PTAGIS Program Review and Roadmap Focused on Portland Team for the 2014 PIT Tag Steering Committee...
-
Upload
antwan-fella -
Category
Documents
-
view
213 -
download
0
Transcript of PTAGIS Program Review and Roadmap Focused on Portland Team for the 2014 PIT Tag Steering Committee...
PTAGIS Program Review and Roadmap Focused on Portland Team
for the 2014 PIT Tag Steering Committee Annual Meeting
Summary of Mark, Release, Recapture, Recovery Data Processing for 2013
2.3 million
PIT-taggedfish
released
30 Organizations
324release
locations
Summary of Observation Data Processing for 2013
11+ million
observations
880 thousand
uniquetags
248interrogation
Sites(25 PTAGIS Sites)
System Upgrade
Major systems upgrade completed in 2013• Except P3 tagging software• Ingres database and UNIX-based systems retired
Timeline:• March 1st: M4 primary data source at all PTAGIS
interrogation sites• April 30th: New website and reporting promoted into
production• Sept 10th: Tag Distribution and Inventory deployed• Sept. 27th: Tagging and legacy Int. Data processing• Sept. 30th : Migrated 1.4M raw data files (100GB)
PTAGIS Website Activity tracked by Google Analytics
Usage Since 5/13:• Total Visits: 27,887• Unique Visitors: 6,599• Page Views: 98,695• Pages/Visit: 3.54• Avg. Visit Duration: 5:46• % New Visits: 21%
Top three cities (total visits): • Portland: 3,974• Boise: 2,754• Salem: 2,165
2013 Summary of Advanced Reporting Usage
433usersran
at least onereport
3.3billionrows
returned
82thousand jobs
ran
Changes to Interrogation Data Validation
• Reject files with File Open/Close Date set to ‘future’• Tag codes are validated against tag mask list• No match observation is marked ‘Invalid Tag’ and filtered
from reports by default
• Reject file containing ‘buffered’ observation records for legacy data submitted from MiniMon/PIFF
Changes to Tag Data Loading and Validation
• Tag data linked to project instead person• Authorize sender of data submitted• Date fields cannot be in future• Release Date >= Tag Date (includes VRT)• Notification emailed both submitter and project
coordinator• No data processed without active project
coordinator
New Website Features: Interrogation Site Metadata
New Website Features: Interrogation Data Load Settings
New Website Features: Event Log Viewer for Interrogation Sites
New Website Features: Clip File Download
New Website Features: Separation-by-Code by Action Code Summary
New Website Features: Raw Data File Browser
Advanced Reporting: New Look-and-Feel
Advanced Reporting: Copy-and-Paste Rows from Report
Advanced Reporting: Share Reports via Email
Upgraded O&M Reports
Upgraded O&M Reports: TASS
PTAGIS RESTful API (Web API)
• Share or manipulate a resource between systems• Uniform interface (HTTP); platform independent• Example: P3 client gets validation codes from
PTAGIS server• Example: M4 client gets site metadata to
standardize configuration• Example: IDFG gets tag data for a specific tag code
to display in an application
PTAGIS RESTful API: Interrogation Site Metadata Example
PTAGIS RESTful API: Tag Event by Tag Code
M4 Deployment for 2013 Evaluation
2013 Separation-by-Code (SbyC) Overview
17 projects
64 action codes
(target groups)
4million target
tag codes
• Coordinated\implemented by online request system• Evaluation made implementation complex• Two issues at GRJ:• Bug in M4 quota counters affected NOAA (G. Axel) study• Configuration error affected Biomark experimental
release/diversion of lamprey
2013 Program Overview
• 10% budget cut• Upgrade deadline due to legacy server licensing• Consolidate Portland lab with Kennewick• Access transceivers and other equipment remotely
• Participated in Council’s Fish Tagging Forum (FTF)• Published March and October Newsletters• Completed 2011 and 2012 Annual Reports for BPA• Submitted FY14 contract/budget to BPA
2014 Roadmap for Systems and Program Coordination (Portland staff)
• Info Sessions to get community feedback• Refine and document upgraded systems
• Tag Distribution Requests• M4 (retire MiniMon)• Data loading (ETL) and alerting• Web API (web services)• Reporting and other Web features• PIT Tag Forecaster
• Develop P4 tagging software• Evolve PTAGIS data model• Prepare for 2015 PIT Tag Workshop
PIT Tag Forecaster
PIT Tag Forecaster: Selected Forecast
PIT Tag Forecaster: Project Detail
PIT Tag Forecaster: ESU (Population) Detail
PIT Tag Forecaster: Location Detail
PIT Tag Forecaster: Forecast Detail
PIT Tag Forecaster: Reports
PIT Tag Forecaster: Next Steps
• Agency meeting next week• Provide system walkthrough for BPA, NOAA, NPCC, USACE
stakeholders
• Refine and integrate into PTAGIS website• Complete validation and administration features• Populate FWP and AFEP projects
• Identify agency users to beta test application• Promote application into production• Refine reporting system with production data• Implement alerting system for annual updates