Federal Aviation Administration
P&S Review Pavement Construction Specifications
FAA Pavement Specifications
State Standards & State Specifications
ACC Summer Workshop
July 17, 2015
John Dermody, P.E., Manager
FAA Airport Engineering, AAS-100
Doug Johnson, P.E., Civil Engineer
FAA Airport Engineering, AAS-100
Federal Aviation Administration
2
•2
Overview
• Why is FAA Reviewing P&S
• Difference between o FAA Specifications and
o State Standards for Airport Pavements &
o State Specifications for Highway Pavements
• When, where and how o State Standards for Airport Pavements
may be used at non primary airports
o State Specifications for highway pavements
may be used on an individual airport project
• Editing FAA Specifications o when is edit a MOS
Federal Aviation Administration
3
Why are we talking about this?
• 2011 Business Plan Goal:
National risk based criteria for FAA review of P&S
o National Working Group Developed Guide
o Phased implementation
o FY 15 All AIP projects Part 139 Airports per matrix and
All AIP @ GA > $2 M
o FY 16 Apply per Review Matrix
• AAS-1 12/08/14 Memorandum:
Implementation Plan for Review of Construction Plans
& Specifications for AIP funded Projects
Federal Aviation Administration
4
Main Objective of P&S Review
• Conformance to
Approved SOW and AIP eligibility
• Conformance to
FAA design & construction standards
• Incorporation of
Required Federal provisions
• Incorporation and conformance with
Airport Safety provisions
Federal Aviation Administration
5
•5
Conformance with
FAA Design & Construction Standards
• Regions / ADO’s that have been relying upon
sponsor certification may find sponsors
o Not following all FAA standards
o Specifications that include modifications to FAA
construction specifications without MOS approval in
accordance with Order 5100.1
Federal Aviation Administration
6
• Intent of Policy is to complete review prior to
advertisement and award so that deficiencies can be
corrected
• Resolution of SOW & Eligibility deficiencies:
o Take work out of project or limit AIP participation
o May require issue addendum or change order
• Design & Construction standards
o Correct plans to follow standards or
o Have sponsor complete MOS
o May require addendum or change order
• Educate Sponsors to current FAA standards
Correction of Deficiencies
Federal Aviation Administration
7
Why
FAA Construction Specifications • AC 150/5370-10G
Standards for Specifying Construction of Airports
Developed specifically for use on airports
Federal Aviation Administration
10
State Standards for
Non Primary Airports • 49 USC 47105
Gives FAA authority to approve State Standards for
Airport Development
Federal Aviation Administration
11
State Specifications for
airfield pavement construction • 49 USC 47114 Allows the Secretary to permit the use
of State Highway Specifications for airfield pavement
construction at non primary airports with runways 5,000
feet or shorter serving aircraft that do not exceed
60,000 pounds gross weight
•This ‘permits’ the FAA
to ‘allow’ the use of
State Highway Specs
•FAA MOS order clarifies
how may be used
Federal Aviation Administration
12
Standards vs Specifications
• State Standards for Airport Pavements
o Standards developed by state for use at any non primary
airport within state
o Once developed and approved for use, may be used at non
primary airports within the state
• Standard Specifications for Highway Pavement
o With appropriate clarifications may follow state highway
specifications for materials, construction and acceptance
o Incorporation of materials meeting state specifications for an
individual project
o May not seek AIP funds for rehabilitation or reconstruction for
10 years after construction (grant special condition)
Federal Aviation Administration
14
• Both AC 5370-10 and AC 5100-13 very clear that any
state standards for airports should start from 5370-10
• Do Not Just Reference ‘follow DOT specification’
AC 5100-13B Development of State
Standards for Nonprimary Airports
Federal Aviation Administration
15
AC 5100-13B Development of State Standards
for Nonprimary Airports
• AC presents guidelines for the development of
State Standards for Airport Projects and the use of
State Highway Specifications for pavement
construction at non primary airports
• Submitted in accordance with Order 5100.1
• Once approved the Standards for Airport Development
developed by State may be used by reference at
nonprimary airports in state
Federal Aviation Administration
20
AC 5100-13B
State Highway Specifications
• State Highway Specifications
o Developed for highway loads not airport
o May not seek AIP funds for rehabilitation or reconstruction for
10 years after construction (grant special condition)
o May need to increase pavement layer thickness’s
• Will require a MOS to utilize in accordance with FAA
Order 5100.1
Federal Aviation Administration
21
MOS must be approved by FAA
Following AC 150/5370-10
is ALWAYS* AIP ELIGIBLE!
Just because State Specifications are allowed does
not mean FAA is requiring their use. *Provided procurement in accordance with Federal Requirements
Federal Aviation Administration
FAA AC 150/5370-10 Starting Point for Project Specifications
What can be changed without a MOS
• See paragraph 4
4. Changes, additions and deletions to the FAA Standard Specifications. Directions to the
Engineer are contained in the AC Engineer Notes (shown between lines of asterisks). These notes explain
the options available to the Engineer when preparing a specification, and the appropriate changes and
additions that must be made. Where numbers, words, phrases or sentences are enclosed in brackets [ ],
a choice or modification must be made. Where blank spaces [ ] occur in sentences, the appropriate
data must be inserted. Where entire paragraphs are not applicable, they should be deleted. Additional
sentences may be added if necessary, however they may not modify the construction standards in this AC.
The final project specifications should not include the Engineer Notes. No other changes to the
specification may be made unless the Engineer has received the approval of the FAA following the
process described in paragraph 2 for modifications to standards
Federal Aviation Administration
25
Difference between Editing vs MOS
• AC 150/5370-10G Paragraph 4 says…
• Directions to the Engineer explain the options available to the
Engineer when developing spec and the appropriate changes
allowed.
• Fill in the [ blanks / spaces] with appropriate data
• Entire paragraphs can be deleted, if not applicable to project.
• Additional sentences can be added, as long as it does not
modify the construction standards, QC, QA measurement and
payment
• No other changes unless MOS approval from the FAA per
Paragraph 2
• Need to show changes edits with track changes on for P&S
review submittal
Federal Aviation Administration
26
Is there any flexibility on modifying
without FAA approval?
• General Provisions
• Can be modified to meet local procurement, however does not
relieve need to follow Federal Regulations
• Must not change the intent
• Changes due to local law/regulation permitted
• Need to show modifications changes with track changes on for
P&S review submittal
Federal Aviation Administration
27
MOS Submittals
Not limited in the same manner as State
Specifications (e.g. non-primary)
Only Airport Sponsors can request a MOS. (Consultants cannot sign!)
Once approved by AAS-100, similar MOS can
be approved within region
Federal Aviation Administration
28
Modification To Standards
Why standards can not be met
Brief description of MOS, Attach copy of proposed specification
using ‘tracked changes’ and other supporting documents so
clear what you want to change
Where is project on airport,?
RW / TW / Apron /Other
Federal Aviation Administration
29
Modification To Standards Only Airport Sponsors (or state) can request a MOS.
(Consultants cannot sign!)
Airport Sponsor (or State) must submit
Federal Aviation Administration
30
Modification To Standards
May be conditions of approval
Must be approved by
ADO/Region before sent to HQ
Federal Aviation Administration
32
Pavement Materials
• Why local materials can not meet specification? (e.g
gradation or quality of materials)
• Will methods be equal or better than FAA spec?
• If substituting local material clearly show where to be
used in pavement structure, attach FAARFIELD design
report. (what do you need the material to do)
Federal Aviation Administration
Use of State Specifications
Where are we today? • Airports serving aircraft 12,500 lbs or less
– No MOS, since our spec is not required
– Does not mean no comments from FAA or Sponsor
• Airports serving aircraft
>12,500 lbs but < 60,000
– MOS approval for materials for use of state materials
current MOS procedure as outlined in
Order 5100.1
• Airports serving aircraft > 60K
– No State materials
– MOS approval follow Order 5100.1
33
Federal Aviation Administration
P & S Review
34
• Encouraging Sponsors and States to use
FAA specifications and standards.
• Educate Sponsors and the States
– Design Contracts should require consultants to
follow FAA standards
– If MOS is needed start early in design process
Following AC 150/5370-10
is ALWAYS AIP ELIGIBLE!
Federal Aviation Administration
35
Questions