Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments,...

37
PROPOSED BUILD TO RENT MIXED USE DEVELOPMENT 118 Bertie Street Port Melbourne SUSTAINABILITY MANAGEMENT PLAN & WATER SENSITIVE URBAN DESIGN RESPONSE FOR LATERAL ESTATE PTY LTD 24 May 2019 File 1014A

Transcript of Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments,...

Page 1: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

PROPOSED BUILD TO RENT MIXED USE DEVELOPMENT

118 Bertie Street Port Melbourne

SUSTAINABILITY MANAGEMENT PLAN

&

WATER SENSITIVE URBAN DESIGN RESPONSE

FOR

LATERAL ESTATE PTY LTD

24 May 2019

File 1014A

Page 2: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 1 ©Ark Resources

CONTENTS

1. INTRODUCTION ............................................................................................................................... 3

2. SITE DESCRIPTION ......................................................................................................................... 5

3. SUMMARY OF KEY ESD INITIATIVES ............................................................................................ 6

4. GREEN STAR................................................................................................................................... 7

5. ENERGY RATINGS .......................................................................................................................... 7

6. DAYLIGHT AND VENTILATION ....................................................................................................... 9

7. MUSIC MODELLING ........................................................................................................................ 9

8. SUSTAINABLE DESIGN INITIATIVES AND SYSTEMS ................................................................. 10

9. IMPLEMENTATION STRATEGY .................................................................................................... 18

10. CONCLUSION ................................................................................................................................ 20

APPENDICES

APPENDIX 1: GREEN STAR ASSESSMENT ............................................................................................ 21

APPENDIX 2: MUSIC RESULTS ................................................................................................................. 26

APPENDIX 3: ENERGY RATING ASSUMPTIONS ...................................................................................... 29

APPENDIX 4: RAINWATER HARVESTING ................................................................................................ 32

APPENDIX 5: WSUD MAINTENANCE MANUAL ........................................................................................ 34

APPENDIX 6: SOLAR PHOTOVOLTAIC SYSTEM ..................................................................................... 35

Page 3: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 2 ©Ark Resources

Issue Date Prepared Approved Status

A 9 May 2016 KK JT DRAFT

B 24 May 2016 KK/MT JT TP Issue

C 22 May 2017 KK JT Revised scheme draft

D 25 May 2017 KK/MR JT Draft

E 6 June 2017 KK/MR JT TP issue

F 8 September 2017 KK JT TP Issue

G 2 April 2019 LD JT Revised scheme draft

H 15 April 2019 LD JT Revised scheme draft

I 24 May 2019 LD JT Revised scheme

© Ark Resources 2019

The information contained in this document that has been produced by Ark Resources Pty Ltd is solely for the use of Ark Resources’ Client for the purpose for which it has been prepared and Ark Resources undertakes no duty to or accepts any responsibility to any third party who may rely upon this document.

All material contained in this report is subject to Australian copyright law. Copyright in the document is owned by Ark Resources Pty Ltd. No material from this document may, in any form or by any means, be reproduced, stored in a retrieval system or transmitted, without prior written permission from Ark Resources.

Any enquiries regarding the use of this report should be directed to:

ARK RESOURCES PTY LTD ABN 29 086 461 369 Suite 8, 10 Northumberland Street South Melbourne VIC 3205 Australia

P: +61 3 9636 0280 W: arkresources.com.au E: [email protected]

Page 4: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 3 ©Ark Resources

1. Introduction

Ark Resources has been engaged by Lateral Estate Pty Ltd to provide advice in relation to environmentally

sustainable development outcomes for the proposed residential development at 118 Bertie Street, Port

Melbourne.

This report contains a summary of:

• Environmental objectives adopted for the development

• Sustainable design initiatives integrated into the design of the project.

Performance outcomes in this report are based on:

• Discussions and correspondence with:

o James Guthrie – Design Coordinator, Lateral Estate

o Alexander Koll – Project Architect, Mako Architects

• Architectural plans prepared by Mako Architects set out below:

Description Drawing

No. Revision Date

Cover Sheet A-0001 C 8/04/2019

Site Plan - Existing Context Uses A-0101 C 8/04/2019

Site Photos - Existing Context A-0102 C 8/04/2019

Site Photos - Existing Context A-0103 C 8/04/2019

Site Plan - Existing Context - Demolition A-0104 C 8/04/2019

Context Plan - Existing Context A-1001 C 8/04/2019

Context Plan - Future Context A-1002 C 8/04/2019

Context Plan - Existing Context A-1003 C 8/04/2019

Context Plan - Future Context A-1004 C 8/04/2019

Plan - Level 01 - Ground A-1101 C 8/04/2019

Plan - Level 02 - Podium A-1102 C 8/04/2019

Plan - Level 03 - Podium A-1103 C 8/04/2019

Plan - Level 04 - Podium A-1104 C 8/04/2019

Plan - Level 05 - Podium A-1105 C 8/04/2019

Plan - Level 06 - Podium A-1106 C 8/04/2019

Plan - Level 07 - Terrace A-1107 C 8/04/2019

Plan - Level 08 A-1108 C 8/04/2019

Plan - Level 09 A-1109 C 8/04/2019

Plan - Level 10 A-1110 C 8/04/2019

Plan - Level 11 A-1111 C 8/04/2019

Plan - Level 12 A-1112 C 8/04/2019

Plan - Level 13 A-1113 C 8/04/2019

Page 5: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 4 ©Ark Resources

Description Drawing

No. Revision Date

Plan - Level 14 A-1114 C 8/04/2019

Plan - Level 15 A-1115 C 8/04/2019

Plan - Level 16 A-1116 C 8/04/2019

Plan - Level 17 A-1117 C 8/04/2019

Plan - Level 18 A-1118 C 8/04/2019

Plan - Level 19 A-1119 C 8/04/2019

Plan - Level 20 A-1120 C 8/04/2019

Plan - Roof Terrace A-1121 C 8/04/2019

Plan - Roof A-1122 C 8/04/2019

Section A A-2001 C 8/04/2019

Section b A-2002 C 8/04/2019

Elevation - south east A-3001 C 8/04/2019

Elevation - south west (Bertie Street) A-3002 C 8/04/2019

Elevation - north west A-3003 C 8/04/2019

Elevation - north east A-3004 C 8/04/2019

Detail Plan - Driveway + Vehicle Access A-4001 C 8/04/2019

PODIUM - Bertie Street Frontage - Existing Condition A-4101 C 8/04/2019

PODIUM - Bertie Street Frontage - Future Context A-4102 C 8/04/2019

PODIUM - Bertie Street Frontage A-4104 C 8/04/2019

PODIUM - New Street Frontage A-4105 C 8/04/2019

PODIUM - New Street A-4108 C 8/04/2019

TOWER - Typical Facade A-4150 C 8/04/2019

Apartment Type Plans - 3 Bedroom A-4201 C 8/04/2019

Apartment Type Plans - 3 Bedroom A-4202 C 8/04/2019

Apartment Type Plans - 3 Bedroom A-4203 C 8/04/2019

Apartment Type Plans - 3 Bedroom A-4204 C 8/04/2019

Apartment Type Plans - 3 Bedroom A-4205 C 8/04/2019

Apartment Type Plans - 2 Bedroom A-4206 C 8/04/2019

Apartment Type Plans - 2 Bedroom A-4207 C 8/04/2019

Apartment Type Plans - 2 Bedroom A-4208 C 8/04/2019

Apartment Type Plans - 2 Bedroom A-4209 C 8/04/2019

Apartment Type Plans - 1 Bedroom A-4210 C 8/04/2019

Shadow Diagrams - Equinox A-8001 C 8/04/2019

Page 6: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 5 ©Ark Resources

Description Drawing

No. Revision Date

Shadow Diagrams - Equinox A-8002 C 8/04/2019

Shadow Diagrams - EquinoX A-8003 C 8/04/2019

Shadow Diagrams - EquinoX A-8004 C 8/04/2019

Amenity - Sunlight A-8101 C 8/04/2019

Amenity - Ventilation A-8102 C 8/04/2019

Amenity - Communal Space A-8103 C 8/04/2019

Perspective View A-9001 C 8/04/2019

2. Site Description

The proposed mixed-use development comprises of eight ground level retail spaces with a total floor area of

860m2and 165 residential apartments with 317 bedrooms. It is estimated that approximately 349 people will

reside in the proposed development.

The proposed building includes the following uses:

Level Use

Ground Floor • Entry lobby, retail, bicycle parking, loading bay, services and bin

room

Level 2 • Residential apartments, car parking

Level 3 • Residential apartments, car parking

Level 4 • Residential apartments, car parking

Level 5 • Residential apartments and storage facilities

Level 6 • Residential apartments

Level 7 • Communal room and roof terrace, residential apartments

Levels 8 - 20 • Residential apartments

Level 21 • Communal facilities, outdoor swimming pool, PV array

The development is located within Fisherman’s Bend precinct of the City of Port Phillip.

The development site has a total area of approximately 3,032 m2 and currently contains a single storey

commercial building.

An image of the site and the surrounding locale is provided below.

Page 7: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 6 ©Ark Resources

Image ©Google Maps

3. Summary of Key ESD Initiatives

The following key ESD initiatives have been incorporated into this project:

• Rainwater harvesting system for toilet flushing and irrigation;

• 26 kW solar photovoltaic system;

• High performance glazing and energy efficient building services, appliances and fixtures; and

• Environmentally preferable internal finishes.

An assessment of sustainable design outcomes of the proposed development has been undertaken with Green Star, MUSIC and FirstRate benchmarking tools based on the proposed architectural design and building services initiatives considered feasible at this stage of the design process. The information presented in this report demonstrates that:

• The NCC Class 2 component of the development will achieve an energy rating of 6.5 stars, which

represents an improvement of 10% on minimum statutory compliance for the NatHERS Melbourne

climate zone.

• The non-Class 2 areas will have an energy performance 10% better than minimum statutory

compliance specified in the National Construction Code.

• The development meets the Best Practice standard for stormwater quality.

The results of the performance assessment are summarised below.

Page 8: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 7 ©Ark Resources

4. Green Star

The Green Star Design & As Built (Version 1.2) has been used as a benchmarking framework for the proposed

scheme and demonstrates that the development is able to achieve a 5 star rating1.

A detailed Green Star assessment has been undertaken to confirm the credits achievable by the proposed

scheme.

Please note that this analysis is based on the best information currently available in relation to the technical

and commercial feasibility of the initiatives proposed. Further investigation will be undertaken during design

development which may result in a change to the package of initiatives specified in order to meet the 5 star

Green Star standard. A summary of the Green Star assessment is provided in Appendix 1.

Further information in relation to specific Green Star credits is provided in Section 7 of this report.

5. Energy Ratings

FirstRate5 (Version 5.2.10a (3.13)) energy ratings have been undertaken for a representative sample of

apartments (Class 2) and are summarised in the table below.

Apartment Star Rating Energy Demand (MJ/m2)

Total Heating Cooling

5.01 6.4 98.9 92.8 6.1

5.02 6.9 85.6 77.8 7.8

5.03 6.9 84.4 80.4 4.0

5.05 6.2 109.2 101.2 8.0

6.01 5.9 116.3 105.2 11.1

6.11 5.6 128.4 119.3 9.1

6.12 5.5 130.5 121.3 9.2

6.13 5.9 118.3 102.3 16.0

6.14 6.0 114.0 95.1 18.8

8.01 6.3 103.8 80.4 23.3

8.02 7.9 57.8 50.1 7.6

8.03 7.8 60.4 51.6 8.8

8.04 7.2 77.6 67.0 10.6

8.05 7.8 59.0 50.4 8.6

8.06 7.4 71.3 63.6 7.7

8.07 6.9 85.9 77.8 8.1

8.08 5.8 121.7 109.8 11.9

8.09 5.9 114.8 99.5 15.2

14.01 6.2 106.8 85.6 21.2

14.02 7.7 62.0 54.5 7.5

14.03 7.6 64.2 56.0 8.2

14.04 7.0 82.7 72.6 10.1

1 Note that a minimum of 60 points must be achieved for a 5 star Green Star rating to be awarded.

Page 9: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 8 ©Ark Resources

Apartment Star Rating Energy Demand (MJ/m2)

Total Heating Cooling

14.05 7.7 62.5 54.7 7.8

14.06 7.3 75.4 68.3 7.2

14.07 6.7 90.8 82.8 8.0

14.08 5.6 126.2 114.5 11.7

14.09 5.8 119.3 104.1 15.3

19.01 6.2 107.9 86.0 21.9

19.02 7.7 63.4 55.7 7.7

19.03 7.6 65.4 57.2 8.2

19.04 7.0 82.7 72.6 10.1

19.05 7.7 63.5 55.9 7.6

19.06 7.3 74.2 66.6 7.6

19.07 6.8 88.5 74.6 13.9

19.08 6.1 112.3 96.6 15.7

19.09 5.8 120.7 105.6 15.1

20.01 5.6 128.6 100.0 28.6

20.02 7.0 82.8 71.7 11.1

20.03 6.9 85.3 73.0 12.3

20.04 6.4 102.2 88.4 13.7

20.05 6.9 84.0 72.0 12.0

20.06 6.7 92.8 80.5 12.4

20.07 6.2 108.3 85.9 22.3

20.08 5.8 122.3 99.7 22.6

20.09 5.8 119.5 94.6 24.9

Estimated Development Average

6.5 93.4 80.4 13.0

Please refer to Appendix 3 for details of energy ratings and building construction assumptions.

The results of the modelling confirm that all apartments have a cooling load less than 30MJ/m2 (NatHERS

Climate Zone 21 Melbourne). All other apartments in the development are expected to have similar or lower

cooling loads.

Page 10: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 9 ©Ark Resources

6. Daylight and Ventilation

All apartment corridors incorporate a source of natural light and ventilation in accordance with the Victorian

Better Apartment Design Standards 2017. Operable glazing in corridors will be automatically actuated so as

to optimise thermal conditions and indoor air quality in accordance with the following control logic.

The proposed building has been designed to optimise access to daylight by adopting the following architectural design strategies on residential levels:

• Shallow podium apartment floor plans;

• Avoidance of battle-axe type bedrooms;

• Generous glazing areas to all habitable rooms;

• Specification of glazing types with appropriate visible light transmission

7. MUSIC Modelling

To assess the quality of stormwater runoff from the site, an analysis has been undertaken using MUSIC

Modelling software.

The MUSIC rating achieved indicates that the proposed development meets the best practice performance

objectives outlined in the Urban Stormwater Best Practice Environmental Management Guidelines (CSIRO

1999) for Total Suspended Solids (TSS), Total Nitrogen (TN), Total Phosphorus (TP) and Gross Pollutants

(GP).

The following reductions from typical urban loads will be achieved:

o Reduction in Total Suspended Solids (TSS) load: 88.6%

o Reduction in Total Phosphorus (TP) load: 60.2%

o Reduction in Total Nitrogen (TN) load: 59.0%

o Reduction in Gross Pollutants (GP) load: 99.3%

Please refer to Appendix 2 for a copy of the simulation models and results.

Page 11: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 10 ©Ark Resources

8. Sustainable Design Initiatives and Systems

Issue Performance Commitments / Description Comments

Indoor Environmental Quality

Natural Ventilation & Daylight

All living rooms and bedrooms have access to abundant natural daylight and adequate ventilation through extensive façade glazing and a combination of openable windows and sliding doors.

Apartment layout design has been developed with particular regard to achieving best-practice daylight amenity to all living spaces and bedrooms.

These features will improve comfort and amenity for residents and reduce peak cooling demand and greenhouse gas emissions arising from mechanical cooling.

Thermal Comfort Thermal comfort for occupants will be enhanced by the specification of high performance glazing.

Note that many apartments will receive direct sunlight due to the arrangement of apartments within each floor plate.

Solar Access The building form and apartment layout has been configured to ensure that the majority of apartments have a Northwest, North or South-east orientation and therefore receive direct solar access.

Reduction of pollutants All interior paints, adhesives and sealants will be Low VOC type to improve indoor environmental quality for residents.

50% of paints by cost will be ultra-low VOC emission (<5g/litre).

All engineered wood products will contain no or low levels of formaldehyde.

Low VOC paints, adhesives, and sealants will be specified to meet the requirements of Credit 13.1 of the Green Star Design & As Built tool, Version 1.2

The ultra-low VOC paint specification meets the innovation requirements of Credit 30C of the Green Star Design & As Built tool, Version 1.2.

Formaldehyde emissions for engineered wood products will be specified to meet the requirements of Credit 13.2 of the Green Star Design & As Built tool, Version 1.2.

Building Energy Management

Energy Efficient Appliances All installed appliances will have an energy efficiency rating within 1 star of the best available at the time of tender.

Appliances will be specified during design development in order to meet nominated performance standards.

Page 12: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 11 ©Ark Resources

Issue Performance Commitments / Description Comments

Apartment Energy Ratings The development will achieve an average energy rating of 6.5 stars and a minimum 5.5 stars for each apartment.

The development energy rating achieved exceeds the NCC 2016 energy efficiency requirements for Class 2 dwellings by 10% (based on total energy loads).

The development thus attains the minimum mandatory requirements for Green Star credit 15B.0 and also meets the SDAPP best practice standard for energy efficiency.

Refer to Appendix 3 for details of building fabric assumptions.

Non-residential energy performance

10% improvement on energy performance of building envelope to non-residential (NCC Class 2) areas.

This will be demonstrated via JV3 modelling methodology using NCC minimum Section J DTS provisions as the reference case.

Energy Management & Control

To encourage energy conservation, all apartments will be fitted with shut-down switches which will facilitate turning off non-essential power use when residents vacate their rooms.

This feature is expected to facilitate energy conservation practices and minimise greenhouse emissions during the occupation of the development.

Renewable Energy System The following renewable energy system will be installed:

• A 26-kW peak solar photovoltaic system on the roof providing renewable energy to offset greenhouse emissions arising from common area energy usage of the development.

• Embodied ecological impacts of PV array and support racking will be reduced by over 20% through use of 300Wp 60-cell modules with efficiency over 20% greater than standard PV modules.

• Embodied impacts of PV modules will be further reduced by procurement from a manufacturer with an above average rating on the current version Silicon Valley Toxics Coalition Solar Scorecard.

The system is predicted to result in equivalent avoided greenhouse emissions of approximately 43.6 tonnes CO2-e each year.

Refer to Appendix 6 for details of proposed system capacity and panel numbers.

Heating & Cooling Space heating and cooling for living areas will be provided by reverse cycle heat pumps with a minimum energy star rating (heating mode) within 1 star of the best available at the time of tender.

Efficient reverse cycle units in conjunction with a thermally efficient building envelope are considered to be an environmentally acceptable method of conditioning apartments.

All installed air-conditioning equipment will be specified to meet the requirements of Credit 15B.1 of the Green Star Design & As Built tool, Version 1.2.

Page 13: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 12 ©Ark Resources

Issue Performance Commitments / Description Comments

Domestic Hot Water Domestic hot water will be provided by an efficient central gas hot water system with a minimum appliance efficiency of 86% and a highly insulated circulating loop to reduce parasitic heat losses.

Lighting Energy efficient lighting systems will be installed throughout the development including:

• LED lighting generally to apartments designed to achieve a maximum lighting power density 10% better than NCC requirements.

• LED or Compact fluorescent lights controlled with occupancy sensors and daylight sensors (as appropriate) to corridors and public areas.

• LED or compact fluorescent external lighting.

• An energy efficient car park lighting system comprising T5 fluorescent lamps with most lighting controlled according to motion sensors. The remaining lights will act as a “skeleton” lighting circuit and will be permanently lit.

• Lighting systems comprise flicker free luminaires and a Colour Rendering Index (CRI) greater than 80

All outdoor lighting to comply with AS4282:1997 for light spill to inhabited boundaries.

Additionally, strategies to reduce glare to be incorporated into the design.

Note that external lighting for the development will be designed with the objective of preventing light spill to the night sky.

The lighting systems will be designed to meet the requirements set out in Credit 11.0, 27.0 and 27.1 of the Green Star Design & As Built tool, Version 1.2.

Car Park Ventilation To reduce greenhouse gas emissions from the apartment’s car park mechanical ventilation system energy use will be minimised by the use of a variable speed fan motor and appropriate controls including CO monitoring.

These initiatives are consistent with Part J of the Building Code of Australia (2016).

Water Management

Fire System Water Temporary storage for a minimum of at least 80% of the routine fire protection system test water and maintenance drain downs will be provided in the ground level for re-use on site.

System to meet requirements for Credit 18B.5 of the Green Star Design & As Built tool, Version 1.2.

Page 14: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 13 ©Ark Resources

Issue Performance Commitments / Description Comments

Rainwater Harvesting A rainwater harvesting system will be installed comprising:

• Rainwater harvesting from all roof areas, L5, L6, L7 and L20 terraces (a total catchment area of 1,435 m2)

• Treatment of all rainwater with a combination of:

o 100-micron screen filter

o 5-micron cartridge filter

o Ultra Violet disinfection unit

• A total storage volume of 62,000 litres in tanks located in the ground level

• Re-use of water for toilet flushing for WCs from Ground Level to Level 12.

• Re-use of water for irrigation for common area planting

Rainwater modelling indicates that this system will provide an estimated annual mains water saving of 663 kL and a supply reliability of 44% for toilet flushing and irrigation.

Please refer to Appendix 4 for details of predicted harvested rainwater volumes and Appendix 5 for an indicative maintenance program.

Water Efficient fixtures Fixtures and appliances installed by the applicant will be within 1 star of the WELS ratings scheduled below:

Where appropriate, water efficient sub-soil drip irrigation system with moisture sensors and timers

Water using fixtures will be specified during design development in accordance with this water efficiency performance standard.

Fixtures will be specified to meet the requirements of Credit 18B.1 of the Green Star Design & As Built tool, Version 1.2.

Page 15: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 14 ©Ark Resources

Issue Performance Commitments / Description Comments

Stormwater Management

Stormwater Quality A preliminary analysis of stormwater quality outcomes has been undertaken using MUSIC modelling software. The results of the analysis are summarised below:

• A 88.6% reduction in Total Suspended Solids (TSS).

• A 60.2% reduction in Total Phosphorus (TP).

• A 59.0% reduction in Total Nitrogen (TN).

• A 99.3% reduction in Gross Pollutants (GP).

A Rocla CDS Nipper gross pollutant trap (or equivalent primary treatment device) located near stormwater Legal Point of Discharge to capture suspended solids and litter generated onsite.

Onsite detention of 80kl has also been provided.

Post-development peak discharge will not exceed pre-development peak discharge using either 1-year or 5-year ARI as appropriate.

The proposed development exceeds the pollutant load reduction targets set out in the Best Practice Environmental Management Guidelines (BPEMG) for Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen (TN) and Gross Pollutants (GP) and therefore meets the objective of the City of Port Phillip’s Water Sensitive Urban Design Policy (Planning Scheme Clause 22.12).

Results meet Green Star Column B targets and the requirements of Credits 26.2 and 30C of the Green Star Design & As Built tool, Version 1.2.

Refer to Appendix 2 for the MUSIC rating results, Appendix 5 for the WSUD Maintenance Manual, and Appendix 6 for the preliminary Site Management Plan.

Note that the preliminary MUSIC modelling undertaken to confirm achievable stormwater quality results is based on best information currently available relating to the technical and commercial feasibility of the WSUD strategy proposed. Further investigation will be undertaken during design development which may result in minor variations to the strategy described above to meet the best practice stormwater quality targets.

Sustainable Transport

Bicycle Facilities Readily accessible bicycle storage facilities have been provided to encourage bicycle use by residents and visitors to the development by including a total of 147 bicycle parking spaces for staff, residents and visitors.

End of trip cyclist facilities for office and retail staff will be facilitated through provision of shower drainage connections to the ground floor slab. This allows tenants to install showers and lockers.

The development will also include the provision of 2 shared cargo/utility pedelec bikes for residents. Dedicated parking spaces are allotted for the cargo bikes on ground level.

The bike parking facilities provided significantly exceed the ratios set out in Clause 52.34 of the City of Port Phillip Planning Scheme and will encourage cycling by residents.

Bicycle numbers meet the requirements of Credit 17B.4 and specification of cargo bikes meets the requirements of Credit 30B of the Green Star Design & As Built tool, Version 1.2.

Page 16: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 15 ©Ark Resources

Issue Performance Commitments / Description Comments

Building Materials

Environmentally Preferable Materials

The following environmentally preferable materials will be specified with the objective of reducing off-site environmental impacts and improving indoor environmental quality for residents:

• All interior paints, floor coverings, adhesives and sealants will be low VOC type

• All engineered wood products will be low formaldehyde type.

• Concrete mixes to incorporate reclaimed water

• Portland cement content of all concrete will be reduced by a 30% measured as an average across all concrete uses in the project to reduce embodied energy (subject to project’s structural requirements)

• Environmentally responsible steel design and procurement

• Specification of sustainable sourced timber (FSC or PEFC)

• Specification of common use PVC products that meet Best Practice Guidelines for PVC in the Built Environment

• 75% of site area to incorporate hardscaping elements with compliant Solar Reflectance Indices (SRI) in order to reduce heat island effects

Low VOC paints, adhesives and sealants will be specified in accordance with the VOC limits set out in Credit 13.1 of the Green Star Design & As Built tool, Version 1.2.

Engineered wood and PVC products will be specified in accordance with the requirements of Credit 13.2 and 20.3 of the Green Star Design & As Built tool, Version 1.2.

Concrete, Steel and Timber products will be specified in accordance with the requirements of Credit 19B.1, 19B.2, 20.1 and 20.2 of the Green Star Design & As Built tool, Version 1.2.

Hardscaping elements will be specified in accordance with the requirements of Credit 25.0 of the Green Star Design & As Built tool, Version 1.2.

Waste Management

Operational Waste Management

The following waste management facilities will be provided in the development:

• An enclosed bin store on ground level for residential waste containing:

o 3 x 1,110 litre bins general waste

o 6 x 1,100 litre bins for recyclables

• An enclosed bin store on ground level for commercial waste containing:

o 2 x 1,100 litre bins general waste

o 1 x 1,100 litre bins for recyclables

• An 8m2 area for the storage of oversized household items is also provided to facilitate re-use within the building

For details of waste management logistics and collection facilities, refer to the Waste Management Plan prepared by Elephants Foot Recycling Solutions.

The dedicated waste storage area for over-sized household items will be specified to meet the requirements of Credit Mat-1 of the Green Star Multi Residential tool Version 1, 2009.

Page 17: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 16 ©Ark Resources

Issue Performance Commitments / Description Comments

Construction Waste Minimisation

A target recycling rate of 90% of construction and demolition waste has been adopted for the construction phase of the development to minimise the volume of waste to landfill. This will be achieved by the development of a comprehensive waste minimisation strategy including:

• Separation of all commercially viable recyclable waste streams

• Training in waste minimisation for all site staff and contractors to form part of site induction training.

• Record keeping of landfill waste and recyclable stream volumes to track performance against the 90% recyclable target.

• Quarterly reporting of volumes and percentages for each waste stream.

A dedicated recycling contractor will be engaged to facilitate separation of commercially viable recyclable waste streams in accordance with the target adopted.

The waste management plan will be in accordance with the requirements of Credit 22A of the Green Star Design & As Built tool, Version 1.2.

Construction & Building Management

Building Users Guide A Building Users Guide will be prepared and will provide details regarding the everyday operation of the building to enable building users to minimise energy and water consumption and optimise internal comfort and amenity.

In addition to the Building Users Guide, a detailed Design Intent Report shall be prepared including an overview of the Service and Maintainability Review of the proposed building systems.

The building users’ guide will be prepared in accordance with the requirements of Credit 4.2 of the Green Star Design & As Built tool, Version 1.2.

The Design Intent Report will be prepared in accordance with the requirements of Credit 2.0 and 2.1 of the Green Star Design & As Built tool, Version 1.2.

Green Star Accredited Professional

A registered Green Star Accredited Professional shall be involved in the project – from design through to practical completion.

This initiative is in accordance with the requirements of Credit 1.0 of the Green Star Design & As Built tool, Version 1.2 and is achieved due to Ark Resources’ involvement in the project.

Green Star Innovation Challenges

Deliver contractor education on Sustainability and project specific Green Star Elements to be undertaken prior to construction works.

Occupant engagement surveys to be carried out both pre-and post-occupancy with anonymised results provided to GBCA.

Page 18: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 17 ©Ark Resources

Issue Performance Commitments / Description Comments

Air Tightness Testing Prior to handover, air tightness testing of 10% of apartments will be undertaken.

Climate Adaptation Plan A Climate Adaptation Plan will be prepared to provide at least 2 design specific responses.

The Climate Adaptation Plan will be prepared in accordance with the requirements of Credit 3.1 of the Green Star Design & As Built tool, Version 1.2.

Metering In addition to individual apartment and tenancy meters for utilities, the following meters will be installed to provide information to the owners corporation in relation to centralised building systems and common area energy consumption:

• Harvested rainwater supply line

• Gas meter for hot water plant

• Photovoltaic system generation meter

• Common area lift and lighting meter

• Car park lighting & power meter

The information collected from these meters will be used by the Owner’s Corporation manager to assess the function and efficacy of central systems during commissioning and ongoing operation.

The metering and monitoring systems shall be installed in accordance with the requirements of Credit 6.0 and 6.1 of the Green Star Design & As Built tool, Version 1.2.

Environmental Management Plan

Prior to construction works, a project specific environmental management plan (EMP) shall be prepared by the Head Contractor.

The EMP shall include an erosion and sediment management plan for the construction works.

Additionally, the head Contractor will have a valid ISO 14001 Environment Management System (EMS) accreditation prior to and throughout the project.

The EMP shall be prepared in accordance with the requirements of Credit 7.0 and 7.1 of the Green Star Design & As Built tool, Version 1.2.

Commissioning & Maintenance

All energy and water management systems set out in this report will be commissioned in accordance with the manufacturer’s specifications.

Ongoing maintenance and regular monitoring of building systems will be undertaken by building management staff to ensure effective and efficient ongoing operation of all centralised building systems set out in this report including the rainwater harvesting system.

Furthermore, an independent commissioning agent shall be appointed to provide commissioning advice, monitor and verify the commissioning of all building systems.

It is anticipated that the building manager will provide regular reports to the Owner’s Corporation members in relation to resource consumption and cost.

The commissioning and tuning process shall be conducted in accordance with the requirements of Credit 2.2, 2.3 and 2.4 of the Green Star Design & As Built tool, Version 1.2.

Page 19: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 18 ©Ark Resources

9. Implementation Strategy

The ESD initiatives set out in this report will be coordinated by the Project Manager in conjunction with the following project design team members:

• Architect

• Thermal Performance Assessor

• Building Services Consultant

• Fire Services Engineer

• Structural Engineer

• Waste Management Consultant

An implementation schedule is set out in the table on the following pages.

ESD Initiative Implementation Schedule

# Initiative Requirement Responsibility Stage

1 Coordination of Initiatives Full implementation. Project Manager All

2 Apartment Energy Ratings Full FirstRate Assessments. Thermal Performance Assessor

Design Development

3 Renewable Energy System Specification of nominated Solar Photovoltaic System Building Services Engineer

Design Development

4 Energy Management and Control Specification of shut down switches which will facilitate turning off non-essential power use when residents vacate their rooms.

Building Services Engineer

Design Development

5 Heating & Cooling Specification of units in accordance with nominated MEPS star ratings.

Building Services Engineer

Design Development

6 Energy Efficient Appliances Specification of appliances in accordance with nominated star ratings.

Architect Design Development

7 Lighting Specification of nominated energy efficient lighting types and automated controls.

Building Services Engineer

Design Development

Page 20: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 19 ©Ark Resources

ESD Initiative Implementation Schedule

# Initiative Requirement Responsibility Stage

8 Domestic Hot Water Centralised gas hot water system. Building Services Engineer

Design Development

9 Rainwater Harvesting Design and specify rainwater harvesting system including toilet flushing & automated irrigation system.

Building Services Engineer

Design Development

10 Landscape features Design and specify raised planter boxes and landscape features. Landscape architect and Civil Engineer

Design Development

11 Water Efficiency Specify fixtures in accordance with nominated WELS star ratings. Architect Design Development

12 Bicycle Facilities Specify bike racks. Architect Design Development

13 Operational Waste Management Provide layout waste storage areas.

Specify bins and associated waste management equipment.

Waste Management Consultant

Design Development

14 Construction Waste Minimisation Prepare construction waste minimisation plan. Building Services Consultant / ESD consultant

Design Development

15 Environmentally Preferable Materials

Specify materials in accordance with nominated schedule. Architect Design Development

16 Metering Specify meters in accordance with nominated schedule. Building Services Engineer

Design Development

17 Construction Stormwater Pollution Reduction Plan

Prepare Construction Stormwater Pollution Reduction Plan in accordance with Councils WSUD policy.

ESD Consultant/ Contractor

Construction/

occupancy

Page 21: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 20 ©Ark Resources

10. Conclusion

This report sets out a range of sustainable design features which are integrated into the design and specification

of the proposed development, in order to improve environmental outcomes during construction and occupation.

This report provides a detailed analysis of ESD performance outcomes utilising relevant ‘tools’ which are

referenced in the Port Phillip Environmentally Sustainable Development Policy.

In terms of performance outcomes, the analysis presented in this report demonstrates that the proposed

development can achieve a Green Star 5 Star Rating which is defined as Australian Excellence standard by

the Green Building Council of Australia

The analysis undertaken also confirms that the proposed development achieves a NatHERS energy rating 10%

above the applicable NCC standard and meets the Best Practice standard for Urban Stormwater Quality.

Accordingly, the sustainable design outcomes from the proposed development are considered to be appropriate

for a Build to Rent mixed-use development of this scale. The outcomes are also consistent with the objectives

of the Environmentally Sustainable Development Policy and the Water Sensitive Urban Design Policy set out

in Clause 22.12 and Clause 22.13 of the Port Phillip Planning Scheme.

Jan Talacko

Director

Page 22: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 21 ©Ark Resources

Appendix 1: Green Star Assessment

Project:Points

Available

Total

Score

Targeted

Current

Rating:100 60.5

CATEGORY /

CREDITAIM OF THE CREDIT / SELECTION CODE CREDIT CRITERIA

Points

Available5* pathway

Management 14

Green Star

Accredited

Professional

To recognise appointment and active

involvement of Green Star AP to ensure

rating tool is applied effectively and as

intended.

1.0 Accredited Professional 1 1

2.0Environmental Performance

Targets- Complies

2.1Services and Maintainability

Review1 1

2.2 Building Commissioning 1 1

2.3 Building Systems Tuning 1 1

2.4Independent Commissioning

Agent1 1

Adaptation and

Resilience

To encourage and recognise projects

resilient to impacts of changing climate &

natural disasters.

3.1Implementation of a Climate

Adaptation Plan2 2

Building

Information

Information facilitating understanding of

building systems, O&M requirements and

targets to optimise performance.

4.1 Building Information 1 1

5.1Environmental Building

Performance1 1

5.2End of Life Waste

Performance1

6.0 Metering - Complies

6.1 Monitoring Systems 1 1

7.0Environmental Management

Plan- Complies

7.1Formalised Environmental

Management System1 1

8BPrescriptive Pathway -

Facilities1 1

Total 14 12

Commissioning

and Tuning

To encourage and recognise

commissioning, handover and tuning

initiatives that ensure all building services

operate to their full potential.

118 Bertie Street, Port

Melbourne

5 Star - Australian Excellence

TP stage -

Preliminary

Green Star - Design & As Built v1.2

Scorecard

Commitment to

Performance

To recognise practices that encourage

building owners, building occupants and

FM teams to set targets and monitor

environmental performance in a

collaborative way.

Metering and

Monitoring

To recognise the implementation of

effective energy and water metering and

monitoring systems.

Responsible

Building

Practices

To reward projects that use best practice

formal environmental management

procedures during construction.

Operational

WastePrescriptive Pathway

Page 23: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 22 ©Ark Resources

17

9.1 Ventilation System Attributes 1 1

9.2 Provision of Outdoor Air 2 1

9.3Exhaust or Elimination of

Pollutants1 1

10.1 Internal Noise Levels 1 1

10.2 Reverberation 1 1

11.0 Minimum Lighting Comfort - Complies

11.1General Illuminance and

Glare Reduction1 1

11.2 Surface Illuminance 1 1

11.3 Localised Lighting Control 1 1

12.0 Glare Reduction - Complies

12.2 Views 1 1

13.1Paints, Adhesives, Sealants

and Carpets1 1

13.2 Engineered Wood Products 1 1

Total 17 11

22

15B.0Conditional Requirement:

NatHERS Pathway- Complies

15B.1 NatHERS Pathway 16 5.5

16APrescriptive Pathway - On-

site Energy Generation1

Total 17 5.5

Acoustic Comfort

To reward projects that provide

appropriate and comfortable acoustic

conditions for occupants.

Indoor Environment Quality

Indoor Air QualityTo recognise projects that provide high air

quality to occupants.

Energy

Greenhouse Gas

Emissions

Max.5pts

achievable via

Credit 15A -

Prescriptive

Pathway.

B. NatHERS Pathway

Lighting Comfort

To encourage and recognise well-lit

spaces that provide a high degree of

comfort to users.

Visual Comfort

To recognise the delivery of well-lit spaces

that provide high levels of visual comfort to

building occupants.

Indoor Pollutants

To recognise projects that safeguard

occupant health through the reduction in

internal air pollutant levels.

Peak Electricity

Demand

Reduction

Prescriptive Pathway

Page 24: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 23 ©Ark Resources

Transport 10

17B.1 Access by Public Transport 3

17B.2Reduced Car Parking

Provision1 0.5

17B.3Low Emission Vehicle

Infrastructure1 1

17B.4 Active Transport Facilities 1 1

Total 7 2.5

Water 12

18B.1 Sanitary Fixture Efficiency 1 1

18B.2 Rainwater Reuse 1 1

18B.3 Heat Rejection 2 2

18B.4 Landscape Irrigation 1 1

18B.5 Fire System Test Water 1 1

Total 6 6

Materials 14

19B.1 Concrete 3 1.5

19B.2 Steel 1 1

20.1Structural and Reinforcing

Steel1 1

20.2 Timber Products 1 1

20.3

Permanent Formwork,

Pipes, Flooring, Blinds and

Cables

1 1

22A Fixed Benchmark 1 1

Total 12 6.5

Construction and

Demolition WasteFixed Benchmark

Sustainable

TransportPrescriptive Pathway

Potable Water Prescriptive Pathway

Life Cycle

Impacts

Points from

operational energy

reductions capped

at 3 out of the 6

Prescriptive Pathway - Life Cycle Impacts

Responsible

Building

Materials

To reward projects that include materials

that are responsibly sourced or have a

sustainable supply chain.

Page 25: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 24 ©Ark Resources

6

23.0Endangered, Threatened or

Vulnerable Species- Complies

23.1 Ecological Value 3 1

24.0 Conditional Requirement - Complies

24.1 Reuse of Land 1 1

Heat Island Effect

To encourage and recognise projects that

reduce the contribution of the project site

to the heat island effect.

25.0 Heat Island Effect Reduction 1 1

Total 6 3

5

26.1 Stormwater Peak Discharge 1 1

26.2Stormwater Pollution

Targets1 1

27.0Light Pollution to

Neighbouring Bodies- Complies

27.1 Light Pollution to Night Sky 1 1

Microbial Control

To recognise implementation of systems

to minimise impacts associated with

harmful microbes in building systems.

28.0Legionella Impacts from

Cooling Systems1 1

Total 5 4

Ecological ValueTo reward projects that improve the

ecological value of their site.

Sustainable Sites

To reward projects that choose to develop

sites that have limited ecological value, re-

use previously developed land and

remediate contaminate land.

Land Use & Ecology

Emissions

Stormwater

To reward projects that minimise peak

stormwater flows and reduce pollutants

entering public sewer infrastructure.

Light PollutionTo reward projects that minimise light

pollution.

Page 26: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 25 ©Ark Resources

10

Innovative

Technology or

Process

The project meets the aims of an existing

credit using a technology or process that

is considered innovative in Australia or the

world.

30AInnovative Technology or

Process2

Market

Transformation

The project has undertaken a sustainability

initiative that substantially contributes to

the broader market transformation towards

sustainable development in Australia or in

the world.

30B Market Transformation 4

Improving on

Green Star

Benchmarks

The project has achieved full points in a

Green Star credit and demonstrates a

substantial improvement on benchmark

required to achieve full points.

30CImproving on Green Star

Benchmarks2

Innovation

Challenge

Where the project addresses an

sustainability issue not included within any

of the Credits in the existing Green Star

rating tools.

30D Innovation Challenge 3

Total 10 10

5* pathway

CORE POINTS 100 50.5

CATEGORY

PERCENTAGE SCORE50.5

INNOVATION POINTS 10 10.0

TOTAL SCORE

TARGETED60.5

Green Star rating 5 Star

10

Innovation

Page 27: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 26 ©Ark Resources

Appendix 2: MUSIC Results

Acr

on

yms

Are

a N

ame

Are

a [m

2 ]R

WT:

Rai

n W

ate

r Ta

nk

Tota

l Ro

of

Are

as t

o R

WT

1,43

5TF

: To

ile

t Fl

ush

ing

L20

Ro

of

389

GP

T: G

ross

Po

llu

tan

t Tr

ap

L20

Terr

ace

312

RG

: Rai

n G

ard

en

L7 T

err

ace

s40

0

L6 T

err

ace

s/B

alco

nie

s19

0

L5 T

err

ace

144

Pe

rme

able

Lan

dsc

ape

Are

as51

7

Pla

nte

rs a

ll L

eve

ls45

7

Po

ol

60

Oth

er

imp

erv

iou

s ar

eas

512

Tota

l Sit

e A

rea

2,46

4

MU

SIC

Mo

de

l 01/

07/2

017

RW

Ts62

kL

Toil

ets

co

nn

ect

ed

to

RW

T fo

r TF

Leve

ls G

rou

nd

to

12

% o

f R

esi

de

nti

al T

oil

ets

co

nn

ect

ed

to

RW

T fo

r TF

60%

An

nu

al w

ate

r d

em

and

fo

r TF

(to

ile

ts c

on

ne

cte

d t

o R

WT

on

ly)

1710

/yr

**P

rim

ary

Tre

atm

en

t S

yste

m 1

(G

PT)

Ro

cla

CD

S N

ipp

er

(or

eq

uiv

ale

nt)

Me

lbo

urn

e W

ate

r Ta

rge

ts

Gre

en

Sta

r T

arg

ets

(Co

lum

n A

)

Re

du

ctio

n in

To

tal S

usp

en

de

d S

oli

ds

(TSS

)88

.6%

80.0

%80.0

%

Re

du

ctio

n in

To

tal P

ho

sph

oru

s (T

P)

60.2

%45

.0%

30.0

%

Re

du

ctio

n in

To

tal N

itro

gen

(TN

)59

.0%

45.0

%30.0

%

Re

du

ctio

n in

To

tal G

ross

Po

llu

tan

ts99

.3%

70.0

%85.0

%

Co

mp

lian

ce w

ith

Mel

bo

urn

e W

ate

r ta

rget

s✓

✓✓

**N

utr

ien

t re

du

ctio

n (

Ph

osp

ho

rou

s an

d N

itro

gen

) n

ot

attr

ibu

ted

to

GP

T as

pe

r M

elb

ou

rne

Wat

er

MU

SIC

gu

ide

lin

es.

Ass

um

pti

on

s

Tre

atm

en

t D

evi

ces

Feat

ure

s

Re

sult

s

NO

TES:

Page 28: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 27 ©Ark Resources

MUSIC SCHEMATIC

Page 29: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 28 ©Ark Resources

RAINWATER CATCHMENT AREA

Page 30: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 29 ©Ark Resources

Appendix 3: Energy Rating Assumptions

Building Materials

Element Description Added R

Value

Floor Type Suspended concrete slab

Floor Insulation

50mm Kingspan Kooltherm:

Underside of suspended concrete floors shared with car park and outside R 2.5

80mm Kingspan Kooltherm:

Underside of suspended concrete floors shared with carpark or outside below (Apt 6.12)

R 4.0

Wall Insulation

Lightweight party walls:

Insulation R 1.5 R 1.5

Lightweight corridor walls:

Insulation R 1.5 R 1.5

Precast concrete Lift & stairwell walls:

Insulation R1.5 R 1.5

Precast concrete external walls:

Insulation R 1.55 R 1.55

Precast concrete external walls:

Insulation R 2.55 (Apt 6.11, 6.12) R 1.55

Glass spandrel walls:

Insulation R 2.5 R 2.5

Roof Insulation

Concrete ceiling/roof with terrace/outside above:

75mm ISO Board R 2.5

Concrete ceiling/roof (Level 20):

70mm Kingspan Kooltherm R 3.5

Window Frames Thermally broken frames to all windows and glazed doors

Sky Lights Nil

External Blinds Screens and shading as per elevations

Page 31: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 30 ©Ark Resources

Glazing

Glazing Type Description Whole of Window

Value Location

Capral – Thermally Broken Futureline 440 Series Fixed

U SHGC

Specified Glazing

CAP-113-03 Double glazed

24mm Insulglass Max 564 - Air 2.00 0.25

All apartments

Energy Rating Software Equivalent

THC-050-09 Series EC75TB Fixed Double glazed

6mm Performa/12mm Argon gap/6mm Clear

2.08 0.26

Capral – Thermally Broken Futureline 54W Series Awning

U SHGC

Specified Glazing

CAP-116-03 Double glazed

24mm Insulglass Max 564 - Air 2.90 0.19 All apartments

Capral – Thermally Broken Futureline Lift & Slide Door

U SHGC

Specified Glazing

CAP-133-03 Double glazed

24mm Insulglass Max 564 - Air 2.40 0.19

All apartments

Energy Rating Software Equivalent

GJA-068-10 GJames Type 448 TB AL door DG

6mm DLE55(S2)Azur/12mm Air gap/6m Clear

2.46 0.19

NOTES

The energy rating software accredited by the Australian Building Codes Board contains a relatively limited

library of window systems. When the glazing systems specified are not available in the software, the protocol

requires that the glazing type which most closely matches the specified glazing is selected for the purpose of

calculating the energy rating.

The table above sets out the glazing specified on the architectural drawings together with the glazing input for

the purposes of calculating the energy rating.

The whole of window U – Value must be equal or lower than the energy rating software value and the whole

of window SHGC – Value must be within +/-5% of the energy rating software value.

Page 32: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 31 ©Ark Resources

General Rating Assumptions

Item Details

Floor Coverings • Tiles to bathrooms, kitchens

• Carpet to bedrooms and all other areas

Window Coverings

• Holland blinds to all windows. (Regulation Mode)2

Draught Proofing • Weather strips to all entry & external doors and windows.

• Seal all exhaust fans.

Down lights • Recessed down lights in ceiling /roof space to be fitted with fire proof unvented down light covers (external roof areas only) to provide air tightness and contact with insulation

General • All party walls are classed as neighbour walls.

Shading • Overshadowing from adjoining buildings has been incorporated into the energy ratings

Ceiling Calculation

• Calculation for loss of ceiling insulation due to down lights, exhaust fans, ceiling speakers etc. have been incorporated into the energy rating where applicable

NOTES

1. Changes to any of the above stated specifications may affect energy performance and invalidate the

energy ratings detailed in this report.

2. Sealing of gaps and cracks: inadequate sealing of gaps and cracks can negatively affect the energy

performance of a dwelling. Provide sealing in accordance with NCC 2016 Part J3.

2 Holland blinds are assumed as required by VBA Practice Note 55 (Clause 5.2). This assumption is for regulatory

purposes only.

Page 33: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 32 ©Ark Resources

Appendix 4: Rainwater Harvesting

Property

Version

box 1

Inputs

Irrigation Schedule

PPL 208 l /m2 S M T W Th Fr S

Flush/Person/Day 5 Jan 10 y y

Litres/Flush 3.3 Feb 10 y y

Total Daily usage (litres) 3432 M ar 10 y y

Apr 5 y

Roof area (m2) 1,435 M ay 5 y

Collection Evaporation 5% Jun 5 y

Tank Capacity (litres) 62,000 Jul 5 y

Aug 5 y

Sep 5 y

Irrigation Area (m2) 210 Oct 5 y

10 Nov 10 y

5 days Dec 10 y y

box 2

System components (kls per year)

box 3

System components (kls per year) based on 12 years of actual historical daily rainfall12 years o f A verages

(k l)

Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Total

R ain R un o ff 46 63 40 64 59 51 48 63 54 70 71 72 701

Overflow - (11) (3) (6) (0) (2) - - - (2) (9) (4) (38)

R ain Water saved 46 51 37 58 59 50 48 63 54 68 62 68 663

Toilet (106) (97) (106) (103) (106) (103) (106) (106) (103) (106) (103) (106) (1,253)

(61) (46) (69) (45) (47) (53) (59) (43) (49) (39) (40) (38) (590)

Irrigation (15) (13) (16) (3) (3) (4) (4) (3) (3) (3) (6) (14) (89)

Unsatisf ied D emand (76) (59) (85) (48) (51) (57) (62) (47) (52) (42) (47) (52) (678)

A ctual Years

(k l)

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Total

R ain R un o ff 490 798 832 858 825 541 672 848 804 598 577 571 8,414

Overflow - (2) (18) (51) (99) - - (105) (151) - (2) (27) (454)

R ain Water saved 490 795 814 808 726 541 672 744 653 598 575 544 7,960

Toilet (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,253) (1,256) (15,036)

(762) (457) (439) (445) (526) (712) (581) (509) (600) (655) (678) (712) (7,076)

Irrigation (100) (76) (75) (83) (90) (89) (93) (86) (92) (80) (103) (101) (1,068)

Unsatisf ied D emand (862) (533) (513) (528) (617) (801) (674) (595) (692) (735) (781) (813) (8,144)

box 4

Reliability of supply (daily demand met)- Tank size what ifs

Tank Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Overall

1k 11% 11% 9% 15% 20% 14% 16% 19% 18% 18% 17% 13% 15%

2k 11% 11% 9% 15% 20% 16% 16% 20% 19% 19% 18% 14% 16%

5k 15% 17% 12% 23% 27% 23% 21% 28% 27% 27% 26% 21% 22%

10k 20% 23% 15% 29% 31% 28% 26% 37% 34% 35% 33% 27% 28%

20k 27% 34% 19% 38% 38% 35% 31% 46% 39% 42% 45% 36% 36%

50k 32% 44% 23% 46% 47% 42% 31% 49% 44% 48% 59% 46% 43%

100k 35% 45% 27% 51% 52% 44% 32% 49% 44% 48% 62% 52% 45%

200k 40% 45% 33% 52% 53% 47% 33% 49% 44% 48% 62% 53% 47%

118 Bertie Street, Port Melbourne

(Shortfall)/Surplus

before Irrigation

(Shortfall)/Surplus

before Irrigation

T'off if Total Rain (mm)

in the last

701

38

- -

(679)

-0

Rain Run off Overflow Toilet Irrigat ion Unsat'd dmnd

Recalc, update pivots,

table and graphs

Page 34: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 33 ©Ark Resources

0

20

40

60

80

100

120

140

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

kl (

month

avera

ge)

Graph 4 - Tank water used v unsatisfied demandby month (kls per month)

Tank water. Unsatisfied Demand.

34%

45%

24%

48% 49%43%

31%

49%44%

48%

61%

48%44%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Overall

No.

days to

tal d

em

and m

et

Graph 2 - Reliability of supply from tank (average across 12 years)

Toilet & Irrigation Toilet only

317 346 411483 532 566 588 648 673 683 694 699

0

200

400

600

800

1,000

1,200

1,400

1,600

1 2 5 10 15 20 25 50 75 100 150 200

Ta

nk

wa

ter

us

ed

(k

lit

es

)

Tank size (kl)

Graph 3 -Tank water used (per year) V Tank sizeKls per year

Tank water used Unsatisfied demand

Page 35: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 34 ©Ark Resources

Appendix 5: WSUD Maintenance Manual

Rainwater Harvesting System Maintenance Program

Once installed, a systematic maintenance program will be implemented by the owner’s corporation

maintenance contractor to ensure the rainwater harvesting system operates as designed and water quality is

maintained.

The scope of the maintenance program will include inspection and rectification of issues associated with:

• Roof gutters and downpipes

• First flush screens and filtration devices

• Pumps

• Distribution pipework and reticulation systems

• Overflow systems

Inspections of the system and any maintenance works required will be undertaken on a quarterly basis.

The rainwater harvesting system will be installed in accordance with the guidelines set out in the Rainwater

Design & Installation Handbook published by the National Water Commission3. A schematic diagram of the

rainwater tank installation is provided below.

3 Rainwater Design & Installation Handbook, National Water Commission, 2008

Page 36: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 35 ©Ark Resources

Appendix 6: Solar Photovoltaic System

High-efficiency solar PV modules with a total capacity of 26 kWp will be installed at roof level as per the

preliminary layout indicated below.

Each PV module will be oriented northwards at 10-15° tilt and have at least 300Wp capacity (i.e. over 20% more efficient than traditional 250Wp 60-cell modules). High-efficiency modules deliver more compact arrays with inherently lower embodied ecological impact per unit of generation than standard efficiency modules.

Indicative Solar Photovoltaic array layout

Total yield of this array will be approximately 37 MWh per annum equating to an estimated annual carbon

emissions offset of 43 tonnes CO2-e per annum.

Page 37: Proposed Residential Development - Planning - Planning€¦ · Level 4 • Residential apartments, car parking Level 5 • Residential apartments and storage facilities Level 6 •

118 Bertie Street, Port Melbourne SMP 24 May 2019

File: 1014A 36 ©Ark Resources

118 Bertie Street, Port Melbourne Input

Calculated

Step Control

Copied data

Data

Total number of bedrooms 317

Average number of people per bedroom 1.1

Total occupants 349

Photovoltaic System

Electricity gas emissions factor, NG [2] kg_CO2-e/kWh 1.16 Scope 2 and 3

PV Melbourne energy delivery MWh/y per kWe 1.40

10° tilt,

Northwards

PV capacity required kWe 26.9

Proposed PV module rating Wp 300

Efficiency improvement over traditional

250W module 20.0%

Typical dimensions for 60-cell module Width (m) x length (m) 1.0 x 1.7

Number of panels required rounded up 90

Expected electricity produced kWh/day 103.2

Annual expected electricity produced MWh/yr 37.7

Annual expected solar energy contribution GJ/y 592.4

Natural gas use reduction from solar GJ/y 789.9

Greenhouse gas emissions factor, NG [1] kg_CO2-e/GJ 55.3 Scope 1 and 3

Greenhouse gas emissions reduction tonnes_CO2-e/yr 43.68

[1] National Greenhouse Accounts (NGA) Factors, August 2018, tables 2 and 38

[2] National Greenhouse Accounts (NGA) Factors, August 2018, table 41 "Latest", "Victoria"