Public Involvement Meeting Presentation A t 26 2015 August 26, 2015 Jeff Berens P E Jeff Berens, P .E. WisDOT Project Manager

Transcript of Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM)...

Page 1: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Public Involvement Meeting PresentationA t 26 2015August 26, 2015

Jeff Berens P EJeff Berens, P.E.WisDOT Project Manager

Page 2: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

General Overview• Study purpose• Study purpose• Corridor needs• Study historyy y

Updated study approach Near-term alternatives Schedule Questions

Page 3: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

City ofMadison

City ofMonona

LakeMonona

Town of Deerfield

City ofMadison

Town ofCottage Grove

NORTH

LakeWaubesa

Deerfield

City ofFit hb

Village ofMcFarland

Town ofPleasant Springs

Town ofChristiana

Lake

Fitchburg

City ofStoughton

Town of

Dunn

Kegonsa

W

Villageof

Oregon

g

Town of Rutland

Town of Albion

Town of Dunkirk

Page 4: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Provide a safe and efficient transportation system in the US 51 corridor to serve present and long-term travel demand while minimizing disturbance to th i t

1. Improve Safety

the environment.

2. Accommodate Travel Demand3. Improve Bicycle and Pedestrian Accommodations4. Corridor Preservation & Long-Term Planningg g5. Improve Deteriorated Pavement

Page 5: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Project Need - SafetyCity ofMadison

City ofMonona

Lake Monona

City ofMadison

minal Voges Rd.Upper

M d L k

Total Crash Rates - (2009-2013)Segment 1: 1.0 x SWA

Segment 2: 1 9 x SWA

LakeWaubesa

City ofFitchburg

Village ofMcFarland

Segment 6

Segment 5

Term

Dr.

Larson BeachRd.

Mud Lake

LowerMud Lake

Segment 2: 1.9 x SWA

Segment 4: 1.8 x SWA

Segment 6: 1.5 x SWA

Spring

 Rd.

DUNN

PLEASANTSPRINGS

LakeKegonsa

Segment 4

Fatal Crash Rates - (2009-2013)

Segment 1: 4.9 x SWA (3 Fatalities)

Segment 2: 2.9 x SWA (1 Fatal)Village ofOregon City of

Stoughton

S

Not to scale

NORTH RUTLAND DUNKIRK ALBION

Segment 3

Segment 1Segment 2

g ( )

Segment 3: 6.1 x SWA (1 Fatal)

Segment 4: 4.0 x SWA (4 Fatalities)

9 fatal and 17 severe injury crashes on US 51 between 2009 and 2013

Page 6: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Project Need – Traffic OperationsOperations modeling shows: Increased congestion between Increased congestion between

County B (East) and Mahoney Rd.

Poor operations at 13 unsignalized intersections between Stoughton

T ffi b k US 51 bl ki id d i

intersections between Stoughton and McFarland.

Traffic back-ups on US 51 blocking side road access in downtown Stoughton.

Page 7: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

WisDOTth i d tauthorized to

begin environmental study PIM #2 PIM #4

PublicInvolvement

Meeting #1 (PIM)

PIM #3

NeedsAssessment Unpublished

DEISDEIS

Page 8: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

F d l fi lFederal fiscal constraint requirement: Improvements selectedImprovements selected in an environmental document must be funded within 6 years of

Unpublished 2013 Draft EIS:• Construction time frame not defined

funded within 6 years of document approval.

• Construction time frame not defined.• Funds to fully address all needs not

available.

Page 9: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Stage 1 Stage 2Stage 1Near-Term

Stage 2Long-Term

Environmental Tier 1 E i t lEnvironmental

Assessment (EA)

Environmental Impact

Statement (EIS)( ) Statement (EIS)

Page 10: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

• Prepared when there isEnvironmental Prepared when there is uncertainty as to the significance of impacts of the project

Environmental Assessment

(EA)tail

project.( )

Environmentalel o

f De

• Required when the proposed action will have a significant impact on the environment

Environmental Impact

Statement

Leve

impact on the environment.(EIS)

Page 11: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Complete document for near-term improvements that are anticipated to be funded within 6 years of EA approvalEA approval.• Intersection safety and operations

• P t diti• Pavement condition

• Bicycle and pedestrian facilities

I l d i i f f t t d f l tIncludes provisions for future study of long-term needs.

Page 12: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Tier 1 EIS will evaluate alternative corridors forTier 1 EIS will evaluate alternative corridors for long-term improvements not anticipated to be funded within 6 years of document approvalfunded within 6 years of document approval.Analyze corridors on broad scale.Ti 1 t bj t t fi l t i t i tTier 1 not subject to fiscal constraint requirement.Follow-up Tier 2 environmental documents

l d f id i d d dcompleted for corridor sections as needed and funding is available.

Page 13: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:
Page 14: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Alternatives

AA Low build

B 4-lane

H Hybrid

All b ild lt ti i l dAll build alternatives include:• Reconstruction of US 51 east of Stoughton • Pa ement replacement north of McFarland• Pavement replacement north of McFarland • Multiuse path from County B to Skyline Drive

Page 15: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Pavement replacement between Stoughton and McFarlandMcFarland w/intersection improvements

Mi f t Minor safety improvements in Stoughton and McFarland

Page 16: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Reconstruction in McFarland and Stoughton

4-lane from Stoughton to McFarland

Stoughton Bypass

Page 17: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Reconstruction in Stoughton gand McFarland

4-lane on west side of Stoughton

Pavement Reconstruction

/i iw/intersection improvements between Stoughton andStoughton and McFarland

Page 18: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:
Page 19: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Alt A & H - Intersection Improvements

Page 20: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Alt A & H - Median

Page 21: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Alt A & H – Median Crossing

Page 22: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Alt H - Typical Section OptionsStoughton: Railroad Crossing to Spring Road

Page 23: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

IMPACTSAlternative

No Build A B HTotal Cost (Millions, in 2014 $) $25 $95 $265 to $280 $135

Potential Relocations 0 3 22 to 33 6Land Converted to R/W (acres) 0 97 293 to 320 110

Wetland Area 0 7 10 to 12 7

Agricultural Area 0 63 216 to 256 66

Fiscal Constraint Yes Yes No YesRequirement Met? Yes Yes No Yes

Page 24: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Environmental Assessment (EA)Spring 2016 Draft EA available for public reviewSpring 2016 Public hearing on Draft EAFall 2016 Final EA; FHWA reviews for Finding of No Significant

Impact (FONSI) applicabilityImpact (FONSI) applicability

Tier 1 Environmental Impact Statement (EIS)Fall 2016 Public involvement meeting for Tier 1 EISg2017 Draft Tier 1 EIS available for public review2017 Public hearing on the Draft Tier 1 EIS2018 Final Tier 1 EIS and Record of Decision (ROD)

Page 25: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

2015• Silverado Drive to Roby Road – Pavement rehabilitation for

northbound and southbound lanes2016

WIS 138 (west) intersection Temporary signal installation• WIS 138 (west) intersection - Temporary signal installation completed by private developer

• Jackson Street intersection - Signal installation completed by private developer

2020• WIS 138 (west) intersection – Convert the existing• WIS 138 (west) intersection – Convert the existing

intersection to a roundabout

Page 26: Public Involvement Meeting Presentation · study PIM #2 PIM #4 Public Involvement Meeting #1 (PIM) PIM #3 Needs Assessment Unpublished DEIS. Fd lfi lFederal fiscal constraint requirement:

Comment Form• Fill Out Here and Put in Comment BoxFill Out Here and Put in Comment Box• Take Home and Mail

Send Comments Via Email -jeff berens@dot wi [email protected]

Request a Presentation or Meeting

Future Public Hearing Future Public Hearing

Website –www.wisconsindot.gov/Pages/projects/by-region/sw/5139901218/default.aspx