[email protected] www.epeconsulting.com Protection & Coordination Description: The initial short-circuit/protection coordination study should be done when a power system is first designed. ... Expansion and growth of a facility will typically result in additional electrical equipment such as circuit breakers, motor control centers, transformers, and cables. System Protection & Coordination plans are executed by Electric Power Engineers on a regular basis. These plans include calculating short circuit currents, sizing and locating fuses and reclosers, preparing three-phase recloser settings, securing RUS approvals (when applicable) City of Brady City of Hearne Navarro County Electric Cooperative Navasota Valley Electric Cooperative Wise Electric Cooperative & many more 1.866.501.3360

Transcript of Protection & Coordination - Home | Electric Power Engineers · System Protection & Coordination...

Page 1: Protection & Coordination - Home | Electric Power Engineers · System Protection & Coordination plans are executed by Electric Power Engineers on a regular basis. These plans include

[email protected]

Protection & Coordination

Description:

The initial short-circuit/protection coordination study should

be done when a power system is first designed. ... Expansion

and growth of a facility will typically result in additional

electrical equipment such as circuit breakers, motor control

centers, transformers, and cables.

System Protection & Coordination plans are executed by

Electric Power Engineers on a regular basis. These plans

include calculating short circuit currents, sizing and locating

fuses and reclosers, preparing three-phase recloser settings,

securing RUS approvals (when applicable)