PROTECTION OF NEW STEEL PILES ON EDEN BREAKWATER … · 2020-02-27 · Location Twofold Bay, Eden...
Transcript of PROTECTION OF NEW STEEL PILES ON EDEN BREAKWATER … · 2020-02-27 · Location Twofold Bay, Eden...
A MEMBER OF WINN & COALES INTERNATIONAL
77 - 95 National Boulevard, Campbellfield, Victoria 3061DENSO (AUSTRALIA) PTY LTD
TEL: +61 3 9356 7600 FAX: +61 3 9387 6973 EMAIL: [email protected] WEB: www.densoaustralia.com.au
SUBSEA & SPLASH ZONE COATINGS
Waterway Constructions were engaged to build a new extension to the existing Eden wharf with 295 linear metres of heavy duty Denso SeaShield Series 2000FD specified to protect 78 new 714mm and 610mm diameter steel piles.
The new wharf extension will enable large cruise ships with a length of 300m or more to enter Eden port and come alongside the wharf rather than using tenders to get passengers to the shore from anchored vessels outside the port.
The wharf extension was officially opened in August 2019 with the first cruise ship docked at the beginning of the cruise ship season the following month.
Location Twofold Bay, Eden NSW
Contractor Waterway Constructions
Client NSW Government
Products Denso SeaShield Series 2000FD
Date Apr 2019
Ref No S043
PROJECT DETAILS
PROJECT DATA
PROTECTION OF NEW STEEL PILES ON EDEN BREAKWATER WHARF EXTENSION
DATE PUBLISHED: FEBRUARY 2020
Denso SeaShield Series 2000FD used on Eden breakwater wharf extension.