PSI Contact• PSI visit arranged for Feb 9th
– Assessment of activity/contamination• Possible remedial action
– Seek additional equipment for solenoid• Power supply• Control system
– Seek help for installation at a later stage• PSI have the experience• Augments UK installation effort (for free)
– Ownership status of equipment• Disposal issues• MoU between CCLRC & PSI ?
![Page 2: PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.](https://reader036.fdocuments.in/reader036/viewer/2022083008/56649f565503460f94c7a609/html5/thumbnails/2.jpg)
![Page 3: PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.](https://reader036.fdocuments.in/reader036/viewer/2022083008/56649f565503460f94c7a609/html5/thumbnails/3.jpg)
ASTeC
• Discussions with ASTeC RF group
• Will take over in next 6 mo overlap
• Equipment form LBNL– Ship to DL– Strip down– Technical assessment– Plan for a test stand at DL
![Page 4: PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.](https://reader036.fdocuments.in/reader036/viewer/2022083008/56649f565503460f94c7a609/html5/thumbnails/4.jpg)
Shutdown work plan • Prior:
– Contract to cut hole (KP to sign job order)– ISIS Synchrotron Beam Components– Beam plug (concrete filled steel tube)
• During cool down period:– Clear MICE side of wall– Tent and prepare
• During:– Clear Synchrotron side of wall– Tent and prepare– Pilot hole– Circular aperture– Clear up
• Post:– Install plug– Reinstate shielding
![Page 5: PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.](https://reader036.fdocuments.in/reader036/viewer/2022083008/56649f565503460f94c7a609/html5/thumbnails/5.jpg)
Shutdown Planning