Oleh : ARDI CHANDRA IBRAHIM ( 2012210351) SEKOLAH TINGGI ...
PROPOSED ROAD -...
1
END POINT 11/000 K.M. ST. POINT 2/800 K.M. PROPOSED ROAD EXECUTIVE ENGINEER TAPI ( R & B ) DIVISION VYARA DEPUTY EXECUTIVE ENGINEER VYARA ( R & B ) SUB DIVISION VYARA CONSTRUCTION OF SONGADH UKAI SHERULLA ROAD K.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE
Transcript of PROPOSED ROAD -...
END POINT 11/000 K.M.
21° - 14' - 16.6"73° - 24' - 09.0"
ST. POINT 2/800 K.M.
21° - 10' - 01.2"73° - 34' - 01.9"
PROPOSED ROAD
EXECUTIVE ENGINEERTAPI ( R & B ) DIVISION
VYARA
DEPUTY EXECUTIVE ENGINEERVYARA ( R & B ) SUB DIVISION
VYARA
CONSTRUCTION OF SONGADH UKAI SHERULLA ROADK.M. 2/800 TO 11/0 DIST. TAPI GUJARAT STATE