Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

61
Spring Lane and Hendren Street Proposed Flood Relief Project November 12, 2013 www.phillywatersheds.org

description

This presentation provides an overview of a potential project to relive neighborhood flooding and sanitary sewer issues in an area of Philadelphia that is served by a private sewer. This was delivered in a face to face meeting with residents in the vicinity of Spring Lane and Hendren Street on November 12, 2013.

Transcript of Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Page 1: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Spring Lane and Hendren StreetProposed Flood Relief ProjectNovember 12, 2013

www.phillywatersheds.org

Page 2: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Outline

Review of Past Problems and Project ObjectivesPWD Involvement and InitiativesWatershed and Neighborhood FindingsPWD Proposed Contributions to SolutionsHomeowner InvolvementChoices and Decision Making

Page 3: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Hendren Street and Spring Lane

Review of original problemStabilize the Spring Lane OutfallProtect the existing 4” force mainAddress the flooding impacts experienced by residents

Page 4: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 5: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 6: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Infrastructure Damage: Failed Outlet-700 Block Spring Lane

Page 7: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Infrastructure Damage: Failed Outlet -700 Block Spring Lane

Page 8: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Impaired Driver Safety: Standing Water-700 Block Spring Lane

PONDED WATER LIMITS AFTER JUNE 2013 THUNDERSTORM

Page 9: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Impaired Driver Safety: Sediment Deposition @ Hendren & Spring Intersection

Page 10: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Roadway/Lawn Interface Deterioration Eroded gutter@ Hendren & Spring Intersection

Page 11: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Homeowner Impacts: Erosion and Pavement Damage- 600 Block Hendren Street

Page 12: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Involvement and Initiatives

Initiative 1: Homeowner Surveys

Quantify number of homeowners adversely affected by stormwater runoffConcurrently gather data to evaluate provision of sanitary sewer service

Initiative 2: Analysis

Determine Source(s) and destinations of problematic runoffEvaluate Potential remedies

Initiative 3: Recommendations

Page 13: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Survey Response Summary

45 Surveys Distributed / 19 Responses (42%)15 Surveys on Spring Lane/ 7 Responses (47%)30 Surveys on Hendren / 12 Responses (40%)

Page 14: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 15: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Survey Summary: Septic

ID Good Condition Fair Condition Poor Condition

Spring Lane 4 2 1

Hendren Street 3 5 4

Total 7 7 5

Page 16: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD- Analysis- Source of Runoff

Drainage Area to Spring Lane is approximately 25 Acres

Page 17: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 18: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Sources: Manatawna Avenue to Spring Lane

Page 19: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Sources: Hendren Street and Yards to Spring Lane

Page 20: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Summary of Observations:

PWD’s installation of storm sewers/inlets in Manatawna Avenue, Hendren Street and Spring Lane will provide control of stormwater from city streets and public rights-of-way, however, runoff from private property, driveways and roof tops will need to be directed and connected to this infrastructure.

Page 21: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Manatawna Stormwater Improvements

Inlets can be added in Manatawna to intercept this street runoffHOWEVER, this represents only a small fraction of the total land area currently contributing to Hendren and Spring flooding.

Page 22: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Analysis: Runoff Path

YardsHendren StreetColonial Swale and YardsResidencesLow Point in Spring (Damaged Storm pipe and Headwall)

Page 23: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Paths: Colonial Gutter

Page 24: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Paths: Yards-Hendren to Spring

Page 25: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Paths: Streets- Spring to Field

Page 26: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 27: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Runoff Paths: Streets -Low Point Spring

Page 28: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Analysis: Significant Runoff Generators

Surface Character affects the amount of runoffImpervious Surface like roofs, drives, streets and walks prohibit infiltration of stormwater. Nearly 100% RunoffPervious, Vegetated Surfaces absorb some runoff, however runoff still occurs, especially in more intense storms

Page 29: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Watershed Statistics: Impervious Surface

25 Acres Total Drainage Area

25% Impervious (6.3 acres)2.3 acres streets (public)4.0 acres roof tops and driveways (privately owned)

75% Pervious (18.6 acres – privately owned)

Page 30: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Public vs. Private Runoff Generators

Runoff from streets and public rights-of-way 2.3 Acres or 9%

Yards, roofs and driveways 18.5 acres + 4 Acres = 22.5 Acres or 91%

Page 31: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Sanitary Sewer Service

Existing Sanitary ChallengesOf the respondents to the survey, 62% indicated that their existing septic system was only in “fair” or “poor” condition

Page 32: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Sanitary Sewer Design Considerations

Spring LaneSouth side of Spring served by a standard depth gravity sewer.

A new pump station will require acquisition of additional right-of-way

Page 33: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Sanitary Sewer Design Considerations

Hendren StreetSouth side residents (uphill) can be served by standard depth (8-feet Separate) sewersNorth side residents (downhill) are below standard depth sewers

Page 34: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 35: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Stormwater Remedies:

Localized Damage solution is available; Repair damage at Spring Lane outfall

Interim: Armor and reinforce

Page 36: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Typical Repair of Damaged Outfall

Page 37: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Stormwater Remedies:

Construction of a Storm Sewer pipe and inlet system in public rights of way is possible

Will provide for safe conveyance of captured runoff

Will fortify repair of damaged Spring Lane outfall and protect forcemain

Page 38: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Actions Required beyond PWD’s Proposed Stormwater Remedies:

Doesn’t Solve the Entire ProblemRequires that private property runoff be redirected to intercept 100% of runoffWill not resolve homeowner flooding emanating from private property runoff

Page 39: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 40: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Stormwater: Increase Effective Runoff Collection – Connect All Roofs to Proposed Main

Page 41: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Stormwater: Increase Effective Runoff Collection – Connect All Roofs to Proposed Main

Page 42: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

PWD Sanitary Sewer Remedies:

Construction of Sanitary Sewer and Pump station is possible

Will provide alternative to replacement of failing septic systemsRequires additional efforts to provide service to entire neighborhood

Downslope properties that have plumbing discharge below street level may need to install ejector/grinder pumps

Page 43: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 44: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Choices Related to PWD Action

Construction Impacts

Financial and Action Commitment

Page 45: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Choices Related to PWD Action

Construction ImpactsPotential roadway changes

WideningADA WalksCurbs or swalesDriveway crossings

Tree, Shrubbery and Fence Removal Probable

Page 46: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Construction Choices Related to PWD Action: Fence POTENTIALLY at Risk

Page 47: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Construction Choices Related to PWD Action: Fence POTENTIALLY at Risk

Page 48: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Construction Choices Related to PWD Action: Trees POTENTIALLY at Risk

Page 49: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Construction Choices Related to PWD Action: Shrubbery POTENTIALLY at Risk

Page 50: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Construction Choices Related to PWD Action: Shrubbery and Specimen Tree at Risk

Page 51: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Consequences of PWD Action:Shrubbery and Specimen Tree at Risk

Page 52: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 53: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer
Page 54: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

ALTERNATIVE APPROACH

Reduced extent of curbing and street wideningIntercept Runoff with Roadside Swales in-lieu of Curbing

Retain Neighborhood CharacterProvides Infiltration

Reduces Runoff VolumeImproves Water Quality

Page 55: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Alternative Approach: Hendren Street Section @ Regulated Width

Page 56: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Alternative Approach: Hendren Street

Section - Retained Narrow Width- No Curb

Page 57: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Choices Related to PWD Action:Financial and Action Commitment

PWD Responsibility Homeowner Responsibility3540 feet of Storm Water Main: Construct, Own & Maintain

3293 feet stormwater laterals and appurtenances from downspouts to edge of street: Construct, Own & Maintain

462 feet stormwater laterals to edge of street: Construct only. (will be owned and maintained by homeowner)

Decommission septic system

3075 feet of Sanitary Sewer Main: Construct, Own & Maintain. 453 feet sanitary laterals to edge of street: Construct only. (will be owned and maintained by homeowner)

3806 feet sanitary laterals and appurtenances from house to edge of street including : Construct, Own & Maintain

Pump station and + 700 Feet of Forcemain: Construct, Own & Maintain

Grinder Pump (if required): Construct, Own & Maintain

Inlets: Construct, Own & MaintainSwales: Construct, Own & Maintain

Pay Assessment fee: $9.00/lineal foot of frontage

Driveway restoration in area of disturbance only Pay monthly service fee

Remove vegetation within construction limits*

Acquire permits and approvals for construction within the public rights-of-way, Only

Acquire permits and approvals for construction within homeowner property limits

* Landscaping outside the right of way that is affected by construction will be replaced with young nursery stock of similar species. Landscape replacement within the right of way will be replaced depending on the situation. Utility, safety and maintenance issues will be evaluated.

Page 58: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Steps to Obtain Public Sewers

Residents signed petition to PWD or their CouncilpersonCity Council Ordinance is required for a public sewerProcess from Ordinance to construction can take a few years

Page 59: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Impact to Customers

Each property owner is assessed at the rate of $9.00 per linear foot of property frontage Plumbing which drains to the back of the house needs to be redirected to the front of the house (PWD has zero interest loans available)Yard drains, downspouts should be connected to new stormsewer via new stormwater lateral (PWD has zero interest loans available)

Page 60: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Benefits of PWD Actions

Reduced runoff from street and connected roofs…reduced property damageImproved Driver Safety-Reduced standing waterElimination of maintenance associated with on-lot septic systemAlternative to replacement of expensive on-lot septic systemImproved marketability of property

Page 61: Proposed Project: Spring Lane and Hendren Street Storm and Sanitary Sewer

Homeowner Solution Choices

PWD Installation of Stormwater and Sanitary Sewer conveyance System?

…or

Limit PWD’s actions to Repair of Damaged Spring Lane outfall?

Other?