PROPOSED UPLAND LANDFILL HYDROGEOLOGICAL REVIEW …...tp3-17 tp5-17 tp9-17 tp8-17 tp7-17 tp4-17...

28
PROPOSED UPLAND LANDFILL HYDROGEOLOGICAL REVIEW BY GW SOLUTIONS Victoria, October 6, 2017 1

Transcript of PROPOSED UPLAND LANDFILL HYDROGEOLOGICAL REVIEW …...tp3-17 tp5-17 tp9-17 tp8-17 tp7-17 tp4-17...

  • PROPOSED UPLAND LANDFILL

    HYDROGEOLOGICAL REVIEW BY

    GW SOLUTIONS

    Victoria, October 6, 2017

    1

  • OUTLINE

    Setting

    Sensitive Receptors - Issues

    Completed Work

    Remaining Questions

    2

  • OUTLINE

    Setting

    3

  • 44km

    Image©2017DigitalGlobe

    Image©2017DigitalGlobe

    Image©2017DigitalGlobe

    ©2017Google

    ©2017Google

    ©2017Google

    Image©2017IMTCAN

    Image©2017IMTCAN

    Image©2017IMTCAN

    Rico Lake

    Campbell River Water Intake

    Cold Creek

    Quinsam River Hatchery

    Quinsam River

    McIvor Lake

    John Hart Lake

    Campbell River

    Uplands Landfill

  • 5

    Rico Lake

    Cold Creek

    Quinsam River Hatchery

    Groundwater flow

  • 6

    !(Ó

    Cold

    Creek

    McIvorLake

    RicoLake

    CampbellLake

    John HartLake

    Fli n tof fCreek

    Casey Cr

    eek

    Wil low Creek

    Qui nsamRiver

    Sno wdonCree

    k

    High

    way

    28Inland Island H

    ighway

    Inla

    ndIs

    land

    Hig

    hway847 IIB (8)

    975 IIA (10)

    976 IIC (7)

    FIGURE 2.1

    088877-03 May 23, 2017

    GIS File: Q:\GIS\PROJECTS\88000s\88877\Layouts\009\88877-03(009)GIS-OT006.mxd

    DRAINAGE MAP

    Source: CanVec Edition 1.1 © Department of Natural Resources Canada. All rights reserved. National Road Network 2.0 GeoBaseCoordinate System: NAD 1983 UTM Zone 10N

    UPLANDS EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    SITE

    0 600 1,200 1,800

    Meters

    LegendAquifer Demand

    Unconsolidated Medium Productivity

    Unconsolidated Low Productivity

    Wetland

    Watercourse

    Manmade Hydrographic Entity (Dam)

    !(Ó Quinsam River Hatchery975 IIA (10) - Aquifer Name975 - Aquifer TagIIC - Aquifer Classification

    CAMPBELL RIVER

    Ladore Dam

    John HartDam

    Mapped Aquifers and Drainage

    Map provided by Uplands

  • 7

    !(Ó

    Cold

    Creek

    McIvorLake

    RicoLake

    CampbellLake

    John HartLake

    Fli n tof fCreek

    Casey Cr

    eek

    Wil low Creek

    Qui nsamRiver

    Sno wdonCree

    k

    High

    way

    28Inland Island H

    ighway

    Inla

    ndIs

    land

    Hig

    hway847 IIB (8)

    975 IIA (10)

    976 IIC (7)

    FIGURE 2.1

    088877-03 May 23, 2017

    GIS File: Q:\GIS\PROJECTS\88000s\88877\Layouts\009\88877-03(009)GIS-OT006.mxd

    DRAINAGE MAP

    Source: CanVec Edition 1.1 © Department of Natural Resources Canada. All rights reserved. National Road Network 2.0 GeoBaseCoordinate System: NAD 1983 UTM Zone 10N

    UPLANDS EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    SITE

    0 600 1,200 1,800

    Meters

    LegendAquifer Demand

    Unconsolidated Medium Productivity

    Unconsolidated Low Productivity

    Wetland

    Watercourse

    Manmade Hydrographic Entity (Dam)

    !(Ó Quinsam River Hatchery975 IIA (10) - Aquifer Name975 - Aquifer TagIIC - Aquifer Classification

    CAMPBELL RIVER

    Ladore Dam

    John HartDam

    ?

    Unknown Aquifers and Groundwater Regime

  • 8

    GOLD R

    IVER H

    IGHWA

    Y

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    LOT C

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    PLAN 42515

    524.777m 271-28-27231.223m 271-28-27

    244.

    553m

    2-2

    2-42

    243.

    443m

    2-2

    2-42

    301.764m

    65-58-15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    +M

    FUEL TANK

    S

    2015-2017 PRODUCTION AREA

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    2015 - 2018PRODUCTION AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    LEGENDEXISTING MAJOR CONTOURS

    EXISTING MINOR CONTOUR

    PROPERTY LINE

    EXISTING LAKE

    EXISTING ACCESS ROADWAY

    165.00

    CAD File: 88877-02(002)GN-WA010.DWG

    May 17, 2016

    88877-02

    FIGURE 1.1

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    SITE PLAN

    SOURCE: TOPOGRAPHICAL SURVEY CONDUCTED BY UPLAND CONTRACTING LTD., JANUARY 29 2015

    0 40 80 120m 0.25

    LIMIT OF EXCAVATION FOR PROPOSED LANDFILL

    LIMIT OF WASTE FOR PROPOSED LANDFILL

    Proposed Landfill

  • 9

    C a m p b e l l R i v e r

    W a t e r s h e d

    Q u i n s a mR i v e r

    W a t e r s h e d

    Argonaut Road

    Highway

    28

    0 100 200 300

    Meters

    FIGURE 2.0B

    88877-03 May 24, 2017

    GIS File: Q:\GIS\PROJECTS\88000s\88877\Layouts\009\88877-03(009)GIS-WA003.mxd

    LOCAL WATERSHED MAP(ACCORDING TO AERIAL SITE SURVEY ELEVATIONS)

    Legend

    Limit of Waste

    Property Line

    Excavated Pit Area (Infiltration to Groundwater)

    Extent of Site Aerial Survey (2010-11-16)

    General Surface Water Flow Direction

    Survey Watershed Boundary

    Inferred Watershed Boundary

    Freshwater Atlas Watershed Boundary

    Catchments

    Quinsam River Watershed (Flows Towards Pitand Infiltrates Ground)

    Quinsam River Watershed (Flows East)

    Campbell River Watershed (Flows West)

    Coordinate System:NAD 1983 UTM Zone 10N

    Sources: CanVec Edition 1.1 © Department of Natural Resources Canada, all rights reserved. National Road Network 2.0 GeoBase. Air photo: © TerraServer, captured September 12th 2014.Watershed Boundaries (Campbell River & Quinsam River) from BC Freshwater Atlas, 2016. Freshwater Atlas derives watershed boundaries from 1:20,000 TRIM elevations. Watershed boundary through and adjacent to property line reflects field observations & on-site aerial survey completed on 2010-11-16.

    UPLANDS EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    Estimated Drainage

  • OUTLINE

    Setting

    Sensitive Receptors - Issues

    10

  • 114km

    Image©2017DigitalGlobe

    Image©2017DigitalGlobe

    Image©2017DigitalGlobe

    ©2017Google

    ©2017Google

    ©2017Google

    Image©2017IMTCAN

    Image©2017IMTCAN

    Image©2017IMTCAN

    Rico Lake Drinking

    Water

    Campbell River Water Intake

    Cold CreekQuinsam River

    Hatchery

    Quinsam River

    McIvor Lake

    John Hart Lake

    Campbell River

    Sensitive Receptors

    Aquatic Ecosystems

  • OUTLINE

    Setting

    Sensitive Receptors - Issues

    Completed Work

    12

  • 13

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    244.

    553m

    2-2

    2-42

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    2015-2017 PRODUCTION AREA

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    2015 - 2018PRODUCTION AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    SW15-02

    BH1-16

    SW15-01(APPROXIMATELY1 KM NORTH)

    RICO GAUGE

    SW16-03

    MW5A-15

    MW7-17

    MW6-17

    BH2-16

    MW3-14

    BH5-15MW5B-15

    MW10-17

    MW2-14MW4A-15

    RW-98020

    MW9-17

    MW8-17

    MW1-14

    LOT C

    PLAN 42515

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    K&D CONTRACTING LTD.

    PROPOSED INFILTRATION POND

    PROPOSED AERATION PONDMW4B-15

    MW2A-16

    TP2-17

    TP1-17

    TP3-17

    TP5-17

    TP9-17

    TP8-17

    TP7-17TP4-17

    TP6-17

    RW-98020

    0 40 80 120m 0.25

    CAD File: 88877-03(009)GN-WA004.DWG

    May 23, 2017

    88877-03

    FIGURE 1.4

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    MONITORING LOCATIONS

    LEGEND

    EXISTING ACCESS ROADWAY

    RESIDENTIAL WELL

    SURFACE WATER SAMPLE LOCATIONSW15-01

    RICO GAUGE SURFACE WATER GAUGE

    LIMIT OF EXCAVATION FOR PROPOSED LANDFILL

    LIMIT OF WASTE FOR PROPOSED LANDFILL

    EXISTING BOREHOLE

    ABANDONED BOREHOLEBH5-15

    BH1-16

    SOURCE: TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATES LAND SURVEYING LTD., NOVEMBER 21, 2016.

    EXISTING MONITORING WELLMW6-17

    EXISTING LAKE

    EXISTING MAJOR CONTOURS (m AMSL)

    EXISTING MINOR CONTOUR (m AMSL)

    UPLAND EXCAVATING LTD. PROPERTY LINE

    165.00

    TP1-17 TEST PIT LOCATION

  • 14

    LOT C

    PLAN 42515

    K&D CONTRACTING LTD.

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    2015-2017 PRODUCTION AREA

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    2015 - 2018PRODUCTION AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    *

    BH1-16145.3

    MW2-14

    *

    *

    *

    *

    BH5-15

    110 OIP

    244.

    553m

    2-2

    2-42

    152

    150

    150180

    192

    BH2-16153.80

    MW5B-15*

    MW4A-15150.25

    *

    182.07183.16

    183.53

    180

    152

    190 188186 184

    184188

    19217

    6

    174

    182

    184.06

    MW10-17

  • 15

    LOT C

    PLAN 42515

    K&D CONTRACTING LTD.

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    244.

    553m

    2-2

    2-42

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    BH2-16

    BH1-16

    178

    178

    *

    **

    EXPLOSIVES SHELTER

    PROPOSED INFILTRATION POND

    PROPOSED AERATION POND

    EXPLOSIVES SHELTER

    MW2-14158.0

    MW5B-15185.9

    MW5A-15184.2

    MW1-14165.2

    RW-98020179.9

    MW9-17167.2

    BH5-15

    MW7-17184.6

    2015-2017 PRODUCTION AREA

    176

    176

    174

    174

    172

    172

    170

    170

    168

    168

    166

    166

    164

    164

    162

    162

    160

    160

    158

    158

    156

    156

    154

    154

    152

    152

    150

    150

    MW3-14156.4

    MW10-17150.1

    MW2A-16158.1

    MW4B-15163.6

    MW8-17172.8

    MW6-17177.9

    MW4A-15165.9

    *

    180

    (MEASURED AT LADORE DAM177.6LOCATED APPROX. 1.7km NW)

    (2)

    RICO GAUGE180.4

    2015 - 2018PRODUCTION AREA

    RW-98020

    MW3-14

    0 40 80 120m 0.25

    CAD File: 88877-03(009)GN-WA001.DWG

    May 23, 2017

    88877-03

    FIGURE 2.9

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    GROUNDWATER ELEVATION CONTOURSSAND & GRAVEL AQUIFER - APRIL 6, 2017

    LEGEND

    EXISTING ACCESS ROADWAY

    EXISTING MONITORING WELL

    RESIDENTIAL WELL

    RICO GAUGE SURFACE WATER GAUGE

    LIMIT OF EXCAVATION FOR PROPOSED LANDFILL

    LIMIT OF WASTE FOR PROPOSED LANDFILL

    EXISTING BOREHOLE

    ABANDONED BOREHOLEBH5-15BH1-16

    GROUNDWATER ELEVATION (m AMSL)

    GROUNDWATER CONTOUR (m AMSL)

    172.8

    170

    SOURCE: TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATES LAND SURVEYING LTD., NOVEMBER 21, 2016.

    GROUNDWATER FLOW DIRECTION

    NOT USED IN CONTOURING

    NOTES:1. RW-98020 WATER ELEVATION WAS MEASURED FEBRUARY 15, 2016.

    *MW4A-15165.9

    INFERRED GROUNDWATER CONTOUR (m AMSL)178APPROXIMATE GROUNDWATER DIVIDEEXISTING LAKE

    EXISTING MAJOR CONTOURS (m AMSL)

    EXISTING MINOR CONTOUR (m AMSL)

    UPLAND EXCAVATING LTD. PROPERTY LINE

    165.00

    2. BASED ON BC HYDRO RECORD OF WATER ELEVATIONS AT LADORE DAM RECORDED EVERY 3 HOURS. (https://www.bchydro.com/energy-in-bc/our_system/transmission_reservoir_data/previous_reservoir_elevations/vancouver_island/ladore_ldr.html)

  • 16

    ELE

    VA

    TIO

    N (m

    AM

    SL)

    ELE

    VA

    TIO

    N (m

    AM

    SL)

    0+00

    0

    0+05

    0

    0+10

    0

    0+15

    0

    0+20

    0

    0+25

    0

    0+30

    0

    0+35

    0

    0+40

    0

    150

    155

    160

    165

    170

    175

    150

    155

    160

    165

    170

    175

    DNORTHWEST

    D'SOUTHEAST

    145145

    140140

    135135

    130130

    125125

    MW

    3-14

    BH

    2-16

    LIM

    IT O

    F E

    CA

    VA

    TIO

    N

    ED

    GE

    OF

    RO

    AD

    FOR

    PR

    OP

    OS

    ED

    LA

    ND

    FILL

    ED

    GE

    OF

    RO

    AD

    ED

    GE

    OF

    RO

    AD

    ED

    GE

    OF

    RO

    AD

    LIM

    IT O

    F E

    CA

    VA

    TIO

    NFO

    R P

    RO

    PO

    SE

    D L

    AN

    DFI

    LL

    MW

    4A-1

    5

    ED

    GE

    OF

    RO

    AD

    HORZ 1:3000SECTION D-D'

    figure 2.2VERT 1:750

    180

    185

    190

    195

    180

    185

    190

    195

    LIM

    IT O

    F W

    AS

    TE F

    OR

    PR

    OP

    OS

    ED

    LA

    ND

    FILL

    MW

    4B-1

    5

    BO

    UN

    DA

    RY

    ED

    GE

    OF

    RO

    AD

    ED

    GE

    OF

    RO

    AD

    0+45

    0

    0+50

    0

    0+55

    0

    0+60

    0

    0+65

    0

    0+70

    0

    0+75

    0

    0+80

    0

    MW

    10-1

    7

    120

    115

    110

    105

    100

    120

    115

    110

    105

    100

    PR

    OP

    ER

    TY

    LIM

    IT O

    F W

    AS

    TE F

    OR

    PR

    OP

    OS

    ED

    LA

    ND

    FILL

    McI

    VO

    R L

    AK

    E

    ED

    GE

    OF

    RO

    ADG

    OLD

    RIV

    ER

    HIG

    HW

    AY

    MW

    6-17

    0+85

    0

    0+90

    0

    0+95

    0

    0+10

    00

    0+10

    50

    CAD File: P:\drawings\88000s\88877\88877 - REPORTS\88877-03(009)\88877-03(009)GN\88877-03(009)GN-WA006.DWG

    May 23, 2017

    88877-03

    FIGURE 2.6

    UPLAND EXCVAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    CROSS-SECTION D-D'

    LEGENDSAND AND GRAVEL

    SANDY SILT

    BEDROCK (BASALT)

    SCREEN INTERVAL

    WATER LEVEL (m AMSL) (APRIL 6, 2017)

  • 17

    BH

    2-1

    6

    MW

    4A

    -15

    MW

    4B

    -15

    AC

    CE

    SS

    RO

    AD

    PRECIPITATION

    AC

    CE

    SS

    RO

    AD

    GO

    LD

    RIV

    ER

    HIG

    HW

    AY

    McIV

    OR

    LA

    KE

    AC

    CE

    SS

    RO

    AD

    UPLANDS EXCAVATING SITE

    RIC

    O L

    AK

    E

    PRECIPITATION

    MW

    5A

    -15

    (Off

    se

    t)

    RW

    -98

    02

    0

    (Off

    se

    t)

    RIC

    O G

    AU

    GE

    WATERSHED DIVIDE

    (BEDROCK OUTCROP

    AREAS)

    BEDROCK UNSATURATED

    SATURATED

    SAND

    AND

    GRAVEL

    NOT TO SCALE

    GROUNDWATER INFLOW

    OUT OF PAGE FROM

    McIVOR LAKE

    WEST SOUTHEAST

    QUINSAM RIVER

    WATERSHED

    DISCHARGE TO

    GROUNDWATER

    CAD File: 88877-03(009)GN-WA008.DWG

    May 23, 2017

    88877-03

    FIGURE 3.0C

    UPLAND EXCAVATING LTD.

    PROPOSED UPLAND LANDFILL

    HYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    CONCEPTUAL FLOW MODEL -

    SCHEMATIC CROSS-SECTION - WEST-SOUTHEAST

    NOTES:1. ONSITE TOPOGRAPHY IS BASED ON THE TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATE LAND SURVEYING LTD., NOVEMBER 21, 2016.2. OFFSITE TOPOGRAPHY HAS BEEN ESTIMATED USING ESRI TOPOGRAPHIC BASEMAP, ACCESSED 2017; BRITISH COLUMBIA MINISTRY OF ENVIRONMENT,

    WATER PROTECTION AND SUSTAINABILITY BRANCH, SEPTEMBER 11, 2014.3. RICO LAKE IS APPROXIMATELY 12 M DEEP (LAKE BOTTOM IS AT 168 mAMSL) - MEASURED BY CAMPBELL RIVER ENVIRONMENTAL COMMITTEE.4. ALL LOCATIONS ARE APPROXIMATE AND MEANT TO DEMONSTRATE CONCEPTUAL FLOW DIRECTION.

    LEGEND

    SAND AND GRAVEL

    SURFACE WATER

    BEDROCK

    SCREEN INTERVAL

    WATER LEVEL

    FLOW DIRECTION

  • 18

    NORTH SOUTHEAST

    MW

    3-14

    BH

    2-16

    AC

    CE

    SS

    RO

    AD

    MW

    4A-1

    5M

    W4B

    -15

    MW

    8-17

    AC

    CE

    SS

    RO

    AD

    MW

    10-1

    7

    AC

    CE

    SS

    RO

    AD

    AC

    CE

    SS

    RO

    AD

    AC

    CE

    SS

    RO

    AD

    GO

    LD R

    IVE

    R H

    IGH

    WA

    Y

    McI

    VO

    R L

    AK

    E

    UPLANDS EXCAVATING SITE

    PRECIPITATION

    PRECIPITATION

    BEDROCK

    UNSATURATED

    SATURATED

    SANDAND

    GRAVELSAND AND GRAVELVERY DENSE

    DISCHARGE TOQUINSAM RIVER

    NOT TO SCALE

    BEDROCKINFERRED

    BEDROCKINFERRED

    WATERSHED

    500m FROMPROPERTY

    LINE

    GROUNDWATERSAND AND GRAVEL

    CAD File: 88877-03(009)GN-WA008.DWG

    May 23, 2017

    88877-03

    FIGURE 3.0B

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    CONCEPTUAL FLOW MODEL -SCHEMATIC CROSS-SECTION - NORTH-SOUTHEAST

    NOTES:1. ONSITE TOPOGRAPHY IS BASED ON THE TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATE LAND SURVEYING LTD., NOVEMBER 21, 2016.2. OFFSITE TOPOGRAPHY HAS BEEN ESTIMATED USING ESRI TOPOGRAPHIC BASEMAP, ACCESSED 2017; BRITISH COLUMBIA MINISTRY OF ENVIRONMENT,

    WATER PROTECTION AND SUSTAINABILITY BRANCH, SEPTEMBER 11, 2014.3. ALL LOCATIONS ARE APPROXIMATE AND MEANT TO DEMONSTRATE CONCEPTUAL FLOW DIRECTION.

    LEGEND

    SAND AND GRAVEL

    SURFACE WATER

    BEDROCK

    SCREEN INTERVAL

    WATER LEVEL

    FLOW DIRECTIONINFERRED BEDROCK

  • 19

    LIMIT OF EXCAVATION

    LIMIT OF WASTE

    RICO GAUGE

    BH5-15

    GOLD

    RIVE

    R HI

    GHWA

    Y

    2047-R

    LOT A

    PLAN 42515

    632m

    2

    -35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    LOT C

    SHOP

    SHED

    104 OIP

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    PLAN 42515

    524.777m 271-28-27

    231.223m 271-28-27

    244.5

    53m

    2-2

    2-4

    2

    243.4

    43m

    2-2

    2-4

    2

    301.76

    4m 65

    -58-15

    137m 136-50-24

    +

    + M

    FUEL TA

    NKS

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    2015 - 2018

    PRODUCTION AREA

    McIVOR LAKE

    ARGONAUT ROAD

    LOT A

    PLAN 30709

    RICO LAKE

    WEIGHSCALE

    112 OIP

    SETTLING PONDS

    WASH PLANT

    OFFICE

    SW15-02

    BH1-16

    SW15-01(APPROXIMATELY1 KM NORTH)

    MW5A-15

    MW7-17

    MW6-17

    BH2-16

    MW3-14

    MW5B-15

    MW10-17

    MW4A-15

    RW-98020

    MW9-17

    MW8-17

    MW1-14

    MW4B-15

    STORAGEAREA

    STORAGEAREA

    STORAGEAREA

    STORAGEAREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    236.23

    6m 65

    -58-15

    MW2-14 MW2A-16

    MW13

    MW11MW12

    LEGEND

    EXISTING MAJOR CONTOURS

    EXISTING MINOR CONTOUR

    PROPERTY LINE

    EXISTING LAKE

    EXISTING ACCESS ROADWAY

    LIMIT OF WASTE

    LIMIT OF EXCAVATION

    TREES/VEGETATION

    EXISTING MONITORING WELL

    RESIDENTIAL WELL

    EXISTING BOREHOLE

    ABANDONED BOREHOLE

    SURFACE WATER SAMPLE LOCATION

    SURFACE WATER GAUGE

    MW3-14

    BH5-15

    SW15-01

    BH5-15

    RICO GAUGE

    RW-98020

    MONITORING WELL INCLUDED IN PROPOSEDENVIRONMENTAL MONITORING PROGRAM

    APPROXIMATE LOCATION OF PROPOSED MONITORINGWELL INCLUDED IN PROPOSED ENVIRONMENTALMONITORING PROGRAM (DURING LANDFILL OPERATIONS)

    MW2-14

    MW12

    CAD File: P:\drawings\88000s\88877\88877 - REPORTS\88877-03(010)\88877-03(010)GN\88877-03(010)GN-WA005.DWG

    May 31, 2017

    88877-03

    FIGURE 14.1

    UPLAND EXCAVATING LIMITEDPROPOSED UPLAND LANDFILL2017 DESIGN, OPERATION, AND CLOSURE PLAN

    ENVIRONMENTAL MONITORING PROGRAMPROPOSED MONITORING LOCATIONS

    0 40 80 120m 1-4000

    SOURCES:TOPOGRAPHICAL SURVEY CONDUCTED BY UPLANDCONTRACTING LTD., JANUARY 29 2015TOPOGRAPHIC SURVEY PLAN OF UPLANDS EXCAVATINGGRAVEL PIT CONDUCTED BY McELHANNEY ASSOCIATES LANDSURVEYING LTD. COMPLETED ON NOVEMBER 21ST, 2016.

    Proposed Long-term Monitoring

  • OUTLINE

    Setting

    Sensitive Receptors - Issues

    Completed Work

    Remaining Questions

    20

  • 21

    !(Ó

    Cold

    Creek

    McIvorLake

    RicoLake

    CampbellLake

    John HartLake

    Fli n tof fCreek

    Casey Cr

    eek

    Wil low Creek

    Qui nsamRiver

    Sno wdonCree

    k

    High

    way

    28

    Inland Island Highw

    ay

    Inla

    ndIs

    land

    Hig

    hway847 IIB (8)

    975 IIA (10)

    976 IIC (7)

    FIGURE 2.1

    088877-03 May 23, 2017

    GIS File: Q:\GIS\PROJECTS\88000s\88877\Layouts\009\88877-03(009)GIS-OT006.mxd

    DRAINAGE MAP

    Source: CanVec Edition 1.1 © Department of Natural Resources Canada. All rights reserved. National Road Network 2.0 GeoBaseCoordinate System: NAD 1983 UTM Zone 10N

    UPLANDS EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    SITE

    0 600 1,200 1,800

    Meters

    LegendAquifer Demand

    Unconsolidated Medium Productivity

    Unconsolidated Low Productivity

    Wetland

    Watercourse

    Manmade Hydrographic Entity (Dam)

    !(Ó Quinsam River Hatchery975 IIA (10) - Aquifer Name975 - Aquifer TagIIC - Aquifer Classification

    CAMPBELL RIVER

    Ladore Dam

    John HartDam

    ?

    Connection of the Site with Regional Groundwater

    Connection of the Site to Regional Groundwater

    ?

    ?

    ?

    ?

  • 22

    BH

    2-1

    6

    MW

    4A

    -15

    MW

    4B

    -15

    AC

    CE

    SS

    RO

    AD

    PRECIPITATION

    AC

    CE

    SS

    RO

    AD

    GO

    LD

    RIV

    ER

    HIG

    HW

    AY

    McIV

    OR

    LA

    KE

    AC

    CE

    SS

    RO

    AD

    UPLANDS EXCAVATING SITE

    RIC

    O L

    AK

    E

    PRECIPITATION

    MW

    5A

    -15

    (Off

    se

    t)

    RW

    -98

    02

    0

    (Off

    se

    t)

    RIC

    O G

    AU

    GE

    WATERSHED DIVIDE

    (BEDROCK OUTCROP

    AREAS)

    BEDROCK UNSATURATED

    SATURATED

    SAND

    AND

    GRAVEL

    NOT TO SCALE

    GROUNDWATER INFLOW

    OUT OF PAGE FROM

    McIVOR LAKE

    WEST SOUTHEAST

    QUINSAM RIVER

    WATERSHED

    DISCHARGE TO

    GROUNDWATER

    CAD File: 88877-03(009)GN-WA008.DWG

    May 23, 2017

    88877-03

    FIGURE 3.0C

    UPLAND EXCAVATING LTD.

    PROPOSED UPLAND LANDFILL

    HYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    CONCEPTUAL FLOW MODEL -

    SCHEMATIC CROSS-SECTION - WEST-SOUTHEAST

    NOTES:1. ONSITE TOPOGRAPHY IS BASED ON THE TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATE LAND SURVEYING LTD., NOVEMBER 21, 2016.2. OFFSITE TOPOGRAPHY HAS BEEN ESTIMATED USING ESRI TOPOGRAPHIC BASEMAP, ACCESSED 2017; BRITISH COLUMBIA MINISTRY OF ENVIRONMENT,

    WATER PROTECTION AND SUSTAINABILITY BRANCH, SEPTEMBER 11, 2014.3. RICO LAKE IS APPROXIMATELY 12 M DEEP (LAKE BOTTOM IS AT 168 mAMSL) - MEASURED BY CAMPBELL RIVER ENVIRONMENTAL COMMITTEE.4. ALL LOCATIONS ARE APPROXIMATE AND MEANT TO DEMONSTRATE CONCEPTUAL FLOW DIRECTION.

    LEGEND

    SAND AND GRAVEL

    SURFACE WATER

    BEDROCK

    SCREEN INTERVAL

    WATER LEVEL

    FLOW DIRECTION

    Groundwater Flow in Fractured Bedrock Aquifer

  • 23

    LOT C

    PLAN 42515

    K&D CONTRACTING LTD.

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    244.

    553m

    2-2

    2-42

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    BH2-16

    BH1-16

    178

    178

    *

    **

    EXPLOSIVES SHELTER

    PROPOSED INFILTRATION POND

    PROPOSED AERATION POND

    EXPLOSIVES SHELTER

    MW2-14158.0

    MW5B-15185.9

    MW5A-15184.2

    MW1-14165.2

    RW-98020179.9

    MW9-17167.2

    BH5-15

    MW7-17184.6

    2015-2017 PRODUCTION AREA

    176

    176

    174

    174

    172

    172

    170

    170

    168

    168

    166

    166

    164

    164

    162

    162

    160

    160

    158

    158

    156

    156

    154

    154

    152

    152

    150

    150

    MW3-14156.4

    MW10-17150.1

    MW2A-16158.1

    MW4B-15163.6

    MW8-17172.8

    MW6-17177.9

    MW4A-15165.9

    *

    180

    (MEASURED AT LADORE DAM177.6LOCATED APPROX. 1.7km NW)

    (2)

    RICO GAUGE180.4

    2015 - 2018PRODUCTION AREA

    RW-98020

    MW3-14

    0 40 80 120m 0.25

    CAD File: 88877-03(009)GN-WA001.DWG

    May 23, 2017

    88877-03

    FIGURE 2.9

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    GROUNDWATER ELEVATION CONTOURSSAND & GRAVEL AQUIFER - APRIL 6, 2017

    LEGEND

    EXISTING ACCESS ROADWAY

    EXISTING MONITORING WELL

    RESIDENTIAL WELL

    RICO GAUGE SURFACE WATER GAUGE

    LIMIT OF EXCAVATION FOR PROPOSED LANDFILL

    LIMIT OF WASTE FOR PROPOSED LANDFILL

    EXISTING BOREHOLE

    ABANDONED BOREHOLEBH5-15BH1-16

    GROUNDWATER ELEVATION (m AMSL)

    GROUNDWATER CONTOUR (m AMSL)

    172.8

    170

    SOURCE: TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATES LAND SURVEYING LTD., NOVEMBER 21, 2016.

    GROUNDWATER FLOW DIRECTION

    NOT USED IN CONTOURING

    NOTES:1. RW-98020 WATER ELEVATION WAS MEASURED FEBRUARY 15, 2016.

    *MW4A-15165.9

    INFERRED GROUNDWATER CONTOUR (m AMSL)178APPROXIMATE GROUNDWATER DIVIDEEXISTING LAKE

    EXISTING MAJOR CONTOURS (m AMSL)

    EXISTING MINOR CONTOUR (m AMSL)

    UPLAND EXCAVATING LTD. PROPERTY LINE

    165.00

    2. BASED ON BC HYDRO RECORD OF WATER ELEVATIONS AT LADORE DAM RECORDED EVERY 3 HOURS. (https://www.bchydro.com/energy-in-bc/our_system/transmission_reservoir_data/previous_reservoir_elevations/vancouver_island/ladore_ldr.html)

    185.9 m185 m

    180 m

    175 m170 m

    165 m

    Groundwater Flow in Fractured Bedrock Aquifer

    ?

    ??

    ?

  • 24

    LOT C

    PLAN 42515

    K&D CONTRACTING LTD.

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    2015-2017 PRODUCTION AREA

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    2015 - 2018PRODUCTION AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    *

    BH1-16145.3

    MW2-14

    *

    *

    *

    *

    BH5-15

    110 OIP

    244.

    553m

    2-2

    2-42

    152

    150

    150180

    192

    BH2-16153.80

    MW5B-15*

    MW4A-15150.25

    *

    182.07183.16

    183.53

    180

    152

    190 188186 184

    184188

    19217

    6

    174

    182

    184.06

    MW10-17

  • 25

    LOT C

    PLAN 42515

    K&D CONTRACTING LTD.

    GOLD

    RIVER

    HIGH

    WAY

    2047-R

    LOT A

    PLAN 42515

    632m

    2-

    35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    SHOP

    OFFICE

    SHED

    104 OIP

    112 OIP

    WASH PLANT

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    524.777m 271-28-27231.223m 271-28-27

    244.

    553m

    2-2

    2-42

    243.

    443m

    2-2

    2-42

    301.764

    m 65-58

    -15

    236.236

    m 65-58

    -15

    137m 136-50-24

    +

    RICO LAKE

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    ARGONAUT ROADMcIVOR LAKE

    LOT A

    PLAN 30709

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    WEIGHSCALE

    50.0m BUFFER ZONE

    APPROXIMATE LOCATIONOF PERMITTED BURN AREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    BH2-16

    BH1-16

    178

    178

    *

    **

    EXPLOSIVES SHELTER

    PROPOSED INFILTRATION POND

    PROPOSED AERATION POND

    EXPLOSIVES SHELTER

    MW2-14158.0

    MW5B-15185.9

    MW5A-15184.2

    MW1-14165.2

    RW-98020179.9

    MW9-17167.2

    BH5-15

    MW7-17184.6

    2015-2017 PRODUCTION AREA

    176

    176

    174

    174

    172

    172

    170

    170

    168

    168

    166

    166

    164

    164

    162

    162

    160

    160

    158

    158

    156

    156

    154

    154

    152

    152

    150

    150

    MW3-14156.4

    MW10-17150.1

    MW2A-16158.1

    MW4B-15163.6

    MW8-17172.8

    MW6-17177.9

    MW4A-15165.9

    *

    180

    (MEASURED AT LADORE DAM177.6LOCATED APPROX. 1.7km NW)

    (2)

    RICO GAUGE180.4

    2015 - 2018PRODUCTION AREA

    RW-98020

    MW3-14

    0 40 80 120m 0.25

    CAD File: 88877-03(009)GN-WA001.DWG

    May 23, 2017

    88877-03

    FIGURE 2.9

    UPLAND EXCAVATING LTD.PROPOSED UPLAND LANDFILLHYDROGEOLOGIC AND HYDROLOGY CHARACTERIZATION REPORT

    GROUNDWATER ELEVATION CONTOURSSAND & GRAVEL AQUIFER - APRIL 6, 2017

    LEGEND

    EXISTING ACCESS ROADWAY

    EXISTING MONITORING WELL

    RESIDENTIAL WELL

    RICO GAUGE SURFACE WATER GAUGE

    LIMIT OF EXCAVATION FOR PROPOSED LANDFILL

    LIMIT OF WASTE FOR PROPOSED LANDFILL

    EXISTING BOREHOLE

    ABANDONED BOREHOLEBH5-15BH1-16

    GROUNDWATER ELEVATION (m AMSL)

    GROUNDWATER CONTOUR (m AMSL)

    172.8

    170

    SOURCE: TOPOGRAPHICAL SURVEY CONDUCTED BY McELHANNEY ASSOCIATES LAND SURVEYING LTD., NOVEMBER 21, 2016.

    GROUNDWATER FLOW DIRECTION

    NOT USED IN CONTOURING

    NOTES:1. RW-98020 WATER ELEVATION WAS MEASURED FEBRUARY 15, 2016.

    *MW4A-15165.9

    INFERRED GROUNDWATER CONTOUR (m AMSL)178APPROXIMATE GROUNDWATER DIVIDEEXISTING LAKE

    EXISTING MAJOR CONTOURS (m AMSL)

    EXISTING MINOR CONTOUR (m AMSL)

    UPLAND EXCAVATING LTD. PROPERTY LINE

    165.00

    2. BASED ON BC HYDRO RECORD OF WATER ELEVATIONS AT LADORE DAM RECORDED EVERY 3 HOURS. (https://www.bchydro.com/energy-in-bc/our_system/transmission_reservoir_data/previous_reservoir_elevations/vancouver_island/ladore_ldr.html)

    No Data

    Assumed groundwater flow

    Groundwater Regime Not Defined in NE Quadrant

  • 26

    LIMIT OF EXCAVATION

    LIMIT OF WASTE

    RICO GAUGE

    BH5-15

    GOLD

    RIVE

    R HI

    GHWA

    Y

    2047-R

    LOT A

    PLAN 42515

    632m

    2

    -35-4

    8

    113 OPP

    105 OPP BCLS724

    110 OIP

    LOT C

    SHOP

    SHED

    104 OIP

    NE 1/4 SEC.32 TP.2 W 1/2 OF NW 1/4 SEC. 33 TP. 2

    PLAN 42515

    524.777m 271-28-27

    231.223m 271-28-27

    244.5

    53m

    2-2

    2-4

    2

    243.4

    43m

    2-2

    2-4

    2

    301.76

    4m 65

    -58-15

    137m 136-50-24

    +

    + M

    FUEL TA

    NKS

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EXPLOSIVES SHELTER

    EX

    PLO

    SIV

    ES

    SH

    ELT

    ER

    STRATA LOT 1

    PLAN VIS6756

    STRATA LOT 2

    PLAN VIS6756

    LOT A

    PLAN 42515

    LOT 6

    PLAN 31913

    LOT 6

    PLAN 31913

    2015 - 2018

    PRODUCTION AREA

    McIVOR LAKE

    ARGONAUT ROAD

    LOT A

    PLAN 30709

    RICO LAKE

    WEIGHSCALE

    112 OIP

    SETTLING PONDS

    WASH PLANT

    OFFICE

    SW15-02

    BH1-16

    SW15-01(APPROXIMATELY1 KM NORTH)

    MW5A-15

    MW7-17

    MW6-17

    BH2-16

    MW3-14

    MW5B-15

    MW10-17

    MW4A-15

    RW-98020

    MW9-17

    MW8-17

    MW1-14

    MW4B-15

    STORAGEAREA

    STORAGEAREA

    STORAGEAREA

    STORAGEAREA

    ASPHALT STOCKPILE

    CONCRETE STOCKPILE

    236.23

    6m 65

    -58-15

    MW2-14 MW2A-16

    MW13

    MW11MW12

    LEGEND

    EXISTING MAJOR CONTOURS

    EXISTING MINOR CONTOUR

    PROPERTY LINE

    EXISTING LAKE

    EXISTING ACCESS ROADWAY

    LIMIT OF WASTE

    LIMIT OF EXCAVATION

    TREES/VEGETATION

    EXISTING MONITORING WELL

    RESIDENTIAL WELL

    EXISTING BOREHOLE

    ABANDONED BOREHOLE

    SURFACE WATER SAMPLE LOCATION

    SURFACE WATER GAUGE

    MW3-14

    BH5-15

    SW15-01

    BH5-15

    RICO GAUGE

    RW-98020

    MONITORING WELL INCLUDED IN PROPOSEDENVIRONMENTAL MONITORING PROGRAM

    APPROXIMATE LOCATION OF PROPOSED MONITORINGWELL INCLUDED IN PROPOSED ENVIRONMENTALMONITORING PROGRAM (DURING LANDFILL OPERATIONS)

    MW2-14

    MW12

    CAD File: P:\drawings\88000s\88877\88877 - REPORTS\88877-03(010)\88877-03(010)GN\88877-03(010)GN-WA005.DWG

    May 31, 2017

    88877-03

    FIGURE 14.1

    UPLAND EXCAVATING LIMITEDPROPOSED UPLAND LANDFILL2017 DESIGN, OPERATION, AND CLOSURE PLAN

    ENVIRONMENTAL MONITORING PROGRAMPROPOSED MONITORING LOCATIONS

    0 40 80 120m 1-4000

    SOURCES:TOPOGRAPHICAL SURVEY CONDUCTED BY UPLANDCONTRACTING LTD., JANUARY 29 2015TOPOGRAPHIC SURVEY PLAN OF UPLANDS EXCAVATINGGRAVEL PIT CONDUCTED BY McELHANNEY ASSOCIATES LANDSURVEYING LTD. COMPLETED ON NOVEMBER 21ST, 2016.

    Proposed Long-term Monitoring

    Potential groundwater flow

    Potentially impacted area- not proposed for monitoring

  • WRAP-UP

    Completed hydrogeological study: Critical gaps remain.

    Role played by fracture bedrock aquifer: Risks of impact to Rico Lake and Campbell River water supply still exist.

    Groundwater in sand and gravel aquifer(s) discharges into sensitive aquatic ecosystems. Groundwater regime still to be defined.

    27