PTTEP1
description
Transcript of PTTEP1
Flash No. : 001/12 Location : UT1-7/D7 Well (PTTEP1)PTTEP1
Decrease Production Cost by Adjusting Counter Balance Weight
Date : January 30, 2012
Introduction/ Opportunity :
PTTEP1 team has found the Sucker Rod Load at
( )Share By : Ubol J., Wattana Re., Sanya M., Anucha Ja. and Arnon K.
UT1-7/D7 well was too high with a strange noise at Gear Reducer.
Why improving “Reliability or Efficiency”? :By reducing the Sucker Rod Load, we can mitigate production cost as we could reduce the load of electrical motor Also the strange noise at Gear Reducer couldmotor. Also, the strange noise at Gear Reducer could cause major damage to equipment.
SOLUTION with COST/ BENEFIT :
Adjust Counter Balance Weight by 40 centimeters to reduce load in Up Stroke cycle.
Benefit:
Picture
Benefit:• Reduce load of motor causes reducing electrical power consumption.
• Eliminate strange noise in Gear Reducer causes prolong life time of Gear Reducer.
• Eliminate noisy environment around community and increase trust from villager. Picture
RESULTS AND VALUE :
The electrical consumption is reduced as follow;
Before: Up Stroke cycle consume electrical current of 40 A and Down Stroke cycle consume 35 A.
After:Up Stroke cycle consume electrical current of 25 A and Down Stroke cycle consume 25 A.
Picture