Protocols for MeasuringWater Level & Streamflow
Office of Research and DevelopmentAir, Climate and Energy Program, National Center for Environmental Assessment
The views expressed in this presentation are those of the author and they do not necessarily reflect the viewsor policies of the U.S. Environmental Protection Agency or other collaborating agencies
May 4, 2016
National Water Quality Monitoring ConferenceField Protocols Workshop
![Page 2: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/2.jpg)
• Streamflow program in Massachusetts• Measuring streamflow: an overview• Measuring stage (water level)
• Site selection• Equipment• Installation• Maintenance & documentation• Data retrieval and QA/QC
• Measuring discharge (streamflow)• Equipment• Techniques• Documentation & maintenance
Hydrology - outline
1
![Page 3: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/3.jpg)
State funded streamflow restorationprogram started in 2002• Initial focus on low-flow
Streamflow gaging inMassachusetts
• Volunteers read staff gages, staff build rating curves• Transducers installed at most sites• QAPP, USGS technical guidance• Two staff• Major costs
• Travel• Equipment
2
![Page 4: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/4.jpg)
1. Measure stage at afixed point• Staff gages• Pressure transducers
2. Relate stagemeasurements todischarge (streamflow).
Measuring streamflow:an overview
3
![Page 5: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/5.jpg)
Measuring water level
Staff gage(discrete data)
4
Pressure transducer(continuous data)
![Page 6: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/6.jpg)
Staff gage allows check ofpressure transducer data
5 Date
Sta
ge
(ft)
Transducer data
Staff gage readings beforetransducer movement
Staff gage readings aftertransducer movement
![Page 7: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/7.jpg)
Vented vs. non-vented transducers
A) B) C)
D)
Characteristic Pressure Transducer
Durable yes
Submersible/waterproof yes
Programmable start time and date yes
Minimum accuracy ≤0.015ft
Precision ±0.005%
Temperature range -5 to 37˚C
Stage rangeSufficient for the expected
variation in stage at the site
Memory Sufficient to last between site visits
Battery life Sufficient to last between site visits
Pressure transducers
6
Accuracy is afunction of the
operational rangeof the transducer
Many different equipment options
![Page 8: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/8.jpg)
7
Vented pressure transducers
Pros• Does not need to be removed from the stream to
download• Data are automatically corrected for barometric pressure
Cons• Maintenance of the vented cable
• Desiccant• Damage to cable
• Cable lengths are fixed• Higher visibility than non-vented transducers
![Page 9: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/9.jpg)
8
Non-vented pressure transducers
Pros• Data loggers are internal
• Less visible than vented transducers• No vented cable or desiccant
• Less maintenance
Cons• Must deploy a second pressure transducer to collect
barometric pressure• Data must be corrected post-download
• Transducer must be removed from the stream todownload data
![Page 10: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/10.jpg)
• Pool with downstream control• Underwater during low flows• Avoid sites with excessivevegetation, unstable banks orstreambed, beaver activity
• Nearby locations to measuredischarge (low and high flows)
• Safe and accessible
Site selection
9
If appropriate site conditions are notpresent where biologic sampling is takingplace you can install anywhere upstreamor downstream of the sampling as longas there is no water entering or leavingthe stream
![Page 11: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/11.jpg)
Staff gage installation
Fixed object• May be more stable in high flow,
high gradient & rocky streams• Objects may include bridges,
boulders, weirs
Streambed• Best in high order streams with
lower flow and limited debris• Must be able to drive a
pole/stake into streambed
10
![Page 12: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/12.jpg)
11
Transducer Installation
Key considerations• Should remain submerged when streamflowing• Deeper pools may reduce ice impacts• Calm pools yield less noisy data
Three methods
• Staff gage board• Fixed object• Streambed
![Page 13: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/13.jpg)
12
Installing data logger for ventedtransducers & barometric transducer
Key considerations with data logger/transducer:• Install in PVC housing for protection• Should be above potential flood/snow line• Should be relatively hidden to discourage vandalism
![Page 14: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/14.jpg)
13
Maintenance
Basic Maintenance• Clean gage andtransducer• Clear leaf litter anddebris from control• Change batteries and
desiccant (if necessary)Gage readingsElevation surveys
![Page 15: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/15.jpg)
14
Elevation Surveys
• Important tool for detecting movement of transducers and staffgages
• Conduct surveys yearly after high spring flows/ice out or ifmovement is suspected
• Can use results to correct transducer data if movement is detected
![Page 16: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/16.jpg)
15
Documentation
• Photos: gage, upstream, downstream (including control), & anythingunusual at every site visit.
• Date, time, stage (from transducer and staff gage), battery status atevery transducer download.
• Any changes to the calibration or location of the transducer.
![Page 17: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/17.jpg)
16
Data retrieval, QA/QC
• Frequent downloads minimize data loss• Download approach varies based on transducer type• QA/QC
![Page 18: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/18.jpg)
17
Relating stage to discharge
Stage data on its own does not give quantitative informationabout the magnitude of streamflow
Establishing a relationship between stage-discharge allowsyou to:
• Compare data from year to year• Compare data from stream to stream• Know the magnitude of streamflow – key attribute that
may change with changing climate
![Page 19: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/19.jpg)
18
Make discharge measurements over a wide range of flows
Plot stage vs. discharge and draw a curve through it – canestimate streamflow at a range of stages
Stage-discharge rating curve
![Page 20: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/20.jpg)
19
Equipment• Flow meter• Wading rod• Measuring tape and stakes
Flow measurement
Documentation• Meter QA/QC• Staff gage reading before and
after measurement• Notes on transect, control, gage
pool, etc.• Photos: gage, upstream,
downstream (including control)
![Page 21: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/21.jpg)
20
Flow measurement techniques
• Good cross-section• At least twenty
measurements, no morethan 5% of flow should passthrough a segment
• Paired measurements
![Page 22: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/22.jpg)
21
Rating curve maintenance
Check rating curve:• Annually (at an absoluteminimum),preferably seasonally
• Leaf buildup• Vegetation• Ice impacts
• After major storms• After other channel-changingactivities (bridge, culvertreplacement)
![Page 23: Protocols for Measuring Water Level & Streamflow · 2016-06-14 · Water Level & Streamflow Office of Research and Development Air, Climate and Energy Program, National Center for](https://reader031.fdocuments.in/reader031/viewer/2022011910/5f77e609313d14134f73361d/html5/thumbnails/23.jpg)
22
Questions?
U.S. Geological Survey, Massachusetts Cooperative Fish and WildlifeResearch Unit
Allison Roy, Assistant Unit Leader and Research Assistant ProfessorDepartment of Environmental Conservation, University of [email protected]
EPA Office of Research and Development
Britta Bierwagen, Acting Team Lead, Exposure Analysis and RiskCharacterization Group, National Center for Environmental [email protected]