Transcript of Proposed Metering Scheme for solar Pv plant
-
8/8/2019 Proposed Metering Scheme for solar Pv plant
1/1
GI
1
Bus
(Draft fordiscussion)
Proposed Metering Scheme
Solar Installation and Metering Scheme
TO UTILITY NETWORK
GridImport=GIGM Grid Export = GE
SW1
S1
Main Consumer bus (11 KV)
CM
ConsumerImport =CI
UTILITY AC BUS
SMSE(N)
SW 3 SW2
Consumer AC LT BusSolar LT
S1 S2
INVERTER
CI
CONSUMER NON -
EMERGENCY LOAD
INVERTER
CUM CHARGER
SOLARPANEL
Roof top solar power plant
CONSUMER
EMERGENCY
LOAD
BATTERY
DG LT Bus
DG
SE(N)+GI=GE+CI
GM=Grid MeterCM=Consumer Meter
SM=Solar Meter
SE(N)=Net Solar Export Meter reading
SW = Switch
Normally solar panel is connected with the grid. When grid fails, inverter controlled
normally closed (ON) Switches S1 and normally open (OFF) Switch S2 will open & close
respectively. On restoration of supply, reverse action will take place.