Protection Engr Tariq Mehmood Cv
-
Upload
irfan-ullah -
Category
Documents
-
view
218 -
download
0
Transcript of Protection Engr Tariq Mehmood Cv
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 1/11
1958
Permanent Location/Address City or TownCountry
LAHOREPakistan
NationalitiyPakistanExperience Classification
Job Function Years ExperienceElectrical Engineers 23
Job Industry Years ExperienceEngineering Not specified.Utilities 23
Qualifications
Highest Qualifications Degree
Qualification Subject Establishment/Country Year Degree ELECTRICAL ENGINEER NED UNIVERSITY KARACHI, PAKISTAN1986
Other Qualifications, Memberships, Certifications
PAKISTAN ENGINEERING COUNCILEIEEE USAComputer Skills and Software Used
CVTesting and Commissioning Manager
Name Tariq Mehmood Chaudhry ________________________________________ Current Location
PRESENTLY I AM WORKING WITH AREVA IN CONGO ON Eni REVAMPING OF CONGOGRID PROJECT, AND RESPONSIBLE FOR THE TESTING & COMMISSIONING OF 220KV SUBSTATIONS, FORCOMPLETE ENERGY AUTOMATION.City Al-JubailState KSA
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 2/11
Country Saudiarabia ________________________________________Permanent Home AddressStateCity 238 Umar Block, Allama Iqbal TownLahoreCountry Pakistan
________________________________________ Language English, Urdu
Ability Read, write and speak fluently ________________________________________ Nationality By Birth Pakistani
________________________________________Experience Classification
Years of Experience
Number of Employers23
3
________________________________________QualificationsHighest Qualification Bachelor of Engineering ELECTRONICS
Subject Establishment/Country Year GPA
BE Electrical (Major electronics) NED university of engineering & technology Karachi, Pakistan 1986 3.73
________________________________________ Professional Trainings
• WAPDA ONE YEAR INDUCTION TRAINING.• FOURE WEEKS PROTECTION COURSE AT TSG TRAINING INSTITUTE LAHORE, PAKISTAN.• AREVA PROTECTION COURSE.• SIEMENS ONE MONTH ON JOB TRAINING IN RELAY MANUFACTURING FACTORY, BERLIN, GERMANY• SIEMENS ONE WEEK TRAINING COURSE IN TRAINING CENTER NEURANBERG, GERMANY• MANY SMALL TRAININGS/SEMINARS ATTENDED.• AutoCAD and all common operating software.
________________________________________AvailabilityEarliest Start Date
Given 4 weeks notice Are you willing to move or relocate? Yes
________________________________________Ideal Next JobProject Manager {protection and control (Testing & Commissioning)-Electrical} position with married status.
________________________________________Required Salary & Conditions
Minimum 4500 € per month in gulf countries + family status + transport + medical.By negotiation only for other than gulf countries.
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 3/11
________________________________________ PROFESSIONAL WORKING EXPERIENCE
March, 2009 to till dateLead Commissioning Engineer – Electrical (Contract)For : AREVA COGILEX FRANCEMARAFIQ POWER PROJECT, AL-JUBAILClient: SAUDI ELECTRIC COMPANYResponsible for:Testing and commissioning of protection relays used on 380KV transmission lines for four circuits.Communication Checking between remote end devices regarding line differential and distance protection.Verification of Control wirings and Primary, secondary equipment connections with drawing.Commissioning two 986 Ah 125 volt dc bettry banks.Testing & commissioning of distribution transformers.
– – – – – – – – – – – – – – – – – –November, 2007 to December 2008.Commissioning protection Engineer (Contract)
For : MAM DUBAI33/11KV Substation Projects – DIBBA AND AL-FUJIRAH SUBSTATIONS.Client: Federal Electricity and Water Authority ( FEWA) UAE.Responsible For:Verification and testing of connections on secondary equipments, and Control Wiring Check with drawing. Circuitmodification with help of drawing.Testing of ABB Protection relays - REF 542 +, SPAJ 115, SPAU, Areva Auxiliary relays, VATECH - ARGUSRELAYS, Solker RF, Solker Guard and test document Preparation.Testing of cable pilot wire differential (End to end test).Transformer Differential and Restricted Earth Fault Stability test and test Document Preparation.Scada signal interfacing up to RTU and commissioning of NCC signals with Scada Engineers.Power transformer complete testing and commissioning of parallel operation with TAPCON.
– – – – – – – – – – – – – – – – – –November, 2004 to November, 2007.Deputy Manager T&D SIEMENS Lahore, Pakistan. Later as incharge of BU EA PTD Lahore
Client: WAPDA, IPPs, AND INDUSTRIESResponsible For:. Relay and control panels testing during client's inspection.. Erection, testing and commissioning of AIS 132kv substations.. Testing and commissioning of 220 KV & 500 KV substations AIS and GIS.. All range of SIEMENS protective relays, main Areva & ABB relays.. Siemens Monitoring and Control devices.
Cable Schedule/Terminal Connection diagram Verification and Modification if Changes required.Testing of 132KV/33KV Primary Equipments and test document Preparation.Circuit Breaker with Isolator, Isolator with Earth Switch Interlock Verification as per Drawing from Control Panel.Circuit Breaker, Isolator Status Checking and Interlock Verification through PLC.Control Scheme and Protection Scheme Verification with drawing.Stability test for Transformer Differential and REF Protection and test document Preparation.
– – – – – – – – – – – – – – – – – –September 2001 to November 2004Posted as system protection engineer (AD) in the office of chief engineer system protection wapda. Then attachedwith MD T&G as staff officer for the completion of few disputed works and assigned the duty to complete the work of 220KV Sibbi substation with in six months. This was commissioned in time and Chairman Wapda Awarded me cashaward WITH COMMENDATION CERTIFICATE. All protection schemes completed by me after the partialcommissioning by contractor.Responsible For:
After two years CE SP called me back and assigned me the responsibility to check the drawings & design of 500/220KV substations & Transmission Lines submitted by contractors for vetting on turn key projects. Inspections of material, design, drawings, erection, testing & commissioning support to WAPDA construction engineers managed by
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 4/11
its own resources.Commissioning Schedule Preparation, Discussion with Chief Engineers Meeting regarding outstanding activities andexecute the job with four junior Engineers.Circuit Breaker with Isolator, Isolator with Earth Switch Interlock Verification as per Drawing from Local Cubicle andRemote Control Panel.Review all Pre Commissioning Activities and test documents.
Assign the testing activities to junior engineers for testing the Power transformer, Circuit breakers and auxiliary relays
and test document verification.Final and overall Checks for Tripping to the Circuit breaker like, O/C& E/F, Breaker failure, Bus bar differential,Transformer differential, upstream/ downstream, Line Protection etc..,Stability test for Transformer Differential and REF Protection and test document Preparation.
– – – – – – – – – – – – – – – – – –March 1998 to August 2001Lead Protection & Instrumentation Engineer – Electrical500 KV grid station Lahore, Pakistan.Nature of Job:My working responsibility was to look after all protection and control circuits fault and trouble shootings, their rectifications, annual testing of protection relays / monitoring devices. The scheme verifications and coordinated thework of three new 220 KV bays with responsibility of shut downs and restoration of supply. Design Co-ordination for Existing substation and modification works.
– – – – – – – – – – – – – – – – – –December 1995 to March 1998
SUB DIVISIONAL OFFICER IESCO ISLAMABAD, PAKISTANResponsible For:To deal with new connections, feasibilities for new industrial consumers, cable laying, jointing, and new feeders up to11kv. Supervision of the contractors during construction of new substation with in IESCO and witnessing of their testing and commissioning works.
Attend the meeting as with Chairman Area Electricity Board, Chief Engineers, Discussion regarding WeekSchedule/Monthly Schedule Program for Primary/Secondary Equipment testing activities, Control Checks, any designmodification and any engineering quires.Testing of CT, CVT, SF6 Circuit Breaker, Power transformer, test documents. Bay Interlock Verification as per Schematic diagram for breaker with Isolator and Isolator with Earth Switch from remote Control panel and localCubicle. Control Checks for CB Closing/Tripping circuit, Power Transformer Alarm/Trappings and other Controls withdrawing and LVAC Board CB manual operation and auto Change over Checks using temp. Supply.
All type of AREVA made Auxiliary relays and K-Series Relays testing and test document Preparation.Stability test for Transformer Differential and REF Protection.
– – – – – – – – – – – – – – – – – –
January 1990 to November 1995SUB DIVISIONAL OFFICER GC-2 PD GSC RAWALPINDI, PAKISTANPosted as sub-divisional officer (SDO-GC-11) in the department of Grid System Construction, RWP. During thisperiod my responsibilities were manage the project of construction of 220/132/66/33KV substations along withadditional augmentation works of the 220/132/66/33KV substations. In this session, I also got the opportunity to workin the Testing & Inspection department of Grid System Construction directorate, Rawalpindi. Where, I performed thetesting and commissioning work of 220/132/66/33kv substations.Responsible for:The complete construction of control building, equipment erection, testing and commissioning using wapda ownworking team and testing equipments, both on primary and secondary sides. Panel wiring Checks as per drawing, redmarking if required and maintaining three set of drawings.
– – – – – – – – – – – – – – – – – –October 1988 to January 1990RESIDENT ENGINEER SUB-STATION AND TRANSMISSION LINES, MIANWALI UNDER CHIEF ENGINEER GSOISLAMABADResponsible for:The management, execution of the operations and complete maintenance of five 132kv substations and thirteen 66kvsubstations. Trouble shooting of transmission line’s faults for huge network of 66KV, 132KV and 220kv transmissionlines. Also the rectification of faults and annual preventive maintenance of the substations and transmission lines bytrained TL crew of wapda. Testing of all protection and monitoring devices and protection scheme verifications insubstations. Providing direction to testing engineers for primary equipment testing and test document implementation.
Auxiliary relays, Electromagnetic type OC, EF (Dir, Non dir) relays testing and test document preparationControl Checks for CB Closing/Tripping circuit, Power Transformer Alarm/Trip Signals and other Controls withdrawing. Bay Interlock Verification as per diagram for breaker with Isolator and Isolator with Earth Switch.
Auto Reclosure Scheme Checking for Line breakers and tie breakers with protection drawing.
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 5/11
– – – – – – – – – – – – – – – – – –July 1987 to September 1988On induction trainings from WAPDA training centers for all departments regarding engineering and management.
DERING MY WORKING EXPERIENCE I DID WORK ON:- ABB Relays Operating Software CAP540, PCM600, CAP316, REF542+ Configuration Tool FuplaSiemens Software – Digsi 4.7 and all old versions
Areva Software- Micom and Studio S1GE- Enervista 489 Setup.Testing Equipments Known to OperateOmicron CMC 156/256Omicron CPC 100Sverker 650/750, ABB XS92aODEN - Three Phase Primary injection kitCT Analyzer- OmicronProgramma TM1600 – Breaker Analyzer SystemProgramma MOM200A - Micro ohm meter MagnusMetriso 5000, Megger BM15 – Insulation Tester, Muliamps all range and many other test kits.Relays Known to TestNumerical Relays
ABB Make – RED670, RET670, REB670 ,REX521, RET316, REL551, RET531, REF542+, SPAJ, SPAU, SPAD,
SPAMSIEMENS Make – 7SJ61, 7SJ62, 7SD61, 7RW600, 7UT613
AREVA Make - P122, P127, P922, P643, MOTPRO, KCGG142, KCEG142, KVFG142, KBCH120VATECH - ARGUS RELAYS, Solker RF, Solker GuardCPR97 (TRENCH) Capacitor Bank ProtectionGeneral Protection Protection Function50, 51 Phase Over Current Relays50N, 51N Phase Earth Fault Relays67,67N Directional OC & EF Protection87T Transformer Differential Protection87L Line Differential Protection87N Restricted EF Protection49 Thermal Overload ProtectionElectromagnetic Relays
ABB Make - RADSB, RADHD, RADHA, RAICA
AREVA - MCCG, MCAG, CDG, CDD, SKD, SKE, MVTP, MVAG, MVAJ, VAA, VTT, VAJM, VDG(ENGLISH ELECTRIC, GEC ALSTOM, ALSTOM)Primary equipment Known to TestCurrent transformer up to 500/220/132/110/66/33/11KV VoltageVoltage transformer up to 500/220/132/110/66/33/11KVCircuit Breaker up to 500/220/132/110/66/33/11KVPower Transformer up to 200MVA single phase and BANK, three phase up to 160MVAPrimary Test Known to CheckStability/Sensitivity Test for Transformer Differential/Restricted Earth fault ProtectionStability/Sensitivity Test for Bus bar Differential ProtectionStability/Sensitivity Test for Line Differential Protection – end to end test.High Voltage test for Primary EquipmentKey SkillsSystematical planning Schedule Preparation for Primary/Secondary equipment testing activities and pre-commissioning activities.
Primary/Secondary electrical equipment testing, using various type of test equipment and test document Preparation.
Control Scheme (Isolator and Circuit Breaker)/ Protection Scheme (Breaker failure, Bus bar Protection, Transformer
differential Protection, Load Shedding, Line differential-end to end test, distance protection) Checking with Schematicdiagram and Automatic Switchover Function checking in 0.415KV LVAC Board.
Electrical/ Mechanical Interlock Verification for Circuit breaker with Isolator and Isolator with Earth Switch as per diagram.
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 6/11
Vendor Document review for Electrical Primary/ Secondary Equipment FAT report. SAT ReportPreparation/Verification and Method of statement Preparation for Commissioning.
Attend the meeting as a lead engineer with Client, Discussion regarding testing/Pre-Commissioning Activities
(Planning Schedule) and clarification for any engineering Quires.Primary and Secondary equipment testing with Client/Consultant and answer for all engineering quires, and Workingexperience with multinational environment.
Successfully Commission the Substation, Power Project with in the Schedule timeLast Modified: JAN, 2010
________________________________________-- End of CV--
Work Locations
Are you willing to move or relocate?
Yes - I will travel domesticallyYes - I will relocate domesticallyYes - I will travel internationallyYes - I will relocate internationally
Availability
Start Immediately?Not available now.Ideal Next Job
excluding IRAQ, AFGHANISTAN. ALL OTHERRequired Salary & Conditions
NOT LESS THAN 9000 USD PER MONTHEmployment History
Total Years of Work ExperienceCommenced Full Time Work261987Last/Current Employer
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 7/11
Job TitleDuration
Elect Engineer From :01-Jan-1987To: 01-Jan-2004
Summary
PLEASE REFER TO MY CV.Work Experience
CVTesting and Commissioning Manager
Name Tariq Mehmood Chaudhry
________________________________________ Current Location
PRESENTLY I AM WORKING WITH AREVA IN CONGO ON Eni REVAMPING OF CONGO GRID PROJECT, ANDRESPONSIBLE FOR THE TESTING & COMMISSIONING OF 220KV SUBSTATIONS, FOR COMPLETE ENERGY
AUTOMATION,City Al-JubailState KSACountry Saudiarabia
________________________________________Permanent Home AddressStateCityCountry Pakistan
________________________________________ Language English, Urdu
Ability Read, write and speak fluently ________________________________________ Nationality By Birth Pakistani
________________________________________Experience Classification
Years of Experience
Number of Employers23
3
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 8/11
________________________________________QualificationsHighest Qualification Bachelor of Engineering ELECTRONICS
Subject Establishment/Country Year GPABE Electrical (Major electronics) NED university of engineering & technology Karachi, Pakistan 1986 3.73
________________________________________
Professional Trainings
• WAPDA ONE YEAR INDUCTION TRAINING.• FOURE WEEKS PROTECTION COURSE AT TSG TRAINING INSTITUTE LAHORE, PAKISTAN.• AREVA PROTECTION COURSE.• SIEMENS ONE MONTH ON JOB TRAINING IN RELAY MANUFACTURING FACTORY, BERLIN, GERMANY• SIEMENS ONE WEEK TRAINING COURSE IN TRAINING CENTER NEURANBERG, GERMANY• MANY SMALL TRAININGS/SEMINARS ATTENDED.• AutoCAD and all common operating software.
________________________________________AvailabilityEarliest Start Date
Given 4 weeks notice Are you willing to move or relocate? Yes
________________________________________Ideal Next JobProject Manager {protection and control (Testing & Commissioning)-Electrical} position with married status.
________________________________________Required Salary & Conditions
Minimum 4500 € per month in gulf countries + family status + transport + medical.By negotiation only for other than gulf countries.
________________________________________ PROFESSIONAL WORKING EXPERIENCE
March, 2009 to till dateLead Commissioning Engineer – Electrical (Contract)For : AREVA COGILEX FRANCEMARAFIQ POWER PROJECT, AL-JUBAILClient: SAUDI ELECTRIC COMPANYResponsible for:Testing and commissioning of protection relays used on 380KV transmission lines for four circuits.Communication Checking between remote end devices regarding line differential and distance protection.Verification of Control wirings and Primary, secondary equipment connections with drawing.Commissioning two 986 Ah 125 volt dc bettry banks.Testing & commissioning of distribution transformers.
– – – – – – – – – – – – – – – – – –November, 2007 to December 2008.Commissioning protection Engineer (Contract)For : MAM DUBAI33/11KV Substation Projects – DIBBA AND AL-FUJIRAH SUBSTATIONS.Client: Federal Electricity and Water Authority ( FEWA) UAE.Responsible For:Verification and testing of connections on secondary equipments, and Control Wiring Check with drawing. Circuitmodification with help of drawing.Testing of ABB Protection relays - REF 542 +, SPAJ 115, SPAU, Areva Auxiliary relays, VATECH - ARGUSRELAYS, Solker RF, Solker Guard and test document Preparation.Testing of cable pilot wire differential (End to end test).Transformer Differential and Restricted Earth Fault Stability test and test Document Preparation.Scada signal interfacing up to RTU and commissioning of NCC signals with Scada Engineers.
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 9/11
Power transformer complete testing and commissioning of parallel operation with TAPCON. – – – – – – – – – – – – – – – – – –November, 2004 to November, 2007.Deputy Manager T&D SIEMENS Lahore, Pakistan. Later as incharge of BU EA PTD LahoreClient: WAPDA, IPPs, AND INDUSTRIESResponsible For:. Relay and control panels testing during client's inspection.
. Erection, testing and commissioning of AIS 132kv substations.. Testing and commissioning of 220 KV & 500 KV substations AIS and GIS.
. All range of SIEMENS protective relays, main Areva & ABB relays.
. Siemens Monitoring and Control devices.
Cable Schedule/Terminal Connection diagram Verification and Modification if Changes required.Testing of 132KV/33KV Primary Equipments and test document Preparation.Circuit Breaker with Isolator, Isolator with Earth Switch Interlock Verification as per Drawing from Control Panel.Circuit Breaker, Isolator Status Checking and Interlock Verification through PLC.Control Scheme and Protection Scheme Verification with drawing.Stability test for Transformer Differential and REF Protection and test document Preparation.
– – – – – – – – – – – – – – – – – –September 2001 to November 2004Posted as system protection engineer (AD) in the office of chief engineer system protection wapda. Then attachedwith MD T&G as staff officer for the completion of few disputed works and assigned the duty to complete the work of
220KV Sibbi substation with in six months. This was commissioned in time and Chairman Wapda Awarded me cashaward WITH COMMENDATION CERTIFICATE. All protection schemes completed by me after the partialcommissioning by contractor.Responsible For:
After two years CE SP called me back and assigned me the responsibility to check the drawings & design of 500/220KV substations & Transmission Lines submitted by contractors for vetting on turn key projects. Inspections of material, design, drawings, erection, testing & commissioning support to WAPDA construction engineers managed byits own resources.Commissioning Schedule Preparation, Discussion with Chief Engineers Meeting regarding outstanding activities andexecute the job with four junior Engineers.Circuit Breaker with Isolator, Isolator with Earth Switch Interlock Verification as per Drawing from Local Cubicle andRemote Control Panel.Review all Pre Commissioning Activities and test documents.
Assign the testing activities to junior engineers for testing the Power transformer, Circuit breakers and auxiliary relaysand test document verification.
Final and overall Checks for Tripping to the Circuit breaker like, O/C& E/F, Breaker failure, Bus bar differential,Transformer differential, upstream/ downstream, Line Protection etc..,Stability test for Transformer Differential and REF Protection and test document Preparation.
– – – – – – – – – – – – – – – – – –March 1998 to August 2001Lead Protection & Instrumentation Engineer – Electrical500 KV grid station Lahore, Pakistan.Nature of Job:My working responsibility was to look after all protection and control circuits fault and trouble shootings, their rectifications, annual testing of protection relays / monitoring devices. The scheme verifications and coordinated thework of three new 220 KV bays with responsibility of shut downs and restoration of supply. Design Co-ordination for Existing substation and modification works.
– – – – – – – – – – – – – – – – – –December 1995 to March 1998SUB DIVISIONAL OFFICER IESCO ISLAMABAD, PAKISTANResponsible For:To deal with new connections, feasibilities for new industrial consumers, cable laying, jointing, and new feeders up to11kv. Supervision of the contractors during construction of new substation with in IESCO and witnessing of their testing and commissioning works.
Attend the meeting as with Chairman Area Electricity Board, Chief Engineers, Discussion regarding WeekSchedule/Monthly Schedule Program for Primary/Secondary Equipment testing activities, Control Checks, any designmodification and any engineering quires.Testing of CT, CVT, SF6 Circuit Breaker, Power transformer, test documents. Bay Interlock Verification as per Schematic diagram for breaker with Isolator and Isolator with Earth Switch from remote Control panel and localCubicle. Control Checks for CB Closing/Tripping circuit, Power Transformer Alarm/Trappings and other Controls with
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 10/11
drawing and LVAC Board CB manual operation and auto Change over Checks using temp. Supply. All type of AREVA made Auxiliary relays and K-Series Relays testing and test document Preparation.Stability test for Transformer Differential and REF Protection.
– – – – – – – – – – – – – – – – – –January 1990 to November 1995SUB DIVISIONAL OFFICER GC-2 PD GSC RAWALPINDI, PAKISTANPosted as sub-divisional officer (SDO-GC-11) in the department of Grid System Construction, RWP. During this
period my responsibilities were manage the project of construction of 220/132/66/33KV substations along withadditional augmentation works of the 220/132/66/33KV substations. In this session, I also got the opportunity to workin the Testing & Inspection department of Grid System Construction directorate, Rawalpindi. Where, I performed thetesting and commissioning work of 220/132/66/33kv substations.Responsible for:The complete construction of control building, equipment erection, testing and commissioning using wapda ownworking team and testing equipments, both on primary and secondary sides. Panel wiring Checks as per drawing, redmarking if required and maintaining three set of drawings.
– – – – – – – – – – – – – – – – – –October 1988 to January 1990RESIDENT ENGINEER SUB-STATION AND TRANSMISSION LINES, MIANWALI UNDER CHIEF ENGINEER GSOISLAMABADResponsible for:The management, execution of the operations and complete maintenance of five 132kv substations and thirteen 66kvsubstations. Trouble shooting of transmission line’s faults for huge network of 66KV, 132KV and 220kv transmission
lines. Also the rectification of faults and annual preventive maintenance of the substations and transmission lines bytrained TL crew of wapda. Testing of all protection and monitoring devices and protection scheme verifications insubstations. Providing direction to testing engineers for primary equipment testing and test document implementation.
Auxiliary relays, Electromagnetic type OC, EF (Dir, Non dir) relays testing and test document preparationControl Checks for CB Closing/Tripping circuit, Power Transformer Alarm/Trip Signals and other Controls withdrawing. Bay Interlock Verification as per diagram for breaker with Isolator and Isolator with Earth Switch.
Auto Reclosure Scheme Checking for Line breakers and tie breakers with protection drawing. – – – – – – – – – – – – – – – – – –July 1987 to September 1988On induction trainings from WAPDA training centers for all departments regarding engineering and management.
DERING MY WORKING EXPERIENCE I DID WORK ON:- ABB Relays Operating Software CAP540, PCM600, CAP316, REF542+ Configuration Tool FuplaSiemens Software – Digsi 4.7 and all old versions
Areva Software- Micom and Studio S1
GE- Enervista 489 Setup.Testing Equipments Known to OperateOmicron CMC 156/256Omicron CPC 100Sverker 650/750, ABB XS92aODEN - Three Phase Primary injection kitCT Analyzer- OmicronProgramma TM1600 – Breaker Analyzer SystemProgramma MOM200A - Micro ohm meter MagnusMetriso 5000, Megger BM15 – Insulation Tester, Muliamps all range and many other test kits.Relays Known to TestNumerical Relays
ABB Make – RED670, RET670, REB670 ,REX521, RET316, REL551, RET531, REF542+, SPAJ, SPAU, SPAD,SPAMSIEMENS Make – 7SJ61, 7SJ62, 7SD61, 7RW600, 7UT613
AREVA Make - P122, P127, P922, P643, MOTPRO, KCGG142, KCEG142, KVFG142, KBCH120VATECH - ARGUS RELAYS, Solker RF, Solker GuardCPR97 (TRENCH) Capacitor Bank ProtectionGeneral Protection Protection Function50, 51 Phase Over Current Relays50N, 51N Phase Earth Fault Relays67,67N Directional OC & EF Protection87T Transformer Differential Protection87L Line Differential Protection
7/27/2019 Protection Engr Tariq Mehmood Cv
http://slidepdf.com/reader/full/protection-engr-tariq-mehmood-cv 11/11
87N Restricted EF Protection49 Thermal Overload ProtectionElectromagnetic Relays
ABB Make - RADSB, RADHD, RADHA, RAICA AREVA - MCCG, MCAG, CDG, CDD, SKD, SKE, MVTP, MVAG, MVAJ, VAA, VTT, VAJM, VDG(ENGLISH ELECTRIC, GEC ALSTOM, ALSTOM)Primary equipment Known to Test
Current transformer up to 500/220/132/110/66/33/11KV VoltageVoltage transformer up to 500/220/132/110/66/33/11KVCircuit Breaker up to 500/220/132/110/66/33/11KVPower Transformer up to 200MVA single phase and BANK, three phase up to 160MVAPrimary Test Known to CheckStability/Sensitivity Test for Transformer Differential/Restricted Earth fault ProtectionStability/Sensitivity Test for Bus bar Differential ProtectionStability/Sensitivity Test for Line Differential Protection – end to end test.High Voltage test for Primary EquipmentKey SkillsSystematical planning Schedule Preparation for Primary/Secondary equipment testing activities and pre-commissioning activities.
Primary/Secondary electrical equipment testing, using various type of test equipment and test document Preparation.
Control Scheme (Isolator and Circuit Breaker)/ Protection Scheme (Breaker failure, Bus bar Protection, Transformer differential Protection, Load Shedding, Line differential-end to end test, distance protection) Checking with Schematicdiagram and Automatic Switchover Function checking in 0.415KV LVAC Board.
Electrical/ Mechanical Interlock Verification for Circuit breaker with Isolator and Isolator with Earth Switch as per diagram.
Vendor Document review for Electrical Primary/ Secondary Equipment FAT report. SAT ReportPreparation/Verification and Method of statement Preparation for Commissioning.
Attend the meeting as a lead engineer with Client, Discussion regarding testing/Pre-Commissioning Activities
(Planning Schedule) and clarification for any engineering Quires.Primary and Secondary equipment testing with Client/Consultant and answer for all engineering quires, and Workingexperience with multinational environment.Successfully Commission the Substation, Power Project with in the Schedule timeLast Modified: June 26, 2009
________________________________________-- End of CV--