    GI

    1

    Bus

    (Draft fordiscussion)

    Proposed Metering Scheme

    Solar Installation and Metering Scheme

    TO UTILITY NETWORK

    GridImport=GIGM Grid Export = GE

    SW1

    S1

    Main Consumer bus (11 KV)

    CM

    ConsumerImport =CI

    UTILITY AC BUS

    SMSE(N)

    SW 3 SW2

    Consumer AC LT BusSolar LT

    S1 S2

    INVERTER

    CI

    CONSUMER NON -

    EMERGENCY LOAD

    INVERTER

    CUM CHARGER

    SOLARPANEL

    Roof top solar power plant

    CONSUMER

    EMERGENCY

    LOAD

    BATTERY

    DG LT Bus

    DG

    SE(N)+GI=GE+CI

    GM=Grid MeterCM=Consumer Meter

    SM=Solar Meter

    SE(N)=Net Solar Export Meter reading

    SW = Switch

    Normally solar panel is connected with the grid. When grid fails, inverter controlled

    normally closed (ON) Switches S1 and normally open (OFF) Switch S2 will open & close

    respectively. On restoration of supply, reverse action will take place.