Public Opinion about Transportation Issues in Northern ... · Public Opinion about Transportation...
Transcript of Public Opinion about Transportation Issues in Northern ... · Public Opinion about Transportation...
Public Opinion about Transportation Issues in Northern Virginia
A Report Prepared for the:
Northern Virginia Transportation Authority By QSA Research & Strategy
October 13, 2005
Public Opinion about Transportation Issues in Northern Virginia
1
TABLE OF CONTENTS Page Executive Summary 2 Introduction 7 Research Objectives 7 Survey Methodology 8 Detailed Findings 10 I Travel Patterns 11 Commute Patterns 11 Employment 11 Frequency of Commuting 12 Workplace Locations 13 Commute Times 20 Commute Modes 22 Non-Commute Travel 28 Modes Used for Non-Commute Travel 28 Frequency of Non-Commute Mode Use 30 II Priorities in Deciding Where to Live 31 Overall Findings: Most and Second Most Important Factors 32 Analysis of the Most Important Factor by Location of Residence 33 Analysis of the Most Important Factor by Employment Status 34 Analysis of the Most Important Factor by Age 35 Analysis of the Most Important Factor by Household Size 36 Patterns of Priorities in Deciding Where to Live 37 III Frustrations with Travel 38 The Level of Frustration 38 Reasons Given for Frustration 39 IV Priorities and Willingness to Pay 40 General Transportation Priorities 40 Willingness to Pay More for Public Transportation 43 Priorities and Willingness to Pay for Specific Projects in Travel Corridors 44 V HOT Lanes 63 Support for HOT Lanes 63 Reported Likelihood of Use of HOT Lanes 65 VI Acceptability of Funding Methods 66 The Most Acceptable Type of Tax Increase 66 Support for Tolls Used for Different Types of Transportation Improvements 69 Support for a Gas Increase Used for Roadways and Public Transportation 70 Support for State Bonds to Pay for All Types of Transportation Improvements 72 Appendix A: Demographics 73 Appendix B: The Questionnaire 74
Public Opinion about Transportation Issues in Northern Virginia
2
EXECUTIVE SUMMARY
The results presented in this report are based on 1,263 telephone interviews conducted among a representative sample of residents of Northern Virginia between April 26 and May 10, 2005. One of the study goals was to understand differences in opinions of residents of the nine jurisdictions represented in the Northern Virginia Transportation Authority (NVTA). Since this requires separate analysis of the results from each jurisdiction, we stratified the sample by jurisdiction and augmented it with “boost” samples so that a minimum of 100 interviews were conducted in each of the nine jurisdictions. The overall results were then weighted to fairly represent Northern Virginia as a whole. Summary of Key Findings: The great majority of Northern Virginians are frustrated with traffic, want transportation improvements, and are willing to pay for them. When asked a general question, half indicated that improved public transportation is their top priority, compared to just over one-quarter who chose roadway improvements. This preference for transit is consistent across all of the jurisdictions included in the survey. Public priorities for specific planned projects vary by the corridors used (and according to the types of projects planned for each corridor). For example, those who use the Route 7/Dulles Corridor place a much higher priority on transit (Metrorail to Dulles) than on road widening projects, while users of the Fairfax County Parkway Corridor place a higher priority on road widening. Not all transit is created equal: When given the choice of Metrorail extensions versus road widening, Northern Virginians tend to favor Metrorail, but when they are given the choice of express buses or light rail versus road widening, they tend to favor road widening. In every corridor, those who chose transit as their top priority were more willing to pay more to get their top priority project built than were those who chose road widening. Most Northern Virginians favor HOT lanes and would pay something to use them. When the question is framed in the context of the amount of money that residents would need to pay to raise an equivalent amount of revenue, more residents favor increasing the sales tax than the income or gas tax. Northern Virginia residents are just as likely to support using highway tolls and increases in the gas tax to pay for public transportation as they are to favor it to pay for highway improvements. Nearly half favor using highway tolls to pay for bike and pedestrian trails. Almost nine in ten Northern Virginians are willing to pay something for more public transportation, and four in ten are willing to pay at least two dollars per day. Travel Patterns • The findings paint a picture of a hard-working workforce, the majority of which
commutes to workplaces away from home on a daily basis. Still, telecommuting and flex time initiatives appear to have had some effect on travel: Ten percent of those
Public Opinion about Transportation Issues in Northern Virginia
3
employed full time by outside employers commute to work less than five days a week. However, most of those who work from home most or all of the time are self-employed.
• Today, one third of commuters work in Fairfax County, or in the independent cities of
Fairfax and Falls Church. Yet, despite the growth of employment centers in Fairfax County and other suburban edge cities, most Northern Virginia commuters commute to workplaces outside the area where they live. Most travel east toward the District of Columbia, and 38 percent work in the core area, which includes Alexandria and Arlington, as well as the District of Columbia. Reverse commutes are rare. Commutes between the Loudoun County and Prince William County (and the independent cities within its borders) in the outer suburbs are very rare.
• Not surprisingly, given the distances that residents travel to go to work, commute
times average nearly 33 minutes overall and nearly 39 minutes for commuters from the outer suburbs. More than four in ten outer-suburb commuters have commute times of 45 minutes or more and about one quarter have commute times of one hour or more.
• More than 80% of commuters from all jurisdictions except Alexandria, Arlington and
Falls Church (who are more likely to take transit) drive alone to work. Nearly half of those who commute to the District and nearly one quarter going to Arlington ride Metrorail, while less than 20% of commuters into these central areas take the bus.
• Not only do the great majority of commuters drive alone to work, but they also do so
with greater consistency than do users of transit, car pools and other modes. Reflecting their greater range of transportation options, drivers who live in the core suburbs are less consistent in driving alone to work than are other Northern Virginia commuters.
• The great majority of Northern Virginia residents drive alone or drive or ride with
others when they make non-commute trips. Although residents of the core suburbs are just as likely to use a motor vehicle for these types of trips as are other Northern Virginia residents, they are more likely to take transit and they are much more likely to walk.
Priorities in Deciding Where to Live • Neighborhoods that offer walkable lifestyles, convenient transit and good schools are
a winning combination for many Northern Virginians. Those who want to be able to walk to shops and services also tend to want to walk to rail and bus stops, and they also want good schools. Conversely, those who want good schools also value being able to walk to shops and services.
• Overall, the most important factors in deciding where to live are good schools (ranked
most or second most important by 46%) and being close to one’s primary workplace
Public Opinion about Transportation Issues in Northern Virginia
4
(45%). However, being able to walk to shops and services (39%) is not far behind. Having a larger home or yard (33%) is less important. Only a relatively small segment (24%) said that being able to walk to transit is their highest priority. This is not surprising since transit is a means to an end, not an end in itself. However, convenient access to transit may help residents achieve other valued ends, including perceived proximity to workplaces, shops and services.
• However, good schools are the highest priority mainly for those living in larger
households, many of whom are in families with school-age children. Proximity to workplaces, shops and services are more important to singles and couples.
Frustrations with Travel
• Two-thirds of Northern Virginians, but three-quarters of outer-suburb residents, are frustrated with the trips they take most often.
• Eighty-six percent of those who said they were frustrated cited “traffic” as the
reason, and another 11 percent cited “inconsiderate” or “aggressive” drivers. Transportation Priorities General Transportation Priorities
• Half of Northern Virginians said that public transportation is their top transportation priority. By contrast, only about one-quarter named roads and highways, not much more than the 15 percent who named either sidewalks and crosswalks (9%) or bike trails and lanes (6%) as their top priority.
• This preference for public transportation is consistent across all the jurisdictions.
Willingness to Pay for More Public Transportation
• On average, Northern Virginians are willing to spend $1.67 per day for improvements that would expand public transportation service and reduce crowding on Metrorail and VRE. Two-thirds said they would pay at least one dollar per day, and one-third said they would pay at least two dollars. Just 15 percent said they would pay nothing.
Public Priorities and Willingness to Pay for Specific Projects in Travel Corridors
• Respondents were asked to identify their highest priority projects that are planned for the corridors they use most often. Since planned projects differ by corridor, it is not surprising that the nature of respondent choices also differs by corridor. The top priority projects in each of the corridors, along with the percentage of respondents
Public Opinion about Transportation Issues in Northern Virginia
5
making it their top priority, are shown below. Where there is no clear winner, the top two or three projects are shown.
Corridor Top Priority Project Route 7 and Dulles Extending Metrorail from the West Falls Church station to Dulles Airport and Ashburn in
Loudoun County (60%) Route 28 Widening Route 28 from Manassas Park to Route 29 to six lanes (34%)*
Building a light rail line from Manassas to Dulles Airport (31%) Tri-County Parkway Building a new four-lane North Bypass on Route 234 from I-66 to Route 659 (36%)
Building a new four to six lane Tri-County Parkway from Route 234 to Route 50 Fairfax County Parkway Widening the Fairfax County Parkway to six lanes from Sunrise Valley Drive to Route 123
(37%) Prince William County Parkway
Widening the Prince William County Parkway to six lanes from Liberia Avenue to MInnieville Road (46%)
Beltway (I-495) Extending Metrorail from the Dunn Loring station to Maryland through Tyson’s Corner (43%) Widening the Beltway to eight unrestricted lanes plus four HOV or HOT lanes from I-395 to the Dulles Toll Road (42%)
I-66 Widening I-66 from the Beltway to Gainesville, adding two unrestricted lanes and two reversible HOT lanes (39%) Extending Metrorail to Centreville (31%)
I-95 Extending Metrorail from Springfield to Potomac Mills (29%) Widening Route 1 to six unrestricted lane from the Stafford County line to I-495 and adding two HOV lanes (21%) Building light rail along Route 1 from Alexandria to the Pentagon (19%)
*Note: Two Route 28 road widening projects were separated in the questionnaire. Since 22 percent said that the other project (Widening Route 28 from the Dulles Toll Road to Route 606) was their top priority, a total of 56 percent make Route 28 road widening projects their top priority.
• In four corridors, one of the choices was an extension of Metrorail. Users of the
Route 7/Dulles Corridor and, to a lesser extent, the I-95 Corridor favor extending Metrorail over road-widening projects, and users of the Beltway Corridor are equally likely to favor extending Metrorail and widening the Beltway. Only among users of the I-66 Corridor is road widening favored over extending Metrorail, and Metrorail does not lag far behind. However, in every corridor where express buses, light rail or VRE were tested against road widening projects, respondents chose the road widening projects.
• Without exception, corridor users whose top priority is transit are willing to pay
more on average than are those whose top priority is road widening. Those who picked transit as their top priority are willing to pay an average of $2.06 per day, compared to $1.46 for those who picked road widening projects, a difference of 60 cents.
HOT Lanes
• Fifty-six percent of the Northern Virginia residents surveyed favor HOT lanes, and
another three percent indicated that they might favor them under some circumstances. Just over one-third are opposed.
Public Opinion about Transportation Issues in Northern Virginia
6
• On average, Northern Virginians are willing to pay $2.47 to use a HOT lane. Only
27 percent said they would pay nothing, and half would pay at least two dollars.
Acceptability of Funding Methods Most Acceptable Types of Tax Increases
• When asked to choose the most acceptable type of tax increase to fund
transportation improvements in Northern Virginia, more chose a half cent increase in the sales tax (46%) than chose a state income tax increase of $25 per $10,000 of taxable income (23%) or a 17 and one half cents increase in the gas tax (20%). (Each of these increases would raise an equivalent amount of revenue ($175 million annually).
Support for Highway Tolls • About seven in ten support the use of highway tolls for either highway
improvements or improvements to public transportation, and nearly half favor their use for bike and pedestrian trails.
Support for Increases in the Gas Tax
• About half of Northern Virginians support gas tax increases to pay for
improvements in either roadways or public transportation, and they are almost as likely to support using the gas tax increase to pay for public transportation as for roadways.
Support for Using State Bonds to Pay for Transportation Improvements
• Seven in ten Northern Virginia residents said they would vote for state bonds paid
for by state income taxes to pay for all types of transportation improvements in Virginia.
Public Opinion about Transportation Issues in Northern Virginia
7
INTRODUCTION Research Objectives The overall goal of this survey is to provide information on the transportation priorities and preferences of Northern Virginia residents to public officials who make decisions about transportation spending. The survey measures, • Travel Patterns
− Commute patterns, time and modes − Modes used for non-commute trips
• Priorities in Deciding Where to Live • Travel Frustrations • Transportation Priorities and Willingness to Pay for Improvements
− General priorities for transportation improvements − Priorities and willingness to pay for specific transportation projects in the
corridors they use • Funding Methods
− Acceptability of Different Funding Methods − Approval and likely use of HOT Lanes − Support for Different Funding Methods
Public Opinion about Transportation Issues in Northern Virginia
8
Survey Methodology Sampling and Data Collection The survey is based on telephone interviews with 1,263 Northern Virginia adults. It is based on a random digit dial (RDD) sample. One of the study goals was to understand differences in opinions of residents of different jurisdictions. Since this requires separate analysis of the results from each jurisdiction, we stratified the sample by jurisdiction and augmented it with “boost” samples so that a minimum of 100 interviews were conducted in each of the nine jurisdictions listed below. However, post-stratification weighting was applied to aggregate totals so these totals accurately reflect the survey area as a whole. For example, if a jurisdiction represents five percent of the population of the study area but ten percent of the sample, the overall result is weighted back to the population percentage. While percentages are based on the weighted data, bases on charts and tables are unweighted to accurately reflect the number of interviews upon which the percentage is based.
Number of Interviews Unweighted
Number of Interviews Weighted
Alexandria City 101 83 Arlington County 105 123 Fairfax County 400 649 Fairfax City 101 14 Falls Church City 100 6 Loudoun County 103 144 Manassas City 100 24 Manassas Park City 101 8 Prince William County 152 211 TOTAL 1263 1,262
Interviews were conducted by Woelfel Research Inc. (WRI) between April 26 and May 10, 2005. The cooperation rate was 91 percent. The sampling error associated with a sample of 1,263 is plus or minus 2.8 percentage points. However, it is important to note that sampling error is only one of several types of error that can affect survey research.
Public Opinion about Transportation Issues in Northern Virginia
9
Analysis The survey results were cross tabulated by both jurisdictions by general areas (e.g. core, inner and outer suburbs) and statistically significant and meaningful differences are pointed out in this report.
− Core suburbs include Alexandria and Arlington. − Inner suburbs include Fairfax County and the independent cities of Fairfax
and Falls Church. − Outer suburbs include Loudoun County, Prince William County and the
independent cities of Manassas and Manassas Park.
Public Opinion about Transportation Issues in Northern Virginia
10
DETAILED FINDINGS
Public Opinion about Transportation Issues in Northern Virginia
11
I. TRAVEL PATTERNS
This chapter describes commute travel patterns in terms of employment, frequency of commuting, workplace locations, commute modes and frequency of use, and commute times. It describes non-commute travel in terms of mode use and frequency of use. COMMUTE PATTERNS Employment About seven in ten of the Northern Virginia residents surveyed are in the work force and six in ten (71% of males and 49% of females) work full time. Although the great majority of workers work for an outside employer, 16 percent are self-employed and, thus, may have more discretion in choosing their workplaces and scheduling their time.
Nineteen percent of those employed by businesses and nine percent of those employed by nonprofits are self-employed.
Employment Status
52%
73%
7%
10%
8%4%
18%
2%9%
11%6%
0%
20%
40%
60%
80%
100%
All Residents (N=1,263)
Employed Persons(N=892)
Not in the Labor ForceUnemployedRetired and Not WorkingSelf Employed Part TimeEmployed Part TimeSelf-employed Full TimeEmployed Full Time
Q1: Which of the following describes your current employment status?
Public Opinion about Transportation Issues in Northern Virginia
12
Frequency of Commuting Ten percent of full time workers employed by an outside employer commuted to work less than five days during the week before the interview, suggesting that flex time and telecommuting are having an impact. However, home-based businesses also have an important impact. Nearly half (45%) of full time workers who are self-employed commuted to work less than five days a week, and 18 percent did not commute at all. Among part time workers, 46 percent of those employed by an outside employer commuted to work at least five days a week, while just seven percent of those who are self-employed did so. On average, Northern Virginia residents commute to work an average of 4.4 days a week, but the military (5.0 days) and other government workers (4.8 days) commute more frequently.
Commute Days by Employment Status
77%90%
46%55%
7%
12%
6%
39% 18%
22%
4% 11%
9%
17%
7% 5%18%
54%
2%2%
0%
20%
40%
60%
80%
100%
Total (100%) Employed FullTime (73%)
EmployedPart Time
(12%)
Self EmployedFull Time
(10%)
Self EmployedPart Time
(5%)
5+ Days 3-4 Days 1-2 Days Zero Days
Base=Employed Persons (N=892)
Q2: In a typical week, how many days – if any – do you commute to a workplace or workplaces outside your home?
Public Opinion about Transportation Issues in Northern Virginia
13
Workplace Locations Although one-third of Northern Virginia commuters work in Fairfax County (or in the independent cities of Fairfax and Falls Church), 38 percent work in the core area that includes Washington, D.C., Arlington and Alexandria. Another 14 percent work in the outer suburbs (Loudoun and Prince William Counties and the independent cities of Manassas and Manassas Park).
.
Workplace Locations
1%2%2%2%
3%3%
5%6%
7%8%
9%21%
29%33%
38%
0% 5% 10% 15% 20% 25% 30% 35% 40%
Manassas ParkManassas
Fairfax CityFalls Church
Other VirginiaMaryland
Prince WilliamLoudoun
Other StateAlexandria
ArlingtonWashington DCFairfax County
Inner Suburbs**Core*
Base=Commuters (N=840)
Q3: Where is your primary workplace located?
* Core=District of Columbia, Alexandria and Arlington** Inner suburbs=Fairfax County, Fairfax City and Falls Church
Public Opinion about Transportation Issues in Northern Virginia
14
Workplace Locations of Commuters from the Core Suburbs Commuters who live in the core suburbs of Arlington and Alexandria are most likely to work in Washington, D.C. About four in ten commuters from the core suburbs travel to the District, while about three in ten commute to workplaces within their own jurisdiction. Despite these similarities in the commute patterns of Arlington and Alexandria commuters, there also are subtle differences. In general, Arlington commuters are more likely than Alexandria commuters to work in their own jurisdiction or commute inward to the District while Alexandria commuters also commute outward to other areas in Virginia. In fact, Alexandria commuters are just about as likely to work in Fairfax County as in Arlington.
Workplaces of Commuters from Core Suburbs
3%
6%
3%
2%
1%
10%
27%
11%
37%
1%
5%
1%
8%
4%
5%
32%
43%
0% 10% 20% 30% 40% 50%
Falls Church
Other Virginia
Maryland
Loudoun
Other State
Fairfax County
Alexandria
Arlington
Washington DC
Alexandria (N=70) Arlington (N=76)
No Core Suburb commuters commute to Fairfax City, Manassas, Manassas Park or Prince William County.
Q3: Where is your primary workplace located?
Public Opinion about Transportation Issues in Northern Virginia
15
Workplaces of Commuters from the Inner suburbs The inner suburbs consist of Fairfax County and the independent cities of Fairfax and Falls Church. The commute patterns of Fairfax County and Fairfax City commuters are almost identical: Fairfax County is, by far, the most common workplace (37%1) followed by Washington, D.C. (23%). Reflecting their location at the eastern edge of Fairfax County, Falls Church commuters are about equally likely to work in Washington, D.C. (30%), as in Fairfax County (27%); and a sizeable minority (14%) work in Falls Church.
1 Percentages cited are for Fairfax County, which is far more populous than Fairfax City.
Workplaces of Commuters from Inner Suburbs
1%4%4%4%
1%2%
7%8%
7%23%
37%
9%2%2%
4%2%2%2%
4%22%
35%
14%
3%2%2%
5%3%
15%30%
27%
0% 10% 20% 30% 40% 50%
Manassas Falls Church
Other VirginiaMaryland
Prince WilliamLoudoun
Other StateAlexandria
ArlingtonWashington DCFairfax County
Fairfax County (N=254) Fairfax City (N=54) Falls Church (N=66)
No Inner Suburb commuters commute to Fairfax City or Manassas.
Q3: Where is your primary workplace located?
Public Opinion about Transportation Issues in Northern Virginia
16
Workplace Locations of Commuters from the Outer Suburbs The outer suburbs consist of Loudoun County and Prince William County (together with the independent cities of Manassas and Manassas Park, which are located within Prince William County). These two areas have very different commute patterns. Thus, they are separated in this analysis. Prince William County, Manassas and Manassas Park: Very few commuters from the Prince William area travel north to workplaces in Loudoun County. Instead, those who work outside the area tend to travel east. Three in ten Prince William County residents commute to Fairfax County, only slightly less than work in Prince William County, Manassas and Manassas Park combined (36%). Twenty-nine percent of commuters from Manassas work in their home city, and more than 22 percent of commuters from Manassas Park work in Manassas and Manassas Park combined.
Workplaces of Commuters from Prince William
29%
7%
7%
1%
4%
3%13%
1%
1%
3%
22%
11%
11%
3%
4%
1%
7%7%
4%
4%
5%
32%
6%
2%
1%
3%
1%28%
1%
6%
6%
7%
30%
8%9%9%
0% 10% 20% 30% 40%
Manassas Manassas Park
Fairfax CityFalls Church
Other VirginiaMaryland
Prince WilliamLoudoun
Other StateAlexandria
ArlingtonWashington DCFairfax County
Manassas (N=72) Manassas Park (N=74)Prince William County (N=100)
Q3: Where is your primary workplace located?
Public Opinion about Transportation Issues in Northern Virginia
17
Loudoun County: Commuters from Loudoun County have very simple commute patterns: 43% work in the County and 34% travel east to Fairfax County or Fairfax City. More commute to Maryland or another state (13%) than commute to Washington, D.C. (5%).
Workplaces of Commuters from Loudoun
3%
3%5%
43%8%
5%31%
0% 10% 20% 30% 40% 50%
Manassas ParkManassas
Fairfax CityFalls Church
Other VirginiaMaryland
Prince WilliamLoudoun
Other StateAlexandria
ArlingtonWashington DCFairfax County
Q3: Where is your primary workplace located?
Base: Loudoun County Commuters (N=74).
Public Opinion about Transportation Issues in Northern Virginia
18
Summary of Commute Patterns Commute patterns explain much of Northern Virginia’s problems with long commutes and traffic congestion. First, only about four in ten commuters live in the same general area where they work. Second, many commuters travel along routes that are not well served by transit. For example, the single most common home-to-work commute is within the inner suburbs, which include Fairfax County and the independent cities of Fairfax and Falls Church (22%), and the third most common commute is within the outer suburbs (13%). Third, as the chart on the following page shows, reverse commutes remain the exception rather than the rule.
Summary of Commute Patterns
1%1%2%2%3%3%
6%7%8%8%10%
13%14%
22%
0% 20% 40% 60% 80% 100%
Core Suburb to Other StateCore Suburb to Inner SuburbOuter Suburb to Core SuburbInner Suburb to Outer Suburb
Outer Suburb to Other StateOuter Suburb to District
Inner Suburb to Other StateCore Suburb to Core Suburb
Core Suburb to DistrictInner Suburb to Core Suburb
Outer Suburb to Inner SuburbOuter Suburb to Outer Suburb
Inner Suburb to DistrictInner Suburb to Inner Suburb
Base=Commuters N=840
Public Opinion about Transportation Issues in Northern Virginia
19
Despite commercial development in edge cities in Northern Virginia’s western suburbs, relatively few commuters travel in a westward direction. For example, 45 percent of commuters from the core suburbs commute to the District but only one percent commutes to the outer suburbs. Similarly, 43 percent of commuters from the inner suburbs commute to the District or the core suburbs, but only three percent commute to the outer suburbs.
Summary of Commute PatternsWorkplace by Location of Residence
0%
20%
40%
60%
80%
100%
Other 8% 9% 8%Outer Suburbs 1% 3% 41%Inner Suburbs 8% 45% 34%Core Suburbs 38% 15% 7%District 45% 28% 11%
Core Suburbs Inner Suburbs Outer Suburbs Workplace
Residence
Public Opinion about Transportation Issues in Northern Virginia
20
Commute Times The average commute time is 32.9 minutes, but the commutes of outer suburb commuters are almost ten minutes longer than are those of core (28.5 minutes) or inner suburb residents (30.1). More than four in ten outer suburb commuters have commute times of 45 minutes or more, and about one quarter have commutes of one hour or more.
Commute Time by Location of Residence
0%
20%
40%
60%
80%
100%
60+ Minutes 15% 8% 11% 26%45-59 Minutes 15% 13% 11% 17%30-44 Minutes 23% 20% 27% 20%15-29 Minutes 29% 37% 32% 19%0-14 Minutes 18% 22% 19% 18%
Total Sample (N=813)
Core Suburbs (N=143)
Inner Suburbs (N=369)
Outer Suburbs (n=310)
Mean=32.9 Mean=28.5 Mean=30.1 Mean=38.9
Q7: About how many minutes does it usually take you to commute to work?
Residence
Public Opinion about Transportation Issues in Northern Virginia
21
As noted earlier, relatively few outer suburb commuters work in the District or the core suburbs. However, those who do (along with those who commute to other states) are likely to have very long commutes (averaging about one hour). However, most outer suburb commuters work closer to home, and they have relatively short commutes.
Mean Commute Time by Commute Pattern
30 2921
45 42
1923
48
323023
28
3844
62
42
19
5761
0
10
20
30
40
50
60
70
Core Suburb Inner Suburb OuterSuburb
Other State District
Total Core Suburb Inner Suburb Outer Suburb
Workplace
Minutes
Residence
Q7: About how many minutes does it usually take you to commute to work?
Public Opinion about Transportation Issues in Northern Virginia
22
Commute Modes Use of Commute Modes during the Past Seven Days Eighty-four percent of Northern Virginia commuters drove alone to work during the week before the interview. Not surprisingly, core suburb commuters are the least likely to drive alone and the most likely to take Metrorail and the bus and to walk to work, but nearly seven in ten residents from the core suburbs drove alone to work. Commuters from Loudoun County (92%) are most likely to drive alone, while commuters from Alexandria (61%), Falls Church (71%) and Arlington (76%) are least likely to do so. More than one in ten commuters from Manassas Park (11%) take VRE.
Commute Modes by Location of Residence
1%
3%
16%
11%
18%
26%
69%
1%
1%
3%
8%
8%
11%
19%
84%
1%
4%
2%
8%
4%
4%
87%
1%
1%
2%
7%
9%
10%
15%
84%
0% 20% 40% 60% 80% 100%
MotorcycleTake VRE
Ride a BicycleTake the Bus
Take a Car PoolWalk
Take MetrorailDrive Alone
Core Suburbs (N=146) Inner Suburbs (N=374)Outer Suburbs (N=320) Total
Q4: During the past seven days, did you ever (READ COMMUTE MODE) for any part of your commute trip?
Base=Commuters
Public Opinion about Transportation Issues in Northern Virginia
23
Commuters who work in Washington, D.C. or the core suburbs have more transportation choices than do other Northern Virginia residents and fewer employees have free parking at work. Thus, fewer drive alone to work. Still, driving alone is the dominant commute mode even for those who work in the District (67%), Arlington (72%) and Alexandria (83%). Car pooling is a significant mode only for those who work in the District (19%) and Arlington (12%).
Percent Who Drive Alone and Car Pool by Workplace
67%
72%
83%
89%
90%
92%
92%
93%
19%
12%
5%
1%
5%
9%
0%
7%
0% 20% 40% 60% 80% 100%
District (N=179)
Arlington (N=77)
Alexandria (N=63)
Prince William* (N=67)
Other State (N=83)
Maryland (N=29)
Loudoun (N=54)
Fairfax* (N=281)
Drive Alone Car Pool
Q4: During the past seven days, did you ever (READ COMMUTE MODE) for any part of your commute trip?
*Includes independent cities within their borders.
Public Opinion about Transportation Issues in Northern Virginia
24
Nearly half of Northern Virginia residents who commute to Washington, D.C. use Metrorail and almost one in five ride the bus. Similarly, almost one quarter of those who commute to Arlington ride Metrorail and 16 percent ride the bus. However, fewer than one in ten use transit to commute to workplaces in other areas.
Percent Taking Transit by Workplace
4%
24%
4%
3%
2%
45%
9%
6%
9%
16%
2%
3%
5%
17%
3%
2%
2%
5%
2%
0% 20% 40% 60% 80% 100%
Alexandria (N=63)
Arlington (N=77)
Fairfax* (N=281)
Loudoun (N=54)
Prince William* (N=67)
District (N=179)
Maryland (N=29)
Other State (N=83)
Metrorail The Bus VRE
Q4: During the past seven days, did you ever (READ COMMUTE MODE) for any part of your commute trip?
*Includes independent cities within their borders.
Public Opinion about Transportation Issues in Northern Virginia
25
Use of Commute Modes Commuters who drive alone use their vehicles an average of 4.5 days a week. By contrast, users of transit and car pools use these modes a little over three and a half days a week, and those who ride bicycles or motorcycles do so even less frequently.
Mean Number of Days Commute Modes Were Used During the Past Seven Days
1.9
2.6
3.6
3.6
3.7
3.8
4.5
0.0 1.0 2.0 3.0 4.0 5.0
Motorcycle (N=8)*
Ride a Bicycle (N=19)*
Take the Bus (N=58)
Car Pool (N=68)
Take Metrorail (N=120)
Walk (N=83)
Drive Alone (N=692)
Base=Mode Users*Caution: Very Small Base
Q4A: (FOR EACH MODE USED) How may days during the past seven days did you (READ MODE)?
Public Opinion about Transportation Issues in Northern Virginia
26
Consistency in the Use of Commute Modes Not only do the great majority of commuters drive alone to work, but they also do so with greater consistency than do users of other modes. On average, these drivers drove alone to work on 93 percent of all of their commute days. Those who took Metrorail did so only 77 percent of the time and those who took the bus did so only 76 percent of the time. The very few commuters who ride bicycles or motorcycles to work are much less consistent than users of other modes.
Use of Commute Modes and Mean Percent of Days Used
1% 1% 2%7% 9% 10%
15%
84%
36%
84%
55%
76% 74% 76% 77%
93%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
M'cycle* VRE* Bicycle* Bus Pool Walk Metro Drive
Percent Using Mode Mean Percent of Commute Days Used
Mean percent of commute days used was calculated by dividing the number of commute days used by the total number of commute days.
Base=Commuters N=840*Caution: Very Small Bases for Mean Percent of Commute Days Used
Public Opinion about Transportation Issues in Northern Virginia
27
Residents of the core suburbs have more transportation choices than do other Northern Virginia commuters, and, consequently, are less consistent in their use of the automobile. Still, 85 percent of core suburb residents who drive alone do so 85 percent of the time, and those who take car pools do so 60 percent of the time.
Differences in the Mean Percentage of Commute Days Users Drove or Used Car Pools by Location of Residence
60%
85%76%
93%
81%
96%
0%10%
20%30%40%50%60%
70%80%
90%100%
Take a Car Pool Drive Alone
Core Suburb Inner Suburb Outer Suburb
Q4A: (FOR EACH MODE USED) How may days during the past seven days did you (READ MODE)?
NOTE: The number of days each mode was used was divided by the number of commute days.
Public Opinion about Transportation Issues in Northern Virginia
28
NON-COMMUTE TRAVEL Modes Used for Non-commute Travel Eighty-five percent of Northern Virginia residents drive alone when they run errands, go shopping, visit friends, go out for meals and entertainment, or take other trips that are not work related. However, just about as many drive or ride with friends when they take non-commute trips, and nearly four in ten walk. Despite having a limited number of routes and stations, more than one in ten take Metrorail for these types of trips. However, despite having more routes and stops, only four percent take the bus. In fact, more ride bicycles (6%) than take the bus for these types of trips, and almost as many ride motorcycles (3%).
Non-commute Modes
3%
4%
6%
13%
37%
78%
85%
0% 20% 40% 60% 80% 100%
Motorcycle
Take the Bus
Ride a Bicycle
Take Metrorail
Walk
Drive or Ride with Others
Drive Alone
Q8: Now I am going to ask you about the trips you make to run errands, go shopping, visit friends, go out for meals and entertainment, in short, all of the trips you make that are not work related. During the past seven days, did you ever (READ) for any part of your commute trip?
Base=Total Sample N=1,263
Public Opinion about Transportation Issues in Northern Virginia
29
Residents of core suburbs are just as likely to drive alone or drive or ride with others when they take non-commute trips as are residents of the inner and outer suburbs. However, they are more likely to take Metrorail and the bus, and they are much more likely to walk.
Non-commute Modes by Location of Residence
2%
8%
8%
22%
59%
76%
82%
3%
4%
7%
16%
41%
78%
86%
2%
2%
4%
5%
23%
78%
81%
0% 20% 40% 60% 80% 100%
Motorcycle
Take the Bus
Ride a Bicycle
Take Metrorail
Walk
Drive or Ride with Others
Drive Alone
Core Suburbs Inner Suburbs Outer Suburbs
Q8: Now I am going to ask you about the trips you make to run errands, go shopping, visit friends, go out for meals and entertainment, in short, all of the trips you make that are not work related. During the past seven days, did you ever (READ) for any part of your commute trip?
Base=Total Sample N=1,263
Public Opinion about Transportation Issues in Northern Virginia
30
Frequency of Mode Use Northern Virginia residents who drive alone when they take non-commute trips do so an average of 4.2 days a week. Those who drive or ride with others do so somewhat less frequently (3.6 days). Metrorail riders use it an average of just 1.5 days a week, making it the least used mode for non-commute trips. However, the very few residents who ride the bus for non-commute trips take the bus an average of 2.6 days a week. This disparity between Metrorail and the bus may be due to greater transit dependence among bus riders.
Mean Number of Days Non-commute Modes Were Used During the Past Seven Days
1.5
1.8
2.1
2.6
3.0
3.6
4.2
0.0 1.0 2.0 3.0 4.0 5.0
Take Metrorail (N=126)
Motorcycle (N=25)
Ride a Bicycle (N=67)
Take the Bus (N=37)
Walk (N=428)
Drive/Ride with Others (N=946)
Drive Alone (N=1,027)
Q8A: How many days during the past seven days did you (READ MODE) for any part of your non-work trips?
Base=Mode Users
Public Opinion about Transportation Issues in Northern Virginia
31
II. PRIORITIES IN DECIDING WHERE TO LIVE
The results in the preceding chapter make it very clear that Northern Virginia’s transportation problems are largely a function of the types of decisions that its residents make about where they will live and work. This chapter explores the types of factors that come into play as residents make decisions about where to live. It is based on responses to two questions: Q10: Now, let’s think about the things that are important to you when you decide where
to live. If price were not an issue, what would be most important to you? Q10A: And what would be second most important?
Being within walking distance of shopping and services Being within walking distance of a bus or rail stop Being close to your primary workplace Having good schools in your neighborhood Having a larger home or yard
Public Opinion about Transportation Issues in Northern Virginia
32
Overall Findings: Most and Second Most Important Factors Overall, the most important factors in deciding where to live are good schools (ranked most or second most important by 46%) and being close to one’s primary workplace (45%). However, being able to walk to shops and services (39%) is not far behind. Having a larger home or yard (33%) is less important. Only a relatively small segment (24%) said that being able to walk to transit is their highest priority. This is not surprising since transit is a means to an end, not an end in itself. However, convenient access to transit may help residents achieve other valued ends, including perceived proximity to workplaces, shops and services.
Important Factors in Deciding Where to Live
9%
17%
17%
25%
27%
15%
16%
22%
20%
19%
0% 20% 40% 60% 80% 100%
Walk to Rail or Bus
Larger Home or Yard
Walk to Shops and Services
Close to Primary Workplace
Good Schools
Most Important Second Most Important
Base=Total Sample N=1,263
45%
39%
33%
24%
46%
Public Opinion about Transportation Issues in Northern Virginia
33
Analysis of the Single Most Important Factor by Location of Residence Core-suburb residents place a high priority on being able to walk or take transit to key destinations. Their three top factors in deciding where to live are being able to walk to shops and services (27%), being close to their primary workplace (26%) and being able to walk to rail or bus stops (17%). Inner-suburb residents are most concerned about having good schools (29%) and being close to their primary workplace (22%), but they also value being able to walk to shops and services (19%). Residents of Falls Church (39%) place a particularly high priority on good schools. Like inner-suburb residents, outer-suburb residents are most concerned about good schools (31%) and being close to their workplace (28%), but they place a higher priority on having a larger home or yard (19%) and a lower priority on being able to walk to shops and services (12%). Not surprisingly, interest in being close to rail or bus stops declines with distance from the core.
Most Important Factor in Deciding Where to LiveBy Location of Residence
9% 17% 10% 5%
17%12%
14% 19%
17%27%
19% 12%
25%
26%
22% 28%
27%16%
29% 31%
5% 3% 6% 5%
0%
20%
40%
60%
80%
100%
Total (N=1263) Core Suburbs(N=206)
Inner Suburbs(N=601)
Outer Suburbs(N=456)
Walk to Rail or Bus Larger Home or YardWalk to Shops and Services Close to Primary WorkplaceGood Schools No Opinion
Public Opinion about Transportation Issues in Northern Virginia
34
Analysis of the Single Most Important Factor by Employment Status Not surprisingly, full time employees (33%) are likely to make being close to their workplace their highest priority, but good schools are a close second (27%). Having a larger home or yard is also a high priority (19%) for this predominantly male group. Part-time employees, who are more likely to be female than male, value good schools most (33%), followed by being close to their workplace (24%) and being able to walk to shops and services (20%). By far the highest priority for retired persons is being able to walk to shops and services (40%). The top priority for persons who are not in the labor force, who are 88 percent female, is good schools (44%), followed by having a larger home or yard (18%).
Most Important Factor in Deciding Where to LiveBy Employment Status
9% 7% 12% 14% 9%17% 19% 12% 11% 18%
17% 11% 20%40%
13%
25% 33% 24%5%
13%
27% 27% 33%12% 44%
5% 2%18%
2%
0%
20%
40%
60%
80%
100%
Total(N=1263)
EmployedFull Time(N=740)
EmployedPart Time(N=152)
Retired(N=228)
Not in LaborForce*(N=143)
Walk to Rail or Bus Larger Home or YardWalk to Shops and Services Close to Primary WorkplaceGood Schools No Opinion
*88% of those not in the labor force are female.
Public Opinion about Transportation Issues in Northern Virginia
35
Analysis of the Single Most Important Factor by Age
Interest in good schools begins among the youngest cohort, which is under age 35, (24%) and reaches its peak in the 35 to 54 age group (38%) and then declines sharply. Interest in being close to one’s primary workplace is greatest in those under 35 (35%), declines gradually to age 64 (24%) and drops precipitously among those who are age 65 and older. There is a similar pattern for having a larger home or yard. Being close to shops and services is not very important to residents under 55 but it is quite important to both residents in the 55 to 64 age range (24%) and those who are 65 and older (43%). Similarly, almost twice as many residents age 55 and older (13%) as residents 35 to 54 (7%) made being close to rail and bus stops their top priority.
Most Important Factor in Deciding Where to LiveBy Age
9% 8% 7% 13% 14%17% 22% 17%
16% 7%
17% 10%9%
24% 43%
25% 35%27%
24% 7%
27%24%
38%15%
13%
5% 2% 8% 15%
0%
20%
40%
60%
80%
100%
Total(N=1263)
Under 35(N=229)
35 to 54(N=578)
55-64 (N=220)
65+ (N=202)
Walk to Rail or Bus Larger Home or YardWalk to Shops and Services Close to Primary WorkplaceGood Schools No Opinion
Public Opinion about Transportation Issues in Northern Virginia
36
Analysis of the Single Most Important Factor by Household Size For larger households – many of which are families with school-age children – good schools are by far the most important factor in deciding where to live while singles and couples focus more on proximity to work and being able to walk to shops and services.
Most Important Factor in Deciding Where to LiveBy Size of Household
9% 12% 12% 9% 4%
17% 13% 19% 19%14%
17%31% 23%
11%7%
25%
31% 26%
27%
19%
27%9%
12% 34%54%
5% 4% 10% 2%
0%
20%
40%
60%
80%
100%
Total(N=1263)
One Person Two Persons ThreePersons
Four or MorePersons
Walk to Rail or Bus Larger Home or YardWalk to Shops and Services Close to Primary WorkplaceGood Schools No Opinion
Public Opinion about Transportation Issues in Northern Virginia
37
Patterns of Priorities in Deciding Where to Live Neighborhoods that offer walkable lifestyles, convenient transit and good schools are a winning combination for many Northern Virginians. Those who want to be able to walk to shops and services also tend to want to walk to rail and bus stops, and they also want good schools. Conversely, those who want good schools also value being able to walk to shops and services.
Second Most Important Factor in Deciding Where to Live by Most Important Factor
6%
44%
13% 11%10%
10%
22% 28%48%
26%
31% 19%
22%
29%
14%
39%16%
37% 21% 30%
4% 2% 11% 4% 3%
0%
20%
40%
60%
80%
100%
Walk to Railor Bus
Larger Homeor Yard
Walk toShops andServices
Close toPrimary
Workplace
GoodSchools
Walk to Rail or Bus Larger Home or YardWalk to Shops and Services Close to Primary WorkplaceGood Schools No Opinion
Second Most Important Factor
Most Important Factor
Public Opinion about Transportation Issues in Northern Virginia
38
III. FRUSTRATIONS WITH TRAVEL This chapter examines the level of frustration that Northern Virginians experience as they travel in the region. It is based on responses to two questions Q13: Thinking now about the types of trips that you make most frequently. . . Would you say that making these trips is usually very frustrating, somewhat frustrating, not very frustrating or not frustrating at all? Q14: What makes these trips frustrating? (Open-ended question) The Level of Frustration Two-thirds of Northern Virginians are very (25%) or somewhat (41%) frustrated with the trips they take most often. The level of frustration increases with distance from the core area: Just 11 percent of core-suburb residents but 20 percent of inner-suburb residents and 39 percent of outer-suburb residents are very frustrated.
Level of Frustration with Trips Taken Most OftenBy Location of Residence
0%
20%
40%
60%
80%
100%
Very Frustrating 25% 11% 20% 39%Somewhat Frustrating 41% 47% 41% 37%Not Very Frustrating 21% 22% 25% 13%Not At All Frustrating 12% 19% 14% 10%
Total Sample (N=1263)
Core Suburbs (N=206)
Inner Suburbs (N=601)
Outer Suburbs (N=456)
Residence
Public Opinion about Transportation Issues in Northern Virginia
39
When those who said they were frustrated were asked what makes their trips frustrating, 86 percent cited traffic and 11 percent cited inconsiderate or aggressive drivers. Nearly all of their responses to this open-ended question involve driving.
Almost nine in ten cited traffic as a reason for their frustration with travel.
2%
2%
2%
2%
3%
3%
11%
86%
0% 20% 40% 60% 80% 100%
Need More Public Transportation
Time It Takes
Too Much Residential Development
Construction
Accidents
Timing of Traffic Lights
Inconsiderate or Aggressive Drivers
Traffic
Base=Very or Somewhat Frustrated N=829
Responses to an Open-Ended Question
Public Opinion about Transportation Issues in Northern Virginia
40
IV. TRANSPORTATION PRIORITIES
This chapter examines both general and corridor-specific transportation priorities and willingness to pay for transportation improvements.
General Transportation Priorities
To measure general transportation priorities, respondents were asked: Q12. I am going to read a list of general types of transportation improvements.
After I finish, please tell me which one is most important to you? Q12A. And which one is second most important?
When asked a general question, Northern Virginians indicated that they place a much higher priority on public transportation than on roads and highways. Nearly three-quarters said that public transportation is their first or second transportation priority, while only about half named roads and highways. Even more striking is the fact that nearly twice as many Northern Virginians named public transportation (50%) as roads and highways as their top priority. Substantial minorities also named sidewalks and crosswalks (27%), bike trails and lanes (18%) and HOV lanes (20%).
Most and Second Most Important General Transportation Priorities
5%
6%
9%
28%
50%
15%
12%
18%
23%
24%
0% 20% 40% 60% 80% 100%
HOV Lanes
Bike Trails and Lanes
Sidewalks and Crosswalks
Roads and Highways
Public Transportation
Most Important Second Most Important
Base=Total Sample N=1,263
74%
20%
18%
27%
51%
Public Opinion about Transportation Issues in Northern Virginia
41
Not only is public transportation the top public priority but it is also the top public priority in all of the nine jurisdictions. In fact, the results are consistent across jurisdictions: Public transportation is the top priority for about half of residents of all jurisdictions. There are, however, predictable differences in the priorities that residents of different jurisdictions assign to roads and highways, HOV lanes, and sidewalks and crosswalks. Roads and highways are less important in Arlington and Falls Church, both of which are very well served by transit, than they are in other jurisdictions. Sidewalks and crosswalks are more important in Alexandria and Falls Church. HOV lanes are less important in Alexandria and more important in Manassas Park and Prince William County.
Most Important Transportation PriorityBy Jurisdiction of Residence
0%
20%
40%
60%
80%
100%
Not Sure 2% 3% 1% 3% 4% 2% 6% 5% 2%Public Transportation 51% 57% 50% 55% 50% 47% 48% 50% 49%Roads and Highways 23% 19% 28% 22% 12% 33% 36% 35% 32%Sidewalks and Crosswalks 17% 9% 9% 6% 19% 8% 6% 5% 7%Bike Trails and Lanes 6% 10% 7% 7% 13% 8% 2% 1% 4%HOV Lanes 1% 2% 6% 7% 2% 3% 2% 4% 6%
Alex Arl FF Cty FF City
Fall Ch Loud Man Man
Pk PW
Base=Total Sample N=1,263
**
** *** **
*Significantly less than average** Significantly more than average
Public Opinion about Transportation Issues in Northern Virginia
42
Almost half (48%) of those who do not use transit now indicated that public transportation is their top priority. This strongly suggests that there is considerable latent demand for public transportation in areas that are not well served.
Percent Citing Public Transportation as their Top Priority by Transit Use
0%
20%
40%
60%
80%
100%
Not Sure 0% 2%Public Transportation 66% 48%Roads and Highways 13% 30%Sidewalks and Crosswalks 7% 9%Bike Trails and Lanes 9% 6%HOV Lanes 5% 5%
Transit User Not Transit User
Base=Total Sample N=1,263
Public Opinion about Transportation Issues in Northern Virginia
43
Willingness to Pay for More Public Transportation On average, Northern Virginia residents are willing to spend $1.67 per day for improvements that would expand public transportation service and reduce crowding on Metrorail and VRE. Two-thirds said they would pay at least one dollar per day and about one-third said they would pay at least two dollars per day. Just 15 percent said that they would pay nothing. These results are consistent across jurisdictions with the exception of Falls Church, whose residents are willing to pay less on average ($1.12) than are other Northern Virginia residents. This is due to the fact that 24 percent of Falls Church residents said they would pay nothing for public transportation improvements.
Q21: How much would you be willing to pay on average each day for improvements
that would expand public transportation service and reduce crowding on Metrorail and VRE?
Daily Amount Willing to Pay for More Public Transportation
15%
18%
21%4%
13%
8%
2%
9%2%
8% $0$0.50$1$1.50$2$3$4$5$6+Not Sure
Base=Total Sample N=1,263
Mean=$1.67
Public Opinion about Transportation Issues in Northern Virginia
44
Public Priorities for Specific Projects in Travel Corridors Measurement of corridor-specific priorities is based on a series of questions. First, respondents were asked to identify the corridors (as defined in the 2030 Plan) that they use on a regular basis.
Q11. Now I would like you to think about all of the trips that you take for any purpose. There are eight primary travel corridors in Northern Virginia. I am going to read a list of these corridors. As I do, please tell me which ones you use at least once a week either on transit, in a motor vehicle or by any other mode of transportation.
• Route 7 or the Dulles Toll Road • Route 28 • Tri-County Parkway: The Loudoun County Parkway, Route 234 or Route
659 in Loudoun and Prince William Counties • The Fairfax County Parkway • The Prince William County Parkway • The Beltway or I-495 Corridor • The Interstate 66 Corridor, including Route 29 and Route 50, the
Metrorail Orange line and the VRE Manassas Line • The I-95 Corridor, including I-395, Route 1, the Blue and Yellow
Metrorail lines and the VRE Fredericksburg line Then, respondents were read a list of projects planned for the corridors they had identified2 and asked “please tell me which project you think should be the highest priority” and “which one should be the second highest priority.” After respondents had identified their top priority project in the corridors they use, they were asked: “How much would you be willing to pay on average each day to get your highest priority project built?” 2 Respondents rated up to two corridors. Those who said they used more corridors were asked to identify the two that they used most often.
Public Opinion about Transportation Issues in Northern Virginia
45
Route 7 and Dulles Corridor Projects Nearly five times as many users of the Route 7 and Dulles Corridor made extending Metrorail from the West Falls Church station to Dulles Airport and Ashburn their top priority (60%) as opted for the next most popular project, widening Route 7 from the Fairfax County Parkway to I-495 (13%). None of the other projects were named top priority by more than one in ten Northern Virginians.
Extending Metrorail from the West Falls Church station to Dulles Airport and Ashburn in Loudoun County Building 6 new interchanges on Route 7 between Leesburg and Route 28 Widening the Dulles Toll Road Widening Route 7 from the Fairfax County Parkway to I-495 Widening the Route 7 and 15 Bypass around Leesburg from 6 to 8 lanes Widening the Dulles Greenway from Route 772 to Route 28 to 4 unrestricted lanes plus 2 HOV lanes
Highest and Second Highest Priority Projects Route 7 and Dulles Toll Road Corridor
3%
4%
6%
7%
13%
60%
10%
13%
15%
11%
22%
11%
0% 20% 40% 60% 80% 100%
Widening Dulles Greenway
Interchanges on Route 7
Widening Dulles Toll Road
Widening Leesburg Bypass
Widening Route 7
Extending Metrorail to Dulles
Highest Priority Second Highest Priority
Base=358 Corridor Users 6% are not sure which project is their highest priority.
71%
21%
17%
13%
18%
35%
Public Opinion about Transportation Issues in Northern Virginia
46
Northern Virginia residents who use the Route 7 and Dulles Corridor are willing to pay an average of $1.85 per day to get their highest priority project built. None of the differences in willingness to pay for particular projects are statistically significant.
Extending Metrorail from the West Falls Church station to Dulles Airport and Ashburn in Loudoun County Building 6 new interchanges on Route 7 between Leesburg and Route 28 Widening the Dulles Toll Road Widening Route 7 from the Fairfax County Parkway to I-495 Widening the Route 7 and 15 Bypass around Leesburg from 6 to 8 lanes Widening the Dulles Greenway from Route 772 to Route 28 to 4 unrestricted lanes plus 2 HOV lanes
Willingness to Pay for Highest Priority Project Route 7 and Dulles Toll Road Corridor
3% 4% 6% 7%13%
60%
$2.48
$1.25 $1.20
$1.94
$1.40
$2.10
0%
20%
40%
60%
80%
100%
WideningGreenway
Rt. 7Interchanges
Widening TollRoad
WideningLeesburgBypass
Widening Rt.7
ExtendingMetrorail to
Dulles
Perc
ent H
ighe
st P
rior
ity
$0.00$0.20$0.40$0.60$0.80$1.00$1.20$1.40$1.60$1.80$2.00$2.20$2.40$2.60$2.80$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.85)
Base=336 Corridor Users 6% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
Public Opinion about Transportation Issues in Northern Virginia
47
Route 28 Corridor Projects The two top priority projects in the Route 28 Corridor are widening Route 28 from Manassas Park to Route 29 and building a light rail line from Manassas to Dulles Airport, followed by widening Route 28 from the Dulles Toll Road to Route 606. Altogether, 56 percent of Corridor users named widening one of the segments of Route 28 as their top priority project.
Widening Route 28 from Manassas Park to Route 29 to 6 lanes Building a light rail line from Manassas to Dulles Airport Widening Route 28 from the Dulles Toll Road to Route 606 Extending the Route 28 bike and pedestrian trail from Route 29 to the Fauquier County Line
Highest and Second Highest Priority Projects Route 28 Corridor
5%
22%
31%
34%
14%
21%
29%
21%
0% 20% 40% 60% 80% 100%
ExtendBike/Pedestrian
Trail
Widen Rt. 28: TollRoad to Rt. 606
Light Rail:Manassas To
Dulles
Widen Rt. 28:Manassas Park to
Rt. 29
Highest Priority Second Highest Priority
Base=287 Corridor Users 8% are not sure which project is their highest priority.
55%
60%
43%
19%
Public Opinion about Transportation Issues in Northern Virginia
48
Users of the Route 28 Corridor are willing to pay an average of $1.65 to get their highest priority project built. Those whose highest priority project is building light rail from Manassas to Dulles Airport are willing to pay an average of $2.22, which is significantly more than those whose top priorities are road widening projects are willing to pay.
Widening Route 28 from Manassas Park to Route 29 to 6 lanes Building a light rail line from Manassas to Dulles Airport Widening Route 28 from the Dulles Toll Road to Route 606 Extending the Route 28 bike and pedestrian trail from Route 29 to the Fauquier County Line
Willingness to Pay for Highest Priority ProjectRoute 28 Corridor
5%
22%31% 34%
$1.60
$1.05
$2.22
$1.57
0%
20%
40%
60%
80%
100%
ExtendBike/Pedestrian
Trail
Widen Rt. 28: TollRoad to Rt. 606
Light Rail:Manassas To
Dulles
Widen Rt. 28:Manassas Park
to Rt. 29
Perc
ent H
iges
t Pri
ority
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.65)
Base=287 Corridor Users 8% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay except for the those indicated are not statistically significant.
**
*
*
** $2.22 is significantly more than $1.05 and $1.57.
Public Opinion about Transportation Issues in Northern Virginia
49
Tri-County Parkway Corridor Projects The Tri-Country Parkway Corridor includes the Loudoun Country Parkway, Route 234 or Route 659 in Loudoun and Prince William Counties. The top priority in this corridor is building a new North Bypass on route 234 from I-66 to Route 659, followed by building a new Tri-County Parkway from Route 234 to Route 50.
Building a new 4 to 6 lane Tri-County Parkway from Route 234 to Route 50 Building a new 4-lane North Bypass on Route 234 from I-66 to Route 659 Building a new 4-lane Loudoun County Parkway from Route 50 to the Dulles Greenway Building a new 4-lane Loudoun County Parkway from Route 7 to Gloucester Parkway
Highest and Second Highest Priority Projects Tri-County Parkway
6%
14%
27%
36%
7%
17%
22%
24%
0% 20% 40% 60% 80% 100%
LC Pkway: Rt. 7-Gloucester
LC Pkway: Rt. 50-Greenway
Tri-C Pkway: Rt. 234-Rt. 50
Rt. 234 North Bypass
Highest Priority Second Highest Priority
Base=107 Corridor Users 17% are not sure which project is their highest priority.
60%
49%
31%
13%
* Includes the Loudoun County Parkway, Route 234 or Route 659 in Loudoun and Prince William Counties
Public Opinion about Transportation Issues in Northern Virginia
50
Users of the Tri-County Parkway Corridor are willing to pay an average of $1.95 per day to get their highest priority project built. Because of small sample sizes, there are no significant differences in willingness to pay between projects.
Building a new 4 to 6 lane Tri-County Parkway from Route 234 to Route 50 Building a new 4-lane North Bypass on Route 234 from I-66 to Route 659 Building a new 4-lane Loudoun County Parkway from Route 50 to the Dulles Greenway Building a new 4-lane Loudoun County Parkway from Route 7 to Gloucester Parkway
Willingness to Pay for Highest Priority ProjectTri-County Parkway* Corridor
6%14%
27%
36%$1.25
$2.49 $2.44
$1.75
0%
20%
40%
60%
80%
100%
LC Pkway: Rt. 7-Gloucester
LC Pkway: Rt. 50-Greenway
Tri-C Pkway: Rt.234-Rt. 50
North Bypass
Perc
ent H
ighe
st P
rior
ity
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.95)
Base=107 Corridor Users 17% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
*Loudon County Parkway/Routes 234 and 659 Corridor
Public Opinion about Transportation Issues in Northern Virginia
51
Fairfax County Parkway Corridor Among users of the Fairfax County Parkway Corridor, the highest priority is widening the parkway from Sunrise Valley Drive to Route 123. Building new interchanges on Monument Drive, Rolling road and Pohick Road and starting a new priority bus service are equally important.
Widening the Fairfax County Parkway to 6 lanes from Sunrise Valley Drive to Route 123 Starting a new Priority Bus Service that travels in a special lane and is not delayed by traffic congestion Building 2 new HOV lanes on the Springfield-Franconia Parkway from the Fairfax County Parkway to Frontier Drive Building 3 new interchanges on Monument Drive, Rolling Road and Pohick Road
Highest and Second Highest Priority Projects Fairfax County Parkway Corridor
11%
18%
20%
37%
17%
19%
17%
20%
0% 20% 40% 60% 80% 100%
New HOV Lanes: S-F Pkway
Priority Bus
New Interchanges
Widening Pkway
Highest Priority Second Highest Priority
Base=201 Corridor Users 13% are not sure which project is their highest priority.
57%
37%
37%
28%
Public Opinion about Transportation Issues in Northern Virginia
52
On average, Fairfax County Parkway Corridor users are willing to pay $1.23 per day to get their top priority project built. Those whose top priority is either new HOV lanes on the Springfield-Franconia Parkway ($1.78) or a new priority bus service ($1.84) are willing to pay about twice as much as are those whose top priority project is new interchanges on the Springfield-Franconia Parkway.
Widening the Fairfax County Parkway to 6 lanes from Sunrise Valley Drive to Route 123 Starting a new Priority Bus Service that travels in a special lane and is not delayed by traffic congestion Building 2 new HOV lanes on the Springfield-Franconia Parkway from the Fairfax County Parkway to Frontier Drive Building 3 new interchanges on Monument Drive, Rolling Road and Pohick Road
Willingness to Pay for Highest Priority Project Fairfax County Parkway Corridor
11%18% 20%
37%
$1.78 $1.84
$0.90
$1.24
0%
20%
40%
60%
80%
100%
New HOV Lanes:S-F Pkway
Priority Bus New Inter- changes
Widening Pkway
Perc
ent H
ighe
st P
rior
ity
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.23)
Base=201 Corridor Users 13% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay except for those indicated are not statistically significant.
****
*
** $1.78 and $1.84 are significantly more than $0.90.
Public Opinion about Transportation Issues in Northern Virginia
53
Prince William County Parkway Corridor Projects Widening the Prince William County Parkway is the top priority for Corridor users, followed by building HOV lanes on the parkway.
Widening the Prince William County Parkway to 6 lanes from Liberia Avenue to Minnieville Road Building HOV lanes on the Prince William Parkway from Hoadly Road to I-95 Starting a new priority bus service from Woodbridge to Manassas
Highest and Second Highest Priority Projects Prince William County Parkway Corridor
18%
19%
46%
25%
34%
17%
0% 20% 40% 60% 80% 100%
Priority Bus
HOV Lanes onParkway
WideningParkway
Highest Priority Second Highest Priority
Base=116 Corridor Users 18% are not sure which project is their highest priority.
63%
43%
53%
Public Opinion about Transportation Issues in Northern Virginia
54
Users of the Prince William County Parkway Corridor are willing to pay an average of $1.52 per day to get their highest priority project built. There are no significant differences in willingness to pay for different projects.
Widening the Prince William County Parkway to 6 lanes from Liberia Avenue to Minnieville Road Building HOV lanes on the Prince William Parkway from Hoadly Road to I-95 Starting a new priority bus service from Woodbridge to Manassas
Willingness to Pay for Highest Priority ProjectPrince William County Parkway Corridor
18% 19%
46%$1.73
$1.92
$1.45
0%
20%
40%
60%
80%
100%
Priority Bus HOV Lanes on Pkway Widening Pkway
Perc
ent H
ighe
st P
rior
ity
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.52)
Base=116 Corridor Users 18% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
Public Opinion about Transportation Issues in Northern Virginia
55
Beltway Corridor Projects Extending Metrorail from the Dunn Loring station to Maryland and widening the beltway to eight unrestricted lanes (plus four HOV or HOT lanes) are equally likely to be top priority projects for users of the Beltway Corridor. Users are much less likely to cite starting an express bus service as their top priority.
Widening the Beltway to 8 unrestricted lanes plus four HOV or HOT lanes from I-395 to the Dulles Toll Road Extending Metrorail from the Dunn Loring station to Maryland through Tyson’s Corner Starting an express bus service
Highest and Second Highest Priority Projects Beltway (I-495) Corridor
8%
42%
43%
26%
28%
31%
0% 20% 40% 60% 80% 100%
Express Bus
Widening theBeltway
Metrorail fromDunn Loring to
MD
Highest Priority Second Highest Priority
Base=347 Corridor Users 7% are not sure which project is their highest priority.
74%
70%
34%
Public Opinion about Transportation Issues in Northern Virginia
56
On average, users of the Beltway Corridor are willing to pay $1.61 per day to get their top priority project built. There are no statistically significant differences in willingness to pay for particular projects.
Widening the Beltway to 8 unrestricted lanes plus four HOV or HOT lanes from I-395 to the Dulles Toll Road Extending Metrorail from the Dunn Loring station to Maryland through Tyson’s Corner Starting an express bus service
Willingness to Pay for Highest Priority ProjectBeltway (I-495) Corridor
8%
42% 43%
$2.13
$1.41
$1.87
0%
20%
40%
60%
80%
100%
Express Bus Widening the Beltway Metrorail from DunnLoring to MD
Perc
ent H
ighe
st P
rior
ity
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.61)
Base=347 Corridor Users 7% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
Public Opinion about Transportation Issues in Northern Virginia
57
Although widening I-66 from the Beltway to Gainesville is the top priority project among users of the Corridor, extending Metrorail to Centreville is a close second. Building an interstate bicycle Route 50 through Northern Virginia is at least as important as building a new interchange on I-66 at Gainesville. Many VRE riders and potential riders live outside the area sampled for this survey. Thus, it is not surprising that extending VRE is not a very high priority among the survey respondents.
Extending Metrorail to Centreville Widening I-66 from the Beltway to Gainesville, adding 2 unrestricted lanes and 2 reversible HOV lanes Building an interchange on I-66 at the Gainesville Interchange (Route 29) Building Interstate Bicycle Route 50 through Northern Virginia and improving bicycle connections across the Theodore Roosevelt Bridge to Washington, D.C. Extending Virginia Railway Express (VRE) from Broad Run to Haymarket Building an additional Metrorail entrance to Rosslyn Station
Highest and Second Highest Priority Projects I-66 Corridor
3%
4%
5%
10%
31%
39%
7%
8%
15%
11%
21%
22%
0% 20% 40% 60% 80% 100%
Extend VRE
Metro Entrance: Rosslyn
Interchange: Gainesville
Interstate Bike Route 50
Metro to Centreville
Widen I-66
Highest Priority Second Highest Priority
Base=574 Corridor Users 7% are not sure which project is their highest priority.
61%
52%
20%
12%
10%
21%
Note: All but two of these projects are outside the beltway.
Public Opinion about Transportation Issues in Northern Virginia
58
Users of the Beltway Corridor are willing to pay an average of $1.74 per day to get their highest priority project built. Those whose highest priority is extending Metrorail to Centreville ($2.12) or extending VRE ($2.30) are willing to pay more than are those whose highest priority is widening I-66 outside the Beltway.
Extending Metrorail to Centreville Widening I-66 from the Beltway to Gainesville, adding 2 unrestricted lanes and 2 reversible HOV lanes Building an interchange on I-66 at the Gainesville Interchange (Route 29) Building Interstate Bicycle Route 50 through Northern Virginia and improving bicycle connections across the Theodore Roosevelt Bridge to Washington, D.C. Extending Virginia Railway Express (VRE) from Broad Run to Haymarket Building an additional Metrorail entrance to Rosslyn Station
Willingness to Pay for Highest Priority ProjectI-66 Corridor
3% 4% 5%10%
31%39%
$2.30
$1.92$1.74
$1.91$2.12
$1.48
0%
20%
40%
60%
80%
100%
Extend VRE MetroEntrance:Rosslyn
Interchange:Gainesville
InterstateBike Route 50
Metro toCentreville
Widen I-66OutsideBeltway
Perc
ent H
ighe
st P
riorit
y
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.74)
Base=574 Corridor Users 7% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
** $2.30 and $2.12 are significantly more than $1.48.
****
*
Public Opinion about Transportation Issues in Northern Virginia
59
Extending Metrorail from Springfield to Potomac Mills is the top priority project for users of the I-95 Corridor, followed by widening Route 1 from Stafford County to Route 1 and building light rail along Route 1 from Alexandria to the Pentagon. Since Stafford and Spotsylvania Counties were not included in this survey, it is not surprising that expanding VRE was named as a high priority by few respondents.
Widening Route 1 to 6 unrestricted lanes from the Stafford County line to I-495 and adding 2 HOV lanes from Route 235 to I-495 Extending Metrorail from Springfield to Potomac Mills Building Light Rail along Route 1 from Alexandria to the Pentagon Building an entrance to HOV lanes at Franconia Road and the Springfield Parkway Building an additional HOV lane on I-395 Expanding Virginia Railway Express (VRE) service
Highest and Second Highest Priority Projects I-95 Corridor
6%
8%
11%
19%
21%
29%
9%
9%
15%
14%
16%
24%
0% 20% 40% 60% 80% 100%
Expanding VRE
Franconia HOV Entrance
New HOV Lane: I-395
Rt. 1 Light Rail
Widen Rt. 1: Stafford
Metro to Potomac Mills
Highest Priority Second Highest Priority
Base=276 Corridor Users 6% are not sure which project is their highest priority.
53%
33%
26%
17%
15%
37%
Public Opinion about Transportation Issues in Northern Virginia
60
On average, users of the I-95 Corridor are willing to pay an average of $1.80 per day to get their highest priority project built. Because of small sample sizes, there are no statistically significant differences in willingness to pay for different projects.
Widening Route 1 to 6 unrestricted lanes from the Stafford County line to I-495 and adding 2 HOV lanes from Route 235 to I-495 Extending Metrorail from Springfield to Potomac Mills Building Light Rail along Route 1 from Alexandria to the Pentagon Building an entrance to HOV lanes at Franconia Road and the Springfield Parkway Building an additional HOV lane on I-395 Expanding Virginia Railway Express (VRE) service
Highest Priority Projects and Mean Willingness to Pay I-95 Corridor
6% 8% 11%19% 21%
29%
$2.07$1.86 $1.83
$1.66 $1.62
$2.26
0%
20%
40%
60%
80%
100%
ExpandingVRE
% New HOVLane: I-395
Rt. 1 LightRail
Widen Rt. 1:Stafford
Metro toPotomac Mills
Perc
ent H
ighe
st P
rior
ity
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
Mea
n W
illin
gnes
s to
Pay
Highest Priority Willingness to Pay Daily Amount (Mean=$1.80)
Base=276 Corridor Users 6% are not sure which project is their highest priority.
CAUTION: Because of small sample sizes, differences in willingness to pay are not statistically significant.
Public Opinion about Transportation Issues in Northern Virginia
61
Summary of Public Priorities: Transit vs. Road Widening The chart below compares the highest priority transit project to the highest priority road widening project in each corridor where both types of projects were presented to respondents. In four corridors, Route 7/Dulles, I-95, the Beltway and I-66, one of the choices was an extension of Metrorail. Users of the Route 7/Dulles Corridor overwhelmingly favor extending Metrorail over road widening projects, and users of the I-95 Corridor also favor Metrorail. Surprisingly, Metrorail is just as likely to be named the top priority of users of the Beltway Corridor as is widening the Beltway. Only among users of the I-66 Corridor is road widening favored over an extension of Metrorail, but it does not lag far behind. However, in every corridor where express buses, light rail or VRE were tested against road widening projects, the road widening projects were favored.
Summary of Public Priorities for Transit and Road Widening
60%
43%
31% 31% 29%
18% 18%13%
42%
56%
39%
21%
37%
46%
0%
10%
20%
30%
40%
50%
60%
70%
Rt. 7/Dulles(N=336)
Beltway(N=437)
Route 28**(N=287)
Interstate-66(N=574)
Interstate 95(N=276)
FF Pkwy(N=201)
PW Pkwy(N=116)
Highest Priority Transit Highest Priority Road Widening
Note: Excludes the Tri-County Parkway because there are no transit projects.
*
*
*
*
*
*Statistically significant difference between transit and road widening**Combines two Route 28 road widening projects
Public Opinion about Transportation Issues in Northern Virginia
62
Without exception, corridor users whose top priority is transit are willing to pay more on a daily basis to get their highest priority project built than are those whose top priority is a road widening project. On average, they are willing to spend 60 cents more ($2.06 vs. $1.46). Although many of the differences shown in the chart below are not statistically significant, the overall pattern is highly significant.
Summary of Mean Willingness to Pay for Transit and Road Widening
$2.10$2.22
$1.84 $1.73$1.87
$2.12$2.26
$2.06
$1.40$1.57
$1.24$1.45 $1.41 $1.48
$1.62$1.46
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
Route 7/Dulles
Route 28 FairfaxCnty
Prkwy
PrinceWilliamCnty
Prkwy
Beltway I-66 I-95 GrandMean*
Highest Priority Transit Highest Priority Road Widening
Note: Excludes the Tri-County Parkway because there are no transit projects.* The bases for the grand mean are 691 for transit and 668 for road widening.
The overall difference between willingness to pay for transit and road widening is highly significant.
Public Opinion about Transportation Issues in Northern Virginia
63
V. HOT LANES This chapter examines support for High-Occupancy Toll (HOT) lanes and willingness to pay to use them. Support for HOT Lanes Respondents were asked: Q15: HOT lanes are HOV lanes that are open to people driving alone if they pay an
extra toll. The amount of the toll would vary and would be highest when traffic is heavy so that everyone who pays a toll or is carpooling or taking a bus would be guaranteed that there will be no delays due to traffic congestion. Would you favor or oppose building these types of HOT lanes?
Fifty-six percent of the Northern Virginia residents surveyed favor HOT lanes, and another three percent indicated that they might favor them under some (unspecified) circumstances. Just over one-third are opposed.
Support for HOT Lanes
56%36%
5% 3%
Favor Oppose Not Sure Depends
Base=Total Sample N=1,263
Public Opinion about Transportation Issues in Northern Virginia
64
Majorities of users of all corridors favor HOT lanes. There are no significant differences by jurisdiction.
More than half of users of all corridors favor HOT lanes.
54%
55%
57%
57%
58%
58%
59%
61%
56%
0% 20% 40% 60% 80% 100%
Fairfax County Parkway
Route 28
Beltway
Prince William County Parkway
Interstate 95
Interstate 66
Route 7 and Dulles Toll Road
Tri-County Parkway
Total
Base=Total Sample N=1,263 Note: None of the corridors are significantly different from the total.
Public Opinion about Transportation Issues in Northern Virginia
65
Reported Likelihood of Use of HOT Lanes Only a little more than one-quarter of Northern Virginia residents said they would be unwilling to pay anything to use a HOT lane. Seventy-three percent said they would pay at least one dollar and half said they would pay at least two dollars. On average, residents are willing to pay $2.47. There are no significant differences by corridor used.
Willingness to Pay to Use HOT Lanes
27%
21%15%
11%
3%
14%
7%
$0$1$2$3$4$5$6+
Base=Total Sample Who Answered the Question N=1,172
Q16: On a day when traffic is heavy, how much – IF ANYTHING – would you be willing to spend to use a HOT lane to travel in free flow traffic rather than being stalled in traffic congestion during peak traffic times?
Public Opinion about Transportation Issues in Northern Virginia
66
VII. ACCEPTABILITY OF FUNDING METHODS
This chapter seeks to identify the type of tax increase that the public finds most acceptable to fund transportation in Northern Virginia. It also examines public support for the following funding methods to pay for different types of transportation improvements.
• Highway tolls for different types of transportation improvements • A gas tax increase for different types of transportation improvements • State bonds for all types of transportation improvements
The Most Acceptable Type of Tax Increase The question designed to identify the most acceptable type of tax increase was framed as follows: Q17: Now we are going to talk about methods for funding transportation improvements
in Northern Virginia. The State of Virginia does not have the funds to pay for many of the transportation improvements that we have been talking about unless it finds new sources of funds.
I am going to read you a list of three different ways that the state could raise funds. Each of these sources would raise the same amount of money for transportation improvements in Northern Virginia. When I finish telling you about these sources of funds, please tell me which ONE is most acceptable to you.
Q17A: And which one is SECOND most acceptable to you?
• Increasing the state income tax an extra $25 for each $10,000 of taxable income • Increasing the sales tax an extra 1/2 cent on each $1 of taxable purchases • Increasing the gas tax an extra 17 and a half cents on a gallon of gas
It is important to note that this is a forced choice question. Respondents were not given an explicit alternative of no tax at all. Thus, the tax that respondents find most acceptable would not necessarily be approved in a referendum. It is also important to note that the dollar amounts of the various tax increases are realistic in the sense that they would all raise the same amount of additional revenue: $175 million dollars per year. These figures were provided by Northern Virginia Transportation Commission staff.
Public Opinion about Transportation Issues in Northern Virginia
67
When the taxes are framed in realistic dollar amounts, Northern Virginia residents clearly favor an increase in the sales tax over increases in either the income tax or the gas tax. Nearly half said that a sales tax increase is the most acceptable alternative, compared to less than one-quarter for either the income tax or the gas tax.
Most and Second Most Acceptable Funding Methods
20% 23%
46%19%
34%
26%
0%
20%
40%
60%
80%
100%
Increase Gas Tax Increase IncomeTax
Increase Sales Tax
Most Acceptable Second Most Acceptable
Base=Total Sample N=1,263
39%
57%72%
Public Opinion about Transportation Issues in Northern Virginia
68
Perhaps because they are better served by transit and need to drive less, Alexandria, Arlington and Falls Church residents are more likely to choose the gas tax and, commensurately, less likely to choose the sales tax than are residents of Prince William County, Manassas and Manassas Park. Residents of all of the outer suburbs are unlikely to choose the gas tax.
Most Acceptable Source of FundsBy Jurisdiction of Residence
0%
20%
40%
60%
80%
100%
Not Sure 3% 1% 2% 2% 2% 5% 6% 3% 1%None 8% 8% 9% 10% 5% 13% 9% 10% 7%Increase Gas Tax 36% 33% 20% 20% 32% 14% 12% 6% 12%Increase Sales Tax 31% 40% 45% 45% 36% 49% 53% 55% 56%Increase Income Tax 23% 18% 24% 24% 25% 20% 20% 26% 24%
Alex Arl FF Cty FF City Fall Ch Loud Man Man Pk PW
Base=Total Sample N=1,263
*
***** *
*
*Significantly less than average** Significantly more than average
**
******* *
Public Opinion about Transportation Issues in Northern Virginia
69
Support for Tolls for Different Types of Transportation Improvements About seven in ten Northern Virginia residents support highway tolls used for either highways or public transportation. This support is consistent in the core, inner and outer suburbs, and there are no significant differences by jurisdiction. Nearly half also favor tolls used for bicycle and pedestrian trails, with support being greatest in the core suburbs and lowest in the outer suburbs. Falls Church residents (62%) are also particularly likely to favor using tolls for this purpose.
Would you support having tolls on a highway, or a portion of a highway, in a transportation corridor you use if you knew that the money collected would be used to pay for (READ) in the same corridor? Q18A: Public Transportation Improvements Q18B: Highway Improvements Q18C: Bike paths and Pedestrian Improvements
Support for Tolls to Pay for Different Types of Improvements by Location of Residence
44%
68% 72%
57%
71% 69%
47%
70% 72%
41%
70% 73%
0%
20%
40%
60%
80%
100%
Bike and Pedestrian Public Transportation Highways
Total (N=1,263) Core Suburbs (N=206)Inner Suburbs (N=601) Outer Suburbs (N=456)
Public Opinion about Transportation Issues in Northern Virginia
70
Support for a Gas Tax Increase for Roadways and Public Transportation About half of residents support a gas tax increase to pay for both roadway and public transportation improvements in Northern Virginia, and they are almost as likely to support using the gas tax for public transportation as for roadways. Regardless of the purpose for which it would be used, residents of the core suburbs are more likely to support increases in the gas tax than are residents of the outer suburbs.
Q19A: Would you support a gas tax increase if you knew that the money collected would
be used to pay for roadway improvements in Northern Virginia? Q19B: Would you support a gas tax increase if you knew that the money collected would
be used to pay for public transportation improvements in Northern Virginia?
Support for a Gas Tax Increase to Pay for Different Types of Improvements by Location of Residence
51%46%
57% 54%51% 48%43% 38%
0%
20%
40%
60%
80%
100%
Roadways Public Transportation
Total (N=1,263) Core Suburbs (N=206)Inner Suburbs (N=601) Outer Suburbs (N=456)
Public Opinion about Transportation Issues in Northern Virginia
71
In all jurisdictions except Loudoun County, there is approximately equal support for increases in the gas tax to pay for roadway and public transportation improvements. Loudoun County residents favor using the increased gas tax to pay for roadway improvements more than improvements in public transportation. Still, nearly four in ten Loudoun County residents favor a gas tax increase that would be used for public transportation improvements.
Support for a Gas Tax Increase to Pay for Different Types of Improvements by Jurisdiction of Residence
31%
39%
39%
41%
46%
47%
48%
61%
62%
38%
38%
50%
45%
51%
46%
54%
60%
54%
0% 20% 40% 60% 80% 100%
Manasass Park N=101)
Manassas (N=100)
Loudoun (N=103)
Prince William (N=152)
Fairfax (N=400)
Fairfax City (N=101)
Alexandria (N=101)
Arlington (N=105)
Falls Church (N=100)
Public Transportation Roadways
Public Opinion about Transportation Issues in Northern Virginia
72
Support for State Bonds to Pay for All Types of Transportation Improvements Seven in ten Northern Virginia residents said they would vote for state bonds to pay for all types of transportation improvements, and this support is consistent across all jurisdictions.
Q20: Would you vote for state bonds paid for by state income taxes if they were used to
pay for all types of transportation improvements in Northern Virginia?
Support for State Bonds to Pay for All Types of Improvements by Jurisdiction of Residence
66%
66%
67%
69%
69%
69%
70%
70%
72%
70%
0% 20% 40% 60% 80% 100%
Manasass Park (N=101)
Manassas (N=100)
Falls Church (N=100)
Fairfax (N=400)
Fairfax City (N=101)
Alexandria (N=101)
Loudoun (N=103)
Arlington (N=105)
Prince William (N=152)
Total (N=1,263)
Public Opinion about Transportation Issues in Northern Virginia
73
Appendix A: Demographics TOT Alx Arl FF
Co. FF Cty
Falls Ch
Loud Man Man Pk
PW
BASE 1263 101 105 400 101 100 103 100 101 101 % % % % % % % % % % Male 44 39 47 46 48 43 39 44 47 47 Female 56 61 53 54 52 57 61 56 53 53 AGE 18 to 24 3 4 2 3 6 4 2 4 7 7 25 to 34 14 20 11 12 7 6 20 14 9 9 35 to 44 23 19 26 20 10 16 31 22 36 36 45 to 54 23 14 21 24 23 32 19 20 22 22 55 to 64 18 21 14 20 19 20 18 18 16 16 65 plus 16 21 21 19 32 21 9 17 9 9 INCOME <$35k 6 10 5 4 7 7 6 5 5 5 $35k-$49.9k 7 12 6 6 6 9 6 19 19 19 $50k-$74.9k 14 16 9 14 15 13 12 16 19 19 $75k-$99.9k 17 14 20 13 19 20 19 16 16 16 $100k-$149.9k 20 14 22 21 21 18 21 20 15 15 $150k-$199.9k 11 9 11 12 9 6 13 6 9 9 $200k + 6 9 8 7 4 10 6 1 4 4 EDUCATION Less than high school 2 2 2 2 3 6 2 7 7 High school graduate 12 11 6 11 9 5 10 31 28 28 Some college 19 16 13 17 23 15 21 24 23 23 College degree 35 34 40 35 30 29 38 21 30 30 EMPLOYMENT SECTOR Business 37 38 32 36 25 27 50 37 43 43 Government 19 21 34 17 15 25 14 20 19 19 Non-Profit 9 9 6 10 12 15 5 12 9 9 Military 1 2 2 1 1 1 EMPLOYMENT Self-employed pt 4 7 5 4 3 4 4 5 5 Self-employed ft 7 2 6 8 5 4 8 2 5 5 Employed ft 52 61 52 49 40 50 55 63 59 59 Employed pt 8 8 12 8 10 12 8 6 6 6 Retired 18 23 17 21 30 20 8 18 8 8 Unemployed/looking 2 2 1 2 2 2 3 3 4 4 Not in labor force 9 3 5 8 10 8 14 3 12 12 HOUSEHOLD SIZE Mean Mean Mean Mean Mean Mean Mean Mean Mean Mean MEAN Number 3.2 1.9 2 2.9 3.5 3.2 4.7 5.3 4.5 4.5
Public Opinion about Transportation Issues in Northern Virginia
74
Appendix B: The Questionnaire Introduction Hello, this is (FIRST AND LAST NAME) calling from QSA Research on behalf of the Northern Virginia Transportation Authority, a group of public officials that makes decisions about transportation spending. They have asked us to conduct a survey to give residents like you a voice in some important decisions about transportation improvements and methods for funding them. If Necessary
• The survey averages about 10 minutes. • The survey is a good opportunity for you to have your voice heard by
public officials who decide which transportation projects to fund and how to pay for them.
• We are not selling anything or raising funds for any organization. We only want your opinions.
• Your answers will be used for statistical purposes only. You will never be identified as a respondent.
Screening Questions S-1 We are surveying only certain areas in Northern Virginia. In what county
or independent city is your home located? (READ LIST.)
Alexandria City 1 CONTINUE n=100 Arlington County 2 CONTINUE n=100 Fairfax County 3 CONTINUE n=411 Fairfax City 4 CONTINUE n=100 Falls Church City 5 CONTINUE n=100 Loudoun County 6 CONTINUE n=100 Manassas City 7 CONTINUE n=100 Manassas Park City 8 CONTINUE n=100 Prince William County 9 CONTINUE n=134 Other 10 CLARIFY. THANK AND CLOSE Refused 11 THANK AND CLOSE
S-2 I need to speak to the adult in your household – that is, a person who is 18
years of age or older – who had the most recent birthday. Is that you or someone else?
Respondent 1 CONTINUE Someone else 2 ASK TO SPEAK TO THAT PERSON.
ALL BACK IF NECESSARY.
920 John Ticer Drive Alexandria, VA 22304 voice: 703-567-7655 fax: 703-567-6156 www.qsaresearch.com
Public Opinion about Transportation Issues in Northern Virginia
75
S-3 WHEN RESPONDENT IS ON THE PHONE. Just to check: Are you at
least 18 years of age?
Yes 1 CONTINUE No 2 THANK AND CLOSE.
Commuting 1 Which one of the following best describes your current employment
status? Is it: (READ LIST)
Self-employed, part time 1 CONTINUE Self-employed, full time 2 CONTINUE Employed full-time 3 CONTINUE Employed part-time 4 CONTINUE Retired and not working 5 SKIP TO Q8 Unemployed, looking for work 6 SKIP TO Q8 Not in labor force for other reasons (Student, homemaker, disabled, etc.)
7 SKIP TO Q8
Don’t Know/Refused 8 SKIP TO Q8 2 In a typical week, how many days – if any – do you commute to a
workplace or workplaces outside your home? RECORD NUMBER OF DAYS. IF ZERO DAYS, SKIP TO Q8
3 Where is your primary workplace located? (READ LIST ONLY IF
NECESSARY)
Alexandria City 1 Arlington County 2 Fairfax County 3 Fairfax City 4 Falls Church City 5 Loudoun County 6 Manassas City 7 Manassas Park City 8 Prince William County 9 Another area in Virginia 10 Maryland 11 West Virginia 12 Washington, DC 13 Other 14 Refused 15
Public Opinion about Transportation Issues in Northern Virginia
76
3A
In what zip code is your primary workplace located? RECORD ZIP CODE. DOUBLE CHECK BY READING BACK TO RESPONDENT. IF RESPONDENT HESITATES, SAY: “We need this information so that we can compare the responses of people going to different destinations.”
4 Now I am going to ask about your commute trips. During the past 7 days,
did you ever (READ #1, THEN READ 2-8). 4A (FOR EACH “Yes”) How many days during past seven days did you
(TYPE OF TRANSPORTATION)? Yes No/
NA # of Days
1 Drive alone for any part of your commute trip?
1 2
2 Take a car pool or van pool for any part of the trip?
1 2
3 Ride a motorcycle for any part of the trip?
1 2
4 Take the bus? 1 2 5 Take Metrorail? 1 2 6 Take Virginia Railway Express
(VRE)? 1 2
7 Ride a bicycle? 1 2 8 Walk? 1 2
ASK Q5-Q6B IF RESPONDENT DOES NOT TAKE TRANSIT. SKIP TO Q7 IF RESPONDENT TAKES TRANSIT (METRORAIL, VRE OR THE BUS)
5 Is there a Metrorail or VRE rail station within walking distance of your
workplace?
Yes 1 SKIP TO Q6 No 2 CONTINUE Not Sure/Refused 3 CONTINUE
5A How likely would you be to take rail to commute to work if there were a
Metrorail or VRE station within walking distance of your workplace?
Extremely likely 1 Very likely 2 Somewhat likely 3 Not very likely 4 Not likely at all 5 Not Sure/Refused 6
Public Opinion about Transportation Issues in Northern Virginia
77
6 Is there a bus stop within walking distance of your workplace?
Yes 1 SKIP TO Q7 No 2 CONTINUE Not Sure/Refused 3 CONTINUE
6A How likely would you be to take the bus if there were a bus stop within
walking distance of your workplace?
Extremely likely 1 Very likely 2 Somewhat likely 3 Not very likely 4 Not likely at all 5 Not Sure/Refused 6
6B How likely would you be to take the bus with a stop within walking
distance of your workplace IF you could ride in comfort on a Priority Express bus that travels in a special lane and is not delayed by traffic congestion?
Extremely likely 1 Very likely 2 Somewhat likely 3 Not very likely 4 Not likely at all 5 Not Sure/Refused 6
7 About how many minutes does it usually take you to commute to work?
RECORD NUMBER OF MINUTES. DOUBLE CHECK BY READING BACK TO RESPONDENT.
Public Opinion about Transportation Issues in Northern Virginia
78
Non-commute Trips 8
Now, I am going to ask you about the trips you make to run errands, go shopping, visit friends, go out for meals and entertainment, in short, all of the trips you make that are not work related. During the past seven days, did you ever (READ #1, THEN READ #2-6).
8A (FOR EACH “Yes”) How many days during past seven days did you take (TYPE OF TRANSPORTATION) for any part of your non-work trips?
Yes No/
NA # of Days
1 Drive alone for any part of one of these trips?
1 2
2 Drive a vehicle with passengers or ride in a vehicle with others
1 2
3 Ride a motorcycle? 1 2 4 Take the bus? 1 2 5 Take Metrorail? 1 2 6 Ride a bicycle? 1 2 7 Walk? 1 2
ASK Q9-Q9B IF RESPONDENT DOES NOT TAKE TRANSIT. SKIP TO Q10 IF RESPONDENT TAKES TRANSIT (METRORAIL, VRE OR THE BUS)
9 Is there a Metrorail station within walking distance of your home? 9A Are there Metrorail stations within walking distance of most of the places
you travel to when you take trips that are not related to work?
Yes, home only 1 CONTINUE Yes, other places only 2 CONTINUE Yes, both 3 SKIP TO Q10 No, neither 4 CONTINUE Not Sure/Refused 5 CONTINUE
9B How likely would you be to take Metrorail to make trips that are not
related to work if there were rail stations within walking distance of BOTH your home and the places you travel to?
Extremely likely 1 Very likely 2 Somewhat likely 3 Not very likely 4 Not likely at all 5 Not Sure/Refused 6
Public Opinion about Transportation Issues in Northern Virginia
79
Neighborhoods 10 Now, let’s think about the things that are important to you when you
decide where to live. If price were not an issue, what would be most important to you - READ (RANDOMIZE ORDER)
10A And what would be second most important READ IF NECESSARY.
1st 2nd Being within walking distance of shopping and services 1 1 Being within walking distance of a bus or rail stop 2 2 Being close to your primary workplace 3 3 Having good schools in your neighborhood 4 4 Having a larger home or yard 5 5 Not sure 6 6
Travel Corridors 11 Now I would like you to think about all of the trips that you take for any
purpose. There are eight primary travel corridors in Northern Virginia. I am going to read a list of these corridors. As I do, please tell me which ones you use at least once a week either on transit, in a motor vehicle or by any other mode of transportation. READ LIST.
Yes No/
DK ASK
A Route 7 or the Dulles Toll Road 1 2 Q11A B Route 28 1 2 Q11B C The Loudoun County Parkway, Route 234 or Route 659 in
Loudoun and Prince William Counties 1 2 Q11C
D The Fairfax County Parkway 1 2 Q11D E The Prince William County Parkway 1 2 Q11E F The Beltway or I-495 Corridor 1 2 Q11F G The Interstate 66 Corridor, including Route 29 and Route 50,
the Metrorail Orange line and the VRE Manassas Line 1 2 Q11G
H The I-95 Corridor, including I-395, Route 1, the Blue and Yellow Metrorail lines and the VRE Fredericksburg line
1 2 Q11H
Note: If the respondent names more than two corridors, ask: Which two of these corridors do you use most? (ASK THE FOLLOWING SERIES FOR NO MORE THAN TWO CORRIDORS.)
Public Opinion about Transportation Issues in Northern Virginia
80
Project Priorities in Transportation Corridors 11A I am going to read you a list of projects planned for the Route 7 and Dulles
Toll Road Corridor. After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER. .
RANDOMIZE ORDER 1st 2nd Extending Metrorail from the West Falls Church station to Dulles Airport and Ashburn in Loudoun County
1 1
Building 6 new interchanges on Route 7 between Leesburg and Route 28 2 2 Widening the Dulles Toll Road 3 3 Widening Route 7 from the Fairfax County Parkway to I-495 4 4 Widening the Route 7 and 15 Bypass around Leesburg from 6 to 8 lanes 5 5 Widening the Dulles Greenway from Route 772 to Route 28 to 4 unrestricted lanes plus 2 HOV lanes
6 6
11A-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11B I am going to read you a list of projects planned for the Route 28 Corridor.
After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Widening Route 28 from Manassas Park to Route 29 to 6 lanes 1 1 Building a light rail line from Manassas to Dulles Airport 2 2 Widening Route 28 from the Dulles Toll Road to Route 606 3 3 Extending the Route 28 bike and pedestrian trail from Route 29 to the Fauquier County Line
4 4
Public Opinion about Transportation Issues in Northern Virginia
81
11B-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11C I am going to read you a list of projects planned for the corridor that
includes the Loudoun County Parkway, Route 234 or Route 659 in Loudoun and Prince William Counties. After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Building a new 4 to 6 lane Tri-County Parkway from Route 234 to Route 50 1 1 Building a new 4-lane North Bypass on Route 234 from I-66 to Route 659 2 2 Building a new 4-lane Loudoun County Parkway from Route 50 to the Dulles Greenway
3 3
Building a new 4-lane Loudoun County Parkway from Route 7 to Gloucester Parkway
4 4
Public Opinion about Transportation Issues in Northern Virginia
82
11C-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11D I am going to read you a list of projects planned for the Fairfax County
Parkway Corridor. After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Widening the Fairfax County Parkway to 6 lanes from Sunrise Valley Drive to Route 123
1 1
Starting a new Priority Bus Service that travels in a special lane and is not delayed by traffic congestion
2 2
Building 2 new HOV lanes on the Springfield-Franconia Parkway from the Fairfax County Parkway to Frontier Drive
3 3
Building 3 new interchanges on Monument Drive, Rolling Road and Pohick Road
4 4
Public Opinion about Transportation Issues in Northern Virginia
83
11D-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11E I am going to read you a list of projects planned for the Prince William
County Parkway Corridor. After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Widening the Prince William County Parkway to 6 lanes from Liberia Avenue to Minnieville Road
1 1
Building HOV lanes on the Prince William Parkway from Hoadly Road to I-95 2 2 Starting a new priority bus service from Woodbridge to Manassas 3 3 11E-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
Public Opinion about Transportation Issues in Northern Virginia
84
11F I am going to read you a list of projects planned for the Beltway. After I
finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Widening the Beltway to 8 unrestricted lanes plus four HOV or HOT lanes from I-395 to the Dulles Toll Road
1 1
Extending Metrorail from the Dunn Loring station to Maryland through Tyson’s Corner
2 2
Starting an express bus service 3 3 11F-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11G I am going to read you a list of projects planned for the I-66 Corridor.
After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Extending Metrorail to Centreville 1 1 Widening I-66 from the Beltway to Gainesville, adding 2 unrestricted lanes and 2 reversible HOV lanes
2 2
Building an interchange on I-66 at the Gainesville Interchange (Route 29) 3 3 Building Interstate Bicycle Route 50 through Northern Virginia and improving bicycle connections across the Theodore Roosevelt Bridge to Washington, D.C.
4 4
Extending Virginia Railway Express (VRE) from Broad Run to Haymarket 5 5 Building an additional Metrorail entrance to Rosslyn Station 6 6
Public Opinion about Transportation Issues in Northern Virginia
85
11G-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
11H I am going to read you a list of projects planned for the I-95 Corridor
After I finish, please tell me which project you think should be the highest priority. READ LIST. PAUSE FOR ANSWER. Which one should be the second highest priority? IF NECESSARY READ LIST OF REMAINING PROJECTS. PAUSE FOR ANSWER.
RANDOMIZE ORDER 1st 2nd Widening Route 1 to 6 unrestricted lanes from the Stafford County line to I-495 and adding 2 HOV lanes from Route 235 to I-495
1 1
Extending Metrorail from Springfield to Potomac Mills 2 2 Building Light Rail along Route 1 from Alexandria to the Pentagon 3 3 Building an entrance to HOV lanes at Franconia Road and the Springfield Parkway
4 4
Building an additional HOV lane on I-395 5 5 Expanding Virginia Railway Express (VRE) service 6 6
Public Opinion about Transportation Issues in Northern Virginia
86
11H-1 How much would you be willing to pay on average each day to get your
highest priority project built? (READ LIST IF NECESSARY. STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
General Public Priorities The next few questions are about more general types of transportation projects. 12 I am going to read a list of general types of transportation improvements.
After I finish, please tell me which one of these transportation improvements is most important to you? READ LIST. RANDOMIZE. ACCEPT ONLY ONE RESPONSE.
12A And which one of these transportation improvements is the second most
important to you? READ LIST AGAIN IF NECESSARY. ACCEPT ONLY ONE RESPONSE.
Single
Most Important
2nd Most Important
Building or expanding public transportation, which includes Metrorail, VRE and bus services
1 1
Building or expanding roads and highways 2 2 Creating more High Occupancy Vehicle or HOV lanes 3 3 Building more sidewalks and crosswalks for pedestrians 4 4 Building more bike trail and bike lanes 5 5
Public Opinion about Transportation Issues in Northern Virginia
87
Frustrations 13 Thinking now about the types of trips that you make most frequently. . .
Would you say that making these trips is usually very frustrating, somewhat frustrating, not very frustrating or not frustrating at all?
Very frustrating 1 CONTINUE Somewhat frustrating 2 CONTINUE Not very frustrating 3 SKIP TO Q15 Not at all frustrating 4 SKIP TO Q15 Not Sure 5 SKIP TO Q15
14 What makes these trips frustrating? PROBE FOR MULTIPLE
RESPONSES. CLARIFY. ASK FOR SPECIFICS. HOT Lanes 15 HOT lanes are HOV lanes that are open to people driving alone if they pay
an extra toll. The amount of the toll would vary and would be highest when traffic is heavy so that everyone who pays a toll or is carpooling or taking a bus would be guaranteed that there will be no delays due to traffic congestion. Would you favor or oppose building these types of HOT lanes?
Favor 1 Oppose 2 Depends: specify 3 Not sure 4
Public Opinion about Transportation Issues in Northern Virginia
88
16 On a day when traffic is heavy, how much – IF ANYTHING – would you
be willing to spend to use a HOT lane to travel in free flow traffic rather than being stalled in traffic congestion during peak traffic times? (READ LIST ONLY IF NECESSARY)
More than $10: specify # $10 10 $9 9 $8 8 $7 7 $6 6 $5 5 $4 4 $3 3 $2 2
$1 1 DO NOT READ: CHECK IF “NO” TO ALL Nothing 0 Not Sure 99
Now we are going to talk about methods for funding transportation improvements in Northern Virginia. The State of Virginia does not have the funds to pay for many of the transportation improvements that we have been talking about unless it finds new sources of funds. I am going to read you a list of three different ways that the state could raise funds. Each of these sources would raise the same amount of money for transportation improvements in Northern Virginia. 17 When I finish telling you about these sources of funds, please tell me
which ONE is most acceptable to you. (READ RANDOMIZED LIST). 17A And which one is SECOND most acceptable to you? (READ
REMAINING TWO OPTIONS IF NECESSARY). RANDOMIZE ORDER 1st 2nd
Increasing the state income tax an extra $25 for each $10,000 of taxable income 1 1 Increasing the sales tax an extra 1/2 cent on each $1 of taxable purchases 2 2 Increasing the gas tax an extra 17 and a half cents on a gallon of gas 3 3 None: PROBE: DO NOT ACCEPT IF POSSIBLE 4 4 Don’t Know/Refused 5 5
Public Opinion about Transportation Issues in Northern Virginia
89
18 RANDOMIZE ORDER Yes No Not
Sure 18A Would you support having tolls on a highway, or a portion of a
highway, in a transportation corridor you use if you knew that the money collected would be used to pay for public transportation improvements in the same corridor? (IF ASKED, TOLLS COULD BE ON BOTH NEW AND EXISTING HIGHWAYS.)
1 2 3
18B Would you support having tolls on a highway in a transportation corridor you use if you knew that the money collected would be used to pay for highway improvements in the same corridor? (IF ASKED, TOLLS COULD BE ON BOTH NEW AND EXISTING HIGHWAYS.)
1 2 3
18C Would you support having tolls on a highway in a transportation corridor you use if you knew that the money collected would be used to pay for bike paths and pedestrian improvements in the same corridor? (IF ASKED, TOLLS COULD BE ON BOTH NEW AND EXISTING HIGHWAYS.)
1 2 3
19 RANDOMIZE ORDER Yes No Not
Sure 19A Would you support a gas tax increase if you knew that the
money collected would be used to pay for roadway improvements in Northern Virginia?
1 2 3
19B Would you support a gas tax increase if you knew that the money collected would be used to pay for public transportation improvements in Northern Virginia?
1 2 3
20 Would you vote for state bonds, paid for by state income taxes if they
were used to pay for all types of transportation improvements in Northern Virginia?
Yes 1 No 2 Not Sure 3
Public Opinion about Transportation Issues in Northern Virginia
90
21 How much would you be willing to pay on average each day for
improvements that would expand public transportation service and reduce crowding on Metrorail and VRE? (READ LIST IF NECESSARY.STOP WHEN RESPONDENT SAYS YES.) (IF NECESSARY: You would pay in tolls or taxes.)
More than $5.00: specify 1 $5.00 2 $4.00 3 $3.00 4 $2.00 5 $1.50 6 $1.00 7
50 cents 8 DO NOT READ: CHECK IF “NO” TO ALL Nothing 9 Not Sure 10
Public Opinion about Transportation Issues in Northern Virginia
91
Classification Variables C-1 What is the last grade in school or year of college that you completed?
Less than high school 1 High school graduate (includes technical or vocational school) 2 Some college 3 Four-year college degree 4 Post graduate degree 5 Refused 6
C-2 Including yourself, how many people live in your household? RECORD
NUMBER. C-3 Do you have access to a car or other motor vehicle most of the time?
Yes 1 No 2 Refused 3
C-4 ASK ONLY IF SELF EMPLOYED OR EMPLOYED FULL TIME OR
PART TIME (CODES 1-4) IN Q1. For what type of organization do you work – business, government, the military, or a non-profit organization?
Business 1 Government 2 Non-profit 3 Other: specify 4 Refused 5
C-5 In what year were you born? RECORD YEAR. C-6 And what is your zip code? RECORD ZIP CODE. DOUBLE CHECK
BY READING BACK TO RESPONDENT. IF RESPONDENT HESITATES, SAY: “We need this information so that we can compare the responses of people whose trips originate in different places.”
Public Opinion about Transportation Issues in Northern Virginia
92
C-7 Finally, please stop me when I read the category that includes your total
household income for the year 2004. Total household income includes all of the money received by all the people in your household before taxes are taken out.
Under $35,000 1 $35,000 to just under $50,000 2 $50,000 to just under $75,000 3 $75,000 to just under $100,000 4 $100,000 to just under $150,000 5 $150,000 to just under $200,000 6 $200,000 or more 7 Refused 8
THAT IS ALL THE QUESTIONS I HAVE. WE REALLY APPRECIATE YOUR HELP. YOUR ANSWERS WILL BE USED TO PROVIDE GUIDANCE TO PUBLIC OFFICIALS IN NORTHERN VIRGINIA AS THEY DECIDE WHICH PROJECTS TO FUND AND HOW TO PAY FOR THEM. C-8 RECORD GENDER.
Male 1 Female 2
Public Opinion about Transportation Issues in Northern Virginia
93
Contact Information: Rebecca C. Quarles, Ph.D. President QSA research & strategy 4920 John Ticer Drive Alexandria, Virginia 22304 Voice (703) 567-7655 Facsimile (703) 567-6156 Email [email protected] URL www.qsaresearch.com