PSR at Training Reactor VR-1 Marek Sedlbauer [email protected] Czech Technical University...
-
Upload
delphia-simmons -
Category
Documents
-
view
222 -
download
1
Transcript of PSR at Training Reactor VR-1 Marek Sedlbauer [email protected] Czech Technical University...
PSR at Training Reactor VR-1
Marek Sedlbauer
[email protected] Technical University in Prague
IAEA Workshop on Application of the Code of Conduct on the Safety of Research Reactors, November 2, 2015
2
Outline
Reactor VR-1 Safety classified SSCs Review and operational safety Documentation Safety committee Emergency Preparedness Review reports
M. Sedlbauer – PSR at Training Reactor VR-1
3333
Reactor VR-1 – parameters
Power 5 kWth
Fuel tube fuel IRT-4M
Vessel Diameter/Height 2 300 mm/ 4 720 mm
Temperature 20°C
Reactor Shielding water + heavy concrete
Core Cooling natural convection
Pressure atmospheric
Reactivity control Cd control rods
Neutron Flux 8. 109 cm-2.s-1
Start-up Neutron Source Am-Be
Work inside the reactor vessel
M. Sedlbauer – PSR at Training Reactor VR-1
4444
Reactor VR-1
1990: commissioning - first criticality 03/12/1990
2015: 25 years of safety and successful operation
www.ReactorVR1.eu
M. Sedlbauer – PSR at Training Reactor VR-1
5
Applied to different fields of Reactor life with emphasis on technologies and activities important to the nuclear safety Systems, Structures and Components (SSCs) –
safety classified equipment – the highest attention, RMS, exp. devices, NMAC system, etc. including their ageing
Procedures, documents Safety analysis Emergency Preparedness Review reports Etc.
Application PSR
555M. Sedlbauer – PSR at Training Reactor VR-1
6
Safety classified SSCs
666M. Sedlbauer – PSR at Training Reactor VR-1
The most important SSCs to safety: Control rods Vessels and corridor Fuel elements (cladding) Control system
Safety classified SSCs are reviewed with the highest possible attention because of their direct impact on safety
Also other SSCs are reviewed regularly – RMS, water management system, physical protection system, experimental devices, ….
7
Control rods
777M. Sedlbauer – PSR at Training Reactor VR-1
7 control rods – type UR-70 with step engine and Cd absorber Operational test – after each disconnection of rod, special
test (velocity of rod up/down and drop time), record in protocol and check log
Regular checks o every year: all rods disassembling by reactor staff, check
of rust products, base functions of mechanisms and absorber
o every 5 years: NDT check of all absorbers by external service company, checks of ageing and tests on special stand, records in protocol and check log
Ad hoc check - in case of rod defects is sent external service company
8
Control rods checks
888M. Sedlbauer – PSR at Training Reactor VR-1
999
Fuel elements
9
IRT-4M fuel elements enriched to 19,7% with Al cladding (thickness up to 0,45 mm) Regular checks - every year during summer shutdown,
checks of all fuel elements visually using light, eyeglass and digital camera, inspection of geometry by special stand, records in check log and photos all sides of fuel elements
Ad hoc – in 2014 realized inspection of the most used fuel elements by profilometer to check cladding
M. Sedlbauer – PSR at Training Reactor VR-1
101010
Profilometer inspection
10M. Sedlbauer – PSR at Training Reactor VR-1
111111
Internal Review and Operational Safety
11
Regular meeting of operational staff monthly meeting initiated by reactor manager evaluation all activities during last operation period
(experience, attention, requirements, etc.) review of all realised checks in last operation period scheduling of staff training activities (NSaf, NSec, RP,
EP) scheduling of reactor operation preparation for regular report to SONS (every 3
months) evaluation of disagreements from internal Bugzilla
information system recommendation for future refurbishment or innovation
M. Sedlbauer – PSR at Training Reactor VR-1
12
Documents at the Reactor VR-1 are divided into groups according importance to safety - graded approach Emphasis on controlled documents – emergency
plan, OLCs, QA program, Monitoring program, SAR, etc.
Controlled document processing – processing request, authorization for document processing and defining the scope of the document, check during the processing, approval process
Effort to do all needed changes in documents as soon as possible
Obligatory review of all controlled documents every year by responsible person for appropriate document
1212
Documentation
12M. Sedlbauer – PSR at Training Reactor VR-1
13
The aim of the committee is to provide sufficient information for the management of the operator of the reactor Established this year (2015) 8 members Committee meetings - regular (annual) or extraordinary
(ad hoc) Independent assessment of the safety of the reactor
operation Good functioning of the Committee may affect safety
culture Review of operation, activities important to safety, plans
of innovation, emergency planning, developments, etc. Evaluation and recommendation report
1313
Safety committee
13M. Sedlbauer – PSR at Training Reactor VR-1
14
Safety committee
141414M. Sedlbauer – PSR at Training Reactor VR-1
Rector - Statutory representativeCHAIRMAN
DeanDEPUTY CHAIRMAN
operational and organizational reactor staff
Head of department
Reactormanager
Radiationprotection
officer
Expert in NS
Expert in OS
Expert in RP
3 independent members
Internal emergency plan - main controlled document to ensure emergency preparedness
Emergency exercise – annual exercise in the presence of all staff, inspection of state authority randomly
Immediate evaluation after emergency exercise in the presence of all staff
Results of evaluation implemented the emergency plan review in case of serious findings
Review of emergency exercise reported to SONS within 14 days
Obligatory review of Internal emergency plan every year by responsible person
Emergency Preparedness
15M. Sedlbauer – PSR at Training Reactor VR-1
Quarterly report Number of hours in operation Characteristic of operation for the three-month period – types
of operation, changes, innovations, inspections, maintenance, etc.
Overview of events important to safety Review of safe operation and compliance with OLCsAnnual report Number of hours in operation per year Characteristic of operation per year Review of safe operation, RP, EP and NSec Plans for the future (document reviews, innovations, etc.)Ad hoc report
Review reports on the State Office
16M. Sedlbauer – PSR at Training Reactor VR-1
17
Thank you for attention
M. Sedlbauer – PSR at Training Reactor VR-1