PROPOSED PROJECT - Ontario Veterinary College...#003 BLDG#039 BLDG#047 BLDG#045 BLDG#077 BLDG#040...
Transcript of PROPOSED PROJECT - Ontario Veterinary College...#003 BLDG#039 BLDG#047 BLDG#045 BLDG#077 BLDG#040...
OVERALL LOCATION PLAN - SPACES RELOCATION ACOLLEGE AVENUE WEST
SMIT
H L
ANE
SurgeryAnesthesia
Medical RecordsOffice
BLDG#046
SPD
Graduate Students
UltrasoundEndo--scopy
Therio
LargeAnimalsImaging
BLDG#049
BLDG#044
BLDG#040
BLDG#077
BLDG#003
BLDG#039
BLDG#047
BLDG#183BLDG#045
BLDG#046
BLDG#049
BLDG#183
BLDG#044
BLDG#003
BLDG#039
BLDG#047
BLDG#045
BLDG#077
BLDG#040
TemporaryClassroom
Medical RecordsFiles
Offices/Meeting
•Temporary Large Classroom
GRADUATEDSTUDENTS
SPD LEARNING ANESTHESIA
KEY:
•Offices/Meeting•Graduate Students Cubicles
•Medical Records Offices•Medical Records Files
MEDICAL RECORDS ULTRASOUND OFFICES L.A. IMAGING THERIO CORRIDOR C1443
•Medical Records Office•Medical Records Files
ENDOSCOPY
C1443
Water Entry
Elec.&IT
PROPOSED PROJECTFIRST FLOOR
PROPOSED PROJECTSECOND FLOOR
1 1 2 2 2 4+5
3 3 7 7 7
PANEL NUMBERn
SURGERY6
OVERALL LOCATION PLAN - PHASES BCOLLEGE AVENUE WEST
SMIT
H L
ANE
SurgeryAnesthesia
Medical RecordsOffice
BLDG#046
SPD
Graduate Students
UltrasoundEndo--scopy
Therio
LargeAnimalsImaging
BLDG#049
BLDG#044
BLDG#040
BLDG#077
BLDG#003
BLDG#039
BLDG#047
BLDG#183BLDG#045
BLDG#046
BLDG#049
BLDG#183
BLDG#044
BLDG#003
BLDG#039
BLDG#047
BLDG#045
BLDG#077
BLDG#040
TemporaryClassroom
Medical RecordsFiles
Offices/Meeting
PHASE 9 PHASE 8
KEY:
Renovation:• Medical Records• Offices/Meetings• Ultrasound• Large Animal Imaging• Graduate Students• Temporary Classroom
Renovation:• Corridor C1443 Relocation
PHASE 3 PHASE 5 PHASE 1 PHASE 4 PHASE 6 PHASE 7
PHASE 10
Demolition:• Building #044 - Existing Radiology, Auditorium, Offices• Building #045 - Existing Surgery
Renovation:• Surgery• Anesthesia (partial)• SPD (partial)
Demolition:• Building #45 - Existing L.A. Surgery, Changeroom
Renovation:• Sterile Processing Department
Building #044Corridor Relocation
Renovation:• Endoscopy• Anesthesia
Demolition:• Building #044 - Existing Sterile Processing Department
PHASE 2Renovation:• Therio
C1443
PROPOSED PROJECTFIRST FLOOR
PROPOSED PROJECTSECOND FLOOR
OVERALL LOCATION PLAN - WORK PLAN C
PHASE ONE & TWO COMPLETED
J
CONSTRUCTIONSTART
PHASE SIXCOMPLETED
PHASE SEVENCOMPLETED
SPD RELOCATION
PHASE EIGHTCOMPLETED
PHASE THREECOMPLETED
DEPART./ STAFFRELOCATION
PHASE FOUR COMPLETED
PHASE FIVECOMPLETED
PHASE NINECOMPLETED
PHASE TENCOMPLETED
CONSTRUCTIONCOMPLETED
SEPT 12, 2016
OCT 3, 2016
OCT 31, 2016
MAY 8, 2017
SEPT 11, 2017
OCT 9, 2017
MAR 20,2018
SURGERY CHANGERM RELOCATION
APRIL 24, 2017
SEPT 18, 2017
F M A M J J A S O N D J F M A M J J A S O N D J F M2016 2017 2018
JUNE 9, 2016
JUNE 10, 2016
SEPT 13, 2016
OCT 4, 2016
APRIL 17, 2017
MAR 30, 2018
NOV 28, 2016
NOV 6, 2017
NOV 1, 2016
APRIL 25, 2017
MAY 9, 2017
SEPT 19, 2017
NOV 7, 2017
APRIL 18, 2017
SEPT 12, 2017
NOV 29, 2016
OCT 10, 2017
PHASE ONE - MEDICAL RECORD/ADMIN & BUSINESS OFFICES
CONSTRUCTION START : 06 JUNE, 2016
CONSTRUCTION COMPLETION : 12 SEPTEMBER, 2016
DURATION : 9 WEEKS
** DEPARTMENT & STAFF RELOCATION: 13 SEPTEMBER ~ 3 OCTOBER, 2016
LAB #103,#103A, #104 & #104A
LAB #1115,#1115A & #1116
LAB #1116,#1118,#1121,#1122 & #1123
• DEMOLITION PLAN
• RENOVATION PLAN
MEETING BUSINESS OFFICES
MED.RECORD OFFICEMED.RECORDS FILES ADMIN. OFFICES
1
PHASE ONE & PHASE TWO - ULTRASOUND/ L.A.IMAGING/ THERIO
SEMINAR
ULTRASOUND #1429, #1430
LAB#1448
CORRIDOR#C1471
LARGE ANIMAL
IMAGING#1471
ULTRASOUND
THERIO.#1429,#1430
• DEMOLITION PLAN • RENOVATION PLAN
CONSTRUCTION START : 10 JUNE, 2016
CONSTRUCTION COMPLETION : 12 SEPTEMBER, 2016
DURATION : 9 WEEKS* ULTRASOUND COMPLETION: 18 JULY, 2016* ULTRASOUND RELOCATION, RENOVATION START ON THERIO (PHASE 2): 25 JULY, 2016* L.A.I. RELOCATION: 13 SEPTEMBER ~ 03 OCTOBER, 2016
2
#1296
CORRIDOR#C1471
#1296
PHASE ONE - GRADUATE STUDENT CUBICLES & TEMPORARY CLASSROOM
CONSTRUCTION START : 10 JUNE, 2016
CONSTRUCTION COMPLETION : 12 SEPTEMBER, 2016
DURATION : 9 WEEKS
** DEPARTMENT & STAFF RELOCATION : 13 SEPTEMBER ~ 3 OCTOBER, 2016
STUDY ROOM #2660,#2661,
& #2661D
TEMPORARYCLASSROOM
LAB #2115,#2120,#2120B & C2120
GRADUATE STUDENT CUBICLES
• DEMOLITION PLAN_GRADUATE STUDENT CUBICLES
• RENOVATION PLAN_GRADUATE STUDENT CUBICLES
3
• DEMOLITION PLAN_TEMPORARY CLASSROOM
• RENOVATION PLAN_TEMPORARY CLASSROOM
PHASE THREE (partial) - EXISTING OFFICES DEMOLITION
PHASE THREE (PARTIAL)CONSTRUCTION START : 4 OCTOBER, 2016
CONSTRUCTION COMPLETION : 31 OCTOBER, 2016
DURATION : 3 WEEKS
NEWL.A.I.
EXIST.OFFICES
• DEMOLITION PLAN temporary path during demolition
EXIST.RECORDS
EXIST.L.A.
IMAGING
EXIST. AUDITORIUM
EXIST.S.P.D.
4
PHASE THREE & FOUR - CORRIDOR C1443 (partial)/SURGERY/SPD (partial)/ ANESTHESIA (partial)
PHASE THREE TO FOURCONSTRUCTION START : 4 OCTOBER, 2016
CONSTRUCTION COMPLETION : 28 NOVEMBER, 2016
DURATION : 7 WEEKS
NEWL.A.I.
• DEMOLITION PLAN
hoardingtemporary corridor C1443
EXIST.RECORDS
EXIST.L.A.
IMAGING
EXIST. AUDITORIUM
EXIST.S.P.D.
5
PHASE FIVE - CORRIDOR C1443 (partial)/SURGERY/SPD (partial)/ ANESTHESIA (partial)
PHASE FIVECONSTRUCTION START : 29 NOVEMBER, 2016
CONSTRUCTION COMPLETION : 17 APRIL, 2017
DURATION : 18 WEEKS
• RENOVATION PLANhoarding
ANESTHESIA(partial)
EXISTINGS.P.D.
SPD (partial)
LAI
THE-RIO
CORRIDOR C1443 (partial)
* LARGE ANIMAL SURGERY SWITCH-OVER TO NEW WASH/CHANGEROOMS: 24 APRIL, 2017
SURGERY
6
next phase completion area
PHASE SIX TO TEN - SPD/ENDOSCOPY/ANESTHESIA
PHASE SIX TO EIGHTCONSTRUCTION START : 25 APRIL, 2017
CONSTRUCTION COMPLETION : 09 OCT, 2017
DURATION : 10 WEEKS
temporary corridor
ANESTHESIA
• RENOVATION PLAN
EXISTINGS.P.D.
• DEMOLITION PLAN
• RENOVATION PLAN• DEMOLITION PLAN
PHASE NINE TO TENCONSTRUCTION START : 10 OCT, 2017
CONSTRUCTION COMPLETION : 20 MAR, 2018
DURATION : 22 WEEKS
CONSTRUCTION TOTAL PERFORMANCE/OCCUPANCY30 MARCH, 2018
CORRIDOR C1443
ENDOSCOPY
SPD
* CORRIDOR C1443 COMPLETE SWITCH-OVER: 06 NOV, 2017
7
hoarding
* SPD SWITCH-OVER TO NEW AREA: 12 SEP ~ 18 SEPT, 2017