Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report 1. Progress on Key Performance Parameters 2. Understanding limitations during LEPS operation 3. Carrier02 Rev. C (with O-E-M improvements) 4. Pre-production tasks/schedule

Transcript of Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and...

Page 1: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Prospect and Plan for IRS3B Readout

Toru IijimaAug. 21, 2013 KEKB Steering Committee report

1. Progress on Key Performance Parameters

2. Understanding limitations during LEPS operation

3. Carrier02 Rev. C (with O-E-M improvements)

4. Pre-production tasks/schedule

Page 2: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

IRS3B-based Readout Overview

8k channels1k 8-ch. ASICs

64 SRM “board stacks”

64 DAQ fiber transceivers

32 FINESSE8 COPPER

FTSW clock, trigger, programming

Waveform sampling ASIC

Clock jitter cleaners

64 SRM

8 COPPER

32 FINESSE

UT3 Trigger module

16 FTSW

2

Page 3: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Executive Summary• After commissioning/learning period, now obtaining electronics resolutions commensurate with stated minimum requirements (<100ps timing)

• Still room to improve: Processing: timebase cal, leading edge timing extraction Board improvements: sampling timebase, gain, risetime

• Rev. C Carrier boards [improved mechanics, amplifiers, signal coupling] being assembled, testing soon

• IRS3C [extended dynamic range] due this week

• Details in subsequent slides3

Page 4: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Board Stack #37 single photon timing, no ADC cuts, no modifications from LEPS configuration

106/128 channels(some missing to be added –missed first pass)

<100ps average once CAMAC contribution removed (not relevant for Belle II)

4

Page 5: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

As understood from simulation

5

Page 6: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Channels within same ASIC similar –common timing/timebase issue

If dominated by DAC/VadjN jitter, should see clear dependence…6

Page 7: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

And it is clearly observed

7

Example channel

Ensemble distribution, No ADC cuts

Probably a combination of jitter (noise on VadjN) and coarseness of DAC [under study]

Page 8: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Pedagogical slides about timing…• Space-time correlations

8

Beam Test Data

Page 9: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

• For large amplitude, corresponding to the tight cuts applied, and assuming (“120ps” width)…

9

About LEPS timing current status… (work in progress)

Sqrt([120ps]2 + [100ps] 2) ~ 156 ps

Electronics contribution

Page 10: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Performance Requirements (TOP)• Single photon timing for MCP-PMTs

σ ~ 38.4ps

σ <~ 10ps(ideal waveform

sampling)

NIM A602 (2009) 438

σ <= 100ps 1% impact

σ <~ 50ps target

To include T0, clock distrib, timebase ctrl

NOTE: this is single-photon timing, notevent start-time “T0”

σT0 = 25ps

10

Page 11: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

• 100ps is min. required for Key Performance Parameters (50ps target)

11

Electronics contribution

Page 12: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

TOP Electronics Production Schedule

12

Install and operate completed modules in Fuji CRT

3+ TOP modules of readout possible(when actual modules ready?)

Window for a “final electro-mech-optical” qualification beam test

Enough ASICs, Rev. C or D (final, dual-stage amp), SCROD Rev. C (?)

Page 13: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

carrier02 revC improvements

received PCBs last weekassembly to begin imminentlywill have assembled boards by end of August

new VadjN/P filtering

new thermal wall connections

new 16 bit DAC with series resistance

13

Page 14: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Status and Prospects• Have achieved Key Performance Parameters over entire IRS3B-based readout module used in beam test; this is only minimum, <=50ps looks achievable

•Will fabricate/populate Carrier02 [IRS3B limited] so can have spares and distribute for testing elsewhere – improved thermo-mechanics

• IRS3C drop-in for IRS3B [extended dynamic range]

• Demonstrate true timing limits 14

Page 15: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Backup

15

Page 16: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Development Timeline (next steps)

16

HardwareDates Milestone(s)

Summer ‘11 –Winter 12

Spring ‘12 –Winter 12

< Spring ‘11 Prototyping

FNAL beamtest

Semi-infinite reviews

Spring ‘13 –Summer 13

LEPS beamtest

Autumn ‘13 v. 3 IRS3C/IRSX v.1 RT recon FINv2, final boardstack

Phas

e 1

Phas

e 2

Page 17: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Comparison IRS3B “toy” Monte Carlo

17

Vpeak 100 ADCRisetime 2.7 nsSampling rate 2.72 Gsa/snom dT 0.368 nsnom dV 13.617 ADC/sample

sSNR = dV/noise

40% CFD ratio: Applied between 2 points on leading edge that bracket this transition

~44ps for 100mV peak, 2mV noise

Leading Edge time [ns]

Page 18: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

In general, noise ‘fixed’

18

40% CFD ratio

Noise 2.4 ADCRisetime 2.7 nsSampling rate 2.72 Gsa/snom dT 0.368 ns

Even in ideal case, for only using 2 points on leading edge, need Vpeak >= 50 ADC to get below 100ps timing

(gain issue)

If no other contributions, would be < 50ps for >100 ADC

Page 19: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Adding in realistic degradations

19

40% CFD ratio

What effects still missing?

• Residual Timebasejitter ?

• Non-linearity on leading edge?

• Something else ?

Page 20: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Adding in realistic degradations (II)

20

What effects still missing?

Modest non-linearity doesn’t make a big difference

Amplifier noise? (doesn’t impact pulser or sine data)

Page 21: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Ways to improve (short-term)1. Increase gain (straightforward)2. Add Voltage Regulator to amplifier power

3. Increase risetime

4. Add better VdlyN, VdlyP filtering (reduce timebase filter)

21

All these to be improved on Carrier02 Thermo-mech prototype (boards have been fabricated, being assembled) Final mechanics after tests with new HV, front/PMT interface (final board-stack w/IRSX)

Page 22: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

One example: improved Risetime

22

Vpeak 100 ADCRisetime 1.0 nsSampling rate 2.72 Gsa/snom dT 0.368 nsnom dV 13.617 ADC/sample

40% CFD ratio

Now < 100ps for ADC>30 (with no other changes)

But will boost gain also

Page 23: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Improvements to carrier02 √ Will populate with improved amplifiers √ add series resistor and capacitors to VadjN/VadjP (10

Ohm+200pF+47nF+2uF) √ exchange SMA connectors for MMCX √ exchange 12 bit external DAC for 16 bit one in same

series √ re-visit c02 wiring to allow powering entire boardstack

with just one cable √ extend width of boards and add holes for new thermal

wall structure concept √ swap ASIC regulator for one with a shutdown featurefull list at http://www.phys.hawaii.edu/~mza/PCB/iTOP/boardstack-v3.html

23

Page 24: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Layout of carrier02 revC

design posted at: http://www.phys.hawaii.edu/~mza/PCB/iTOP/carriers/index.html

Improved –pin-tie thermal stack

24

Page 25: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

2.72 ns risetime 1.45 ns risetime

2-stage prototype Amp

Optimization study ongoing …25

Page 26: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

80fC injected charge

<1 ns risetime

2-stage prototype Amp -- measurements

Some care required to avoid oscillations..

26

170mV peak(~250-300 ADC counts)

Page 27: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

new circuit (OPA847, 2.4k feedback)

Simulation indicates -- prior to changing layout radically (2x stage design), can already improve amplitude/risetime by switching to LHM6629 (single stage)

Need to confirm stability – will populate first batch with this circuit

For Rev C Carrier02

27

Page 28: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

original circuit (OPA846, 6k feedback)

new circuit (OPA847, 2.4k feedback)

2.72 ns risetime 1.45 ns risetime

Optimizing gain, risetime for “drop in” amp

Previous measurements…28

Page 29: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

original circuit (OPA846, 6k feedback)

new circuit (OPA847, 2.4k feedback)

2.72 ns risetime 1.45 ns risetime

Optimizing gain, risetime for “drop in” amp

Optimization study ongoing …29

Page 30: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Next steps: IRS3C & IRSX ASICsIRS3C = IRS3B + 2 small changes

Exploit lessons learned from TARGET[i] series development, other ASICs

30

Example: linearity improvement

IRSX design review (September – if ready)

(in fab – due imminently)

2X dynamic range,Greatly improved linearity

Page 31: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

31

Expectations – matched to measurements

J-F Genat, G. Varner, F. Tang, H. FrischNIM A607 (2009) 387-393.

G. Varner and L. RuckmanNIM A602 (2009) 438-445.

1GHz analog bandwidth, 5GSa/s

Simulation includes MCP response

• Noise/amplitude• Non-linearity• Timebase non-uniformity

Page 32: Prospect and Plan for IRS3B Readout - University of Hawaiiidlab/taskAndSchedule/... · Prospect and Plan for IRS3B Readout Toru Iijima Aug. 21, 2013 KEKB Steering Committee report.

Simple estimate based upon trigger threshold dependenceUse as cross-check for detailed fit estimate, though robust (insensitive to laser coupling/optical fiber alignment)

Trigger Efficiency estimate

32