PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial...
-
Upload
rachel-bell -
Category
Documents
-
view
212 -
download
0
Transcript of PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial...
PSI Contact• PSI visit arranged for Feb 9th
– Assessment of activity/contamination• Possible remedial action
– Seek additional equipment for solenoid• Power supply• Control system
– Seek help for installation at a later stage• PSI have the experience• Augments UK installation effort (for free)
– Ownership status of equipment• Disposal issues• MoU between CCLRC & PSI ?
ASTeC
• Discussions with ASTeC RF group
• Will take over in next 6 mo overlap
• Equipment form LBNL– Ship to DL– Strip down– Technical assessment– Plan for a test stand at DL
Shutdown work plan • Prior:
– Contract to cut hole (KP to sign job order)– ISIS Synchrotron Beam Components– Beam plug (concrete filled steel tube)
• During cool down period:– Clear MICE side of wall– Tent and prepare
• During:– Clear Synchrotron side of wall– Tent and prepare– Pilot hole– Circular aperture– Clear up
• Post:– Install plug– Reinstate shielding
Shutdown Planning