Proposed LBT Instrument Facility Enclosure OSU MODS.

4
Proposed LBT Instrument Facility Enclosure OSU MODS

Transcript of Proposed LBT Instrument Facility Enclosure OSU MODS.

Page 1: Proposed LBT Instrument Facility Enclosure OSU MODS.

Proposed LBT Instrument Facility Enclosure

OSU

MODS

Page 2: Proposed LBT Instrument Facility Enclosure OSU MODS.

Proposed First Floor LBT Instrument Facility

• Minimizes handling, lifting, and moving

• Safe access to auxiliary bay crane

• Space for large, high ceiling cleanroom

• Utilities nearby

• Proximity to existing electronics lab

• Space for wet and dry bench lab

Page 3: Proposed LBT Instrument Facility Enclosure OSU MODS.

• Consider possibility of second floor use above facility • Architectural & structural consult and approval • Cost of installation of additional heating, cooling, and air handling capacity • Size, class, and cost of cleanroon• Requirements for mobile crane within enclosure• Feasibility of using level 3L for machine shop• Cost estimates for interior insulation, finishing, and furnishings

Actions Required to Evaluate

Page 4: Proposed LBT Instrument Facility Enclosure OSU MODS.