 EFFECTIVE TRAINING MANAGEMENT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 30-01 05-07 03-05 07-09 03-05 5.950.000

224HUMAN RESOURCES MANAGEMENT FOR NON-HRMANAGER

2 10-11 12-13 15-16 12-13 09-10 27-28 12-13 20-21 13-14 10-11 15-16 12-13 3.950.000

225 JOB COMPETENCY PROFILING 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 19-20 3.950.000226 MEASURING TRAINING IMPACT 2 25-26 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 25-26 29-30 27-28 3.950.000227 PERFORMANCE BASED PAY 2 01-02 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 01-02 05-06 06-07 3.950.000

228STRATEGIC HUMAN RESOURCES MANAGEMENT FORGLOBAL COMPETITIVE ADVANTAGE

2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 20-21 17-18 11-12 19-20 20-21 3.950.000

229 WORKLOAD ANALYSIS 2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 20-21 24-25 18-19 26-27 26-27 3.950.000230 ACTIVITY BASED MANAGEMENT 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000

231NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS ANDMAKE YOU MORE EFFECTIVE NEGOTIATOR

2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000

232 STRATEGIC MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 06-08 05-07 15-17 07-09 05-07 5.950.000233 Supply Chain Management (SCM) 2 24-25 14-15 14-15 11-12 23-24 28-29 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000234 Supplier Management 2 31-01 21-22 21-22 18-19 30-31 04-05 18-19 20-21 19-20 31-01 21-22 19-20 3.950.000235 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 08-11 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.950.000

236ASPEK HUKUM DAN PENYELESAIAN KONFLIKPERTANAHAN

3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 22-24 05-07 26-28 5.950.000

237 ANTI MONOPOLI 3 29-31 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 29-31 12-14 26-28 5.950.000238 HUKUM KEPAILITAN 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 01-03 19-21 26-28 5.950.000

239 HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000

240HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGANBISNIS

3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 29-31 05-07 15-17 07-09 26-28 5.950.000

241 HUKUM TINDAK PIDANA KORUPSI 3 24-26 13-15 14-16 11-13 21-23 25-27 11-13 01-03 12-14 24-26 14-16 10-12 5.950.000

242STRATEGI MENGANTISIPASI RISIKO TINDAK PIDANA(KORUPSI)

3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 08-10 19-21 31-02 21-23 17-19 5.950.000

243TINDAK PIDANA PENCUCIAN UANG DAN PERANAN BANKUNTUK MENCEGAHNYA

3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 14-16 26-28 03-05 28-30 26-28 5.950.000

Page 36: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

244TIPIKOR DALAM PENGELOLAAN KEUANGANPERUSAHAAN & PERBANKAN

3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 27-29 03-05 10-12 05-07 03-05 5.950.000

245 BERITA ACARA PEMERIKSAAN 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 30-01 10-12 17-19 12-14 12-14 5.950.000246 MARITIME & SHIPPING LAW IN INDONESIA 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 06-08 17-19 22-24 19-21 19-21 5.950.000247 HUKUM DAN KONTRAK KONSTRUKSI 3 29-31 26-28 26-28 23-25 30-01 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000248 BASIC OF SUPPLY CHAIN MANAGEMENT 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000249 EFFECTIVE LINE BALANCING 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 20-21 03-04 29-30 05-06 03-04 3.950.000

250FILLING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF

3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000

251INFORMATION SYSTEMS AND INFORMATIONTECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT

3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000

252 ISO WAREHOUSING 2 24-25 07-08 07-08 04-05 23-24 04-05 04-05 20-21 05-06 24-25 07-08 27-28 3.950.000253 KOMPUTERISASI PERGUDANGAN 2 31-01 14-15 15-16 12-13 30-31 28-29 12-13 20-21 13-14 31-01 15-16 13-14 3.950.000

254MAINTENANCE MANAGEMENT (FOR MANUFACTUREAND OIL & GAS COMPANY)

3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 06-08 19-21 03-05 21-23 19-21 6.500.000

255MEASURING AND MANAGING COST ESCALATION INPROJECT

2 18-19 08-09 08-09 05-06 17-18 04-05 05-06 20-21 06-07 18-19 08-09 03-04 3.950.000

256 MODERN WAREHOUSE DESIGN 2 25-26 12-13 12-13 09-10 24-25 27-28 09-10 20-21 10-11 25-26 12-13 10-11 3.950.000257 NEGOTIATION SKILL FOR PURCHASING STAFF 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 14-16 17-19 31-02 19-21 17-19 5.950.000

258OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES

3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 01-03 28-30 26-28 5.950.000

259PLANNING AND MANAGING INVENTORIES IN A SUPPLYCHAIN

3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 01-03 03-05 08-10 05-07 05-07 5.950.000

260 PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 5.950.000261 PROJECT EVALUATION AND FINANCING 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000

262 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 27-29 05-07 03-05 07-09 03-05 5.950.000

263 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 30-01 10-12 10-12 12-14 10-12 5.950.000264 RFID for WAREHOUSE 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 3.950.000

265STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAHSAKIT

3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 06-08 26-28 24-26 28-30 26-28 5.950.000

266STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASIMICROSOFT EXCEL

3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 14-16 03-05 31-02 05-07 05-07 5.950.000

267TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLYCHAIN

3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 12-14 5.950.000

268 VENDOR MANAGED INVENTORY 2 08-09 21-22 21-22 18-19 07-08 07-08 18-19 20-21 19-20 08-09 21-22 19-20 3.950.000269 Workload Analysis 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000270 ENTERPRISE RESOURCES PLANNING (ERP) 4 22-25 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 22-25 06-09 03-06 7,950,000271 ANALISA KEBUTUHAN BARANG PERSEDIAAN 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 10-12 5.950.000

Page 37: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

272 PROJECT COST MANAGEMENT 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 13-15 19-21 03-05 21-23 19-21 5.950.000

273PROJECT MANAGEMENT IN ENGINEERING,PROCUREMENT & CONSTRUCTION

3 10-12 28-02 28-30 25-27 09-11 27-29 25-27 27-29 26-28 10-12 28-30 26-28 5.950.000

274 ADVANCED LAND TRANSPORT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 05-07 5.950.000275 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 29-31 19-21 26-28 6,500,000

276JOB DESCRIPTION ANALYSIS, DEVELOPMENT, ANDDESIGN

2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000

277 Project Management (3 Hr) 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 08-10 05-07 26-28 6,500,000278 PROJECT MANAGEMENT (PM) (5Hr) 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 17-21 9,500,000279 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 12-14 21-23 18-20 21-23 04-06 18-20 06-08 19-21 22-24 21-23 26-28 6,500,000

280STRATEGIC HUMAN RESOURCE MANAGEMENT ANDORGANIZATION DEVELOPMENT

3 31-02 28-02 28-30 25-27 28-30 25-27 25-27 14-16 26-28 31-02 28-30 26-28 6,500,000

281 Strategic Performance Management 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 29-31 05-07 03-05 07-09 03-05 6,500,000282 Strategic Planning 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 30-03 10-14 08-12 12-16 10-14 9,500,000283 CRYSTALL BALL 3 15-17 12-14 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000

284DECISION MAKING BY USING STRATEGIC THINKING(PENDEKATAN SISTEMIK DAN NEW 7 TOOLS APPROACH)

2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000

285INOVASI DAN KREATIFITAS MENUJU ORGANISASIPEMBELAJARAN

2 02-03 14-15 12-13 09-10 02-03 27-28 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000

286 LEADERSHIP FOR MANAGER 4 08-11 19-22 20-23 17-20 07-10 04-07 17-20 27-30 18-21 08-11 20-23 18-21 7.950.000287 ADMINISTRASI KEPABEANAN 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 27-30 17-20 01-04 19-22 17-20 7.950.000

288Custom facility, Shipping Documents & Export ImportProcedure

2 08-09 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.000

289 EFFECTIVE PUBLIC RELATIONS SKILL 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000290 Export-Import 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 06-08 10-12 22-24 12-14 10-12 5.950.000291 Export-Import and Incoterm 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 13-15 19-21 29-31 21-23 19-21 5.950.000292 FREIGHT FORWARDING 2 02-03 28-01 28-29 25-26 03-04 25-26 25-26 20-21 26-27 04-05 28-29 27-28 3.950.000293 Incoterm 2010 2 10-11 08-09 08-09 05-06 10-11 07-08 05-06 20-21 06-07 10-11 08-09 06-07 3.950.000

294PEMAHAMAN SHIPPING DOCUMENT & PROSEDURKEPABEANAN

3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 29-31 12-14 17-19 14-16 12-14 5.950.000

295 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 10-13 7.950.000

296 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 27-29 10-12 01-03 12-14 26-28 5.950.000297 Office Automation 2 11-12 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 11-12 26-27 26-27 3.950.000298 PROBLEM SOLVING & DECISION MAKING 3 15-17 05-07 05-07 02-04 16-18 06-08 02-04 06-08 03-05 15-17 05-07 03-05 5.950.000299 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 3 08-10 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 08-10 07-09 26-28 5.950.000300 SUPPLY MARKET ANALYSIS 4 16-19 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 16-19 12-15 10-13 7.950.000301 TOTAL COST OF OWNERSHIP ANALYSIS 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 30-01 24-26 31-02 26-28 26-28 5.950.000

Page 38: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

302 CONTRACT MANAGEMENT 4 08-11 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 08-11 05-08 03-06 7.950.000303 PAJAK DAN PROSEDUR IMPLEMENTASI 4 15-18 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 15-18 12-15 10-13 7.950.000304 TAX AND FINANCIAL CONTROL 3 22-24 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 22-24 19-21 26-28 5.950.000305 Inventory Management Manufacturing Industry 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 04-07 7.950.000306 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 23-26 20-23 17-20 7.950.000307 Perancangan Tata Letak Pabrik 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 11-14 7.950.000308 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 04-07 7.950.000309 PRODUCTION AND PLANNING CONTROL 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 11-14 7.950.000

310 Production Handling Separation and Measurement 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.950.000

311 QUALITY CONTROL OF PRODUCT 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 17-20 7.950.000312 QUALITY SYSTEM ENGINEERING 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 03-06 7.950.000313 SYSTEM AND COST PRODUCTION 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 04-07 7.950.000314 ANALISA KEUANGAN 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 26-27 4.500.000

315ANALISA KREDIT MODAL KERJA KONTRAKTOR DANSTANDBY KREDIT

2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 20-21 24-25 15-16 26-27 27-28 4.500.000

316 ANALISA PERKREDITAN 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 27-30 03-06 22-25 05-08 10-13 7.950.000317 BASIC ACCOUNTING 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 17-20 7.950.000

318PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORANARUS KAS_CASH FLOW

2 02-03 21-22 21-22 18-19 02-03 04-05 18-19 20-21 19-20 01-02 21-22 26-27 4.500.000

319 PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY) 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 4.500.000320 PENYELESAIAN KREDIT BERMASALAH 2 17-18 08-09 08-09 05-06 16-17 06-07 05-06 20-21 06-07 17-18 08-09 03-04 4.500.000321 PENYUSUNAN DAN ANALISA SCORING RATING 2 25-26 12-13 15-16 12-13 24-25 27-28 12-13 20-21 13-14 25-26 15-16 13-14 4.500.000

322PENYUSUNAN PERATURAN INTERNAL PERKREDITANBANK

3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 06-08 19-21 31-02 21-23 19-21 5.950.000

323 GOOD CORPORATE GOVERNANCE 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 13-15 26-28 03-05 28-30 26-28 5.950.000324 Audit Perkreditan Bank 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 29-31 03-05 10-12 05-07 05-07 5.950.000

325 Pencegahan dan Audit Fraud di Lingkungan Perbankan 3 17-19 13-15 12-14 09-11 16-18 25-27 09-11 01-03 10-12 17-19 12-14 10-12 5.950.000

326 COST MANAGEMENT 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000327 DASAR-DASAR PERBENDAHARAAN 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 06-09 03-06 22-25 05-08 10-13 7.950.000328 MANAJEMEN RISIKO INVESTASI 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 13-16 10-13 29-01 12-15 17-20 7.950.000

329MANAJEMEN KEUANGAN UNTUK NON MANAJERKEUANGAN

2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 26-27 3.950.000

330 STUDY KELAYAKAN BISNIS 2 08-09 26-27 26-27 23-24 03-04 25-26 23-24 20-21 24-25 08-09 26-27 27-28 3.950.000331 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 27-30 24-27 15-18 26-29 03-06 7.950.000332 FINANCING CONDOTEL HOTEL OPERATION 4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 22-25 05-08 10-13 7.950.000

333MANAGEMENT OF OUTSOURCE STAFF HOUSING ANDCATERING SERVICES

4 29-01 12-15 13-16 10-13 14-17 25-28 10-13 07-10 11-14 29-01 13-16 18-21 7.950.000

Page 39: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

334 Service Recovery Create Loyal Customers for Life 3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 10-12 28-30 26-28 5.950.000335 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 4 15-18 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 15-18 26-29 10-13 7.950.000

336PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT)

2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000

337 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 5.950.000338 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000

339Change & conflict management and dealing with difficultpeople

2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000

340 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 3.950.000341 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000342 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.000343 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.000344 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 3.950.000345 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 5.950.000346 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 5.950.000347 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 5.950.000348 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 5.950.000349 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.950.000350 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000351 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.500.000

352ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSEPEOPLE

3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.500.000

353CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.500.000

354PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN (Petroleum Economics)

4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 8.500.000

355CATERING & ACCOMMODATION MANAGEMENT(INCLUDING TABLE MANNER)

4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 17-20 7.950.000

356COMMUNICATION, ASSERTIVENESS AND CONFLICTMANAGEMENT

2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 3.950.000

357 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.950.000358 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 5.950.000

359HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP

2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 3.950.000

360 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.000361 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

Page 40: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

MANAJEMEN - PROCUREMENT1 Prinsip dasar dan prosedur pengadaan barang & jasa 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.000

2 HARGA PERKIRAAN SENDIRI (HPS) 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 20-21 03-04 08-09 05-06 03-04 3.950.0003 ASPEK TKDN 2 29-30 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 29-30 19-20 26-27 3.950.0004 INTEGRATED PROCUREMENT MANAGEMENT 2 08-09 05-06 05-06 02-03 02-03 06-07 02-03 20-21 03-04 08-09 05-06 26-27 3.950.000

5TEKNIK DAN METODE PENYUSUNAN HPS OE (HARGAPERKIRAAN SENDIRI) ATAS PENGADAAN BARANG DANJASA

3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 08-10 03-05 31-02 05-07 05-07 5.950.000

6 Procurement & Purchasing Management 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.0007 Strategic Sourcing & Vendor Management 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000

8Metode Penyusunan Spesifikasi & Harga PerkiraanSendiri

2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000

9 Negotiation Skills For Procurement 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00010 Procurement Progress & Order Monitoring 2 29-30 14-15 14-15 11-12 28-29 28-29 11-12 20-21 12-13 29-30 14-15 12-13 3.950.00011 Procurement Fraud & Audit 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 20-21 19-20 03-04 21-22 19-20 3.950.00012 BASIC PROCUREMENT & PURCHASING 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 13-15 24-26 22-24 26-28 26-28 5.950.00013 PROCUREMENT MANAGEMENT 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 20-21 17-18 01-02 19-20 17-18 3.950.00014 PROCUREMENT STRATEGY 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 20-21 24-25 08-09 26-27 26-27 3.950.00015 PRINCIPLES OF PROCUREMENT MANAGEMENT 3 24-26 13-15 14-16 11-13 23-25 25-27 11-13 06-08 12-14 24-26 14-16 12-14 5.950.00016 E-PROCUREMENT (E-Proc) 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 06-08 24-26 22-24 26-28 26-28 5.950.00017 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 19-21 5.950.000

18SUSTAINABLE PROCUREMENT IN RELATION WITHQUALITY ASSURANCE

4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 16-19 06-09 04-07 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MOTIVASI DAN PERSONALDEVELOPMENT

1 Communication SKILL 2 08-09 14-15 15-16 12-13 07-08 25-26 12-13 06-07 13-14 08-09 15-16 13-14 3.950.0002 Dynamic Interpersonal & Comunication Skills 2 22-23 28-01 28-29 25-26 21-22 27-28 25-26 20-21 26-27 22-23 28-29 27-28 3.950.0003 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 2 31-01 07-08 07-08 04-05 30-31 07-08 04-05 27-28 05-06 31-01 07-08 05-06 3.950.000

4 Effective public speaking and business presentation 2 04-05 12-13 12-13 09-10 03-04 28-29 09-10 30-31 10-11 03-04 12-13 10-11 3.950.000

5 CARA MENYENANGKAN MEMBANGUN TIM IMPIAN 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 01-04 26-29 03-06 7.950.0006 Constructive Anger Management 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 27-29 10-12 15-17 12-14 10-12 5.950.0007 Menjadi pribadi yang asertif 3 29-31 12-14 14-16 11-13 28-30 27-29 11-13 29-31 12-14 29-31 14-16 12-14 5.950.0008 Menjadi pribadi yang berpengaruh 3 02-04 21-23 21-23 18-20 02-04 06-08 18-20 01-03 19-21 03-05 21-23 19-21 5.950.0009 Motivating staff for excellent performance 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 13-15 03-05 17-19 05-07 26-28 5.950.000

Page 41: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

10 BOOST YOUR CREATIVITY IN THINKING MIND MAP 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 3.950.000

11BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT &SECRETARY

3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000

12 EFFECTIVE MASTER OF CEREMONY (MC) 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 27-29 19-21 01-03 21-23 17-19 5.950.00013 ACHIEVEMENT MOTIVATION 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 3.950.00014 Advance Negotiation Skill 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 06-08 17-19 15-17 19-21 17-19 5.950.00015 CHANGE YOUR MINDSET 4 02-05 12-15 13-16 10-13 08-11 25-28 10-13 30-02 11-14 01-04 13-16 11-14 7.950.00016 MC (MASTER OF CEREMONY) 3 02-04 12-14 19-21 16-18 02-04 04-06 16-18 13-15 17-19 08-10 19-21 26-28 5.950.000

17COMMUNICATION, ASSERTIVENESS AND CONFLICTMANAGEMENT

2 10-11 22-23 22-23 19-20 02-03 04-05 19-20 20-21 20-21 10-11 22-23 20-21 3.950.000

18 INNER SUCCESS TRAINING 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 13-16 03-06 29-01 05-08 03-06 7.950.00019 TOTOK AURA MENUJU TOTAL BEAUTY 3 03-05 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 03-05 19-21 17-19 5.950.00020 SPEED AND INNOVATION 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 27-29 19-21 24-26 21-23 19-21 5.950.000

21HYPNOTIC SELLING TECHNIQUE Menjual TanpaHambatan dengan Aplikasi Hypnosis dan NLP

2 22-23 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 22-23 12-13 27-28 3.950.000

22 CONTEMPORARY COMMUNICATION & LEADERSHIP 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.00023 TALENT MANAGEMENT 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 11-14 7.950.00024 WOMENS PRIME POWER, BEAUTY AND BRAIN 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.00025 ASSERTIVE TRAINING 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 22-24 12-14 26-28 5.950.00026 BRAIN POWER 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000

27CAPACITY BUILDING(MEMBANGUN KAPASITAS DANKEMAMPUAN)

3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 10-12 5.950.000

28 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 03-05 05-07 05-07 5.950.00029 INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT) 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 13-15 10-12 10-12 12-14 12-14 5.950.000

30PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENTMOTIVATION TRAINING)

3 22-24 13-15 14-16 11-13 23-25 25-27 11-13 30-01 12-14 22-24 14-16 10-12 5.950.000

31 PEOPLE SKILL 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 08-10 17-19 29-31 19-21 17-19 5.950.00032 PRIBADI EFEKTIF 2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000

33SENSITIVITY TRAINING (TURNING POINT ATAU NEWBORN)

3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 14-16 10-12 15-17 12-14 12-14 5.950.000

34 TEKNIK PRESENTASI 2 18-19 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 18-19 19-20 17-18 3.950.00035 TRAINING OF TRAINER 3 22-24 28-02 28-30 25-27 23-25 27-29 25-27 29-31 26-28 22-24 28-30 26-28 5.950.00036 ACHIEVEMENT MOTIVATION 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.00037 EFFECTIVE COMMUNICATION SKILL 3 31-02 13-15 12-14 09-11 30-01 27-29 09-11 06-08 10-12 31-02 12-14 10-12 5.950.00038 EFFECTIVE PRESENTATION SKILLS 3 03-05 19-21 21-23 18-20 02-04 06-08 18-20 14-16 19-21 01-03 21-23 19-21 5.950.00039 EMOTIONAL QUETIENTS 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 29-31 26-28 10-12 28-30 26-28 5.950.00040 ICE BREAKING AND ENERGIZERS 3 29-31 21-23 19-21 16-18 28-30 06-08 16-18 13-15 17-19 29-31 19-21 17-19 5.950.00041 TRAINING OF TRAINER (TOT) 3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000

Page 42: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

42 Train the trainers 4 02-05 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 02-05 19-22 18-21 7.950.00043 ACHIEVEMENT MOTIVATION TRAINING 2 08-09 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 08-09 19-20 26-27 3.950.00044 CAPACITY BUILDING SOFT SKILL PROGRAM 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 5.950.00045 BREATHING ARTS FOR CREATIVE THINKING 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.00046 EFFECTIVE STRATEGY TO CONTROL STRESS 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 26-28 5.950.00047 ESQ FOR PEAK PERFORMANCE 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 29-31 19-21 24-26 21-23 26-28 5.950.00048 HUMAN PERFORMANCE AND LIMITATION 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 01-03 26-28 31-02 28-30 26-28 5.950.000

49MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADIYANG UNGGUL

2 15-16 19-20 19-20 16-17 17-18 07-08 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000

50 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 3 08-10 21-23 21-23 18-20 07-09 06-08 18-20 14-16 19-21 08-10 21-23 19-21 5.950.000

51 MANAGING PRESSURE FOR PEAK PERFORMANCE 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 01-03 12-14 26-28 5,950,00052 Stress Management Strategies 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 14-16 05-07 08-10 07-09 05-07 5.950.000

53HYPNO-PRESENTATION SKILL UNLOCKING YOURPOTENTIAL POWER

3 17-19 07-09 07-09 04-06 16-18 06-08 04-06 08-10 05-07 17-19 07-09 26-28 5.950.000

54 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 3 24-26 13-15 14-16 11-13 23-25 27-29 11-13 14-16 12-14 24-26 14-16 12-14 5.950.000

55IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT

3 31-02 19-21 19-21 16-18 30-01 04-06 16-18 29-31 17-19 31-02 19-21 19-21 5.950.000

56 SEVEN HABITS WITH NLP APPROACH 3 02-04 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 01-03 07-09 05-07 5.950.00057 EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 14-16 17-19 03-05 19-21 17-19 5.950.00058 FINDING YOUR ESSENTIAL SELF 3 15-17 05-07 05-07 02-04 14-16 04-06 02-04 01-03 03-05 15-17 05-07 03-05 5.950.00059 INTERPERSONAL COMMUNICATION SKILL 2 08-09 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 08-09 08-09 06-07 3.950.000

60 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 2 24-25 21-22 21-22 18-19 21-22 07-08 18-19 20-21 19-20 24-25 21-22 17-18 3.950.000

61 SELF-EFFECTIVENESS & DEVELOPMENT 2 02-03 14-15 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 13-14 3.950.000

62PERSONALITY DEVELOPMENT BERBASIS EMOTIONALAND SPRITUAL QUETIENTS

4 29-01 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 29-01 12-15 03-06 7.950.000

63 STRESS & CONFLICT MANAGEMENT 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 01-03 24-26 31-02 26-28 26-28 5.950.00064 BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI 5 08-12 19-23 12-16 09-13 07-11 25-29 09-13 06-10 10-14 01-05 12-16 10-14 8.950.000

65CORPORATE BUILDING DALAM MEMBANGUN KULTURDAN ETIKA INTERNAL ORGANISASI

3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000

66MODEL PEMBINAAN ANGGOTA YANG EXCELLENTDALAM DUNIA KERJA PERUSAHAAN

3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

67 Office COMMUNICATION AND BEHAVIOR ETHIC 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.000

68CHANGE & CONFLICT MANAGEMENT AND DEALINGWITH DIFFICULT PEOPLE

2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000

69COLLABORATION MS Office AND EFFECTIVEPRESENTATION

3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 5.950.000

Page 43: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

70Change & conflict management and dealing with difficultpeople

2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000

71 Strategic and Systematic Thinking 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 20-21 06-07 29-30 08-09 06-07 3.950.00072 THE LEADERSHIP CHALLENGE 2 02-03 14-15 15-16 12-13 02-03 28-29 12-13 30-31 13-14 01-02 15-16 13-14 3.950.00073 COACHING & CONSELING DI PERUSAHAAN 3 24-26 21-23 21-23 18-20 21-23 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.00074 COACHING AND COUNSELING ( MONITORING) 3 02-04 12-14 19-21 16-18 02-04 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.00075 PERFORMANCE COACHING FOR MANAGER 2 15-16 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 15-16 05-06 26-27 3.950.00076 EFFECTIVE PRESENTATION AND REPORT WRITING 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 06-08 24-26 24-26 26-28 26-28 5.950.00077 Effective Time Management 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 13-15 03-05 31-02 05-07 03-05 5.950.00078 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 30-01 17-19 08-10 19-21 17-19 5.950.00079 Strategic Time Management 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 01-03 28-30 26-28 5.950.00080 TIME MANAGEMENT 4 16-19 26-01 26-29 23-26 15-18 25-28 23-26 13-16 24-27 16-19 26-29 03-06 7.950.00081 HOW TO HANDLE CRITICISM AND COMPLAIN 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000

Page 44: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 45: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING1 Kalibrasi dan Tera 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.0002 Kalibrasi Massa & Dimensi 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.0003 SAP 2000 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.0004 TEKLA STRUCTURE 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 06-08 03-05 08-10 05-07 03-05 5.950.000

5ISO 10012 MEASUREMENT MANAGEMENT SYSTEMFOR SUPPORTING ISO 9001 CERTIFICATION

2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000

6 MANAJEMEN KALIBRASI 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.0007 Root Cause Analysis 2 15-16 22-23 22-23 19-20 14-15 07-08 19-20 15-16 20-21 15-16 22-23 20-21 3.950.000

ENGINEERING - MECHANICAL1

ELEMEN MESIN DESIGN, MAINTENANCE ANDTROUBLESHOOTING

3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000

2INSTALLATION, MAINTENANCE ANDTROUBLESHOOTING OF GAS COMPRESSOR AND PIPINGSYSTEM

3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

3 PRINSIP DASAR PENYUSUNAN TROUBLESHOOTING 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 30-01 03-05 29-31 05-07 03-05 5.950.000

4ROTATING EQUIPMENT PUMP, COMPRESSOR, GASTURBINE, MAINTENANCE AND TROUBLESHOOTING

3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.000

ENGINEERING - MAINTENANCE1 Maintenance Management 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 3.950.0002 MAINTENANCE PLANNING & SCHEDULING 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000

3RELIABILITY CENTERED MAINTENANCE (RCM) ININDUSTRY

3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000

4 ROOT CAUSE ANALYSIS (RCA) IN INDUSTRY 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 01-03 05-07 03-05 5.950.0005 TURNAROUND & SHUTDOWNS MANAGEMENT 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 10-12 5.950.0006 AUTONOMOUS MAINTENANCE 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.0007 MAINTENANCE MANAJEMEN 2 10-11 01-02 29-30 26-27 09-10 27-28 26-27 08-09 27-28 10-11 29-30 26-27 3.950.000

8PRACTICAL PROBLEM SOLVING FOR MAINTENANCE ANDENGINEER

1 12-12 09-09 09-09 06-06 11-11 04-04 06-06 10-10 07-07 12-12 09-09 07-07 2.250.000

9 TPM (TOTAL PREVENTIVE MAINTENANCE) 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 26-27 3.950.000

10ZERO BREAK DOWN THROUGH SMALL DEFECTELIMINATION

1 02-02 05-05 05-05 02-02 04-04 06-06 02-02 30-30 03-03 01-01 05-05 03-03 2.250.000

11 TOTAL PRODUCTIVE MAINTENANCE 2 08-09 14-15 14-15 11-12 07-08 25-26 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000

PUBLIC TRAINING SCHEDULE 2018 DI JAKARTA

Page 46: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - IT

1Database Management System Development AndGraphic Display With Access 2010 And SQL Method

3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000

2Excellent Automation Office Data Processing System andData Export with visual basic aplication excel 2007

2 15-16 19-20 19-20 16-17 14-15 07-08 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000

3Excellent Automation Office Data Processing System andData Export With Visual Basic Aplication Excel 2010

2 22-23 26-27 26-27 23-24 21-22 28-29 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000

4 Mastering Excel 2010 For Office Data Processing 2 31-01 12-13 12-13 09-10 30-31 28-29 09-10 29-30 10-11 31-01 12-13 10-11 3.950.0005 COBIT 4.1 Foundation 2 04-05 01-02 29-30 26-27 02-03 25-26 26-27 02-03 27-28 04-05 29-30 26-27 3.950.0006 COBIT 5 Foundation 2 11-12 07-08 07-08 04-05 10-11 06-07 04-05 09-10 05-06 11-12 07-08 05-06 3.950.0007 ITIL V.3 FOUNDATION 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.0008 ITIL V2011Foundation with Intl Cert. Exam Preps 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 14-16 24-26 17-19 26-28 26-28 5.950.0009 GRAPHIC DESIGN & DESKTOP PUBLISHING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 06-09 17-20 08-11 19-22 17-20 7.950.000

10 IT HELPDESK 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 14-16 17-19 15-17 19-21 17-19 5.950.000

11Financial Accounting Information System DevelopmentWith Excel 2007 and VBA

2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000

12Financial Accounting Information System DevelopmentWith Excel 2010 and VBA

2 04-05 14-15 15-16 12-13 02-03 25-26 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000

13Implementation Of Payroll Admisnistration System WithExcel 2010 For HRD

3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 10-12 21-23 19-21 5.950.000

14 Inventory System Development Using Acces 2007 2 17-18 28-01 28-29 25-26 16-17 27-28 25-26 15-16 26-27 17-18 28-29 27-28 3.950.00015 Inventory System Development Using Acces 2010 2 24-25 05-06 05-06 02-03 23-24 04-05 02-03 20-21 03-04 24-25 05-06 03-04 3.950.000

16Mastering Microsoft Project 2007 (Concept andApplication)

2 02-03 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

17POS AND INVENTORY SYSTEM DEVELOPMENT WITHUSING ACCESS 2010

2 25-26 14-15 14-15 11-12 24-25 27-28 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000

18Powerful Database Analysis and Dashboard Reportingwith Excel 2010

2 01-02 21-22 21-22 18-19 31-01 04-05 18-19 30-31 19-20 01-02 21-22 19-20 3.950.000

19Workload Analysis Implementation With Excel 2007 forHR & Non HR

2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000

20 ISO IEC 20000 IT SERVICE MANAGEMENT 2 29-30 08-09 08-09 05-06 28-29 06-07 05-06 27-28 06-07 29-30 08-09 03-04 3.950.00021 ISO IEC 38500 IT-GOVERNANCE 2 04-05 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.00022 ISO 20000 Foundation 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.00023 IT BUSINESS ANALYSIS 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000

Page 47: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

24 IT PROJECT MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 27-29 26-28 24-26 28-30 26-28 5.950.00025 IT RISK MANAGEMENT 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 03-07 9.500.00026 IT Strategic Planning 2 04-05 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.00027 Managing Software Requirements 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 30-01 19-21 03-05 21-23 19-21 5.950.000

28PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASIBUMN

3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5,950,000

29 SOFTWARE PROJECT MANAGEMENT 3 29-31 13-15 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.00030 SOFTWARE QUALITY ASSURANCE 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.00031 SOFTWARE TESTING FOUNDATION 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.00032 Systems Analysis and Design 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.00033 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 14-16 19-21 31-02 21-23 19-21 5.950.00034 GRAFIC DESIGN & PRODUCT PACKAGING 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.000

35COMPREHENSIVE WEBSITE WRITING SKILL FORCORPORATE BRANDING

2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000

36DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)

2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 26-27 3.950.000

37MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAIMEDIA KOMUNIKASI CSR

1 22-22 07-07 07-07 04-04 21-21 04-04 04-04 20-20 05-05 22-22 07-07 05-05 2.250.000

38TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILEBERBASIS DIGITAL

1 04-04 28-28 28-28 25-25 04-04 29-29 25-25 01-01 26-26 03-03 28-28 28-28 2.250.000

39TRAVEL WRITER DAN KETERAMPILAN MENULISPERJALANAN WISATA MELALUI MEDIA ONLINE

2 10-11 05-06 05-06 02-03 09-10 05-06 02-03 08-09 03-04 10-11 05-06 03-04 3.950.000

40Presentation Skill With Power Point 2007, Swishmax andULEAD

3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 01-03 24-26 03-05 26-28 26-28 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - PETROLEUM & MINING

1 CHEMICALS TREATMENT FOR PRODUCED WATER 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 01-03 12-14 10-12 6.500.0002 Oilfield Production Chemicals 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.500.000

3MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGASINDONESIA

2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.000

4TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUETENTANNG SMELTER

2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000

HSE1 ACCIDENT INVESTIGATIONS 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000

Page 48: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

2Assesment And Evaluation Of Waste Water TreatmentSystem (WWT)

2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000

3 Basic K3 (Non-certification) 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 3.950.0004 Clean Development Mechanism (CDM) 2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 13-14 24-25 15-16 26-27 26-27 3.950.0005 Contractor Safety Management System 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.0006 HSE Risk Assesment 2 29-30 14-15 14-15 11-12 28-29 28-29 11-12 27-28 12-13 29-30 14-15 12-13 3.950.0007 Improvement Of Waste Water Treatment 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 01-02 19-20 03-04 21-22 19-20 3.950.0008 Job Safety Analysis 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 08-09 26-27 10-11 28-29 27-28 3.950.0009 Permit To Work System 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 15-16 05-06 17-18 07-08 05-06 3.950.000

10 Penanganan Limbah B3, Bahan Berbahaya dan Beracun 1 24-24 12-12 16-16 13-13 23-23 27-27 13-13 20-20 14-14 24-24 16-16 14-14 2.500.000

11 Pandemic Preparedness for Leaders 1 29-29 12-12 12-12 09-09 28-28 25-25 09-09 27-27 10-10 29-29 12-12 10-10 2.250.00012 HAZARD IDENTIFICATION & KYT TRAINING 1 24-24 07-07 07-07 04-04 23-23 04-04 04-04 20-20 05-05 24-24 07-07 05-05 2.250.00013 Advanced Rigging 5 22-26 19-23 19-23 16-20 21-25 04-08 16-20 27-31 17-21 22-26 19-23 17-21 9.500.00014 Basic rigging 5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 30-03 24-28 29-02 26-30 03-07 9.500.00015 Basic Scaffolding 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.950.00016 Forklift Safety 1 08-08 12-12 12-12 09-09 02-02 25-25 09-09 20-20 10-10 08-08 12-12 26-26 2.250.00017 CONFINED SPACE 1 15-15 19-19 19-19 16-16 14-14 08-08 16-16 13-13 17-17 15-15 19-19 17-17 2.250.000

18ASPEK DAN DAMPAK LINGKUNGAN SISTEMMANAJEMEN ISO 14001-2004

2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000

19 HSE Internal Audit Based on ISO 19011-2011 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000

20INTEGRATED QHSE MANAGEMENT SYSTEM (ISO 9001-2008, ISO 14001 2004 & OHSAS 18001-2007)

4 22-25 12-15 13-16 10-13 21-24 25-28 10-13 28-31 11-14 22-25 13-16 11-14 7.950.000

21 INTERNAL AUDIT HSE 2 31-01 21-22 21-22 18-19 30-31 07-08 18-19 20-21 19-20 31-01 21-22 19-20 3.950.000

22Internal Audit OHSAS 18001-2007 Based on ISO 19011-2013

2 17-18 12-13 12-13 09-10 16-17 25-26 09-10 15-16 10-11 17-18 12-13 10-11 3.950.000

23Internal Audit Integrated QHSE Management SystemBased on ISO 19011-2011

4 23-26 20-23 20-23 17-20 22-25 05-08 17-20 27-30 18-21 23-26 20-23 18-21 7.950.000

24 INTERPRETING & DOCUMENTING OF OHSAS 18001 2007 2 18-19 19-20 19-20 16-17 17-18 06-07 16-17 13-14 17-18 18-19 19-20 17-18 3.950.000

25Understanding & Implementing Of HSE (Health, Safety& Environment) Management Systems

2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 08-09 19-20 10-11 21-22 19-20 3.950.000

26 Pemahaman, Dokumentasi & Implementasi SMK3 2 30-31 14-15 12-13 09-10 29-30 25-26 09-10 27-28 10-11 30-31 12-13 10-11 3.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN1 PRIMAVERA P6 FOR PROJECT MANAGEMENT(PM) 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 27-29 17-19 29-31 19-21 17-19 5.950.0002 PROJECT MANAGEMENT OFFICE 2 15-16 12-13 12-13 09-10 14-15 28-29 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

Page 49: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

3 BERITA ACARA PEMERIKSAAN 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.0004 INTELLIGENT & INVESTIGATION 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.0005 SECURITY RISK ASSESSMENT 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.0006 INVESTIGATIVE TECHNIQUES 2 02-03 21-22 21-22 18-19 02-03 07-08 18-19 30-31 19-20 01-02 21-22 19-20 3.950.0007 RISK MANAGEMENT FUNDAMENTAL 2 10-11 28-01 28-29 25-26 09-10 28-29 25-26 06-07 26-27 10-11 28-29 27-28 3.950.0008 TEKNIK NLP INVESTIGATION 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 15-16 05-06 17-18 07-08 05-06 3.950.0009 INTERVIEW AND INTERROGATION 2 24-25 14-15 14-15 11-12 23-24 25-26 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000

10 ADVANCE SECURITY INVESTIGATION 2 31-01 22-23 22-23 19-20 30-31 06-07 19-20 29-30 20-21 31-01 22-23 20-21 3.950.000

11COMMUNITY SAFETY, CRIME PREVENTION AND SOCIALCONTROL

2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000

12 INTELLIGENT & BOMB THREAT 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 08-10 05-07 10-12 07-09 05-07 5.950.00013 INTELLIGENT SECURITY DALAM INDUSTRI 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 13-14 13-14 18-19 15-16 13-14 3.950.00014 INVESTIGATION REPORTING 2 25-26 19-20 19-20 16-17 24-25 04-05 16-17 20-21 17-18 25-26 19-20 17-18 3.950.00015 PENGAMANAN OBYEK VITAL 2 01-02 26-27 26-27 23-24 31-01 25-26 23-24 30-31 24-25 01-02 26-27 27-28 3.950.00016 PROSEDUR DAN RENCANA AKSI SEKURITI 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 02-03 03-04 04-05 05-06 03-04 3.950.00017 SECURITY INCIDENT REPORT WRITING 2 08-09 14-15 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00018 SECURITY VULNERABILITY ASSESSMENT 2 15-16 21-22 21-22 18-19 14-15 07-08 18-19 15-16 19-20 15-16 21-22 19-20 3.950.00019 TEKNIK WAWANCARA PEMERIKSAAN 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.00020 Shipping Agency 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00021 ISO IEC 17020 2012 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.00022 SOAR Analysis 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.00023 SWOT Analysis 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 3.950.00024 SIKAP KERJA 5S 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.00025 HR Audit (Audit SDM) 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00026 7 Management Tools 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00027 7 QC Tools (7 Alat Pengendali Mutu) 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.00028 Dasar-dasar Manajemen Produksi 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.00029 Dasar-dasar Organisasi 2 02-03 28-01 28-29 25-26 02-03 25-26 25-26 30-31 26-27 01-02 28-29 27-28 3.950.00030 Finance for Non Finance Staff 2 10-11 07-08 07-08 04-05 09-10 07-08 04-05 08-09 05-06 10-11 07-08 05-06 3.950.00031 Gemba Kaizen (Continuous Improvement) 2 17-18 14-15 15-16 12-13 16-17 27-28 12-13 15-16 13-14 17-18 15-16 13-14 3.950.00032 HR for Non HR 2 25-26 21-22 21-22 18-19 24-25 04-05 18-19 20-21 19-20 25-26 21-22 19-20 3.950.00033 Human Resources Management 3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 29-31 26-28 31-02 28-30 26-28 5.950.00034 Kepemimpinan Gemba 2 11-12 12-13 12-13 09-10 10-11 25-26 09-10 09-10 10-11 11-12 12-13 10-11 3.950.00035 Manajemen Mutu 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.00036 Manajemen Supervisi 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 06-08 17-19 08-10 19-21 17-19 5.950.00037 Marketing for Non Marketing Staff 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 15-16 26-27 15-16 28-29 27-28 3.950.00038 Materials Management 2 24-25 07-08 07-08 04-05 23-24 04-05 04-05 20-21 05-06 24-25 07-08 05-06 3.950.00039 Pelatihan Aplikasi DELTA 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 29-31 12-14 31-02 14-16 12-14 5.950.00040 Penerapan Program 5S 2 03-04 22-23 22-23 19-20 03-04 06-07 19-20 30-31 20-21 01-02 22-23 20-21 3.950.000

Page 50: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

41 Pengenalan Program 5S 1 11-11 02-02 30-30 27-27 10-10 25-25 27-27 09-09 28-28 11-11 30-30 26-26 2.250.00042 Perencanaan & Pengendalian Produksi 3 17-19 07-09 07-09 04-06 16-18 06-08 04-06 13-15 05-07 17-19 07-09 05-07 5.950.00043 Perilaku Organisasi 3 24-26 12-14 12-14 09-11 23-25 26-28 09-11 27-29 10-12 24-26 12-14 10-12 5.950.000

44PROSDEM Pemecahan Masalah dan PengambilanKeputusan

3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 17-19 5.950.000

45 Quality Awareness Peduli Mutu 2 04-05 26-27 26-27 23-24 02-03 28-29 23-24 20-21 24-25 03-04 26-27 27-28 3.950.00046 Service Excellence 2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 09-10 03-04 11-12 05-06 03-04 3.950.00047 Statistical Quality Control 2 15-16 14-15 15-16 12-13 14-15 25-26 12-13 15-16 13-14 15-16 15-16 13-14 3.950.00048 Teknik Rapat 2 01-02 28-01 28-29 25-26 31-01 27-28 25-26 30-31 26-27 01-02 28-29 26-27 3.950.00049 Teknik Wawancara 1 02-02 07-07 07-07 04-04 04-04 06-06 04-04 30-30 05-05 05-05 07-07 05-05 2.250.00050 Training for Trainers 2 17-18 19-20 19-20 16-17 16-17 07-08 16-17 13-14 17-18 17-18 19-20 17-18 3.950.00051 Training Management 2 24-25 01-02 29-30 26-27 23-24 25-26 26-27 20-21 27-28 24-25 29-30 27-28 3.950.00052 Work Force Management 2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000

53BEING A GREAT SUPERVISOR SUPERVISORS THE MOSTIMPORTANT POSITION OF THE ORGANIZATIONOPERATIONALLY

2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000

54 Engagement and Retention 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000

55 Lean Thinking In Improving Workplace Performance 2 24-25 14-15 14-15 11-12 23-24 25-26 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000

56 Suppliers Evaluation 2 31-01 21-22 21-22 18-19 30-31 04-05 18-19 29-30 19-20 31-01 21-22 19-20 3.950.00057 The AIDDA-SPIN Selling System 2 10-11 08-09 08-09 05-06 09-10 06-07 05-06 08-09 06-07 10-11 08-09 06-07 3.950.00058 Total Quality Management 2 18-19 12-13 15-16 12-13 17-18 28-29 12-13 13-14 13-14 18-19 15-16 13-14 3.950.00059 Workforce Management 2 25-26 22-23 22-23 19-20 24-25 07-08 19-20 20-21 20-21 25-26 22-23 20-21 3.950.00060 5S - Housekeeping Management 2 01-02 26-27 26-27 23-24 31-01 25-26 23-24 30-31 24-25 01-02 26-27 27-28 3.950.00061 Managers Training of Enlightment 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 02-03 03-04 04-05 05-06 03-04 3.950.00062 Probing Techniques 2 11-12 14-15 12-13 09-10 10-11 27-28 09-10 09-10 10-11 11-12 12-13 10-11 3.950.00063 KEY PERFORMANCE INDICATORS 2 29-30 07-08 07-08 04-05 28-29 04-05 04-05 27-28 05-06 29-30 07-08 05-06 3.950.000

64ELECTRONIC FILING & DOCUMENT MANAGEMENTSYSTEM

3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000

65 FUNDAMENTALS OF STRATEGIC PLANNING 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000

66MODERN OFFICE ADMINISTRATION FOR EXECUTIVESECRETARY AND EXECUTIVE ADMINISTRATION

2 08-09 05-06 05-06 02-03 07-08 07-08 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000

67NEGOTIATION AND LOBBYING SKILLS FOR DECISIONMAKER

2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

68OUTSOURCING MANAGEMENT Memberdayakan TenagaOutsourcing

2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000

69OUTSOURCING MANAGEMENT MEMBERDAYAKANTENAGA MITRA KERJA (TMK) DI PERUSAHAAN

2 01-02 28-01 28-29 25-26 31-01 28-29 25-26 30-31 26-27 01-02 28-29 27-28 3.950.000

Page 51: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

70ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFSMETHOD BASED ON DOCUMENT REGULATION

3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000

71 Office Management And Filing System 2 08-09 01-02 29-30 26-27 07-08 25-26 26-27 06-07 27-28 08-09 29-30 26-27 3.950.000

72PAYROLL ADMINISTRATION SYSTEM IMPLEMENTATIONWITH EXCEL 2010 & VBA

2 18-19 07-08 07-08 04-05 17-18 07-08 04-05 13-14 05-06 18-19 07-08 05-06 3.950.000

73 Profesional General Affair Officer With Data Processing 2 10-11 08-09 08-09 05-06 09-10 06-07 05-06 08-09 06-07 10-11 08-09 06-07 3.950.000

74Training Need Analysis which Comprehensive AndEffective

2 15-16 12-13 15-16 12-13 14-15 25-26 12-13 15-16 13-14 15-16 15-16 13-14 3.950.000

75 A3 REPORT 2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 27-28 24-25 29-30 26-27 26-27 3.950.00076 CONTINUOUS IMPROVEMENT 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.00077 IMPLEMENTASI 5R 2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00078 Security Risk Assessment for Leaders 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

79 Security Risk Management for High Risk Industries 3 08-10 26-28 26-28 23-25 07-09 26-28 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000

80 Teknik Investigasi Fraud Berbasis NLP 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 13-15 03-05 15-17 05-07 03-05 5.950.000

81 Teknik Komunikasi Safety yang Prima Berbasis NLP 1 22-22 13-13 13-13 10-10 21-21 29-29 10-10 20-20 11-11 22-22 13-13 11-11 2.250.000

82 Teknik Komunikasi Security yang Prima Berbasis NLP 1 30-30 21-21 21-21 18-18 29-29 04-04 18-18 28-28 19-19 30-30 21-21 19-19 2.250.000

83 Teknik Penyusunan SOP Security 2 04-05 01-02 29-30 26-27 03-04 25-26 26-27 01-02 27-28 03-04 29-30 26-27 3.950.00084 Teknik Wawancara Investigasi Berbasis NLP 2 11-12 08-09 08-09 05-06 10-11 05-06 05-06 09-10 06-07 11-12 08-09 06-07 3.950.00085 Terrorism Risk Management for Leaders 1 18-18 14-14 14-14 11-11 17-17 27-27 11-11 16-16 12-12 18-18 14-14 12-12 2.250.000

86 FORMASI PENDALAMAN IFRS-PSAK terbaru 2013-2015 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000

87INTERNATIONAL FINANCIAL REPORTING STANDARDS(IFRS)

2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

88 5S IN MANUFACTURING 1 15-15 19-19 19-19 16-16 14-14 04-04 16-16 13-13 17-17 15-15 19-19 17-17 2.250.00089 ENHANCING MANAGERIAL SKILL & LEADERSHIP 2 29-30 05-06 05-06 02-03 28-29 05-06 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000

90FAILURE MANAGEMENT WITH FAILURE MODE ANDEFFECT ANALYSIS

1 02-02 12-12 12-12 09-09 02-02 27-27 09-09 30-30 10-10 01-01 12-12 10-10 2.250.000

91 GEMBA KAIZEN 2 08-09 20-21 20-21 17-18 07-08 07-08 17-18 06-07 18-19 08-09 20-21 18-19 3.950.00092 GUGUS KENDALI MUTU (GKM) & PDCA DELTA 2 16-17 28-01 28-29 25-26 15-16 28-29 25-26 14-15 26-27 16-17 28-29 27-28 3.950.00093 INCREASING MANUFACTURING PROFIT 2 31-01 13-14 13-14 10-11 30-31 25-26 10-11 29-30 11-12 31-01 13-14 11-12 3.950.00094 LEAN MANUFACTURING SYSTEM 2 03-04 22-23 22-23 19-20 03-04 05-06 19-20 31-01 20-21 02-03 22-23 20-21 3.950.000

95MANAGEMENT OPERATING SYSTEM THROUGH RACICONCEPT

1 18-18 08-08 08-08 05-05 17-17 07-07 05-05 16-16 06-06 18-18 08-08 06-06 2.250.000

96 Manufacturing Cost Improvement 2 25-26 14-15 15-16 12-13 24-25 28-29 12-13 20-21 13-14 25-26 15-16 13-14 3.950.000

Page 52: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

97MASTERING QC 7 TOOLS FOR PROBLEM SOLVING &IMPROVEMENT

2 01-02 19-20 19-20 16-17 31-01 07-08 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

98 Production Optimization and Minimize Down Time 2 18-19 12-13 12-13 09-10 17-18 27-28 09-10 13-14 10-11 18-19 12-13 10-11 3.950.000

99 Manufacturing Planning & Control 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000100 Practical Supply Chain Management 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000101 Principle of Manufacturing Management 2 02-03 12-13 12-13 09-10 02-03 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000102 Principle of Operation Planning 2 08-09 19-20 19-20 16-17 07-08 06-07 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000103 PRODUCTION PLAN & INVENTORY CONTROL 2 15-16 28-01 28-29 25-26 14-15 28-29 25-26 13-14 26-27 15-16 28-29 27-28 3.950.000

104 Project Planning And Control Using microsoft project 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000

105 Project Planning And Control Using Oracle Primavera P6 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000

106Enterprise Resource Planing (ERP) with SAP BusinessOne

3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5,950,000

107 KOMPUTER AKUNTANSI DAN PAJAK UMKM 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3,950,000

108 PROJECT MANAGEMENT FOR NON PROJECT MANAGER 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 4.500.000

109TINGKAT KOMPONEN DALAM NEGERI (TKDN)PERATURAN, PENERAPAN DAN EVALUASI

2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 4.500.000

110CREATIVE PROBLEM SOLVING AND SHARP DECISIONMAKING

2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000

111 CUSTOMER SERVICE EXCELLENT 2 02-03 05-06 05-06 02-03 02-03 07-08 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000

112EFFECTIVE HANDLING COMPLAINT AND PROBLEMSOLVING

2 08-09 12-13 12-13 09-10 07-08 27-28 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000

113 LEADERSHIP DEVELOPMENT PROGRAM 2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 27-28 3.950.000114 LEADERSHIP FOR FORMEN 2 31-01 07-08 07-08 04-05 30-31 06-07 04-05 30-31 05-06 31-01 07-08 05-06 3.950.000115 POSITIVE FIGHTER FOR SALES PEOPLE 2 04-05 14-15 14-15 11-12 03-04 25-26 11-12 01-02 12-13 03-04 14-15 12-13 3.950.000

116POWERFUL MARKETING AND SALES TO BOOSTINGYOUR TARGET

2 17-18 01-02 29-30 26-27 16-17 27-28 26-27 15-16 27-28 17-18 29-30 26-27 3.950.000

117 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 2 01-02 12-13 15-16 12-13 31-01 28-29 12-13 27-28 13-14 01-02 15-16 13-14 3.950.000

118 SERVICE WITH DELIGHT (FOR GA & SUPPORT TEAM ) 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 09-10 24-25 11-12 26-27 27-28 3.950.000

119STRATEGIC HUMAN RESOURCE MANAGEMENT ANDORGANIZATION DEVELOPMENT

3 17-19 05-07 05-07 02-04 16-18 06-08 02-04 13-15 03-05 17-19 05-07 03-05 5.950.000

120 SUPERVISORY PROGRAM 2 24-25 14-15 12-13 09-10 23-24 27-28 09-10 20-21 10-11 24-25 12-13 10-11 3.950.000

121 MANAGING AND CONDUCTING MEETING EFFECTIVELY 2 04-05 28-01 28-29 25-26 03-04 28-29 25-26 30-31 26-27 01-02 28-29 26-27 3,950,000

122 TFT -FOR ICE BREAKER 2 08-09 08-09 08-09 05-06 07-08 06-07 05-06 06-07 06-07 08-09 08-09 06-07 3,950,000

Page 53: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

123 BUSINESS PROCESS MANAGEMENT 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

124ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM

2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000

125ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM COMPLETE IMPLEMENTATION

5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 27-31 24-28 29-02 26-30 03-07 8.950.000

126ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM CORE IMPLEMENTATION

3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 26-28 5.950.000

127ISO 27001 INFORMATION SECURITY MANAGEMENTSYSTEM INTERNAL AUDIT

2 08-09 14-15 14-15 11-12 07-08 25-26 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000

128ISO 28000 SUPPLY CHAIN SECURITY MANAGEMENTSYSTEM

2 17-18 21-22 21-22 18-19 16-17 04-05 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000

129ISO 31000 - RISK MANAGEMENT PRINCIPLES ANDGUIDELINES

2 24-25 26-27 26-27 23-24 23-24 27-28 23-24 20-21 24-25 24-25 26-27 26-27 3.950.000

130 ISO IEC 9000 2008 QUALITY MANAGEMENT SYSTEM 2 10-11 22-23 22-23 19-20 09-10 07-08 19-20 08-09 20-21 10-11 22-23 20-21 3.950.000131 RISK MANAGEMENT ON OPERATIONAL BUSINESS 2 18-19 28-01 28-29 25-26 17-18 25-26 25-26 13-14 26-27 18-19 28-29 27-28 3.950.000132 Records Management System (RMS) 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000

133 Teknik-Teknik Pembenahan Dokumen Arsip In Aktif 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000

134 Customer Care and Service Excellence 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000135 Accounting For Non Accountant 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 01-03 19-21 17-19 5.950.000136 Advance Business Process Management 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 06-08 24-26 08-10 26-28 26-28 5.950.000137 ADVANCED PROJECT MANAGEMENT 2 15-16 05-06 05-06 02-03 14-15 07-08 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000138 BUSINESS ANALYSIS FOUNDATION 2 22-23 12-13 12-13 09-10 21-22 28-29 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000139 Business Process Mapping 2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 27-28 20-21 29-30 22-23 20-21 3.950.000140 ESSENTIALS OF PROJECT MANAGEMENT 3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.000141 Human Resources Policies And SOP HRD 2 24-25 19-20 19-20 16-17 23-24 07-08 16-17 20-21 17-18 24-25 19-20 17-18 3.950.000142 ISO 27001 FOUNDATION TRAINING 2 02-03 08-09 08-09 05-06 03-04 04-05 05-06 30-31 06-07 01-02 08-09 06-07 3.950.000143 IT BALANCED SCORECARD 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000144 KPIs With Balance Score Card 2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000145 LOGISTICS MANAGEMENT TRAINING 3 29-31 12-14 14-16 11-13 28-30 27-29 11-13 29-31 12-14 29-31 14-16 12-14 5.950.000146 PMBOK PROJECT MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 13-15 05-07 15-17 07-09 05-07 5.950.000147 PRACTICAL BALANCED SCORECARD 3 24-26 13-15 12-14 09-11 23-25 27-29 09-11 27-29 10-12 24-26 12-14 10-12 5.950.000148 Practical Planning And Controlling Project 3 31-02 19-21 19-21 16-18 30-01 04-06 16-18 01-03 17-19 31-02 19-21 17-19 5.950.000149 Primavera P6 Professional Fundamental 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 08-10 24-26 01-03 26-28 26-28 5.950.000150 PROJECT COST ESTIMATION 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 14-16 12-14 17-19 14-16 12-14 5.950.000151 PROJECT COST MANAGEMENT 3 22-24 21-23 21-23 18-20 21-23 04-06 18-20 29-31 19-21 22-24 21-23 19-21 5.950.000152 PROJECT FINANCING 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 30-01 26-28 29-31 28-30 26-28 5.950.000153 PROJECT LEADERSHIP 2 02-03 07-08 07-08 04-05 02-03 07-08 04-05 20-21 05-06 04-05 07-08 05-06 3.950.000

Page 54: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

154 PROJECT MANAGEMENT based on PRINCE2 3 08-10 13-15 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000155 Project Management For HR Profesional 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000156 PROJECT MANAGEMENT FUNDAMENTALS 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 27-29 24-26 24-26 26-28 26-28 5.950.000157 PROJECT MANAGEMENT IN SALES 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 31-02 07-09 05-07 5.950.000158 PROJECT MANAGEMENT IN MARKETING 3 03-05 12-14 14-16 11-13 02-04 27-29 11-13 08-10 12-14 01-03 14-16 12-14 5.950.000

159 PROJECT MANAGEMENT USING MICROSOFT PROJECT 3 10-12 21-23 21-23 18-20 09-11 04-06 18-20 14-16 19-21 10-12 21-23 19-21 5.950.000

160 PROJECT QUALITY MANAGEMENT 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000161 PROJECT RISK MANAGEMENT 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000162 SUPPLY CHAIN MANAGEMENT 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 01-03 05-07 15-17 07-09 05-07 5.950.000163 CORPORATE CASH MANAGEMENT 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000164 CORPORATE FINANCE 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 03-04 3.950.000165 FINANCIAL ACCOUNTING FOR NON 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000166 FINANCIAL-ACCOUNTING ANALYSIS & REPORTING 2 22-23 19-20 19-20 16-17 21-22 06-07 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000167 STRATEGIC BUSINESS & FINANCIAL ANALYSIS 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 27-28 3.950.000168 THE STATEMENT OF CASH FLOW 2 04-05 07-08 07-08 04-05 03-04 07-08 04-05 30-31 05-06 03-04 07-08 05-06 3.950.000169 ACCOUNT PAYABLE MANAGEMENT 2 10-11 14-15 14-15 11-12 09-10 25-26 11-12 06-07 12-13 10-11 14-15 12-13 3.950.000170 Basic Professional Salesperson 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000171 Boosting Sales Promotion Girl or Boy (SPG or SPB) 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.000172 Design & Delivery Sales Presentation 2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000173 Managing Objection, Customer Solution 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000174 Service Quality (Level Basic) 2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 13-14 12-13 15-16 14-15 12-13 3.950.000175 Service Quality (Level Intermediate) 2 24-25 21-22 21-22 18-19 23-24 07-08 18-19 20-21 19-20 24-25 21-22 19-20 3.950.000176 Strategic Way Of Selling 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.000177 The Art Of Persuasive Negotiation & Closing Sales 2 04-05 07-08 07-08 04-05 03-04 04-05 04-05 01-02 05-06 03-04 07-08 05-06 3.950.000178 ASPECTS OF CONTRACT 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000179 HUKUM KEPAILITAN 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000180 AUDIT OPERASIONAL & KINERJA 2 15-16 26-27 26-27 23-24 02-03 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000

181BASIC AUDIT TECHNIQUES & TOOLS FOR THE NEWAUDITORS

3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000

182 Dasar-Dasar Audit Internal 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 20-21 10-11 29-30 12-13 10-11 3.950.000

183MEMBANGUN & MENGEMBANGKAN INTERNAL AUDITDEPARTEMENT

2 02-03 19-20 19-20 16-17 03-04 07-08 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

184Peran Auditor Internal Dalam Mencegah Kecurangan(Fraud)

2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000

185 SKILLS FOR THE BEGINNING AUDITORS 2 17-18 08-09 08-09 05-06 14-15 04-05 05-06 15-16 06-07 17-18 08-09 06-07 3.950.000186 FRAUD & INVESTIGATIVE AUDITING 2 25-26 14-15 14-15 11-12 24-25 25-26 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000187 HR Audit 2 31-01 21-22 21-22 18-19 30-31 06-07 18-19 30-31 19-20 31-01 21-22 19-20 3.950.000188 Soul Selling 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 27-28 3.950.000

Page 55: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

189 CREATIVE PROBLEM SOLVING AND DECISION MAKING 2 22-23 19-20 19-20 16-17 21-22 06-07 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000

190 MANAGING AND SUPERVISING PEOPLE AT WORK 2 04-05 07-08 07-08 04-05 03-04 07-08 04-05 01-02 05-06 03-04 07-08 05-06 3.950.000191 MANAJEMEN ATASAN 2 10-11 14-15 14-15 11-12 09-10 25-26 11-12 08-09 12-13 10-11 14-15 12-13 3.950.000192 MANAJEMEN PERKANTORAN MODERN 2 17-18 21-22 21-22 18-19 16-17 04-05 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000193 MANAJEMEN PERUBAHAN 2 24-25 01-02 29-30 26-27 23-24 27-28 26-27 20-21 27-28 24-25 29-30 26-27 3.950.000194 MANAJEMEN SUMBER DAYA MANUSIA 2 02-03 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000195 MENJADI SEKRETARIS PROFESIONAL 2 18-19 26-27 26-27 23-24 17-18 25-26 23-24 13-14 24-25 18-19 26-27 27-28 3.950.000196 PROFESSIONAL ADMINISTRATION SKILLS 2 25-26 05-06 05-06 02-03 24-25 04-05 02-03 20-21 03-04 25-26 05-06 03-04 3.950.000197 SUPERVISORY MANAGEMENT 2 04-05 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000198 EFFECTIVE MEETING PLANING 2 22-23 12-13 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000199 REPORT WRITING 2 29-30 21-22 21-22 18-19 28-29 04-05 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000200 Technical Report Writing & Presentation Skills 3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 03-05 28-30 26-28 5.950.000201 INTERNAL QUALITY AUDIT ISO 9001_2015 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 4.500.000202 TOTAL QUALITY CONTROL 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 4.500.000203 Advance Supervisory Management 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000

204ANALISIS KEBUTUHAN PELATIHAN (TRAINING NEEDSANALYSIS)

2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000

205 Influential Leadership Excellence 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 5.950.000206 Leader as a C.O.A.C.H 3 03-05 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 5.950.000207 Practical Customer Service 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.000208 Working as a Team Excellence 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000

209EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYAKEPABEANAN

3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000

210 L C, UCP 600, ISBP DAN EXIM TRADE FINANCE 3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 08-10 05-07 03-05 5.950.000211 MANAGEMENT EXPORT–IMPORT 2 15-16 12-13 12-13 09-10 14-15 28-29 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

212EXPORT IMPORT DALAM RANGKA EFISIENSI BIAYAKEPABEANAN PLUS VISIT TJ. PRIOK

3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000

213SYSTEM PERPAJAKAN KEPABEANAN PELABUHAN DANIT INVENTORY KAWASAN BERIKAT

2 29-30 01-02 29-30 26-27 28-29 25-26 26-27 20-21 27-28 29-30 29-30 26-27 3.950.000

214 Media Relation and Communication 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000215 Media Relations Strategy & Executions 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000216 Media Relations Strategy for Effective Promotion 2 22-23 12-13 12-13 09-10 21-22 28-29 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000217 Lean Manufacturing 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000218 Lean Warehousing 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000219 CORPORATE COMMUNITY RELATION 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000

220CSR COMMUNICATION AND SOCIAL BRANDINGBUILDING

2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000

Page 56: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

221CSR COMMUNICATION FOR ORGANIZATIONALLEGITIMACY IN SOCIAL MEDIA

2 29-30 26-27 26-27 23-24 28-29 27-28 23-24 27-28 24-25 29-30 26-27 26-27 3.950.000

222 CSR COMMUNICATION IN OFFICIAL WEBSITE 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000223 CSR PATNERSHIP & STAKEHOLDER RELATIONSHIP 2 08-09 14-15 14-15 11-12 07-08 28-29 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000224 CSR STRATEGIC & CORPORATE REPUTATION 2 17-18 21-22 21-22 18-19 16-17 07-08 18-19 15-16 19-20 17-18 21-22 19-20 3.950.000

225CUSTOMER RETENTION MARKETING MEMBANGUNHUBUNGAN LEBIH BAIK DENGAN PELANGGAN

2 24-25 28-01 28-29 25-26 23-24 25-26 25-26 20-21 26-27 24-25 28-29 27-28 3.950.000

226 EFFECTIVE CSR COMMUNICATION IN MASS MEDIA 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.000

227IMC DRIVER FOR INTEGRATED MARKETINGCOMMUNICATIONS (IMC)

2 04-05 12-13 15-16 12-13 03-04 27-28 12-13 01-02 13-14 03-04 15-16 13-14 3.950.000

228 INTEGRATED CORPORATE COMMUNICATION 2 10-11 22-23 22-23 19-20 09-10 06-07 19-20 08-09 20-21 10-11 22-23 20-21 3.950.000

229INTERNAL COMMUNICATION AND CHANGECOMMUNICATION

2 18-19 01-02 29-30 26-27 17-18 28-29 26-27 13-14 27-28 18-19 29-30 26-27 3.950.000

230KOMUNIKASI ORGANISASI PENINGKATAN KINERJAKOPERASI

2 25-26 08-09 08-09 05-06 24-25 07-08 05-06 20-21 06-07 25-26 08-09 06-07 3.950.000

231 MANAGING ISSUE AND RESPONDING TO CRISIS 2 01-02 14-15 12-13 09-10 31-01 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000

232MEDIA RELATIONS PRACTICE DAN TECHNIQUES INMEDIA RELATIONS

2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 02-03 17-18 04-05 19-20 17-18 3.950.000

233 OPTIMALISASI CYBER PUBLIC RELATIONS 3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 08-10 24-26 10-12 26-28 26-28 5.950.000234 PROFESSIONAL WRITING AND PUBLISHING 2 22-23 12-13 14-15 11-12 21-22 25-26 11-12 20-21 12-13 22-23 14-15 12-13 3.950.000

235 SHARIAH BANK & CORPORATE SOCIAL RESPONSIBILITY 2 29-30 21-22 21-22 18-19 28-29 07-08 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000

236STRATEGI KOMUNIKASI PEMASARAN PRODUK DAN JASAKOPERASI

2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 30-31 27-28 01-02 29-30 26-27 3.950.000

237COMPREHENSIVE IN HOUSE MAGAZINE WRITING SKILLFOR CORPORATE BRANDING

2 08-09 07-08 07-08 04-05 07-08 04-05 04-05 06-07 05-06 08-09 07-08 05-06 3.950.000

238COMPREHENSIVE NEWSLETTER WRITING SKILL FORCORPORATE BRANDING

2 17-18 14-15 15-16 12-13 16-17 28-29 12-13 13-14 13-14 17-18 15-16 13-14 3.950.000

239COMPREHENSIVE PROBLEM SOLVING OF DIRECTMARKETING

2 24-25 22-23 22-23 19-20 23-24 06-07 19-20 20-21 20-21 24-25 22-23 20-21 3.950.000

240 COMPREHENSIVE SUSTAINABLE REPORT WRITING SKILL 2 31-01 26-27 26-27 23-24 30-31 25-26 23-24 29-30 24-25 31-01 26-27 27-28 3.950.000

241CUSTOMER SERVICE SKILL (MENINGKATKANHUBUNGAN HARMONIS DENGAN PELANGGAN MELALUICUSTOMER SERVICE)

2 10-11 12-13 12-13 09-10 09-10 27-28 09-10 08-09 10-11 10-11 12-13 10-11 3.950.000

242DIGITAL MARKETING COMMUNICATIONS UNTUKMENINGKATKAN PENJUALAN

2 18-19 19-20 19-20 16-17 17-18 04-05 16-17 15-16 17-18 18-19 19-20 17-18 3.950.000

243 FACILITATION SKILL FOR COMMUNITY DEVELOPMENT 2 01-02 05-06 05-06 02-03 31-01 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000

Page 57: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

244HANDLING NEGATIVE COMMENT OR COMPLAIN INSOCIAL MEDIA

2 04-05 14-15 14-15 11-12 03-04 25-26 11-12 02-03 12-13 04-05 14-15 12-13 3.950.000

245MANAJEMEN USAHA KECIL Untuk mendukung ProgramCSR bidang Ekonomi

2 11-12 21-22 21-22 18-19 10-11 07-08 18-19 09-10 19-20 11-12 21-22 19-20 3.950.000

246 MEDIA HANDLING & COMMUNICATION SKILLS 2 15-16 01-02 29-30 26-27 14-15 27-28 26-27 13-14 27-28 15-16 29-30 27-28 3.950.000

247MERANCANG MEDIA PROMOSI WISATA YANG EFEKTIFDAN EFISIEN

2 29-30 12-13 15-16 12-13 28-29 28-29 12-13 27-28 13-14 29-30 15-16 13-14 3.950.000

248PELATIHAN PROMOSI WISATA MELALUI VIDEO YANGEFEKTIF DAN EFISIEN

2 02-03 22-23 22-23 19-20 02-03 05-06 19-20 30-31 20-21 01-02 22-23 20-21 3.950.000

249PENGEMBANGAN KETERAMPILAN FASILITATORPEMBERDAYAAN MASYARAKAT

2 17-18 08-09 08-09 05-06 16-17 07-08 05-06 15-16 06-07 17-18 08-09 06-07 3.950.000

250 SKILL AND ATTRIBUTE FOR NEW PUBLIC RELATIONS 2 23-24 14-15 12-13 09-10 22-23 27-28 09-10 20-21 10-11 23-24 12-13 10-11 3.950.000

251TEKNIK DAN SKILL PERIKLANAN KORPORAT MELALUIAUDIO VISUAL

1 31-31 19-19 19-19 16-16 30-30 04-04 16-16 29-29 17-17 31-31 19-19 17-17 2.250.000

252 Annual Report Writing 2 18-19 12-13 14-15 11-12 17-18 25-26 11-12 13-14 12-13 18-19 14-15 12-13 3.950.000

253 Best Practice In Online Event Community Management 2 25-26 20-21 20-21 17-18 24-25 07-08 17-18 20-21 18-19 25-26 20-21 18-19 3.950.000

254 Brand Engagement Di Media Sosial 2 01-02 01-02 29-30 26-27 31-01 27-28 26-27 30-31 27-28 01-02 29-30 26-27 3.950.000255 Brand Strategy & Creativity 2 04-05 07-08 07-08 04-05 02-03 04-05 04-05 02-03 05-06 04-05 07-08 05-06 3.950.000

256 Corporate Advertising & Media Placement Strategy 2 11-12 14-15 15-16 12-13 10-11 28-29 12-13 09-10 13-14 11-12 15-16 13-14 3.950.000

257 Corporate Identity Process And Development 2 15-16 22-23 22-23 19-20 14-15 06-07 19-20 15-16 20-21 15-16 22-23 20-21 3.950.000258 CSR Communication Management 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 27-28 3.950.000259 Effective Business Writing And Communication 2 29-30 08-09 08-09 05-06 28-29 07-08 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000

260Maketing Communication For Cooperatives And Small-Medium Businesses

2 02-03 12-13 12-13 09-10 03-04 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000

261 Problem Solving Of Direct Marketing 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000262 Proposal And Business Report 2 17-18 28-01 28-29 25-26 16-17 28-29 25-26 13-14 26-27 17-18 28-29 26-27 3.950.000263 Consultative Selling Process 2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000264 Inbound & Outbound Sales Call 2 29-30 05-06 05-06 02-03 28-29 04-05 02-03 27-28 03-04 29-30 05-06 03-04 3.950.000265 Leadership Skill For Sales Leader 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 01-03 12-14 10-12 5.950.000266 Retail Sales Training 2 08-09 19-20 19-20 16-17 07-08 06-07 16-17 06-07 17-18 08-09 19-20 17-18 3.950.000267 Solution Selling Skill For Pharmaceutical Industry 2 31-01 14-15 15-16 12-13 30-31 27-28 12-13 29-30 13-14 31-01 15-16 13-14 3.950.000268 The 7 Skills of Salesmanship 2 04-05 21-22 21-22 18-19 02-03 04-05 18-19 02-03 19-20 04-05 21-22 19-20 3.950.000269 CHANGE MANAGEMENT 2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000270 CREATIVE & INNOVATIVE THINKING 2 15-16 07-08 07-08 04-05 14-15 07-08 04-05 13-14 05-06 15-16 07-08 05-06 3.950.000271 CUSTOMER SERVICE TRAINING 2 24-25 14-15 14-15 11-12 23-24 28-29 11-12 20-21 12-13 24-25 14-15 12-13 3.950.000272 EXCELLENT SUPERVISORY SKILLS 2 04-05 28-01 28-29 25-26 03-04 25-26 25-26 01-02 26-27 03-04 28-29 27-28 3.950.000273 GOAL SETTING 2 10-11 08-09 08-09 05-06 09-10 07-08 05-06 08-09 06-07 10-11 08-09 06-07 3.950.000

Page 58: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

274 How To Manage & Motivate an Excellent Team 2 17-18 12-13 15-16 12-13 16-17 27-28 12-13 15-16 13-14 17-18 15-16 13-14 3.950.000275 KREATIVITAS DAN INOVASI 2 25-26 19-20 19-20 16-17 24-25 04-05 16-17 20-21 17-18 25-26 19-20 17-18 3.950.000276 LEADERSHIP FOR OFFICER & STAFF 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 27-28 27-28 29-30 29-30 26-27 3.950.000277 LEADERSHIP SKILLS FOR TOP MANAGEMENT 2 02-03 05-06 05-06 02-03 02-03 06-07 02-03 02-03 03-04 04-05 05-06 03-04 3.950.000278 LEADERSHIP TRAINING 2 11-12 14-15 12-13 09-10 10-11 25-26 09-10 09-10 10-11 11-12 12-13 10-11 3.950.000279 Managerial Skills & Leadership Training 2 18-19 21-22 21-22 18-19 17-18 07-08 18-19 13-14 19-20 18-19 21-22 19-20 3.950.000280 MANAJEMEN KONFLIK 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 27-28 3.950.000

281MEMBANGUN BUDAYA PERUSAHAAN YANG KUAT DANUNGGUL

2 04-05 12-13 14-15 11-12 03-04 28-29 11-12 30-31 12-13 01-02 14-15 12-13 3.950.000

282MEMOTIVASI ANGGOTA TIM DAN STAF UNTUKMENINGKATKAN PRODUKTIVITAS MEREKA

2 08-09 22-23 22-23 19-20 07-08 06-07 19-20 06-07 20-21 08-09 22-23 20-21 3.950.000

283 MENGOPTIMALKAN KINERJA KARYAWAN BACK OFFICE 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 15-16 26-27 15-16 28-29 26-27 3.950.000

284 MOTIVASI MENJUAL 2 01-02 14-15 15-16 12-13 31-01 27-28 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000285 Salesmanship 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 01-02 17-18 03-04 19-20 17-18 3.950.000286 SELLING SKILLS 2 10-11 01-02 29-30 26-27 09-10 28-29 26-27 08-09 27-28 10-11 29-30 27-28 3.950.000287 SERVICE EXCELLENT 2 17-18 05-06 05-06 02-03 16-17 06-07 02-03 13-14 03-04 17-18 05-06 03-04 3.950.000288 Star Employee 2 25-26 12-13 12-13 09-10 24-25 25-26 09-10 20-21 10-11 25-26 12-13 10-11 3.950.000289 TEAM BUILDING 2 29-30 21-22 21-22 18-19 28-29 07-08 18-19 27-28 19-20 29-30 21-22 19-20 3.950.000290 PELATIHAN TEAM WORK 2 04-05 26-27 26-27 23-24 03-04 27-28 23-24 02-03 24-25 04-05 26-27 26-27 3.950.000291 TIME MANAGEMENT 2 11-12 07-08 07-08 04-05 10-11 04-05 04-05 09-10 05-06 11-12 07-08 05-06 3.950.000292 USING PSYCHOLOGICAL TECHNIQUES IN SELLING 2 18-19 14-15 14-15 11-12 17-18 28-29 11-12 15-16 12-13 18-19 14-15 12-13 3.950.000293 Conflict Management & Handling Difficult People 2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 30-31 06-07 01-02 08-09 06-07 3.950.000294 SALES FIGHTER 2 24-25 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 24-25 29-30 26-27 3.950.000295 BASIC MANAGERIAL AND LEADERSHIP 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000296 FUNDAMENTAL SUPERVISORY TRAINING 2 22-23 05-06 05-06 02-03 21-22 05-06 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000297 TEAM BUILDING SESSION 2 16-17 07-08 07-08 04-05 15-16 07-08 04-05 14-15 05-06 16-17 07-08 05-06 3.950.000298 DASAR-DASAR MANAJEMEN 2 02-03 26-27 26-27 23-24 02-03 27-28 23-24 30-31 24-25 01-02 26-27 26-27 3.950.000299 KEPEMIMPINAN (LEADERSHIP) 2 15-16 14-15 14-15 11-12 14-15 28-29 11-12 13-14 12-13 15-16 14-15 12-13 3.950.000300 KETERAMPILAN SUPERVISI (SUPERVISORY SKILL) 3 03-05 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 03-05 07-09 05-07 5.950.000301 MANAJEMEN WAKTU (TIME MANAGEMENT) 2 10-11 12-13 15-16 12-13 09-10 27-28 12-13 08-09 13-14 10-11 15-16 13-14 3.950.000302 MANAJEMEN STRATEGI (STRATEGIC MANAGEMENT) 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 15-16 20-21 17-18 22-23 20-21 3.950.000303 MEMBINA KELOMPOK KERJA 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 29-31 26-28 24-26 28-30 26-28 5.950.000304 PENGAMBILAN KEPUTUSAN (DECISION MAKING) 2 02-03 14-15 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000305 Practical Problem Solving 2 22-23 08-09 08-09 05-06 21-22 04-05 05-06 20-21 06-07 22-23 08-09 06-07 3.950.000306 DOCUMENT CONTROLLER 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

307INTEGRATED ISO 9001-2008 & ISO 14001-2004MANAGEMENT SYSTEM

2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 13-14 03-04 15-16 05-06 03-04 3.950.000

Page 59: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

308 Internal Audit ISO 17025-2005 Based on ISO 19011-2011 2 04-05 01-02 29-30 26-27 03-04 28-29 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000

309 Internal Audit ISO 14001-2004 Based on ISO 19011-2012 2 11-12 07-08 07-08 04-05 10-11 04-05 04-05 09-10 05-06 11-12 07-08 05-06 3.950.000

310 Interpreting & Documenting of ISO 9001 with IWA-2 2 01-02 26-27 26-27 23-24 31-01 27-28 23-24 20-21 24-25 01-02 26-27 27-28 3.950.000

311 Interpreting & Documenting of ISO 9001 with IWA-4 2 02-03 08-09 08-09 05-06 02-03 04-05 05-06 02-03 06-07 04-05 08-09 06-07 3.950.000

312 Interpreting & Documenting of ISO 14001-2004 2 08-09 14-15 14-15 11-12 07-08 28-29 11-12 06-07 12-13 08-09 14-15 12-13 3.950.000

313 INTERPRETING AND DOCUMENTING OF ISO 9001 2008 2 22-23 28-01 28-29 25-26 21-22 25-26 25-26 20-21 26-27 22-23 28-29 26-27 3.950.000

314 INTERPRETING OF ISO 9001 2008 1 29-29 05-05 05-05 02-02 28-28 08-08 02-02 31-31 03-03 29-29 05-05 03-03 2.250.000

315INTERNAL QUALITY AUDIT ISO 9001 2008 Based on ISO19011 2011

2 04-05 12-13 15-16 12-13 03-04 27-28 12-13 30-31 13-14 01-02 15-16 13-14 3.950.000

316 Understanding and Documenting of ISO 9001-2008 2 15-16 01-02 29-30 26-27 14-15 28-29 26-27 15-16 27-28 15-16 29-30 27-28 3.950.000

317PEMAHAMAN & PENERAPAN SISTEM MANAJEMENKEAMANAN INFORMASI ISO 27001-2005

2 24-25 06-07 06-07 03-04 23-24 06-07 03-04 20-21 04-05 24-25 06-07 04-05 3.950.000

318Training SOP (Standard Operating Procedure) Writing &Improvement

2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 01-02 20-21 03-04 22-23 20-21 3.950.000

319DOCUMENTING AND IMPLEMENTING OF ISO 9001 2008FOR SERVICE INDUSTRIES

2 11-12 26-27 26-27 23-24 10-11 27-28 23-24 09-10 24-25 11-12 26-27 26-27 3,950,000

320 Key Changes ISO 9001.2008 to ISO 9001.2015 1 17-17 08-08 08-08 05-05 16-16 04-04 05-05 13-13 06-06 17-17 08-08 06-06 2.250.000

321 Understanding and Documenting of ISO 9001 2015 2 25-26 12-13 14-15 11-12 24-25 28-29 11-12 20-21 12-13 25-26 14-15 12-13 3,950,000

322 IT HELPDESK 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 14-16 17-19 15-17 19-21 17-19 5.950.000

323Financial Accounting Information System DevelopmentWith Excel 2007 and VBA

2 29-30 08-09 08-09 05-06 28-29 04-05 05-06 27-28 06-07 29-30 08-09 06-07 3.950.000

324Financial Accounting Information System DevelopmentWith Excel 2010 and VBA

2 04-05 14-15 15-16 12-13 02-03 25-26 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000

325Implementation Of Payroll Admisnistration System WithExcel 2010 For HRD

3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 08-10 19-21 10-12 21-23 19-21 5.950.000

326 Inventory System Development Using Acces 2007 2 17-18 28-01 28-29 25-26 16-17 27-28 25-26 15-16 26-27 17-18 28-29 27-28 3.950.000327 Inventory System Development Using Acces 2010 2 24-25 05-06 05-06 02-03 23-24 04-05 02-03 20-21 03-04 24-25 05-06 03-04 3.950.000

328Mastering Microsoft Project 2007 (Concept andApplication)

2 02-03 19-20 19-20 16-17 03-04 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

329POS AND INVENTORY SYSTEM DEVELOPMENT WITHUSING ACCESS 2010

2 25-26 14-15 14-15 11-12 24-25 27-28 11-12 20-21 12-13 25-26 14-15 12-13 3.950.000

Page 60: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

330Powerful Database Analysis and Dashboard Reportingwith Excel 2010

2 01-02 21-22 21-22 18-19 31-01 04-05 18-19 30-31 19-20 01-02 21-22 19-20 3.950.000

331Workload Analysis Implementation With Excel 2007 forHR & Non HR

2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000

332 ISO IEC 20000 IT SERVICE MANAGEMENT 2 29-30 08-09 08-09 05-06 28-29 06-07 05-06 27-28 06-07 29-30 08-09 03-04 3.950.000333 ISO IEC 38500 IT-GOVERNANCE 2 04-05 12-13 15-16 12-13 02-03 28-29 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000334 ISO 20000 Foundation 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 29-31 24-26 31-02 26-28 26-28 5.950.000335 IT BUSINESS ANALYSIS 3 15-17 21-23 21-23 18-20 14-16 06-08 18-20 13-15 19-21 15-17 21-23 19-21 5.950.000336 IT PROJECT MANAGEMENT 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 27-29 26-28 24-26 28-30 26-28 5.950.000337 IT RISK MANAGEMENT 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 03-07 9.500.000338 IT Strategic Planning 2 04-05 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.000339 Managing Software Requirements 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 30-01 19-21 03-05 21-23 19-21 5.950.000

340PENYUSUNAN PENGELOLAAN TEKNOLOGI INFORMASIBUMN

3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 06-08 26-28 08-10 28-30 26-28 5,950,000

341 SOFTWARE PROJECT MANAGEMENT 3 29-31 13-15 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000342 SOFTWARE QUALITY ASSURANCE 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.000343 SOFTWARE TESTING FOUNDATION 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000344 Systems Analysis and Design 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000345 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000346 GRAFIC DESIGN & PRODUCT PACKAGING 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 30-02 10-13 01-04 12-15 10-13 7.950.000

347COMPREHENSIVE WEBSITE WRITING SKILL FORCORPORATE BRANDING

2 02-03 08-09 08-09 05-06 02-03 07-08 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000

348DUNIA MAYA MERK DAN ADVERTENSI (CARA PRAKTISMENGKOMUNIKASIKAN MEREK DI MEDIA ONLINE)

2 25-26 28-01 28-29 25-26 24-25 28-29 25-26 20-21 26-27 25-26 28-29 26-27 3.950.000

349MENGOPTIMALKAN WEBSITE KORPORAT SEBAGAIMEDIA KOMUNIKASI CSR

1 22-22 07-07 07-07 04-04 21-21 04-04 04-04 20-20 05-05 22-22 07-07 05-05 2.250.000

350TEKNIK DAN SKILL PUBLIKASI COMPANY PROFILEBERBASIS DIGITAL

1 04-04 28-28 28-28 25-25 04-04 29-29 25-25 01-01 26-26 03-03 28-28 28-28 2.250.000

351TRAVEL WRITER DAN KETERAMPILAN MENULISPERJALANAN WISATA MELALUI MEDIA ONLINE

2 10-11 05-06 05-06 02-03 09-10 05-06 02-03 08-09 03-04 10-11 05-06 03-04 3.950.000

352MANAJEMEN RANTAI SUPLAI DI INDUSTRI HULU MIGASINDONESIA

2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 4.500.000

353TUMPANG TINDIH LAHAN PERTAMBANGAN DAN ISSUETENTANNG SMELTER

2 22-23 26-27 26-27 23-24 21-22 25-26 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000

354IMPROVING PERFORMANCE THROUGH COACHING andCOUNSELLING

2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 29-30 20-21 29-30 22-23 20-21 3.950.000

355 COACHING & COUNSELING 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.000356 Sales Coaching Skill For Leader 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 13-14 26-27 15-16 28-29 27-28 3.950.000

Page 61: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

357 COACHING & KONSELING YANG EFEKTIF 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000358 DIRECTING COACHING COUNSELING DELEGATING 1 08-08 19-19 19-19 16-16 07-07 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.000359 COACHING AND COUNSELING 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.000360 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.000361 Kebiasaan Efektif Menuju Sukses 2 04-05 08-09 08-09 05-06 03-04 06-07 05-06 01-02 06-07 03-04 08-09 06-07 3.950.000362 Manajemen Stres 1 02-02 14-14 14-14 11-11 02-02 29-29 11-11 03-03 12-12 05-05 14-14 12-12 2.250.000363 Teknik Presentasi 2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000364 The Champion Training 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.000365 Developing Excellent Internal Trainer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000

366SPEAKING FOR BUSINESS (PRESENTATION,NEGOTIATION & LOBBYING)

2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000

367 EFFECTIVE COMMUNICATION FOR MANAGERS 1 08-08 19-19 19-19 16-16 02-02 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.000368 Analytical Thinking & Problem Solving 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000

369 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000

370 Talent Management 2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.000371 Fundamental Strategic Thinking Skill 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.000372 SMART GOALS SETTING 1 22-22 21-21 21-21 18-18 21-21 05-05 18-18 20-20 19-19 22-22 21-21 19-19 2.250.000

373BUILDING POTENTIAL LEADER THROUGH POSITIVEHABITS

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000

374EXCELLENT MOTIVATION AND TEAM WORK OUTBOUNDTRAINING

2 15-16 22-23 22-23 19-20 14-15 04-05 19-20 13-14 20-21 15-16 22-23 20-21 2.950.000

375 Sales Presentation Skill 2 24-25 07-08 07-08 04-05 23-24 07-08 04-05 20-21 05-06 24-25 07-08 05-06 3.950.000376 NLP FOR NEGOTIATION 2 22-23 22-23 22-23 19-20 21-22 06-07 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000377 HAPPY PENSION 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000378 TEAM & COMMITMENT BUILDING 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 26-27 3.950.000379 MASA PERSIAPAN PENSIUN (MPP) 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.000380 SEVEN HABITS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000381 PROCUREMENT MANAGEMENT 2 11-12 05-06 05-06 02-03 10-11 07-08 02-03 20-21 03-04 11-12 05-06 03-04 3.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MOTIVASI & PERSONALDEVELOPMENT

1INTERPERSONAL COMMUNICATION FOR SELFDEVELOPMENT

2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000

2 METAZONE Class 1 22-22 05-05 05-05 02-02 21-21 05-05 02-02 20-20 03-03 22-22 05-05 03-03 2.250.0003 STRESS MANAGEMENT FOR PRODUCTIVE PEOPLE 1 29-29 12-12 12-12 09-09 28-28 27-27 09-09 27-27 10-10 29-29 12-12 10-10 2.250.0004 Dynamic Presentation Skill 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

Page 62: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

5 Komunikasi Cerdas 2 17-18 07-08 07-08 04-05 16-17 07-08 04-05 15-16 05-06 17-18 07-08 05-06 3.950.0006 Self Coaching for Life Optimization 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000

7MY VALUE… SEBUAH TRAINING MOTIVASI UNTUKKARYAWAN

2 04-05 26-27 26-27 23-24 02-03 25-26 23-24 02-03 24-25 04-05 26-27 27-28 3.950.000

8 POWERFUL COMMUNICATION SKILL 2 10-11 19-20 19-20 16-17 09-10 07-08 16-17 08-09 17-18 10-11 19-20 17-18 3.950.000

9POWERFUL PUBLIC SPEAKING(From Designing Trainingto Powerful Delivery)

2 22-23 08-09 08-09 05-06 21-22 04-05 05-06 20-21 06-07 22-23 08-09 06-07 3.950.000

10 SAY NO!!! To GIVE UP 2 02-03 21-22 21-22 18-19 02-03 06-07 18-19 02-03 19-20 04-05 21-22 19-20 3.950.00011 commitment to change 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.00012 communication for best result 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00013 Personal Development 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.00014 PUBLIC SPEACING & PRESENTATION SKILLS 2 01-02 14-15 12-13 09-10 31-01 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.00015 Excellent Communication at Work 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.00016 Powerful Presentation Excellence 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 5.950.000

17PRESENTATION AND EFFECTIVE COMMUNICATIONSKILLS

2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 15-16 03-04 15-16 05-06 03-04 3.950.000

18 15 ETOS KERJA DAN KEPRIBADIAN 2 22-23 05-06 05-06 02-03 21-22 04-05 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00019 CHARACTER BUILDING 2 02-03 19-20 19-20 16-17 02-03 06-07 16-17 30-31 17-18 01-02 19-20 17-18 3.950.000

20MERANCANG DAN MENYAMPAIKAN PRESENTASI YANGBERKARAKTER, UNIK, DAN MENARIK

2 24-25 08-09 08-09 05-06 23-24 07-08 05-06 20-21 06-07 24-25 08-09 06-07 3.950.000

21 EFFECTIVE COMMUNICATION SKILL 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.00022 EFFECTIVE PRESENTATION SKILLS 2 08-09 12-13 15-16 12-13 07-08 27-28 12-13 06-07 13-14 08-09 15-16 13-14 3.950.00023 PRESENTATION SKILL BASED ON NLP 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 13-14 17-18 15-16 19-20 17-18 3.950.000

24Presentation Skill With Power Point 2007, Swishmax andULEAD

3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 01-03 24-26 03-05 26-28 26-28 5.950.000

25 EFFECTIVE COMMUNICATION FOR MANAGERS 1 08-08 19-19 19-19 16-16 02-02 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.00026 Analytical Thinking & Problem Solving 2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 13-14 24-25 15-16 26-27 26-27 3.950.000

27 BUILDING COLLABORATIVE RELATIONSHIPS TRAINING 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.000

28 Talent Management 2 04-05 01-02 29-30 26-27 03-04 27-28 26-27 01-02 27-28 03-04 29-30 26-27 3.950.00029 Fundamental Strategic Thinking Skill 2 22-23 28-01 28-29 25-26 21-22 28-29 25-26 20-21 26-27 22-23 28-29 26-27 3.950.00030 SMART GOALS SETTING 1 22-22 21-21 21-21 18-18 21-21 05-05 18-18 20-20 19-19 22-22 21-21 19-19 2.250.000

31BUILDING POTENTIAL LEADER THROUGH POSITIVEHABITS

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000

32EXCELLENT MOTIVATION AND TEAM WORK OUTBOUNDTRAINING

2 15-16 22-23 22-23 19-20 14-15 04-05 19-20 13-14 20-21 15-16 22-23 20-21 2.950.000

33 Sales Presentation Skill 2 24-25 07-08 07-08 04-05 23-24 07-08 04-05 20-21 05-06 24-25 07-08 05-06 3.950.00034 NLP FOR NEGOTIATION 2 22-23 22-23 22-23 19-20 21-22 06-07 19-20 20-21 20-21 22-23 22-23 20-21 3.950.00035 TEKNIK MEMBACA DAN MENULIS 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.000

Page 63: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

36 Kreativitas 2 18-19 22-23 22-23 19-20 17-18 07-08 19-20 13-14 20-21 18-19 22-23 20-21 3.950.00037 ACHIEVEMENT MOTIVATION 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 30-31 24-25 01-02 26-27 26-27 3.950.00038 ACHIEVMENT ORIENTATION 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 06-07 03-04 08-09 05-06 03-04 3.950.00039 EMOTIONAL INTELLIGENSI 2 29-30 28-01 28-29 25-26 28-29 28-29 25-26 27-28 26-27 29-30 28-29 27-28 3.950.00040 MANAJEMEN STRES 2 31-01 08-09 08-09 05-06 30-31 06-07 05-06 29-30 06-07 31-01 08-09 06-07 3.950.00041 MENINGKATKAN KECERDASAN EMOSI 2 11-12 22-23 22-23 19-20 10-11 07-08 19-20 09-10 20-21 11-12 22-23 20-21 3.950.00042 TRAINING FOR TRAINERS (TOT) 2 15-16 07-08 07-08 04-05 14-15 07-08 04-05 15-16 05-06 15-16 07-08 05-06 3.950.00043 Managing Stress for Practical Purpose 3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 14-16 19-21 10-12 21-23 19-21 5.950.00044 Personal Excellence Winner Attitude 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.00045 EMOTIONAL INTELLIGENCE 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 29-31 19-21 31-02 21-23 19-21 5.950.00046 TRAINING FOR TRAINER 2 01-02 05-06 05-06 02-03 31-01 06-07 02-03 30-31 03-04 01-02 05-06 03-04 3.950.00047 EMPOWERING EMOTIONAL INTELLIGENCE 1 15-15 26-26 26-26 23-23 14-14 27-27 23-23 13-13 24-24 15-15 26-26 26-26 2.250.000

48KESEHATAN MENTAL & PSYCHO ENERGY - SELFTHERAPY

1 29-29 14-14 14-14 11-11 28-28 28-28 11-11 27-27 12-12 29-29 14-14 12-12 2.250.000

49 PSYCHO ENERGY THERAPY 1 04-04 20-20 20-20 17-17 04-04 07-07 17-17 01-01 18-18 03-03 20-20 18-18 2.250.00050 SELF EMPOWERING TRAINING 2 09-10 27-28 27-28 24-25 08-09 28-29 24-25 07-08 25-26 09-10 27-28 27-28 3.950.00051 ACHIEVEMENT MOTIVATION TRAINING 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000

52 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 2 08-09 05-06 05-06 02-03 07-08 06-07 02-03 06-07 03-04 08-09 05-06 03-04 3.950.000

53 KETERAMPILAN KOMUNIKASI DAN INTERAKSI 2 24-25 21-22 21-22 18-19 23-24 07-08 18-19 20-21 19-20 24-25 21-22 19-20 3.950.00054 MENTALITAS DASAR 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 30-01 03-05 31-02 05-07 03-05 5.950.00055 TEKNIK HUBUNGAN ANTAR MANUSIA 2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 13-14 24-25 18-19 26-27 26-27 3.950.00056 HAPPY PENSION 2 29-30 12-13 12-13 09-10 28-29 27-28 09-10 27-28 10-11 29-30 12-13 10-11 3.950.00057 TEAM & COMMITMENT BUILDING 2 08-09 28-01 28-29 25-26 07-08 28-29 25-26 06-07 26-27 08-09 28-29 26-27 3.950.00058 MASA PERSIAPAN PENSIUN (MPP) 2 31-01 07-08 07-08 04-05 30-31 04-05 04-05 29-30 05-06 31-01 07-08 05-06 3.950.00059 SEVEN HABITS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000

60IMPROVING PERFORMANCE THROUGH COACHING andCOUNSELLING

2 29-30 22-23 22-23 19-20 28-29 04-05 19-20 29-30 20-21 29-30 22-23 20-21 3.950.000

61 COACHING & COUNSELING 2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 13-14 10-11 15-16 12-13 10-11 3.950.00062 Sales Coaching Skill For Leader 2 15-16 28-01 28-29 25-26 14-15 25-26 25-26 13-14 26-27 15-16 28-29 27-28 3.950.00063 COACHING & KONSELING YANG EFEKTIF 2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00064 DIRECTING COACHING COUNSELING DELEGATING 1 08-08 19-19 19-19 16-16 07-07 04-04 16-16 06-06 17-17 08-08 19-19 17-17 2.250.00065 COACHING AND COUNSELING 2 29-30 19-20 19-20 16-17 28-29 04-05 16-17 27-28 17-18 29-30 19-20 17-18 3.950.00066 KETERAMPILAN NEGOSIASI (NEGOTIATION SKILL) 2 31-01 28-01 28-29 25-26 30-31 25-26 25-26 29-30 26-27 31-01 28-29 27-28 3.950.00067 Kebiasaan Efektif Menuju Sukses 2 04-05 08-09 08-09 05-06 03-04 06-07 05-06 01-02 06-07 03-04 08-09 06-07 3.950.00068 Manajemen Stres 1 02-02 14-14 14-14 11-11 02-02 29-29 11-11 03-03 12-12 05-05 14-14 12-12 2.250.00069 Teknik Presentasi 2 22-23 22-23 22-23 19-20 21-22 04-05 19-20 20-21 20-21 22-23 22-23 20-21 3.950.00070 The Champion Training 2 08-09 12-13 12-13 09-10 07-08 28-29 09-10 06-07 10-11 08-09 12-13 10-11 3.950.00071 Developing Excellent Internal Trainer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000

Page 64: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

72SPEAKING FOR BUSINESS (PRESENTATION,NEGOTIATION & LOBBYING)

2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 20-21 17-18 29-30 19-20 17-18 3.950.000

Page 65: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 66: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING1 MANAJEMEN PERAWATAN BANGUNAN GEDUNG 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 30-01 10-12 29-31 12-14 10-12 5.950.0002 QA & QC PEMELIHARAAN BANGUNAN GEDUNG 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 13-15 24-26 08-10 26-28 26-28 5.950.0003 QUALITY ASSURANCE FOR ENGINEER 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 27-29 03-05 15-17 05-07 03-05 5.950.0004 SHIP’S HANDLING 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 13-15 19-21 29-31 21-23 19-21 5.950.0005 INSTRUMENTATION AND CONTROL SYSTEMS 4 08-11 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 08-11 26-29 03-06 8.500.0006 DASAR-DASAR REKAYASA PERANCANGAN PABRIK 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 6.950.0007 Simulasi Proses Kimia Dengan Hysys 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.950.000

8CHEMICAL ENGINEERING FUNDAMENTALS FOR NONENGINEER

4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000

9 Amoniak Handling Fasilities 4 16-19 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 16-19 05-08 04-07 7.950.00010 CORROSION MANAGEMENT 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 11-14 7.950.00011 INDUSTRIAL AUTOMATION & CONTROL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 03-06 7.950.000

12INSTRUMENTASI PENGUKURAN LANJUT (ADVANCEINSTRUMENTATION)

4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 10-13 7.950.000

13POTENSI KESALAHAN PADA SISTEM PENGUKURAN,SENSOR, DAN INSTRUMENTASI PENGUKURAN

4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 17-20 7.950.000

14 PROCESS CONTROL INSTRUMENTATION 4 15-18 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 15-18 27-30 03-06 7.950.00015 SCADA UNTUK ENGINEER 4 22-25 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 22-25 06-09 10-13 7.950.00016 SCADA UNTUK OPERATOR & TEKNISI 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 18-21 7.950.00017 SISTEM PENGUKURAN DAN KALIBRASI 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 04-07 7.950.00018 DASAR TEKNIK KENDALI UNTUK INDUSTRI 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 15-18 19-22 17-20 7.950.00019 Building Maintanance 3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 27-29 24-26 22-24 26-28 26-28 5.950.00020 DRAUGHT SURVEY 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 08-11 19-22 17-20 7.950.00021 MANAJEMEN PROYEK KONSTRUKSI 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.00022 SUPERVISI PROYEK BANGUNAN GEDUNG 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.00023 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.00024 MANAJEMEN PROYEK KONSTRUKSI 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.00025 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 03-05 28-30 26-28 5.950.00026 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.00027 Aviation & Airport Operations 2 08-09 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 08-09 08-09 26-27 3.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MECHANICAL1 PNEUMATIC AND HYDRAULIC SYSTEMS 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 10-13 8.500.000

PUBLIC TRAINING SCHEDULE 2018 DI YOGYAKARTA

Page 67: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

2HYDRAULLIC ANALYSIS FOR PIPING AND PIPELINENETWORK

4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 8.500.000

3HEAT EXCHANGERS STANDARD DESIGN,MAINTENANACE AND INSPECTION

4 15-18 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 15-18 27-30 11-14 7.950.000

4PUMP OPERATION, MAINTENANCE &TROUBLESHOOTING

4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 17-20 7.950.000

5 BASIC MACHINERY VIBRATION 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 03-06 7.950.0006 BASIC VIBRATION ANALYSIS 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 10-13 7.950.000

7CENTRIFUGAL COMPRESSOR PERFORMANCE &CONDITION EVALUATION

4 15-18 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 15-18 12-15 18-21 7.950.000

8COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING

4 22-25 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 22-25 20-23 04-07 7.950.000

9 FLANGE AND JOINT INTEGRITY 4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 17-20 7.950.00010 MACHINERY VIBRATION ANALYSIS 4 23-26 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 23-26 26-29 18-21 7.950.00011 PIPESTRESS ANALYSIS USING SOFTWARE CAESAR II 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 11-14 7.950.00012 TEORI DAN APLIKASI BELT CONVEYOR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 11-14 7.950.000

13 AC AND REFRIGERATION SAFETY AND CONTROL SYSTEM 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 10-13 7.950.000

14 AC CONTROLLING SYSTEM 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 5.950.000

15 BASIC GAS COMPRESSOR OPERATION & MAINTENANCE 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000

16 BASIC MECHANICAL 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7.950.00017 BASIC PIPELINE ENGINEERING 4 15-18 12-15 13-16 10-13 14-17 25-28 10-13 07-10 11-14 15-18 13-16 11-14 7.950.00018 BASIC REFRIGERATION 4 23-26 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 23-26 20-23 18-21 7.950.000

19BEARING TECHNOLOGY AND ENGINE LUBRICATIONSYSTEM

3 31-02 28-02 28-30 25-27 30-01 27-29 25-27 29-31 26-28 31-02 28-30 26-28 5.950.000

20 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 03-05 07-09 05-07 5.950.00021 HYDRAULICS AND PNEUMATICS 3 10-12 12-14 12-14 09-11 09-11 25-27 09-11 06-08 10-12 10-12 12-14 10-12 5.950.000

22INTEGRATED PIPELINE DESIGN, OPERATION DANMAINTENANCE

4 16-19 19-22 19-22 16-19 15-18 04-07 16-19 13-16 17-20 16-19 19-22 17-20 7.950.000

23 METALLURGY IN WELDING 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

24OPERASI DAN PERAWATAN SISTEM POMPASENTRIFUGAL

4 08-11 20-23 20-23 17-20 07-10 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000

25 PIPELINE FOR NON PIPELINE 4 15-18 27-02 27-30 24-27 14-17 26-29 24-27 28-31 25-28 15-18 27-30 04-07 7.950.00026 PIPELINE INSPECTOR 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 23-26 06-09 10-13 7.950.00027 PROCESS PIPING & PIPELINE SYSTEM 4 30-02 12-15 12-15 09-12 29-01 25-28 09-12 06-09 10-13 30-02 12-15 17-20 7.950.00028 RECIPROCATING COMPRESSOR 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 26-28 5.950.00029 VIBRATION ANALYSIS 3 17-19 05-07 05-07 02-04 16-18 06-08 02-04 30-01 03-05 17-19 05-07 03-05 5.950.00030 REFRIGERATION_OPERATION AND MAINTENANCE 4 22-25 12-15 13-16 10-13 21-24 25-28 10-13 07-10 11-14 22-25 13-16 11-14 7.950.000

Page 68: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

31 TROUBLESHOOTING AC SPLIT DUCT 4 29-01 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 18-21 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MAINTENANCE1

MAINTENANCE MANAGEMENT (PDM, PM, & Pro-ActiveMaintenance)

4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 04-07 7.950.000

2ADVANCE MAINTENANCE PLANNING, SCHEDULLING,AUDITING, BENCHMARKING & IMPROVEMENT

3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000

3MAINTENANCE PLANNING, SCHEDULLING AND WORKCONTROL

3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000

4MODERN MAINTENANCE MANAGEMENT BY MEANS OFRELIABILITY

4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000

5RELIABILITAS SISTEM SEBUAH CARA UNTUK MENILAIKEBERHASILAN MAINTENANCE

3 10-12 26-28 26-28 23-25 09-11 27-29 23-25 27-29 24-26 10-12 26-28 26-28 5.950.000

ENGINEERING - ELECTRICAL1 4G LTE RF PLANNING 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.0002 FUNDAMENTAL CONTROLLER AND VALVE 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 30-02 24-27 01-04 26-29 03-06 8.500.000

3PEMBANGKIT dan PENGUKURAN LISTRIK TEGANGANTINGGI

4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 06-09 03-06 08-11 05-08 10-13 8.500.000

4POWER GENERATOR DAN AUTOMATIC VOLTAGEREGULATOR

4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 17-20 8.500.000

5 PREVENTIVE DAN PERBAIKAN MESIN LAS LISTRIK 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 27-30 17-20 22-25 19-22 04-07 8.500.0006 STABILITAS SISTEM TENAGA LISTRIK 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 31-03 25-28 29-01 27-30 11-14 8.500.0007 SUBSTATION EQUIPMENT & CONTROL RELAY 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 07-10 04-07 02-05 06-09 18-21 8.500.0008 UN INTERRUPTIBLE POWER SUPPLY (UPS) 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 13-16 11-14 09-12 13-16 03-06 8.500.0009 ELECTRICAL SAFETY EXPLOSION 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 28-31 18-21 16-19 20-23 10-13 8.500.000

10 ENGINEERING IN MINING - POWER SYSTEM PROTECTION 4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 30-02 24-27 23-26 26-29 17-20 8.500.000

11 INDUSTRIAL CONTROL SYSTEMS 4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 06-09 03-06 30-02 05-08 04-07 8.500.000

12 ARC Flash Protection For Electrical Safety Professionals 2 02-03 12-13 12-13 09-10 02-03 28-29 09-10 20-21 10-11 01-02 12-13 26-27 3.950.000

13 Induction Machine Maintenance 2 08-09 19-20 19-20 16-17 03-04 07-08 16-17 20-21 17-18 08-09 19-20 27-28 3.950.000

14 Perlengkapan Dan Sistem Distribusi Tegangan Tinggi 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 13-15 26-28 15-17 28-30 26-28 5.950.000

15 Teknik Proteksi Korosi 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 27-29 05-07 22-24 07-09 26-28 5.950.00016 Variable Frequency Drive or Variable Speed Drives 4 29-01 12-15 13-16 10-13 28-31 26-29 10-13 31-03 11-14 29-01 13-16 11-14 7.950.00017 SOLAR PHOTOVOLTAIC BUILDING SYSTEM 4 02-05 20-23 20-23 17-20 08-11 05-08 17-20 07-10 18-21 02-05 20-23 18-21 7.950.000

Page 69: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

18 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 15-17 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 15-17 19-21 26-28 5.950.00019 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 22-25 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 22-25 26-29 17-20 7.950.00020 BASIC ELECTRICAL 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 29-31 05-07 26-28 5.950.00021 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 26-28 5.950.000

22DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES ANDAPPLICATION

4 08-11 20-23 20-23 17-20 14-17 04-07 17-20 13-16 18-21 08-11 20-23 03-06 8.500.000

23DISTRIBUTION SYSTEM FUZZY LOGIC & METERING LOADCONTROL

4 16-19 27-02 27-30 24-27 21-24 25-28 24-27 28-31 25-28 16-19 27-30 10-13 7.950.000

24ELECTRIC MOTOR SYSTEM PRINCIPLES, APPLICATIONS &CONTROL

4 23-26 06-09 06-09 03-06 28-31 05-08 03-06 31-03 04-07 23-26 06-09 18-21 7.950.000

25ELECTRICAL MACHINES, DRIVES, TRANSFORMER ANDPOWER SYSTEM

3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 08-10 12-14 31-02 14-16 26-28 5.950.000

26 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 13-16 17-20 02-05 19-22 04-07 7.950.000

27 ESTIMASI PROYEK KELISTRIKAN 4 15-18 05-08 05-08 02-05 22-25 05-08 02-05 30-02 03-06 15-18 05-08 17-20 7.950.00028 FIRE PREVENTION & PROTECTION SYSTEM 4 22-25 12-15 12-15 09-12 29-01 26-29 09-12 06-09 10-13 22-25 12-15 03-06 7.950.00029 GARDU INDUK 3 29-31 21-23 21-23 18-20 02-04 04-06 18-20 13-15 19-21 29-31 21-23 26-28 5.950.00030 GROUNDING SYSTEM 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 28-31 25-28 01-04 27-30 10-13 7.950.000

31 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 08-10 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 08-10 07-09 26-28 5.950.000

32 INSTRUMENTATION AND CALIBRATION 4 16-19 12-15 13-16 10-13 14-17 26-29 10-13 07-10 11-14 16-19 13-16 18-21 7.950.00033 LIGTNING PROTECTION & GROUNDING SYSTEM 3 24-26 19-21 19-21 16-18 21-23 04-06 16-18 14-16 17-19 24-26 19-21 26-28 5.950.00034 MEKATRONIKA 4 30-02 26-01 26-29 23-26 28-31 25-28 23-26 27-30 24-27 30-02 26-29 04-07 7.950.000

35MICROCONTROLLER APPLICATION IN INDUSTRIALPLANTS

3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 26-28 5.950.000

36 PEMBANGKIT DAN DISTRIBUSI LISTRIK 3 10-12 12-14 12-14 09-11 09-11 27-29 09-11 06-08 10-12 10-12 12-14 12-14 5.950.000

37POWER DISTRIBUTION SYSTEM OPERATION ANDCHARACTERISTIC

3 15-17 21-23 21-23 18-20 16-18 04-06 18-20 13-15 19-21 15-17 21-23 17-19 5.950.000

38POWER DISTRIBUTION SYSTEM PROTECTION ANDRELAYING

4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 28-31 25-28 22-25 27-30 03-06 7.950.000

39 POWER MANAGEMENT SYSTEM 3 29-31 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 29-31 07-09 26-28 5.950.000

40 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 02-05 12-15 13-16 10-13 07-10 26-29 10-13 07-10 11-14 01-04 13-16 10-13 7.950.000

41 PROCESS CONTROL AND LOOP 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 08-11 19-22 18-21 7.950.000

42PROGRAMMABLE LOGIC CONTROLLER (PLC) ADVANCEDAND APPLICATED

4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 27-30 24-27 16-19 26-29 04-07 8.500.000

43PROGRAMMABLE LOGIC CONTROLLER (PLC) PRINCIPLES,HARDWARE AND SOFTWARE, DIAGNOSTICS ANDTROUBLESHOOTING

4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 23-26 05-08 11-14 7.950.000

Page 70: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

44SUPERVISORY CONTROL AND DATA ACQUISITIONSYSTEM (SCADA)

4 30-02 12-15 12-15 09-12 08-11 26-29 09-12 06-09 10-13 30-02 12-15 17-20 7.950.000

45 TEKNIK INSTALASI DAN PROTEKSI LISTRIK 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 13-15 19-21 03-05 21-23 26-28 5.950.000

46TEKNIK LISTRIK TEGANGAN RENDAH & TINGGI DANELEKTROINSTRUMENT

4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 09-12 27-30 03-06 7.950.000

47 TRANSMISI DAN DISTRIBUSI LISTRIK 3 15-17 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 15-17 07-09 26-28 5.950.00048 SUBSTATION SWITCHYARD 150 KV 3 22-24 12-14 14-16 11-13 23-25 27-29 11-13 08-10 12-14 22-24 14-16 10-12 5.950.00049 PRESSURE TRANSMITTER 4 29-01 19-22 19-22 16-19 29-01 04-07 16-19 13-16 17-20 29-01 19-22 18-21 7.950.00050 MV SWITCHGEAR & Power Circuit Breaker 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 01-04 26-29 04-07 7.950.00051 Power Generation Operation & Control 4 08-11 05-08 05-08 02-05 14-17 05-08 02-05 30-02 03-06 08-11 05-08 11-14 7.950.00052 Management and Audit Energy 4 16-19 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 16-19 12-15 17-20 7.950.00053 POWER GENERATOR & AVR 4 23-26 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 23-26 20-23 03-06 7.950.00054 AC DC Electrical Motor Drive 4 30-02 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 30-02 27-30 10-13 7.950.000

55ADVANCED ELECTRICAL MOTOR (Operation maintenancetroubleshooting and Failure)

4 02-05 06-09 06-09 03-06 15-18 05-08 03-06 31-03 04-07 02-05 06-09 18-21 7.950.000

56 Electrical Maintenance 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 07-10 11-14 09-12 13-16 04-07 7.950.00057 Infrared Thermography 4 15-18 19-22 19-22 16-19 29-01 04-07 16-19 13-16 17-20 15-18 19-22 11-14 7.950.00058 Instrumentation Electric and Control System 4 22-25 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 22-25 26-29 17-20 7.950.000

59Manajemen Perawatan gedung dan fasilitas sertapencegahannya terhadap bahaya kebakaran

4 29-01 05-08 05-08 02-05 14-17 05-08 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000

60 Mengaplikasikan Teknik Pencahayaan 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 01-04 12-15 10-13 7.950.000

61 Switchgear MCC Electrical Syatem and Troubleshooting 4 08-11 20-23 20-23 17-20 28-31 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000

62Uninterruptible Power Supply (UPS) Power SupplyAnalysis and Troubleshooting

4 16-19 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 16-19 27-30 04-07 7.950.000

63 ALARM AND PROTECTIVE DEVICES 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 17-20 7.950.00064 ELECTRICAL SAFETY 4 09-12 26-01 26-29 23-26 15-18 25-28 23-26 27-30 24-27 09-12 26-29 11-14 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

ENGINEERING - MINING1 COALBED METHANE 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 27-29 17-19 15-17 19-21 17-19 6.500.0002 APPLIED MINING GEOSTATISTICS 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 10-12 7.500.000

3BASIC OF GEOLOGY MAPPING AND MININGEXPLORATION

3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 06-08 17-19 22-24 19-21 17-19 7.500.000

4 COAL AND MINERAL MINING LAW 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 7.500.000

5 Dasar-Dasar Teknik Eksplorasi dan Pemetaan Air tanah 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 01-03 05-07 03-05 7.500.000

6 Genesa Mineral dan Batubara 3 08-10 13-15 14-16 11-13 07-09 25-27 11-13 01-03 12-14 08-10 14-16 12-14 7.500.000

Page 71: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

7Geoteknik untuk Perancangan Lereng Penambangan(Best Practice and Case Study)

3 17-19 21-23 21-23 18-20 16-18 04-06 18-20 08-10 19-21 17-19 21-23 19-21 7.500.000

8 Manajemen Eksplorasi 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 14-16 26-28 24-26 28-30 26-28 7.500.0009 Geothermal System and Technology 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 29-31 05-07 31-02 07-09 05-07 7.500.000

10 Monitoring Kestabilan Lereng 3 03-05 12-14 12-14 09-11 02-04 25-27 09-11 30-01 10-12 03-05 12-14 10-12 7.500.00011 PENGOLAHAN EMAS 3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 06-08 17-19 10-12 19-21 17-19 7.500.00012 KUALITAS BATUBARA DAN STOCKPILE MANAGEMENT 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 13-15 24-26 15-17 26-28 26-28 7.500.000

13MINING TRAINING - BEST PRACTICE MANAGEMENTEXPLORASI

3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 27-29 03-05 22-24 05-07 03-05 7.500.000

14 STUDY KELAYAKAN INVESTASI PERTAMBANGAN 3 29-31 13-15 14-16 11-13 28-30 25-27 11-13 01-03 12-14 29-31 14-16 12-14 7.500.00015 BASIC COAL MINING 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 19-21 7.500.00016 COAL HANDLING 3 08-10 28-02 28-30 25-27 07-09 27-29 25-27 14-16 26-28 08-10 28-30 26-28 7.500.00017 TEKNIK REKLAMASI LAHAN PASCA PENAMBANGAN 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13 7.950.00018 Geoteknik Terapan Untuk Perencanaan Lereng 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 06-09 24-27 01-04 26-29 03-06 8.500.00019 GEOTEKNIK DALAM TAMBANG TERBUKA 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 08-11 05-08 10-13 8.500.00020 PERENCANAAN DALAM TAMBANG TERBUKA 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 27-30 10-13 15-18 12-15 17-20 8.500.00021 Implementasi K3 Di Sektor Pertambangan 2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 5.500.000

22 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 20-21 5.500.000

23 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 31-01 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 31-01 05-06 03-04 5.500.000

24BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS

3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000

ENGINEERING - MIGAS

1COST CONTROL AND FINANCIAL REPORTING OF THEUPSTREAM OPERATION OF OIL AND GAS UNDERINDONESIA PSC

3 08-10 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 08-10 26-28 26-28 5.950.000

2 DRILLING ENGINEERING FOR NON- DRILLING ENGINEERS 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000

3OIL AND GAS CONTRACT MANAGEMENT PRINCIPLESAND PRACTICES

3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 27-29 10-12 22-24 12-14 10-12 5.950.000

4 PETROLEUM ECONOMICS, RISK & FISCAL ANALYSIS 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 30-01 17-19 29-31 19-21 17-19 5.950.0005 PLACED INTO SERVICES (PIS) 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 06-08 26-28 01-03 28-30 26-28 5.950.0006 POD, WP&B, AFE 3 10-12 07-09 07-09 04-06 07-09 04-06 04-06 14-16 05-07 10-12 07-09 05-07 5.950.000

7PTK 041 2011 PEMELIHARAAN FASILITAS PRODUKSIMINYAK DAN GAS BUMI

3 17-19 13-15 14-16 11-13 16-18 27-29 11-13 29-31 12-14 17-19 14-16 12-14 5.950.000

8UPSTREAM OIL & GAS PROJECT_PETROECONOMICEVALUATION AND ANALYSIS

3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 08-10 24-26 31-02 26-28 26-28 5.950.000

Page 72: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

9OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATIONS

4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.950.000

10 OIL AND WATER HANDLING FACILITIES 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 28-31 18-21 02-05 20-23 10-13 7.950.00011 OFFSHORE WELLHEAD PLATFORM OPERATION 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 6.500.00012 PIGGING OPERATIONS 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000

13PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMANPENGADAAN BARANG DAN JASA INDUSTRI HULU MIGAS

3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 03-05 05-07 03-05 5.950.000

14 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000

15MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GASINDUSTRY

3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 26-28 5.950.000

16PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS

3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 01-03 19-21 24-26 21-23 19-21 5.950.000

17BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS

3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

HSE1 PERSONAL TRANSFER SAFETY 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.0002 SAFE FUEL TRANSFER 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.0003 SAFE NAVIGATION LESSON & ENGINE ROOM SAFETY 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 06-08 10-12 22-24 12-14 10-12 5.950.0004 SHIP’S STORAGE AND SAFE STORAGE 2 10-11 08-09 08-09 05-06 09-10 07-08 05-06 20-21 06-07 10-11 08-09 06-07 3.950.0005 WORKING ALOFT AND WORKING OVER SIDE 2 18-19 14-15 15-16 12-13 17-18 28-29 12-13 20-21 13-14 18-19 15-16 13-14 3.950.0006 CONTRACTOR SAFETY MANAGEMENT SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000

7SISTEM MANAJEMEN KESEHATAN DAN KESELAMATANKERJA

3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 06-08 10-12 17-19 12-14 10-12 5.950.000

8 EFFLUENT PRODUCED WASTE WATER 4 29-01 05-08 05-08 02-05 28-31 04-07 02-05 06-09 03-06 29-01 05-08 10-13 7.950.0009 H2S AWARENESS 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 7.950.000

10 PRODUCED WATER TREATMENT FOR RE-INJECTION 4 08-11 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 08-11 19-22 04-07 7.950.00011 HYDROCARBON 4 23-26 06-09 06-09 03-06 29-01 04-07 03-06 07-10 04-07 23-26 06-09 18-21 7.950.00012 DANGEROUS GOODS 2 22-23 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 22-23 12-13 26-27 3.950.00013 TAHAPAN DAN METODE PENYUSUNAN AMDAL 3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 27-29 03-05 08-10 05-07 03-05 5.950.00014 TRAINING OF TRAINERS SAFETY 3 15-17 13-15 14-16 11-13 14-16 27-29 11-13 14-16 12-14 15-17 14-16 12-14 5.950.00015 Basic Safety 2 15-16 19-20 19-20 16-17 14-15 06-07 16-17 20-21 17-18 15-16 19-20 17-18 5.500.00016 HACCP 2 17-18 28-01 28-29 25-26 16-17 25-26 25-26 20-21 26-27 17-18 28-29 27-28 5.500.00017 Hazard Identification & Risk Assesment (HIRA) 2 24-25 08-09 08-09 05-06 23-24 06-07 05-06 20-21 06-07 24-25 08-09 06-07 5.500.00018 Incident Investigation 2 11-12 01-02 29-30 26-27 10-11 28-29 26-27 20-21 27-28 11-12 29-30 26-27 5.500.000

Page 73: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

19 Job Safety Analysis (JSA) 2 25-26 14-15 12-13 09-10 24-25 25-26 09-10 20-21 10-11 25-26 12-13 10-11 5.500.00020 Manajemen Risiko K3 2 15-16 12-13 14-15 11-12 14-15 28-29 11-12 20-21 12-13 15-16 14-15 12-13 5.500.000

21 Panitia Pembina Keselamatan & Kesehatan Kerja (P2K3) 2 29-30 28-01 28-29 25-26 28-29 25-26 25-26 20-21 26-27 29-30 28-29 26-27 5.500.000

22 Regulasi Keselamatan Kerja 2 24-25 01-02 29-30 26-27 23-24 28-29 26-27 20-21 27-28 24-25 29-30 27-28 5.500.000

23SMK3 (Sistem Manajemen Keselamatan & KesehatanKerja)

2 18-19 26-27 26-27 23-24 17-18 27-28 23-24 13-14 24-25 18-19 26-27 26-27 5.500.000

24KESELAMATAN DAN KESEHATAN KERJA PADAPELAKSANAAN PROYEK KONSTRUKSI

3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.000

25 MARINE SAFETY MANAGEMENT 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 09-12 27-30 04-07 7.950.00026 OIL POLLUTION 4 23-26 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 23-26 13-16 17-20 7.950.00027 BASIC SAFETY MANAGEMENT 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.00028 MODERN SAFETY MANAGEMENT 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.00029 Implementasi K3 Di Sektor Pertambangan 2 02-03 22-23 22-23 19-20 02-03 07-08 19-20 20-21 20-21 04-05 22-23 20-21 5.500.000

30 Regulasi Keselamatan Kerja Di Sektor Pertambangan 2 17-18 22-23 22-23 19-20 16-17 07-08 19-20 20-21 20-21 17-18 22-23 20-21 5.500.000

31 ALARM AND PROTECTIVE DEVICES 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 17-20 7.950.00032 ELECTRICAL SAFETY 4 09-12 26-01 26-29 23-26 15-18 25-28 23-26 27-30 24-27 09-12 26-29 11-14 7.950.00033 SHIP’S SECURITY OFFICER 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.00034 KESELAMATAN PELAYARAN 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.00035 OIL TANKERS AND TERMINALS SAFETY 4 02-05 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 01-04 06-09 03-06 7.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN1

CORPORATE SOCIAL RESPONSBILITY (COMMUNITYDEVELOPMENT)

3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

2 EFFECTIVE BUSINESS WHITER (WHITE PAPER) 3 29-31 05-07 05-07 02-04 28-30 06-08 02-04 30-01 03-05 29-31 05-07 03-05 5.950.0003 EFFECTIVE PR CAMPAIGN TECHNIQUE 3 02-04 13-15 14-16 11-13 02-04 25-27 11-13 08-10 12-14 01-03 14-16 12-14 5.950.0004 GENERAL AFFAIR MANAGEMENT DEVELOPMENT 3 10-12 21-23 21-23 18-20 09-11 04-06 18-20 14-16 19-21 10-12 21-23 19-21 5.950.000

5HOW TO MANAGE CHANGE, CONFLICT AND DIFFICULTEMPLOYEE TO CREATE PRODUCTIVITY

3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000

6INTERACTION AND TELEPHONE COURTESY (IMPROVETELEPHONE SKILL CALL CENTER)

3 24-26 07-09 07-09 04-06 23-25 06-08 04-06 01-03 05-07 24-26 07-09 05-07 5.950.000

7 MANAJEMEN KEARSIPAN DAN TATA KELOLA KANTOR 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 13-15 17-19 03-05 19-21 17-19 5.950.0008 MARKETING THINK GLOBAL BUT ACTION LOCAL 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.0009 OFFICE MANAGEMENT (MANAJEMEN KEARSIPAN) 3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 14-16 19-21 29-31 21-23 19-21 5.950.000

10PR STRATEGY PR FOR EXCELLENTSECRETARYADMINISTRATION

3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 01-03 28-30 26-28 5.950.000

11 QUALITY CUSTOMER SERVICE (SERVICE EXCELLENT) 3 17-19 12-14 12-14 09-11 16-18 25-27 09-11 06-08 10-12 17-19 12-14 10-12 5.950.000

Page 74: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

12THE LOYALIST MEMBANGUN MENTAL LOYALITASKARYAWAN

3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 13-15 17-19 24-26 19-21 17-19 5.950.000

13 TIME MANAGEMENT 3 03-05 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 03-05 05-07 03-05 5.950.00014 AUDIT OPERASIONAL KINERJA 3 08-10 13-15 14-16 11-13 07-09 25-27 11-13 08-10 12-14 08-10 14-16 12-14 5.950.000

15ELECTRONIC FILING IMPLEMENTATION WITH RMS & EFSMETHOD BASED ON DOCUMENT REGULATION

3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 5.950.000

16 Humas 2 22-23 01-02 29-30 26-27 21-22 28-29 26-27 20-21 27-28 22-23 29-30 26-27 3.950.00017 CSR Communication 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 29-31 10-12 01-03 12-14 10-12 5.950.000

18ACCOUNTING AND FINANCE FOR NON-FINANCIALMANAGERS

3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 5.950.000

19 BASIC ACCOUNTING 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 03-05 5.950.00020 FINANCIAL STATEMENT ANALYSIS 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.00021 DECISION MAKING BY USING STRATEGIC THINKING 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 20-21 24-25 08-09 26-27 26-27 3.950.00022 DESAIN CSR DAN PENGUKURAN KINERJANYA 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000

23INOVASI DAN KREATIFITAS MENUJU ORGANISASIPEMBELAJARAN

2 22-23 12-13 12-13 09-10 21-22 27-28 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000

24LIFE CYCLE COSTING AND SUSTAINABILITYMANUFACTURING

3 29-31 21-23 21-23 18-20 28-30 04-06 18-20 06-08 19-21 29-31 21-23 19-21 5.950.000

25 MANAJEMEN GEDUNG DAN KANTOR 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 13-15 26-28 03-05 28-30 26-28 5.950.000

26REDESAIN KOMPETENSI SDM DAN PENGEMBANGANKNOWLEDGE MANAJEMEN

3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 29-31 05-07 10-12 07-09 05-07 5.950.000

27 TEKNIK PENINGKATAN PRODUKTIVITAS KERJA 3 24-26 19-21 19-21 16-18 23-25 04-06 16-18 08-10 17-19 24-26 19-21 17-19 5.950.000

28 INTRAPRENEURSHIP (CORPORATE ENTREPRENEURSHIP) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 29-01 26-29 03-06 7.950.000

29 PERSIAPAN PENSIUN (PRE-RETIREMENT TRAINING) 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 01-04 05-08 10-13 8.500.00030 LEMBAGA KEUANGAN MIKRO SYARIAH 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 08-10 12-14 26-28 5.950.00031 PEOPLE EQUITY 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 5.950.000

32BIMBINGAN TEKNIS MEMBUAT PERENCANAANSTRATEGIS SEKOLAH

2 22-23 01-02 29-30 26-27 21-22 25-26 26-27 20-21 27-28 22-23 29-30 26-27 3.950.000

33 PENYUSUNAN RENSTRA DESA 2 01-02 08-09 08-09 05-06 31-01 04-05 05-06 20-21 06-07 01-02 08-09 06-07 3.950.00034 Persiapan Purnabhakti 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 02-05 13-16 11-14 7.950.000

35Audit Sosial Dan Corporate Social Performance (CSP)Bagi Manajer Dan Pengelola Perusahaan

3 10-12 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 10-12 21-23 19-21 5.950.000

36Mengembangkan Elemen-Elemen Strategis Unik BagiUpaya Meningkatkan Kinerja Competitive AdvantageUKM

3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 01-03 24-26 17-19 26-28 26-28 5.950.000

37Meningkatkan Kemampuan Modal Sosial UKM SebagaiUpaya Meningkatkan Kinerja Bisnis

3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 08-10 03-05 24-26 05-07 03-05 5.950.000

38 Mewujudkan Harmonisasi Organisasi 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 13-15 10-12 29-31 12-14 10-12 5.950.000

Page 75: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

39 LOSS PRVENTION AND MODERN SECURITY 2 02-03 26-27 26-27 23-24 02-03 25-26 23-24 20-21 24-25 01-02 26-27 26-27 3.950.000

40 PENGAMANAN MELEKAT (CLOSE PROTECTION GUARD) 2 08-09 05-06 05-06 02-03 07-08 04-05 02-03 20-21 03-04 08-09 05-06 03-04 3.950.000

41TEKNIK PEMERIKSAAN (INVESTIGASI) DAN PRESENTASIPENGUNGKAPAN KASUS

2 15-16 12-13 12-13 09-10 14-15 27-28 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000

42 Persiapan Masa Pensiun Orientasi Pendirian Usaha Baru 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000

43 BISNIS PELAYARAN 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 01-03 19-21 17-19 5.950.00044 BUSINESS LEGAL CONTRACT DRAFTING 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 30-01 17-19 22-24 19-21 17-19 5.950.000

45CARA EFEKTIF MELAKUKAN PROSES PENAGIHANHUTANG

2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000

46 FRAUD MANAGEMENT 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 10-12 5.950.00047 LEGAL DRAFTING AND WRITING 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 27-29 19-21 15-17 21-23 19-21 5.950.000

48MEKANISME PENYUSUNAN PERJANJIAN DANPEMBUATAN DOKUMEN HUKUM DALAM MENANGANIKREDIT MACET OLEH PERUSAHAAN

2 25-26 28-01 28-29 25-26 24-25 25-26 25-26 20-21 26-27 25-26 28-29 27-28 3.950.000

49 PELAKSANAAN KONTRAK 2 31-01 08-09 08-09 05-06 30-31 07-08 05-06 20-21 06-07 31-01 08-09 06-07 3.950.000

50PENYUSUNAN KONTRAK BISNIS, NEGOSIASI DANNYELESAIAN SENGKETA

3 10-12 19-21 19-21 16-18 09-11 04-06 16-18 08-10 17-19 10-12 19-21 17-19 5.950.000

51PERANCANGAN PEMBUATAN PERATURAN PERUNDANG-UNDANGAN (LEGAL DRAFTING)

3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 14-16 26-28 17-19 28-30 26-28 5.950.000

52TATACARA BERACARA PERKARA PERSELISIHANHUBUNGAN INDUSTRIAL DI PENGADILAN HUBUNGANINDUSTRIAL

2 22-23 05-06 05-06 02-03 21-22 07-08 02-03 20-21 03-04 22-23 05-06 03-04 3.950.000

53HUBUNGAN INDUSTRIAL DAN HUKUMKETENAGAKERJAAN

3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 29-31 10-12 31-02 12-14 10-12 5.950.000

54 EMPLOYEE ENGAGEMENT 2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 3.950.00055 MANAJEMEN PENGEMBANGAN PRODUK PERBANKAN 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 13-16 24-27 22-25 26-29 03-06 7.950.00056 PROFESSIONAL SALESMANSHIP 2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 26-27 3.950.00057 STRATEGIC BRAND MANAGEMENT 2 02-03 12-13 12-13 09-10 02-03 28-29 09-10 20-21 10-11 01-02 12-13 10-11 3.950.00058 STRATEGIC PUBLIC RELATION 2 08-09 21-22 21-22 18-19 07-08 07-08 18-19 20-21 19-20 08-09 21-22 19-20 3.950.00059 Continous Improvement And Creativity 3 17-19 28-02 28-30 25-27 16-18 25-27 25-27 27-29 26-28 17-19 28-30 26-28 5.950.000

60PENERAPAN ISPS CODE DAN ISM CODE DALAMPELAYARAN

3 22-24 26-28 26-28 23-25 21-23 25-27 23-25 30-01 24-26 22-24 26-28 26-28 5.950.000

61 INCOTERM DALAM EKSPOR-IMPOR 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 03-05 5.950.00062 CUSTOM CLEARANCE 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000

63CUSTOM PROCEDURE, SHIPPING & EXPORT-IMPORTDOCUMENT

3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000

64 PORT MANAGEMENT 3 24-26 07-09 07-09 04-06 23-25 04-06 04-06 08-10 05-07 24-26 07-09 05-07 5.950.000

Page 76: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

65 SHIPPING AGENCY 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 14-16 12-14 31-02 14-16 12-14 5.950.00066 Maritime And Shipping Law 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 03-05 21-23 19-21 5.950.00067 Bisnis Pelayaran 3 10-12 26-28 26-28 23-25 09-11 25-27 23-25 30-01 24-26 10-12 26-28 26-28 5.950.00068 GENERAL CHARTER CONDITION (GENCON) 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 06-08 03-05 17-19 05-07 03-05 5.950.00069 Hukum Perkapalan 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 13-15 10-12 22-24 12-14 10-12 5.950.00070 Shipping Management 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000

71REDUCTION COST DENGAN ACTIVITY BASED COST (ABC)SYSTEM

3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000

72PENYUSUNAN PERENCANAAN STRATEGIK DAN EVALUASIKINERJA DENGAN MENGGUNAKAN ANALISA SWOT BSC

3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000

73 Perhitungan Unit Cost 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.00074 TEKNIK PENULISAN LAPORAN YANG EFEKTIF 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 01-03 19-21 17-19 5.950.00075 JOURNALISM TRAINING 2 08-09 26-27 26-27 23-24 07-08 25-26 23-24 06-07 24-25 08-09 26-27 26-27 3.950.00076 Quantum Teaching 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 06-08 24-26 01-03 26-28 26-28 5.950.000

77 Manajemen Rekam Medis dan Informasi Kesehatan 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000

78 Penyusunan Renstra SI-TI di Rumah Sakit 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000

79SISTEM INFORMASI MANAJEMEN RUMAH SAKIT (SIM-RS)

3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000

80 MANAJEMEN PERPUSTAKAAN 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 30-01 10-12 22-24 12-14 10-12 5.950.000

81SISTEM MANAGEMENT MUTU ISO 9001 2008 UNTUKPERPUSTAKAAN

3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 06-08 17-19 29-31 19-21 17-19 5.950.000

82 Audit Internal dan MR 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 13-15 24-26 01-03 26-28 26-28 5.950.00083 PERSUASIVE SELLING SKILLS WORKSHOP 2 22-23 05-06 05-06 02-03 21-22 06-07 02-03 20-21 03-04 22-23 05-06 03-04 3.950.00084 PERSUASIVE-SELLING SKILLS WORKSHOP 2 24-25 12-13 12-13 09-10 23-24 27-28 09-10 20-21 10-11 24-25 12-13 10-11 3.950.00085 QUANTUM LEADERSHIP SKILLS WORKSHOP 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 13-15 19-21 31-02 21-23 19-21 5.950.00086 BREAKTHROUGH LEADERSHIP AND DRIVING CHANGE 3 29-31 12-14 12-14 09-11 28-30 27-29 09-11 06-08 10-12 29-31 12-14 10-12 5.950.00087 BUSINESS PROCESS AND PROJECT MANAGEMENT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 29-31 26-28 08-10 28-30 26-28 5.950.00088 COMMERCIAL FINANCIAL AWARENESS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 01-03 05-07 17-19 07-09 05-07 5.950.00089 DEVELOPING EXECUTIVE LEADERSHIP SKILLS 3 24-26 13-15 14-16 11-13 23-25 27-29 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000

90EFFECTIVE MANAGEMENT SKILLS FOR MIDDLEMANAGEMENT

3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000

91EFFECTIVE MANAGEMENT USING FINANCIALPERFORMANCE

3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 5.950.000

92 ESSENTIAL MANAGEMENT SKILLS 3 15-17 12-14 12-14 09-11 14-16 27-29 09-11 06-08 10-12 15-17 12-14 10-12 5.950.00093 FINANCIAL MODELLING AND DECISION MAKING 3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 13-15 17-19 22-24 19-21 17-19 5.950.00094 FINANCIAL RISK MANAGEMENT 3 29-31 28-02 28-30 25-27 28-30 25-27 25-27 29-31 26-28 29-31 28-30 26-28 5.950.00095 FORMULATING CORPORATE STRATEGY 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 5.950.000

Page 77: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

96 FUNDAMENTALS OF SUPPLY CHAIN MANAGEMENT 3 08-10 13-15 14-16 11-13 07-09 27-29 11-13 08-10 12-14 08-10 14-16 12-14 5.950.00097 INSPIRATIONAL LEADERSHIP AND CHANGE 3 17-19 21-23 21-23 18-20 16-18 06-08 18-20 14-16 19-21 17-19 21-23 19-21 5.950.00098 INSPIRATIONAL LEADERSHIP AND CREATIVITY 3 24-26 26-28 26-28 23-25 23-25 25-27 23-25 27-29 24-26 24-26 26-28 26-28 5.950.00099 LEADERSHIP AND DEVELOPMENT OF TALENT 3 31-02 05-07 05-07 02-04 30-01 04-06 02-04 30-01 03-05 31-02 05-07 03-05 5.950.000

100 LEADERSHIP SKILLS FOR SUPERVISORS 3 03-05 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 03-05 12-14 10-12 5.950.000101 MANAGEMENT MASTERCLASS 3 10-12 19-21 19-21 16-18 09-11 06-08 16-18 13-15 17-19 10-12 19-21 17-19 5.950.000102 ORGANIZATIONAL DEVELOPMENT 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 29-31 26-28 15-17 28-30 26-28 5.950.000103 RISK MANAGEMENT AND DRIVING CHANGE 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 5.950.000104 STRATEGIC DECISION MAKING 3 29-31 13-15 14-16 11-13 28-30 27-29 11-13 08-10 12-14 29-31 14-16 12-14 5.950.000105 STRATEGIC FINANCIAL MANAGEMENT 3 02-04 21-23 21-23 18-20 02-04 06-08 18-20 14-16 19-21 01-03 21-23 19-21 5.950.000

106STRATEGIC PEOPLE MANAGEMENT FOR IMPROVEDPERFORMANCE

3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000

107 SUCCESSFUL PERFORMANCE MANAGEMENT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 30-01 03-05 17-19 05-07 03-05 5.950.000108 SUCCESSFUL PROJECT MANAGEMENT 3 24-26 12-14 12-14 09-11 23-25 27-29 09-11 06-08 10-12 24-26 12-14 10-12 5.950.000109 SUCCESSFUL STRATEGIC MANAGEMENT 3 31-02 19-21 19-21 16-18 30-01 06-08 16-18 13-15 17-19 31-02 19-21 17-19 5.950.000

110 SUCCESSFUL SUPERVISORY SKILLS FOR TEAM LEADERS 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000

111 THE ADVANCED MANAGEMENT PROGRAMME 3 10-12 07-09 07-09 04-06 09-11 04-06 04-06 01-03 05-07 10-12 07-09 05-07 5.950.000112 THE SENIOR MANAGEMENT PROGRAMME 3 15-17 13-15 14-16 11-13 14-16 27-29 11-13 08-10 12-14 15-17 14-16 12-14 5.950.000

113TRANSFORMATIONAL LEADERSHIP AND STRATEGYFORMULATION

3 22-24 21-23 21-23 18-20 21-23 06-08 18-20 14-16 19-21 22-24 21-23 19-21 5.950.000

114 BUILDING GREAT TEAMWORK 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000115 CONTRACT ADMINISTRATION & NEGOTIATION 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000116 EXCELLENT SUPERVISORY SKILLS 2 08-09 07-08 07-08 04-05 07-08 07-08 04-05 06-07 05-06 08-09 07-08 05-06 3.950.000117 LEADERSHIP SKILLS 2 17-18 14-15 14-15 11-12 16-17 25-26 11-12 15-16 12-13 17-18 14-15 12-13 3.950.000118 MANAJEMEN PERUSAHAAN 2 24-25 21-22 21-22 18-19 23-24 04-05 18-19 20-21 19-20 24-25 21-22 19-20 3.950.000

119MEMPERKUAT STRATEGI PENGANGGARAN DANMENGEKSPLORASI PERAMALAN, PENGENDALIAN BIAYADAN MASALAH PERILAKU

2 31-01 01-02 29-30 26-27 30-31 27-28 26-27 29-30 27-28 31-01 29-30 26-27 3.950.000

120

MENDAPATKAN KETERAMPILAN, WAWASAN DANKOMPETENSI YANG DIBUTUHKAN DALAMMEMENANGKAN NEGOSIASI MELALUI WIN-WINSOLUTION

2 04-05 08-09 08-09 05-06 02-03 06-07 05-06 02-03 06-07 04-05 08-09 06-07 3.950.000

121 PROBLEM SOLVING AND DECISION MAKING 2 25-26 26-27 26-27 23-24 24-25 25-26 23-24 20-21 24-25 25-26 26-27 27-28 3.950.000122 PROFITABLE SELLING SKILLS 2 01-02 05-06 05-06 02-03 31-01 04-05 02-03 30-31 03-04 01-02 05-06 03-04 3.950.000123 PUBLIC SERVICE AND MARKETING 2 02-03 14-15 12-13 09-10 03-04 27-28 09-10 30-31 10-11 01-02 12-13 10-11 3.950.000124 SERVICE EXCELLENCE 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 09-10 17-18 11-12 19-20 17-18 3.950.000

125TEKNIK PENYUSUNAN PROSEDUR DAN KEBIJAKANPENCEGAHAN KECURANGAN DAN PENYELEWENGAN

2 15-16 28-01 28-29 25-26 14-15 28-29 25-26 15-16 26-27 15-16 28-29 26-27 3.950.000

Page 78: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

126 LEGAL AUDIT & LEGAL OPINION DRAFTING 3 29-31 12-14 14-16 11-13 28-30 25-27 11-13 27-29 12-14 29-31 14-16 12-14 5.950.000127 LEADERSHIP WITH NLP 2 04-05 21-22 21-22 18-19 02-03 04-05 18-19 01-02 19-20 03-04 21-22 19-20 3.950.000128 Balance Scorecard 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 27-29 10-12 22-24 12-14 10-12 5.950.000

129MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAANBERBASIS TI

2 15-16 26-27 26-27 23-24 14-15 25-26 23-24 20-21 24-25 15-16 26-27 26-27 3950000

130 OTOMASI PERPUSTAKAAN BERBASIS SLIMS 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 27-29 03-05 22-24 05-07 03-05 5.950.000131 EQUIPMENT MATERIALS SPECIFICATION 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 27-29 10-12 22-24 12-14 26-28 5.950.000132 INVENTORY REDUCTION 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000133 LOGISTIC INTERNAL SUPPLY CHAIN MANAGEMENT 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 06-08 24-26 01-03 26-28 26-28 5.950.000134 WAREHOUSING 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 13-15 03-05 08-10 05-07 03-05 5.950.000135 LOGISTIC OPERATION 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 29-31 12-14 15-17 14-16 10-12 5.950.000136 PAJAK PENGHASILAN 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 30-01 17-19 22-24 19-21 26-28 5.950.000137 ESTIMASI DAN ANALISIS BIAYA PROYEK 3 08-10 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000138 MANAJEMEN PERGUDANGAN (WAREHOUSING) 3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 05-07 5.950.000139 MANAJEMEN PRODUKSI DAN OPERASI 3 24-26 13-15 14-16 11-13 23-25 25-27 11-13 08-10 12-14 24-26 14-16 12-14 5.950.000140 PROJECT MANAGEMENT 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.000141 INFORMASI, DOKUMENTASI DAN PERPUSTAKAAN 5 29-02 26-02 26-30 23-27 28-01 25-29 23-27 06-10 24-28 29-02 26-30 03-07 9.250.000142 LAYANAN PERPUSTAKAAN BERBASIS TI 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 01-03 05-07 26-28 5.950.000143 MANAJEMEN PERPUSTAKAAN 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 27-29 10-12 08-10 12-14 10-12 5.950.000144 PERPUSTAKAAN DIGITAL 2 15-16 19-20 19-20 16-17 14-15 07-08 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000145 PROJECT FEASIBILITY STUDY 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000146 SUPPLY CHAIN MANAGEMENT (SCM) 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000147 Manajemen Transportasi 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 13-15 17-19 15-17 19-21 17-19 5.950.000148 Time Management 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000149 Effective Training Management 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 06-08 17-19 22-24 19-21 17-19 5.950.000150 ANALISA JABATAN 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 03-05 5.950.000151 COMPENSATION & BENEFIT SYSTEM 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 13-15 10-12 08-10 12-14 10-12 5.950.000152 FRAUD PREVENTION AND DETECTION 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.000153 KEY PERFORMANCE INDICATOR 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 3.950.000154 MANAJEMEN RISIKO 2 15-16 19-20 19-20 16-17 14-15 06-07 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000155 ORGANIZATIONAL CHANGE 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 3.950.000156 ANALISA LAPORAN KEUANGAN DASAR 2 29-30 07-08 07-08 04-05 28-29 07-08 04-05 20-21 05-06 29-30 07-08 05-06 3.950.000157 MANAJEMEN STRATEGI 2 04-05 14-15 14-15 11-12 03-04 28-29 11-12 20-21 12-13 03-04 14-15 12-13 3.950.000158 PEMBELAJARAN AKUNTANSI IFRS 2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 20-21 19-20 10-11 21-22 19-20 3.950.000

159ALTERNATIVE DISPUTE RESOLUTION (ADR) ALTERNATIVEPENYELESAIAN SENGKETA (APS )

2 29-30 12-13 12-13 09-10 28-29 25-26 09-10 20-21 10-11 29-30 12-13 26-27 3.950.000

160 KREDIT BERMASALAH 2 02-03 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 01-02 19-20 17-18 3.950.000

161MENATA OUTSOURCING SESUAI SURAT EDARANMENAKERTRANS RI

2 08-09 26-27 26-27 23-24 07-08 27-28 23-24 20-21 24-25 08-09 26-27 27-28 3.950.000

Page 79: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

162 PERSELISIHAN HUBUNGAN INDUSTRIAL 2 15-16 05-06 05-06 02-03 14-15 06-07 02-03 20-21 03-04 15-16 05-06 03-04 3.950.000163 General Affairs Management System 3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 30-01 12-14 22-24 14-16 10-12 5.950.000164 AIR AND SEA CARGO HANDLING 3 15-17 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 15-17 05-07 26-28 5.950.000165 FLIGHT OPERATION MANAGEMENT 3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 29-31 19-21 26-28 5.950.000166 AIR CARGO 2 18-19 14-15 14-15 11-12 03-04 25-26 11-12 20-21 12-13 18-19 14-15 27-28 3.950.000167 CSR COMMUNITY DEVELOPMENT 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000

168MONITORING DAN EVALUASI PROGRAM CSR DANCOMMUNITY DEVELOPMENT

3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 5.950.000

169STAKEHOLDER MAPPING DALAM CSR THROUGH TEAMBUILDING

3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 13-15 10-12 08-10 12-14 26-28 5.950.000

170PEMETAAN STAKEHOLDER DAN PERENCANAANPROGRAM CSR

3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 5.950.000

171Manajemen Pengadaan Tanah Untuk KepentinganUmum

3 08-10 05-07 05-07 02-04 07-09 04-06 02-04 13-15 03-05 08-10 05-07 03-05 5.950.000

172 Administrasi Pertanahan Desa 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 20-21 10-11 15-16 12-13 10-11 3.950.000

173Pengadaan Tanah Untuk Pembangunan BagiKepentingan Umum

3 22-24 19-21 19-21 16-18 21-23 06-08 16-18 27-29 17-19 22-24 19-21 17-19 5.950.000

174Penyusunan Dokumen Perencanaan Pengadaan TanahUntuk Kepetingan Umum (DP2TUP)

3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000

175 CONTRACT MANAGEMENT 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 06-08 03-05 29-31 05-07 03-05 5.950.000176 INVENTORY AND WAREHOUSE MANAGEMENT 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 10-12 5.950.000177 LEADERSHIP FOR QUALITY MANAGEMENT 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 27-29 17-19 08-10 19-21 17-19 5.950.000178 PDCA (Planning, Doing, Checking, Acting) 3 03-05 21-23 21-23 18-20 02-04 06-08 18-20 29-31 19-21 03-05 21-23 19-21 5.950.000179 PROJECT MANAGEMENT 3 17-19 05-07 05-07 02-04 16-18 04-06 02-04 06-08 03-05 17-19 05-07 03-05 5.950.000180 RISK MANAGEMENT 3 22-24 12-14 12-14 09-11 21-23 27-29 09-11 13-15 10-12 22-24 12-14 10-12 5.950.000181 SUPERVISORY MANAGEMENT 3 29-31 19-21 19-21 16-18 28-30 06-08 16-18 27-29 17-19 29-31 19-21 17-19 5.950.000182 SUPPLY CHAIN MANAGEMENT 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 01-03 28-30 26-28 5.950.000183 TRANSPORTATION MANAGEMENT 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 29-31 19-21 24-26 21-23 19-21 5.950.000

184TERM OF REFFERENCE PENYUSUNAN HOSPITALDISASTER PLAN

5 29-02 19-23 19-23 16-20 28-01 04-08 16-20 06-10 17-21 29-02 19-23 17-21 9.500.000

185 Analisis Beban Kerja 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 5.500.000186 Balanced Scorecard 2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 5.500.000187 Career Management 2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 5.500.000188 Community Development 2 29-30 07-08 07-08 04-05 28-29 07-08 04-05 20-21 05-06 29-30 07-08 05-06 5.500.000189 Corporate Social Responsibility 2 04-05 14-15 14-15 11-12 03-04 28-29 11-12 20-21 12-13 03-04 14-15 12-13 5.500.000190 General Affair (GA) 2 10-11 21-22 21-22 18-19 09-10 04-05 18-19 20-21 19-20 10-11 21-22 19-20 5.500.000191 Hubungan Industrial 2 31-01 12-13 15-16 12-13 30-31 27-28 12-13 20-21 13-14 31-01 15-16 13-14 5.500.000192 Kalkulasi Perhitungan Tunjangan Hari Raya (THR) 2 01-02 19-20 19-20 16-17 31-01 06-07 16-17 20-21 17-18 01-02 19-20 17-18 5.500.000193 Key Perfomance Indicator (KPI) 2 04-05 26-27 26-27 23-24 03-04 27-28 23-24 20-21 24-25 01-02 26-27 27-28 5.500.000

Page 80: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

194 Leadership 2 08-09 07-08 07-08 04-05 07-08 07-08 04-05 20-21 05-06 08-09 07-08 05-06 5.500.000195 Manajemen Sumber Daya Manusia 2 22-23 21-22 21-22 18-19 21-22 04-05 18-19 20-21 19-20 22-23 21-22 19-20 5.500.000196 Regulasi Ketenagakerjaan 2 04-05 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 04-05 12-13 10-11 5.500.000197 Teknik Penyusunan PKWT, PP & PKB 2 25-26 07-08 07-08 04-05 24-25 07-08 04-05 20-21 05-06 25-26 07-08 05-06 5.500.000

198Teknik Penyusunan Silabus Dan Rencana PelaksanaanPelatihan (RPP)

2 01-02 14-15 14-15 11-12 31-01 28-29 11-12 27-28 12-13 01-02 14-15 12-13 5.500.000

199 Training & Development Management 2 02-03 21-22 21-22 18-19 02-03 04-05 18-19 30-31 19-20 01-02 21-22 19-20 5.500.000200 Training Need Analysis 2 08-09 28-01 28-29 25-26 07-08 25-26 25-26 08-09 26-27 08-09 28-29 27-28 5.500.000201 Housekeeping Management 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 7.950.000202 COMPLAINT HANDLING MANAGEMENT 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 5.950.000203 CREATIVE PROBLEM SOLVING 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.000204 EFFECTIVE LEADERSHIP 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 5.950.000205 SELF MANAGEMENT MANAGEMENT BY OBJECTIVE 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.000

206KELUHAN (GRIEVANCES) SUMBER DAYA MANUSIA DIERA TERKINI

4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.950.000

207 COMPETENCIES MAPPING & DEVELOPMENT 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 10-13 7.950.000208 ISPS CODE 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 15-18 26-29 03-06 7.950.000209 JETTY OPERATION 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 30-01 03-05 22-24 05-07 26-28 5.950.000210 LOADING AND UPLOADING 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 29-01 12-15 10-13 7.950.000211 MARINE AND TERMINAL OPERATION 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 01-04 20-23 18-21 7.950.000212 MARINE SURVEYOR TRAINING 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 16-19 06-09 11-14 7.950.000213 PORT MANAGEMENT 4 30-02 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 30-02 19-22 03-06 7.950.000214 SHIPPING MANAGEMENT 4 02-05 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 02-05 26-29 10-13 7.950.000215 SHIPPING REPORTING SYSTEMS 4 08-11 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 08-11 05-08 18-21 7.950.000216 TANKER OPERATION 4 15-18 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 15-18 12-15 04-07 7.950.000217 PILOT, JETTY AND LOADING MASTER 4 22-25 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 22-25 20-23 11-14 7.950.000218 ISM CODE 4 29-01 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 29-01 27-30 17-20 7.950.000219 LOADING UNLOADING pelabuhan curah kering 4 09-12 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 09-12 13-16 10-13 7.950.000220 PROJECT MANAGEMENT DENGAN PRIMAVERA 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 30-01 24-26 29-31 26-28 26-28 5.950.000

221APPLIED FACILITY SECURITY RISK ASSESSMENT WITHSOFTWARE FASRIM

2 08-09 12-13 12-13 09-10 07-08 25-26 09-10 20-21 10-11 08-09 12-13 10-11 7.000.000

222APPLIED PROCESS SECURITY RISK ASSESSMENT (FAILUREMODE AND EFFECT ANALYSIS)

2 15-16 19-20 19-20 16-17 14-15 04-05 16-17 20-21 17-18 15-16 19-20 17-18 3.950.000

223APPLIED SECURITY ANALYSIS (CRIME TREND, ROOT-CAUSE, COST-BENEFIT) UTILIZING SOFTWARE SYSCAT

2 22-23 26-27 26-27 23-24 21-22 27-28 23-24 20-21 24-25 22-23 26-27 26-27 7.000.000

224DESIGNING COST EFFECTIVE SECURITY SYSTEM (BENEFIT-COST ANALYSIS METHOD)

2 29-30 05-06 05-06 02-03 28-29 06-07 02-03 20-21 03-04 29-30 05-06 03-04 3.950.000

225DESIGNING KPI FOR SECURITY DEPARTMENT ANDSECURITY WORK PLAN PROPOSAL

2 02-03 14-15 14-15 11-12 02-03 28-29 11-12 20-21 12-13 01-02 14-15 12-13 3.950.000

Page 81: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

226SECURITY AWARENESS PROGRAM AND PROMOTINGIMAGE FOR SECURITY

2 10-11 21-22 21-22 18-19 09-10 07-08 18-19 20-21 19-20 10-11 21-22 19-20 3.950.000

227 CONTRACT MANAGEMENT 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 5.950.000

228CONTRACT MANAGEMENT, STRATEGY ANDADMINISTRATION FOR OIL AND GAS COMPANY

3 29-31 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 29-31 12-14 26-28 5.950.000

229 GOOD CORPORATE GOVERNANCE (GCG) 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 5.950.000230 ASPEK HUKUM PADA PROYEK KONSTRUKSI 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000231 MANAJEMEN PROYEK KONSTRUKSI 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 14-16 19-21 31-02 21-23 19-21 5.950.000232 PENGENDALIAN MUTU PADA PROYEK KONSTRUKSI 3 03-05 28-02 28-30 25-27 02-04 27-29 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000233 INTRODUCTION AVIATION & AIRPORT OPERATIONS 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000234 Aviation & Airport Operations 2 08-09 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 08-09 08-09 26-27 3.950.000235 SHIP’S SECURITY OFFICER 3 03-05 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 03-05 28-30 26-28 5.950.000236 KESELAMATAN PELAYARAN 3 15-17 28-02 28-30 25-27 14-16 25-27 25-27 01-03 26-28 15-17 28-30 26-28 5.950.000237 OIL TANKERS AND TERMINALS SAFETY 4 02-05 06-09 06-09 03-06 22-25 05-08 03-06 31-03 04-07 01-04 06-09 03-06 7.950.000238 Regulasi Ketenagakerjaan Di Sektor Pertambangan 2 31-01 05-06 05-06 02-03 30-31 04-05 02-03 20-21 03-04 31-01 05-06 03-04 5.500.000

239BEST PRACTICE SCM DAN STRATEGIC INVENTORYCONTROL AND WAREHOUSING PERUSAHAAN TAMBANGDAN MIGAS

3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 06-08 10-12 29-31 12-14 10-12 5.950.000

240 Mastering Your Health For Best Performance 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000

241 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000

242 Job Hunting For Beginner 2 18-19 05-06 05-06 02-03 17-18 04-05 02-03 20-21 03-04 18-19 05-06 03-04 5.500.000243 Seven Habbits 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 06-07 17-18 11-12 19-20 17-18 5.500.000244 MANAJEMEN PROYEK KONSTRUKSI 3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 01-03 19-21 17-19 5.950.000245 SUPERVISI PROYEK BANGUNAN GEDUNG 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 01-03 12-14 10-12 5.950.000

246PENERAPAN PTK 007 Rev. 3 SEBAGAI PEDOMANPENGADAAN BARANG DAN JASA INDUSTRI HULU MIGAS

3 03-05 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 03-05 05-07 03-05 5.950.000

247 LEGAL ASPECT IN OIL & GAS INDUSTRIES 3 08-10 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 08-10 26-28 26-28 5.950.000

248MINI BUSINESS & ADMINISTRATIONS FOR OIL AND GASINDUSTRY

3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 15-17 07-09 26-28 5.950.000

249 GREAT TEAMWORK AND SYNERGY 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 5.950.000250 CAPACITY BUILDING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000

251 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000

252 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000

253 SERVICE EXCELLENT with NLP 2 11-12 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 11-12 08-09 06-07 3.950.000254 PERFORMANCE GOALS SETTING 2 10-11 12-13 15-16 12-13 09-10 28-29 12-13 08-09 13-14 10-11 15-16 13-14 3.950.000

Page 82: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

255 COMMUNICATION SKILLS FOR SALES 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 5.950.000256 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MANAJEMEN - PROCUREMENT1

ASPEK HUKUM DAN OE PENGADAAN BARANG JASAPEMERINTAH

3 02-04 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 01-03 19-21 17-19 5.950.000

2TEKNIK OWNER ESTIMATE DAN PENGADAAN BARANGJASA

4 16-19 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 16-19 13-16 11-14 7.950.000

3 CONTRACT AND PROCUREMENT FRAUD IDENTIFICATION 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 01-03 05-07 03-05 5.950.000

4PEMBUATAN DELIK HUKUM PENGADAAN BARANG JASAPERUSAHAAN

2 04-05 14-15 15-16 12-13 02-03 27-28 12-13 02-03 13-14 04-05 15-16 13-14 3.950.000

5 BEST PRACTICES IN MANAGING PROCUREMENT 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000

6BID AND TENDERING MANAGEMENT LEADING TOCONTRACT

3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 30-01 03-05 22-24 05-07 03-05 5.950.000

7 EFFECTIVE PROJECT PROCUREMENT MANAGEMENT 3 10-12 05-07 05-07 02-04 09-11 04-06 02-04 30-01 03-05 10-12 05-07 03-05 5.950.0008 Basic Procurement & Purchasing 3 24-26 21-23 21-23 18-20 23-25 04-06 18-20 01-03 19-21 24-26 21-23 19-21 5.950.0009 METODA PENYUSUNAN HPS PERUSAHAAN 3 24-26 07-09 07-09 04-06 23-25 04-06 04-06 08-10 05-07 24-26 07-09 05-07 5.950.000

10 PROCUREMENT AND CONTRACT MONITORING 3 10-12 26-28 26-28 23-25 09-11 25-27 23-25 30-01 24-26 10-12 26-28 26-28 5.950.000

11PENERAPAN PTK 007 REVISI 2 DAN TKDN SBG PEDOMANPENGADAAN BARANG & JASA INDUSTRI HULU MIGAS

3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 01-03 19-21 24-26 21-23 19-21 5.950.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga

MOTIVASI & PERSONAL DEVELOPMENT

1 GREAT TEAMWORK AND SYNERGY 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 5.950.0002 CHARACTER BUILDING 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 06-08 10-12 08-10 12-14 10-12 5.950.0003 COMMUNICATION SKILL 3 15-17 19-21 19-21 16-18 14-16 04-06 16-18 13-15 17-19 15-17 19-21 17-19 5.950.0004 LOBBY & NEGOTIATION SKILL 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.0005 MIND MAPPING AND HYPNOSIS FOR PROFESIONAL 3 15-17 05-07 05-07 02-04 14-16 06-08 02-04 30-01 03-05 15-17 05-07 03-05 5.950.000

6MOTIVATION YOUR SELF (ACHIEVEMENT MOTIVATIONTRAINING)

3 22-24 13-15 14-16 11-13 21-23 25-27 11-13 08-10 12-14 22-24 14-16 12-14 5.950.000

7 PROFESSIONAL PUBLIC SPEAKING 3 10-12 07-09 07-09 04-06 09-11 06-08 04-06 01-03 05-07 10-12 07-09 05-07 5.950.0008 THE POWER OF POSITIVE MIND 3 31-02 26-28 26-28 23-25 30-01 27-29 23-25 27-29 24-26 31-02 26-28 26-28 5.950.0009 COMMUNICATION SKILLS 2 29-30 08-09 08-09 05-06 28-29 07-08 05-06 20-21 06-07 29-30 08-09 06-07 3.950.000

10 ACHIEVEMENT MOTIVATION TRAINING 2 22-23 19-20 19-20 16-17 21-22 04-05 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000

Page 83: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

11 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 02-03 12-13 12-13 09-10 02-03 25-26 09-10 20-21 10-11 01-02 12-13 10-11 3.950.000

12 INSPIRATIONAL PRESENTATION WITH NLP TECHNIQUES 2 15-16 26-27 26-27 23-24 14-15 27-28 23-24 20-21 24-25 15-16 26-27 26-27 3.950.000

13 BASIC – ADVANCE CLINICAL HYPNOTHERAPY WORKSHOP 3 29-31 13-15 14-16 11-13 28-30 27-29 11-13 06-08 12-14 29-31 14-16 12-14 5.950.000

14 BECOMING AN INSPIRING & INFLUENCE TEACHER 2 04-05 21-22 21-22 18-19 03-04 07-08 18-19 20-21 19-20 03-04 21-22 19-20 3.950.00015 EFFECTIVE COMMUNICATION SKILLS WITH NLP 2 10-11 28-01 28-29 25-26 09-10 25-26 25-26 20-21 26-27 10-11 28-29 27-28 3.950.00016 SELF-TRANSFORMATION MANAGEMENT WORKSHOP 2 02-03 01-02 29-30 26-27 02-03 28-29 26-27 20-21 27-28 04-05 29-30 26-27 3.950.00017 THE PARENTING NOBLE 2 18-19 14-15 14-15 11-12 17-18 25-26 11-12 20-21 12-13 18-19 14-15 12-13 3.950.00018 ACHIEVEMENT MOTIVATION 2 15-16 05-06 05-06 02-03 14-15 04-05 02-03 13-14 03-04 15-16 05-06 03-04 3.950.00019 COMMUNICATION SKILLS 2 29-30 19-20 19-20 16-17 28-29 06-07 16-17 27-28 17-18 29-30 19-20 17-18 3.950.00020 PRESENTATION SKILLS 2 18-19 22-23 22-23 19-20 17-18 07-08 19-20 13-14 20-21 18-19 22-23 20-21 3.950.00021 EFFECTIVE PRESENTATION SKILLS 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 30-01 10-12 15-17 12-14 10-12 5.950.00022 OPTIMALISASI PENGELOLAAN TALENTA 3 29-31 26-28 26-28 23-25 28-30 27-29 23-25 13-15 24-26 29-31 26-28 26-28 5.950.000

23DEVELOPING POSITIVE PERSONAL CHARACTER INPROBLEM SOLVING

2 22-23 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 22-23 19-20 26-27 3.950.000

24 NEGOTIATION SKILL 3 31-02 13-15 14-16 11-13 30-01 27-29 11-13 14-16 12-14 31-02 14-16 12-14 5.950.00025 Training of Trainer 3 08-10 07-09 07-09 04-06 07-09 04-06 04-06 08-10 05-07 08-10 07-09 05-07 5.950.00026 PRESENTATION SKILL FOR THE BEGINNERS 3 08-10 12-14 12-14 09-11 07-09 27-29 09-11 06-08 10-12 08-10 12-14 10-12 5.950.00027 COMMUNICATION SKILLS 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.00028 POWERFULL PRESENTATION (basic) 3 31-02 07-09 07-09 04-06 30-01 06-08 04-06 01-03 05-07 31-02 07-09 05-07 5.950.00029 SELF MANAGEMENT EMOTION AND STRESS 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 08-10 12-14 03-05 14-16 12-14 5.950.00030 CAPACITY BUILDING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 5.950.000

31 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 08-09 19-20 19-20 16-17 07-08 04-05 16-17 20-21 17-18 08-09 19-20 17-18 3.950.000

32 EFFECTIVE INTERVIEWING SKILLS WITH NLP APPROACH 2 17-18 07-08 07-08 04-05 16-17 04-05 04-05 20-21 05-06 17-18 07-08 05-06 3.950.000

33 SERVICE EXCELLENT with NLP 2 11-12 08-09 08-09 05-06 10-11 04-05 05-06 20-21 06-07 11-12 08-09 06-07 3.950.00034 PERFORMANCE GOALS SETTING 2 10-11 12-13 15-16 12-13 09-10 28-29 12-13 08-09 13-14 10-11 15-16 13-14 3.950.00035 COMMUNICATION SKILLS FOR SALES 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 5.950.000

36Pencarian Minat, Bakat, dan Kecerdasan Dasar melaluiAnalisis Sidik Jari bagi Pekerja & Profesional

2 02-03 08-09 08-09 05-06 02-03 06-07 05-06 20-21 06-07 03-04 08-09 06-07 5.500.000

37Pencarian Minat, Bakat, dan Kecerdasan Dasar melaluiAnalisis Sidik Jari bagi Pelajar & Mahasiswa

2 10-11 14-15 15-16 12-13 09-10 27-28 12-13 20-21 13-14 10-11 15-16 13-14 5.500.000

38 TOT (TRAINING OF TRAINER) 2 22-23 07-08 07-08 04-05 21-22 07-08 04-05 20-21 05-06 22-23 07-08 05-06 3.950.00039 Training Of Trainer (TOT) 2 15-16 08-09 08-09 05-06 14-15 06-07 05-06 15-16 06-07 15-16 08-09 06-07 5.500.00040 Effective Presentation Skills 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000

Page 84: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

41MEMBANGUN PROFESSIONAL BEHAVIOR DENGANKECERDASAN EMOSI DAN KECERDASAN SPIRITUAL

2 29-30 26-27 26-27 23-24 28-29 25-26 23-24 20-21 24-25 29-30 26-27 26-27 3.950.000

42 THE POWER OF SELF HEALING 2 02-03 05-06 05-06 02-03 02-03 04-05 02-03 20-21 03-04 01-02 05-06 03-04 3.950.00043 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 2 11-12 19-20 19-20 16-17 10-11 04-05 16-17 20-21 17-18 11-12 19-20 17-18 3.950.00044 Mastering Your Health For Best Performance 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 30-01 17-19 29-31 19-21 17-19 5.950.000

45 BUILDING AND MANAGING HIGH PERFORMANCE TEAMS 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 17-19 5.950.000

46 Job Hunting For Beginner 2 18-19 05-06 05-06 02-03 17-18 04-05 02-03 20-21 03-04 18-19 05-06 03-04 5.500.00047 Seven Habbits 2 11-12 19-20 19-20 16-17 10-11 06-07 16-17 06-07 17-18 11-12 19-20 17-18 5.500.000

Page 85: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys
Page 86: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des HargaSERTIFIKASI KEMNAKER RI:Bdg/Jkt/Yogya

1 Ahli K3 Kimia 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 9.950.0002 Ahli K3 Listrik 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 11.950.0003 Ahli K3 Umum 12 08-20 19-03 05-17 16-28 14-26 28-09 02-14 30-11 03-15 01-13 05-17 03-15 9.500.0004 Ahli K3 Pesawat Angkat dan Angkut 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0005 Ahli K3 Pesawat Tenaga dan Produksi 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0006 Ahli K3 Pesawat uap dan bejana tekan 25 02-30 29-26 26-26 02-30 02-30 02-30 01-31 03-01 01-29 01-29 20.950.0007 Auditor SMK3 4 02-05 12-15 26-29 23-26 28-31 25-28 23-26 13-16 24-27 22-25 26-29 03-06 7.500.0008 Petugas K3 Kimia 6 15-20 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 08-13 05-10 10-15 7.500.0009 Teknisi K3 Listrik 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 06-10 17-21 01-05 19-23 17-21 6.950.000

10 Petugas K3 Madya Ruang Terbatas (Confined Space) 3 15-17 05-07 12-14 09-11 14-16 04-06 09-11 06-08 03-05 01-03 12-14 03-05 6.500.00011 Petugas K3 Utama Ruang Terbatas (Confined Space) 5 15-19 05-09 12-16 09-13 14-18 04-08 09-13 06-10 03-07 01-05 12-16 03-07 6.750.00012 Petugas Penyelamat (Rescuer) Ruang Terbatas 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 13-15 03-05 24-26 05-07 17-19 6.500.00013 Petugas K3 Pemantauan Lingkungan Kerja 6 08-13 19-24 19-24 16-21 14-19 04-09 16-21 06-11 17-22 08-13 12-17 10-15 8.950.00014 Teknisi K3 Deteksi Gas 2 29-30 14-15 15-16 12-13 31-01 25-26 12-13 20-21 13-14 29-30 15-16 10-11 4.000.00015 juru ikat (rigger) 3 03-05 12-14 19-21 16-18 02-04 04-06 16-18 14-16 17-19 15-17 19-21 10-12 3.500.00016 operator pita transport (conveyor) 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 17-19 3.950.00017 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 1 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 27-29 03-05 08-10 05-07 03-05 5.500.00018 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 2 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 15-18 12-15 10-13 6.500.00019 TENAGA KERJA PADA KETINGGIAN (TKPK) TINGKAT 3 4 22-25 19-22 20-23 17-20 21-24 04-07 17-20 06-09 18-21 22-25 20-23 17-20 6.500.00020 TENAGA KERJA BANGUNAN TINGGI (TKBT) TINGKAT 2 2 15-16 05-06 26-27 26-27 21-22 25-26 26-27 13-14 27-28 29-30 29-30 17-18 3.950.00021 juru Las (Welder) SMAW kelas 1 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 17.500.00022 juru Las (Welder) SMAW kelas 2 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 17.000.00023 juru Las (Welder) SMAW kelas 3 6 08-13 05-10 05-10 02-07 14-19 04-09 02-07 06-11 03-08 01-06 05-10 03-08 16.500.00024 juru Las (Welder) GTAW kelas 1 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 17.500.00025 juru Las (Welder) GTAW kelas 2 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 17.000.00026 juru Las (Welder) GTAW kelas 3 6 22-27 19-24 19-24 16-21 21-26 25-30 16-21 27-01 17-22 15-20 12-17 10-15 16.500.00027 operator forklift 3 03-05 12-14 19-21 16-18 02-04 04-06 16-18 14-16 17-19 08-10 19-21 10-12 3.500.00028 operator gondola 3 02-04 13-15 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 17-19 5.750.00029 operator crane 4 22-25 05-08 05-08 02-05 21-24 05-08 02-05 13-16 03-06 22-25 05-08 03-06 5.750.000

PUBLIC TRAINING SCHEDULE 2018 SERTIFIKASI K3 DI 3 KOTA: BANDUNG / JAKARTA / YOGYAKARTA

Page 87: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys

30 operator genset 4 15-18 12-15 12-15 09-12 28-31 26-29 09-12 27-30 10-13 15-18 12-15 10-13 6.950.00031 operator alat berat 4 02-05 19-22 20-23 17-20 07-10 04-07 17-20 06-09 18-21 01-04 20-23 17-20 7.500.00032 operator boiler kelas 1 6 08-13 05-10 05-10 16-21 14-19 04-09 16-21 06-11 17-22 08-13 12-17 10-15 6.500.00033 operator boiler kelas 2 4 08-11 05-08 05-08 16-19 14-17 04-07 16-19 06-09 17-20 08-11 12-15 10-13 5.500.000

No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des HargaSERTIFIKASI BNSP RI: Bdg/Jkt/Yogya

1 Ahli K3 Umum Muda 4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 06-09 17-20 15-18 19-22 03-06 7.750.0002 Ahli K3 Umum Madya 5 22-26 19-23 12-16 09-13 28-01 25-29 09-13 27-31 10-14 22-26 12-16 17-21 8.250.0003 Ahli K3 Umum Utama 6 08-13 05-10 19-24 23-28 14-19 25-30 23-28 06-11 24-29 15-20 12-17 10-15 9.500.0004 HAZARD Operability Study (HAZOP) 4 02-05 05-08 05-08 02-05 21-24 05-08 02-05 13-16 03-06 08-11 05-08 17-20 7.750.0005 Operator Migas 4 15-18 12-15 12-15 09-12 28-31 25-28 09-12 27-30 10-13 15-18 12-15 04-07 7.750.0006 Pengawas K3 Migas 6 22-27 19-24 19-24 16-21 14-19 04-09 16-21 06-11 17-22 22-27 12-17 10-15 9.250.0007 Pengawas Utama K3 Migas 6 15-20 19-24 19-24 23-28 14-19 25-30 23-28 06-11 24-29 15-20 12-17 17-22 9.500.0008 Safety Inspector 4 02-05 06-09 06-09 03-06 22-25 04-07 03-06 13-16 04-07 01-04 06-09 03-06 7.750.0009 Investigasi Insiden 4 08-11 12-15 13-16 10-13 29-01 25-28 10-13 28-31 11-14 09-12 13-16 10-13 7.750.000

10 Operator Gas Tester 4 16-19 19-22 19-22 16-19 07-10 05-08 16-19 30-02 17-20 16-19 19-22 17-20 7.750.00011 Auditor SMK3 4 22-25 19-22 26-29 23-26 14-17 26-29 23-26 06-09 24-27 22-25 26-29 04-07 7.750.00012 Internal Auditor SMK3 3 03-05 26-28 26-28 23-25 02-04 27-29 23-25 30-01 24-26 10-12 26-28 26-28 5.950.00013 Petugas K3 Laboratorium 4 29-01 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 29-01 05-08 11-14 7.750.00014 FIREMAN 1 2 15-16 12-13 12-13 09-10 14-15 25-26 09-10 27-28 17-18 15-16 12-13 17-18 5.750.00015 FIREMAN 2 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 27-29 17-19 15-17 12-14 17-19 6.750.00016 FIRE OFFICER 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 27-30 17-20 15-18 12-15 17-20 7.750.00017 HIMU 4 22-25 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 15-18 13-16 10-13 7.750.00018 HIMA 5 22-26 05-09 05-09 02-06 07-11 04-08 02-06 06-10 03-07 22-26 05-09 03-07 8.500.00019 HIU 5 08-12 19-23 19-23 16-20 21-25 04-08 16-20 27-31 17-21 01-05 19-23 17-21 8.950.00020 Pengawas SMK3 Kontraktor (CSMS) 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 03-06 7.750.00021 PETUGAS K3 FASILITAS KESEHATAN 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 11-14 7.750.00022 Petugas Penanganan Bahaya Gas H2S 3 29-31 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 29-31 19-21 26-28 5.950.00023 SAFETYMAN MIGAS 3 02-04 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 01-03 28-30 26-28 5.950.00024 SAFETYMAN UMUM 3 08-10 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 08-10 07-09 26-28 5.950.00025 Petugas P3K 3 15-17 12-14 14-16 11-13 14-16 25-27 11-13 13-15 12-14 15-17 14-16 26-28 5.950.000

Page 88: Public Training Schedule 2018 PT.MMS di Indonesia (1,11 Mb)mairodi-training.com/wp-content/uploads/2017/12/Public-Training... · 49 simulasi proses teknik kimia menggunakan hysys