Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012...
-
Upload
sherilyn-day -
Category
Documents
-
view
214 -
download
0
Transcript of Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012...
![Page 1: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/1.jpg)
Public Hearing on Proposed Closure of
Allegheny 1 Elementary School
Wednesday, February 15, 2012Hollidaysburg Area Senior High School
Auditorium7 p.m.
Moderator: David Andrews, Esquire
![Page 2: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/2.jpg)
Allegheny 1
Built in 1954• Enrollment when opened was 190
Addition added in 1968 • Seven classrooms • Library• Bathroom
![Page 3: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/3.jpg)
Reasons for Recommending School Closure
• Cost prohibitive repairs and renovations
Substantial renovations are necessary to comply with building codes and to adequately address electrical, site and potential structural concerns.
![Page 4: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/4.jpg)
Allegheny 1 Elementary SchoolCondition Assessment Report
By Gwin, Dobson & Foreman, Inc. Consulting Engineers
W. Andrew Arnold, P.E.
![Page 5: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/5.jpg)
Topics of Review
Site – drainage, parking requirements
Architectural and structural – roofing, windows, asbestos abatement, terrazzo flooring, space requirements
Heating, Ventilation and Air Conditioning – boiler system, unit ventilators, steam piping
Plumbing – domestic water piping, sanitary waste and vent system, storm drainage system, fuel gas system, fixtures, fire suppression
Electrical – transformer, switchboard and branch panels, emergency generator, receptacles, interior and exterior lighting, technology, fire alarm, security
![Page 6: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/6.jpg)
Estimated costs associated with addressing current functional issues and
to become code compliant:
• Site: $230,000 minimum• Architectural and structural: $855,000 to $1.06• Heating, Ventilation, and Air Conditioning: $750,000 to $800,000• Plumbing: $330,000 to $345,000• Electrical: $630,00 to $685,000
TOTAL: $2.8 to $3.2 million
![Page 7: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/7.jpg)
Reasons for Recommending School Closure
Budget Constraints • Spending limits• Taxing limits• State budget
![Page 8: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/8.jpg)
Reasons for Recommending School Closure
– District-wide Declining Enrollment• In 2002 there were 3858 students today we have 3490
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 20123200
3300
3400
3500
3600
3700
3800
3900
Enrollment
![Page 9: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/9.jpg)
Estimated Savings
• Building Operational Costs: $90,000 • Salaries and Benefits: $600,000
• Repairs & Renovations: $2.8 to $3.2 mil
![Page 10: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/10.jpg)
Attendance Areas• Studentsin the Evergreen, Carson Valley, Fox Hollow and Hixton Areas will attend CWL (highlighted in green).
• Students along Mill Rdand in the Willowbrook area will attend FOT (highlighted in yellow).
![Page 11: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/11.jpg)
Transportation
• Five buses currently service Allegheny 1 – (11, 12, 18, 19, 40)
• Most students who currently ride bus 12 will go to Foot of Ten
• Students who currently ride buses 11, 18, 19, or 40 will go to Charles W. Longer
• Students may have 5 to 10 minute longer ride times.
![Page 12: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/12.jpg)
Proposed Transition Plan
• Charles W. Longer• 163 will move from A1 to CWL
• Foot of Ten Elementary• 57 students will move to FOT
Average class sizeKindergarten - 2nd
22 students
Average class size3rd through 6th
24 students
CWL Enrollment
538
Foot of Ten Enrollment
602
![Page 13: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/13.jpg)
Enrollment and Building CapacityCharles W. Longer
Current Enrollment: 375
Proposed Enrollment: 538
Building Capacity: 650
![Page 14: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/14.jpg)
Enrollment and Building CapacityFoot of Ten
Current Enrollment: 545
Proposed Enrollment: 602
Building Capacity: 650
![Page 15: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/15.jpg)
Building Capacity
Allegheny 1 Charles W. Longer
Foot of Ten Frankstown100
200
300
400
500
600
700
800
900
1000
1100
Current EnrollmentProposed EnrollmentCapacity
![Page 16: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/16.jpg)
Timeline
• The board of education vote regarding Allegheny 1 will be held no earlier than
May 16, 2012.
• If the board votes to close the school, several orientations will be held in the spring to acclimate students, parents, and teachers with their new school.
![Page 17: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.](https://reader035.fdocuments.in/reader035/viewer/2022062718/56649e705503460f94b6e496/html5/thumbnails/17.jpg)
PUBLIC COMMENT