PROPOSED IMPROVEMENT BRIDGE PROJECT
Transcript of PROPOSED IMPROVEMENT BRIDGE PROJECT
STA 13+33.8
BEGIN BRIDGE
STA 12+00.00
BEGIN PROJECT
MIL
LER BR
OOK
STA 13+84.1
END BRIDGE
STA 15+50.00
END PROJECT
N
VT S
TAT
E
PLA
NE
GRID
False
Northin
g: 0.00
00
False
Easting
: 16404
16.6667
Origin La
titude: 42
°30’00.00
00"N
Central M
eridia
n: 72°3
0’00.0
000"W
US S
urvey
Foot
Transv
erse M
ercato
r
NAD83 Ve
rmont S
tate Pl
anes
VT83
BO 1446(39)
STOWE
TOWN OF STOWE
COUNTY OF LAMOILLE
ROUTE NO :
LENGTH OF STRUCTURE :
LENGTH OF ROADWAY :
LENGTH OF PROJECT :
TOWN HIGHWAY 43 (CLASS 3 TOWN HIGHWAY)
PROJECT LOCATION :
PROJECT DESCRIPTION :
50.3 FEET.
350.00 FEET.
299.7 FEET.
AND METHODS.
VTRANS UPON CONTRAT AWARD IN ACCORDANCE WITH THEIR MEANS
CONTRACTOR SHALL SUBMIT A SITE-SPECIFIC EPSC PLAT TO
FOR EPSC. NO SITE-SPECIFIC EPSC PLAN IS INCLUDED. THE
5. THIS PROJECT WILL UTILIZE THE VT DEC LOW RISK SITE HANDBOOK
4. FINAL HYDRAULICS HAS BEEN REQUESTED.
SUBMIT THEIR OWN TRAFFIC CONTROL PLAN FOR VTRANS APPROVAL.
CONCEPTUAL PURPOSES ONLY. THE CONTRACTOR SHALL DEVELOP AND
3. A TRAFFIC CONTROL PLAN HAS BEEN SHOWN IN THE PLANS FOR
UTILIZED ON THE ONE-WAY TEMPORARY BRIDGE.
BRIDGE UPSTREAM. TEMPORARY TRAFFIC SIGNALS WILL BE
TRAFFIC WILL BE MAINTAINED ON A ONE-WAY TEMPORARY
2. THE BRIDGE WILL BE CLOSED DURING CONSTRUCTION AND
AND PROPERTY OWNERS.
IN ORDER TO REDUCE IMPACTS TO EXISTING RESOURCES
1. ATTEMPTS TO MINIMIZE PROJECT LIMITS HAVE BEEN MADE
REVIEWER NOTES:
NAVD88
NAD83(96)
9/21/2009
R. GILMAN
2
0 4040
SCALE: 1" = 40’-0"
BO 1446(39)
STOWE
CAROLYN COTA, P.E.
22-FEB-2021
CONCEPTUAL PLANS
TO TH-1 (MOSCOW RD)
TH-43 (NEBRASKA VALLEY RD)
CLUB (DEAD END)
TO LAKE MANSFIELD TROUT
TH-43 (NEBRASKA VALLEY RD)
10+5010+50
11+00
12+0013+00
14+00
15+0016+00 16+90
SUBSTRUCTURE, ROADWAY AND CHANNEL WORK.
REPLACEMENT OF THE EXISTING BRIDGE TO INCLUDE SUPERSTRUCTURE,
AND EXTENDING EASTERLY .047 MILES.
APPROXIMATELY 1.5 MILES NORTHWEST FROM ITS INTERSECTION WITH TH 1 (MOSCOW ROAD)
BRIDGE 48 IS LOCATED IN THE TOWN OF STOWE ON TH 43 (NEBRASKA VALLEY ROAD)
VERM ONTFREEDOM ANDUNITY
CANADA
ORLEANSESSEX
WASHI
NGTON
LAMOILLE
FRANKLIN
GR
AN
D IS
LE
ADDISON
CHIT
TENDEN
ORANGE
CA
LE
DO
NIA
WIN
DS
OR
RUTLAND
BE
NNIN
GT
ON
WINDHAM
N
VT
ST
AT
E P
LA
NE
GRID
APPROVED DATE
DATUM
VERTICAL
HORIZONTAL
SURVEYED DATE :
SURVEYED BY :
PROJECT MANAGER :
PROJECT NAME :
PROJECT NUMBER :
NEW YORK
State of
MASSACHUSETTS
Commonwealth of
NEW HAMPSHIRE
State of
BRIDGE PROJECT
PROPOSED IMPROVEMENT
AGENCY OF TRANSPORTATION
STATE OF VERMONT
QUALITY ASSURANCE PROGRAM : LEVEL
SHEET OF SHEETS1 13
PLANS.
SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE
REVISIONS AND SUCH REVISED SPECIFICATIONS AND
FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT
FEDERAL HIGHWAY ADMINISTRATION ON APRI L 1 3, 2018
FOR CONSTRUCTION DATED 2018, AS APPROVED BY THE
WITH THESE PLANS AND THE STANDARD SPECIFICATIONS
CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE
HIGHWAY DIVISION, CHIEF ENGINEER
4’-0"
CLEAR ZONE
(TYP)
SHOULDER
GRADE
0.020 0.0200.060
WITH GUARDRAIL WITHOUT GUARDRAIL
BRIDGE
LC
C
TH 43 ROADWAY TYPICAL SECTION
SCALE �" = 1’-0"
SCALE �" = 1’-0"
TH 43
L
7’-0" CLEAR ZONE (FILL)
7’-0" CLEAR ZONE (CUT)
SAND BORROW
SUBBASE
- AGGREGATE SURFACE COURSE
- PAVEMENT (TOTAL THICKNESS)
SURFACE
+/- 1"
+/- 1"
+/- �"
+/- �"
MATERIAL TOLERANCES(IF USED ON PROJECT)
3’-0"9’-0" TRAVEL LANE (TYP)12’-0" TO FACE OF RAIL (TYP)3’-0"
GRADE
(GALVANIZED) (TYP)
C15x33.9 DIAPHRAGM
(SEE SD-502.00)
DRIP NOTCH
0.020 0.020
27’-4"
LONGITUDINAL DECK GROOVING
CONCRETE, CLASS PCD W/
9" HIGH PERFORMANCE
(T
YP)
11�
"
3 13
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
STOWE
BO 1446(39)
C. BURRALLC. BURRALL
C. COTA M. LONGSTREET
TYPICAL SECTIONS 1
270 GRADE 50 (TYP)
AASHTO M 270M/M
STEEL (GALVANIZED)
W30x116 STRUCTURAL
2’-11"7’-2"3’-7"
(TYP) (TYP) (TYP)
BRIDGE TYPICAL SECTION
FLOW
13’-8" TO FASCIA(TYP)12’-0" TO FACE OF RAIL (TYP)
9’-0" TRAVEL LANE (TYP) 3’-0"
(TYP)
SHOULDER
TOPSOIL
(TYP)
1:3
1:2
1:2
2" TYPE IIIS
1 �" BCP, TYPE IVS OVER
* 1 �" BCP, TYPE IVS OVER
*
CONCRETE PAVEMENT
5" BITUMINOUS
HSD-400.01)
(SEE DETAIL
SAFETY EDGE
SHOULDERS
5" AGGREGATE
OF THE STANDARD SPECIFICATIONS.
APPLICATION RATES IN TABLE 406.12A
EMULSION SHALL BE APPLIED PER THE
s12j658typ.dgn
GRADED CRUSHED STONE
18" SUBBASE OF DENSE6" SAND BORROW
1’-8"
(SEE STD G-1B)
(POWDER COATED BLACK)
BOX BEAM GUARDRAIL
(SEE STD S-364A)
(POWDER COATED BLACK)(TYP)
3 RAIL BOX BEAM
BRIDGE RAILING, GALVANIZED
OLD ALIGNMENT, FIX TO NU4 OFF ALIGNMENT IN BETWEEN
SCALE 1" = 20’-0"
20 0 20
N
VT S
TAT
E
PL
AN
E
GRID
False No
rthing
: 0.000
0False Ea
sting: 1
640416.66
67
Origin La
titude: 42
°30’00
.0000"
N
Centra
l Meri
dian: 7
2°30’0
0.0000
"WUS S
urvey
Foot
Transv
erse M
ercato
rNA
D83
Vermon
t State
Plane
sVT
83
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
------
4 13
STOWE
BO 1446(39)
s12j658nu4.dgn
C.BURRALL
MCL
MCL
EXISTING CONTITIONS
10+50
11+00
12+00
13+00 14+00
15+00
16+00
16+90
25
HVCTRL
102
HVCTRL
101
HVCTRL
100
HVCTRL
ELEV. = 753.28
IN TREE
RAILROAD SPIKE
BENCHMARK
FLOW
PIPE
FILL
STONE
MILLER
BR
OOK
FL
OW
#66
MAILBOX
#86
MAILBOX
#1533
MAILBOX
CBL LS 514UP 8" W/CAP� " IRON ROD
(NEBRASKA VALLEY ROAD)
TH-43
(NEBRASKA VALLEY ROAD)
TH-43
(F
AL
LS
BR
OO
K
LA
NE)
TH-45
(S
UG
AR
BU
SH
LA
NE)
TH-47
DRIVE
GRAVEL
DRI
VE
GR
AV
EL
(35)
R2-1
SIGN
(FALLS BROOK LN)D3-1
SIGN
SUGARHOUSE)(NEBR. KNOLL
TIC SIGN
(35)
R2-1
SIGN
(SUGAR BUSH LN)D3-1
SIGN
W14-1
SIGN
2-145-1
COMB
145-1
COMB
145-2
COMB
COMB
WIRE
GUY
WIRE
GUY
WIRE
GUY
SPAN LENGTH: 45’
CONCRETE CIP DECK
BUILT 1925 ROLLED I BEAM,
EXISTING BRIDGE INFORMATION
AP
PR
OX. E
XIS
TIN
G T
OW
N R.O.W.
P
L
APP
RO
X. E
XIS
TIN
G T
OW
N R.O.W.
APPROX. EXISTING TOWN R.O.W.
APPROX. EXISTING TOWN R.O.W.
APPROX. EXISTING TOWN R.O.W.
APPROX. EXISTING TOWN R.O.W.
750
750
750
750
750
750
750
750
750
750
750
750
760
760
80’-0"
e = 6.00%
E = 13.55’
L = 275.85’
T = 139.67’
R = 713.00’
CURVE (1)
e = 3.60%
E = 2.68’
L = 185.00’
T = 92.60’
R = 1600.00’
CURVE (2)
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
------
5 13
10+50
11+00
12+00
13+00 14+00
15+00
16+00
16+90
ST
A 10
+50.00
PO
B
ST
A 11
+56.58PC
STA 14+32.42
PT
ST
A 15
+04.81
PC
ST
A 15
+97.41
PI (
CU
RV
E 2)
STA 16+89.81
POE
STOWE
BO 1446(39)
s12j658nu4.dgn
C.BURRALL
LAYOUT OPTION 4
MCL
MCL
30°
10+00
11+00
11+25
11+25
60°
STA 12+96.25
PI (CURVE 1)
BRIDGE C
TEMPORARY
L
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
TEMPORARY
KEVIN, JOHN & EDWARDADAMS, MARION LIFE ESTATE NF
McBRINE, JOHNNF
McBRINE, JOHNNF
& LOUISE M.TOWNSEND, GEORGE R NF
HALE, HEATHERNF
25
HVCTRL
102
HVCTRL
101
HVCTRL
100
HVCTRL
DIST=65.90
TIE
DIST=69.40
TIE
DIST=77.31
TIE
DIST=82.56
TIE
ELEV. = 753.28
IN TREE
RAILROAD SPIKE
BENCHMARK
FLOW
PIPE
FILL
STONE
MILLER
BR
OOK
FL
OW
#66
MAILBOX
#86
MAILBOX
#1533
MAILBOX
CBL LS 514UP 8" W/CAP� " IRON ROD
(NEBRASKA VALLEY ROAD)
TH-43
(NEBRASKA VALLEY ROAD)
TH-43
(F
AL
LS
BR
OO
K
LA
NE)
TH-45
(S
UG
AR
BU
SH
LA
NE)
TH-47
DRIVE
GRAVEL
DRI
VE
GR
AV
EL
(35)
R2-1
SIGN
(FALLS BROOK LN)D3-1
SIGN
SUGARHOUSE)(NEBR. KNOLL
TIC SIGN
(35)
R2-1
SIGN
(SUGAR BUSH LN)D3-1
SIGN
W14-1
SIGN
2-145-1
COMB
145-1
COMB
145-2
COMB
COMB
WIRE
GUY
WIRE
GUY
WIRE
GUY
SPAN LENGTH: 45’
CONCRETE CIP DECK
BUILT 1925 ROLLED I BEAM,
EXISTING BRIDGE INFORMATION
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
------
5 13
STOWE
BO 1446(39)
s12j658nu4.dgn
C.BURRALL
MCL
MCL
LAYOUT TEMP OPTION 4
N
VT S
TAT
E
PLA
NE
GRID
False
Northin
g: 0.00
00
False
Easting
: 16404
16.6667
Origin La
titude: 42
°30’00.00
00"N
Central M
eridia
n: 72°3
0’00.0
000"W
US S
urvey
Foot
Transv
erse M
ercato
r
NAD83 Ve
rmont S
tate Pl
anes
VT83
720
730
740
750
760
770
780
790790
730
740
750
760
770
780
790790
720720
730
740
750
760
770
780
790790
10
+50
10
+75
11
+00
11
+25
11
+50
11
+75
12
+00
12
+25
12
+50
12
+75
13
+00
13
+25
13
+50
13
+75
14
+00
14
+25
14
+50
14
+75
15
+00
15
+25
15
+50
PVI 10+50.00
ELEV 755.33
PV
C 11
+58.12
EL
EV 753.36
PVI 12+44.12
ELEV 751.78
LO 12
+58.68
EL
EV 752.44
PV
T 13
+30.12
EL
EV 752.90
PV
C 13
+91.20
EL
EV 753.69
PVI 14+55.70
ELEV 754.53
PV
T 15
+20.20
EL
EV 757.02
-1.8300% 1.3000%
3.8500%
L =172.00 FT
G1 =-1.8300%
G2 =1.3000%
HSD =340 FT
K =55
L =129.00 FT
G1 =1.3000%
G2 =3.8500%
HSD =456 FT
K =51
755.33
754.88
754.42
753.96
753.50
753.07
752.75
752.54
752.44
752.46
752.59
752.84
753.16
753.48
753.82
754.25
754.80
755.48
756.28
757.20
755.3
754.8
754.3
753.9
753.4
753.1
752.7
752.5
752.5
752.4
752.4
752.4
742.9
742.6
753.0
753.7
754.5
755.3
756.2
757.1
758.1
TH43
720
730
740
750
760
770
780
790790
15
+50
15
+75
16
+00
16
+25
16
+50
16
+75
17
+00
PV
C 15
+77.25
EL
EV 759.21
PVI 16+27.25
ELEV 761.14
PV
T 16
+77.25
EL
EV 763.75
L =100.00 FT
G1 =3.8500%
G2 =5.2270%
HSD =340 FT
K =73
758.16
759.13
760.12
761.21
762.38
763.63
759.1
760.2
761.3
762.4
763.7
3.8500%
TH43
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
------
6 13
STOWE
BO 1446(39)
s12j658nu4.dgn
C.BURRALL
PROFILE OPTION 4
MCL
MCL
GENERAL NOTES
DEFINITIONS
COBBLE
BOULDER
GRAVEL
BEDROCK (LEDGE)
SILT
CLAY
SAND
VARVED
HARDPAN
MUCK
MOISTURE CONTENT
FLOWING SAND
STRIKE
DIP
12 inches.
- Rock in its native
- A rock fragment with an
- Rock fragments with an
average dimension > 12 inches.
average dimension between 3 and
- Rounded particles of rock
able strength when air-dried.
no strength when air-dried.
or slightly plastic and exhibits
- Fine grained soil, exhibits
plasticity when moist and consider-
- Alternate layers of silt
- Granular soil so
and clay.
- Extremely dense soil,
cemented layer, not softened
when wet.
- Weight of water
- Inclination of bed with a
into drill casing during extraction
- Angle from magnetic north
of wash rod.
to line of intersection of bed
with a horizontal plane.
saturated (loose) that it flows
- Particles of rock < 0.0787"
< 3" and > 0.0787" (#10 sieve).
(#10 sieve) and > 0.0029" (#200 sieve).
- Soil < 0.0029" (#200 sieve), non
(AASHTO)
horizontal plane.
divided by dry weight of soil.
- Soft organic soil (containing
> 10% organic material.
location of indefinite thickness.
or judgment by the Contractor.
interpretation, independent analysis
personal investigation, independent
is not intended as a substitute for
tion is presented in good faith and
the Agency. The subsurface informa-
access to the same data available to
intended to provide the Contractor
the information in the Contract is
estimating purposes. Presentation of
interpreted for Agency design and
surface data was performed and
Analysis and interpretation of sub-
face information presented herein.
exercised in preparing the subsur-
Engineering judgment was
1.
2.
3.
4.
5.
6.
7.
meters and survey feet.
Grid North American Datum 1983 in
are shown in Vermont State Plane
Northing and Easting coordinates
Subsurface Investigations, 1988.
defined in the AASHTO Manual on
discontinuities in the bedrock is
fractures, joints and other
weathering, and spacing of
describe the hardness, degree of
Terminology used on boring logs to
portray final contract details.
only and may not accurately
profile are for illustrative purposes
the boring plan layout or soils
Pictorial structure details shown on
7 13BORING INFORMATION SHEET
s12j658bor.dgn
0 2020
SCALE: 1" = 20’-0"
BO 1446(39)
STOWE
and other factors.
ing rainfall, methods of exploration
may vary according to the prevail-
ed at the time of exploration and
conditions indicated are as record-
Observed water levels and/or
boring or sample locations.
encountered between individual
surface conditions that may be
reflect actual variations in sub-
the Agency and may not necessarily
available subsurface information by
engineering interpretation from
ties and descriptions are based on
Soil and rock classifications, proper-
and 02/1 1/2015 by the Agency.
herein were made between 12/03/2014
The subsurface explorations shown
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
C. BURRALL
ROCK QUALITY DESIGNATION
SHEAR STRENGTH
N TERM
DESCRIPTIVE
(GRANULAR SOILS)
DENSITY
(COHESIVE SOILS)
CONSISTENCY
N TERM
DESCRIPTIVE
A7
A6
A5
A4
A2
A3
A1
AASHTO
Very Loose
Loose
Med. Dense
Dense
Very Dense
Very Soft
Soft
Med. Stiff
Stiff
Very Stiff
Hard
Very Hard
COLOR
Orange
Light
Green
Gray
Dark
Brown
Blue
Black
Multicolored
Yellow
White
Tan
Red
Purple
Pink
SOIL CLASSIFICATION
TO DENSITY/CONSISTENCYCORRELATION GUIDE OF "N"
mltc
yel
wh
tn
rd
pu
pnk
Clayey Soil - Highly Compressible
Clayey Soil - Low Compressibility
Silty Soil - Highly Compressible
Silty Soil - Low Compressibility
Silty or Clayey Gravel and Sand
Fine Sand
Gravel and Sand
>50
25-50
11-24
5-10
<5
>60
31-60
16-30
9-15
5-8
2-4
<2
<250
250-500
>4000
500-1000
1000-2000
2000-4000
IN P.S.F.
ROCK
DESCRIPTION
CONSISTENCY
UNDRAINED
SHEAR STRENGTH
Very Poor
Poor
Fair
Good
Excellent
Soft
Very Soft
Med. Stiff
Stiff
Hard
Very Stiff
COMMONLY USED SYMBOLS
Water Elevation
Standard Penetration Boring
Auger Boring
Rod Sounding
Sample
Standard Penetration Test
Blow Count Per Foot For:
2" O. D. Sampler
1 �" I. D. Sampler
Hammer Weight Of 140 Lbs.
Hammer Fall Of 30"
Field Vane Shear Test
S
N
Can Not Penetrate Further
No Ledge To Depth
Ledge
No Recovery
Percent Recovery
Recovery
Rock Quality Designation
California Bearing Ratio
NP
PI
PL
LL
M
NX
BX
AX
HSA
WA
MD
DC
B
Wash Ahead
Mud Drill
Diamond Core
Blast
Core Size 1 �"
Hollow Stem Auger
Core Size 2 �"
Core Size 1 �"
Plastic Limit
Liquid Limit
Non Plastic
Plasticity Index
Sat
W
MTW
M
D
Saturated
Wet
Moist To Wet
Moist
Dry
Double Tube Core Barrel Used
US
VS
Undisturbed Soil Sample
Bo
Gr
Sa
Si
Cl
HP
Le
NLTD
CNPF
TLOB
Boulder
Gravel
Sand
Silt
Clay
Hardpan
NR
Rec.
%Rec.
RQD
CBR
< Less Than
> Greater Than
R.Q.D. (%)
>90
76 to 90
51 to 75
25 to 50
<25
R Refusal (N 100)>
or
lt
gn
gry
dk
brn
bl
blk
Moisture Content (Dry Wgt. Basis)
VTSPG NAD83 - See Note 7
Top of Ledge Or Boulder
C. BURRALL
M. LONGSTREET
C. COTA
N
VT S
TAT
E
PL
AN
E
GRID
False No
rthing
: 0.000
0False Ea
sting: 1
640416.66
67
Origin La
titude: 42
°30’00
.0000"
N
Centra
l Meri
dian: 7
2°30’0
0.0000
"WUS S
urvey
Foot
Transv
erse M
ercato
rNA
D83
Vermon
t State
Plane
sVT
83
BORING CHART
NO.
HOLE STATION NORTHING EASTINGOFFSET
B-101
B-102
B-103
6.42 LT 714241.58 1571864.66
9.39 LT
14.94 RTB-104
13.67 RT
TEMP BRIDGE
CL
B-102
B-103
B-104
B-101
13+30.96
13+43.33
13+77.93
13+94.57
714218.59 1571870.08
714230.76 1571909.92
714203.02 1571919.99
12+00
13+00 14+00
15+00
MILLER
BR
OOK
FL
OW
(NEBRASKA VALLEY ROAD)
TH-43
(F
AL
LS
BR
OO
K
LA
NE)
TH-45
(S
UG
AR
BU
SH
LA
NE)
TH-47
C. COTA
8 13
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+50
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+50
730
740
750
760
770
780
790
800
STA.11+00 TO STA.12+50
F.G. = 754.42
F.G. = 753.50
F.G. = 752.75
F.G. = 752.44
-0.020 0.007
-0.032 0.032
-0.0580.058
-0.0600.060
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
TH43 CROSS SECTIONS 1
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
MATCH TH45
C. COTA
9 13
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+60
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+20
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+50
730
740
750
760
770
780
790
800
STA.12+60 TO STA.13+50
F.G. = 752.44
F.G. = 752.59
F.G. = 752.78
F.G. = 753.16
-0.0600.060
-0.0600.060
-0.0600.060
-0.0600.060
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
TH43 CROSS SECTIONS 2
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
MATCH TH45
C. COTA
10 13
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+50
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+75
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+00
730
740
750
760
770
780
790
800
STA.14+00 TO STA.15+00
F.G. = 753.82
F.G. = 754.80
F.G. = 755.48
F.G. = 756.28
-0.051 0.051
-0.018 0.018
-0.002 0.002
0.014 -0.014
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
TH43 CROSS SECTIONS 3
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
C. COTA
11 13
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+50
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+75
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
16+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
16+50
730
740
750
760
770
780
790
800
STA.15+50 TO STA.16+50
F.G. = 758.16
F.G. = 759.13
F.G. = 760.12
F.G. = 762.37
0.036 -0.036
0.036 -0.036
0.036 -0.036
0.036 -0.036
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
TH43 CROSS SECTIONS 4
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
C. COTA
12 13
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+15
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+20
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+30
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+40
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+50
730
740
750
760
770
780
790
800
STA.10+00 TO STA.10+50
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
CHANNEL CROSS SECTIONS 1
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
C. COTA
13 13
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+60
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+70
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+80
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
10+90
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
11+00
730
740
750
760
770
780
790
800
730
740
750
760
770
780
790
800
0 10 20 30 40-10-20-30-40
11+25
730
740
750
760
770
780
790
800
STA.10+60 TO STA.11+25
STOWE
BO 1446(39)
12j658/s12j658xs.dgn
CHANNEL CROSS SECTIONS 2
M. LONGSTREET C. BURRALL
M. LONGSTREET
22-FEB-2021
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF