PROPOSED (IN PROGRESS )MULTI- FAMILY BUILDING … · 2020. 9. 11. · REONNG VRTUA OPEN HOUSE 485...
Transcript of PROPOSED (IN PROGRESS )MULTI- FAMILY BUILDING … · 2020. 9. 11. · REONNG VRTUA OPEN HOUSE 485...
REZONING VIRTUAL OPEN HOUSE
GROUP #800-838 West Hastings St, Vancouver, BC. V6C 0A6485 WEST 28TH AVENUE
OWNER1098428 BC Ltd.
A-1
COVER SHEET
PROPOSED (IN PROGRESS )MULTI- FAMILY BUILDING DEVELOPMENT VANCOUVER, B.C.RE-ZONINGMAY 29, 2020
Sheet List Table
Sheet Number Sheet Title
COVER SHEET
A-1
A-2
A-3
A-4
A-5
SITE PLAN
A-6
P2 PARKING PLAN
A-7
LEVEL 1 FLOOR PLAN
A-8
LEVEL 2 FLOOR PLAN
LEVEL 3 FLOOR PLAN
LEVEL 4 FLOOR PLAN
SECTION A-AA-14
ARCHITECTGIANT UNION DESIGNARCHITECTURE AND PLANNING LTD.
#800-838 WEST HASTINGS STREETVANCOUVER, BC, V6C 0A6CONTACT: Xinmai Li
James PaulPeng WangJoseph DomingoAaron Li
TEL: 604-806-0268EMAIL: [email protected]
[email protected] [email protected]@[email protected]
SURVEYLNLS1528 KingswayVancouver, B.C.V5N 2R9CONTACT:EMAIL:
A-9
485 West 28th Ave., Vancouver, BCContact: Mr Chen
TEL: 604-720-9999604-341-7777
ROOF PLAN
A4-15
P1 PARKING PLAN
SECTION B-B
589 Lucerne PlaceNorth Vancouver, B.C., V7N 3A6TEL: (604) 986-2238CEL: (604) 987-2321CONTACT: Nancy PaulEMAIL: [email protected]
LANDSCAPENancy Paul Landscape Architect
ARBORISTMonkey Tree Services LtdTEL: (604) 833-2479Contact:Daniel Holliday, I.S.A
EMAIL:[email protected]
CONTEXT PLAN
STATISTICS AND DESIGN RATIONAL
BUILDING MASSING
LEVEL 5 FLOOR PLAN
LEVEL 6 FLOOR PLAN
A-10
ELEVATIONA-11
ELEVATIONA-12
SURVEY AND BUILDING GRADE
CIVIL CONSULTANT.R.F. BINNE & ASSOCIATES LTD.300 - 4940 Canada WayBurnaby, BC, V5G 4K6TEL: (604-420-1721)FAX: 604-420-4743Contact: Russell Warren P.Eng., Green Assc.SeniorProject ManagerEMAIL:[email protected]
GREEN BUILDINGJRS ENGINEERING300 – 4595 Canada Way, Burnaby BC V5G 1J9TEL: (604) 320-1999CEL: (604) 386-3298CONTACT: Jack Cui
EMAIL:[email protected]
CITY OF VANCOUVERCity of VancouverUnit 205 - 4180 Lougheed HWY,515 W 10th Avenue, Vancouver BC V5Z 4A8TEL: (604) 871-6738
Contact: Lecia Desjarlais, PlannerEMAIL:[email protected]
GEOTECHNICAL CONSULTANTGEOCAN ENGINEERING INC.
765 Foster AvenueCoquitlam, BC, V3J 2L8
TEL: (778)-987-7461Contact: Heqing Jian P. Eng.EMAIL:[email protected]
L-1 LANDSCAPE PLAN
L-2
L-3
FSR OVERLAY
A010 FSR OVERLAY LEVEL 1
LANDSCAPE DRAWINGS
SHADOW ANALYSIS
STREETSCAPE
DATENO. DESCRIPTION
ISSUES
CLIENT
COPYRIGHT:
SEAL
SUB-CONSULTANT
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
PROJECT NO:
DRAWN BY:
CHK'D BY:
SCALE:
DATE:
REV:
Any reproduction or distribution for any purpose other than authorized by theArchitect is forbidden. Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and the Architect shall be informed of any variationsfrom the dimensions and conditions shown on the drawing. Shop drawingsshall be submitted to the Architect for approval before proceeding withfabrication.
MAIN CONSULTANT
KEY PLAN
telfax
604-806-0268 604-806-0260
Vancouver, BC. V6C 0A6 800-838 West Hastings StreetGUD Group
82001
XINMAI
MAY 29, 2020
485 West 28th Ave.
---------1 LETTER OF INQUIRY
Vancouver BC
20-05-292 ISSUED FOR REZONING
1098428 BC Ltd.
MAX/JOSEPH
A001
A002
A003
A004
A005
A006
A007
ELEVATIONA-13
PERSPECTIVEA008
LANDSCAPE PLAN
LANDSCAPE PLAN
A011 FSR OVERLAY LEVEL 2
A012 FSR OVERLAY LEVEL 3
A013 FSR OVERLAY LEVEL 4
A014 FSR OVERLAY LEVEL 5
A015
A016
FSR OVERLAY LEVEL 6
FSR OVERLAY ROOF LEVEL
PERSPECTIVEA009
PERSPECTIVEA0010
PERSPECTIVEA0011
PERSPECTIVEA0012
PERSPECTIVEA0013
PERSPECTIVEA0014
PERSPECTIVEA0015
ARCHITECTURAL DRAWINGS
481-485 West 28th Avenue
An overview of the rezoning application and supporting Council-approved policies
September 14 - October 4, 2020
2
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
What is Rezoning?The City of Vancouver is divided into zoning districts. The Zoning and Development By-law sets out the rules for development in each zoning district, including the use (e.g. multiple dwelling) and physical form (e.g. height).
Rezoning changes how a property can be used or developed through a regulation change. It is required when a proposal does not conform with existing zoning. The purpose of rezoning is to:
• change land use regulations to enable development in line with City objectives; and
• secure public benefit contributions to help address increased demand on City facilities resulting from the rezoning.
Site-specific comprehensive development districts (CD-1s)
When a site is rezoned, the site is assigned a site-specific CD district. Each CD district is given a unique number to identify the district (e.g. CD-1 (647)). CD-1 district by-laws have regulations that are specific to the site.
Sep 01, 2020 15:091000 0 1000 2000Meters
Scale 1: 68479
3
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
What Guides a Rezoning?Council-approved plans and policies outline where rezoning applications can be considered and what may be allowed on a site.
Community and area plans
The City of Vancouver has community and area plans that set out the long-term vision for a community area. These plans provide a framework to guide change and development over a period of approximately 20 to 30 years. They may also work within broader objectives established for the entire city and at regional and provincial levels.
Community and area plans provide guidance and direction on a variety of topics, from land use and urban design, to housing, transportation, and community facilities.
Rezoning policies
Rezoning policies provide guidance for developing or using a property in ways that may not be possible under existing rules or zoning. They provide a framework to achieve City objectives by enabling and incentivizing development across the city.
Example of a rezoning proposal
Example of a constructed building
Considered under rezoning policy
Example of planning policy
4
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Rezoning Process: Key Steps
Council makes a decision at a
public hearing
BEFORE REZONING
• Plans and policies developed• Council approves plans and policies
Rezoning enquiry
submitted and reviewed(optional)
Rezoning application submitted
Virtual pre-application
open househosted by the
applicant(optional)
Report and by-law drafted; Council refers
application to a public hearing
Virtual open house
Q&A
WE ARE HERE
Rezoning process
Public engagement
City Council decision
Council votes to enact a
by-law
Staff and advisory group
review
Legal and service
agreements completed
AFTER REZONING
• Development permit process• Building permit process• Inspections and occupancy
5
Proposed Rezoning
GROUP #800-838 West Hastings St, Vancouver, BC. V6C 0A6485 WEST 28TH AVENUE
PERSPECTIVE
DATENO. DESCRIPTION
ISSUES
CLIENT
COPYRIGHT:
SEAL
SUB-CONSULTANT
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
PROJECT NO:
DRAWN BY:
CHK'D BY:
SCALE:
DATE:
REV:
Any reproduction or distribution for any purpose other than authorized by theArchitect is forbidden. Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and the Architect shall be informed of any variationsfrom the dimensions and conditions shown on the drawing. Shop drawingsshall be submitted to the Architect for approval before proceeding withfabrication.
MAIN CONSULTANT
KEY PLAN
telfax
604-806-0268 604-806-0260
Vancouver, BC. V6C 0A6 800-838 West Hastings StreetGUD Group
82001
XINMAI
MAY 29, 2020
485 West 28th Ave.
---------1 LETTER OF INQUIRY
Vancouver BC
20-05-292 ISSUED FOR REZONING
1098428 BC Ltd.
MAX/JOSEPH
A-16BIRDSEYE VIEW WEST 28TH AVE.
BG 259.84'
BG 262.40'
BG 261.65'
BG 264.60'
BG 260.99'
BG 261.91'
BG 263.35'
BG 264.33'
BG 262.83'
PROPERTY LINE
LEVEL4 ROOF
LEVEL3 ROOF
LEVEL2 ROOF
PROPERTY LINE
51'-9"DN
RAMP DOWN 15%
PMT
WEST 28TH AVENUE
CAM
BIE
ST.
LAN
E
65'-1
1"
6'-0
"20
'-0"
150'-0"
PARKING BELOW
ROOF GARDEN
EXIST TREE TO BE RETAINED
12'-0" 12'-0"
12'-0
"
14'-1
0"
8'-0
"
10'-0
"
8'-0
"
12'-0
"
12'-0"
16'-0"28'-5"
12'-8"
11'-1
"
11'-1
"
25'-3
"
73'-8"
PROPERTY LINE
SROW
3'-5
" 12'-0
"
12'-0"
2'-5"
11"
1'-0"
SITE PLAN
A
400
A
400
B
401
B
401
150'-0"[45.72M]1'-0"
[.30M] 11'-0"[3.35M]
16'-4"[4.98M]
20'-134"
[6.14M]10'-6"
[3.20M]
28'-434"
[8.65M]
19'-214"
[5.85M]22'-4"
[6.81M]
9'-114"
[2.78M]
9'-634"
[2.91M]
2'-514"
[.74M]
13
A
2 3 5 6 7 8 11
B
C
D
E
F
4 9 10 12
G
1
69'-7
1 2"
[21.
22M
]8'
-23
4"
[2.5
1M]
9'-1
0"[3
.00M
]
5'-2
"[1
.58M
]34
'-4"
[10.
46M
]
11'-0
34"
[3.3
7M]
111 2"
[.29
M]
RAM
P U
P 8%
4R DN
4R D
N
3R DN
4R DN 4R DN
GRAVEL
PMT
4R DN
FH
MAIN ENTRANCE
4R DN
DATENO. DESCRIPTION
ISSUES
CLIENT
COPYRIGHT:
SEAL
SUB-CONSULTANT
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
PROJECT NO:
DRAWN BY:
CHK'D BY:
SCALE:
DATE:
REV:
Any reproduction or distribution for any purpose other than authorized by theArchitect is forbidden. Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for all dimensions andconditions on the job and the Architect shall be informed of any variationsfrom the dimensions and conditions shown on the drawing. Shop drawingsshall be submitted to the Architect for approval before proceeding withfabrication.
MAIN CONSULTANT
KEY PLAN
telfax
604-806-0268 604-806-0260
Vancouver, BC. V6C 0A6 800-838 West Hastings StreetGUD Group
82001
XINMAI
MAY 29, 2020
485 West 28th Ave.
---------1 LETTER OF INQUIRY
Vancouver BC
20-05-292 ISSUED FOR REZONING
1098428 BC Ltd.
MAX/JOSEPH
1/8"=1'-0"
A-101
SITE PLAN
9/9/2020 Property Viewer
https://vanmap.vancouver.ca/property/ 1/1
40m40m40m40m40m
-123.115217 49.246062 Degrees
+–
Property Viewer
481 w 28th
Show search results for 481 w …
We would like your feedback on a rezoning application
The proposal is to allow for the development of a 6-storey residential building. The zoning would change from RS-1 (single detached houses and duplexes) to CD-1 (comprehensive development). The proposal includes:
• 27 market strata units
• Floor space ratio (FSR) of 2.54
• Floor area of 2,455.3 sq. m (26,429 sq. ft.)
• Building height of 19.2 m (63 ft.)
• Partial 7th storey amenity space
• 34 vehicle parking spaces and 64 bicycle parking spaces
The application is being considered under the Cambie Corridor Plan.
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
CA
MB
IE S
T
W 28TH AVE
W 29TH AVE
QUEEN ELIZABETH PARK
6
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Cambie Corridor Plan: VisionThe Cambie Corridor Plan provides a framework to help guide the future of the Cambie Corridor. Recognizing that the Plan articulates a long-term vision, the framework:
• Uses images and policy to describe the future vision of the Corridor, providing detail on matters like the future built form and public realm conditions.
• Includes a description of the public benefits and amenities (including affordable housing) that are expected as the Corridor grows.
• Establishes a series of implementation strategies to ensure that the vision evolves.
• Provides land use policy that allows the City to consider development applications that are consistent with the future vision of the Corridor.
Varying land uses, density, building heights, and building forms will reflect the context and character of the neighbourhoods along the Corridor. Mid-rise building forms will be emphasized for most of the Corridor, with taller towers at key locations such as Marine Drive, Oakridge, and larger unique sites. Every station is considered for appropriate building forms based on its context. Higher buildings along the arterial streets and strategic sites will sensitively transition into the surrounding neighbourhoods, which are characterized by their rich offering of ground-oriented housing.
Providing amenities & services
Connecting the corridor
Providing housing diversity & affordability
Creating a Municipal Town Centre
Transforming single-family neighbourhoods
Recognizing opportunities on unique sites
CAMBIE CORRIDORPLAN
Plan Highlights
Ebisu Park
On
tario
St.
Ca
mb
ie S
t.C
am
bie
St.
Oa
k S
t.
King Edward Ave.
W 24th Ave.
W 26th Ave.
W 32nd Ave.
W 39th Ave.
W 47th Ave.
W 49th Ave.
Ash
St.
Ash
St.
Yu
ko
n S
t.
He
ath
er S
t.H
eath
er S
t.
Willo
w S
t.
Eliz
ab
eth
St.
Alb
erta
St.
Ash
St.
Ma
nso
n S
t.
He
ath
er S
t.
Ba
illie S
t.
Ash
St.
Ash
St.
Alb
erta
St.
Co
lum
bia
St.
W 26th Ave.
W 27th Ave.
W 29th Ave.
W 33rd Ave.
W 23rd Ave.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Oa
k S
t.
W 54th Ave.
BC Children’s and Women’s Hospitals
HeatherLands
OakridgeTransitCentre
OakridgeCentre
Langara College
LangaraGardens
PearsonDogwood
W 20th Ave.
W 20th Ave.
Yu
ko
n S
t.
Tu
pp
er S
t.
Co
lum
bia
St.
Ma
nito
ba S
t.
La
ure
l St.
He
ath
er S
t.
Ca
mb
ie S
t.C
am
bie
St.
Kersland D
r.
Ash St.
Co
lum
bia
St.
Ma
nito
ba S
t.
W 46th Ave.
W 52nd Ave.
W 59th Ave. W 59th Ave.
W 58th Ave.
W 62nd Ave.
W 64th Ave.
W 65th Ave.
W 49th Ave.
W 49th Ave.
Oa
k S
t.
W 37th Ave.W 37th Ave.
W 37th Ave.
W 41st Ave.
W 41st Ave.W 41st Ave.
W 45th Ave.
W 43rd Ave.
SW M
arine D
r.
SW M
arine D
r.
W 70th Ave.
W 67th Ave.
On
tario
St.
On
tario
St.
On
tario
St.
King Edward Ave. King Edward Ave.
W 44th Ave.
Willo
w S
t.
Tisd
all S
t.
Tisd
all S
t.
W 57th Ave.
W 18th Ave.
W 16th Ave.
Oa
k S
t.
WinonaPark
Tisdall
Park
OakPark
Ash Park
Eburne
Park
Langara
Golf Course
Columbia
Park
Queen
Elizabeth
Park
Oak
Meadows
Park
BraemarPark
Douglas
Park
Hillcrest
Park
Nat
Bailey
Stadium
CambiePark
Heather
Park
W 64th Ave.
He
ath
er S
t.
Jewish CommunityCentre
Ca
mb
ie S
t.
W 21st Ave.
W 23rd Ave.
W 17th Ave.
W 62nd Ave.
W 60th Ave. Yu
ko
n S
t.
7
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Cambie Corridor: Plan Overview
CAMBIE CORRIDORPLAN
CAMBIE CORRIDOR PLAN | 37
Introduction
The approach of this Plan considers the context and character of the different neighbourhoods. Recognizing that a “one size fits all” approach is not appropriate, the Corridor has been divided into five neighbourhood areas. This Plan builds on the existing character and context in each neighbourhood, strengthening and enhancing the identities while providing a unified Corridor concept with additional housing and employment concentrations close to transit and other amenities.
How this chapter works
For each neighbourhood the following information is provided:
• A high-level description of the neighbourhood’s character, including public realm and built form elements
• Street-level illustrations of selected area(s) in the neighbourhood
• Specific heights, densities, and land uses for proposed buildings
• Affordable housing requirements
• Section drawings of selected representative areas in the neighbourhood showing the massing and height of possible new development—including the interface to adjacent properties
For additional guidance with respect to building form and public realm improvements, please see Chapter 5 (Built Form Guidelines) and the Cambie Corridor Public Realm Plan, respectively.
Ebisu Park
On
tari
o S
t.
Ca
mb
ie S
t.
Oa
k S
t.
King Edward Ave.
W 24th Ave.
W 26th Ave.
W 32nd Ave.
W 39th Ave.
W 47th Ave.
W 49th Ave.
Ash
St.
Yu
ko
n S
t.
He
ath
er
St.
Willo
w S
t.
Eliza
be
th S
t.
Alb
ert
a S
t.
Ash
St.
Ma
nso
n S
t.
He
ath
er
St.
Ba
illie S
t.
Ash
St.
Ash
St.
Alb
ert
a S
t.
Co
lum
bia
St.
W 26th Ave.
W 27th Ave.
W 23rd Ave.
VanDusen
Gardens
Riley
Park
Montgomery
Park
Grimmett
Park
Mt. Pleasant
Park
Ca
mb
ie S
t.
Oa
k S
t.
W 54th Ave.
BC Children’s and Women’s Hospitals
RCMP Site
OakridgeTransitCentre
OakridgeCentre
Langara College
LangaraGardens
PearsonDogwood
W 20th Ave.
W 20th Ave.
Yu
ko
n S
t.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
La
ure
l S
t.
He
ath
er
St.
Ca
mb
ie S
t.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
W 46th Ave.
W 52nd Ave.
W 59th Ave. W 59th Ave.
W 49th Ave.
Oa
k S
t.
W 37th Ave.W 37th Ave.
W 41st Ave.
W 41st Ave.
SW M
arine D
r.
W 70th Ave.
W 67th Ave.
On
tari
o S
t.
On
tari
o S
t.O
nta
rio
St.
King Edward Ave.
16th Ave.
W 44th Ave.
Willo
w S
t.
Tis
da
ll S
t.
Tis
da
ll S
t.
W 57th Ave.
W 18th Ave.
W 17th Ave.
W 16th Ave.
W 19th Ave.
Oa
k S
t.
WinonaPark
Tisdall
Park
OakPark
Ash Park
Eburne
Park
Langara
Golf Course
Columbia
Park
Queen
Elizabeth
Park
Oak
Meadow
Park
Braemar
Park
Douglas
Park
Hillcrest
Park
Nat
Bailey
Stadium
CambiePark
Heather
Park
W 64th Ave.
He
ath
er
St.
CAMBIE VILLAGE
QUEEN ELIZABETH
OAKRIDGE TOWN CENTRE
LANGARA
MARPOLE /MARINE LANDING
West 16th Avenue
King Edward Avenue
Cam
bie
Str
eet
Cam
bie
Str
eet
Marine Driv
e
Ont
ario
Str
eet
Ont
ario
Str
eet
Oak
Str
eet
Oak
Str
eet
West 58th Avenue
West 48th Avenue
West 37th Avenue
West 57th Avenue
04 | NEIGHBOURHOODS
Providing amenities & services
Connecting the corridor
Providing housing diversity & affordability
Creating a Municipal Town Centre
Transforming single-family neighbourhoods
Recognizing opportunities on unique sites
Plan Highlights
Neighbourhoods
Corridor has been divided into five neighbourhood areas. The plan builds on the existing character and context in each neighbourhood, strengthening and enhancing the identities while providing a unified Corridor concept with additional housing and employment concentrations close to transit and other amenities.
The Cambie Corridor Plan is a framework to guide change and growth over the next 30 years. Varying land uses, density, building heights, and building forms will reflect the context and character of the neighbourhoods. Mid-rise building forms will be emphasized for most of the Corridor, with
taller towers at key locations such as Marine Drive, Oakridge, and larger unique sites. Every station is considered for appropriate building forms based on its context. Higher buildings along the arterial streets and strategic sites will sensitively transition into the surrounding neighbourhoods, which are characterized by their rich offering of ground-oriented housing.
Over the next 30 years, the Corridor will add:
• Space for 9,200+ new jobs
• Opportunities for multi-family housing on 2,000 single-family lots
• New and vibrant public spaces, including 20+ acres of new parks
• More than 5,000 secured rental units and 2,800 social housing units
• A vibrant and enhanced Oakridge Municipal Town Centre
8
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Cambie Corridor: Neighbourhood Vision
Queen Elizabeth
Neighbourhood Character
The Queen Elizabeth area’s existing residential character, with its green park-like setting, will be strengthened and enhanced. The area is also characterized by its proximity to several large institutional sites including B.C. Women’s and Children’s Hospitals, St. Vincent’s Campus of Care site, the Heather Lands (former RCMP Barracks), and Eric Hamber Secondary School. Most of these institutional sites will stay and serve existing and future populations while the Heather Lands will redevelop with new uses and buildings.
Vision for the area
• New mid-rise residential buildings will be introduced along Cambie St with special design consideration for buildings directly across from Queen Elizabeth Park (north of 33rd Ave) to reflect the unique siting conditions and public view opportunities.
• Sidewalks and setbacks will respond to the park edge, and include green buffers and edges that contribute to this unique area of the community and city.
• New family-oriented housing opportunities, in the form of townhouses, will be introduced in transition areas surrounding Cambie St and other large sites and will complement the existing residential character of the neighbourhood.
• New development along Oak St will provide a continuous urban interface and improved public realm.
• A strengthened local shopping area at Oak St and King Edward Ave will provide more housing, shops and services within walking distance to nearby residents.
CAMBIE CORRIDOR PLAN | 49
QU
EE
N E
LIZ
AB
ET
H
Artist ’s i l lustrat ion of what the Queen El izabeth ne ighbourhood could look l ike in the future ( looking nor th on Cambie Street at 3 1st Avenue) . Th is image shows the c losure of 3 1st Avenue with new publ ic open space .
9
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Cambie Corridor: Land Use Policy
Uses: Residential
Density: 2.0-2.5 FSR*
Height: Up to 6 storeys
• Above 4 storeys, upper floors will be stepped back from Cambie Street.
• Buildings will provide front doors onto the street and will seek to activate and enhance the adjacent lane by providing townhouses at the rear.
• Development proposals will include required public realm features (i.e., street trees, landscaped setbacks, etc.) See Cambie Corridor Public Realm Plan.
Refer to the Built Form Guidelines (Chapter 5) for more information.
*The suggested FSR range is an estimate based on intended urban design performance. The development potential for each site may fall within, below, or above the FSR range. More information is provided in Chapter 5.
CAMBIE CORRIDOR PLAN | 5 1
QU
EE
N E
LIZ
AB
ET
H
Ebisu Park
On
tari
o S
t.
Ca
mb
ie S
t.C
am
bie
St.
Oa
k S
t.
King Edward Ave.
W 24th Ave.
W 26th Ave.
W 32nd Ave.
W 39th Ave.
W 47th Ave.
W 49th Ave.
Ash
St.
Ash
St.
Yu
ko
n S
t.
He
ath
er
St.
He
ath
er
St.
Willo
w S
t.
Eliza
be
th S
t.
Alb
ert
a S
t.
Ash
St.
Ma
nso
n S
t.
He
ath
er
St.
Ba
illie S
t.
Ash
St.
Ash
St.
Alb
ert
a S
t.
Co
lum
bia
St.
W 26th Ave.
W 27th Ave.
W 29th Ave.
W 33rd Ave.
W 23rd Ave.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Oa
k S
t.
W 54th Ave.
BC Children’s and Women’s Hospitals
HeatherLands
OakridgeTransitCentre
OakridgeCentre
Langara College
LangaraGardens
PearsonDogwood
W 20th Ave.
W 20th Ave.Y
uko
n S
t.
Tu
pp
er
St.
Co
lum
bia
St.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
La
ure
l S
t.
He
ath
er
St.
Ca
mb
ie S
t.C
am
bie
St.
Kersland D
r.
Ash St.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
W 46th Ave.
W 52nd Ave.
W 59th Ave. W 59th Ave.
W 58th Ave.
W 62nd Ave.
W 64th Ave.
W 65th Ave.
W 49th Ave.
W 49th Ave.
Oa
k S
t.
W 37th Ave.W 37th Ave.
W 37th Ave.
W 41st Ave.
W 41st Ave.W 41st Ave.
W 45th Ave.
W 43rd Ave.
SW M
arine D
r.
SW M
arine D
r.
W 70th Ave.
W 67th Ave.
On
tari
o S
t.
On
tari
o S
t.O
nta
rio
St.
King Edward Ave. King Edward Ave.
W 44th Ave.
Willo
w S
t.
Tis
da
ll S
t.
Tis
da
ll S
t.
W 57th Ave.
W 18th Ave.
W 16th Ave.
Oa
k S
t.
WinonaPark
Tisdall
Park
OakPark
Ash Park
Eburne
Park
Langara
Golf Course
Columbia
Park
Queen
Elizabeth
Park
Oak
Meadows
Park
BraemarPark
Douglas
Park
Hillcrest
Park
Nat
Bailey
Stadium
CambiePark
Heather
Park
W 64th Ave.
He
ath
er
St.
Jewish CommunityCentre
Ca
mb
ie S
t.
W 21st Ave.
W 23rd Ave.
W 17th Ave.
W 62nd Ave.
W 60th Ave.
Yu
ko
n S
t.
Apartment (up to 6 storeys)
Cambie: King Ed - 29th
LANE LANE
PEDESTRIANPERCEPTION ZONE
3-STOREY TOWNHOUSE
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.3-STOREY TOWNHOUSE
Cambie Street(200’)
W 26th Ave frontage W 26th Ave frontage150’ 150’
Representative Section: Cambie Street between K ing Edward Avenue and 26th Avenue
4.2.2 Cambie Street: King Edward–29th Avenue
Uses: Residential
Density: 2.0–2.5 FSR*
Height: Up to 6 storeys
• Above 4 storeys, upper floors will be stepped back from Cambie Street.
• Buildings will provide front doors onto the street and will seek to activate and enhance the adjacent lane by providing townhouses at the rear.
• Development proposals will include required public realm features (i.e., street trees, landscaped setbacks, etc.) See Cambie Corridor Public Realm Plan
Refer to the Built Form Guidelines (Chapter 5) for more information.
*The suggested FSR range is an estimate based on intended urban design performance. The development potential for each site may fall within, below, or above the FSR range. More information is provided in Chapter 5
CAMBIE CORRIDOR PLAN | 5 1
QU
EE
N E
LIZ
AB
ET
H
Ebisu Park
On
tari
o S
t.
Ca
mb
ie S
t.C
am
bie
St.
Oa
k S
t.
King Edward Ave.
W 24th Ave.
W 26th Ave.
W 32nd Ave.
W 39th Ave.
W 47th Ave.
W 49th Ave.
Ash
St.
Ash
St.
Yu
ko
n S
t.
He
ath
er
St.
He
ath
er
St.
Willo
w S
t.
Eliza
be
th S
t.
Alb
ert
a S
t.
Ash
St.
Ma
nso
n S
t.
He
ath
er
St.
Ba
illie S
t.
Ash
St.
Ash
St.
Alb
ert
a S
t.
Co
lum
bia
St.
W 26th Ave.
W 27th Ave.
W 29th Ave.
W 33rd Ave.
W 23rd Ave.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Ca
mb
ie S
t.
Oa
k S
t.
W 54th Ave.
BC Children’s and Women’s Hospitals
HeatherLands
OakridgeTransitCentre
OakridgeCentre
Langara College
LangaraGardens
PearsonDogwood
W 20th Ave.
W 20th Ave.
Yu
ko
n S
t.
Tu
pp
er
St.
Co
lum
bia
St.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
La
ure
l S
t.
He
ath
er
St.
Ca
mb
ie S
t.C
am
bie
St.
Kersland D
r.
Ash St.
Co
lum
bia
St.
Ma
nit
ob
a S
t.
W 46th Ave.
W 52nd Ave.
W 59th Ave. W 59th Ave.
W 58th Ave.
W 62nd Ave.
W 64th Ave.
W 65th Ave.
W 49th Ave.
W 49th Ave.
Oa
k S
t.
W 37th Ave.W 37th Ave.
W 37th Ave.
W 41st Ave.
W 41st Ave.W 41st Ave.
W 45th Ave.
W 43rd Ave.
SW M
arine D
r.
SW M
arine D
r.
W 70th Ave.
W 67th Ave.
On
tari
o S
t.
On
tari
o S
t.O
nta
rio
St.
King Edward Ave. King Edward Ave.
W 44th Ave.
Willo
w S
t.
Tis
da
ll S
t.
Tis
da
ll S
t.
W 57th Ave.
W 18th Ave.
W 16th Ave.
Oa
k S
t.
WinonaPark
Tisdall
Park
OakPark
Ash Park
Eburne
Park
Langara
Golf Course
Columbia
Park
Queen
Elizabeth
Park
Oak
Meadows
Park
BraemarPark
Douglas
Park
Hillcrest
Park
Nat
Bailey
Stadium
CambiePark
Heather
Park
W 64th Ave.
He
ath
er
St.
Jewish CommunityCentre
Ca
mb
ie S
t.
W 21st Ave.
W 23rd Ave.
W 17th Ave.
W 62nd Ave.
W 60th Ave.
Yu
ko
n S
t.
Apartment (up to 6 storeys)
Cambie: King Ed - 29th
LANE LANE
PEDESTRIANPERCEPTION ZONE
3-STOREY TOWNHOUSE
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.
RES.3-STOREY TOWNHOUSE
Cambie Street(200’)
W 26th Ave frontage W 26th Ave frontage150’ 150’
Representative Section: Cambie Street between K ing Edward Avenue and 26th Avenue
4.2.2 Cambie Street: King Edward–29th Avenue
Uses: Residential
Density: 2.0–2.5 FSR*
Height: Up to 6 storeys
• Above 4 storeys, upper floors will be stepped back from Cambie Street.
• Buildings will provide front doors onto the street and will seek to activate and enhance the adjacent lane by providing townhouses at the rear.
• Development proposals will include required public realm features (i.e., street trees, landscaped setbacks, etc.) See Cambie Corridor Public Realm Plan
Refer to the Built Form Guidelines (Chapter 5) for more information.
*The suggested FSR range is an estimate based on intended urban design performance. The development potential for each site may fall within, below, or above the FSR range. More information is provided in Chapter 5
Mid-rise residential buildings form a spine accommodating growth along key arterials. These midrise forms provide a new streetwall typology in the city, framing the arterials and supporting increased residential density.
Cambie Street: King Edward-29th Avenue
10
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
Ways to Provide Feedback
There are several ways to provide comments to staff
Staff can receive comments throughout the rezoning process up until City Council votes to refer an application to a public hearing. Feedback directed to staff is summarized in the referral report prepared for City Council.
1. Go online at Shape Your City Vancouver https://shapeyourcity.ca/485-w-28-ave
• Submit your comments
• Ask your questions during the Virtual Open House
Note that the content is available in eight languages
2. Send an email to the rezoning [email protected]
3. Call the rezoning planner604-829-9506
11
PROPOSED REZONING: 481-485 WEST 28TH AVENUE
What Happens Next
Referral report
Staff review all comments received and summarize the feedback into a referral report for City Council. This report contains a recommendation to refer the application to a public hearing, along with a recommendation to approve or refuse the application. Conditions to address public concerns may also be included, where feasible.
Referral and public hearing
If an application is referred to a public hearing, surrounding properties and those who have selected to be contacted about the application will receive a public hearing notification. At that point, all comments regarding the application are to be directed to City Council through the City Clerk’s Office for consideration at the public hearing.
Public hearings are held to consider and decide on rezoning applications. At public hearings, City Council’s role is to listen to all concerns in order to inform their decision on a rezoning application.
Find out more:
• What happens at public hearings
• Contact City Council about public hearing agenda items