Department of Civil Engineering CERTIFICATE This is to certify that the work, which is being presented in the report on summer training from Public Work Department, Nagaur (Raj.) on “Construction of Tehsil Building” submitted by Mr. Prabhat Vaishnav, a student of fourth year (VII Sem.) B.Tech. in Civil Engineering in partial fulfillment for the award of degree of Bachelor of Technology is a record of student’s work carried out and found satisfactory for submission. [ii]

description

kokol

Transcript of Ptr Starting Pages

Department of Civil Engineering

CERTIFICATEThis is to certify that the work, which is being presented in the report on summer training from Public Work Department, Nagaur (Raj.) on Construction of Tehsil Building submitted by Mr. Prabhat Vaishnav, a student of fourth year (VII Sem.) B.Tech. in Civil Engineering in partial fulfillment for the award of degree of Bachelor of Technology is a record of students work carried out and found satisfactory for submission.

Head of Department Principal

AcknowledgementI, hereby, take this opportunity to express my deep feelings of gratitude to the PWD engineers services, Nagaur (Raj.) for bestowing upon me the opportunity to be a part of such an interesting and work oriented department.I would like to express my thanks to Dr. Arvind Agarwal, Chairman of ACERC, for providing us such a great infrastructure and environment for our overall development.I express sincere thanks to Dr. I.C. Sharma, the Principal of ACERC, for his kind cooperation and extendible support.Words are inadequate in offering our thanks to Ms. Geetanjali Ganguly, Seminar Coordinator of Civil Engineering Department, for consistent encouragement and support.I would also like to thank Mr. M.P. Singh (Project Manager) & all the staff and technicians who helped me to get an ultimate exposure to the practical perspective of Civil Engineering.

Prabhat Vaishnav, B.Tech. , 4th Year, 7th Sem. RTU Roll No. 11EAYCE083

CANDIDATES DECLARATION

I Prabhat Vaishnav, student of B.Tech VII Semester, studying at Arya College of Engineering and Research Centre, Jaipur, hereby declare that the summer training project report on Construction of Tehsil Building submitted to Rajasthan Technical University, Kota in partial fulfillment of degree of Bachelor in Technology is the original work conduct by me.The information and data given in the report is authentic to the best of my knowledge.This summer training report not being submitted to any other university for award of any other Degree, Diploma and Fellowship.

Prabhat Vaishnav, B.Tech. , 4th Year, 7th Sem. RTU Roll No. 11EAYCE083

List Of ContentsCertificate....[ii]

Acknowledgement..[iii]

Abstract[iv]

List of content..[v]

List of Figures..[vii]

List of tables [viii]

1. Introduction

2. Structural system for buildings.................................(2)

2.1 Introduction to structural sytem.(2)

2.2 Buildings of different type(2)

2.2.1. Load bearing masonary building...............................(2)

2.2.2. Framed buildings..................................(3)

2.2.3. Partially framed and partially load................................(3)

3. Contouring of site,,,..(4)

3.1 Contour plans.....(4)

4. Layout plan of project..(5)

4.1 Sit plan and planning of building...(5)

5. Brief specification .........................................(7)

5.1 Foundation and plinth.....(6)

5.2 Super structure....(6)

5.3 Doors and windows....(6)

5.4 Flooring (7)

5.5 Roofing... (7)

5.6 Finishing.....(7)

5.7 Miscellaneous work .......(8)

5.8 Sanitary and water supply..(8)

5.9 Development .....(8)

6. Design parameters....(10)

6.1 Design parameters followed during structural design of site... (10)

6.2Brick work...(11)

6.3Laying......(11)

6.4Curing..(11)

6.5Joints(12)

6.6Measurements.. (12)

7. Abstract sheet ..(13)

8. Description of items sub head wise..(14)

8.1 Reinforced cement concrete work..........................(14)

8.1.1 Formwork...(14)

8.1.2. Reinforcement(15)

8.1.3. Concreting..(16)

8.2 Sizes of R.C.C. members....(17)

9. Details of work at site...........(18)

9.1Earthwork....(18)

9.2Concrete work.(18)

9.3Stone work...(18)

10. Rain water harvesting.....(20)

10.1Introduction.....(20)

10.2Types of rain water harvesting system(20)

11. Quality control and test..........(22)

11.1Test for fineness of cement.....(22)

11.2Test for compressive strength of cement ....(22)

11.3Test for compressive strength of sample of concrete......(23)

11.4Test for compressive strength of bricks..(24)

11.5Test for water absorption of bricks..(24)

11.6Test for efflorescence of bricks...(25)

11.7Bulking of fine aggregate / Sand (Field methods).. (26)

11.8Test for silt contents of coarse sand(26)

11.9Slump test for concrete...(27)

12. Conclusions(28)

13. References .....(29)

List Of Figures

Figure Number & DetailsP.No.

1) Layout plan of P.C.C........(1)

2) Moulding of bricks...(4)

3) Laying of bricks........(5)

4) Curing...................................(6)

5) Formwork.....(9)

6) Reinforcement..(10)

7) Concreting........(11)

8) Excavation work...............................(16)

9) Concrete mixing...............................(17)

10) Coarse aggregate.......(18)

11) Fine aggregate .....(19)

LIST OF TABLESTable No. Details1. Clear cover for structural member2. Development length3. Classification of bricks4. Cost calculation5. Limit of fineness for cement 6. Limit of fineness for concrete