Proposed School Construction Bond Referendum
Preparing Our Graduates for the World that Awaits Them
What is the Bond’s Purpose?Address GrowthWe need new schools and additional classrooms to provide a seat for every child
Renovate FacilitiesMajor renovations are urgently needed to maintain safe, healthy learning environments for students and staff
Increase Academic Opportunities We need to increase access and opportunity for all students, particularly middle and high school students
Preparing Our Graduates for the World that Awaits Them
We All Benefit from Good Public Schools
Good schools:• Spur economic growth by attracting and
retaining businesses
• Strengthen communities – people who graduate from high school earn more and spend more
• Strengthen housing values by improving the tax base and the local economy
• Develop the community leaders of tomorrow
Preparing Our Graduates for the World that Awaits Them
Bond Referendum Actions• Beginning in 2012 BoE and BoCC toured schools• BoE directed staff to conduct facility studies
(Penderlea; other needs) and growth study• June: BoE presented $67 million bond proposal;
BoCC requested increase to maintain Penderlea as K-8; BoE revised bond proposal to $75 million
• July: BoCC approved maximum $75 million bond proposal and requested community input; BoE held three community meetings
• August: BoCC – two meetings; approved bond referendum August 18
Preparing Our Graduates for the World that Awaits Them
EVERY Region Requires Attention
Northern Region:Three Renovations and Additions
Southern Region:Three Renovations and Additions
Eastern Region:Two New Schools
Preparing Our Graduates for the World that Awaits Them
Address Growth
Annual Growth
20th Day ADM
8859 (9102 w/PK)
80278156
8261
8442
8691
8000
8200
8400
8600
8800
9000
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Estimated
Preparing Our Graduates for the World that Awaits Them
Address Growth
East• TMS – 126%
• NTES – 119%
• STES – 111%
• TES – 104%
South• CFMS – 112%
• RPES – 108%
• CFES – 98%
At the end of the 2013-14 school year, seven schools were already at or above capacity
due to high population growth
Preparing Our Graduates for the World that Awaits Them
Anticipated Growth in Southern and Eastern Areas of Pender County
• Annual projected growth – at least:–2750 students over the next 10 years–275 additional students per year (on average)
• Numbers may be even larger– Study was based only on subdivisions in
process–Additional major subdivisions are planned–New wastewater capacity will increase
development
Preparing Our Graduates for the World that Awaits Them
Eastern Region
Two New Schools
Project Cost
Elementary School$35,000,000
Middle School
Preparing Our Graduates for the World that Awaits Them
Eastern Region: Surf City / North Topsail
• Two schools:
– K-5 approximately 600 students
– 6-8 approximately 600 students
• Cost savings through shared common areas
• Alleviate overcrowding at all elementary schools in that region
• Alleviate overcrowding at the only middle school in that region
Preparing Our Graduates for the World that Awaits Them
Northern Region
Three Renovations/Additions
Location Project Cost
Penderlea K-8 $21,500,000
Burgaw Middle $3,000,000
Pender High $6,000,000
Preparing Our Graduates for the World that Awaits Them
Penderlea Facility Study• Structural problems
• Modifications to meet building codes
• Not ADA compliant
• Air quality challenges
• Does not meet NC Public School Facility Guidelines (instruction)
• SAFETY concerns
Preparing Our Graduates for the World that Awaits Them
Northern Region: Penderlea
• Construct new 48,000 sq. ft. building (est.)
• Renovate existing facility–All existing buildings, including cafeteria floor,
gym floor, lowering classroom floors, auditorium
• Design capacity 600-650 students
Preparing Our Graduates for the World that Awaits Them
Northern Region: Burgaw Middle• New 10,000 sq. ft. addition to include science
classrooms and band classroom
• Renovate building entrance
• Renovate existing band room to create auxiliary building
Preparing Our Graduates for the World that Awaits Them
Northern Region: Pender High School• Main entrance (safety concerns)• Exterior building walls and old windows
(energy)• Covered walkways to to
adjacent buildings• Safe commons area• Support staff
offices, including counselors • New restroom / field house facility
Preparing Our Graduates for the World that Awaits Them
Southern Region
Three Renovations/Additions
Location Project Cost
West Pender Middle $2,500,000
Cape Fear Elementary$7,000,000
Cape Fear Middle
Preparing Our Graduates for the World that Awaits Them
• Additional classrooms, including science labs
• Building entrance
• New doors and locks; enclosed walkways
Southern Region: West Pender Middle
Preparing Our Graduates for the World that Awaits Them
Southern Region: Cape Fear Elementary & Middle
• Alleviate overcrowding
• 16 classrooms (27,136 sq. ft.)
– 8 Elementary and 8 Middle School classrooms
• Cafeteria space to accommodate additional students
• Increase capacity to 1400 students
Preparing Our Graduates for the World that Awaits Them
Considerations and Assumptions• This bond is for school construction only
• Cost per square foot is increasing monthly
• Projects include computer infrastructure, traffic improvements, furniture, potential rising construction costs, etc.
• Savings of approximately $3 million due to internal project management
• The bond can be no more than $75 million, but it can be less
Summary: Bond Proposal
Project Project CostSurf City / Topsail Elementary
$35,000,000Surf City / Topsail MiddlePenderlea $21,500,000Burgaw Middle $3,000,000Pender High $6,000,000West Pender Middle $2,500,000Cape Fear Elementary
$7,000,000Cape Fear MiddleTotal (school construction only) $75 million
Preparing Our Graduates for the World that Awaits Them
Total Projected Costs
Estimated maximum cost of
8.4¢ per $100
Additional $84 annually on property valued at $100,000
or $7 monthly This is less than
25¢ per day
Preparing Our Graduates for the World that Awaits Them
Preparing Our Graduates for the World that Awaits Them
The Bond’s PurposeAddress GrowthWe need new schools and additional classrooms to provide a seat for every child
Renovate FacilitiesMajor renovations are urgently needed to maintain safe, healthy learning environments for students and staff
Increase Academic Opportunities We need to increase access and opportunity for all students, particularly middle and high school students