Public Private Partnership on Solid Waste Management: A ... · PDF filePublic Private...
Transcript of Public Private Partnership on Solid Waste Management: A ... · PDF filePublic Private...
Public Private Partnership on Solid Waste Management: A Business Opportunity
Launching of Alliance for Marine Plas?c Solu?ons
UjangSolihinSidik
DeputyDirectorforProduct&Packaging,
DirectorateofSolidWasteManagement
DirectorGeneralforSolidWaste,HazardousWasteand
HazardousSubstanceManagement
MinistryofEnvironmentandForestry
RepublicofIndonesia
Indonesia SWM State
65,088,257.71
65,999,493.32
66,923,486.23
67,860,415.03
68,810,460.84
2015 2016 2017 2018 2019
Projec2onofSWGenera2onSWComposiPon
Source:ProgramAdipura,2013
Source:BPS&MoEF,2015
429,254.81
470,544.10
507,738.17
2011 2012 2013
TrendofPlas2cWasteGenera2onin
SeveralBigCi2es(m3)SWManagement State(%)
Landfilled 69%
Buried(tradiPonally) 10%
Compostedandrecycled 7.5%
Burned(openly) 5%
Un-managed 8.5%
Source:ProgramAdipura,2013
SWM: From Household to Global Issue
It used to be neighborough issue, now it becomes global challenges
PollutetoEnvironment
NovaluesHealthproblem
Shanty&unlivableciPes
Sourceofconflict
SourceofGHG
Costcentre
Flooding
Outofpriorityissue
Waste=Problems
Others
Obsolete Paradigm of Our Waste
POTENCY OF SOLID WASTE AS RESOURCE
NO.
Composi2onAmount(tons) Usage
Types %
1 Compostable
organic
60 38.400.000 Compost,Biogas,Heat/Electricity
2 Plas2c 14 8.960.000 Rawmaterial,Heat/Electricity
3 Paper 9 5.760.000 Rawmaterial
4 Metal 4,3 2.752.000 Rawmaterial
5 Rubber 5,5 3.520.000 Refusederivedfuel
6 Tex2le 3,5 2.240.000 Rawmaterial
7 Glass 1,7 1.088.000 Rawmaterial
8 Others 2,4 1.536.000 Others
5
POLICY TRANSFORMATION (UU NO. 18/2008 & PP NO. 81/2012)
• WASTEJUSTPOLLUTANTLOADS
• NOWASTEREDUCTION
• NOWASTETORESOURCE
• NORESOURCEEFFICIENCY
• FULLVIRGINRESOURCEEXTRACTION
• LINIERECONOMY
6
SHIFTINGTHEPARADIGM
ENDOFPIPESOLUTION 3R&EPR CIRCULARECONOMY
• REDUCEWASTEASPOLLUTANTLOADS
• REDUCTIONATSOURCE
• WASTETORESOURCE
• RESOURCEEFFICIENCY
• LIMITVIRGINRESOURCEEXTRACTION
• PRODUCERRESPONSIBILITY
• LESSWASTEBYDESIGN
• MAKEWASTEANEWLIFEASLONGASPOSSIBLE
• SUSTAINABLECITIESANDCOMMUNITIES(SDGGOALNO11)
• RESPONSIBLECONSUMPTION&PRODUCTION(SDGGOALNO12)
Beforelawerected LawimplementaPon AdvanceimplementaPon
Avoid&reducewaste
Rawmaterial Businessopportunity
Clean&livableciPes
RDF
AlternaPveenergy
Futureinvestment
FloodingprevenPon
Mainstreamissue
Waste=Solu2ons
Compost
NewParadigmofOurWaste
SOLID WASTE MANAGEMENT (Law No. 18 Year 2008)
KeyFactors:
1. Government both central and local are responsble to ensure SWM
impementa2on is carried out well in environmentally sound
management
2. Eachindividualandproducerobligetoreducetheirwaste
WASTEMINIMISATION:1. AVOIDANCE&PREVENTION
2. RECYLINGATSOURCE
3. REUSEATSOURCE
WASTEHANDLING:1. SEGREGATION
2. COLLECTION
3. TRANSPORTATION
4. TREATMENT(composPng,recyling,
energyrecovery)
5. FINALPROCESSING(atlandfill)
1. Formulatenorm,standard,procedure,and
criteria
2. StrengthencoordinaPon&partnershipatcentral
andlocalgovernment
3. Strengthencommitmentofcentral&local
execuPve&parliamenttoallocateSWM
sufficientbudget
4. Strengthencapacityonleadership,insPtuPon,
andhumanresource
5. DevelopinformaPonsystem
6. Strengthencommunityengagementthrough
communicaPon,informaPon&educaPon
7. DevelopincenPve&disincenPveschemeon
wasteminimizaPon
8. Strengthencommitmentofbusiness(producer&
retailer)tominimizethewaste
WASTEMINIMISATION
1. Formulatenorm,standard,procedure,andcriteria
2. StrengthencoordinaPon&partnershipatcentralandlocal
government
3. Strengthencommitmentofcentral&localexecuPve&
parliamenttoallocateSWMsufficientbudget
4. Strengthencapacityonleadership,insPtuPon,andhuman
resource
5. DevelopinformaPonsystem
6. StrengthencommunityengagementthroughcommunicaPon,
informaPon&educaPon
7. Develop&implementfinancialschemeforinvestment,
operaPng&maintenance
8. Strengthenpublicprivatepartnershiponwastehandling
9. DevelopincenPve&disincenPveschemeonwastehandling
10. Implementbestavailable&environmentallysoundtechnology
11. Lawenforcement
WASTEHANDLING
STRATEGY OF SOLID WASTE MANAGEMENT (Proposed Draft of Presidential Regulation)
BUSINESSOPPORTUNITIESONSOLIDWASTEMANAGEMENT
SOURCE
PLTSa
TPS
TPS3R
CompostIndustry
RecyclingCenter
TPA/TPST
MIDSTREAM:WasteHandling&U2liza2on
Publicinvestment:Rp500juta/ton;OM:Rp50-100
ribu/ton
BankSampah
Compos2ng
Publicinvestment:• Rp300-1.000/kgscaleof
RT/RW
• Rp20-50ribu/tonscaleof
estate
TPS3R:Publicinvestment:Rp500juta/ton
OM:Rp50-100ribu/ton
Collec2onFeeRp3ribu-50ribu/KK/bulan
TPA:Publicand/orprivateinvestment:Rp5M/ha;OM:
Rp150-400ribu/ton
TPST:Integratedtreatment
facilitywithembeddedlandfill.Thevalueofinvestmentisvary
dependontypeoftechnology.
Transporta2onPublicand/orprivateinvestment:
Rp300-500juta/unit;OM:Rp
50-150ribu/ton
Incinera2onplant:Publicand/orprivate
investment:Rp1,4T/1000
ton;OP:Rp500ribu/ton
LandfillgastoelectricityUnitcostRp700-800/kWh
DOWNSTREAM:FinalprocessingatLandfill
Publicand/orprivateinvestment:Rp1M/10ton;
OP:Rp100-200ribu/ton
Publicand/orprivateinvestment:Rp1M/10
ton;OM:Rp100-150
ribu/ton
Publicinvestment:Rp20-30juta/unit
UPSTREAM:WasteMinimisa2on
CementindustryRefuseDerivedFuel
(RDF)forfeedingthe
kilnRDFPre-processingPublicand/orprivateinvestment:
Rp40-60M/120ton;OM:Rp
200-400ribu/ton
LEGALFRAMEWORKOFPPPONSWMPROJECT
SWMProject
Sector
Inter-sector
LocalRegula2on
PPP
LawNo.18/2008SolidWasteManagement;
LawNo.30/2007Energy;
ESDMMinisterialRegulaPonNo.12/2017
LawofPT;
LawofTax;
Lawofinvestment,et..
Govt.RegulaPonNo.50/2007Local
GovernmentPartnership
PresidenPalRegulaPonNo.38/2005
anditschanges.
BappenasRegulaPonNo.3/2012
11
Source:Gunsairi,Bappenas2014
LANDFILLGAS
COLLECTION,TRANSPORTATION,
TREATMENT
Scheme of PPP on SWM Project
Service Contract
O & M Contract
BLT (Leasing)
BOT/ ROT
BOOT/ ROOT
BOO/ ROO
Privatization
Public Investment
Private Investment
O&M Contract � Operation and Maintenance
BLT (Leasing) � Build and Transfer
BOT � Build Operate Transfer
ROT � Rehabilitate Operate Transfer
BOOT � Build Own Operate Transfer
DBFO � Develop Build Finance Operate
BOO � Build Own Operate
ROO � Rehabilitate Operate Own Source:Gunsairi,Bappenas2014
1. Projectfinancialfeasibility:
• Bigscaleprojectwithminimumcapacity500tons/day
• Notyetbankable(highrisklowreturn)
2. ConPnuityoffeedstocksupply
3. CommitmentofPpingfeefromlocalgovernment
4. Landavailability
5. Propersitethatacceptablebypublic/community
6. Proventechnologynotyetacceptablebypublic/community.
13
Challenges on PPP Project
TERIMAKASIH
THANKYOU